Loading...
HomeMy WebLinkAbout09) Change Order 9 " .,> Document G701™ - 2001 ARCHITECT'S PROJECT NUMBER: JEFF.015 CONTRACT DATE: July 08,2005 CONTRACT FOR: Renovation of Structure OWNER: 18I ARCHITECT: 18I CONTRACTOR: 18I FIELD: 18I OTHER: 0 CHANGE ORDER NUMBER: 009 DATE: March 02, 2006 FOllOWS: . "sputed amount attributable to previously executed Construction Change Directives) ;tk and Ceramic Tile at Lab 320 per the Owner's Request Deduct ($ 4,300.00) '.' enings in Parapet Walls of the Stair Towers per the dows with Metal Studs and Drywall per the Architect's Request . dware Set that Can be Re-used at One of the New Offices on chitect's Request Add Add $ 135.00 $ 1,059.00 ($ 712.00) ($3,818.00) Deduct Total Deduct $ $ $ $ $ 3,131,855.00 156,359.00 3,288,214.00 3,818.00 3,284,396.00 (0) days. e date of this Change Order therefore is June 01, 2006 changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which " Directive until the cost and time have been agreed upon by both the Owner and executed to supersede the Construction Change Directive. E. H. Construction LLC CONTRACTOR (Firm name) P. O. Box 109 Brooks, Kentucky 40109 BY ADDRESS B~jJ~ (Typed name) . $-/5-0C- DATE (Typed name~ .3 ,/?)~ DATE ' AlA Document G701.... _ 2001. Copyright @ 1978 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlAe Document is protected by U.S. Copyright Law and Internatlo!l81 Treaties. Unauthorized reproduction or distribution of this AlAe Document, or any 1 portion of It, may result In severe civil and criminal penalties, and wfll be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 11 :57:34 on 03/06/2006 under Order No.1 000209618_2 which expires on 1217/2006, and is not for resale. User Notes: (7811 50209)