HomeMy WebLinkAbout2011-R-23 RESOLUTION NO. 201I -R- 23
A RESOLUTION OF THE JEFFERSONVILLE COMMON COUNCIL TO
SUPPORT EFFORTS TO IMMEDIATELY COMMENCE WORK UPON THE
EAST END BRIDGE AND TO COOPERATE WITH STATE, FEDERAL, AND
OTHER LOCAL AUTHORITIES TO ARRANGE THE FUNDING AND
COMMENCEMENT OF THE BRIDGE PROJECT
WHEREAS, the Sherman Minton Bridge was closed indefinitely as of Friday,
September 9, 2011, due to concerns about the structural integrity of the bridge, which
spans the Ohio River; and
WHEREAS, the Sherman Minton Bridge carries Interstate 64 across the Ohio River,
and, until its closing, was one of the three (3) bridges that currently allow travel between
Southern Indiana and Louisville Kentucky;
WHEREAS, the City of Jeffersonville, Indiana, is vitally and inextricably connected to
the Louisville Metropolitan Area, and much of the area's commerce, employment,
recreation, and culture depends upon readily available automobile transit across the Ohio
River,
WHEREAS, the closure of the Sherman Minton Bridge has drastically increased the
volume of traffic and congestion on the George Rogers Clark Memorial Bridge (the
Second Street Bridge) and the John F. Kennedy Memorial Bridge, the two remaining
spans which connect Southern Indiana and the Louisville Metropolitan Area, both of
which are located within the City of Jeffersonville, Indiana;
WHEREAS, the dramatic increase in the volume and congestion of traffic upon the
Jeffersonville Bridges and the Jeffersonville roadways approaching the bridges has
resulted in a myriad of economic costs, including, but not limited to, the following:
additional working hours and employment costs for Jeffersonville Police, Fire, and other
emergency responders; accelerated depreciation upon vehicles and equipment utilized by
such emergency responders; increased wear and damage to the infrastructure of the City
of Jeffersonville; lengthened commute times; decreased interaction between
Jeffersonville and the Louisville Metropolitan Area; decreased patronage of
Jeffersonville retail, dining, and other service establishments; increased fuel costs to the
citizens of the City of Jeffersonville.
WHEREAS, in addition to the above - mentioned costs, the long -term closing of the
Sherman Minton Bridge will deter the growth of industrial, commercial, and residential
developments in Jeffersonville, Indiana;
WHEREAS, the far - reaching costs of the closure of the Sherman Minton Bridge upon
the City of Jeffersonville, as well as its citizens and businesses, are impossible to
calculate with any degree of accuracy, but can be reasonably expected to have a cost of
many millions of dollars;
WHEREAS, that the closure of the Sherman Minton Bridge, and the resulting increase
in volume and congestion upon the remaining bridges, will also have significant
deleterious effect upon interstate commerce, not only between Indiana and Kentucky, but
also upon the commerce of those numerous States which rely upon transit along
Interstates 1- 65,1 -64, and 1 -71;
WHEREAS, Interstates 1-65,1-64, and 1 -71 connect numerous and diverse metropolitan
areas, including, but not limited to, Indianapolis, Indiana, Chicago, Illinois, Nashville,
Tennessee, Atlanta, Georgia, St. Louis, Missouri, and Cincinnati, Ohio, and the increased
congestion of traffic at the conjunction of these Interstates will have a negative effect
upon the commerce and transit between these and many other metropolitan areas;
WHEREAS, the far - reaching effects of the closure of the Sherman Minton Bridge
require immediate action on the State, local and federal levels in order to alleviate the
increased volume and congestion of traffic crossing the Ohio River between Southem
Indiana and the Louisville Metropolitan Area;
WHEREAS, the construction of the East End Bridge, connecting Southeastem Clark
County, Indiana and Eastern Jefferson County Kentucky, currently proposed as an aspect
of the Ohio River Bridges Project of Kentucky and Indiana, would significantly alleviate
the increased volume and congestion of the George Rogers Clark Memorial Bridge (the
Second Street Bridge) and the John F. Kennedy Memorial Bridge;
WHEREAS, construction of the East End Bridge would accommodate greater travel
between Southern Indiana and the Louisville Metropolitan Area, and would improve
commerce between the State of Indiana and the Commonwealth of Kentucky, as well as
commerce with those numerous States that rely upon Interstates 1 -65, 1-64, and 1 -71 for
transit and the transportation of goods;
WHEREAS, the Common Council for the City of Jeffersonville has previously adopted
Resolution 2010 -R -33, in which the Council expressed disapproval for any plan to
finance new bridge construction by placing tolls upon already existing Ohio River
Bridges or Interstate connectors thereto;
WHEREAS, the indefinite closure of the Sherman Minton Bridge represents an
emergency on a local, State, and national level requiring that those entities concerned
immediately cooperate to fund the commencement of the East End Bridge;
WHEREAS, the present emergency notwithstanding, the logic and fairness of the
Council's previously stated disapproval of such tolls upon already existing Ohio River
Bridges or Interstate connectors thereto continue to be apparent to the Council;
NOW, THEREFORE, BE IT RESOLVED that the Common Council of the City of
Jeffersonville, Indiana, hereby resolves to cooperate with all interested State, local, and
federal authorities affected by transit across the Ohio River to commence and fund the
construction of the East End Bridge;
IT IS FURTHER RESOLVED that the Council authorizes the delivery of the present
resolution to the representatives of all such State, local, and federal authorities, and that
the delivery of this resolution of the Council be accompanied by correspondence
communicating the importance of funding and commencing the East End Bridge project
and the urgency with which it must be commenced;
IT IS FURTHER RESOLVED that the Council continues to disapprove of the
institution of any tolls upon existing bridges and /or Interstate connectors thereto for the
purpose of funding the East End Bridge project, the urgency of the, project
notwithstanding; /r�
Passed and adopted this 3 day of l lc'>`.nbe. f , 2011.
ATTEST:
Ad/ A t ip pl///
omas R. Galli I.: Peggy er
Presiding Officer / Clerk- Treasurer
Presented by me as Clerk and Treasurer to the Mayor of said City of Jeffersonville this
ha' day of WAro ss%) ,2011.
Pec ilder
Clerk- Treasurer
Approv . and signed by me this 7 day of 0 r , 2011.
!/ /
omas R. Galli _ an, or