Chippewa Drive Storm Sewer Repairs
Jeffersonville, Indiana
Fill&d: ADril 11
----"~
A*o!.il:It;Bn
6-102
r\
Rpr. 09 2008 07:41RM P3
P"ROM : J'iL, Inc.
FRX NO. :812-288-6656
Rpr. 09 2008 07:41RM P4
Presorlb~,!!'y State Board of Accounts
Form No:.~~ (Revised :i!OO~t
CONTRACTORS BID FOR PUBLIC WORK
PART I
(To be completed for all bids)
(Please type or print)
Clty{State:
4. Telephone Number:
Date:
70....,""' 0 +
CJ;II ~ K
7e 0 i"\ C.", J., ...1- ,-,.." 9, j..1" t
~
1f.('/~ eQI'/~..J st.
fYI f-., Lt' ~I Z AI '17' 'f"
J
f-'~. Ol'''f'''J~J'
'/-//-01'
je ., /~, /..,.. \111/(.
1. Governmental Unit (Owner):
2. County;
3. Bidder (Firm):
Address:
r.
5. Agent of Bidder (if applicable):
Pursuant to notices given, the undersigned offers to furnish labor and{or material necessary to complete
the pUblic works project of 70"",,* . f 7e II~'J",...,:/I(. (!).:J'J',tJ.. ~f. ~~vJ
, ( .,
(Governmental Unit) In accordance with plans and specifications prepared by \T ..1'... L
and dated '1- 0 ,.. D .,
$ JJ~~tJooe.,
llnit Price for additional 60" RCP Class 3 is $ per linear foot.
The undersigned further agrees to furnish a bond or certified cneck With thIS bid for an amoLlntspeCified in the
notice of the letting, If alternative bids apply, the undersigned submits B proposal for each in accordance with the
notice. An.y addendums attached will be specifically referenced at the applicable page.
for the sum of
S'( iH '-c "J
If additional units of material included in the contract are needed, the cost of units must be the same as
that shown in the original contract If accepted by the Governmental Unit If the bid IS to be awarded on a unit
basis, the itemiz.ation of the units shall be shown on a separate attachment.
The Contractor and his subcontractors. if any, shall not discriminate against or Intimidate any employee,
or applicant for employment, to be employed in the performance of this contract. with respect to any matter
directly or indirectly related to employment because of race, religion. color. sex, national origin or ancestry.
Breach of this covenant may be regarded as a material breach of the contract.
CERTIFICATION OF USE. OF UNITED STATES STEEL. PRODUCTS
(If applicable)
f',
I, the undersigned bidder or agent as a contractor on a public works project. understand my statutory
obligation to use steel products made in the United States. I.C. 5-16-8-2. I hereby certify that I and all
subcontractors employed by me for this project will use U.S. steel products on this project if awarded. 1
understand that violations hereunder may result in forfeiture of contractual payments.
6-102
F"ROM :J'rL, Inc.
FAX NO. :812-288-6656
Apr. 09 2008 07:41AM P5
f'-..\ '
f-U!I
ACCEPTANCE
The above bid is accepted this
t~
day of
A~
. 'ZJcD8 , subject to the
following conditions:
- Nt) tJe...-
, ~ tF- Pu"'l~ ~~';.SAk1;
, l
""10M 1J1nHI tv' , ~,
.. -1"\.01 , (~ / Q..,.o.., ~
PART II
(Complete sections I, II, III, and IV for all state and local public works proJects as required
by statutes if project is one hundred thousand dollars ($100,000) or more. (Ie 36~1"12"4)
Governmental Unit: row ^ 0 f C I 4: , I'
Bidder (Firm) 7 e."", C. "" J,. ~ .J.;-", ,. 1. /; e..
'I -,I" () , --
Date:
These statements to be submitted under oath by each bidder with and as a part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1, What public works projects has your organization completed for the period of one (1) year prior to the
date of the current bid?
Class of Work
when
Completed
Contra.,~~ .f.~mount
Name and Addr~~,sgf9.wner
f'e. LilT; iFc!i (
2. What public works projects are nOw In prooess of construction by your organization?
, '-When to be
Comoleted
Contract ~rrJount
Cla~~. of Work
N~mi?"and Address of Own~t__".
.wn" fE ~ If-i- he 1ft P
f'\
8-103
PROM :J'TL, Inc.
FAX NO. :812-288-6656
Apr. 09 2008 07:41AM P6
r
3.
Have you ever failed to complete any work awarded to you?
)\10
If so, where and why?
4. List referenced from private firms for which you have performed work.
p(~ IfTrl1cff' p
SECTION II PLAN AND EQUIPM~NT QUESTIONNAIRE
1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when
you could begin work, completed the project, number of workers, etc, and any other information which
you believe would enable the governmental unit to consider your bid.)
pf.e ~TThc" (j)
2. If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you expect to require a bond. However, if you
are unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. }If-lief P, c..J. 1''''':''3
Goo}.. '^ ...~ I1Jt J. ./1-
3. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
r~,. If'tr. c L,'/
4. Have you entered into contracts or received offars for all materials which substantiate the prices used in
preparing your proposal? OthelWise, please explain the rationate used whIch would corroborate the
prices listed.
Y( j
r\.
8-104
mOM : JTL, Inc.
FAX NO. :812-288-5555
Apr. 09 2008 07:41AM P7
r"
SECTION III CONTRACTOR'S F1NANCIACSTATE:MENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to
the governing body awarding the contract must be specific enough in detail so that said governing body can make
a proper determination afthe bidder's capability far completing the project if awarded.
p,,. 11+"'", t. t.... J 8.~J
SECTION IV OATH AND AFFIRMATION
I hereby affirm under the penalties of pe~ury that the facts and information contained In the foregoing bid
for public works are true and correol to the best of my knowledge and belief.
Dated at 11I''-'ll: oJ ,.IN this II d. day of A"ll , "00 P
T i~.~ ~."" f,,,, Jto,^\, "'I, e.
By r/(N7tJ:=
CO,. J I" /h~/'.
(Tille of Pe on SIgning)
f\
ACKNOWLEDGEMENT
STATE OF
COUNTY OF
:r.l'\J
c. l, .fe.l(
)
)
)
c cJ tn()~el J
Ctl,.~II'. tn.....l'-'
(TItle)
being duly sworn, deposes and says that he is
of the above r ~...... 0.... f/ · .1-,.,.). '- '- e
(Name of Organio:a!lotJ)
and that the answers to the questions in the foregoing questionnaires and all statements therein contained are
true and correct
Subscribed and sworn to before me this
11 t!. .A 1 "'l tfI
day of ,.." ,.: , ".. 0 0 ~
~~~~
Notal)' Public
,....--.,
r
My Commission Expires: tl - ~ ~ :J..D l (P
County of Residence: .l.t ') l6..~~ ~
)
8"105
FROM : JTL, Inc.
FRX NO. :812-288-6656
Rpr. 09 2008 07:42RM P8
r,
NON - COLLUSION AFFIDAVIT
The undersigned bidder or agent, being duly sworn on oath, says that he has not, nor has any other
member, representative, or agent of the firm, company, corporation or partnership represented by him, entered
Into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such
letting nor to prevent any person from bidding nor to include anyone to refrain from bidding. and that this bid is
made without reference to any other bid and without any agreement, understanding or combination with any other
person in reference to such bidding.
He further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale.
OATH AND AFFIRMATION
I affirm under the penalties of perjury that the foregoing facts and information are true and correct to the
best of my knowledge and belief.
Dated at /1I'IJl,L..~:vJ
7
this
I/I"J A I
day of ",. ,;
7e.olltl\ C.",fo, .fJ..."",,~ t." e.
-...,e::> /J (Name of Organization)
~m~
~J -k-. rn...,., -c/
(illle of Person~Slgnlng)
).0 IJ ,
, '
By
f'
ACKNOWLEDGEMENT
STATE OF :IN
COUNTY OF C 4. IIIl. K
)
) S$:
)
& J 1ft tJ4.AI J
~ .'" ~ J.,. (1),/.
(nle)
being duty swom. deposes and says that he Is
of the above 7~."" e......J. r, c /.'A, "I" t
(Name of Organl::eatlon)
and that the statements contained in the foregoing bid, certification and affidavit are true andeorrect.
Subscribed and sworn to before me this Ill. day of Ii /': I ,2,00 ~,
&~~C3
My Commission Expires: :z - ;;2 - :LO 1 ~
County of Residence:tDQ~ ~
r\
8.106
_J... . .
~
TEAM CONTRACTING, LLC
(\
14912 Railroad Street
Memphis, Indiana 47143
Post Office Box 237
Memphis, Indiana 47173
Telephone 812-294-1258
Fax 812~294~3'754
Estimating Fax 812-294-3901
In Business Since 1995
April 11, 2008
Mr. Robert Miller, City Engineer
City of Jeffersonville
Town Hall
Jeffersonville, IN 47153
Re: Chippewa Street Emergency Repair
Dear Robert:
In response to your Request for Price Quotation on the above referenced project, we
are pleased to offer the following proposal and scope of work. Please note that we are
trying to provide the Owner an accurate top end cost, based upon the existing site
conditions, and our expectations as to what might occur.
Please note our responses and scope based upon your numbered items.
1. Mob & Demob is included, complete.
2. Dewatering well-Your RFP requests us to include one well, which we can price.
However, in trying to provide accurate information, we have included the costs of
3-4 wells. We have been in contact with Kelley Dewatering, Griffin Dewatering,
and Hydraserve, all noted dewatering firms. Kelley is very familiar with this
project and has been onsite. They most recently bid the WWTP and Louise St.
projects and have extensive soil borings. Both Kelly and Griffin have advised
that one well will not get the water level down and that a minimum of 3, and they
both recommend 4 wells will be required to get the water down to the necessary
level. You may contact Brad Kelley at 616-340-2038. An additional problem, as
pointed out by both dewatering companies, the Ohio River Upper Gauge is very
high with only a small predicted drop for the next 3 weeks according to the US
Army Corps of Engineers Website, which increases the amount of dewatering.
Our lump sum bid includes the cost of a maximum of 4 wells for the 30 day
period. If you want a price for only one well, we can provide that option.
3. All excavation, haulofftrucking, sheeting, and trench boxes are included. Due to
existing utilities, groundwater, etc, the only feasible method is to utilize the
United Slide Rail Shoring System, which we have included.
4. We have included 24' of 60" RCP, due to the standard 8' lengths. Independent
Concrete Pipe has advised us that they only run 4' sections when it involves a
large number of pieces and will not tool up fo 1-4' section. Concrete collars and
tie-ins to existing pipe, structure, etc. is included.
5. Granular backfill oflndiana #11 is included.
6. We have included the paving spec as detailed as 12" dga, 4" HMA Base, 2" HMA
binder, and 1" HMA surface. Please note that as ofthis morning, the actual
Demolition. Concrete - Site Development - Utilities
Equal Opportunity Employer - M/F/HN
- ~ 's. ~ ( 1 .
~
TEAM CONTRACTING, LLC
r\
14912 Railroad Street
Memphis, Indiana 47143
Post Office Box 237
Memphis, Indiana 47173
Telephone 812-294-1258
Fax 812-294-3754
Estimating Fax 812-294-3901
In Business Since 1995
cracks are 60' apart, and we are assuming that an additional 10' on each end has
already been undercut and will need to be replaced. Our bid is based upon
replacing 80 If long x 22' wide asphalt patch. This also includes the excavation of
this area and refill with # 11 stone to the necessary depths, which we anticipate to
be 10-12'.
7. We have included tying in the pipe to the new manhole. However, within the last
3 days, the top of the manhole grate is now almost a foot below the surface which
shows that the manhole has settled as well. This will involve more than
"stabilizing" and will probably result in that manhole being removed and either
reinstalled or replaced, once the excavation and extent of the manhole damage is
uncovered. Any costs to remove, replace, or relocate the manhole are not
included.
8. We have included 160 If of curb, which reflects the 80' of roadway estimated to
be replaced.
9. Surface restoration included in this bid includes the removal ofthe two big trees
(one is already falling and the other will probably be lost as well), recompacting
and filling the two yard areas that have settled almost a foot (but not any
excavation), seed, etc. The one asphalt driveway is cracked and settled 16' from
the edge of curb and we have included replacing that drive, 20' x 8' wide. In
addition, the two exposed aggregate drives will have at least their aprons replaced
as they have settled as well. All of that work is included in our base bid.
10. Traffic control as required is included, including orange snow fence completely
around the perimeter of the construction area during non-working hours.
11. Cleaning and jetting of the existing storm sewer to a maximum of 120 lfis
included.
NOT INCLUDED IN BASE BID
1. Any allowances to replace or temporarily cut and remove the existing water main
that runs parallel to the storm pipe.
2. Any allowances to replace or temporily cut and remove the existing gas, cable tv,
or sanitary sewer property leads in the affected area.
3. There is at least one existing curb basin inlet that has already settled as well and
we assume the lead pipe to it has also settled. We include no costs at this time to
raise or repair that basin or pipe lead until such time as it is excavated and the
necessary repairs are determined.
4. No bypass pumping of the existing storm piping is included.
TOTAL PRI CE------------$112,OOO.OO
f'
\
Respectfully Submitted;
Ed Morris, Construction Manager
Demolition. Concrete. Site Development - Utilities
Equal Opportunity Employer - M/F/HN
04/15/2008 09:44
8122943901
TEAM CONTRACTING
TEAM CONTRACTING,. LLC
{'
14912 RAIL~OAO ST
MEMPHIS IN 47141;1
Post. Offlce BOIC 287
MeMPHIS IN 47143
EST, FAX; (812) 294-3901
-.
Phone: (.012) 294-1258-
FAX TRANSMISSION COVER SHEET
DATE:
'I--/!"OSJ
-:fa' , Co I
TIME:
10:00
-:2 r i' . t C J'" ,
FAX#:
TO:
COMPANY:
-S.. T- L.
C l.. r f , W .. ~ .,. , ..& .,...
RE:
Number of Pages including this sheet
COMMENTS:
Lt../-
C ql} :.f YOIJ L~...f.. 7vt"J/".'1.r.
,... ~ JI ^ 0 ~ __1-. ~ z: (! """' ,. .. t;.} .., I
J l 7
S" ';0" J 'I" f fit S..' fD J 0 ~ c.."J..,."t. ;.
Il. 4't'\ t J
q
If any pages are missing or Illegible. please notify sender at (812) 294-1258.
~ J fY'o1. I., j
Sender
r
F:/Generallnfo/New Forms/Fax Cover Sheet
r
Demolltiotl - Conerete . Site Development - UtlJl~es
Equal Oppotbmlty Employer MIF/HIV
PAGE 01/05
04/15/2008 09:44
8122943901
TEAM CONTRACTING
PAGE 02/05
rj
\
A
14912 Rallro~Street
MemPhis, Indiana 47143
TEAM CONTRACTING, LLC
Tel@phono812-294-12158
Pest OftIca Box 237
Memphis, Indiana 47173
Fax 812-294-3754
&ttmlltlng Fllx 812-294-3901
In Business Since 1995
April 11 ~ 2008
Mr. Robert Mi11er~ City Engineer
City of Jeffersonville
Town Hall
Jeffersonville~ IN 471.53
Re: Chippewa Street Emergency Repair
Dear Robert
In response to your Request for Price Quotation on the above referenced project. we
are pleased to offer the following proposal and scope of work. Please note that we are
trying to provide the Owner an accurate top end costt based upon the existing site
conditions~ and our expectations as to what might occur.
Please note our responses and scope based upon your numbered items.
('
L Mob & Demob is included, complete.
2. Dewatering well-Your RFP requests us to include one well~ which we can price.
However~ in trying to provide accurate infonnation~ we have included the costs of
34 wells. We have been in contact with Kelley Dewatering, Griffin Dewatering,
and Hydraserve, all noted dewatering finns. Kelley is very familiar with this
project and has been onsite. They most recently bid the WWTP and Louise St.
. projects and have extensive soil borings. Both Kelly and Griffm have advised
that one well will not get the water level down and that a minimum of 3, and they
both recom.mend 4 wells will be required to get the water down to the necessary
level. You may contact Brad Kelley at 616-340-2038. An additional problem, as
pointed out by both dewatering companies, the Ohio River Upper Gauge is very
high with only a small predicted drop for the next 3 weeks according to the US
Anny Corps of Engineers Website, which increases the amount of dewatering.
Our lump sum bid includes the cost of a maximum of 4 wells for the 30 day
period. If you want a price for only one well, we can provide that option.
3. All excavation, haulofftrucking, sheeting, and trench boxes are included. Due to
existing utilities, groundwater, etc, the only feasible method is to utilize the
United Slide Rail Shoring System~ which we have included.
4. We have included 24' of 60" Rep, due to the standard 8~ lengths. Independent
Concrete Pipe has advised us that they only run 4; sections when it involves a
large number of pieces and will not tool up fo 1-4' section. Concrete collars and
tie-ins to existing pipe; structure. etc. is included.
5. Granular backfill of Indiana # 11 is included.
6. We have included the paving spec as detailed as 12" dga, 4" HMA Base, 2" HMA
binder, and 1" HMA surface. Please note that as of this morning, the actual
Demolition ~ Concrete - Site Development - UtilitIes
equal 0pp0ttunJt;y Etnp10yer - MIF/HIV
@4/15/~008 09:44
8122943901
TEAM CONTRACTING
PAGE 03/05
~
14912 Railroad Street
MemphIS, Indiana 47143
TEAM CONTRACTING, LLC
Post Office Box 237
Memphis, Indiana 47173
Telephone 812-294-1258
Fax 812.294-3154
Ef1;tlrnatlng Fax 812~294-3901
In Business Since 1995
cracks are 60' apart, and we are assuming that an additional 10' on each end has
already been undercut and will need to be replaced. Our bid is based upon
replacing 80 lflong x 22' wide asphalt patch. This also includes the excavation of
this area and refill with # 11 stone to the necessary depths, which we anticipate to
be 10-12'.
7. We have included tying in the pipe to the new manhole. However, within the last
3 days, the top of the manhole grate is now almost a foot below the surface which
shows that the manhole has settled as well This will involve more than
"stabilizing" and will probably result in that manhole being removed and either
reinstalled or replaced, once the excavation and. extent of the manhole damage is
uncovered. Any costs to rem.ove, replacet or relocate the manhole are not
included.
8. We have included 160 If of curb, which reflects the 80~ of roadway estimated to
be replaced.
9. Surface restorati.on i.ncluded in this bid includes the removal of the two big trees
(one is already falling and the other will probably be lost as well), recompacting
and filling the two yard areas that have settled almost a foot (but not any
excavation), seed, etc. The one asphalt driveway is cracked and settled 16' from
the edge of curb and we have included replacing that drive, 20' x 8' wide. In
addition, the two exposed aggregate drives will have at least their aprons replaced
as they have settled as well. All of that work is included in our base bid.
10. Traffic control as required is included, including orange snow fence completely
around the perimeter of the constnIction area during non-working hours.
11. Cleaning and jetting of the existing storm sewer to a maximum of 120 If is
included.
NOT INCLUDED IN BASE BID
1. Any allowances to replace or temporarily cut and remove the existing water m.ain
that runs parallel to the storm pipe.
2. Any allowances to replace or temporlly cut and remove the existing gas~ cable tv ~
or sanitary sewer property I.eads in the affected area.
3. There is at least one existing curb basin inlet that has already settled as well and
we assume the lead pipe to it has also settled, We include no costs at this time to
raise or repair that basin or pipe lead until such time as it is excavated and the
necessary repairs are detennined.
4. No bypass pumping of the existing storm piping is included.
r\
OemQlltiOn :: concrete. Site DlMllopment. Utilltie$
Equal OpportunIty Employer - MIFlHfV
04/15/2~08 09:44
8122943901
TEAM CONTRACTING
PAGE 04/05
r\
A
TEAM CONTRACTING, LLC
14912 Railroad StrHt
Memphls,lndllllna 47143
Post Offlce Bole 237
Memphis, Indiana 47113
1.lephone812-2~1258
. ,..1'..... .__~_ _
Falli 912-~94-3754
EstlmaUng Fax 812-294-3901
In Business Since 1995
ADDITIONAL UNIT PRICES:
1. 60" RCP-If pipe can be added without additional dewaterin,g wells or asphalt
replacement~ the unit price will be $2,100 per Jf. Based upon discussion with our
dewatering sub, we think that a maximum of an additional 16' (2 joints) of 60" can
be installed utilizing the dewatering system for the first 24'. Also, as we have
included replacing 80' of asphalt in out' base bid, this increase of pipe should not
cause any additional asphalt replacement.
2. 60" RCP----If pipe can be added into the existing excavated pit, without additional
dewatering, hauloff, etcJ then the unit price in item 1 will be lowered to $ 1,110.
This will include only moving the sheeting box, excavating down to the flowUne
from the previously excavated pit (approximately an addinona16'), removal of the
existing pipe, and placement of the new pipe. This includes no allowances for
additional stone refill, asphalt patching~ existing utility repairJ dewatering, or
extended rental on the shoring system. The decision to replace additional pipe must
be made as soon as the condition of the existing pipe is determined.
3. 60" Rep-If additional wells are required, then an addi.ti.onal $200 per If will be
required, in addition to more contract time if it requires the dewatering sub to
remobiJi.ze to the site, drill the wells, and then wait for the water to be putled down
to a manageable level.
4. We have included 80' x 22' offull depth and full width asphalt replacement in our
bid. If the road is undercut worse than anticipated~ or if additional pipe or other
utility repair is required, our additional price to place the dgabase and asphalt, will
be $60.00 per sy.
5. We have included the dig out, hauloff., and dump fees for the in place material in
order to rebuild the street. Again, this is based upon our 80' x 22' parameters. If
additional excavation is required, beyond this area~ please add $16.00 per cy.
6. We have included necessary refill of # 11 stone in. the affected area of new asphalt.
If additional excavation is required, then the cost to refill those areas with # 11 stone
will be $12.70 per ton, compacted in place.
7 . We have included 160 If of new curb in our base bid. Additional curb will. be
$24.00 per If.
8. Concrete driveways or aprons, beyond the two included in our bid, will be
additional at $46.00 per sy. Asphalt driveway restorati.on will be $24.00 per sy.
This should cover the bulk of any additional work that might be required and establish
those units now. I do not know if we can cover all ofthe unknowns but we have tried to
eliminate the bulk of the costs in our lump sum bid. If you have any questions, please
contact me at any time.
TOTAL PRICE--------$112,OOO.OO
-----_.._-~. - ..~.__.__... ---... .............,.. ~..
Demolition. CC)I"ICrete - Slte Development - Utilities
Equal Oppcrlunlty Employer - MIFIHN
@4/15/2008 09:44
8122943901
TEAM CONTRACTING
PAGE 05/05
r
~
14912 Railroad Stmat
MemphIs, Indiana 47143
Talephone ii12~294-12S8
TEAM CONTRACTING, LLC
Post OffIce Box 237
Memphis, Indiana 47118
Fax 812-294-3754
Eatlmlltlng .Fa>t 812.294-3901
-fl11/~
In Business Since 1995
Respectfully Submitted;
Ed Morris, Construction Manager
~.._.._/
r",