Loading...
HomeMy WebLinkAbout10-19-10 Change Order Winn Dixie Ditch Storm Drain • CHANGE ORDER - EXTRA WORK AGREEMENT NO. 3 JOB NO. 0689R Project Name Winn Dixie Ditch Storm Drain Rehabilidation Contractor Clark Nickles, Inc. You are hereby authorized to proceed with the following described change or extra work: As per attached documentation: 1. Add one (1) 15" Headwall (a) $1,008.00 /EA = $ 1,008.00 2. Add three (3) 18" Headwall a $1,060.00 /EA = $ 3,180.00 2. Regrade Ditch East of Station 38 +21 $3,520.00 /LS = $ 3,520.00 3. Credit for sod (aa $5,000.00 /LS = $ (5,000.00) 4. Delete 12' of 18" HP PP ® $118.80/LS = $ (118.80) 2. Delete Dud Headwall a $1,745.00/LS = $ (1,745.00) 3. Delete INDOT Stone 1473 (aa $1,435.46/LS = $ (1,435.46) 4. Add 4 Bar Saeens at Headwalls a $560.00 /EA = $ 2,240.00 ADD = $ 1,648.74 The method of payment for this change or extra work shall be: An additional amount of one thousand six hundred and forty -eight dollars and seventy -four cents = $1,648.74 Consul ' g Engineer. Jacobi, Toombs and Lanz, Inc. 6 071 q/( Engineer's Signature Date Owners Approval: Cry of cffysonvile fYLc�.P t Pre. AYn;n� c e t2l ore, l 6 "/ /D Signature of�er(s Date Car Ni s, Inc. rr / ,.P 1 10 " I 1 !O Authorized Repre I n ive Tide t)atc CAuooNllINYYR Own eeda.xaa Page 1 of 1 1,0/05/201B 11:17 812256507 CLARK NICFLES PAGE 01/82 1601 Tunnel MID Road Charlestown, IN 47111 (612) 256-3477 phone (612) 256.6074 fax COMMERCIAL EXCAVATION + DEMOLITION • CRANE & HEAVY EQUIPMENT RENTAL ' BONDED & FULLY INSURED • Licensee D5MOLRION CONTRACTORS IN INDIANA & KENTUCKY October 1, 2010 Aaron Sutherland Jacobi, Toombs, and Lanz 120 Bell Avenue Clarksville, IN 47129 Via Fax — (812) 288 -6656 RE: Winn Dixie Ditch Storm Project / Job No. 0689R Jeffersonville, Indiana Request for Change Order - REVISED Dear Mr. Sutherland: Clark Nickles, Inc. proposes to furnish labor, equipment, materials, and supervision to complete the following work. ADDITIONAL WORK One (I) 15" Headwall @ $1,008.00 ea. - S1,008.00 Three (3) 18" Headwall @ $1,060.00 ea. _ $3,180.00 Regrade Ditch East of Sation 38 +21 16 Hrs. Trackhoe @ $ 160.00 = $ 2,560.00 8 Hrs. Dozer @ $ 120.00 - $ 960.00 Total Add $ 7,708.00 CREDIT Line Item #4 Sod — - $5,000.00 Line Item #8 12' of 18" HP PP = - $ 118.80 Line Item #27 Headwall = - $1,745.00 Line Item #29 INDOT #73 — - $1.435.46 Total Credit $8,299.26 //� Net Credit $ 591.26 lark Nickles {{{� /(((///./ ) • 1501 Tunnel Mill Road Charlestown, IN 47111 - (812) 2563477 phone • , � > (812) 256 -6074 fax Yal } 'bo € y -. 0 a � At!W it S 7."- E i �i ? ..:.vts•'£ E COMMERCIAL EXCAVATION • DEMOLITION < CRANES HEAVY EQUIPMENT RENTAL `yi.:a�'�+"'�S ` .4 : 4 • BONDED & FULLY INSURED • LICENSED DEMOLITION CONTRACTORS IN INDIANA & KENTUCKY October 4, 2010 Aaron Sutherland Jacobi, Toombs, and Lanz 120 Bell Avenue Clarksville, IN 47129 Via Fax — (812) 288 -6656 RE: Winn Dixie Ditch Storm Project / Job No. 0689R Jeffersonville, Indiana Request for Change Order — Safety Gates - REVISED Dear Mr. Sutherland: Clark Nickles, Inc. proposes to furnish labor, equipment, materials, and supervision to complete the following work. ADDITIONAL WORK Install four (4) safety gates for end of pipe. 1 V2" pipe stock 8" on center, anchor and pad lock down to concrete at headwall with hinges on top. For the Lump Sumo $2,240.00 /Clark Nickles