HomeMy WebLinkAboutProposalRevised June 26, 2006
MEADOWS DETENTION BASIN AND DRAINAGE IMPROVEMENTS, JOB N0.0412
ITEM APPROXIMATE DESCRIPTION WITH UNIT PRICE TOTAL
NO. QUANTITY UNIT PRICE IN NUMBERS AMOUNT
WRITTEN IN WORDS FOR BID ITEM
1 1 LS Clearing and Grubbing
for Sixty-Nine Thousand Five Hundred
Dollars and No Cents Dollars
Per Lump Sum $ 69,500.00 $ 69,500.00
2 3 EA Stabilized Construction Entrance
for One Thousand Four Hundred Fifteen
Dollars and No Cents Dollars
Per Each $ 1,415.00 $ 4,245.00
3 1 LS Linear Grading
for One Hundred Thirty-Six Thousand
Dollars and No Cents Dollars
Per Lump Sum $ 136,000.00 $ 136,000.00
4 14,625 CYS Berm Earthwork
for Thirteen Dollars and No Cents
Dollars
Per Cubic Yard $ 13.00 $ 190,125.00
5 116 TONS HMA Surface, Type'B', Complete
for Fifty-Two Dollars and No Cents
Dollars
Per Ton $ 52.00 $ 6;032.00
6 347 TONS HMA Intermediate, Type'B', Complete
for Fifty Dollars and No Cents
Dollars
Per Ton $ 50.00 $ 17,350.00
7 1,050 TONS Type'O' Compacted Aggregate Base Size
No. 53
for Twenty-One Dollars and No Cents
Dollars
Per Ton $ 21.00 $ 22,050.00
r:
8 1 LS Concrete Overflow Structure, Complete
for Nine Thousand Five Hundred
Dollars and No Cents Dollars
Per Lump Sum. $ 9,500.00 $ 9,500.00
9 125 SYS 12" Hand-Laid Riprap, Grouted
for Forty-Four Dollars and No Cents
Dollars
Per Square Yard $ 44.00 $ 5,500.00
10 3,155 TONS Indiana No. 2 Stone, in Berm
for Eleven Dollars and No Cents
Dollars
Per Ton $ 11.00 $ 34,705.00
sydnry\w~locs\04\O~i12\~Ixcilicafiore \vuaJrfic~ds \OUNJTITIfS A-206
Revised June 26, 2006
MEADOWS DETENTION BASIN AND DRAINAGE IMPROVEMENTS, JOB N0.0412
ITEM APPROXIMATE DESCRIPTION WITH UNIT PRICE TOTAL
NO. QUANTITY UNIT PRICE IN NUMBERS AMOUNT
WRITTEN IN WORDS FOR BID ITEM
11
4835 SYS ___
Needle Punched, Nonwoven Filter Fabric
in Berm
for Two Dollars and Filly Cents
` Dollars
Per Square Yazd $ 2.50 $ 12,087.50
12 411 CYS Class 'A' Concrete for Ditch Retaining
Wall, Reinforced
for Five Hundred Five Dollars and No
Cents Dollars
Per Cubic Yard $ 505.00 $ 207,555.00
13 1250 LFT 8' Wide Concrete Bottom Ditch
for Sixty Dollars and No Cents
Dollars
Per Linear Foot $ 60.00 $ 75,000.00
14 32 SYS Concrete Splash Apron
for Ninety Dollars and No Cents
Dollars
Per Squaze yard $ 90.00 $ 2,880.00
. 15 31 LFT 48" RCP Storm Sewer, Class III, Outlet
Control Pipe
for One Hundred Eighty Dollars and
No Cents Dollars
Per Lineal Foot $ 180.00 $ 5,580.00
16 2 EA 48" Concrete End Section, with
Dissipators
for Three Thousand Three Hundred Eighty
Five Dollars and No Cents Dollars
Per Each $ 3,385.00 $ 6,770.00
17 1 EA Seepage Collar for 48" RCP Outlet
Control Structure
for One Thousand Two Hundred Fifty
Dollars and No Cents Dollars
Per Each $ 1,25.0.00 $ 1,250.00
18 161 LFT 24" RCP Storm Sewer, Class III
for Forty-Eight Dollars and No Cents
Dollars
Per Lineal Foot $ 48.00 $ 7,728.00
19 4 EA 24" Concrete End Section
for One Thousand Three Hundred
Dollars and No Cents Dollars
• Per Each $ 1,300.00 $ 5,200.00
9,>yJnry\wp/xs\04\04/Z\7~ccilicaliom3 \gvanlilie:+.rJs \OUN`l~ITIE~? A'207
Revised June 26, 2006
MEADOWS DETENTION BASIN AND DRAINAGE IMPROVEMENTS, JOB N0.0412
ITEM APPROXIMATE DESCRIPTION WITH UNIT PRICE TOTAL
NO. QUANTITY UNIT PRICE IN NUMBERS AMOUNT
WRITTEN IN WORDS FOR BID ITEM
20 16 LFT 12" RCP, Class III
for One Hundred Ten Dollars and
No Cents Dollars
Per Linear Foot $ 110.00 $ 1,760.00
21 100 LFT PVC Pipe Extensions
for Twenty-Five Dollars and No Cents
Dollars
Per Linear Foot $ 25.00 $ 2,500.00
22 150 LFT 12"PVC Force Main, DR18, with
Fittings, Restrainers
for Eighty Dollars and No Cents
Dollars
Per Linear Foot $ 80.00 $ 12,000.00
23 120 LFT W Beam (Steel) Guardrail
for Forty Dollars and No Cents
Dollars
Per Linear Foot $ 40.00 $ 4,800.00
24 2 EA Guardrail Curved Terminal End Section
• for Thirty-One Dollars and No Cents
Dollars
Per Each $ 31.00 $ 62.00
25 29,950 SYS Seeding
for No Dollars and Thirty-Two Cents
Dollars
Per Square Yard $ 0.32 $ 9,584.00
26 1,900 SYS Sodding
for Two Dollars and Eighty-Five Cents
Dollars
Per Square Yard $ 2.85 $ 5,415.00
27 5,700 LFT Erosion Control Silt Fence, Complete
for Three Dollars and No Cents
Dollars.
Per Linear Foot $ 3.00 $ 17,100.00
28 1 LS Traffic Control, Signs, Barricades,
Complete
for Five Thousand Dollars and No
Cents Dollars
Per Lump Sum $ 5,000.00 $ 5,000.00
•
s:SyJny\vploc7~U`f~U4/2\>Grci/icafian>\quanfllics.ds\OUNJr~I(IE~S A-208
Revised June 26, 2006
• MEADOWS DETENTION BASIN AND DRAINAGE IMPROVEMENTS, JOB NO. 0412
ITEM APPROXIMATE DESCRIPTION WITH UNIT PRICE TOTAL
NO. QUANTITY UNIT PRICE IN NUMBERS AMOUNT
WRITTEN IN WORDS FOR BID ITEM
29 642 TONS Repave Crum's Lane, 110 #/SY HMA
Surface, including Tack Coat
for Fifty-Two Dollars and No Cents
Dollars
Per Ton $ 52.00 $ 33,384.00
30 3,111 SYS Mi114' Strip at Each Payment Edge on
Crum's Lane Prior to Paving
for Three Dollars and Fifty Cents
Dollars
Per Square Yards $ 3.50 $ 10,888.50
__ _-
31 1 LS Chain Link Gate, Complete
for Six Thousand Eight Hundred Dollars
and No Cents Dollars
Per Lump Sum $ 6,800.00 $ 6,800.00
32 1 LS Construction Engineering (Stake-Out),
Complete
for Eighteen Thousand Dollars and
No Cents Dollars
Per Lump Sum $ 18,000.00 $ 18,000.00
• 33 60 LFT 70" Dia. Steel Casing, bored under CSX
Railroad Tracks
for One Thousand Nine Hundred
Ninety-Nine Dollars & No Cants Dollars
Per Linear Foot $ 1,995.00 $ 119,700.00
34 64 LFT 54" RCP, Class III, jacked inside 70" steel
casing
for Two Hundred Twenty Dollars and
No Cents Dollars
Per Linear Foot $ 220.00 $ 14,080.00
35 8,014 CYS Berm Key Way and Undercut
Excavation, complete, including grading
and seeding of waste area
for Fourteen Dollars and No Cents
Dollars
Per Cubic Yard $ 14.00 $ 112,196.00
SUMMATION OF ITEMS 1 THROUGH 35 =TOTAL BID PRICE _
$ 1,192,327.00
One Million One Hundred Ninety-Two Thousand Three Hundred Twenty-Seven Dollars and
No Cents Dollars
We Acknowledge Receipt of : Addendum No. 1 (Dated June 14, 2006)
• Addendum No. 2 (Dated June 26, 2006)
s:syArry\wtdocs\Ok\04/Z\sFccilicatiorrs\quadifies.ds\OUMI~iTIES A-209