HomeMy WebLinkAboutChange Form #1 10th St PS Expansion WORK DIRECTIVE CHANGE FORM TO: PACE CONTRACTING WORK DIRECTIVE CHANGE NO. 1 DATE: 8/3/11 PROJECT NAME 10Th ST. PS EXPANSION PROJECT NO: 423098 Specification Reference: 007215 GC 114 00 73 14 Supplem r Conditions paragraph SC 13 Drawing Reference: NA DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE: Substantial Completion deadline shall be extended 22 calendar days from May 16, 2012 to June 7, 2012. Final completion date shall not be extended (remains at July 30, 2012. Pump station shall have minimum 35 mgd capacity by May 24, 2012. City shall not direct means and methods for how to achieve the scheduled deadlines. No overtime or fast track costs shall be paid. REASON FOR THIS ORDER: Vectren gas line relocation was anticipated to be complete in April 2011 as per Specification Section 0073 14 Supplementary Conditions, paragraph SC -13. However, actual gas line relocation was not completed until June 2, 2011, causing excavation activities to be delayed. Contractor schedule indicated a start date for driving H -beam piling of May 9, 2011. However, Contractor did not start driving piling until May 31, 2011 due to the concern over the active gas line onsite. This represents a delay of 22 calendar days. See attached letter from Pace dated 8/2/11. AUTHORIZATION: THIS WORK DIRECTIVE CHANCE AUTHORIZES THE WORK TO BE COMPLETED AS OUTLINED. A Contract Change Order in the amount of $ 0.00 will be issued to you in the near future to cover this WORK DIRECTIVE CHANGE. PROJECT COMPLETION DATE: 0i /DEDUCT/UNCHANGED 22 r'AI.ENDAR DAYS TO SUBST • 0, COMLETIOND' ILINEONLY n By: e BY: ' t,.,,. f(a¢a Proj � c •n Engineer) entP •ject Representative BY E B �� V / Prolger (Contr- or) • dministrator (• 7 Ref tative) Jeffersonville, Indiana Additional Forms Supplemental to Agreement Form Tenth Street Pump Station Expansion 00 52 25