HomeMy WebLinkAboutChange Order 005Y
~ AIA Document G701'" - 2001
Change Order
Rex Lockazd Ma or Robert aiz
(Typed name) (Typed name) ~
PO Box 3243, 812 W. Magnolia Avenue, City- unty uu'Idi ; 501 EasCCo-urt
Louisville, Kentuck 40201-3243 Aver e, Jeff on lle, Indiana 47130
A R 5S ADD ES
1
B (Si ature) BY gnatur
DATE
• AIA Document G701 T" -2001. Copyright 0 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AI
Document is protected by U.S. Copyright law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any
portion of it, may resuH in severe civil and criminal penattles, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AIA software at 08:53:00 on 03!16/2007 under Order No.1000265728_3 which expires on 10/24/2007, and is not for resale.
User Notes: (3145294736;
PROJECT (Name and address): CHANGE ORDER NUMBER: 005 OWNER:
Ken Ellis Senior Center DATE: Mazch 16, 2007 ARCHITECT:
1425 Pennsylvania Avenue
Jeffersonville, Indiana 47130 CONTRACTOR:
TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: JEFF.022.90 FIELD:
Kevco Construction, LLC CONTRACT DATE: September 26, 2006
PO Box 3243 CONTRACT FOR: New Building OTHER:
812 W. Magnolia Avenue
Louisville, Kentucky 40201-3243
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives)
COR #003 -Lower Existing Water Line in Order to Install New Sewer Line to Maintain Proper
Clearance per Indiana American Water Company Requirements. ADD $ 2,191.00
COR #004 -Install Metal Stud Wall and Gypsum Wallboard with Finish Paint and Install
Spandrel Glass per the Owner's Request. ADD $ 2,825.00
COR #005 -Additional Cost to Install Water Main Extension per the
Indiana American Water Company Requirements ADD $ 2,745.75
Total ADD $ 7,761.75
The original Contract Sum was $ 830,000.00
The net change by previously authorized Change Orders $ 4,985.00
The Contract Sum prior to this Change Order was $ 834,985.00
The Contract Sum will be increased by this Change Order in the amount of $ 7,761.75
The new Contract Sum including this Change Order will be $ 842,746.75
The Contract Time will be increased by Zero (0) days.
The date of Substantial Completion as of the date of this Change Order therefore is Apri120, 2007
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guazanteed Maximum Price which
have been authorized by Construction Change Directive untIl the wst and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
The Estopinal Group LLC Kevw Construction, LLC Cit of Jeffersonville _
ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Fyr nar
C~~TrC '1
DATE
•~ ~ Transmittal Form
KEVCO CONSTRUCTION, LLC
P.O. Box 3243
Date: ~, ® ~
Company: `'
Attn: G'~~d~- ~s41--~~ --~~
From: ~ ~~ ~~.~~~.~
812 W. Magnolia Ave
_ouisville, Kentucky 40201-3243
502) 635-1641-Faz {502) 635-1634
Regarding:
We are sending you:
O As requested
(Ey~Attached
( ) Under separate cover
For your:
() Records
() Use and information
(c~Approval
() Review and comment
() Use and distribution
Via:
() Overnight mail
() Mail .
(Hand delivered
( ) Fax
Telefax no.:
Copies Date Description.
Memo: f? ~ ~ ~~.=-~' ~~~~-
~ 2,191.00
Remarks: ~,~ ~ ,~~ ~-~
mss' .~
Number of pages (including this page):
Signed: ~,~
Copies to:
•
SE~JT BY: WM. B. ENG'_E,
[NC.; 812 944 9064; JAN-5-07 11:43AM;
Proposal
l~f/I ~1. B. ~N ~L ~~ II ~1 ~.
EKCAVATlNG CON7'RACTaRS
20 >=. $th -New Albany, Indiana
Malling Address:
42 Hilltop Raad, Floyds Knobs, IN 47119
Phane (812) $44-9041 Fax (812) 944-9064
Sumitted 2~
Kevco Constru
Attention: R
Date: January 5, 2007
Project trams:
Ken Eltis
PAGE 2/2
Wm.13. En'le, Inc. ro os~s to com lets the items listed below as
l.) Lower water main to a low for sanitary sewer installation
Equipment, labor ~c material
%~
ands ecifieations for the ro eCt listed above.
$2,182.00
~~
~ ~ ~~
__
If rock or unfavorable gro nd conditions are encountered during Construction there may be additional cast to the
Contractor/Owner.
Authorized 5ignatl~re
Note: This proposal may e with drawn by WM. B. C;ngle, Inc. if not accepted within 30 days.
Arccpts~nce of Proposal
Payment Terms: Payment will he made within 30 days upon t~cceipt of stitcment and/or Completion of this project,
2% per month service cha ge will b~ applied to all past due accounts.
date ~;Qnature
•
Kevco Construction, Inc.
P.O. Box 3243
Louisville, KY 40201-3243
L
Fax: 502.635.1634
Office: 502.635.1641
• REQUEST FOR CHANGE ORDER(R.F.C.)
Date: 02/19/2007
Project: Ken Ellis Senior Center
1425 Pennsylvania Ave
Jeffersonville, IN 47130
To: The Estopinal Group
Nathan Love
903 Spring St.
Jeffersonville, IN 47130
RFC No.: 003 -Attachment
Job No.: 2325
PKG No.:
Reason For Change Request:
^ Arch/Engr. Request
^ Owner Request
^ Field Condition
THE CONTRACT IS PROPOSED TO BE CHANGED AS FOLLOWS:
ATTACHMENT TO CHANGE ORDER #003
IVlaterial $ 689.00
Labor $1,502.00
The total amount of attachment to change order #004 $2,191.00
THE CONTRACT TIME WILL BE INCREASED BY DAYS.
PLEASE RESPOND REGARDING ACCEPTANCE OF THIS R.F.C. AND PROCESS A CHANGE ORDER
IMMEDIATELY.
Kevco Construction
Page 1 of 1
February 23, 2007
The Estopinal Group
Nathan Love
903 Spring St.
Jeffersonville, IN 47130
Ken Ellis Senior Center
Attachment to Change Order #003
1.) Material
a.) 4 - 8 45 de~~r~ ~ Z~cnds with retainers @ $191.00 ea $ 74.00
b.) 6' - 8' pipe err S 5.00/ft $ 48.00-
e.) 5 tons of stone ci ~ 10.0i~ loin ~ 50.00
8 hrs. backhole ti~ ith operatt~r '~z, $7~.OOllu' `~ 600.00
16 hrs. -labor r ~45.SE~ `~ 72A.00
The total am~?~mt ofattaclmr~ni ~~~ ~han~;e.order #003 ~~ 52,191.0(!
-, Mailing Address: Office: 502-635-1641 Shipping Address:
PO Box 3243 Fax: 502-635-1634 812 W. Magnolia Ave. Suite #2
Louisville, Kentucky 40201-3243 Louisville, Kentucky 40208
. ~ Transmittal Farm
KEVCO CONSTRUCTION, LLC
P.O. Box 3243
812 W. Magnolia Ave
_ouisville, Kentucky 40201-3243
:502) 635-1641-Faz (502) 635- .1634
~ ~
Date:
Company:
Attn:
From:
Regarding:
Copies Date Description.
We are sending you:
~/t~s requested
O Attached
() Under separate cover
Ror your:
O Records
() Use and information Memo: , ,
(1=~Approval .
() Review and comment
() Use and distribution `
Via:
() Overnight mail Remarks:
() Mail
(and delivered
()F~
T,elefax no.:
Number of pages (including this page):
Signed: ,
Copies to:
LJ
~~~/ 4'
Kevco Construction, Inc.
P.O. Box 3243
Louisville, KY 40201-3243
REQUEST FOR CHANGE ORDER(R.F.C.)
..
Date: Friday, February 02, 2007
Project: hen Ellis Senior Center
1425 Pennsylvania Ave
Jeffersonville IN 47130
RFC No.: 004
To: The Estopinal Group
Nathan Love
903 Spring St
Teffersonville, IN 47130
Job No.: 2325
PKG No.:
Fax: 502.635.1634
Office: 502.635.1641
Reason For Change Request:
^ Arch/Engr. Request
^ Owner Request
^ Field Condition
THE CONTRACT IS PROPOSED TO BE CHANGED AS FOLLOWS:
Change in work as per sketch dated 1/05/2007 to change (3) windows to
Greg Spandrel insulated units approx. 70" x 26". Install gypsum board on stud
Wall Full height with blocking for folding door latch system
The total amount of C.O. #4
THE CONTRACT TIME WILL BE INCREASED BY DAYS.
$2,825.00
PLEASE RESPOND REGARDING ACCEPTANCE OF THIS R.F.C. AND PROCESS A CHANGE ORDER
IMMEDIATELY.
Kevco Construction, Inc.
' '~ P.O. Box 3243
Louisville, KY 40201-3243
L
Fax: 502.635.1634
Office: 502.635.1641
• REQUEST FOR CHANGE ORDER(R.F.C.)
Date: 02/19/2007
Project: Ken Ellis Senior Center
1425 Penns lvania Ave
Jeffersonville, IN 47130
To: The Estopinal Group
Nathan Love
_903 Spring St.
Teffersonville, IN 47130
THE CONTRACT IS PROPOSED TO BE CHANGED AS FOLLOWS:
ATTACHMENT TO CHANGE ORDER #004
Material $1,239.00
Labor $1,586.00
The total amount of attachment to change order #004 $2,825.00
THE CONTRACT TIME WILL BE INCREASED BY DAYS.
PLEASE RESPOND REGARDING ACCEPTANCE OF THIS R.F.C. AND PROCESS A CHANGE ORDER
IMMEDIATELY.
RFC No.: 004 -Attachment
Job No.: 2325
PKG No.:
Reason For Change Request:
^ Arch/Engr. Request
^ Owner Request
^ Field Condition
.7
Kevco Construction
Page 1 of I
February 23, 2007
~ ~ECL~~°ED
The Estopinal Group THE ESTOPINAL GPOUP LLC
Nathan Love
903 Spring St.
Jeffersonville, IN 47130
Ken Ellis Senior Center
Attachment to Change Order #004
l.) Glass Material $ 993.00
3.) Material for new wall (2x4's, drywall, mud, $ 246.00
Scr~~~~s, tape Ri blocking material)
4.) Labor for ne~~ mill (i:nc]uding paint) $1,586.00
(16 hrs @ $9~?.0(? ~ - ~~' lnen @ $49.50/hr/eal
The total amount ~~l~~nt<<chmentt~~~h~n~~~~~or~i~r ~!0=~: $?;R?~.~i(1
Mailing Address: Office: 502-635-1641 Shipping Address:
PO Box 3243 Fax: 502-635-1634 812 W. Magnolia Ave. Suite #2
Louisville, Kentucky 40201-3243 Louisville, Kentucky 40208
Request for change
Nathan Love
From: Jessica LaDuke [JLaduke@KEVCOCONSTRUCTION.NET]
Sent: Tuesday, March 13, 2007 10:38 AM
To: Nathan Love
Subject: RFC 006 Ken Ellis Senior Center Waterline extention
REQUEST FOR CHANGE ORDER~R.F.C.)
Date: Tuesday, March 13, 2007
Project: Ken Ellis Senior Center
1425 Pennsylvania Ave
Jeffersonville, IN 47130
RFC No.: ~ ~g
.'/
Job No.: 2325
PKG No.:
To: The Estopinal Group
Nathan Love
903 Spring Street
• Jeffersonville, IN 47130
Reason For Change Request:
Arch/Engr. Request
Owner Request
Field Condition
THE CONTRACT IS PROPOSED TO BE CHANGED AS FOLLOWS:
WATERLINE EXTENTION IN THE AMOUNT OF $2,745.75
•
Page 1 of 2
3/20/2007
-~~
•
:]
•
Kevco Construction
Page 1 of 1
March 19, 2007
The Estopinal Group
Nathan Love
903 Spring St. -
Jeffersonville, IN 47130
Ken Ellis Senior Center
Attachment to Change Order #~ 005
1. Install 8" water main on east side of Pennsylvania Ave.
2. Install 6" fire service across road to valve pit.
3. Additional 8" e900 pipe to be supplied by IAWC.
4. Tap cxistin~ plain with conventional tee and valve.
5. Price Breakdown:
40' 6"- C900 _ _ $180.00
Flush pit. $34.00
Saw' cut $216.00
Flowabic till (8 yds. (a), $9~.001yd.) _ -,$760.00
Patch road-cut ~ ~ $283,00
_...I'Iates $200.00
Equiprient & labor (3 hrs. (u), $207.00) $62 L00
Contractor allowable 5"fo mark-up $130.75
The total amount of change order #006
~'~ ~~~
$ 2,745.75
Mailing Address: Otlice: 502-631641 Shipping Address:
PO Box 3243 Faz: 50235-1634 812 W. Magnolia Ave. Suitei#2
Louisville, Kentucky 40201-3243 Louisville, Kentucky 40208 ,