Document G701™ - 2001
CHANGE ORDER NUMBER: 016
DATE: August 22, 2006
OWNER: [81
ARCHITECT: [81
CONTRACTOR: [81
FIELD: D
OTHER: [81
ARCHITECT'S PROJECT NUMBER: JEFF.015
CONTRACT DATE: July 08, 2005
CONTRACT FOR: Renovation of Structure
FOLLOWS:
:'~isputed amount attributable to previously executed Construction Change Directives)
, ite - Owner's Directive $27,014.00
rized Change Orders
ge Order was
by this Change Order in the amount of
. s Change Order will be
sed by Fourteen ( 14) days.
n as of the date of this Change Order therefore is August 04, 2006
$
$
$
$
$
3,131,855.00
399,954.00
3,531,809.00
27,014.00
3,558,823.00
t include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
ctionDirective imtil the cost and time have been agreed upon by both the Owner and
't::han xecuted to supersede the Construction Change Directive.
BY (Signature)
Robert Waiz
(Typed name)
Q--5-0l.:-
DATE
E. H. Construction LLC
CONTRACTOR (Firm name)
P. O. Box 109
Brooks, Kentucky 40109
ADDRESS
(Typed name)
DATE
AlA Document G701 TN _ 2001. Copyright @ 1978 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This A1Af>
Document Is protected by U.S. Copyright Law and internatiol1al Treaties. Unauthorized reproduclion or distribution of this AlA" Document, or any 1
portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at 08:11 :32 on 08/23/2006 under Order No.1 000209618_2 which expires on 1217/2006. and is not for resale.
User Notes: (398048323)