Loading...
HomeMy WebLinkAbout6-30-09 Change Order - Allison LaneCHANGE ORDER -EXTRA WORK AGREEMENT NO. 2 JOB NO. Project Name: Allison Lane Sidewalk Installation Owner: Jeffersonville Board of Public Works & Safety Contractor: Clark Nickles, Inc. 0779 1. Remove Concrete Driveway at spare parking lot adjacent to Chase Bank for Lump Sum of $1,448.00 $ 1,448.00 2. Increase in Quantity of 6" Concrete Driveway by 76 SYS @ unit price of $41.00 ontract Pay Item No. 8) $ 3,116.00 3. Decrease in Quantity of Curb Ramp, Red by 50 SYS @ unit price of $57.00/SY (Contract Pay Item No. 4) $ -2$50.00 4. Increase in Quantity of 4" Concrete Sidewalk by 50 SYS @ unit price of $37.00/LFT (Contract Pay Item No. 1) $ 1850.00 5. Decrease in Quantity of Curb & Gutter, Concrete by 205 LFT @ unit price of $16.00/LFT (Contract Pay Item No. 2) $ _3280.00 6. Decrease in Quantity of 12" Storm Sewer by 213 LFT @ unit price of $21.00/LFT (Contract Pay Item No. 6) $ -4473.00 7. Increase in Quantity of Compacted Aggregate Base by 11 Tons @ unit price of $18.00/Ton (Contract Pay Item No. 3) $ 198.00 8. Increase in Quantity of Catch Basins by 2 Ea. @ unit price of $1,640/Ea. (Contract Pay Item No. 5) $ 3,280.00 9. Increase in Quantity of 12" Pipe End Sections by 1 Ea. @ unit price of $173.00/Ea. (Contract Pay Item No. 7) $ 173.00 10. Core Catch Basins per drainage revisions for Lump Sum of $300.00 $ 300.00 11. Connect 12" Pipe to Ex. 15" Pipe per drainage revisions for Lump Sum of $475.00 $ 475.00 12. Additional Linear Grading at Meadowlark & Allison Lane for Lump Sum of $250.00 $ 250.00 ls. Decrease in Quantity of Sod by 270 SYS @ unit price of $3.60/SYS $ -972.00 The Method of payment for this Change Order shall be a deduction in the amount of: Fo r Hundred and Ei -Five Dollars and no cents - $ -485.00 Cons ting Engineer: Ja i, T ombs d I,~nz, Inc. ..~- .~ A~ ~ ~ c~ / E ineer's Signature Date Jeffe~hvi~,~o~dof Publicy~Vorks & Safety Sig~tfature of Owner(s) uthorized Representative Inc. -7~~~~1 Date ~~ c~c,~]~ ~~.~ ~~0 9 Title Date