HomeMy WebLinkAbout09) Change Order 9
" .,>
Document G701™ - 2001
ARCHITECT'S PROJECT NUMBER: JEFF.015
CONTRACT DATE: July 08,2005
CONTRACT FOR: Renovation of Structure
OWNER: 18I
ARCHITECT: 18I
CONTRACTOR: 18I
FIELD: 18I
OTHER: 0
CHANGE ORDER NUMBER: 009
DATE: March 02, 2006
FOllOWS: .
"sputed amount attributable to previously executed Construction Change Directives)
;tk and Ceramic Tile at Lab 320 per the Owner's Request Deduct ($ 4,300.00)
'.' enings in Parapet Walls of the Stair Towers per the
dows with Metal Studs and Drywall per the Architect's Request
. dware Set that Can be Re-used at One of the New Offices on
chitect's Request
Add
Add
$ 135.00
$ 1,059.00
($ 712.00)
($3,818.00)
Deduct
Total Deduct
$
$
$
$
$
3,131,855.00
156,359.00
3,288,214.00
3,818.00
3,284,396.00
(0) days.
e date of this Change Order therefore is June 01, 2006
changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
" Directive until the cost and time have been agreed upon by both the Owner and
executed to supersede the Construction Change Directive.
E. H. Construction LLC
CONTRACTOR (Firm name)
P. O. Box 109
Brooks, Kentucky 40109
BY
ADDRESS
B~jJ~
(Typed name) .
$-/5-0C-
DATE
(Typed name~
.3 ,/?)~
DATE '
AlA Document G701.... _ 2001. Copyright @ 1978 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlAe
Document is protected by U.S. Copyright Law and Internatlo!l81 Treaties. Unauthorized reproduction or distribution of this AlAe Document, or any 1
portion of It, may result In severe civil and criminal penalties, and wfll be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at 11 :57:34 on 03/06/2006 under Order No.1 000209618_2 which expires on 1217/2006, and is not for resale.
User Notes: (7811 50209)