Loading...
HomeMy WebLinkAboutContract AML, INC ,--.... ..., :;1 II Document A101™ -1997 I i Form of Agreement Between Owner and Contractor basis of payment is a S TIP ULA TED SUM as of the Third day of January in the year of Two tp~c::>wner:.........o. address and (Jth,l?r information) ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AlA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AlA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AlA Document A201-1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. Seven words, indicate day, month and year) City of Jeffersonville JeffersonvilleCity Hall 500 QlIarter MasterQollf! Jeffersonville, IN 47130 a,n,atp~to~tractor: .. (Na.me, address and oth~rinformation) AML, Inc. 2916 Cam.pionROlld Floyd Knobs, IN 47119 812.923.9895 812.923.5628 The Project is: (Name and location) Fire Station No. 2 ~lIeadquarters 2204 East Tenth Street JeffersonviHeXN Fire Station.No. 4 . . 5413 Highway 62 Jeffersonville, IN City Services Complex 2200Pepperidge Lane This document has been approved and endorsed by The Associated General Contractors of America. The NShi!~8~is: ....... (Name, address and other injormailon) Kovert Hawkins Architects, Inc. 630 Walnut Street Jeffersonville, IN 47130 Telephone NlIrnb~T:$12 282 9554 Fax Number: 8122$29171 The Owner and Contractor agree as follows. AlA Document A10FM -1997. Copyright @ 1915,1918,1925,1937,1951,1958,1961,1963,1967, 1974, 1977, 1987, 1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This A,IA@ Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 1 reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document waS produced by AlA software at 15:14:39 on 12/21/2006 under Order NO.1 000252465_1 which expires on 8/4/2007, and is not for resale. User Notes: (3056745153) _.. ... THE CONTRACT DOCUMENTS Documents consist ofthis Agreement~ Conditions ofthe Contract (General, Supplementary and other Drawings, Specifications, Addenda is&ued prior to execution of this Agreement, other documents listed and Modifications issued after eJ}ecution of this Agreement; these form the Contract, and are as VIly a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire ftliegrated agreement between the parties hereto and supersedes prior negotiations, representations or ements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in 'cle 8. ;'!;,<i::,:, " ):v,/\t"'.;,'}'o' ICLE 2'r~E WOR,~ 8.fTH1S CONTRACT .y11~ Contray.torshallf#Jiy ~xecute the W ork descri~ed in the Contract Documents, ex.cept to the extent specifically ....;..i.Il(1.icated !Il..tp.~<:ontrllctpocuments to be the responsibility of others. ,', ,',' ,,',' ',', ':::",,,:-, ,:,-..':' ":"""....," I ii:~~TICLE~DATE dFco~MENCEMENT AND SUBS~ANTIAL COMPLETION ",_"':'::>.:":';::.:.':';"'::':" ",:'~:-'-';-0~:\'-(~'''''':'"'' 'f,~0'r-c'~"f'" ',' -' -.. d'-' '",', "---' ';'.J. ." -,' ,"__'J",', -1- ,'," c__,. "'_""-_-'';''',''', ',' 'J.".";,, ",,', : /~}:1 T,!'1e.;q~t~ofg:>lll1!!~n~~Wx!lt of the Work shall, be the elate o(thisAgreeII1eIlt unless a different date is stated B~loy.;RrI?r()visioIlismaqe fQLthe date to be fixed in a notice to proceed issued by the Owner. ~;;j(rnsert iiie!1ate o[commencement if it differs from the date of this Agreement or, if applicable, state that the date Will be fixed in a notice to proceed.) ,;!~-j!::;>"/,~,, "",','"",' >,-" ,-,-,;:_,:},-";":<,;/,..:,;,_>,-,,,,:,,, ,,:,;,;/':",:'i",_:-,/:"" ",.:':,-',:'':-_-,:';,' I ;Ir,priortothe commen~~m~lltQf the Work, the Oimer requires time to file mortgages, mechanic's liens and other s~9urity interests, the Owner) time requirement shall be as follows: .~ 3~tTh~C6ntl'actTimesh~1l'be measured from t~e date of commencement. ;\./..i\i'/; ..........;/.............7'.. : ~'i~:~'J6e.;Contr~<:;tQt:~hall achieve Substantial Co~pletion of the entire Work not later than days from the date of ;P2mm~~g~m~nt,.or..~~follo"'s: i r~n..~~rt.num~~';?tcaJendar.days. Alternatively, a calendar date may be used when coordinated with the date of cohiniencemen.t.[f~lr;#/itated el~/:,~~~Jn the C~ntract Documents, insert any requirements for earlier Substantial (;ompletion of certain portions of the Work.) Work Substantial Completion Date 4 September 15,2007 City Services Complex September 15, 2007 Station NQ. 211P,qII~<:ldquarters December 15, 2007 , s1f6ject to adjustll1~Ht~~fthf$~~ntract Time as Jrovided ill the Contract Documents. (Insert pr()yi$,i~l'ls,. if any, jorliquidated damages relating to failure to complete on time or for bonus payments for early completion of the Work.) I '\:,'-."';"',"0 , '-"~';::i ::\..;j__ '>J;',,,,__j:";,,; ARTICLE 4.. .CONTRACT SUM ..' ';"'-"',';:""__;''-'''''':''''>' ""--:__;""\i-"'\':--'-':""~~""'::':,",,';"';"-:"'f"" ".' ,', ,'"" :" ,'" ',' ',' --', ",,' --,", ',", ,--I ~ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The C:ontract Sumshall be Nine Million Three Hundred Ninety Nine Thousand Dollars and .00/1.00 ($9,399,000.00 . ), subject to additions and ded~ctions as provided in the Contract Documents. '''~f~':fl1~tg~tJ'igt Sum is based upon the fOllowihg alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: I AlA Document A101TM -1997. Copyright @ 1915,1918,1925,1937,1951,1958,1961,1963,1967, 1974, 1977, 1987, 1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA@ Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 2 reproduction or distribution of this AlA" Document. or any 'portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:14:39 on 12/21/2006 under Order No.1 000252465_1 which expires on 8/4/2007, and is not for resale. User Notes: (3056745153) (State the numbers or other identification of accepted alternates. If decisions on other alternates are to be made by to the execution of this AgreJment, attach a schedule of such other alternates showing the each and the date when that amount expires) Base Bid DEDUCT - Alternate No.1: Composition Shingle Roof (Stations #2 and #4) $9,399,000.00 CONTRACT AMOUNT Unit prices, if as follows: Descdption N/A Units Price ($ 0.00) .'--:.:.<.:,,-:.-.:: .: ,'-.-:.' .' .AR"ICLI;~'.eAYM~J'~ ~5.1 P~OGRESS PA)'M~Nr~'.' ......~ 5.1.1~ase<lupon Applications for Payment subm).tted to the Architect by the Contractor and Certificates for }>aymentissued by the Archit~ct, the Owner shall rp.ake progress payments on account of the Contract Sum to the C():t;[~ct()r aspr6vid:~~~10yvand elsewhere in thel Contract Documents. .);,c.)y....y../.. ..y(. ..... .... " I ~ 5.t2The;period covei~<lby each Application forPayment shall be one calendar month ending on the last day of HJ2~ril.onth, or as k::C'''<'''',l.>fj.t';''(-,:, . ~5.1:art:Q~i~edm,l!t~~A:p~lication for Payment iJ received by the Architect not later than the Twenty-Fifty (25th) day ofamonth, the Qwnersl1fl,Jl make payment to the Contractor not later than the Fifteenth (I5th) day of the following" month. If lll1 Application for Payment is received by the Architect after the application date fixed above, payment shall be.ma<l~. by the Owner not later thal]l Thirty (30 ) days after the Architect receives the Application for Payment. :,_:,,:",::,~:,:-:~'::.t,:'-;:_>::-,,~,:'-,,_: ''.' ,,:.. . :~;;-,',:,,: ,'0; : ',':' :.',: :._: '::: ,:',;-, i ~ 5.1.4 EachApplication for Payment shall be bastfd on the most recent schedule of values submitted by the ....S;()l!tractor in aCS2Ig~~~e with t~.~.J;;8;y:~.~.ct Docu~ents. The schedule of values shall allocate the entire Contract .....~~m ~'[)1ong the .Ia~()us portions oftl1~ Work. Tht1 schedule of values shall be prepared in such form and supported . by such<la~fl tOSll1?st,flf1gflt~its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as fl. basis for reviewing t~e Contractor's Applications for Payment. " -":h:")'};':_':";':':;-';:'<;;:':;;'_:'" _ ,,;:,):':.::.:",','--:;:"-:>-/'-.-.'-"':, I ~ 5.t5A-.pplications for Paym~nlshaUindicate the percentage of completion of each portion of the Work as of the end of the. period covered by th~ Application for I>ayment. ~5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: ' .1 Take that portion of the Contract ~um properly allocable to completed Work as determined by mllltiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of Ten ( 10% ). Pending final determination of co~t to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Se;ction 7.3.8 of AlA Document A201-l997; that portion of the Contract S~m properly allocable to materials and equipment delivered and stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Ten (10% ); .3 Subtract the aggregate of previous payments made by the Owner; and ~i I AlA Document A101TM -1997. Copyright @1915, 1918, 1925,1937, 1951,1958,1961,1963,1967,1974,1977,1987,1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This ~IA@ Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 3 reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document wGis produced by AlA software at 15:14:39 on 12/21/2006 under Order No.1 000252465_1 which expires on 8/4/2007, and is not for resale. . User Notes: (3056745153) "'" .4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AlA Document A201-1997. progress payment amount determined in accordance with Section 5.1.6 shall be further modified under circumstances: Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and (Section 9.8.5 of A/A Document A201-1997 requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any.) completion of the Work is thereafter materially delayed through no fault of the any additional amounts payable in accordance with Section 9.10.3 of AlA Document retainage, if any, shall be as follows: Completion of the entire Work, to reduce or limit the retainage resulting from 5.1.6.1 and 5./.6.2 above, and this is not explained elsewhere in the Contract such reduction or limitation.) (50%) complete, the Owner will pay ninety percent (90%) ofthe amount due the payments. At the time the work is Fifty percent (50%) complete and thereafter, if work and its progress are and remain satisfactory to the Architect, and in absence of he shall, authorize all past and future payments be increased to an amount equal to prior approval, the Contractor shall not make advance payments to suppliers for not been delivered and stored at the site. the entire unpaid balance of the Contract Sum, shall be made by the Owner to the has been issued by the Architect. p~er,:t~Ji~;.tJ.payment to the Contractor shall be made no later than 30 days after the issuance of the fiJlal Ceni!iQ~t~,!g~Fayment, or as follows: 6'.TER.MfNATION OR SUSPENSION '1<': (;:_':"~::";1'-?>'";'1'~7.~:'~?t_":'("~ The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AlA Document A201-1997. be suspended by the Owner as provided in Article 14 of AlA Document A201-1997. ......>>.n LLANEOUS PROVISIONS :l'Wnere.t~tei;.~nce is made in this Agreement to a provision of AlA Document A201-1997 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. .r' ; AlA Document A10pM -1997. Copyright @ 1915,1918,1925,1937,1951,1958,1961,1963,1967, 1974, 1977, 1987, 1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA@ Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 4 reproduction or distribution of this AIAf> Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:14:39 on 12/21/2006 under Order No.1 000252465_1 which expires on 8/4/2007, and is not for resale. User Notes: (3056745153) ~ 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is of interest agreed upon, if any.) Percent (0.67%) per month, compounded. laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws other regulations at the Owner's and Contractor's principal places of business, the location of the Project and affect the validity of this provision. Legal advice should be obtained with respect to deletions or and also regarding requirements such as written disclosures or waivers.) is: information) AML, Inc. 2916 Campion Roa<l Floyd Knobs, IN 47119 ~7.5Neitbel'the O'-":m~r'~Il()r the Contractor's representative shall be changed without ten days written notice to the . other party. ~:~~ix;i1;':<'Y;'~:<;":",~~::,;i~ ,..,~.,,; , ~ 7.6 Other -,;,,',,,,,,,,, ..:;'i:""':,":-,::-"":-" ..:...:,....-', .: ..-...,.-.....-..,.... .....-.-.., -', : "':-:1'<':'::'}"' ';i:/ :<":./;:::/.:.,-: ,'- ::<: ,:,'~<-':.:'.. .....:"., ...., ......,..,.-..,.....-'........,...... ..., ARTICL;ES 'ENUMERAtiON OF CONTRACT DOCUMENTS ';f~rffie Contrngtl~~ume~ts,"except for Modifications issued after execution of this Agreement, are enumerated as lloW~:.. . ~8.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between Owner and Contractor, AlA Dl:>91.lml'1l1t1\JQl-1997. ~ 8:"1:2 The Generalcoil~ttlQif~.itethe 1997 edition of the General Conditions of the Contract for Construction, AlA Document A20 1-1997. ,. -,:':""-:',..,-':'" "'" /.",'.,'" ...:.:..'......:... ~ 8.1.3 T~~sJ;pl~hientary and other Conditions of the Contract are those contained in the Project Manual dated October 2, 2006 , and are as follows Document Title Pages are those contained in the Project Manual dated as in Section 8.1.3, and are as follows: here or refer to an exhibit attached to this Agreement.) I Title of Specifications "Exhibit A" AlA Document A101™ -1997. Copyright @ 1915,1918,1925,1937,1951,1958,1961,191>3,1967, 1974, 1977, 1987, 1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA@ Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 5 reproduction or distribution of this AIA@ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:14:39 on 12/21/2006 under Order No.1000252465_1 which expires on 8/4/2007, and is not for resale. User Notes: (3056745153) (Rows deleted) Drawings are as follows, and are dated October 2, 2006 unless a different date is shown below: the Drawings here or refer to an exhibit attached to this Agreement.) Station No.2 and Headquarter Drawings "Exhibit B" Title of Fire Station No.4 Drawings "Exhibit C' Title of City Services Complete Drawings "Exhibit D" Number One (1) Two (2) Date October 27, 2006 November 9, 2006 November 10, 2006 November 14,2006 Pages Twenty-Seven (27) Twenty -Six (26) Five (5) Fifteen (15) bidding requirements are not part of the Contract Documents unless the bidding this Article 8. '," ~. 8.~.rgtherA()~um~Il~s, if~ny ,forming part of the Contract Documents are as follows: {(List~f!reo;n.~ additiqn.O;raoc~~nts that are intended to form part of the Contract Documents. AlA Document A201- ,!il,2~.Z]Jrovfa~s t~t!Ji4cding.requirements such as advertisement or invitation to bid, Instructions to Bidders, sample v;'..fqrrns andt~e Go~trg,ctor'.~,k,ktJ!:re not part of the Contract Documents unless enumerated in this Agreement. They >Shouldge list(!4~~re o.,!ly if intended to be part of the Contract Documents.) e into as of the day and year first written above and is executed in at least three original be delivered to the Contractor, one to the Architect for use in the administration of the del' to the Owner. f :3th/ L/;).d~ CONTRACTOR (Signature) Scott L. We1ch, President (Printed name and title) I .1.' y- RobertWaiz, Mayor (Printed name and. iitfe) ,~,/:"..~. ('i AlA Document A10FM -1997. Copyright @ 1915,1918,1925,1937,1951,1958,1961,1963,1967, 1974, 1977,1987,1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA'" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 6 reproduction or distribution of this AlA'" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:14:39 on 12/21/2006 under Order No.1 000252465_1 which expires on 8/4/2007, and is not for resale. User Notes: (3056745153) "Exhibit A" 200527.01/02/03 10/02/06 CITY OF JEFFERSONVILLE FIRE STATION NO.2 & HQ / FIRE STATION NO. 4/ CITY SERVICES COMPLEX f' INDEX TO SPECIFICATIONS il Section 00100 AlA A701 Section 00210 Section 00220 Section 00300 Section 00301 Section 00302 Section 00410 AlA A310 Section 00430 Section 00500 AlA A101 Section 00600 AlA A312 Section 00670 r\1 Section 00700 AlA A201 Section 00810 Section 00830 Insert ,~ ("Ii DIVISION 1 Section 01110 Section 01130 Section 01210 Section 01220 Section 01230 Section 01300 Section 01310 Section 01320 Section 01330 Section 01370 Section 01400 Section 01420 Section 01510 Section 01520 Section 01610 Section 01630 Section 01640 Section 01732 Section 01740 Section 01770 Section 01780 Section 01781 ~ BIDDING REQUIREMENTS Notice to Bidders Instructions to Bidders Supplementary Instructions to Bidders Contractor's Bid Submittal Checklist Contractor's Bid Form: Public Works Proposal Form: Part I (Form No. 96, Revised 2005) Proposal Form: Part II (Form No. 96, Revised 2005) CONTRACT FORMS Bid Security Form Bid Bond Subcontractor List Agreement Form Standard Form of Agreement Between Owner and Contractor Contractor's Bond for Construction Performance Bond and Payment Bond Escrow Agreement CONDITIONS OF THE CONTRACT General Conditions General Conditions of the Contract for Construction Supplementary General Conditions Wage Determination Schedule Wage Scale GENERAL REQUIREMENTS Summary of Work - Single Contract General Construction Requirements Cash Allowances Contingency Allowance Alternates Project Meeti ngs Project Management and Coordination Construction Progress Documentation Submittal Procedures Schedule of Values Quality Control References Temporary Utilities Temporary Construction Product Delivery and Handling Product Options and Substitutions Owner Furnished Equipment Cutting and Patching Cleaning Closeout Procedures Closeout Submittals Closeout Maintenance Materials INDEX TO SPECIFICATIONS INDEX-1 "Exhibit A" CITY OF JEFFERSONVILLE FIRE STATION NO.2 & HQ / FIRE STATION NO. 4/ CITY SERVICES COMPLEX 200527.01/02/03 10/02/06 r\ DIVISION 2 SITE WORK Section 02060 Building Demolition Section 02110 Site Clearing Section 02200 Earthwork Section 02280 Termite Control Section 02370 Erosion Control Section 02510 Asphalt Concrete Paving (IN) Section 02710 Water Distribution Section 02720 Site Drainage Section 02730 Sanitary Sewage Section 02750 Concrete Paving and Curbs Section 02810 Irrigation System Section 02826 Aluminum Louvered Gates Section 02830 Chain Link Fences Section 02930 Lawns and Grasses Section 02950 Trees, Plants and Ground Covers Section 02951 L-Shaped Aluminum Maintenance Edging DIVISION 3 CONCRETE Section 03300 Cast-In-Place Concrete Section 03470 Tilt-up Precast Concrete DIVISION 4 MASONRY r: Section 04100 Mortar '''---< Section 04150 Masonry Accessories Section 04160 Masonry Reinforcement Section 04210 Face Brick Masonry Section 04220 Concrete Unit Masonry Section 04430 Limestone Section 04510 Masonry Protection and Cleaning Section 04731 Manufactured Stone Ornaments DIVISION 5 METALS Section 05200 Open-Web Joists Section 05300 Metal Roof Deck Section 05310 Metal Form Deck Section 05500 Miscellaneous Metals Section 05515 Fixed Aluminum Wall Ladders DIVISION 6 CARPENTRY Section 06100 Rough Carpentry Section 06190 Prefabricated Wood Trusses Section 06200 Finish Carpentry Section 06602 Pre-Formed Moldings rli INDEX TO SPECIFICATIONS INDEX-2 "Exhibit A" CITY OF JEFFERSONVILLE FIRE STATION NO.2 & HQ / FIRE STATION NO. 4/ CITY SERVICES COMPLEX 200527.01/02/03 1 0/02/06 nDIVISION 7 Section 07110 Section 07190 Section 07200 Section 07240 Section 07310 Section 07415 Section 07531 Section 07600 Section 07615 Section 07625 Section 07626 Section 07650 Section 07725 Section 07840 Section 07900 THERMAL AND MOISTURE PROTECTION Dampproofing Water Repellents Insulation Exterior Insulation and Finish System Shingles Pre-Finished Exterior Wall Panels Elastomeric Sheet Roofing System - Fully Adhered (EPDM) Flashing, Sheet Metal and Roof Accessories Metal Roofing Aluminum Soffit Aluminum Soffit Vent Flexible Flashing Roof Scuttle and Ladder Firestopping Joint Sealers '" DIVISION 8 Section 08110 Section 08211 Section 08305 Section 08331 Section.08360 Section 08362 Section 08410 Section 08611 Section 08710 Section 08800 DOORS AND WINDOWS Steel Doors and Frames Flush Wood Doors Access Doors Coiling Counter Door - Powder Coat Finish Sectional Overhead Doors Full Glass Aluminum Sectional Overhead Doors - Fire Station Operation Aluminum Entrances and Storefronts Clad Wood Windows and Doors Finish Hardware Glass and Glazing DIVISION 9 Section 09100 Section 09215 Section 09250 Section 09300 Section 09510 Section 09575 Section 09576 Section 09623 Section 09650 Section 09670 Section 09680 Section 09720 Section 09772 Section 09900 Section 09950 Section 09960 Section 09981 FINISHES Metal Support Systems Veneer Plaster Gypsum Drywall Tile Acoustical Ceilings Epoxy Terrazzo Terrazzo Vitrefication Finishing System Recycled Rubber Sports Floor Resilient Tile Flooring Decorative Epoxy Floor Coating Carpeting Presentation Dry Erase Wallcovering Modular Wall Panel System Painting Wallcoverings High Performance Coating - Multicolor Paint Dyed Concrete E" INDEX TO SPECIFICATIONS INDEX-3 "Exhibit A" CITY OF JEFFERSONVILLE FIRE STATION NO.2 & HQ 1 FIRE STATION NO. 4/CITY SERVICES COMPLEX (' I DIVISION 10 Section 10100 Section 10161 Section 10171 Section 10190 Section 1 0200 Section 1 0350 Section 1 0420 Section 10430 Section 10440 Section 10522 Section 1 0530 Section 10650 Section 10800 SPECIALTIES Visual Display Boards Stainless Steel Toilet Partitions Solid Plastic Toilet Partitions Cubicle Tracks Louvers and Vents Flagpole Plaque Exterior Signs Interior Signs Fire Extinguishers and Cabinets Pre-Manufactured Fuel Pump Canopy Accordion Folding Partitions Toilet Accessories DIVISION 11 Section 11133 Section 11450 Section 11452 EQUIPMENT Video Monitor Mounts Food Service Equipment Residential Appliances (' DIVISION 12 Section 12325 Section 12502 Section 12505 Section 12560 FURNISHINGS Plastic Laminate Cabinets and Casework Window Shades Horizontal Mini-Blinds Pull Down Wall Beds DIVISION 13 Section 13129 Section 13850 Section 13930 SPECIAL CONSTRUCTION Pre-Manufactured Truss-Framed Storage Buildings Fire Detection and Alarm System Wet Pipe Fire Suppression Sprinklers DIVISION 14 Not Used CONVEYING SYSTEMS r: INDEX TO SPECIFICATIONS 200527.01/02/03 1 0102/06 INDEX-4 "Exhibit A" CITY OF JEFFERSONVILLE FIRE STATION NO.2 & HQ / FIRE STATION NO.4 / CITY SERVICES COMPLEX 200527.01/02/03 10/02/06 r\ , (' DIVISION 15 Insert Section 15010 Section 15013 Section 15015 Section 15020 Section 15040 Section 15050 Section 15060 Section 15070 Section 15075 Section 15080 Section 15085 Section 15110 Section 15121 Section 15130 Section 15140 Section 15150 Section 15190 Section 15210 Section 15400 Section 15460 Section 15482 Section 15530 Section 15550 Section 15651 Section 15736 Section 15759 Section 15794 Section 15810 Section 15815 Section 15820 Section 15830 Section 15831 Section 15865 Section 15902 Section 15950 MECHANICAL Mechanical Subcontractor and Material List Scope of Project Excavation and Backfill Mechanical General Requirements Operations and Maintenance Data System Testing Basic Materials and Methods Piping Installations Mechanical Vibration and Seismic Controls Labeling and Identification Pipe Insulation Duct Insulation General Duty Valves Gauges Domestic Hot Water Circulating Pump Domestic Water Piping Interior Sewer, Soil, Waste, and Vent Piping Natural Gas Piping System Compressed Air Piping System Plumbing Fixtures and Trim Water Softener (Fire Station # 4 only) Domestic Water Heater Gas Furnace Systems Flue Vents Refrigerant Piping System Packaged Rooftop Units Gas-Fired Unit Heaters Energy Recovery Unit Low Pressure Ductwork Fire and Smoke Dampers Ductwork Accessories Inline Cabinet Fans Propeller Fans Vehicle Exhaust Removal System Control Wiring and Control Dampers Testing and Balancing ~\ I' ' INDEX TO SPECIFICATIONS INDEX-5 "Exhibit A" CITY OF JEFFERSONVILLE FIRE STATION NO.2 & HQ 1 FIRE STATION NO. 4/CITY SERVICES COMPLEX {'Ii DIVISION 16 Insert Section 16010 Section 16011 Section 16012 Section 16013 Section 16014 Section 16015 Section 16020 Section 16050 Section 16071 Section 16110 Section 16111 Section 16120 Section 16121 Section 16134 Section 16140 Section 16150 Section 16155 Section 16160 Section 16161 Section 16170 Section 16181 Section 16182 Section 16190 Section 16216 Section 16400 Section 16450 Section 16500 Section 16501 Section 16601 Section 16740 Section 16933 Section 16950 Section 16951 ELECTRICAL Electrical Subcontractor and Material List General Provisions Scope of Work Site Utilities Excavation Excavation and Backfill Manuals and Record Drawings Labeling and Identification Temporary Work Basic Materials and Methods Seismic Controls for Electrical Work Raceway Conduit Wire and Cable Power System Power System Wire Connections and Devices Outlet Boxes Wiring Devices Motors Motor Starters Panel boards Installation of Switchboards, Panelboards and Cabinets Disconnect Switches Fuses Circuit Breakers Hangers and Supporting Devices Internal Combustion Generator Service and Metering Grounding Lighting Lamps, Ballasts, Accessories Transient Voltage Surge Suppressors Telephone Conduit System Outside Light Control Occupancy Sensors Controls and Control Wiring ri INDEX TO SPECIFICATIONS 200527.01/02/03 1 0102/06 INDEX-6 f' "Exhibit B" DRAWING SHEET INDEX Station No.2 Jeffersonville Fire Department Jeffersonville, Indiana File: OS27.02/D-1 Drawing Title GENERAL DRAWINGS G-l 0 1 Life Safety Plan CIVIL DRAWINGS C-OOO Site Survey C-OO 1 Demolition Plan C-1 0 1 Site Development Plan C-l02 Site Utility Plan C-201 C-202 C-203 C-204 C-30l C-302 C-303 r'i C-40 1 C-402 C-403 C-404 Grading and Drainage Plan Plan / Profile of Proposed Roadway Catch Basin Profiles Subsurface Drainage Storm water Pollution Prevention Plan Storm water Pollution Prevention Narrative Storm water Pollution Prevention Details Site Details Site Details Site Details Site Details LANDSCAPE DRAWINGS L-l01 Landscape Plan / Plant Schedule L-102 Landscape Enlarged Plans / Plant Schedule L-103 Edging Enlarged Plans STRUCTURAL DRAWINGS S-lOl Foundation Plan S-20 1 Framing Plan S-301 Foundation / Framing Details S-302 Foundation / Framing Details ARCHITECTURAL DRAWINGS A-101 Architectural Plan A-20 1 A-30 1 A-401 A-SOl A-S02 Dimension Plan & Enlarged Plans Roof Plan Reflected Ceiling Plan Exterior Elevations Exterior Elevations r A-601 A-602 A-701 A-702 A-703 A-704 A- 705 A-706 A-80 1 A-802 A-901 A-902 "Exhibit B" DRAWING SHEET INDEX Station No.2 Jeffersonville Fire Department Jeffersonville, Indiana File: 0527.02/D-l Building Sections Building Sections Wall Sections Wall Sections Wall Sections Wall Sections Wall Sections Wall Sections & Details Door Schedule / Door and Window Elevations Door and Window Details Miscellaneous Details Miscellaneous Details KITCHEN DRAWINGS K-I0l Kitchen Equipment Plan & Exhaust Hood Details K-I02 Kitchen Exhaust Hood Details EQUIPMENT DRAWINGS Q-I0l Equipment Plan r Q-201 Q-202 Q-203 Casework Elevations Casework Elevations Casework Elevations INTERIOR DRAWINGS 1-101 Finish Plan 1-102 Finish Patterns &, Details FIRE PROTECTION DRAWINGS F-I0l Fire Suppression Plan (Alternate No.2) F-201 Fire Alarm Plan PLUMBING DRAWINGS P-I0l Plumbing Foundation Plan & Details P-201 Plumbing Plan P-202 Gas & Compressed Air Piping Plan P-301 Enlarged Plumbing Plan & Details P-40 1 Plumbing Fixture Schedule MECHANICAL DRAWINGS M-201 Mechanical Plan M-301 Enlarged Utility Room Plan M-401 Mechanical Equipment Schedules MP-I0l Vibration & Seismic Control Details ~. "Exhibit B" DRAWING SHEET INDEX Station No.2 Jeffersonville Fire Department Jeffersonville, Indiana File: 0527.02/D-1 ELECTRICAL DRAWINGS E-101 Site Electrical Plan E-201 Power Plan E-301 Lighting Floor Plan E-40 1 Electrical Systems Floor Plan E-50 1 Fixture Schedules & Panel Schedules E-502 Panel Schedules TRAINING TOWER (ALTERNATE) TT-101 Structural Drawings TT-102 Architectural Drawings TT -103 Miscellaneous Drawings .' r-" "Exhibit C" DRAWING SHEET INDEX Station No.4 Jeffersonville Fire Department Jeffersonville, Indiana File: 0527.01/D-l Drawing Title GENERAL DRAWINGS G-l 0 1 Life Safety Plan CIVIL DRAWINGS C-OOO Site Survey C-l 0 1 Site Development Plan C-I02 Site Utility Plan C-201 Grading and Drainage Plan C-202 State Highway/New Driveway Plan C-301 Stormwater Pollution Prevention C-302 Stormwater Pollution Prevention C-303 Stormwater Pollution Prevention C-40 1 Site Details C-402 Site Details C-403 Site Details C-404 Site Details LANDSCAPE DRAWINGS L-I0l Landscape Plan / Plant Schedule L-I02 Seed/Sod and Edging Plan STRUCTURAL DRAWINGS S-101 Foundation Plan S-201 Roof Framing Plan S-301 Foundation / Framing Details S-302 Foundation / Framing Details ARCHITECTURAL DRAWINGS A-I 0 1 Architectural Plan A-20 1 Dimension Plan & Enlarged Plans 1" A-301 A-401 A-501 A-502 A-601 A-602 A-701 A-702 A-703 A-704 A-705 f'h Roof Plan Reflected Ceiling Plan Exterior Elevations Exterior Elevations Building Sections Building Sections Wall Sections Wall Sections Wall Sections Wall Sections Wall Sections and Details /"", "Exhibit C" DRAWING SHEET INDEX Station No.4 Jeffersonville Fire Department Jeffersonville, Indiana File: 0527.01/D-1 A-801 A-802 Door Schedule / Door and Window Elevations Door and Window Details A-901 A-902 Miscellaneous Details Site Storage Building r KITCHEN DRAWINGS K-101 Kitchen Equipment Plan & Exhaust Hood Details K-102 Kitchen Exhaust Hood Details EOUIPMENT DRAWINGS Q-101 Equipment Plan Q-201 Casework Elevations INTERIOR DRAWINGS 1-101 Finish Plan 1-102 Finish Details FIRE PROTECTION DRAWINGS F-101 Fire Suppression Plan (Alternate No.2) F-201 Fire Alarm Plan PLUMBING DRAWINGS P-101 Plumbing Foundation Plan & Details P-201 Plumbing Plan P-202 Gas and Compressed Air Piping Plan P-301 Enlarged Plumbing Plan & Details P-401 Plumbing Fixture Schedule MECHANICAL DRAWINGS M-20 1 Mechanical Floor Plan M-40 1 Mechanical Equipment Schedules MP-1 0 1 Vibration & Seismic Control Details ELECTRICAL DRAWINGS E-101 Site Electrical Plan E-20 1 Power Plan E-301 Lighting Plan E-40 1 Systems Floor Plan E-501 Fixture Schedule & Panel Schedules r (5' "Exhibit D" DRA WING SHEET INDEX City Services Complex Jeffersonville, Indiana File: 0527.03/D-l Drawing Title GENERAL DRAWINGS G-l 0 1 Life Safety Plan CIVIL DRAWINGS C-OOO Site Survey C-OO 1 Site Demolition Plan C-l 0 1 Site Development Plan C-I02 Site Utility Plan C-201 C-202 C-203 C-204 C-30 I C-302 C-303 ri C-40 1 C-402 C-403 C-404 Site Grading and Drainage Plan Roadway Plan and Profile Stormwater Profiles Subsurface Drainage Plan Stormwater Pollution Prevention Plan Stormwater Pollution Prevention Plan Stormwater Pollution Prevention Details Site Details Site Details Construction Details & Specifications Construction Details & Specifications LANDSCAPE DRAWINGS L-l 0 1 Landscape Plan / Plant Schedule L-I02 Landscape Enlarged Plans / Plant Schedule L-I03 Edging Enlarged Plans STRUCTURAL DRAWINGS S-101 Foundation Plan: Building 1 S-102 Foundation Plan: Building 2 S-103 Foundation Plan: Building 3 S-201 Framing Plan: Building 1 S-202 Framing Plan: Building 2 S-203 Framing Plan: Building 3 S-301 Canopy Framing Plan S-401 Tilt-wall Details ARCHITECTURAL DRAWINGS A-I 0 1 Architectural Plan: Building 1 A-I02 Architectural Plan: Building 2 A-I03 Architectural Plan: Building 3 A-20 1 A-301 Enlarged Plans Roof Plans ., r".. A-401 A-402 A-SOl A-502 A-503 A-504 A-60 1 "Exhibit D" DRAWING SHEET INDEX City Services Complex Jeffersonville, Indiana File: 0527.03/D-1 Reflected Ceiling Plan: Building 1 Reflected Ceiling Plan: Building 2 Exterior Elevations Exterior Elevations Exterior Elevations Exterior Elevations Building Sections A-701 Wall Sections A-702 Wall Sections A-703 Wall Sections A-80 1 Door Schedule / Door and Window Elevations A-90 1 Miscellaneous Details EQUIPMENT DRAWINGS Q-101 Casework ElevationslDetails INTERIOR DRAWINGS 1-101 Finish Plan: Building 1 1-102 Finish Plan: Building 2 ri PLUMBING DRAWINGS P-1 0 1 Plumbing Plan: Building 1 P-102 Plumbing Plan: Building 2 P-103 Plumbing Plan: Building 3 P-201 P-202 Water/Gas/Air Piping Plans: Building 1 Water/Gas/Air Piping Plans: Building 2 MECHANICAL DRAWINGS M-101 HVAC Plans: Building 1 M102 HV AC Plans: Building 2 M-201 Miscellaneous Details ELECTRICAL DRAWINGS E-101 Site Electrical Plan E-201 E-202 E-203 Ir--'p. E-301 E-302 E-303 E-401 E-402 Power Plans: Building 1 Power Plans: Building 2 Power Plans: Building 3 Lighting Plans: Building 1 Lighting Plans: Building 2 Lighting Plans: Building 3/Fixture Schedule Service Riser Diagrams Panel Schedules