Loading...
HomeMy WebLinkAboutBid Contract JTL 't:'~ t'- :)'!' JACOBI, TOOMBS AND LANZ, INC. CONSUL TING ENGINEERS . , 120 Bell Avenue Clarksville, Indiana 47129 (812) 288-6646 (812) 288-6656 Fax {'\ November 20, 2006 Mr. Kevin Lagrange, President Jeffersonville Board of Parks and Recreation 1406 Fredericks Avenue Jeffersonville, Indiana 47130 Re: Duffy's Landing Improvements Dear Mr. LaGrange: The purpose of this letter is to present our company's proposal to complete the design phase for the renovations to Duffy's Landing with the following cost estimate: Cost Estimate for Proposed Improvements to Duffy's Landing . Remove the existing boat dock and slips $ 0 (Work to be performed by Parks works crew) . Remove existing pilings (By others, if required) $ 1,500 () . After removal of existing dock, dredge boat $ 5,000 "-- ,/ dock and ramp areas . Install Desired Boat Dock Configuration $ 27,000 0 96' Long Headwall Dock w/Handrail 0 'L' Shape Configuration Boat Slip 4' Wide by 48' & 32' Long 0 4' Wide by 24' Long Finger Slip 0 Including Mooring Cleats & End Cap Lights 0 Structural Pilings ,~ . Install a 4' Wide by 95' Long Sidewalk $ 3,000 . Engineering 0 Evaluation of Dredge Volume (survey) 0 USACE, IDEM, & IDNR Permitting 0 Dock Layout and Design Coordination 0 Secure Estimates for Materials 0 Construction/Installation Observation $ 9,500 Total $ 46,000 r\ ,J ....., .,. "\..' ,e r fl '~. Our firm proposes to provide these services on a time and material basis, in accordance with our current hourly billing rates, (attached), with a not-to-exceed budget of nine thousand and five hundred dollars ($9,500). Jacobi, Toombs and Lanz, Inc. appreciates this opportunity to be of service, and ifthis proposal is acceptable, please countersign the acceptance statement below. Very Truly Yours, ~06 (~ ~. ~O-~