HomeMy WebLinkAboutContract - 6-20-2005 " ~ \:..iAIX Document A10f' -1997 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STlPULA TED SUM AGR:EEMENT made as of the 20th (In words, indicate day, month and year) d~y of June in the year of 2005 BETWEEN the Owner: (Name, address and other information) City-of Jeffersonville - Board of Public Works City-County Building 501 East Court Avenue Jeffersonville, Indiana 47130 The Architect is: (Name, address and other information) The Estopinal Group LLC 903 Spring Street Jeffersonville, Indiana 47130 ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AlA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AlA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AlA Document A201-1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. r--- and the Contractor: (Name, address and other information) E H Construction, LLC 1188 E Bluelick Road Sheph~rdsville, KY. 40165 Mailing Address: P. O. Box 910 Brooks, KY. 40109 The Project is: (Name and location) Jeffersonville City Hall Quartermaster Renovation 500 Quartermaster Court Jeffersonville, Indiana 47130 This document has been approved and endorsed by The Associated General Contractors of America. The Owner and Contractor agree as follows. r-. AlA Document A101TM -1997. Copyright @ 1915, 1918, 1925, 1937, 1951 1958,1961,1963,1967,1974,1977,1980,1987,1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA'o1 Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:47:54 on 06/17/2005 under Order No.1 000150170_1 which expires on 12/7/2005, and is not for resale. User Notes: (2752440368) 1 ~, ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement~ Conditions of the Contract (General, Supplementary and other Con<:iitions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after e",ecution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 8. ARTICLE 2 THE WORK OF THIS CONTRACT , The Contractor shall fully execute the Wark described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION ~ 3.1 The date of commencem",nt of the W ark shall :be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed ~n a notice to proceed issued by the Owner. (Insert the date of commencement ifit differs from the date of this Agreement or, if applicable, state that the date will befixed in a notice to proceed.) Work to commence within 14 days of contract execution. If, prior to the commencement bf the Work, the Owner requires time to file mortgages, mechanic's liens and other security interests, the Owner's time requirement shall be as follows: ~ 3.2 The Contract Time shallpe measured from th~ date of commencement. 304 ~ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than days from the date of commencement, bras follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencemerlt. [.f1JJess stated elsewhere in the Corztract Documents: insert any requirements for earlier Substantial Completion of certain portions of the Work.) Portion of Work Substantial Completion Date r-" AlA Document A1011M -1997. Copyright @ 1915, 1918, 1925; 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1980,1987,1991 and 1997 by The American Institute of Architects. All rights reserved. WARNIN~: This AIA@ Document is protected by U.S. Copyright Law and International Treaties. 2 Unauthorized reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. this document was produced by AlA software at 15:47:54 on 06/17/2005 under Order No.1000150170_1 which expires on 12/7/2005, and is not for resale. User Notes: (2752440368) ~- , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to complete on time or for bonus payments for early completion of the Work.) ARTICLE 4 CONTRACT SUM ~.4.1 The OWner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be ($ ), subject to additions and deductions as provided in the Contract Documents. $3,131,855 Three million one.hundred thirty one thousand eight hundred fifty five dollars ~ 4.2 The Contract S\!m i$1:>!!$!?eg upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or otl1erid,{!ntification of accepted alternates. If decisions on other alternates are to be made by the Owner s.l!;bsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires) See Attached ~ 4.3 Unit prices, if any, are as follows: Description Units Price ($ 0.00) See Attached ARTIGk!;S ...PAYMENTS ~5.1PROGRESS PAYMENTS.. ...... ... ~ 5.1.1 Based upon Applications for Payment subrriitted to the Architect by the Contractor and Certificates for Payrnent issued by the Arcl1.itect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below al1d elsewhere in the Contract Documents. ~ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: ~ 5.1.3 Provided that an Application for Payment is received by the Architect not later than the10tHay of a month, the Owner shall make payment to the Contractor not later than the10tway of th~ month. If an Application for Payment is received by the Architect after the application date fixed above, pafillfn't shall be made by the Owner not later than ( 10 ) days after the Architect receives the Application for Payment. ,~ AlA Document A101TN -1997. Copyright @1915, 1918, 1925~ 1937, 1951,1958, 1961,1963,1967,1974,1977,1980,1987,1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA@ Document is protected by U.S. Copyright Law and International Treaties. 3 Unauthorized reproduction or distribution of this AIA@ Docu,ment, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:47:54 on 06/17/2005 under Order No.1000150170_1 which expires on 121712005, and is not for resale. User Notes: (2752440368) I ...... - r-- 1/ EH CONSTRUCTION, LLC GENERAL CONTRACTORS · CONSTRUCTION MANAGERS P.O. BOX 910 BROOKS, KY 40109 (502) 957-7471 · FAX (502) 957-3420 Attachment 4.2 1. 2. 6. 7. 8. 9. $69,908 Acoustical Ceiling Panels Acoustical Wall Panels Lightning Protection Building Exterior Flood Lighting Building Exterior Flood Lighting Cupola Exterior Floor Lighting ~, , 3. Build out the Council Offices on third floor "The decision to accept Alternate Number 3 will be made by the Jeffersonville City Council within 30 days of project initiation." $76,547 ~ ~O \~ 'S~ 0.J~t.\:\ At> ct(~~.A4<'\<- "~~'N) ~(C~ t'Q'J' ($13,600) ~ r1#- Voluntary Deductive Alternates Floor mount toilets in lieu of wall mount Level right self leveling in lieu of gyp-crete Keeping electrical circuits closer together 4.3 Unit Prices 1. Cost, per ton, to provide miscellaneous steel 2. Cost, per lineal foot, to provide and install 2xlO (SY #2) framing members 3. Cost, per hanger, to provide and instaIl1-3/4"x9-l/2" L VL framing members 4. Cost, per hanger, to provide and install Simpson Strong-Tie type LB hangers 5. Cost, per brick, to remove and replace damaged facing Brick, includes aging applications 6. Cost, per sensor, to provide and install Lithonia infrared wall box occupancy sensor in lieu of on/off toggle switch 7. Cost per 4' X 8' sheet, to provide and install exterior grade plywood for potential roof deck replacement $2,760 per ton 3.25 per LF 6.60 per LF 10.00 ea 12.65 ea 78.00 per sensor 45.00 per sheet r, ~ ( ~ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sumjirnong the various portions of the Work. The ~chedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. ~. 5.1.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. ~ 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of (10'1.). Pending final determination of cost to the O>yner of changes in the Work, amounts not in dispute shall be included as provided in Section 7.3.8 of AlA Document A20l-l997; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of,~O% ); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtractamoll)1ts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AlA pocument A20l-l997. r ~ 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under f1iefol1owing circumstances: .1 Add, upon SubstantialC()mpletion of the Work, a sum sufficient to increase the total payments to the full amount of theC()nt(a~t Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and (Section 9.8.5 of AJADocument A201-1997 requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any.) .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of AlA Document A201-1997. ~ 5.1.8 Reduction or limita!i()!:1 of retain age, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Sections 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) No Reduction of Retainage ~ 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. r\ I AlA Document A101™ -1997. Copyright @1915, 1918. 1925. 1937. 1951,1958,1961,1963,1967,1974,1977,1980,1987,1991 and 1997 by The American Institute of Architects. All rights reserved. WARNiNG: This AIA@ Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA@ Docu1TIent, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:47:54 on 06/17/2005 under Order No.1 000150170_1 which expires on 12/7/2005, and is not for resale. User Notes: (2752440368) 4 ~ 5.2 FINAL PAYMENT ~ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when: .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AlA Document A201-l997, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. ~5.2.2 1 ~.'."'" . ... ~ Final payment will be released by the Owner within 30 days of the date of substantial completion and submission of as-built documents to the Architects. ARIICLE6JJ:.RMINA!!QRQR S.~SPENSION ~6:1 The ContraCt maYbe terminated by the Owner or the Contractor as provided in Article 14 of AlA Document A201-1997. ~6.2 The Work may be suspended by the Owner as provided in Article 14 of AlA Document A201-1997. ARTICLE 7 MISCJ;bJ,AN!;QU.~,egO"ISI()NS ~ 7.1 Where reference is made in this Agreel"Iient to a provision of AlA Document A201-1997 or another Contract Document, the referel1~t: rt:ft:1'"s to that provision as amended or supplemented by other provisions of the Contract ~ 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, orin the absencetl1ereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) ( 0%) per annum (Usury laws and requiremelJts ulJder..the Federal [ruth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) ~ 7.3The Owner's representative is: (Name, address and other information) The Honorable Rob Waiz City of Jeffersonville Jeffersonville, Indiana ~ 7.4 The Contractor's representative is: (Name, address and other information) f' AlA Document A101TM -1997. Copyright @ 1915,1918,1925,1937,1951.,1958,1961,1963,1967, 1974, 1977, 1980, 1987, 1991 arid 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA@ Document is protected by U.S. Copyright Law and International Treaties. 5 Unauthorized reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. !his document was produced by AlA software at 15:47:54 on 06/17/2005 under Order No.1000150170_1 which expires on 12/7/2005, and is not for resale. User Notes: (2752440368) r JaclC Jolly E H Construction, LLC Shepherdsville, KY. 40165, P. O. Box 910, Brooks, JY. 40109 (502) 957-7471 Fax (502) 957-3420 ~ 7.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. ~ 7.6 Other provisions: ARTICLE.8 E.NlIMERATlONOF CONTRACT DOCUMENT. S... .. .. .. '. .." .. "._:'.,....,.."'".-".,.,,,..,',.,.......,,. .0 '. .. .0- .. .,... .. ............ .. ,.., -",'.>,"'" ''''''''.'.l-''''"",-", .. ,', ~ 8.1 The ContractPQC;),!.p:lents, except for Modifications issued after executioIl of this Agreement, are enumerated as follows: ~ 8.1.1 The Agreement is this executed 1997 editio{l of the Standard Form of Agreement Between Owner and Contra9tot, AlA Document Al 0 1-1997. ~. 8.1.2 The General. Conditions are the 1997 edition. o. f. the G.....e.. n. e.ral Condit.io. ns of the Contract for Construction, AlA ,", ....,... ."""._.". ''''''','''''0'' .. "."".',.,...~"~.-.~_..._-,,,_,,,,.. __.. _,,', " .. '. .." _I .. .. .. ...... '... ...... ,... ". .. .. .. .0_'.. .. .'" .." Document A20l-l997. . ~ 8.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated , and are as follows Document Section 00800 Title Supplementary Conditions Pages 1-7 ~ 8.1.4 The Specific;ations are those contained in th,e Project Manual dated as in Section8.1.3, and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) See Attached t\ AlA Document A101™ -1997. Copyright @ 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1980, 1987, 1991 and 1997 by The American Ins1itute of Architec1s. All rights reserved. WARNING: This AlA'" Document is protected by U.S. Copyright Law and International Treaties. 6 Unauthorized reproduction or distribution of this AlA'" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:47:54 on 06/17/2005 under Order No.1000150170_1 which expires on 121712005, and is not for resale. User Notes: (2752440368) Jeffersonville City Hall Quartermaster Renovation SECTION 00003 - TABLE OF CONTENTS Section 00003 Section 00004 Section 00010 Section 00020 Section 00100 Section 00120 Section 00200 Section 00300 I'."...... ,i'..' ~.....' Section 00310 Section 0041 0 Section 00500 I . r I I Section 00600 Section 00700 Section 00800 Division 1 Section 01100 Section 01210 Section 01230 Section 01250 Section 01270 Section 01290 Section 01310 Section 01320 Section 01330 Section 01331 I Section 01400 Section 01420 Section 01500 Section 01600 Section 01700 Section 01731 Section 01732 Section 01770 Section 01781 Se~tiPn 01782 I I Division 2 Division 3 I Cover Certification Page Table of Contents List of Drawings Project Directory Invitation to Bidders Instructions to Bidders AlA Documentary A701 - Instruction to Bidders Supplementary Instructions to Bidders Information Available to Bidders UL Design Numbers Bid Form Form 96 AlA Document A305 - Contractor's Qualification Statement Bidders Checklist Bid Security Form AlA Document A310 - Bid Bond Agreement Form AlA Document A 101 - Standard Form of Agreement Between Owner and Contractor Contractor's Bond for Construction AlA Document A312 - Performance Bond General Conditions AlA Document A201 - General Conditions of the Contract Supplementary Conditions General Reauirements Summary Allowances Alternates Contract Modification Procedures Unit Prices Payment Procedures Project Management and Coordination Construction Progress Documentation Submittal Procedures . Electronic Drawing Files Electronic Release Form Quality Requirements References Temporary Facilities and Controls Product Requirements ' Execution Requirements Cutting and Patching Selective Demolition Closeout Procedures Project Record Documents Operation and Maintenance Data Site Work Concrete Section 03300 Cast-In-Place Concrete Section 03540 Cementitious Underlayment l- f I TABLE OF CONTENTS I JEFF.015 January 2005 00003 - 1 I Jeffersonville City Hall Quartermaster Renovation JEFF.015 January 2005 Section 16429 . Section 16441 Section. 16470 Section 16475 Section 16476 Section 16481 Section 16485 Section 16491 Section 16511 Section 165~ 1 Section 16671 Section 16726 Section 16902 Section 16904 I Switchboards - Low Voltage Safety Switches Panelboards Circuit Breakers and Fusible Switches - Low Voltage Enclosed Circuit Breakers Motor Starters - Low Voltage Contactors Fuses Interior lighting Exterior Lighting Transient Voltage Surge Suppression (TVSS) Council Chamber Sound System Electrical Control Devices Microprocessor Trip Units for LV Circuit Breakers \ END OF SECTION 00003 I r II r" ~ I I I I , . I I ~~ t I TABLE OF CONTENTS 00003 - 4 I r r (Paragraph deleted) ~ 8.1.5 The Drawings are as follows, and are dated unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) See Attached (Paragraph deleted) ~8.1.6 The Addenda, if allY, are as follows: Number 1 2 3 4 5 Date 1/27/05 2/04/05 2/20/05 3/21/05 3/21/05 Pages 5 3 3 2 4 Portions of AddeIlda rellltingto bidding requirements are not part of the Contract Documents unless the bidding requirements are also eIlumerated in this Article 8. ~ 8.1.7 Other documents, if any, forming part of the Contract Documents are as follows: (List here any additi()l){lltiQt;yments thelt are intended to form part of the Contract Documents. AlA Document A201- I99?provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample Jorms and the CQll/t(;tr:tor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here Qnly if intended to be part of the Contract Documents.) red into as of the day and year first written above and is executed in at least three original n IS to be delivered to the Contractor, one to the Architect for use in the administration of the mainder to the Owner. c#:~ Jack Jolly Project Manafer (Printed name and title) (Printed name and title) AlA Document A101lN -1997. Copyright @1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1980,1987,1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA@ Document is protected by U.S. Copyright Law and International Treaties. 7 Unauthorized reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:47:54 on 06/17/2005 under Order No.l000150170_1 which expires on 12/7/2005, and is not for resale. User Notes: (2752440368) Jeffersonville City Hall JEFF .015 Quartermaster Renovation January 2005 ;,....--,,,,, M6.1 Mechanical Details M7.1 Mechanical Flow Diagram M8.1 Mechanical Schedules P1.0 General Notes, Symbols & Specifications P3.1 First Floor Plan - Plumbing P3.2 Second Floor Plan - Plumbing P3.3 Third Floor Plan - Plumbing P5.1 Plumbing Riser Diagram P6.1 Plumbing Details P6.2 Plumbing Details P8.1 Plumbing Schedules FP3.1 First Floor Plan - Fire Protection FP3.2 Second Floor Plan - Fire Protection FP3.3 Third Floor Plan - Fire ProteCtion E1.0 Symbols. Notes and Schedules - Electrical E3.1 First Floor Plan - Lighting E3.2 Second Floor Plan - Lighting E3.3 Third Floor Plan - Lighting E4.1 First Floor Plan - Power E4.2 Second Floor Plan - Power E4.3 Third Floor Plan - Power E5.1 First Floor Plan - Systems E5.2 Second Floor Plan - Systems E5.3 Third Floor Plan - Systems E7.1 Riser Diagram and Details - Electrical E7.2 Panel Schedules - Electrical ---- l END OF SECTION 00004 , ~ i~ 00004 - 2 LIST OF DRAWINGS " ~ ~" ~.. ~ Additions and Deletions Report for @ TM AlA Document A 101 - 1997 This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to th~ standard form AlA document in order to complete it, as well as any text the author may have added to or deleted from the original AlA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AlA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AlA document. This Additions and Deletions Report and its associated document were generated simultaneously by AlA software at 15:47:54 on 06/17/2005. PAGE 3 ~ 5.1.3 Provided that an Application for Payment is received by the Architect not later than the10tblay of a month, the Owner shall make payment to the Contractor not later than the10tlrlay of the ~onth. If an Application for Payment is received by the Architect after the application date fixed above, payM~~'shall be made by the Owner not later than ( 10 ) days alter the Architect receives the Application for Payment. PAGE 5 ) per annum PAGE 7 Se6tiGfl. +itIe Pages NumbeF +itIe Oate Additions and Deletions Report for AlA Document A101™ -1997. Copyright @ 1915,1918,1925,1937,1951,1958,1961,1963,1967, 1974, 1977, 1980 1987 1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA@ Document is protected by U.S. Copyright 1 Law ~nd I~ternational Treaties. Unauthorized reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:47:54 on 06/17/2005 under Order No.1 000150170_1 which expires on 12/7/2005, and is not for resale. User Notes: (2752440368)