Loading...
HomeMy WebLinkAboutChange Order #3 CHANGE ORDER - EXTRA WORK AGREEMENT NO. 3 JOB NO. 0412i Project Name Meadows Drainage Improvement Contractor Temple & Temple Excavating & Paving, Inc. You are hereby authorized to proceed with the following described change or extra work: As per attached documentation: 1. Delete 1514 CY of Berm Earthwork at $13.00 per CY = $ . (19,682.00) 2. Add 4.03 TN of HMA Surface, Type "B" at $52.00 per TN = $ 209.56 3. Delete 27.05 TN of HMA Intermediate, Type "B" at $50.00 per TN = $ (1,352.50) 4. Add 443.40 TN of Type "0" Compacted Aggregate at $21.00 per TN = $ 9,311.40 5. Delete 1780 TN of Indiana No.2 Stone at $11.00 per TN = $ (19,580.00) 6. Add 28 LF ofPVC Pipe Extensions at $25.00 per LF = $ 700.00 7. Add 2457 SY of Seeding at $0.32 per SY = $ 786.24 8. . Delete 1210 SY of Sodding at $2.85 per SY = $ (3,448.50) 9. Delete 700 LF of Erosion Control Silt Fence at $3.00 per LF = $ (2,100.00) 10. Add 207.63 TN of Repave Crum's Lane at $52.00 per TN = $ 10,796.76 11. Add 200 SY of Mill 4' Strip at $3.50 per SY = $ 700.00 12. Delete 5714.26 CY of Berm Key Way and Undercut at $14.00 per CY = $ (79,999.64) 13. Delete 99 LF of Grade Beam Wall at $45.08 per LF = $ (4,462.92) 14. Delete 56 SY of Grouted Rip-Rap at $44.00 per SY = $ (2,464.00) 15. Add 30.75 LF of Retaining Wall at $505.00 per LF = $ 15,528.75 16. Add 15.31 TN of Rip-Rap at $28.45 per TN = $ 435.57 17. Add adjust to line #44 $2 perLS = $ 2.00 r DELETE $ (94,619.28) = The method of payment for this change or extra work shall be: A deletion in the amount of ninety-four thousand and six hundred and ninteen dollars and twenty-eight cents = $94,619.28 Owner's Approv nc. Consulting Engin r: Date ~:l ;hJi1 Authorized Representative Date r" C:AaronI0412i'.0412i change order-3.xls Page 1 of 1