Loading...
HomeMy WebLinkAboutChange Order 4 Mill Creek Pump Station Replacement CHANGE ORDER • EXTRA WORK AGREEMENT NO.4 JOB NO. 08161 Project Name: Mill Creek Pump Station Replacement Owner: Jeffersonville Sewer Board Contractor: Mac Construction & Excavating General Contract Additions Relocate Electrical Junction Boxes off of Top Slab (Lump Sum) 52,038.00 Additional Chain Unk Fence (130 LF @ $33 /LF) $4,290.00 Add Hatch on Top Slab (Lump Sum) 56,1.26.31 Additional Rock Encountered (148.2 CY @ 5115 /CY) 517,043.00 Subtotal 529,497.31 General Contract Deductions Unsatisfactory Soil Excavation (Entire Quantity Unused) 520,000.00 48" Pipe (Deduct 16.5 LF @ $500 /LF) 58,250.00 36' Pipe (Deduct 4 LF @ $700 /LF) 52,800.00 Silt Fence (Deduct 121 LF @ $5.50 /LF) 5665.50 2" PVC Water Main (Deduct 140 LF @ $17 /LF) 52,380.00 2 " Gate Valve & Box (Lump Sum) $250.00 Tapping Sleeve Including Watermain Connection (Lump Sum) 53,1100.00 Inlet Protection (Deduct 1 Ea. @ $150/Ea4 $150.00 Use of Jetted Bank Run Sand In Place of Flowable Fill for (Lump Sum) 55,000.00 $42,495.50 Decrease al the amount of Twelve Thousand Nine Hundred and Ninety-Eight [Oilers and Nineteen Cents ($12,998.19) Consulting Engineer: Jacobi, Toombs & Lanz, Inc. E sSignature Date Eil Owner's Approval: Jeffersonville Sewer Bo fl Signature of Owner( Date Contractor's Approval: Mac Construction & Excavating --//��//���� ���� ln r //� /'ti / (Zi* /v -4 -// AuthOffIttliteputsrmjatlye Signature Date