May 8, 2006
Mr. Kevin Lagrange, President
Jeffersonville Board of Parks and Recreation
1406 Fredericks Avenue
Jeffersonville, Indiana 47130
Re: Proposal to Update Five-Year Master Plan
Dear Mr. LaGrange:
The purpose of this letter is to present our company's proposal to update the Five-Year Parks
and Recreation Plan for the years 2007-2011. As you may be aware, our firm updated the
current plan for the years 2002-2006.
JTL will provide the following services:
1. Review the current Master Plan and update existing facility descriptions.
2. Meet with Parks Board and Park and Recreation representatives and discuss
ideas.
3. Host Public Information Meeting and request public input.
4. Update Needs Analysis and Standards.
5. Prioritize Five- Year action plan.
6. Prepare Report.
Our firm can complete the work required by July 31,2006.
We propose to be compensated on a time and materials basis, in accordance with our current
hourly billing rates (attached), with a Not-to-Exceed budget of five thousand dollars ($5,000).
Jacobi, Toombs and Lanz, Inc. appreciates this opportunity to be of service, and if this
proposal is acceptable, please countersign the acceptance statement below.
Very Truly Yours,
0)
,.d" , 5,'-59dne9,-WFDOCS'rcoposals'\f;ve-gear plan.doc
t"i.
r--\
~
Accepted thisf3,v... day of M~ 2006
S'5~dne~"WFDOCS'f>coposals 'fjve-~ea' plan.doc
,.
.,
0:
JACOBI, TOOMBS AND LANZ, INC.
2006
HOURLY BILLING RATES
CODE
CLASSIFICATION
* HOURLY RATE
r\
SE
PM
PE
DE
DT
DTT
EA
EA2
LS
LAS
CGM
CM
GIS
CT
CD
SM
SC
ST
SA
FC2
FC3
RCM
RP
RI
ADM
CL
GPS
EXP
Senior Engineer/Principal (PE)
Project Manager (PE)
Project Engineer (P.E.)
Design Engineer (P.E)
Detail Engineer (ELT.)
Detail Engineer (ELT.)
Engineer Assistant
Engineer Assistant (in training)
Land Surveyor (Licensed)
Land Acquisition Specialist
CADD/GIS Manager
CADD Manager
GIS Technician
CADD Technician/Draftsperson
CADD Designer
Survey Manager (P.E./P.LS.)
Survey Chief (Not Registered)
Survey Technician
Surveyor Assistant
2~ Man Field Crew
3~ Man Field Crew
Resident Construction Manager
Resident Construction Representative
Resident Inspector
Administrative Assistant
Clerical
GPS Equipment
Mileage ~ Per Mile
120.00
100.00
87.50
75.00
57.50
50.00
45.00
30.00
70.00
50.00
80.00
60.00
50.00
45.00
57.50
85.00
47.50
40.00
30.00
87.50
127.50
60.00
55.00
45.00
47.50
40.00
50.00
0.34
-If Overtime is charged at 1.5 times the regular billing rate.
sect\sect\My Docs\]TI \lTL Rates\]TI Rates2006.xls
JACOBI, TOOMBS AND LANZ, INC.
CONSULTING ENGINEERS
.
,
120 Bell Avenue
Clarksville, Indiana 47129
(812) 288-6646 (812) 288-6656 Fax
0\
May 8, 2006
.
.
,
Mr. Kevin Lagrange, President
Jeffersonville Board of Parks and Recreation
1406 Fredericks A venue
Jeffersonville, Indiana 47130
Re: Duffy's Landing Improvements
Dear Mr. LaGrange:
The purpose of this letter is to present our company's proposal to design the renovations to
Duffy's Landing. Our firm surveyed and designed the original park in 1990.
JTL proposes to determine what improvements should be implemented by using a two-step
process as follows:
I. Preliminary Study & Design Phase
r\
',,- j
Under this portion of the work, our firm will do the following:
1. Field-assess the existing condition of the park.
2. Investigate the need to expand the facility.
3. Evaluate alternatives for replacement of the existing docks. We understand
that the existing wooden docks are very maintenance-intensive and are not
preferred.
4. Consult with Board, boaters, U.S. Army Corps of Engineers and other
interested parties to evaluate improvements to the continuing problem with
floating debris and siltation.
5. Evaluate the need and feasibility of providing restroom facilities, vending
machines.
6. Host a public meeting to obtain user input.
7. Prepare and present Engineering Report, including construction cost
opinions and recommendations for the Board.
Our firm proposes to provide these services on a time and material basis, in
accordance with our current hourly billing rates, (attached), with a not-to-exceed
budget of five thousand dollars ($5,000). This phase of the project is to be
completed within one hundred and twenty calendar days.
n
"'-
5,'5~dne~"Wf'DOC5'rroposals"du1+~'s land;n g ;mprovements.doc
~.
!
II. Final Design Phase, Preparation of Construction Documents
Our detailed proposal to complete this phase will be provided once the Preliminary
Studies Phase is completed.
Jacobi, Toombs and Lanz, Inc. appreciates this opportunity to be of service, and if this
proposal is acceptable, please countersign the acceptance statement below.
Very Truly Yours,
BI, TOOMBS AND LANZ, INC.
:-t.
Accepted this 5 I day of ItA G-f 2006
, iaJd
{\
5,'5ydney,WFDOCS'\,pcoposals,dul+y's la nd;ng ;mprovements.doc
~
JACOBI, TOOMBS AND LANZ, INC.
2006
HOURLY BILLING RATES
CODE
CLASSIFICATION
* HOURLY RATE
SE
PM
PE
DE
DT
DTT
EA
EA2
LS
LAS
CGM
CM
GIS
CT
CD
SM
SC
ST
SA
FC2
FC3
RCM
RP
RI
ADM
CL
GPS
EXP
Senior Engineer/Principal (P.E)
Project Manager (P.E.)
Project Engineer (P.E.)
Design Engineer (P.E.)
Detail Engineer (ELT.)
Detail Engineer (ELT.)
Engineer Assistant
Engineer Assistant (in training)
Land Surveyor (Licensed)
Land Acquisition Specialist
CADD/GIS Manager
CADD Manager
G IS Technician
CADD Technician/Draftsperson
CADD Designer
Survey Manager (P.E./P.LS.)
Survey Chief (Not Registered)
Survey Technician
Surveyor Assistant
2~ Man Field Crew
3~ Man Field Crew
Resident Construction Manager
Resident Construction Representative
Resident Inspector
Administrative Assistant
Clerical
GPS Equipment
Mileage ~ Per Mile
120.00
100.00
87.50
75.00
57.50
50.00
45.00
30.00
70.00
50.00
80.00
60.00
50.00
45.00
57.50
85.00
47.50
40.00
30.00
87.50
127.50
60.00
55.00
45.00
47.50
40.00
50.00
0.34
* Overtime is charged at 1.5 times the regular billing rate.
(':
sect\sect\My Docs\)TL \JTL Rates\)TL Rates2006.x1s