HomeMy WebLinkAboutBid/Contract
t'"
: Prescribed by State Board of Accounts
Form No. 96 (Revised 2000)
0,
CONTRACTORS BID FOR PUBLIC WORK
PART I
(To be completed for all bids)
(Please type or print)
Date:
/;).-11-07
1. Governmental Unit (Owner):
Jt4f'r J~A.J;JI(, S~t...,,/ gl)c".J
5. Agent of Bidder (if applicable):
ceo-- I(
7 e....-- (}.,....I......,I: "'II L (.. C.
1'1 ~f~ e.;I,...J Sf.
(II,.... ,L: J, ..J,IV 'f?1 'f 3
.
'1,').- ~o,'-f"" lJ,rf
1"1 A
2. County:
3. Bidder (Firm):
Address:
City/State:
4. Telephone Number:
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete
the public works project of (! : 1-, of ~ 1-/,,.. J 0"'''': If" .IIII
(Governmental Unit) in accordance with plans and specifications prepared by "JT L l~,'", #,"J,
CJ..... /('v;/If, :tAl and dated '-&1./b07 for the sum of
1*' w. /1....,,),.,,1 IV.'... 1-, fu~" lL.,.,~. ..JTL~c. J/-./,.J h."7 rJ.nr...rx ~ c:y '1/ g Y ls;.!!.
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the
notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the
notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as
that shown in the original contract if accepted by the Governmental Unit. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate attachment.
The Contractor and his subcontractors, if any, shall not discriminate against or intimidate any employee,
or applicant for employment, to be employed in the performance of this contract, with respect to any matter
directly or indirectly related to employment because of race, religion, color, sex, national origin or ancestry.
Breach of this covenant may be regarded as a material breach of the contract.
CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS
(If applicable)
r'\
I, the undersigned bidder or agent as a contractor on a public works project, understand my statutory
obligation to use steel products made in the United States. I.C. 5-16-8-2. I hereby certify that I and all
subcontractors employed by me for this project will use U.S. steel products on this project if awarded. I
understand that violations hereunder may result in forfeiture of contractual payments.
B-102
~
ACCEPTANCE
~~...
The above bid is accepted this
5-rrt
day of ~~, 2U;Je; . subject to the
following conditions:
- N,,~E.-
\..,
f'1'~01Z ~ ftN \ -pe.es.
tut~~~
'13\,^-S~, I Sl~
PART II
~.
~~
(Complete sections I, II, III, and IV for all state and local public works projects as required
by statutes if project is one hundred thousand dollars ($100,000) or more. (IC 36-1-12-4)
-;Je If,r Sollv:/lt Sp""".r /oerJ
Governmental Unit:
T eo..., (\... fr. ~j: II J, J. /" e.
I ~.. ,,- 0 7
Bidder (Finn)
Date:
~~
These statements to be submitted under oath by each bidder with and as a part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. What public works projects has your organization completed for the period of one (1) year prior to the
date of the current bid?
When
Contract Amount Class of Work Completed Name and Address of Owner
A
(,"" If t "" t.,. II
2. What public works projects are now in process of construction by your organization?
When to be
Contract Amount Class of Work Completed Name and Address of Owner
~
y",," pl'f'c ( ,-"t;/'
.;:-~.
8-103
~l
.1.
Have you ever failed to complete any work awarded to you?
,110
If so, where and why?
-~
" /
4. List referenced from private firms for which you have performed work.
f,,. /J-fJ"cL,J
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when
you could begin work, completed the project. number of workers, etc. and any other information which
you believe would enable the governmental unit to consider your bid.)
1--1~,,11 So_t:~I-, /..C'7 f"/~ Pj, ~..it""f.hV't.li T,,,"lct.. fJ.h~ e,.ft;
R 04,. · I-;..^
~.~\
2. If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you expect to require a bond. However, if you
are unable to currently provide a listing, please understand a listing must be provided prior to contract
approval.
7b B t !1.I6"" .rrrP
3. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
f~r /J-{-r..-Co L,)
4. Have you entered into contracts or received offers for all materials which substantiate the prices used in
preparing your proposal? Otherwise, please explain the rationale used which would corroborate the
prices listed.
Yfj
~\
r
,I
8-104
~
cr,
SECTION'" CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to
the governing body awarding the contract must be specific enough in detail so that said governing body can make
a proper determination of the bidder's capability for completing the project if awarded.
~ r It- -f+ "'c l...1
SECTION IV OATH AND AFFIRMATION
I hereby affirm under the penalties of pe~ury that the facts and information contained in the foregoing bid
for public works are true and correct to the best of my knowledge and belief.
Dated at /fI,....., L:); .:i:AI this / I t} day of p, e. 2.Q;)7
.
f:......f./o-e I:,.
By
m~.., .J ,......
(Title of Person Signing)
~~;~:
:/ \
ACKNOWLEDGEMENT
STATE OF
COUNTY OF
IN
CLh~1(
)
)
)
tn t.lv: '" L" Ih...o"\ .)
0"", tn,r
(Title) . ,
being duly sworn, deposes and says that he is
of the above -r ~ ..... (lC",., 1-,.,.. Co, J: ;'\ ~I L.l.. C!..
(Name of Organization)
and that the answers to the questions in the foregoing questionnaires and all statements therein contained are
true and correct.
Subscribed and sworn to before me this
Jr I. t1
/1- day of /-"c.
/1 ,/l I ,'VI /l
L",I t.j"rV LZ. .
fj
2007
,
"1"'\
L9;J0~
Notary Public
My Commission Expires: ,;{- <,0. - {5< () D '8'
, -
County of Residence: WtJ..61u rzt) !-{)/'"'[
/
~,
8-105
~-0
/
~
.r--~
,
.
.~
NON - COLLUSION AFFIDAVIT
The undersigned bidder or agent. being duly sworn on oath, says that he has not, nor has any other
member, representative, or agent of the firm, company, corporation or partnership represented by him, entered
into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such
letting nor to prevent any person from bidding nor to include anyone to refrain from bidding, and that this bid is
made without reference to any other bid and without any agreement, understanding or combination with any other
person in reference to such bidding.
He further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale.
OATH AND AFFIRMATION
I affirm under the penalties of perjury that the foregoing facts and information are true and correct to the
best of my knowledge and belief.
(YJ L. !j /)
, "", ..) I 1N this / / day of Vi' <:. .
I
~~)' t!;e.
By ~ - ..1 9 ZO'L
o l' ''''. rn · ) "....
I (Title of Person Signing)
Dated at
2cb7
ACKNOWLEDGEMENT
STATE OF
L./\/
c.l..A/l.K
)
) SS:
)
COUNTY OF
(Title)
1'1 ( 'v.. '" L, "" 0;'1.)
0, ,;". ;n."'J ,/
I ~
being duly sworn, deposes and says that he is
of the above If'tt:''''''' Ceo.., j. /rc l "'), L I.- e
(Name of Organization)
and that the statements contained in the foregoing bid, certification and affidavit are true and correct.
Subscribed and sworn to before me this / I b day of p, Co '. '~ ,-;zoo 7
&u~~ 6 (~
. Notary Public
My Commission Expires: ~" ~ - 6~ D IJ g
County of Residence: b\..) OlS JUllt) +0 /l
8-106
!
.J
~
'-
0
~ ~
C rn
rn ~
0 ~
t) '0
ro '0 )
V-E ~ M (f)
--..) 0 :).... I- "
~ ~ () "-"') ~
-..) -
~ r'" UJ ~ l",,\
-,
~ ~ ~ 0
....:.: . ~ 'i .......
.. c ~ -
a.. -
6 " " ....... 'w r-
0 ~ - - )
0 ~ ~ U- - ()
N . ~ - .
'0 U- (" ~ 0 0 ) (; \
Q) .)
rn o '" ...... ~ (' ..., -
':; "" U- ......
Q) oc::J 0 " ~
~ . . "'" ,
.-..,.,/\ <""6 -.a S ~ C'\
co \
0> OJ ~ .... ... ~ ........
0 0- f () ~ c
z " ... ~ Q)
\~ .)- ~ ::J ~
E ro
- CO K .....
0 c
u.
:J 0
-0 ~
a.. ..!!!
u::
~\
8-107
---,'/""
~,.
~
,1. .,1
TO THE BIDDER-
The following Form 96a is not required by the State Board of Accounts. However, the bidder must
either use this form or one similar to it prepared by their accountant.
JACOBI, TOOMBS AND LANZ, INC.
S:ISydneyIWPDOCSlmlsCellaneousIMASTERldIVB,wpd
B-108
.'
General Ponn No. 96-1lI
Prescribed by the Stllte
Board of Accounts of
lndillnll. Revised 1'949
STANDARD QUESTIONNAIRES AND
FINANCIAL STATEMENT FOR BIDDERS
Prescribed by
THE STATE BOARD OF ACCOUNTS OF INDIANA
For use in investigating and determining the qualifications of bidders on public
construction when the aggregate cost of any such work or improvement will be Five
Thousand Dollars or more.
These statements to be submitted under oath by each bidder with and as a part of his
bid, as provided by Chapter 305, page 1248, Acts of 1947.
/Ov.-. 0 -P J'~;t 1'1' Jo /l "',' /I~ ,$A1
.. ~ .....- ---.-..- ------- .-..----. -------..... -..-.. .......................... -. .......... ............. ............. ............... .............................. .......... ........-.... ....................
By mm..m.......Tr::.~_~.....g~~..~::...~..~f:~~.h....~.~_.~........m......... ~ ~~~~:t:~~hip
An individual
Submitted to
IV ~ fa. e.; Ir o.,J Jf.
.................................................................................................................................................................................................-......................-........................................
(Y},,,,,, 71....J ..IN V7/~J
............ m ............./-..m.... ../............. ......................... ................................ .....................
Date submitted ..............................i....~.:.~..~~.~...~..?............................... 20..9..2......
Address
Filed
At'. BOYCE, MUNCIE, IND
~"
S:lSydney\WPDOCS\mlscellaneous\MASTER\dlvB.wpd
B-109
Submitted by ...m............m.T::...:~....9~.~.!.~:.~.~~.jL...'-:!:..~..................m... ................................m.....
A Corporatio
0- a nershi]
An Individual
--. ~.r"
\",-,J
"
Princi al Office at I '1 , I ;l eo: / ro .,J J I.
p ...... m.......... ............ ...... ................................. ..... ....... .................. ........ ... ......... ..................... ......... ............... ........ .......
I ............. ..... .... .... .._...... ..... ........r!!. ~.:./. .~.~~~!. ...!....~.... ~.?. ~.~. ~... ..... .... .................................................. .............. .u. .....................
EXPERIENCE QUESTIONNAIRE
The signatory of this questionnaire guarantees the truth and accuracy of all statements and of all answers to interrogatoric
hereinafter made.
1. How many years has your organization been in business as a general contractor under your present business name?
............... .................. m.......... .............................. ..fJ...... on.................. m........................................................ ..u...m...... .... .... u..... ......
2. How many years experience in construction work has your organization had (a) as a general contractor; and (b)
as a subcontractor? ....m ...........m................../~mm.........................m.m............ ....... .m.... ...... ... ............ ..... ....... ... ....... .................
3. What projects has your organization completed? ...................................................................m...............................................
CONTRACT AMOUNT
CLASS OF WORK
WHEN COMPLETED
NAME AND ADDRESS
OF OWNER
.................................................. .... ...........t...~~..... !!.'..!!. .':!...~ .~' ..~.~.... ........................................ ................................................. ..
3a. What projects does your organization now have in process of construction?
~r\
CONTRACT AMOUNT
CLASS OF WORK
WHEN COMPLETED
NAME AND ADDRESS
OF OWNER
...................................................... ............ f. ~ ~.. ... ...!!:. .c.~t!:. .:. ~. ~.'!!... ............. ..... ........... no... ..... .. u.... on........................................
4. Have you ever failed to complete any work awarded to you? If so, where and why.
. -.... - - -......... -.............................. -....................... .ytl-7iJ..... .............................,. -. -..... -.... - -........................................................................
5. Has any officer or partner of your organization ever been an officer or partner of some other organization that failed
complete a construction contract? If so, state name of individual, other organization and reason therefor.
........ ......... ........ ..... ................. ..... ....... ... .... ......... .N.'!?.. ........ ...... ........ ............... ....... ....... ......... ...... ........ ...... ............... ... .... ....... .........
6. H;~.~~y.~ffi~~~..;~.p~~t~~~.;f.y;~~.~~g;~i~~ti~.~.~~~~.f~il~d..t~.~;;~pl~.t~.~.~;;~~t;~~ti~~.~~.~i:~~~t.h;~di~d.i~.hi~7h.~~.~~
name? If so, state name of individual, n~ .ft owner and reason therefor.
7.
In what other lines of business are you financiaYl interested? .
...... _.................................................... ........... _.......~. ~......... _............... m......................................................................................
~\
S:\Sydney\WPDOCS\miscellaneousIMASTERldlvB. wpd
B-ll 0
8. For what corporations or individuals have you performed work, and to whom do you refer?
::::::::::~:::::::::::::~::::::::::::::::::::::::::::::::::::::::::::::r.~::::'!.:T.r.~::0!!.::~~:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
9. For what cities have you performed work and to whom do you refer?
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::r.f~:::/f-r.!:?!.:~!!.::~!!.::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
10. For what counties have you performed work and to whom do you refer?
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::tt.g:::::?ft.f:?!.~:l!!.?!::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
11. For what State bureaus or departments have you performed work and to whom do you refer?
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::f.:r?:::::::!f.:t!.?!.~!.~I!!..::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
12. Have you ever performed any work for the U.S. Government? If so, when and to whom do you refer?
~,r, ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::r.:f~:::::ifrliJ.(lJ.::~~:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
..---......-----..................................................................................................................................................................................................-..........................................................................................................................................................................-
13 What is the construction experience of the principal individuals of your organization?
YEARS OF
PRESENT POSITION CONSTRUCTION
OR OFFICE EXPERIENCE
INDIVIDUALS
NAME
MAGNITUDE AND N WHAT CAPACITY
TYPE OF WORI<
..... ... .-... ....... ............ ........... .. ... .... ....... ............ ...... ........ -.. ..fi'i.....;tj.if/4..c.; "f p..... ............. ......... ...... . ............... ... .......... ......... .....
,,--...r-"\
S:\Sydney\WPDOCS\mlscellaneousIMASTER\divB. wpd
B-ll1
PLAN AND EQUIPMENT QUESTIONNAIRE
The g),gnatory of this questionnaire guarantees the truth and accuracy of all statements and of all answers to interrogatorie~
hereinafter made.
In what manner have you inspected this proposed work? Explain in detaiL
.......................--............--.....--.......;;z.......OIiJ.iTr.e:;.....vi"J.l7.S..--....--..............--...........................--.--........--.................--...--........
........................................................_........................................____.............................................................................................................u...................................................................----....................................................................................................
..............................................................................................................................................................................................................................................................................................................................................................................................................
..................................-............................................--.........-.............................-......--......................................................-....................................................................................................-.........................................................................................
2. Explain your plan or layout for performing the proposed work.
........................................................................................................................................................................................................................................................................................................................................................................................................
...................................... ......... ....J:t.;,;....r i..'..'...'" --....-- .... ... ...m. m'.'. .----......... ....... .............. ................. -- ...... -- .....................................
.................... __............. -- --". -- n..... S -.q~::.o;';'. r............ n --...... m..'" .... m.... ..--. --.. ... ... ........ --...... n. n..................... --.. ..m...... ......... '..'."."."....'
....................... __ __....... ................"i./i-. 'to,,:s, 70. "j!.. 'iii,.' n... o..........m........ n........ m..." n......... --.'.'. --.... n n..................................... m." --.... ....
::::::::::::::::::::::::::::::::::::::::::::::::::~~~~::::~:;:;:~:~:~:~:~:;~:::::~:;:::~;;:;:;:~::~~~;;:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
::::::::::::::::::::::::::::::::::::::::::::::::::!l~t:~;::Tt..:::::~:~:~~:?~:~:::~~:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
s 1-" d "'-'.5 I- - wJ
....................-..........................................................................................................-..................................................--...................................................................-...................................................-...........................................................'
..........................................................................................................................................................-.......................................................................................................................................................................................................................
...............................................................................................................................................................................................................................................................................................................................................................................................
.. ....~~.. ............................ ............. ......................................... ............... ................................. ............................... ................ ................................................................ ...... ..... .............. ............................. ................................ ......... .............................
...........................................................,.................................................................................................................................................................-..-....................................................................................................................................................................
..............-....-..-.-...........-............................--..............-........--..............-.........................................................................................................-..................................................................................................-.............-......................-..............
........................................................................................................................................................................................................................................................................................................................................................................................................
The work, if awarded to you, will have the persqnal supetvision of whom?
(Y), Iv~'" L,. '"" ,,~..)
3.
A""""'""<
,--" .~
..................................................................................................................................................................................................................................................................................................................................................................................................
,
............................-...................................................................................................................................................................................................................................-...................................................................................................................................
4. * Do you intend to do the hauling on the proposed work with you own forces? If so, give amount and type c
. ..__~~~~~.~.~~.~~.~.~..~~.~~'....m........ .m... mr~~......(!..~.:'.:.~...~~.~.....m.......m....m..... ....... ....... ....... "'.". ......... ........ ...... ........ ...... ...
......................................................................................................................................................................................................................................................................................................................................................................................
5. * If you intend to sublet the hauling or perform it through an agent, state amount of subcontract or agent contract am
if known, the name and address of subcontractor or agent, amount and type of his equipment, and financi:
responsibility.
..-...............................................................................................................................-......................................................................................................................................................................................................................................................
...---...........-.........-..............................................................................-................-.........................-.......................................................-..............-...............................................................-.......................................--....................................................
.......................................................................................................................................................................................................................................................................................................................................................................................
6. * Do you intend to do the grading on the proposed work with your own forces?
.......................................................................................................................................--......................................................................................................................................................................................................................................................
::::::::::::::::::::::::::::::::: ::::::::::::::::::: ::::::::::::::::f tJ::::::::: ::::::: :::::: ::: :::::::::::::::::: ::::: :::::::::::::: :::::::::: ::: :::::::::::::::: ::: :::::::::::: ::::::::: ::::::: ::::::
............................................................................-.....................................................................................................................................................................................................................................................................................................
................................-.................-..................................................................-..........................................-.............................................................................................................................................................................................................................
*.......1 ~;;;.. 4: ~;'-6 -;~d. 7" ;';~y" ~;'''( "b~" ;ppl1;~bi~ "i~:;li ~ild"i~g ~~~;~~;;: "ir'" ~-;;t:"~~it:""'''''''''''..''''''''''''''''''.''''''''''''''''''.''.'''''''''''''''''''''''''''''''''''''''''''''.'''''''''''''.''''.''''''''''''''''''''.'''''''''''''''''''''''''''''''''''.'''''.'''''''''''''.''''''''''. .
.r--~
S:\Sydney\WPDOCS\mlscellaneousIMASTER\dlvB. wpd
B-112
7.
* If you intend to sublet the grading or perform it through an agent, state amount of subcontract or agent's contract and,
if known, the name and address of subcontractor or agent, amount and type of his equipment and financial
re~ponsibllity .
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~I!:.:::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::: ::::::::::::::::::::
~r
....._-~..............._......................-....................-....-... ................ ........................................ ............. ........................--............................. .......... .......................................... .............. ............................ .............. .............. .............. ........................................... ..........
8. Do you intend to sublet any other portions of the work? If so, state amount of subcontract and, if known, the name and
address of the subcontractor, amount and type of his equipment and financial responsibility.
..................................................................................................................................................................................................................................................................................................-...............................................................................................----.............
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::7J!.:::::::~~::::::::!.'!.~::~:~:!T..:~:~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
..-............................................--....................................................................................................-.......................................................................................................................................................................................................
9. F~:;~.:;hi~h.~;b.~.~~t~~~t~~~..~~.~g~~t~.d.~.y~~. .~~p~~t.t~.~~qci~~.~.b~~d?. ... .............. ..................................... ....... ...... ........ ......
............................................ ....................... ......... .....illii ~i' i:,:...... .................... ........ .............. .............. ....... ........... ........... ........... .........
.. ..........................~........................................ .......... .......................................... ................................................................................ ....................................... .................................................. ....................... ......o................ ...................................
..........................................................................................................................................o............................................................................~............................................................................................................................................................
..........................-.....................o...................................................................................................................................................................................................................................................................................................................-.............
10. What equipment do you own that is available for the proposed work;>
DESCRIPTION,
SIZE, CAPACITY, CONDITION
ETe.
QUANTITY
ITEM
YEARS OF
SERVICE
PRESENT
LOCATION
.... ..-.......... ................ ................................ ................... ........ ......................... ......- .............-................................................. ..........................................................~... ............................... .............. ............. ...... . .............. ................ ........ ........ .............~
P f It, frr r I C {-f f tJ
..._............................................................ ................................................__...... ............l......................._.......................... .................--....................................-- --..............-....................---................. .......................................................................
........................................................ ........................-............................. .............................................-.................. ..............................-........................... ..............-..............-............................. .............................................................
~r\
" ...... ............. m.... ..... .. ............ ...... .m' ....... ...... ... ... ....... ..... .............. ..... ..... ...... .............. ..... ................... ..... .......... ...... ... .............. .............
.-..........--...................-..-........................ ..........-........................................... ......................-....-...............-..................... -.............................................................. ......................................................... ...............................................................
..o........................................................... ......................................................... ..................................................................... .........................................-................... ................................-........................... ........-.....................................................
................................ ................... ..... ......o ........ ..................................... ........... ... ................. ..................... ... .................. ........ ..... ...o........... ......................... .......... .. .................. ....... ..................~........... ... ............. ....... ............ ................... ...........
.......................................................o............ ........._................................................ ............................-.................................. -........................................................... ............................................................. ................................................................
............................................................ ............................................................... .......................................................... ................................................................. ............................................................. ....................................................................
. .......... ......... ................. .................... ...... ... .......................... ....... ..........- ....-.. .... .............................................. .......... .......... .... .............. .............. .................. ................................. .....~............. ........... .......... ..... ...... ..... ............. ............... ..........
.................................................................. ..................................................... ................................................................. ........................................................ ........................................................... .............................................................
................................-.............................. .....................-................................-.... ........-................................................... .................................................... ....................................................... ...............................................................
.............................................................- ...................................-................. .............................................................. .............................................................. ............................................................ ........-..............-...............................
~\
S:\Sydney\WPDOCS\mlscellaneous\MASTERldlvB.wpd
B-113
11. What equipment do you intend to purchase for use on the proposed work, should the contract be awarded to you?
APPROXIMATE
COST
~UANFITY
ITEM
DESCRIPTION, SIZE CAPACITY, ETe.
----......................................-.......... -.--........................................--..................
................. .W~..-e;......"..."...".". ........................ ..................... ..... ............ ..................
.............--.................................................... ..........---........................-............................ ...............................................................................................................................--..................................---..................................- ...................................................................
.........---.................................................... .................................................................. ................................................................................-.......................................................................................................................... ................................................................
..... -..- -.................................. ~. ~..... ~. ~.. ~ . ~......................_........ ............ -......... ..........~............................ ~............ ................... ................ .......... ..................................................... ......-.. .................. ............ ..... .......... ..............................
..... ..~.......... ............... ................................. .................... ..................................... ..... ............................... ............................. .................................................................~...... ................... ................................... ..............................................................
.................................................................. ............................................................ ......................................................................................................................................................................................... ...............................................................
.............................................................. ..........................................--................... .......................................................................................................................................................................................... .-................................................-..........
12. How and when will you pay for the equipment purchased?
rv/r+
................................................................................................................................................................................................................................................................................................................................................................................
13. Do you propose to rent any equipment for this work? If so, state type, quantity and reasons for renting.
.................................................................................................................................................................................-............................................................................................................................................................................
...............................................................................................................................................................................................................................................................................................................................................................................
.................... ............. .......... _... ...........................!J./D............. ..... ... ....... .... ..... ....... ...... ......................... ............ ....... ................. ..............
....................................................................................................................................................................................................................................-..............................................................................................................................................
............................................................................................................................................--...............................................................-....................-.....................-......................................................................................................................
---." /".
14. Have you made contracts or received firm offers for all materials within prices used in preparing your proposal? Do m
give names of dealers or manufacturers.
.................................... .... ............................... y... f...s............ ........................................................................... .......... ............................
...........................................................................................................................................................................................................................................................................................................................................................................
(t1~"'I~..jl ;[..Ai this .. II e da of j}"C, 20 07
.. ............. J................................... ............................................ y ....................... .................................. ..............'
Tec.hl CC"'\ J,.. ~ t :")/ /...t."C-
By n 0 no_ _...--::-;'"~:-::-::::::--::
................ ........ ...(!;....~.~.~;il~~~~:S:i~iJ~.-::................ ..................
Dated at
COUNTY OF
::eN
......... .... ...................... ............. )
CLAeK )5S:
..... .... ............ .......... ................. )
STATE OF
...........__.....I!!.~~..":..;....;.~..-:..~.~.~..............................................being duly sworn, deposes and says that he is a member of
............L~.~:':......~.~...:..~~...:~.:..k...~!:-.~..........................................and that the answers to the questions in the foregoing
(Name of Organizahon)
~~
questionnaire and all statements therein containeg are true and correct. p,
~b:~=s~~:ns:o~e~o me ~hi~ ~..~..}j~irzf-.i.......................day of ...........~..:.:...._....................................20 ..9..7................
y p ........................-.....................................
. ~ L-~ "
fpVJ....-t" I . )1J?"L"t1.._-)
....e.,..._.............,............"...,....... ....,..... ........... ...."...._...................-..._............~
{!/J,ro/ i::>.. ottke S .- Af().J..ar7
S:\Sydney\WPDOCSlmI5cellaneou5\MASTER\dlvB. wpd
B-114
!\
~
r\
;,:nJ/\'N('~HF.L TI.(JtRACE COMBINED SEW~~R SEPARATION PROJECT,
:Y~"t~_~'(). 0720
~.~..l"~,,....-~-
API'ROXlMATlt, DESC1H~!TON WITH UNIT UNJT PRICE IN TOTAL AMOUl'T
nn-CM ]'.0. c:; UANTITY PRICEw'6~~~EN IN NUMIH.;RS FOR lltn TTE1\-1
. - ---'-'
IS-inch Cured. in-Place
Pipe Liner J. .
For.w..t. ~~.."/.... 'Y~'.~.~.." ...
.. ..... ",...". M........... .Dollars
Per Linear Foot
11
,.
t.. ~
Rev. 12/5107
'::":::;;;;~,,;;~.;,;';'7,,~;:;::-.~~.~~
lJf LF
$
'CJ
0'"
-
$
0; 3 fY ~
2 "l1 ( 5 Lf
12-inch Cured.in.Place
Pipe Lir~r
For...... r.f!.~,~1- P~~".... .....
p~~' I~ i ;;~~; . i.: ~:~~ .... ..Do 11 ars $ Ii J ";:
___.....~_~_.--.___.__._..,._.,_L__....
Suinch Cured-in-Place Pipe
;;~~~.~'... T. ~:~~. 7..... ~.'~ {... .....
Perl :i;~~~;.~~~~~,.....Dollars $ :3' ~ ·
34~ 1.F
h-""',"",,'.----"""--
I.; 1:';(,1 LF
12-inch Rep ~\orm Se'wer
fOf.. fl!:.~~...~... f::,,:~.:.....
-0 t.
..... .....t?............. ...Dollars
Per Linear Foot $
9S~
"
19 EA
Catch Dasin. Tvpe 'C' J
FOL......7 ~.~ .'~~. ./~":.~. ~':"..,.
.H' ............ ................ Dollars
Per Each
..
$ / ~O~ -
"',.".,......,.,'''''',~'''',.....,..........-..__.,.,~.,"._--_.,--' ,------
--,...--.---------....-
(.
21A
Catch Basin Type '.I' . J
For... ..1.1:.' #-"',~, ...J:I:.~,,:,:1.:~
....................... ...Dollars
I 3 DO '!.! $
.Co
;1. I ~ r;() -
$
'} lIS
Pe.r bach
D<)watcring for C.I.P.P.
Installation (if required)
fIoL. ..... .~~..;..,.., .'"
.... ........................".. .I)oJ1al's / '!.!
.!~~.~._l:.~~J~_~~~_._.._.._~,"_...-
Surt~lGe Milling
For........Q~. .R.~.!(~"......
. ..t.. .~.. .~~. ~;~t~....BlJll,Jll:s'
Per Squair.: Yard S I. ~
$
... 00
YS: 30.;) -
I
$
/;1., 3Y8'I/>~
-0
$ JtJ3'3YS~
'j -
$
..
?- ~ fOe;) -
- I
$
I~
;.< 3,'/00 SYS
~;. t:,:!drV''''i't'LH)CS\fn\(,!i'111\hC:C1\~ '","'PD
A~209
$
-.f , ..;1 " ~
7 ,1.
BLANCHEL TERRACE COMBINED SEWER SEPARATION PROJECT,
JOB NO. 0720
ITEM NO.
9
10
11
12
r''\
'"""
13
14
15
r,
APPROXIMATE DESCRIPTION WITH UNIT
QUANTITY PRICE WRITTEN IN
WORDS
200 TONS INDOT, Surface Type
Asphalt S' l-
F or............. ~ l." .t. ..........."....
............................. . Dollars
Per Ton
1175 LF 6-inch Stand-up Concrete
;~;~.... (... ;,~".~ .~...:... ~..~..
............................ ..Dollars
Per Linear Foot
UNIT PRICE IN TOTAL AMOUNT
NUMBERS FOR BID ITEM
$
~ () oj;
O.
$ I ~ (:JDd --
DO
$ /~ rSO -
O.
$ -;l, (7i?D -
...., ClIO .
$ tJI'o, t-t70 -
0-
$ / yo c -
..
$ I, 0 'to -
I o.
$ I'c.:ro--
$
/ r~
1 LS
Traffic Control I
For........7:. ":':.~... !..~~.:~........
P~~'L~~~'S~......Dollars $ (;2, Of) r:; ".;
Downspout Disconnection
@2 Blanchel Terrace
Sheet #1 I
For..:.:.. :!~~.'1.. ~.:"t...........
P~;L~~'S~..."...Dollars $ eJ, &00 ~
Downspout Disconnection
@3 Blanche! Terrace
~:;.~~. ~~ f::'J. .~. ~.~~~... !.f.~~~.1
... ............. ..... ..........Dollars (;.
Per Lump Sum $ I fa?-
Downspout Disconnection
@4 Blanche! Terrace .
~~;~t.~~~...!.~::.~.:.~.~...
.............::-~.~.~.........Dollars .. ~
Per Lump Sum $ 1,0'(0-
Downspout Disconnection
@ 20 Blanche! Terrace
Sheet #4 I /J
yt/:,..,I-,....}I..... ,.v
For..................................... .
....................."."...... .Dollars
Per Lump Sum
1 LS
1 LS
I LS
I LS
c;.oC
$ I ~ OCl -
S :ISydneyIWPDOCSlO7\0720IsecA2. WPD
A-210
ry ;J,
BLANCHEL TERRACE COMBINED SEWER SEPARATION PROJECT,
JOB NO. 0720
APPROXIMATE DESCRIPTION WITH UNIT UNIT PRICE IN TOT AL AMOUNT
QUANTITY PRICE WRITTEN IN NUMBERS FOR BID ITEM
WORDS
r,
ITEM NO.
16
17
18
r,
19
20
21
1 LS
Downspout Disconnection
@21 Blanche! Terrace
Sheet #5
For. u. u .~. (.~ /f.. u!.f~.~....
... u ./1.". ~....":!..... u.... .Dollars
Per Lump Sum $
Downspout Disconnection
@ 22 Blanche! Terrace
Sheet #6 J.. I fi.
For.... ..T...:~ ,1... u. ~::~.........
..... H':.,,:.l.~.~.... u..... uDollars
Per Lump Sum $
Downspout Disconnection
@23 Blanchel Terrace
~:~t/'~ ~ ..!..':::.~.~ :~.'!......
........... .:'. ~ .~tu... u.. ..Dollars
Per Lump Sum $
Downspout Disconnection
@35 Blanche! Terrace
Sheet #8 ~
/II ." tt. }/... " ,1....y
For............:.........................
........................ u.... .Dollars
Per Lump Sum
Downspout Disconnection
@ 730 Park Place
Sheet #9
F Tw 0 7J....""~#'...1J
or......................................
.... ........ .t:':'..~....... ..... .Dollars
Per Lump Sum
Downspout Disconnection
@411 E. Terrace Heights
Sheet #10 /J
rCl"'''' 11.",1......,
For.... '1'; l.),:.............. u.......
.............:......t........ .Dollars
Per Lump Sum $
. ..
:3 300 -
3 '/120
,
lo$'O 9Jt
$
Co ~..
70() --
$
0&1
3. 100-
I
1 LS
1 LS
1 LS
1 LS
1 LS
Co"
$ ~,DdC) -
.c.
L/ S"o -
$ 3Yoo
1 - Dc,.
$ 'I 0 j 0 --
Q, oc.
$ fOc:J -
oc.
$ ;;1., OClCJ -
$ 'IS'o o..=.
S:\SydneyIWPDOCSlO7\0720IsecA2. WPD
A-211
)'
f"
r"
,i .
.. BLANCHEL TERRACE COMBINED SEWER SEPARATION PROJECT,
JOB NO. 0720
APPROXIMATE DESCRIPTION WITH UNIT UNIT PRICE IN TOTAL AMOUNT
ITEM NO. QUANTITY PRICE WRITTEN IN NUMBERS FOR BID ITEM
WORDS
22
1 LS
23
OEA
Downspout Disconnection
@ 420 E. Terrace Heights
Sheet #11;-0...... /t...,t.J
For........................ ..............
.. ............................ .Dollars
Per Lump Sum $
Standard Concrete Splash
Block J
For.... ...... .T~.':~..y.............
.............................. .Dollars
Per Each $
6-inch Corrugated Plastic
Pipe
For......... .r:: f.~.:. ~.~...........
...... ......................... Dollars
Per Linear Foot $
Downspout Elbow,
Plastic J f
For.... T.~.~:: .f..... :'.~.~..........
P~~'E~~h................Dollars $ ? 5' ~..
e;.
'I pc) -
3 t) o~
24
OLF
"... 0&#
I::' -
25
OEA
,J 1>.
$ 7 (;7()-
$ - 0-
$ -0-
$
- 0-
26
OEA
27
5 LF
Install Concrete
Downspout Cap' , /I
o "" !fo-";'" . v
For..... "f"'" ~......................
.............: ~:.....t....... .Dollars
Per Each $
8" PVC Pipe Section
Replacement, Sta. 7+30 to
7+35, If2~:B;/. ....t.,)
For..........~...........................
P~;r:~~~:F~~~......Dollars $ "3~c ~
_ ot.
/~O -
$ - 0-
28
1 LS
.,.
$ I, t,a> -
T. V. Inspection
Sta. 9+00 to End of Line,
Line 'B'
T..- 1-1.....1,..;
For ....f:..l~ .... .... ............. ....
P~~.L~~~.t~.......Dollars $ ~ S- {)f!::
$
;2.SV~
S:\Sydney\WPDOCS\07\072O\secA2. WPD
A-212
f'\
r\
r,
'J; BLANCHEL TERRACE COMBINED SEWER SEPARATION PROJECT,
JOB NO. 0720
APPROXIMATE DESCRIPTION WITH UNIT UNIT PRICE IN TOTAL AMOUNT
ITEM NO. QUANTITY PRICE WRITTEN IN NUMBERS FOR BID ITEM
WORDS
Manhole Lid R-1785,
Type 'B' Self-sealing
~:~.~~~;4~.~;~.{~.~.~~:!. .....
...............................Dollars S"O c) d>":
Per Each $ $
SUMMATION OF ITEMS 1 THRU 29 = TOTAL BID PRICE = $
29
3EA
ArJ J ." .p... JI, '"' "':J.. AcK ^~ _I,. J)J'" J
S:ISydneyIWPDOCSI07\072O\secA2. WPD
A-213
I .5"'00 ~
;;) , cI; '3 If 3 .s:.::..
r\
1'"
.J
DIVISION B - CONTRACT FORMS
SECTION B-1- CONTRACT DOCUMENTS
1.0 GENERAL
1.1 It is understood that the signature and seal of the CONTRACTOR on a properly completed and
executed State Board of Accounts Form 96 indicates the CONTRACTOR's acceptance of all
terms as set out in these specifications and documents and his willingness to complete the
project as stated herein and shown on the drawings.
1.2 I t is further understood that by the acceptance of, and the proper afftxing of the signatures of
the OWNER to the Form 96, that a binding contract exists between the OWNER and the
CONTRACTOR.
1.3 After the OWNER signs the Form 96, and notifies the CONTRACTOR of his acceptance, the
CONTRACTOR shall proceed to complete the project with the best workmanship possible
conforming to all specifications set out herein and to all details, drawings and notes shown on
the plans for this project.
S:\Sydney\ WPDOCS\07\onO\divB. wpd
B-101