Estopinal Group B141- 1997 Part 2
ii • Document B141TM -1997 Part 2 Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING SERVICES 2.4 DESIGN SERVICES 2.5 CONSTRUCTION PROCUREMENT SERVICES 2.6 CONTRACT ADMINISTRATION SERVICES 2.7 FACILITY OPERATION SERVICES 2.8 SCHEDULE OF SERVICES 2.9 MODIFICATIONS • ARTICLE 2.1 PROJECT ADMINISTRATION SERVICES § 2.1.1 The Architect shall manage the Architect's services and administer the Project. The Architect shall consult with the Owner, research applicable design criteria, attend Project meetings, communicate with members of the Project team and issue progress reports. The Architect shall coordinate the services provided by the Architect and the Architect's consultants with those services provided by the Owner and the Owner's consultants. § 2.1.2 When Project requirements have been sufficiently identified, the Architect shall prepare, and periodically update, a Project schedule that shall identify milestone dates for decisions required of the Owner, design services furnished by the Architect, completion of documentation provided by the Architect, commencement of construction and Substantial Completion of the Work. § 2.1.3 The Architect shall consider the value of alternative materials, building systems and equipment, together with other considerations based on program, budget and aesthetics in developing the design for the Project. ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. § 2.1.4 Upon request of the Owner, the Architect shall make a presentation to explain the design of the Project to representatives of the Owner. § 2.1.5 The Architect shall submit design documents to the Owner at intervals appropriate to the design process for purposes of evaluation and approval by the Owner. The Architect shall be entitled to rely on approvals received from the Owner in the further development of the design. § 2.1.6 The Architect shall assist the Owner in connection with the Owner's responsibility for filing documents required for the approval of governmental authorities having jurisdiction over the Project. • AIA Document 8141 ^~ -1997 Part 2. Copyright ©1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIAg Documerrt is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:46:16 on 06/15/2006 under Order No.1000209618_t which expires on 12/7/2006, and is not for resale. User Notes: (2990699080) • § 2.1.7 EVALUATION OF BUDGET AND COST OF THE WORK § 2.1.7.1 When the Project requirements have been sufficiently identified, the Architect shall prepare a preliminazy estimate of the Cost of the Work. This estimate may be based on current area, volume or similaz conceptual estimating techniques. As the design process progresses through the end of the prepazation of the Construction Documents, the Architect shall update and refine the preliminary estimate of the Cost of the Work. The Architect shall advise the Owner of any adjustments to previous estimates of the Cost of the Work indicated by changes in Project requirements or general market conditions. If at any time the Architect's estimate of the Cost of the Work exceeds the Owner's budget, the Architect shall make appropriate recommendations to the Owner concerning financial, operational consequences that will result from to adjusting the Project's size, quality or budget, and the Owner shall cooperate with the Architect in reviewing and making judgments and decisions concerning such adjustments.. § 2.1.7.2 Evaluations of the Owner's budget for the Project, the preliminary estimate of the Cost of the Work and updated estimates of the Cost of the Work prepared by the Architect represent the Architect's judgment as a design professional familiar with the construction industry. It is recognized, however, that in the current inflationary period we are in, however, that neither the Architect nor the Owner has control over the cost of labor, materials or equipment, over the Contractor's methods of determining bid prices, or over competitive bidding, market or negotiating conditions. Accordingly, the Architect cannot and does not warrant or represent that bids or negotiated prices will not vary from the Owner's budget for the Project or from any estimate of the Cost of the Work or evaluation prepared or agreed to by the Architect. § 2.1.7.3 In preparing estimates of the Cost of the Work, the Architect shall be permitted to include contingencies for design, bidding and price escalation; to determine what materials, equipment, component systems and types of construction are to be included in the Contract Documents; to make reasonable adjustments in the scope of the Project and to include in the Contract Documents alternate bids as may be necessazy to adjust the estimated Cost of the Work to meet the Owner's budget for the Cost of the Work. If an increase in the Contract Sum occurring after execution of the Contract between the Owner and the Contractor causes the budget for the Cost of the Work to be exceeded, that budget shall be increased accordingly. • § 2.1.7.4 If bidding or negotiation has not conunenced within 90 days after the Architect submits the Construction Documents to the Owner, the budget for the Cost of the Work shall be adjusted to reflect changes in the general level of prices in the construction industry. § 2.1.7.5 If the budget for the Cost of the Work is exceeded by the lowest bona fide bid or negotiated proposal, the Owner shall: ,1 give written approval. of an increase in the budget for the Cost of the Work; .2 authorize rebidding or renegotiafing of the Project within a reasonable time; .3 terminate in accordance with Section 1.3.8.5; or .4 cooperate in revising the Project scope and quality as required to reduce the Cost of the Work. § 2.1.7.6 If the Owner chooses to proceed under Section 2.1.7.5.4, the Architect, without additional compensation, shall modify the documents for which the Architect is responsible under this Agreement as necessazy to comply with the budget for the Cost of the Work. The modification of such documents shall be the limit of the Architect's responsibility under this Section 2.1.7. The Architect shall be entitled to compensation in accordance with this Agreement for all services performed whether or not construction is commenced. ARTICLE 2.2 SUPPORTING SERVICES § 2.2.1 Unless specifically designated in Section 2.8.3, the services in this Article 2.2 shall be provided by the Owner or the Owner's consultants and contractors. 1 § 2.2.1.1 The Architect shall prepare a program setting forth the Owner's objectives, schedule, constraints and criteria, including space requirements and relationships, special equipment, systems and site requirements. § 2.2.1.2 The Owner shall furnish surveys to describe physical chazacterisflcs, legal limitations and utility locations for the site of the Project, and a written legal description of the site. The surveys and legal information shall include, as applicable, grades and lines of streets, alleys, pavements and adjoining property and structures; adjacent drainage; • AIA Document B147 ~"" -1997 Part 2. Copyright ®1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIAg Documerd is protected by U.S. Copyright Law and International Treaties. ~ Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:46:16 on 06/15/2006 under Order No.1000209618_t which expires on 12!7/2006, and is not for resale. User Notes: (2990699080) rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundazies and contours of the site; . locations, dimensions and necessary data with respect to existing buildings, other improvements and trees; and information concerning available utility services and lines, both public and private, above and below grade, including inverts and depths. All the information on the survey shall be referenced to a Project benchmark. § 2.2.1.3 The Owner shall furnish services of geotechnical engineers which may include but are not limited to test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion tests and resistivity tests, including necessazy operations for anticipating subsoil conditions, with reports and appropriate recommendations. ARTICLE 2.3 EVALUATION AND PLANNING SERVICES § 2.3.1 The Architect shall provide a preliminazy evaluation of the information furnished by the Owner under this Agreement, including the Owner's program and schedule requirements and budget for the Cost of the Work, each in terms of the other. The Architect shall review such information to ascertain that it is consistent with the requirements of the Project and shall notify the Owner of any other information or consultant services that may be reasonably needed for the Project. § 2.3.2 The Architect shall provide a preliminazy evaluation of the Owner's site for the Project based on the information provided by the Owner of site conditions, and the Owner's program, schedule and budget for the Cost of the Work. § 2.3.3 The Architect shall review the Owner's proposed method of contracting for construction services and shall notify the Owner of anticipated impacts that such method may have on the Owner's program, financial and time requirements, and the scope of the Project. ARTICLE 2.4 DESIGN SERVICES § 2.4.1 The Architect's design services shall include normal structural, mechanical and electrical engineering services. • § Z.4.2 SCHEMATIC DESIGN DOCUMENTS § 2.4.2.1 The Architect shall provide Schematic Design Documents based on the mutually agreed-upon program, schedule, and budget for the Cost of the Work. The documents shall establish the conceptual design of the Project illustrating the scale and relationship of the Project components. The Schematic Design Documents shall include a conceptual site plan, if appropriate, and preliminazy building plans, sections and elevations. At the Architect's option, the Schematic Design Documents may include study models, perspective sketches, electronic modeling or combinations of these media. Preliminary selections of major building systems and construction materials shall be noted on the drawings or described in writing. § 2.4.3 DESIGN DEVELOPMENT DOCUMENTS § 2.4.3.1 The Architect shall provide Design Development Documents based on the approved Schematic Design Documents and updated budget for the Cost of the Work. The Design Development Documents shall illustrate and describe the retinement of the design of the Project, establishing the scope, relationships, forms, size and appearance of the Project by means of ptans, sections and elevations, typical construction details, and equipment layouts. The Design Development Documents shall include specifications that identify major materials and systems and establish in general their quality levels. § 2.4.4 CONSTRUCTION DOCUMENTS § 2.4.4.1 The Architect shall provide Construction Documents based on the approved Design Development Documents and updated budget for the Cost of the Work. The Construction Documents shall set forth in detail the requirements for construction of the Project. The Construction Documents shall include Drawings and Specifications that establish in detail the quality levels of materials and systems required for the Project. § 2.4.4.2 During the development of the Construction Documents, the Architect shall assist the Owner in the development and prepazation of: (1) bidding and procurement information which describes the time, place and conditions of bidding; bidding or proposal forms; and the form of agreement between the Owner and the Contractor; and (2) the Conditions of the Contract for Construction (General, Supplementary and other Conditions). The • AIA Document 6141 T"" -1997 Part 2. Copyright ®1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The American InstRute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. 3 Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:46:16 on 06/15/2006 under Order No.1000209618_1 which expires on 12!7/2006, and is not for resale. User Notes: (2990699080) Architect also shall compile the Project Manual that includes the Conditions of the Contract for Construction and • Specifications and may include bidding requirements and sample forms. ARTICLE 2.5 CONSTRUCTION PROCUREMENT SERVICES § 2.5.1 The Architect shall assist the Owner in obtaining either competitive bids or negotiated proposals and shall assist the Owner in awarding and prepazing contracts for construction. § 2.5.2 The Architect shall assist the Owner in establishing a list of prospective bidders or contractors. § 2.5.3 The Architect shall assist the Owner in bid validation or proposal evaluation and determination of the successful bid or proposal, if any. If requested by the Owner, the Architect shall notify all prospective bidders or contractors of the bid or proposal results. § 2.5.4 COMPETITIVE BIDDING § 2.5.4.1 Bidding Documents shall consist of bidding requirements, proposed contract forms, General Conditions and Supplementary Conditions, Specifications and Drawings. § 2.5.4.2 If requested by the Owner, the Architect shall arrange for procuring the reproduction of Bidding Documents for distribution to prospective bidders. The Owner shall pay directly for the cost of reproduction or shall reimburse the Architect for such expenses. § 2.5.4.3 If requested by the Owner, the Architect shall distribute the Bidding Documents to prospective bidders and request their return upon completion of the bidding process. The Architect shall maintain a log of distribution and retrieval, and the amounts of deposits, if any, received from and returned to prospective bidders. § 2.5.4.4 The Architect shall consider requests for substitutions, if permitted by the Bidding Documents, and shall prepare and distribute addenda identifying approved substitutions to all prospective bidders. § 2.5.4.5 The Architect shall participate in or, at the Owner's direction, shall organize and conduct apre-bid • conference for prospective bidders. § 2.5.4.6 The Architect shall prepare responses to questions from prospective bidders and provide clarifications and interpretations of the Bidding Documents to all prospective bidders in the form of addenda. § 2.5.4.7 The Architect shall participate in or, at the Owner's direction, shall organize and conduct the opening of the bids. The Architect shall subsequently document and distribute the bidding results, as directed by the Owner. § 2.5.5 NEGOTIATED PROPOSALS § 2.5.5.1 Proposal Documents shall consist of proposal requirements, proposed contract forms, General Conditions and Supplementary Conditions, Specifications and Drawings. § 2.5.5.2 If requested by the Owner, the Architect shall arrange for procuring the reproduction of Proposal Documents for distribution to prospective contractors. The Owner shall pay directly for the cost of reproduction or shall reimburse the Architect for such expenses. § 2.5.5.3 If requested by the Owner, the Architect shall organize and participate in selection interviews with prospective contractors. § 2.5.5.4 The Architect shall consider requests for substitutions, if permitted by the Proposal Documents, and shall prepare and distribute addenda identifying approved substitutions to all prospective contractors. § 2.5.5.5 If requested by the Owner, the Architect shall assist the Owner during negotiations with prospective contractors. The Architect shall subsequently prepare a summazy report of the negotiation results, as directed by the Owner. • AIA Document B141 TM -1997 Part 2. Copyright ®1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. ~ Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:46:16 on 06/15/2006 under Omer No.1000209618_1 which expires on 12/7/2006, and is not for resale. User Notes: (2990699080) ARTICLE 2.6 CONTRACT ADMINISTRATION SERVICES § 2.6.1 GENERAL ADMINISTRATION § 2.6.1.1 The Architect shall provide administration of the Contract between the Owner and the Contractor as set forth below and in the edition of AIA Document A201, General Conditions of the Contract for Construction, current as of the date of this Agreement. Modifications made to the General Conditions, when adopted as part of the Contract Documents, shall be enforceable under this Agreement only to the extent that they are consistent with this Agreement or approved in wrifing by the Architect. § 2.6.1.2 The Architect's responsibility to provide the Contract Administration Services under this Agreement comrnences with the award of the initial Contract for Construction and terminates at the issuance to the Owner of the final Certificate for Payment. However, the Architect shall be entitled to a Change in Services in accordance with Section 2.8.2 when Contract Administration Services extend 60 days after the date of Substantial Completion of the Work. § 2.6.1.3 The Architect shall be a representative of and shall advise and consult with the Owner during the provision of the Contract Administration Services. The Architect shall have authority to act on behalf of the Owner only to the extent provided in this Agreement unless otherwise modified by written amendment. § 2.6.1.4 Duties, responsibilities and limitations of authority of the Architect under this Article 2.6 shall not be restricted, modified or extended without written agreement of the Owner and Architect with consent of the Contractor, which consent will not be unreasonably withheld. § 2.6.1.5 The Architect shall review properly prepared, timely requests by the Contractor for additional information about the Contract Documents. A properly prepared request for additional information about the Contract Documents shall be in a form prepared or approved by the Architect and shall include a detailed written statement that indicates the specific Drawings or Specifications in need of clarification and the nature of the clarification requested. § 2.6.1.61f deemed appropriate by the Architect, the Architect shall on the Owner's behalf prepare, reproduce and distribute supplemental Drawings and Specifications in response to requests for information by the Contractor. § 2.6.1,7 The Architect shall interpret and decide matters concerning performance of the Owner and Contractor under, and requirements of, the Contract Documents on written request of either the Owner or Contractor. The Architect's response to such requests shall be made in writing within any time limits agreed upon or otherwise with reasonable promptness. § 2.6.1.8 Interpretations and decisions of the Architect shall be consistent with the intent of and reasonably inferable from the Contract Documents and shall be in writing or in the form of drawings. When making such interpretations and initial decisions, the Architect. shall endeavor to secure faithful performance by both Owner and Contractor, shall not show partiality to either, and shall not be liable for the results of interpretations or decisions so rendered in good faith. § 2.6.1.9 The Architect shall render initial decisions on claims, disputes or other matters in question between the Owner and Contractor as provided in the Contract Documents. However, the Architect's decisions on matters relating to aesthetic effect shall be final if consistent with the intent expressed in the Contract Documents. § 2.6.2 EVALUATIONS OF THE WORK § 2.6.2.1 The Architect, as a representative of the Owner, shall visit the site at intervals appropriate to the stage of the Contractor's operations, or as otherwise agreed by the Owner and the Architect in Article 2.8, (1) to become generally familiar with and to keep the Owner informed about the progress and quality of the portion of the Work completed, {2) to endeavor to guard the Owner against defects and deficiencies in the Work, and (3) to determine in general. if the Work is being performed in a manner indicating that the Work, when fully completed, will be in accordance with the Contract Documents. However, the Architect shall not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. The Architect shall neither have control over or charge of, nor be responsible for, the construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, since these are solely the Contractor's rights and responsibilities under the Contract Documents. AIA Document Bt 41 TM -1997 Part 2. Copyright ©1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:46:16 on 06!15/2006 under Order No.1000209618_1 which expires on 1217/2006, and is not for resale. User Notes: (2990699080) § 2.6.4.2 The Architect shall maintain a record of submittals and copies of submittals supplied by the Contractor in • accordance with the requirements of the Contract Documents. § 2.6.4.3 If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of the Contractor by the Contract Documents, the Architect shall specify appropriate performance and design criteria that such services must satisfy. Shop Drawings and other submittals related to the Work designed or certified by the design professional retained by the Contractor shall bear such professional's written approval when submitted to the Architect. The Architect shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals. § 2.6.5 CHANGES IN THE WORK § 2.6.5.1 The Architect shall prepaze Change Orders and Construction Change Directives for the Owner's approval and execution in accordance with the Contract Documents. The Architect may authorize minor changes in the Work not involving an adjustment in Contract Sum or an extension of the Contract Time which aze consistent with the intent of the Contract Documents. If necessary, the Architect shall prepare, reproduce and distribute Drawings and Specifications to describe Work to be added, deleted or modified, as provided in Section 2.8.2. § 2.6.5.2 The Architect shall review properly prepaeed, timely requests by the Owner or Contractor for changes in the Work, including adjustments to the Contract Sum or Contract Time. A properly prepared request for a change in the Work shall be accompanied by sufficient supporting data and information to permit the Architect to make a reasonable determination without extensive investigation or preparation of additional drawings or specifications. If the Architect determines that requested changes in the Work aze not materially different from the requirements of the Contract Documents, the Architect may issue an order for a minor change in the Work or recommend to the Owner that the requested change be denied. § 2.6.5.3 If the Architect determines that implementation of the requested changes would result in a material change to the Contract that may cause an adjustment in the Contract Time or Contract Sum, the Architect shall make a recommendation to the Owner, who may authorize further investigation of such change. Upon such authorization, • and based upon information furnished by the Contractor, if any, the Architect shall estimate the additional cost and time that might result from such change, including any additional costs attributable to a Change in Services of the Architect. With the Owner's approval, the Architect shall incorporate those estimates into a Change Order or other appropriate documentation for the Owner's execution or negotiation with the Contractor. § 2.6.5.4 The Architect shall maintain records relative to changes in the Work. § 2.6.6 PROJECT COMPLETION § 2.6.6.1 The Architect shall conduct inspections to determine the date or dates of Substantial Completion and the date of t3na1 completion, shall receive from the Contractor and forward to the Owner, for the Owner's review and records, written warranties and related documents required by the Contract Documents and assembled by the Contractor, and shall issue a final Certificate for Payment based upon a final inspection indicating the Work complies with the requirements of the Contract Documents. § 2.6.6.2 The Architect's inspection shall be conducted with the Owner's Designated Representative to check conformance of the Work with the requirements of the Contract Documents and to verify the accuracy and completeness of the list submitted by the Contractor of Work to be completed or corrected. § 2.6.6.3 When the Work is found to be substantially complete, the Architect shall inform the Owner about the balance of the Contract Sum remaining to be paid the Contractor, including any amounts needed to pay for final completion or correction of the Work. § 2.6.6.4 The Architect shall receive from the Contractor and forwazd to the Owner: (1) consent of surety or sureties, if any, to reduction in or partial release of retainage or the making of final payment and (2) affidavits, receipts, releases and waivers of liens or bonds indemnifying the Owner against liens. • AIA Document 8141 TM -1997 Part 2. Copyright ®1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Documenrt is protected by U.S. Copyright Law and International Treaties. f Unauthorized reproduction or distribution of this AIAe Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:46:16 on 0 611 5/2 0 0 6 under Order No.1000209618_1 which expires on 12/712006, and is not for resale. User Notes: (2990699080) ARTICLE 2.7 FACILITY OPERATION SERVICES § 2.7.1 The Architect shall meet with the Owner or the Owner's Designated Representative promptly after • Substantial Completion to review the need for facility operation services. § 2.7.2 Upon request of the Owner, and prior to the expiration of one year from the date of Substantial Completion, the Architect shall conduct a meeting with the Owner and the Owner's Designated Representative to review the facility operations and performance and to make appropriate recommendations to the Owner. ARTICLE 2.8 SCHEDULE OF SERVICES § 2.8.1 Design and Contract Admitistration Services beyond the following limits shall be provided by the Architect as a Change in Services in accordance with Section 1.3.3: .1 up to two ( 2 )reviews of each Shop Drawing, Product Data item, sample and similar submittal of the Contractor. .2 up to one monthly ( 1 monthly )visits to the site by the Architect over the duration of the Project during construction. .3 up to one ( 1 )inspections for any portion of the Work to determine whether such portion of the Work is substantially complete in accordance with the requirements of the Contract Documents. .4 up to One ( 1 )inspections for any portion of the Work to determine final completion. § 2.8.2 The following Design and Contract Administration Services shall be provided by the Architect as a Change in Services i n accordance with Section 1.3.3: .1 review of a Contractor's submittal out of sequence from the submittal schedule agreed to by the Architect; .2 responses to the Contractor's requests for information where such information is available to the Contractor from a careful study and comparison of the Contract Documents, field conditions, other Owner-provided information, Contractor-prepared coordination drawings, or prior Project correspondence or documentation; .3 Change Orders and Construction Change Directives requiring evaluation of proposals, including the preparation or revision of Instruments of Service; . .4 providing consultation concerning replacement of Work resulting from fire or other cause during construction; .5 evaluation of an extensive number of claims submitted by the Owner's consultants, the Contractor or others in connection with the Work; .6 evaluation of substitutions proposed by the Owner's consultants or contractors and making subsequent revisions to Instruments of Service resulting therefrom; .7 preparation of design and documentation for alternate bid or proposal requests proposed by the Owner; or .8 Contract Administration Services provided 60 days after the date of Substantial Completion of the Work. § 2.8.3 The Architect shall furnish or provide the following services only if specifically designated: Services Responsibility (Architect, Owner or Not Provided Location of Service Description .1 Pr rammin ---•~•-----Owner 2.2.1.1 .2 Land Surve Services ----Owner .3 Geotechnical Services -----Owner .4 S ace Schematics/Flow Dia rams ---Architect 2.4.2.1 .5 Existin Facilities Surve s ----Not A licable .6 Economic Feasibili Studies Not A licable .7 Site Anal sis and Selection -----Not A licable .8 Environmental Studies and Re orts -----Owner .9 Owner-Su lied Data Coordination -----Owner .10 Schedule Develo ment and Monitolln -----Owner AIA Document B14t e'" -1997 Part 2. Copyright ©1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. g Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:46:16 on 06/15/2006 under Order No.1000209618_1 which expires on 12!7/2006, and is not for resale. User Notes: (2990699080) L~ Services Responsibility (Architect, Owner or Not Provided Location of Service Description .11 Civil Desi n ---Architect .12 Landsca a Desi n -Not A licable .13 Interior Desi n Not A licable .14 S ecial Biddin or Ne otiation Not A licable .15 Value Anal sis ------Not A licable .16 Detailed Cost Estimatin --------Not A licable .17 On-Site Pro'ect Re resentation --Not A licable .18 Construction Mana ement -----Not A licable .19 Start-u Assistance -----Not A licable .20 Record Drawin s -----Not A licable .21 Post-Contract Evaluation ------Not A licable .22 Tenant-Related Services ----Not A licable .23 -- --Si na e - Not A licable .24 - - - ui ment Plannin Not A licable .25 -------MEP Services ------Architect .26 Structural Services Architect Description of Services. (insert descriptions of the services designated.) The Estopinal Group LLC wiii provide Architecture, Mechanical, Electrical, Plumbing, Civil and Structural. ARTICLE 2.9 MODIFICATIONS § 2.9.1 1vlodifications to this Standard Form of Architect's Services: Design and Contract Administration, if any, aze as follows: • if necessary, the Owner shall furnish the services of an industrial Hygienist certified by the American Boazd of Industrial Hygiene to survey, test, monitor and determine the extent of asbestos contamination or contamination by other pollutants and to recommend, specify and direct the abatement, removal, treatment and disposal of asbestos or other pollutants. The Owner (hereinafter referred to as the "Indemnitor") hereby agrees to indemnify, save and hold harmless, and defend at its own expense the Architect, the Architect's Consultants, their respective paztners, agents, employees and any other person or entity for whom any of them may be legally responsible (hereinafter referred to as the "Indemnitees") against all claims, loses, damages, suites, costs and expenses, including attorney's fees, or actions of any nature whatsoever which arise out of, or are in any way related to hazardous or polluting materials in any form at the Project site, including but not limited to asbestos, asbestos products, polychlorinated biphenyl or other toxic substance or :Pollutants"; including without limiting the generality of the foregoing; all liability for claims for death or damage to property, including the loss or use thereof and consequential damages therefrom, or damages for economic loss to any indemnity or Indemnitor or its employees, servants and agents to the extent such claims and claim expenses are excluded from coverage under the indemnities' professional liability insurance, whether such claims are based upon, or claimed to be based upon, statutory, contractual, tort or other liability of any Indemnitee or alleged to be caused by the joint, or several, or comparative (but not sole) negligence, breach of contract, breach of warranty, strict liability, or other breach of duty by any Indemnitee. If any part of this provision is adjudged to be contrary to law, the remaining parts of the provision shall in all other respects be and remain legally effective and binding. Moreover, this provision shall not be constructed to eliminate or in any way reduce any other indemnification or right which the Owner or the Architect has by law. The Architectural Services to be provided pursuant to the Owner/Architect Agreement aze being performed solely for the benefit of the Owner, and no benefit is meant to be conferred upon any person or entity not a party to this Agreement, and no such person or entity should rely upon this Architect's performance of those services to the Owner, and no claim against the Architect shall accrue to; any contractor, subcontractor, consultant, engineer, supplier, fabricator, manufacturer, tenant, surety, or any third pazty as a result of the Agreement or the performance • AIA Document B141 TM' -1997 Part 2. Copyright ®1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The American InstRute of Architects. All rights reserved. WARNING: This AIA Documenrt is protected by U.S. Copyright Law and International Treaties. 9 Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:46:16 on 0 611 512 00 6 under Order No.1000209618_1 which expires on 12/7/2006, and is not far resale. User Notes: (2990699080) or nonperformance of architectural services on this project. The Owner agrees that the provisions of this paragraph shall appear in the General Conditions of the Contract Documents. • The Architectural Services under this Agreement shall be provided in conformity with the standards of reasonable care and skill of the architectural profession of the community for a structure of the type covered by this Agreement. The Architect will not be responsible for the performance of any contract, work or products or any effects resulting therefrom, or any contractor, subcontractors, manufacturer, supplier or fabricator, or any consultant or engineer retained by the Owner. Architect shall maintain throughout the period of the Project and for a period of three years thereafter, a standard form of errors and omissions insurance with an insurance company satisfactory to the Owner. Architect shall also maintain with an insurer licensed in the State of Indiana the following issuance coverage: -Comprehensive General Liability insurance in the amount or $1,000,000 combined single limit' -Automobile Liability in the amount of $1,000,000 and -Worker Compensation in the Statutory Amount Architect will assure that any and all consultants engaged or employed by the Architect carry and maintain similar insurance in similar amounts. Architect will submit to Owner proof of said insurance prior to conunencement of this Agreement. The proof of insurance will incorporate a provision requiring written notice to Owner at least thirty days prior to any cancellation, non-renewal or material modification of said insurance. By its execution, this Standard Form of Architect's Services: Design and Contract Administration and modifications hereto are incorporated into the Standard Form of Agreement Between the Owner and Architect, AIA Document B 141-1997, that was entered into by the parties as of the date: 4 January 2006 By its exeeu this andard Form of Architect's Services: Design and Contr ct 's tion hereto are 'ncorporate i o the Standard Form of Agreement Between the Ow an chi B141-1~7, that waed into by the parties as of the date: ////// /r • OWNF~t ~f/~~ ARCHITECT ( r The Honorable Robert L. Waiz, Jr. .Mayor City of Jeffersonville City-County Building 501 E. Court Avenue, Room 404 Jeffersonville, Indiana 47130 (Signature) ~ ~ I V v R. Wayne Estopinal, AIA, ACHA President The Estopinal Group LLC 903 Spring Street Jeffersonville, IN 47130 (Printed name and title) (Printed name and title) • AIA Document 8141 TM - 7997 Part 2. Copyright ®1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIAs Document is protected by U.S. Copyright Law and International Treaties. ~ Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:46:16 on 06/15/2006 under Order No.1000209618_t which expires on 1217/2006, and is not for resale. User Notes: (2990699080)