HomeMy WebLinkAboutChange Order 4 Mill Creek Pump Station Replacement CHANGE ORDER • EXTRA WORK AGREEMENT NO.4 JOB NO. 08161
Project Name: Mill Creek Pump Station Replacement
Owner: Jeffersonville Sewer Board
Contractor: Mac Construction & Excavating
General Contract Additions
Relocate Electrical Junction Boxes off of Top Slab (Lump Sum) 52,038.00
Additional Chain Unk Fence (130 LF @ $33 /LF) $4,290.00
Add Hatch on Top Slab (Lump Sum)
56,1.26.31
Additional Rock Encountered (148.2 CY @ 5115 /CY) 517,043.00
Subtotal 529,497.31
General Contract Deductions
Unsatisfactory Soil Excavation (Entire Quantity Unused) 520,000.00
48" Pipe (Deduct 16.5 LF @ $500 /LF) 58,250.00
36' Pipe (Deduct 4 LF @ $700 /LF) 52,800.00
Silt Fence (Deduct 121 LF @ $5.50 /LF) 5665.50
2" PVC Water Main (Deduct 140 LF @ $17 /LF) 52,380.00
2 " Gate Valve & Box (Lump Sum) $250.00
Tapping Sleeve Including Watermain Connection (Lump Sum) 53,1100.00
Inlet Protection (Deduct 1 Ea. @ $150/Ea4 $150.00
Use of Jetted Bank Run Sand In Place of Flowable Fill for (Lump Sum) 55,000.00
$42,495.50
Decrease al the amount of Twelve Thousand Nine Hundred and Ninety-Eight [Oilers and Nineteen Cents ($12,998.19)
Consulting Engineer: Jacobi, Toombs & Lanz, Inc.
E sSignature Date
Eil Owner's Approval: Jeffersonville Sewer Bo
fl
Signature of Owner( Date
Contractor's Approval: Mac Construction & Excavating --//��//���� ���� ln
r //� /'ti / (Zi* /v -4 -//
AuthOffIttliteputsrmjatlye Signature Date