SECTION 00520
AGREEMENT
r ';
[ ! THIS AGREEMENT is by and between CITY OF JEFFERSONVILLE. INDIANA
[ , (hereinafter called OWNER) and MITCHELL AND STARK CONSTRUCT/ON
1. ;.
(hereinafter called CONTRACTOR).
1 :
, ,
OWNER and CONTRACTOR, in consideration of the mutual covenants set forth herein, agree as
follows:
( ,
! .
~ :
{ ~
Article 1. WORK
f r
!
1 ~,
1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Work is generally described as follows:
CONTRACT 1-2007
~ "
'(.,;"
Article 2. THE PROJECT
2.01 The Project for which the Work under the Contract Documents may be the whole or only a
part is generally described as follows:
RIVERPORT NO.2 PUMP STA TJON REPLACEMENT
Article 3. ENGINEER
3.01 The Project has been designed by Strand Associates, Inc.@ (hereinafter called ENGINEER),
who is to act as OWNj;:R's representative, assume all duties and responsibilities, and have the
rights and authority assigned to ENGINEER in the Contract Documents in connection with
completion of the Work in accordance with the Contract Documents.
Article 4. CONTRACT TIMES
4.01 Time of the Essence
A. AI! time limits for Milestones, if any, Substantial Completion, and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Dates for Substantial Completion and Final Payment
A. The Work will be substantially complete within 150 calendar days after the date
when the Contract Time commences to run as provided in Paragraph 2.03 of General Condltions,
and will be completed and ready for final payment in accordance with Paragraph 14.07.B of the
General Conditions within 180 calendar days after the date when the Contract Time commences to
run.
Section 00520-1
5-944-02911.2007
(\ 4.03 Liquidated Damages
A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and
that OWNER will suffer financial loss if the Work is not completed within the times specified in
Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the
General Conditions. The parties also recognize the delays, expense and difficulties involved in proving
in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not completed on
time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as
liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay to OWNER the following
daily charge:
Original Contract Amount
From More Than To and Including
Daily Charge
Calendar Day
$
$ 100,000
500,000
1,000,000
3,000,000
5,000,000
$ 500
800
1,000
1,200
1,500
2,000
100,000
500,000
1,000,000
3,000,000
5,000,000
The above liquidated damages shall be applied separately to each of the substantial and final
completion dates as shown in Paragraph 4.02.
Article 5. CONTRACT PRICE
5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the
Contract Documents an amount in current funds as follows:
THREE HUNRED SIXTY.FIVE THOUSAND, SIX HUNDRED FORTY-SIX DOLLARS
A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an
exhibit.
B. All specific cash allowances are included in the Contract Price and have been
computed in accordance with Paragraph 11.02 of the General Conditions.
Article 6. PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as provided in the
General Conditions.
6.02 Progress Payments; Retainage
A. OWNER shall make progress payments on account of the Contract Price on the basis of
CONTRACTOR's Applications for Payment as established at the preconstruction conference during
performance of the Work as provided in Paragraphs 6.02.A.1 and 6.02.A.2 below. All such payments
("\ will be measured by the schedule of values established in Paragraph 2.07.A of the General Conditions
Section 00520-2
5-944-D2911-2007
f '
; .
ii. ..;.
f'
"f.1
f ?
:~
~, .~
f t
,
";. ~:
~ ':'
t...:il
p
L
{\
~..A
i ~
, ,
(and in the case of Unit Price Work based on the number of units completed) or, in the event there is no
schedule of values, as provided in the General Requirements:
f ":
1. Prior to Substantial Completion, OWNER will retain an amount equal to 10% of each
progress payment application until 50% of the Work has been completed. At 50% completion,
further progress payment applications shall be paid in full to the CONTRACTOR and no
additional amounts will be retained.
~ i
f'
\ :
t .; 6.03 Final Payment
i.
t :;
A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of
the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by
ENGINEER as provided in said Paragraph 14.07.
i ~
Article 7. HIERARCHY
t ~
7.01 In resolving inconsistencies among two or more sections of the Contract Documents,
precedence shall be given in the following order:
r T"
First:
Second:
Third:
Fourth:
Fifth:
Sixth:
Seventh:
Eighth:
WRITTEN AMENDMENTS
AGREEMENT
CHANGE ORDERS
ADDENDA
SUPPLEMENTARY CONDITIONS
GENERAL CONDITIONS
SPECIFICATIONS
DRAWINGS
::l.. ;.,
Figure dimensions (numerical) on Drawings shall take precedence over dimensions measured utilizing
a scare.
Article 8. CONTRACTOR'S REPRESENTATIONS
8.01 In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following
representations:
A. CONTRACTOR has examined and carefully studied the Contract Documents and the other
related data identified in the Bidding Documents.
B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
general, local, and Site conditions that may affect cost. progress, and performance of the Work.
C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws
and Regulations that may affect cost, progress and performance of the Work.
D. CONTRACTOR has carefully studied (1) all reports of explorations and tests of subsurface
conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing
surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which
have been identified in the Supplementary Conditions as provided in Paragraph 4.02 of the General
Conditions and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site
which has been identified in the Supplementary Conditions as provided in Paragraph 4.06 of the
General Conditions.
Section 00520-3
5-944-029/1-2007
E. CONTRACTOR has obtained and carefully studied (or accepts consequences of not doing
so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data
concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site
that may affect the cost, progress, or performance of the Work or which relate to any aspect of the
means, methods, techniques, sequences, and procedures of construction to be employed by
CONTRACTOR, including any specific means, methods, techniques, sequences, and procedures of
construction expressly required by the Contract Documents and safety precautions and programs
incident thereto.
F. CONTRACTOR does not consider that any further examinations, investigations,
explorations, tests, studies, or data are necessary for the performance of the Work at the Contract
Price, within the Contract Times, and in accordance with the other terms and conditions of the
Contract Documents.
G. CONTRACTOR is aware of the general nature of work to be performed by OWNER
and others at the Site that relates to the Work as indicated in the Contract Documents.
H. CONTRACTOR has correlated the information known to CONTRACTOR, information
and observations obtained from visits to the Site, reports and drawings identified in the Contract
Documents, and all additional examinations, investigations, explorations, tests, studies, and data
with the Contract Documents.
L CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities,
or discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written
resolution thereof by ENGINEER is acceptable to CONTRACTOR.
r,
J. The Contract Documents are generally sufficient to indicate and convey understanding
of all terms and conditions for performance and furnishing of the Work.
Article 9. CONTRACT DOCUMENTS
The Contract Documents consist of the following:
,
t.
9.01 Contents
r
~
A. The Contract Documents consist of the following:
,.
1. This Agreement (pages 00520-1 through, 00520-9, inclusive);
2. Performance bond (pages to 00600-1 through 00600-4, inclusive);
3. Payment bond {pages 00600-5 through 00600-8, inclusive);
~
t
4. Other bonds
a. N/A
(pages N/A to N/A, inclusive);
b. N/A
(pages N/A to N/A, inclusive);
(pages N/A to N/A, inclusive);
c. N/A
5. General Conditions (pages 00700-1 through 00700-41 , inclusive);
0,
Section 00520w4
5-944-029/1-2007
,
l ,~
,\ '\
f!
L
f t~
tt
r2
L
'L$!
r,
i..b
6. Supplementary Conditions (pages 00800-1 through 00800-13, inclusive);
7. Specifications as listed in the table of contents of the Project Manual;
[!
8. Drawings SHEET NO. 1 THROUGH NO.7
i ~
r ~
i i
! ~
I ;
1.. ;
inclusive incorporated herein by reference with each sheet bearing the following
general title:
f r
J:
i ~
RIVERPORT NO.2 PUMP STA TION AND FORCE MAIN UPGRADES
1 '
~ ~
as well as drawings listed in the table of contents that are bound at the back of these
specifications.
9. Addenda (NO.1
).
10. Exhibits to this Agreement (enumerated as follows:)
a. Notice to Proceed (pages 00550, inclusive);
b. CONTRACTOR's Bid (pages 00400-1 to 00400-8);
c. Supplemental Unit Prices are included as part of the Agreement except as noted:
(N/A
);
d. Documentation submitted by CONTRACTOR prior to Notice of Award
(LETTER DATED JUNE 4.2007
);
11. The following may be delivered or issued on or after the Effective Date of the
Agreement and are not attached hereto:
a. Work Change Directives;
b. Change Order(s).
B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as
expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as provided in
Paragraph 3.04 of the General Conditions.
Section 00520-5
5-944-02911-2007
Article 10. MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings stated in the General Conditions
and the Supplementary Conditions.
10.02 Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract will be
binding on another party hereto without the written consent of the party sought to be bound; and
specifically but without limitation, monies that may become due and monies that are due may not be
assigned without such consent (except to the extent that the effect of this restriction may be limited by
law), and unless specifically stated to the contrary in any written consent to an assignment, no
assignment will release or discharge the assignor from any duty or responsibility under the Contract
Documents.
10.03 Successors and Assigns
A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, its partners, successors, assigns and legal representatives in
respect of all covenants, agreements, and obligations contained in the Contract Documents.
10.04 Severability
{'\
A. Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue
to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract
Documents shall be reformed to replace such stricken provision or part thereof with a valid and
enforceable provision that comes as close as possible to expressing the intention of the stricken
provision.
ri
Section 00520-6
5-944-{)29f1-2007
f ~'
;
i ~
.t; .:
,
,
l'
1 ;
~ :
l
{ .~
1
j
t :;
L
~
f r
t ,to
f
t
r" '-,"
,', \:
"
~J
, '
, '
l,'
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in triplicate. One
counterpart each has been delivered to OWNER, CONTRACTOR, and ENGINEER. All portions of the
Contract Documents have been signed or identified by OWNER and CONTRACTOR or identified by
ENGINEER on their behalf.
This Agreement will be effective on a J AA ;'/!r ,;( () , aM 7
(which is the Effective Date of the Agreement~
1 ",
i '
~ :
j,
(Seal)
OWNER
LLE INDIANA
ATTEST:
By:
Signature and Title
By:
Signature and Title
Address for Givinq Notices:
Name:
Street:
City, State, Zip Code:
Phone:
Facsimile:
E-mail:
Designated Representative:
Section 00520-7
5-944-029/1-2007
r.,
oj CONTRACTOR MITCHELL AND STARK CONSTRUCT/ON
Jdt~
Signature and Title
lJze.rJDU;V I
(Seal)
ATTEST:
By:
du4aL '~~l~
Signature and Title
Ass I 5//}.n/J k el: I!-r.~
By:
Signature and Title
Address for Givinq Notices:
Name:
F'\
. 0
Street:
City, State, Zip Code:
Phone:
Facsimile:
E-mail:
Designated Representative:
;1
.0
License No.:
(Where applicable)
(If CONTRACTOR is a corporation or a partnership, attach evidence of authority to sign.)
r\
\
Section 00520-8
5-944-02911-2007
r\'
(>
INSTRUCTIONS FOR EXECUTING CONTRACT
r 1.
1 i
If the Agreement is to be signed by the Secretary of the corporation, the certificate below should be
executed by some other officer of the corporation, under the corporate seal. In lieu of the foregoing
certificate, there may be attached to the Agreement copies of so much of the records of the corporation
which will show the official character and authority of the officers signing, duly certified by the secretary
or assistant secretary under the corporate seal to be true copies.
( j
r ~
!
i'
~ ;
The full name and business address of CONTRACTOR should be inserted and the Agreement should
be signed with CONTRACTOR's official signature. Please have the name of the signing party printed
under all signatures to the Agreement.
f: ,
~ '
t
r:
i .
i ~
If CONTRACTOR is operating as a partnership, each partner should sign the Agreement. If the
Agreement is not signed by each partner, there should be attached to the Agreement a duly
authenticated power of attorney evidencing the signer's (signers') authority to sign such Agreement for
and in behalf of the partnership.
~ :'
If CONTRACTOR is an individual, the trade name (if CONTRACTOR is operating under a trade name)
should be indicated in the Agreement and the Agreement should be signed by such individual. If signed
by other than CONTRACTOR, there should be attached to the Agreement a duly authenticated power
of attorney evidencing the signer's authority to execute such Agreement for and in behalf of
CONTRACTOR.
;
,
!. ~
j
i ;.
f ::'
j
t. j:
. If CONTRACTOR is a corporation, the following certificate should be executed:
I, ~NI\I.,t; ,J: .Jr.4.e.e:s , certify that I am the A5Si5r~,J r
Secretary of the corporation named as CONTRACTOR herein above; that
;7z€'o c: /I4/?/Z ~.oJ , who signed the foregoing Agreement on behalf of
CONTRACTOR was then ~$~.i'a~ of said corporation; that said Agreement
was duly signed for and in behalf of said Corporation by authority of its governing body, and is within
the scope of its corporate powers.
/;
t. :,
f
.-
~
~~~
(C rporate Seal)
t
if
~
t
END OF SECTION
[
~
~
"
Section 00520-9