Loading...
HomeMy WebLinkAbout01) Change Order 1 Document G701 ™ - 2001 , ARCHITEcrs PROJECT NUMBER: JEFF.015 CONTRACT DATE: July 08,2005 CONTRACT FOR: Renovation of Structure OWNER: 181 ARCHITECT: 181 CONTRACTOR: 181 FIELD: 181 OTHER: 0 CHANGE ORDER NUMBER: 001 DATE: September 06,2005 F()LLOWS: ..... 'sputed amount attributable to previously executed Construction Change Directives) ncrete and Asphalt Under Existing Concrete Floor Slab, Total CO #1 $ 5,250.00 $ 1,990.00 $ - 0- $ 6,398.00 $ 6,009.00 $ 1,395.00 $ - 0- $ 21,042.00 $ 3,131,855.00 $ 0.00 $ 3,131,855.00 $ 21,042.00 $ 3,152,897.00 t All Existing MEP at Site edinT&M .to Revise Roof Cricket After Demo Revealed Unforeseen Conditions .. d Standing Seam Roofing to Close Building #4 - Above Sheathing per Contract onsideration de changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which Change Directive until the cost and time have been agreed upon by both the Owner and rder is executed to supersede the Construction Change Directive. EARCHITECT, CONTRACTOR AND OWNER. DATE DATE . 1 East Court Indiana 47130 (Typed name) t4 ~,,\. OS E. H. Construction LLC CONTRACTOR (Firm name) P. O. Box 109 Brooks, Kentucky 40109 ADDRESS AfA JJ~ BYeJig6ature V Jack Jolly (Typed name) ~'-7~()> . ". DATE r~ AlA Document ~701TM -2001. Copyright @1978and2001 by'The American Institute of Architects. All rights reserved. WARNING: This AlA'" Document Is pr;nected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA'" Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 09:53:40 on 09/07/2005 under Order No.1000150170_2 which expires on 1217/2005, and is not for resale. User Notes: (3939588763) 1 Ii ~ JUl-26-2005 09:19AM .I:H FROM-EH CONSTRUCTION 502 957 S420 T-175 P.001/00S F-520 Brooks, KY 40109 502957-7471 FAX 502957-3420 Shepherdsville, Ky 40165 Col2. .t4 t EH CONSTFlUCTION, LLC DATE 7/25/05 COMPANY: The Estopinal Group ATTENTION: Corky Scales SUBJECT: Jeffersonville City Hall - Cost ~or Extra Concrete Trench Removal/Replacement FMNO.: 283-4383 TOTAL NO. OF PAGES INCLU01NG THIS COVER PAGE: 3 If you do not receive all the pages, or if the copy is not legible. please inform us immediately. COMMENTS: Corky, Attached is the estimated cost for the removal of the additional asphalt and concrete that was an unforseen condition under the floor slab. This concrete must be removed in order to install the UG plumbing. Please call me if you have any questions. r Thank you. JACK JOLLY E H CONSTRUCTION, LLC 'If 502 957 3420 T-175 P,002/003 F-520 JP no @ mp~I~I~~D ESTIMATE JUL-26-2005 09:20AM FROM-EH CONSTRUCTION '. E H Construction, LLC {\ P.O. Box 910 Brooks, KY 40109 (502)'957-7471 Fax: (502) 967.3420 No. Page No. of Pages 'r /7> J..r- /? ~ 3e> LJJ'A~ .LF J' ~ ;$' ~ zS-o JYL-26-2005 09:20AM FROM-EH CONSTRUCTION 502 957 3420 T-175 P,003/003 F-520 , .~ KAUFMAN CONCRETE CUTTING CO. J 113 ~ST MA.rN' STREET LODlSVILLE, KENTIJCKY 40203 (502) 589-9035 July 19.2005 E H Construction 1188 E Blue Lick Rd. Sbepherds~lle,lC~ 40165 Attu: Mr. Jack Jolly Rc: Jeffersonville City Hall Renovation Mr. Jolly: Kaufman Concrete Cutting; CO'I Inc. proposes to Flat Saw approximately 175 linl:aT feet of 8~) concrete at a cost of $2.00 per linear foot. This slab is approximately 8" below another slab therefore; it will require the use of a deep saw. All dirt and debris m.ust be removed in the srea for us to ha vc room to work. E H Construction will be responsible for layout. Except as otherwise specifically provided to the contrary in this proposal, Kaufman Concrete Cutting is not responsible: for damages to underground utilitiil:s stich as wires. irriga.tion systems, cables, etc. All agreements are contingent upon strikes~ accidents, or delays beyond Ow: control. I The fono~g rat=s are in addition to the base contract amOlJ:lJt and are in effect d1..Uing shutdowns Or required premium time. Techttician(s) & Equipment 1. Stand-by Time 2. Ov=rtime/After Hours/Saturday 3. Double TimdSunday 4, Water Control $65.00 per man hI' $15.00 per man br $30.00 per man. hr $40,00 per man br ~OLCUTTJNG Charlie Duncan - Operations Managt..'T E H CONSTRUCT10N Authorized Signature CD/jrp U: \Ke\OSProposals\EHConstnlcnon.r ~fferso;C.ville0tyHa110719 .doc