HomeMy WebLinkAboutWilson School ImprovementsWILSON SCHOOL ROAD IMPROVEMENTS
JEFFERSONVILLE BOARD OF PUBLIC WORKS & SAFETY
JEFFERSONVILLE, INDIANA
PROFESSIONAL ENGINEERING SERVICES AGREEMENT
This is an agreement made as of this ~ 9 day of ~-i'u ~ ~ ~" , 2009, between the
City of Jeffersonville, Indiana, acting thru its duly appointed Board of Public Works and
Safety (CLIENT) and Jacobi, Toombs, and Lanz, Inc. (JTL), a firm of Professional Engineers,
Surveyors and GIS Specialists.
CLIENT hereby retains JTL to perform services as described in Attachment A. JTL agrees to
perform the services in consideration of the compensation described in Attachment B and in
accordance with the Professional Engineering Services described in Attachment A and in
accordance with the terms described in Attachment C.
This Agreement consists of this document together with Attachment A -Project Description and
Proposed Engineering Services, Attachment B -Fee Schedule, Attachment C -Hourly Billing Rates
and Attachment D -Terms and Conditions. This agreement between the CLIENT and JTL
supercedes all prior written and oral understandings. This agreement may only be amended,
supplemented, modified or canceled by a duly executed written instrument.
In executing this Agreement, the undersigned also acknowledge their authority to bind the parties to
all terms and conditions.
In witness whereof, the parties hereto have made and executed this Agreement as of the day and
year first written.
CLIENT.•
Jeffersonville Board of Public Works and
Safety
Jeffersonville, Indiana
500 Quartermaster Court
Jeffersonville, Indiana 47130
By: 5
ayor Thomas R. Ga ~ ,President
R b L. Miller, Member ~%
Barbara L. Wilson, Member
CONSULTAIVT.•
Jacobi, Toombs and Lanz, Inc.
Consulting Engineers
120 Bell ~?
Clarksville
By:
Witness:
S:\SYDNEY\WPDOGS\US\0872\ENG[NEERINGAGREEMENT.DOCX Page 1 Of 1
ey Finney, Adm. Asst.
Attachment A:
Project Description and Proposed Engineering Services
1. Project Description
The purpose of this project is to design a new street to connect Jeffersonville-Charlestown Pike to
New Albany-Charlestown Pike along the Southwesterly portion of Wilson Elementary School. The
project length in approx. 1,200 feet, and will consist of a two-lane road flanked by curb and gutters,
and sidewalks. Turning lanes will be included at the intersection of both Pikes as required.
A traffic study will be completed to evaluate the effects of closing access from Jeffersonville-
Charlestown Pike to Holmans Lane by installing a cul-de-sac. Also, a warrant study will be
completed to determine if a traffic signal is required at the intersection of New Albany-Charlestown
Pike. If this signal is required, signal design will be provided.
2. Scope of Engineering Services
The Consultant shall provide the following:
I. Survey and Design
1. Topographic Survey of improvement route.
2. Design, preparation of plans, specifications, contract documents.
3. Preparation of any Easement plats and descriptions that may be
necessary for the project.
4. Coordination with the Client, and State agencies, including
preparation and submittal of any permit applications that may be
required.
5. Utility relocation coordination
6. Assist the Owner in bidding the work, analyze Contractor bids
received, and make award recommendation.
7. Provide and manage the Geotechnical Investigation as required.
8. Provide Traffic Analysis of corridor to assess the beneficial or
negative effects of closing Jeffersonville-Charlestown Pike at
Holmans Lane by installing a cul-de-sac.
9. Provide traffic signal criteria study (warrant analysis) for signal at
New Albany-Charlestown Pike and Wilson School Road.
10. If signal is warranted, provide design, plans and specifications.
5:l5ydnEyiL"Jr DCiCSt=s,+';Q3.2ienaneerirgas,r~ar.~ent.docx
Professions( Seruices Agreemenf
II. Construction Observation
1. The construction inspector required to ascertain that the project is
constructed in accordance with the contract documents will be
provided by the CLIENT.
2. Review shop drawings submitted by the Contractor, Contractor
payment requests.
3. Address Contractors questions, work out problems that may arise.
4. Report to the Client on a monthly basis.
5. Preparation and negotiation of change orders.
3. Project Schedule
Survey and Design Services shall commence upon receipt of a signed contract and notice-to-
proceed, and shall be completed within one hundred twenty (120) calendar days.
Construction Observation Services shall be provided during construction, tentatively scheduled to
commence spring 2010.
S.;S~dr;eyi`fJPGOCSt~ n;~S'2tAngneerirga;~reer?~art. dccx
Pro#essionaE ~eruices Agreerrient
Professional Services Agreement
Attachment B: Fee Schedule
The Consultant shall receive as payment for the work performed under this agreement the following
fees:
I. Survey and Design
For items I.1 thru I.9, JTL shall be compensated the lump sum fee of forty seven thousand seven
hundred fifty dollars ($47,750.00)
For item I.10, JTL shall be compensated the lump sum fee of five thousand dollars ($5,000.00).
II. Construction Observation
For items II.1 thru II.5, JTL shall be compensated on a Time and Material basis, based on the hourly
billing rates shown in Attachment `C' with an initial Not-To-Exceed budget of thirty thousand
dollars ($30,000.00)
S:?SyUneyiVJPCO'Si^rc,t~u'2teng€n~erirgagr~e^ i~ttY. da.x
i~'rofessiorsa( ~eruices Agree~:nt
ATTACHMENT `C'
JACOBI, TOOMBS AND LANZ, INC.
2008
HOURLY BILLING RATES
January 9, 2008
~' HOURLY
CODE CLASSIFICATION RATE
SE Principal (P.E.) 130.00
PM Project Manager (P.E.) 110.00
SPE Senior Project Engineer (P.E.) 100.00
PE2 Project Engineer II (P.E.) 95.00
PEl Project Engineer I (P.E.) 90.00
DE2 Design Engineer II(P.E.) 85.00
DEl Design Engineer I(P.E.) 80.00
DT Detail Engineer II (E.I.T.) 62.50
DTT Detail Engineer I(E.I.T.) 57.50
EA Engineer Assistant 50.00
EA2 Engineer Assistant (in training) 35.00
CGM CADD/GIS Manager 95.00
CM CADD Manager 65.00
GIS GIS Technician 55.00
CT CADD Technician/Draftsperson 50.00
CD CADD Designer 62.50
SM Survey Manager (P.E./P.L.S.) 95.00
LS Land Surveyor (Licensed) 75.00
SC Survey Chief (Not Registered) 55.00
ST Survey Technician 45.00
SA Surveyor Assistant 35.00
FC2 2-Man Field Crew 100.00
FC3 3-Man Field Crew 140.00
RCM Resident Construction Manager 65.00
RP Resident Construction Representative 57.50
RI Resident Inspector 50.00
ADM Administrative Assistant/ General 57.50
CL Administrative Assistant/ Clerical 40.00
LAS Land Acquisition Specialist 55.00
GPS GPS 50.00
RTS Robotic Total Station Equipment 50.00
EXP Mileage -Per Mile 0.34
Overtime will be charged at 1.25 times the regular billing rate.
~* Serving as an expert witness in legal proceedings will be charged at 2 times the regular billing rate.
These rates may be adjusted on an annual basis as required by economic factors at the
discretion of Jacobi, Toombs ~ Lanz, Inc.
5;?Syc7nc~ytL".ii'GOC:SiC~Fi;C3'tierr;~ireerir:gagreen.~~er~f. dccx
Professinnal Services Agreement
Professional Services Agreement
Attachment D -Terms and Conditions
Services Jacobi, Toombs and Lanz, Inc. (JTL) will
perform services for the Client with these Terms and
Conditions. JTL has developed the Project scope of
service, schedule, and compensation based on
available information and various assumptions. The
Client acknowledges that adjustments to the schedule
and compensation may be necessary based on the
actual circumstances encountered by JTL in
performing their services.
Authorized Representatives The officer assigned to
the Project by JTL is the only authorized
representative to make decisions or commitments on
behalf of JTL. The Client shall designate a
representative with similar authority.
Project Requirements The Client shall confirm the
objectives, requirements, constraints, and criteria for
the Project at its inception. If the Client has
established design standards, they shall be furnished
to JTL at Project inception. JTL will review the Client
design standards and may recommend alternate
standards considering the standard of care provision.
Site Access The Client shall obtain all necessary
approvals for JTL to access the Project site(s).
Period of Service JTL shall perform the services for
the Project in a timely manner consistent with sound
professional practice. JTL will strive to perform its
services according to the Project schedule set forth in
Attachment B. The services of each task shall be
considered complete when deliverables for the task
have been presented to and accepted by the Client.
Compensation In consideration of the services
performed by JTL, the Client shall pay JTL in the
manner set forth in Attachment C. The parties
acknowledge that terms of compensation are based
on an orderly and continuous progress of the Project.
If delays on the project take place, JTL shall notify the
Client's designated agent of the nature and cause of
the delay and any additional costs this may create
both in the Project cost itself and the compensation
due to JTL. The client shall then review the nature
and cause of the delay and additional costs, and the
parties shall separately agree to any extensions of
time or additional compensation to JTL.
Payment Definitions The following definitions shall
apply to methods of payment:
• Salary cost is defined as the individuals base salary
plus customary and statutory benefits. Statutory
benefits shall be as prescribed by law and
customary benefits shall be as established by JTL
employment policy.
• Cost plus is defined as the individuals base salary
plus actual overhead plus professional fees.
Overhead shall include customary and statutory
benefits, administrative expenses, and non-project
operating costs.
• Lump sum is defined as a fixed price amount for the
scope of services described.
S:lBydneyiVJP C(~ C S10F+;U'u'2iengi nseringagreen.~terrt_ docx
• Standard Rates is defined as individual time
multiplied by standard billing rates for that
individual.
• Subcontracted services are defined as Project-
related services provided by other parties to JTL.
• Reimbursable expenses are defined as actual
expenses incurred in connection with the Project.
Payment Terms JTL shall submit monthly invoices
for services performed and Client shall pay the full
invoice amount within 30 days of the invoice date.
Invoices will be considered correct if not questioned in
writing within 10 days of the invoice date. JTL shall be
entitled to a 2% per month administrative charge in
the event of payment delay. Client payment to JTL is
not contingent on arrangement of project financing.
Invoice payment delayed beyond 60 days shall give
JTL the right to stop work until payments are current.
Non-payment beyond 70 days shall be just cause for
termination by JTL.
Additional Services The Client and JTL
acknowledge that additional services may be
necessary for the Project to address issues that may
not be known at Project initiation or that may be
required to address circumstances that were not
foreseen. Other than an emergency, JTL shall notify
the Client through its designated agent, prior to
incurring additional expenses or performing additional
work, of the need for additional services or work that
JTL reasonably believes may be necessary. The
Client shall then review the nature of the additional
services, and the payment for such additional
services. The parties shall separately agree on the
need for additional services and payment for such
additional services.
Independent Consultant JTL shall serve as an
independent consultant for services provided under
this agreement. JTL shall retain control over the
means and methods used in performing their services
and may retain subconsultants to perform certain
services as determined by JTL.
Standard of Care Services provided by JTL will be
performed with the care and skill ordinarily exercised
by members of the same profession practicing under
similar circumstances. JTL will not be liable for the
cost of any omission that adds value to the Project.
Compliance with Laws JTL shall perform its services
consistent with sound professional practice and
endeavor to incorporate laws, regulations, codes, and
standards applicable at the time the work is
performed. In the event that standards of practice or
legal requirements change during the Project, JTL
shall promptly notify the Client through its designated
agent of such changes and any additional costs that
this may create both in the Project cost itself and the
compensation due to JTL. The Client shall then
review the nature and cause of the changes and
additional costs, and the parties shall separately
agree to any changes in the Project or additional
compensation to JTL.
Professional Services Agreement
Permits and Approvals JTL will assist the Client in
preparing applications and supporting documents for
the Client to secure permits and approvals from
agencies having jurisdiction over the Project. The
Client agrees to pay all application and review fees.
Ownership of Documents Documents prepared by
JTL for the Project are instruments of service and
shall remain the property of JTL. Record documents
of service shall be based on the printed copy. JTL will
furnish documents electronically, however, the Client
releases JTL from any liability that may result from
documents used in this form. JTL shall not be held
liable for reuse of documents for any purpose other
than those intended under the Project.
Insurance JTL will maintain the following insurance
and coverage limits during the period of service. The
Client will be named as an additional insured on the
Commercial General Liability and Automobile Liability
policies.
Worker's Compensation $500,000 per Accident and
$500,000 Policy Limit
Commercial General $1,000,000 per occurrence
Liability (bodily injury including death
& property damage)
$2,000,000 aggregate
Automobile Liabilitv $1,000,000 combined single
limit for bodily injury and
property damage
Professional Liabilitv $1,000,000 each claim and
in the aggregate
The Client shall make arrangements for Builder's
Risk, Protective Liability, Pollution Prevention, and
other specific insurance coverage warranted for the
Project in amounts appropriate to the Project value
and risks. JTL shall be a named insured on those
policies where JTL may be at risk. The Client shall
obtain the counsel of others in setting insurance limits
for construction contracts.
Waiver of Subrogation JTL shall endeavor to obtain
a waiver of subrogation against the Client, if
requested in writing by the Client, provided that JTL
will not increase its exposure to risk and the Client will
pay the cost associated with any premium increase or
special fees.
Indemnification JTL shall indemnify the Client from
any reasonable damages caused solely by the
negligent act, error, or omission of JTL in the
performance of services under the Project. If such
damage results in part by the negligence of another
party, JTL shall be liable only to the extent of their
proportional negligence.
Third Party Claims The Client will compensate JTL
for services performed in defense of any third party
claim unless the claim resulted from the negligent act,
error or omission of JTL.
Legal Expense In the event legal action becomes
necessary to enforce the provisions of this
agreement, the prevailing party shall be entitled to
recover the costs of legal action against the opposing
party, including, but not limited to, court costs,
attorney fees, and related legal expenses.
5,;SydneYiL^JPa"a0'SIN~:if~u'2tert~€reerirgagreerE~ of dacx
Lien Rights JTL may file a lien against the Client's
property in the event that the Client does not make
payment within the time prescribed in this agreement.
The Client agrees that services by JTL are considered
property improvements and the Client waives the right
to any legal defense to the contrary.
Consequential Damages Neither the Client nor JTL
shall be liable to the other for any consequential
damages regardless of the nature or fault.
Environmental Matters The Client warrants they
have disclosed all potentially hazardous materials that
may be encountered on the Project. In the event
unknown hazardous materials are encountered, JTL
shall be entitled to additional compensation for
appropriate actions to protect the health and safety of
its personnel, and for additional services required to
comply with applicable laws. JTL and the Client
acknowledge that unforeseen environmental matters
may arise during the course of the Project. The Client
shall notify JTL of any potential environmental matters
of which the Client may be aware, and JTL shall
immediately notify the Client through its designated
agent of any environmental matters of which JTL
becomes aware. The parties shall mutually agree to a
course of action, which shall include termination of the
Project. In the case of an emergency, JTL will take
appropriate action and immediately contact the
Client's designated agent. In the event of an
emergency, JTL will be compensated for actual costs
and for its services based on the billing rates
established in the agreement.
Cost Opinions JTL shall prepare cost opinions for
the Project based on historical information that
represents the judgment of a qualified professional.
The Client and JTL acknowledge that actual costs
may vary from the cost opinions prepared and that
JTL offers no guarantee related to the Project cost.
Independent Counsel The Client agrees to obtain
independent legal and financial counsel for the
Project considering JTL does not furnish these
services.
Contingency Fund The Client acknowledges the
potential for changes in the work during construction
and the Client agrees to include a contingency fund in
the Project budget appropriate to the potential risks
and uncertainties associated with the Project. JTL
may offer advice concerning the value of the
contingency fund; however, JTL shall not be liable for
additional costs that the Client may incur beyond the
contingency fund they select unless such additional
cost results from a negligent act, error, or omission
related to services performed by JTL.
Contractor Selection JTL may make
recommendations concerning award of construction
contracts and products. The Client acknowledges
that the final selection of construction contractors and
products is their sole responsibility.
Shop Drawing Review If included in the scope of
service, JTL shall review shop drawing submittals
from the contractor solely for their conformance with
the design intent of and performance criteria specified
for the Project. JTL shall not be liable for the
performance of or consequential damages of any
Professional Services Agreement
1 '
equipment furnished by the contractor under the
Project.
Construction Review If included in the scope of
service, JTL shall observe the progress and content
of the work to determine if the work is proceeding in
general accordance with the Contract Documents.
This construction review is intended to observe,
document, and report information concerning the
construction process. Observation of work at the
Project site shall not make JTL responsible for the
work performed by another party, the means,
methods, techniques, sequences, or procedures
selected by another party, nor the safety precautions
or programs of another party.
Rejection of Work JTL may recommend that the
Client reject work by construction contractors that
does not conform to the requirements of the Project.
Safety JTL shall be responsible solely for the safety
precautions or programs of its employees and no
other party.
Information from Other Parties The Client and JTL
acknowledge that JTL will rely on information
furnished by other parties in performing its services
under the Project. JTL shall not be liable for any
damages that may be incurred by the Client in the use
of third party information.
Construction Record Drawings If included in the
scope of service, JTL will deliver drawings to the
Client incorporating information furnished by
construction contractors. In that construction record
drawings are based on information provided by
others, JTL cannot and does not warrant their
accuracy.
Force Majeure Neither party will hold the other
responsible for damages or delay caused by acts of
God, acts of war, strikes, accidents, or other events
beyond the other's control.
Dispute Resolution The Client and JTL agree that
they shall diligently pursue resolution of all
disagreements within 45 days of either party's written
notice using a mutually acceptable form of mediated
dispute resolution prior to exercising their rights under
law. JTL shall continue to perform services for the
Project and the Client shall pay for such services
during the dispute resolution process unless the
Client issues a written notice to suspend work.
Suspension of Work The Client may suspend
services performed by JTL with cause upon fourteen
(14) days written notice. JTL shall submit an invoice
for services performed up to the effective date of the
work suspension and the Client shall pay JTL all
outstanding invoices within fourteen (14) days. If the
work suspension exceeds thirty (30) days from the
effective work suspension date, JTL shall be entitled
to renegotiate the Project schedule and the
compensation terms for the Project.
Termination The Client or JTL may terminate
services on the Project upon seven (7) days written
notice in the event of substantial failure by the other
party to fulfill its obligations of the terms hereunder.
JTL shall submit an invoice for services performed up
to the effective date of termination and the Client shall
pay JTL all outstanding invoices within fourteen (14)
S:':Sydney:L^,+PDf7C510rri08'71e?~;~neerirg;~~reerrtent. dotix
days. The Client may withhold an amount for services
that may be in dispute provided that the Client
furnishes a written notice of the basis for their dispute
and that the amount withheld represents a reasonable
value.
Governing Law The terms of agreement shall be
governed by the laws of the state where the services
are performed provided that nothing contained herein
shall be interpreted in such a manner as to render it
unenforceable under the laws of the state in which the
Project resides.
Assignment Neither party shall assign its rights,
interests or obligations under the Project without the
express written consent of the other party.
Waiver of Rights The failure of either party to
enforce any provision of these terms and conditions
shall not constitute a waiver of such provision nor
diminish the right of either party to the remedies of
such provision.
Warranty JTL warrants that they will deliver products
under the Project within the standard of care. JTL
provides no other expressed or implied warranty.
Severability Any provision of these terms later held
to violate any law shall be deemed void and all
remaining provisions shall continue in force. In such
event, the Client and JTL will work in good faith to
replace an invalid provision with one that is valid with
as close to the original meaning as possible.
Survival All provisions of these terms that allocate
responsibility or liability between the Client and JTL
shall survive the completion or termination of services
for the Project.
Professional Seruices Agreement