Re: Duffy's Landing Improvements
Dear Mr. LaGrange:
The purpose of this letter is to present our company's proposal to complete the design
phase for the renovations to Duffy's Landing with the following cost estimate:
Cost Estimate for Proposed Improvements to Duffy's Landing
. Remove the existing boat dock and slips $ 0
(Work to be performed by Parks works crew)
. Remove existing pilings (By others, if required) $ 1,500
() . After removal of existing dock, dredge boat $ 5,000
"-- ,/ dock and ramp areas
. Install Desired Boat Dock Configuration $ 27,000
0 96' Long Headwall Dock w/Handrail
0 'L' Shape Configuration Boat Slip
4' Wide by 48' & 32' Long
0 4' Wide by 24' Long Finger Slip
0 Including Mooring Cleats & End Cap Lights
0 Structural Pilings ,~
. Install a 4' Wide by 95' Long Sidewalk $ 3,000
. Engineering
0 Evaluation of Dredge Volume (survey)
0 USACE, IDEM, & IDNR Permitting
0 Dock Layout and Design Coordination
0 Secure Estimates for Materials
0 Construction/Installation Observation $ 9,500
Total $ 46,000
r\
,J
....., .,. "\..'
,e
r
fl
'~.
Our firm proposes to provide these services on a time and material basis, in accordance
with our current hourly billing rates, (attached), with a not-to-exceed budget of nine
thousand and five hundred dollars ($9,500).
Jacobi, Toombs and Lanz, Inc. appreciates this opportunity to be of service, and ifthis
proposal is acceptable, please countersign the acceptance statement below.
Very Truly Yours,
~06
(~ ~. ~O-~