HomeMy WebLinkAbout01) Change Order 1
Document G701 ™ - 2001
,
ARCHITEcrs PROJECT NUMBER: JEFF.015
CONTRACT DATE: July 08,2005
CONTRACT FOR: Renovation of Structure
OWNER: 181
ARCHITECT: 181
CONTRACTOR: 181
FIELD: 181
OTHER: 0
CHANGE ORDER NUMBER: 001
DATE: September 06,2005
F()LLOWS:
..... 'sputed amount attributable to previously executed Construction Change Directives)
ncrete and Asphalt Under Existing Concrete Floor Slab,
Total CO #1
$ 5,250.00
$ 1,990.00
$ - 0-
$ 6,398.00
$ 6,009.00
$ 1,395.00
$ - 0-
$ 21,042.00
$ 3,131,855.00
$ 0.00
$ 3,131,855.00
$ 21,042.00
$ 3,152,897.00
t All Existing MEP at Site
edinT&M
.to Revise Roof Cricket After Demo Revealed Unforeseen Conditions
.. d Standing Seam Roofing to Close Building
#4 - Above
Sheathing per Contract
onsideration
de changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
Change Directive until the cost and time have been agreed upon by both the Owner and
rder is executed to supersede the Construction Change Directive.
EARCHITECT, CONTRACTOR AND OWNER.
DATE
DATE
. 1 East Court
Indiana 47130
(Typed name)
t4 ~,,\. OS
E. H. Construction LLC
CONTRACTOR (Firm name)
P. O. Box 109
Brooks, Kentucky 40109
ADDRESS
AfA JJ~
BYeJig6ature V
Jack Jolly
(Typed name)
~'-7~()>
.
".
DATE
r~
AlA Document ~701TM -2001. Copyright @1978and2001 by'The American Institute of Architects. All rights reserved. WARNING: This AlA'"
Document Is pr;nected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA'" Document, or any
portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AlA software at 09:53:40 on 09/07/2005 under Order No.1000150170_2 which expires on 1217/2005, and is not for resale.
User Notes: (3939588763)
1
Ii
~ JUl-26-2005 09:19AM
.I:H
FROM-EH CONSTRUCTION
502 957 S420 T-175
P.001/00S F-520
Brooks, KY 40109
502957-7471
FAX 502957-3420
Shepherdsville, Ky 40165
Col2. .t4 t
EH CONSTFlUCTION, LLC
DATE 7/25/05
COMPANY:
The Estopinal Group
ATTENTION:
Corky Scales
SUBJECT:
Jeffersonville City Hall - Cost ~or Extra Concrete Trench Removal/Replacement
FMNO.:
283-4383
TOTAL NO. OF PAGES INCLU01NG THIS COVER PAGE:
3
If you do not receive all the pages, or if the copy is not legible. please inform us immediately.
COMMENTS:
Corky,
Attached is the estimated cost for the removal of the additional asphalt and concrete that
was an unforseen condition under the floor slab. This concrete must be removed in
order to install the UG plumbing. Please call me if you have any questions.
r
Thank you.
JACK JOLLY
E H CONSTRUCTION, LLC
'If
502 957 3420 T-175 P,002/003 F-520
JP no @ mp~I~I~~D ESTIMATE
JUL-26-2005 09:20AM
FROM-EH CONSTRUCTION
'.
E H Construction, LLC
{\
P.O. Box 910
Brooks, KY 40109
(502)'957-7471
Fax: (502) 967.3420
No.
Page No.
of
Pages
'r
/7> J..r- /?
~
3e> LJJ'A~ .LF
J'
~
;$' ~ zS-o
JYL-26-2005 09:20AM FROM-EH CONSTRUCTION
502 957 3420
T-175 P,003/003 F-520
,
.~
KAUFMAN CONCRETE CUTTING CO.
J 113 ~ST MA.rN' STREET
LODlSVILLE, KENTIJCKY 40203
(502) 589-9035
July 19.2005
E H Construction
1188 E Blue Lick Rd.
Sbepherds~lle,lC~ 40165
Attu: Mr. Jack Jolly
Rc: Jeffersonville City Hall Renovation
Mr. Jolly:
Kaufman Concrete Cutting; CO'I Inc. proposes to Flat Saw approximately 175 linl:aT feet of 8~)
concrete at a cost of $2.00 per linear foot. This slab is approximately 8" below another slab
therefore; it will require the use of a deep saw. All dirt and debris m.ust be removed in the srea
for us to ha vc room to work.
E H Construction will be responsible for layout.
Except as otherwise specifically provided to the contrary in this proposal, Kaufman Concrete
Cutting is not responsible: for damages to underground utilitiil:s stich as wires. irriga.tion systems,
cables, etc. All agreements are contingent upon strikes~ accidents, or delays beyond Ow: control.
I
The fono~g rat=s are in addition to the base contract amOlJ:lJt and are in effect d1..Uing shutdowns
Or required premium time.
Techttician(s) & Equipment
1. Stand-by Time
2. Ov=rtime/After Hours/Saturday
3. Double TimdSunday
4, Water Control
$65.00 per man hI'
$15.00 per man br
$30.00 per man. hr
$40,00 per man br
~OLCUTTJNG
Charlie Duncan - Operations Managt..'T
E H CONSTRUCT10N
Authorized Signature
CD/jrp