Loading...
HomeMy WebLinkAboutChange Order 3 8th Street Combined Sewere Separation CHANGE ORDER - EXTRA WORK AGREEMENT NO. 3 JOB NO. 10108 Project Name 8th Street Combined Sewer Separation Contractor TSI Paring You are hereby authorized to proceed with the following described change or extra work: As per attached documentation: 1. 83 LF of 12" Dia. RCP Storm Sewer Q 154 /LF Installed = $ 4,482.00 2. 1 Catch Basin Type D @ $1200/EA Installed = $ 1,200.00 3. 10 SY Type 13 Curb Ramp @ $75 /SY Installed = $ 75000 4. 27 SY Concrete Sidewalk Removal and Replacement «4 $38 /SY Installed = $ 1,026.00 5. 83 LF of Combined Concrete Curb and Outlet Qa $14 /LF Installed = $ 1,162.00 TOTAL = $ 8,620.00 The method of payment for This change tit earn work shall be: An additional amount of eight thousand six hundred twenty dollars = $8,620.00 Consulting Engineer: Jacobi, Toombs and Lanz, Inc. Engineer's Si:. attire 1111 Date Owners Approval: Ci • /c9erson i � // /fit /0/11 6 :1 ... , c of Gamer( O Contractor's App vat: TS/ n Authorized kepcien i� + / '1 ill /v ^ � ate • Page 1 of 1