Loading...
HomeMy WebLinkAbout02-01-2011 Change Order Seventh and Indiana Partial Sewer Separation CHANGE ORDEIL- EXTRA WORK AGREEMENT NO. 2 - JOB NO. 0699C _ Project Name Seventh and Indiana Partial Sewer Separation _ Contractor TS1 Paving l Yon are hereby authorized to pmeeed with the following desccbed change or extra work: As per attached documentation: 1. Add 90 TT of 12" Perforated Pipe a $24.00/LI _ $ 9„160.00 2. Core Existing Catch Basin (No. 13) a $362.50/LS = $ 362.50 3. Core Drywall {a} $290.00/LS - $ 290.00 4. Raise Drywell Rim with 18" Ring = $ 1,000.00 ADD = $ 3,812.50 The method of payment for this change or extra work shall be An additional amount of three- thousand eight hundred and twelve dollars and fifty cents = $3,812.50 Consulting Engineer: ac Tnornlrs and Lanz, Inc. F. g ' Dat Owners Approval: 9Jeferson,/ r ,// ` �% 2163 Si is rc •f awucr s D tc Contractor's Approval: '' P ving ` r ��� Authorized Repre ' • a ' di Titte t o i r, • c:Aa,rasoUAafar, a Page 1 of 1