Loading...
HomeMy WebLinkAboutChange Order #1 ,1 r, CHANGE ORDER - EXTRA WORK AGREEMENT NO. 1 Project Name Meadows Drainage Improvement Contractor Temple & Temple Excavating & Paving, Inc. You are hereby authorized to proceed with the following described change or extra work: As per attached documentation: L Delete Quantity From Pay Item No. 12 Class "A" Concrete for Ditch RetainingWall 175 CYS @ $505.00/CYS 2. Add Pay Item "Grouted Riprap Wall" (See Attached Cost Breakdown) 3. Add Pay Item "Headwall at Upstream End of Culvert Under RR" 1 Lump Sum 4. Add Pay Item "Riprap at Ends of Culvert Under Berm" 39.26 Tons @ $39.60/Ton JOB NO. ~ --.... 0412i = $ (88,375.00) = $ 78,920.05 = $ 7,721.65 ,- $ 1,554.70 DEDUCT = $ The method of payment for this change or extra work shall be: A deduction amount of one hundred and seventy-eight dollars and sixty cents = $178.60 s an~~ Inc. Owner's Approval: Signature of Own s. Con.tractor's App al: ~ & Temple Excavatin Authorized Representative C:Aoron104l2i10412i change order.xls Page 1 of 1 (178.60) "7 'Wo? Date .1 r 26-May-07 Meadows Drainage Improvement Project Addendum Exhibit 'A' f\ Grade Beam and Grouted Rip Rap Length of Grade Beam 575'Iong x 1'-0" wide x 2'~6" Tall Rip Rap Slope 575 If x 12' l' deep 767sys (The quantities are based on pre-construction quantities) Grade Beam 575 LF $ 45.08 LF $ 25,921.00 Grouted RipRao 767 SYS $ 44.00 SYS $ 33,748.00 Additional RioRao at the base $ 2,081.05 , 100 LF of walls at end of ditch 34 CYCS $ 505.00 CYS $ 17,170.00 Total for RipRap Wall $ 78,920.05 Item No.12 Class "A" Concrete for Ditch Retainina Wall 411 CYS $ 505.00 CYS $ 207,555.00 Installed To-Date 236 CYS $ 505.00 CYS $119,180.00 Remaining Cost $ 88,375.00 Concrete Headwall on Upstream of Culvert Under RR Total Cost $ 7,721.65 r,