HomeMy WebLinkAboutBid Contract JTL 5 year plan (\ f'i . J '. 4' JACOBI, TOOMBS AND LANZ, INC. CONSULTING ENGINEERS . , 120 Bell Avenue Clarksville, Indiana 47129 (812) 288-6646 (812) 288-6656 Fax May 8, 2006 Mr. Kevin Lagrange, President Jeffersonville Board of Parks and Recreation 1406 Fredericks Avenue Jeffersonville, Indiana 47130 Re: Proposal to Update Five-Year Master Plan Dear Mr. LaGrange: The purpose of this letter is to present our company's proposal to update the Five-Year Parks and Recreation Plan for the years 2007-2011. As you may be aware, our firm updated the current plan for the years 2002-2006. JTL will provide the following services: 1. Review the current Master Plan and update existing facility descriptions. 2. Meet with Parks Board and Park and Recreation representatives and discuss ideas. 3. Host Public Information Meeting and request public input. 4. Update Needs Analysis and Standards. 5. Prioritize Five- Year action plan. 6. Prepare Report. Our firm can complete the work required by July 31,2006. We propose to be compensated on a time and materials basis, in accordance with our current hourly billing rates (attached), with a Not-to-Exceed budget of five thousand dollars ($5,000). Jacobi, Toombs and Lanz, Inc. appreciates this opportunity to be of service, and if this proposal is acceptable, please countersign the acceptance statement below. Very Truly Yours, 0) ,.d" , 5,'-59dne9,-WFDOCS'rcoposals'\f;ve-gear plan.doc t"i. r--\ ~ Accepted thisf3,v... day of M~ 2006 S'5~dne~"WFDOCS'f>coposals 'fjve-~ea' plan.doc ,. ., 0: JACOBI, TOOMBS AND LANZ, INC. 2006 HOURLY BILLING RATES CODE CLASSIFICATION * HOURLY RATE r\ SE PM PE DE DT DTT EA EA2 LS LAS CGM CM GIS CT CD SM SC ST SA FC2 FC3 RCM RP RI ADM CL GPS EXP Senior Engineer/Principal (PE) Project Manager (PE) Project Engineer (P.E.) Design Engineer (P.E) Detail Engineer (ELT.) Detail Engineer (ELT.) Engineer Assistant Engineer Assistant (in training) Land Surveyor (Licensed) Land Acquisition Specialist CADD/GIS Manager CADD Manager GIS Technician CADD Technician/Draftsperson CADD Designer Survey Manager (P.E./P.LS.) Survey Chief (Not Registered) Survey Technician Surveyor Assistant 2~ Man Field Crew 3~ Man Field Crew Resident Construction Manager Resident Construction Representative Resident Inspector Administrative Assistant Clerical GPS Equipment Mileage ~ Per Mile 120.00 100.00 87.50 75.00 57.50 50.00 45.00 30.00 70.00 50.00 80.00 60.00 50.00 45.00 57.50 85.00 47.50 40.00 30.00 87.50 127.50 60.00 55.00 45.00 47.50 40.00 50.00 0.34 -If Overtime is charged at 1.5 times the regular billing rate. sect\sect\My Docs\]TI \lTL Rates\]TI Rates2006.xls JACOBI, TOOMBS AND LANZ, INC. CONSULTING ENGINEERS . , 120 Bell Avenue Clarksville, Indiana 47129 (812) 288-6646 (812) 288-6656 Fax 0\ May 8, 2006 . . , Mr. Kevin Lagrange, President Jeffersonville Board of Parks and Recreation 1406 Fredericks A venue Jeffersonville, Indiana 47130 Re: Duffy's Landing Improvements Dear Mr. LaGrange: The purpose of this letter is to present our company's proposal to design the renovations to Duffy's Landing. Our firm surveyed and designed the original park in 1990. JTL proposes to determine what improvements should be implemented by using a two-step process as follows: I. Preliminary Study & Design Phase r\ ',,- j Under this portion of the work, our firm will do the following: 1. Field-assess the existing condition of the park. 2. Investigate the need to expand the facility. 3. Evaluate alternatives for replacement of the existing docks. We understand that the existing wooden docks are very maintenance-intensive and are not preferred. 4. Consult with Board, boaters, U.S. Army Corps of Engineers and other interested parties to evaluate improvements to the continuing problem with floating debris and siltation. 5. Evaluate the need and feasibility of providing restroom facilities, vending machines. 6. Host a public meeting to obtain user input. 7. Prepare and present Engineering Report, including construction cost opinions and recommendations for the Board. Our firm proposes to provide these services on a time and material basis, in accordance with our current hourly billing rates, (attached), with a not-to-exceed budget of five thousand dollars ($5,000). This phase of the project is to be completed within one hundred and twenty calendar days. n "'- 5,'5~dne~"Wf'DOC5'rroposals"du1+~'s land;n g ;mprovements.doc ~. ! II. Final Design Phase, Preparation of Construction Documents Our detailed proposal to complete this phase will be provided once the Preliminary Studies Phase is completed. Jacobi, Toombs and Lanz, Inc. appreciates this opportunity to be of service, and if this proposal is acceptable, please countersign the acceptance statement below. Very Truly Yours, BI, TOOMBS AND LANZ, INC. :-t. Accepted this 5 I day of ItA G-f 2006 , iaJd {\ 5,'5ydney,WFDOCS'\,pcoposals,dul+y's la nd;ng ;mprovements.doc ~ JACOBI, TOOMBS AND LANZ, INC. 2006 HOURLY BILLING RATES CODE CLASSIFICATION * HOURLY RATE SE PM PE DE DT DTT EA EA2 LS LAS CGM CM GIS CT CD SM SC ST SA FC2 FC3 RCM RP RI ADM CL GPS EXP Senior Engineer/Principal (P.E) Project Manager (P.E.) Project Engineer (P.E.) Design Engineer (P.E.) Detail Engineer (ELT.) Detail Engineer (ELT.) Engineer Assistant Engineer Assistant (in training) Land Surveyor (Licensed) Land Acquisition Specialist CADD/GIS Manager CADD Manager G IS Technician CADD Technician/Draftsperson CADD Designer Survey Manager (P.E./P.LS.) Survey Chief (Not Registered) Survey Technician Surveyor Assistant 2~ Man Field Crew 3~ Man Field Crew Resident Construction Manager Resident Construction Representative Resident Inspector Administrative Assistant Clerical GPS Equipment Mileage ~ Per Mile 120.00 100.00 87.50 75.00 57.50 50.00 45.00 30.00 70.00 50.00 80.00 60.00 50.00 45.00 57.50 85.00 47.50 40.00 30.00 87.50 127.50 60.00 55.00 45.00 47.50 40.00 50.00 0.34 * Overtime is charged at 1.5 times the regular billing rate. (': sect\sect\My Docs\)TL \JTL Rates\)TL Rates2006.x1s