Loading...
HomeMy WebLinkAbout08) Change Order 8 {:)(,\.:i:;:':':::,);'!;:::~ '~IA Document G70f" - 2001 ARCHITECT'S PROJECT NUMBER: JEFF.015 CONTRACT DATE: July 08, 2005 CONTRACT FOR: Renovation of Structure OWNER: 181 ARCHITECT: 181 CONTRACTOR: 181 FIELD: 181 OTHER: 0 CHANGE ORDER NUMBER: 008 DATE: February 13, 2006 ()LLOWS: ...... .sputed amount attributable to previously executed Construction Change Directives) s Required to Install New Aluminum Clad Wood Window at Mechanical Room 219 x10 Floor Joists in Mechanical Room Described on Sheets A4.3 & A5.3 Dated 01/30/06 Add Add Add $ 2,024.00 $ 86.00 $ 191.00 Add $28,034.00 dditional Special Shaped Brick Not Included in Base Bid 8t Add Total Add $ 2,944.00 $33,279.00 $ 3,131,855.00 $ 123,080.00 $ 3,254,935.00 $ 33,279.00 $ 3,288,214.00 ..................changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which ';Change Directive until the cost and time have been agreed upon by both the Owner and Order is executed to supersede the Construction Change Directive. EARCHITECT, CONTRACTOR AND OWNER. E. H. Construction LLC CONTRACTOR (Firm name) P. O. Box 109 Brooks, Kentucky 40109 ADDRESS .Pr7 (Typed name) :5- /- ofo DATE 0% I II> t,(p DA E (Typed name) .,2-/'/-ofo DATE AlA Document G701 'IN _ 2001. Copyright @ 1978 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlAe Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA" Document, or any 1 portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 08:59:02 on 02/13/2006 under Order No. t000209618_2 which expires on t 217/2006, and is not for resale. User Notes: (29379383t 2)