HomeMy WebLinkAboutLogan Lane Sewers4:,-.
Construction
Solutions lLC
November 16, 2008
Jeffersonville Sewer Board
c/o Jacobi Toombs and Lanz
120 Bell Avenue
Clarksville, Indiana 47129
Attention: Mr. Josh Hillman
SUBSURFACE EXPLORATION PROPOSAL
Logans Lane Sewers
Jeffersonville, Indiana
CS Proposal No. 8G-11/16c
Dear Josh:
We are pleased to present this proposal for the subsurface explorations at the referenced site in
Jeffersonville, Indiana. This proposal includes our understanding of the project information, the
proposed scope of services, a fee estimate, and a projected schedule.
PROJECT INFORMATION
Project information was provided by you in an electronic transmittal dated November 14, 2008.
You indicated that the city of Jeffersonville intended to install sewers along Logans Lane, off
Woodland Court, in Jeffersonville, Indiana. Your information included a sanitary sewer plan.
You requested a proposal to advance two rock soundings along the existing roadway and one soil
test boring in an undeveloped future development area to evaluate soil support conditions and
depths to rock. Boring and sounding locations were provided by you.
SCOPE OF WORK
It is our intent to conduct a subsurface exploration in order to obtain information about subgrade
support conditions and depth to rock along Logans Lane in Jeffersonville, Indiana. This
exploration is not designed to produce information concerning contamination or other
environmental conditions.
Boring and sounding locations were designated by your engineers and will be located in the field
using standard taping procedures and available fixed structures. No surveying equipment will be
utilized in this exploration. It is assumed that Jeffersonville representatives have agreed to
borings located in the roads, and appropriate representatives will be present to locate sewer and
water connections after the borings are located.
At the time of the exploration, atruck-mounted drill rig will be mobilized to the project site.
(Weather conditions may delay mobilization during periods of prolonged precipitation). The
332 East Chestnut Street Jeffersonville, Indiana 47130 (812) 725-7580 fax (812) 725-7584
Logans Lane Sewers
Jeffersonville, Indiana
November 16, 2008
drill rig apparatus will be used to advance a total of five borings and twenty six rock soundings
along the roadway.
One boring will be advanced to a depth of 24 feet; one sounding will be advanced to 5 feet; and
one sounding will be advanced to 7 feet. In the borings, standard penetration testing will be
performed at depths of 1.5 feet, 4.0 feet, 6.5 feet, 9.0 feet, 13.5 feet, 18.5 feet and 23.5 feet,
where refusal is not shallower. Splitspoon samples will be obtained at each test interval. The
samples will be classified in the field by an engineer from our firm and will be placed in sealed
jars and returned to the laboratory for testing.
Groundwater levels will be recorded at boring termination in all of the borings. Due to safety
considerations, twenty-four hour groundwater readings will not be taken, and all borings will be
backfilled after the borings are completed and capped with asphalt patch. If, at any time during
field activities, unanticipated soil conditions that could lead to significant design or construction
difficulties are encountered, you will be notified.
After field testing is complete, the subsurface information will be reviewed and evaluated and a
written report of our findings will be issued. The report will include:
• a description of the exploratory methods used
• asphaltic concrete pavement thicknesses in the borings
• aggregate base layer thicknesses in the borings
• descriptions of subsurface conditions encountered in the borings
• a list of refusal depths in the soundings
• a summary of published geologic information
• a Boring/Sounding Location Plan
• Boring Logs
If, at any time during the project, unexpected or unusual conditions or information are identified,
the scope of work will be reviewed to confirm that it is still appropriate and adequate. If
additional exploration and/or testing are necessary, you will be notified, and the added tasks will
be submitted for your approval.
SCHEDULE
Based on our current workload, the subsurface exploration can be started within five to six days
of authorization, weather permitting. It is anticipated that exploratory activities can be completed
in three working days. As was previously noted, if, at any time during field activities,
unanticipated soil conditions that could lead to significant design or construction difficulties are
encountered, you will be notified. A verbal report can be submitted within two working days of
the completion of field activities. A written report of the work can be submitted within seven
working days of the completion of field activities. If significant project delays are experienced,
you will be contacted to discuss the revised schedule.
(:nn efrnrtinn
Logans Lane Sewers
Jeffersonville, Indiana
November 16, 2008
FEE ESTIMATE
The scope of work provided in this proposal can be performed for the lump sum fee of $2,400.00
(two thousand four hundred dollars). Our fee is based on one drill rig mobilization and a total of
8 feet of soil test drilling, 16 feet of rock coring, and 12 feet of rock soundings. This fee also is
based on the assumption the site will be accessible to all terrain drilling equipment at the
time of the subsurface exploration. Our fee includes a charge for this equipment. Heavy
equipment needed to move the drill rig on the site can be retained for an extra charge. If
additional exploration or testing activities are deemed necessary, a revised fee schedule will be
provided for your approval. No additional fees will be incurred without your prior approval. If,
at the client's request, at any time after the start of this project and prior to the completion of this
project, the project is terminated, a prorated fee will be calculated based upon the work
completed up to the point that the project is terminated.
AUTHORIZATION
You may authorize our work on this project by your signature on this page. You may wish to
issue a purchase order; however, this proposal and the contract number must be referenced on the
purchase order. Please note that your signature implies acceptance of the attached Contract
Terms. We must have a signed copy of this entire document in order to proceed with the project.
We appreciate the opportunity to provide you with geotechnical services. If we can answer any
questions, please call.
Sincerely,
CONSTRUCTION SOLUTIONS, LLC
Peggy Hagerty Duffy, P.E.
Vice President
C:\he\prop\GLogansLane
PROPOSAL ACCEPTANCE
Project: Logans Lane Sewers
Location: Logans Lane, near Woodland Court
Jeffersonville, Indiana
Client: Jeffersonville Sewer Board
c/o Jacobi Toombs and Lanz
120 Bell Avenue
Clarksville, Indiana 47129
Proposal Date: 11/16/06
Proposal No.: 11/16c
SIGNATURE:
TITLE l .~
DATE: -- ~, ~ / e ~
PRINTED NAME:
(Please note that your signature implies acceptance of the attached Contract Terms and the full CS Proposal No.
8G-Il/16c document).
(:nnefnirtinn
Contract Terms
1. PARTIES AND SCOPE OF WORK: Hagerty Engineering, Ina (hereinafter referred to as "CS") shall include said company performing the
work. "Work" means the specific geotechnical, analytical, tesfing or other service to be performed by CS as set forth in CS's proposal, the
clients' acceptance thereof and these Contract Terms. "Client" refers to the person or business entity ordering the work to be done by CS. If the
client is ordering the work on behalf of another, the client represents and warrants that the client is the duly authorized agent of said party for the
purpose of ordering and directing said work. Unless otherwise stated in writing, the client assumes sole responsibility for determining whether
the quantity and the nature of the work ordered by the client is adequate and sufficient for the clients' intended purpose. Client shall
communicate these Contract Terms to each and every third party to whom the client transmits any part of CS's work. CS shall have no duty or
obligation to any third party greater than that set forth in CS's proposal, client's acceptance thereof and these Contract Terms. The ordering of
work from CS shall constitute acceptance of the terms of CS's proposal and these Contract Terms.
2. TESTS AND INSPECTIONS: Client shall cause all tests and inspections of the site, materials and work performed by CS or others to be
timely and properly performed in accordance with the plans, specifications and contract documents, and CS's recommendations. No claims for
loss, damage or injury shall be brought against CS by client or any third party unless all tests and inspections have been so performed and unless
CS's recommendations have been followed. Client agrees to indemnify, defend and hold CS, its officers, employees and agents harmless from
any and all claims, suits, losses, costs and expenses, including, but not limited to, court costs and reasonable attorney's fees in the event that all
such tests and inspections are not so performed or CS's recommendations are not so followed except to the extent that such failure is the result of
a negligence, willful or wanton act or omission of CS, its officers, agents or employees.
3. SCHEDULING OF WORK: The services set forth in CS's proposal and client's acceptance will be accomplished in a timely, workmanlike
and professional manner by CS personnel at the prices quoted. If CS is required to delay commencement of the work or if, upon embarking
upon its work, CS is required to stop or interrupt the progress of its work as a result of changes in the scope of the work requested by the client,
to fulfill the requirements of third parties, interruptions in the progress of construction, or other causes beyond the direct reasonable control of
CS, additional charges will be applicable and payable by client.
4. ACCESS TO SITE: Client will arrange and provide such access to the site as is necessary for CS to perform the work. CS shall take
reasonable measures and precautions to minimize damage to the site and any improvements located thereon as the result of its work or the use of
its equipment; however, CS has not included in its fee the cost of restoration of damage which may occur. Restoration of or reparation for
damage to crops on agricultural land is not included in the fee stated in this proposal. Closing of open soil boring holes created by CS's
activities is included in the fee stated in this proposal. If client desires or requires CS to restore the site to its former condition, upon written
request CS will perform such additional work as is necessary to do so and client agrees to pay to CS the cost thereof.
5. DAMAGE TO EXISTING MAN-MADE OBJECTS: Unless CS has assumed in writing the responsibility of locating subsurface or latent
conditions, client agrees to indemnify and save CS harmless from all claims, suits, losses, costs and expenses, including reasonable attorney's
fees as a result of personal injury, death or property damage occurring with respect to CS's performance of its work and arising from subsurface
or latent conditions or damage to subsurface or latent objects, structures, line or conduits where the actual or potential presence and location
thereof was not revealed to CS by client.
6. PAYMENT: Client shall be invoiced at the completion of the work described in this proposal. Client agrees to pay the invoice within thirty
(30) days of its receipt.
7. TERMINATION: This agreement may be terminated by either party upon seven day's prior written notice. In the event of termination, CS
shall be compensated by client for all services performed up to and including the termination date, including reimbursable expenses, and for the
completion of such services and records as are necessary to place CS's files in order and/or protect its professional reputation.
8. WARRANTY: CS's services will be performed, its finding obtained and its reports prepared in accordance with its proposal, client's
acceptance thereof, these Contract Terms, and with generally accepted principles and practices. In performing its professional services, CS will
use that degree of care and skill ordinarily exercised under similar circumstances by members of its profession. This warranty is in lieu of all
other warranties or representations, either express or implied. Statements made in CS reports are opinions based upon engineering judgement
and are not to be construed as representations of fact.
Should CS, or any of its professional employees be found to have been negligent in the performing of professional services or work or to have
made and breached any express or implied warranty, representation or contract, client, all parties claiming through client and all parties claiming
to have in any way relied upon CS's services or work agree that the maximum aggregate amount of the liability of CS, its officers, employees and
agents shall be limited to $1,000,000 or the total amount of the fee paid to CS for its work performed with respect to the project whichever
amount is greater. CS is insured with the following policy limits:General Liability, $1,000,000/occurrence, $2,000,000/aggregate; Automobile
Liability, $1,000,000; Professional Liability, $1,000,000; Workers Compensation, $100,000/accident.
9. INDEMNITY: Except to the extent specifically addressed in paragraph 8, client agrees to indemnify, defend and hold CS, its officers,
employees, agents, and independent contractors harmless from any and all claims, suits, losses, costs and expenses, including but not limited to
court costs and reasonable attorney's fees arising or alleging to have arisen out of the performance of CS's work. In the event that client or
client's principal shall bring any suit, cause of action, claim or counterclaim against CS to the extent that CS shall prevail in such suit, cause of
action, claim, or counterclaim the party initiating such action shall pay to CS the costs and expenses incurred by CS to answer and/or defend
such suit, cause of action, claim or counterclaim, including reasonable attorney's fees, court costs, witness fees and other related expenses.
cs Proposal No. 8G-11/16c - I,ogans Lane Sewers -Jeffersonville, Indiana