HomeMy WebLinkAboutAddendum #1
" } ).
FROM : JTL, Inc.
r'\
1 ,
'~J I
f\
, )
f\
\" _/
FAX NO. :812-288-6656
Oct. 29 2007 04:58PM P2
JACOBI, TOOMBS AND LANZ, INC.
CONSULTING ENGINEERS
e
:I
120 Belt Avenue
Clarksville, Indiana 47129
(812) 288~6646 (812) 288-6656 Fax
Octobex 29, 2007
ADDENDUM NO.1
Chatlestown Pike Side.walk Ph. 2
Job No. 0796
The following tcvisjOl18 ate hereby incorpor.atecl:
1. The sidewalk alignment at Tall Oa.ks d11ve rlea.l. P. T. 18+36.74 will shift approximately 2.5 feet to
the south to avoid a water valve. With this .tealtgnment. it will be neces9ary to re1oc~l.te the
existing !Stop $lgn to 1 fnnt frnm the edge of the new sidewalk alignment. There will be 110
tevi.sed pay item for. this .r.elocation. Please include this revision in your bid priCt~. St!e the
attached figure for a graphic representation of this addendum.
The Contractor shall a.cknowledge receipt of this AddcndLm1 No.1 in writing on all bids turned i11.
-
rge 1. C, V.l~.
~c. k~ v.J \€ J. a~ \f:,
~
J~
::;:\"o;;ydm:y\WPOOCS\07\0796\0796.ADOflNDI 1M 1.dClc