BID OF
MC lDISTRUCTION & EXCAVATING, INC.
(Contractor)
1908 l.IIRLR-I CllJRT
, (Address)
NEllI ALBANY, INDIANA 47151-6787
FOR
PUBLIC WORKS PROJECTS
OF
CITY CF JEFFERSONVILlE. INDIANA DRAINAGE BOARD
BONENEERGER'S OAK GROVE SUBDIVISION DRAINAGE PROJECT
JOB NO. 970SA
Filed C:P.Gc.G-~ 2-""2--
~g
,~
Action taken
B-I02
~lestf1be<lbySl.I.lkY-lao!~
AE ao.,e. Ce.. W\c. t.l.UII'ICIt.1H I~~
FOllnNo tilA<<-"tMCllM71
CONTRACTORS Bib FOR PUBLIC WORKS.
PART I
(To be completed for all bids)
(Please type or print)
L Governmental Unit:
2. County:
3. Bidder (Firm):
Address:
City/State:
4. Telephone Number:
Date:
r.TTY nF JEFFERsnNVllJF, TNDTANA nRATNAGF BOARD
r.I ARK" r11INTY
P1AC CO\ISTROCTlt:J1 & EXCAVATING. INC.
1908 UNRUH" CWRT
NEW AlBANY. INDIANA
(B12) 941-"1895
5. Agent of Bidder (if applicable):
Pursuant to notices given, the undersigned oIfers to furnish labor and/or material necessary to complete
. . CITY OF JEFFERSONVILLE, INDIANA
the public works project of " " (Governmental Unit) in accordance with plans
DRAINAGE BOARD " ~......,
and specifications of said unit for the sum of ~ 17EiM/~ ~-T1!fr:-oSI4:-L- . The under-
signed further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of
the letting. If alternative bids apply, submit a proposal for each in accordance with the notice.
If additional units of material included in the contract are needed. the cost of units must be the same as
that shown in the original contract. If the bid is to be awarded on a unit basis, the itemization of units shall be
shown on a separate attachment. The Contractor and his subcontractors. if any. shall not discriminate against
or intimidate any employee, or applicant for employment, to be employed in the performance of this contract. with
respect to any matter directly or indirectly related tel employment because of race, religion, Color, sex, national
origin or ancestry. Breach of this covenant may be regarded as a material breach of the contract.
I
CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS
(If ~pplicable)
I, the undersigned bidder or agent as a contractor on a public works project, understand my statutory obliga-
tion to use steell3roducts made in the United States. I.C. 5-16-8-2. I hereby certify that I and all subcontractors
employed by me for this project will use U.S. steel products on this project if awarded. I understand that violations
hereunder may result in forfeiture of contractual payments.
I
NON-COLLUSION AFFIDAVIT
The undersigned bidder or agent, being duly sworn on oath, says that he h"as not, nor has any other member,
representative, or agent of the firm. company, corporation or partnership represented by him, entered inlo any
combination. collusion or agreement with any person relative to the price to be bid by anyone at such letting nor
to prevent any person from bidding nor 10 induce anyone to refrain from bidding, and thai this bid is made without
reference to any other bid and without any agreement, underslanding or combination with any other person in
reference to such bidding.
He further says that no person or persons. firms, or corporation has, have or will receive directly or indirect-
ly, any rebate, fee. gift, commission or thing of value on account of such sale.
OATH ANb AFFIRMATION
I affirm under the penalties of perjury that the foregoing facts and information are true and correct to the
best of my knowledge and belief.
.vt:>
Dated at NRII AI RANY,TNOTANA this "-z..z..
PRESIDENT
(Tille of Person Signing)
By
ACKNOJvLEDGEMENT
STATE OF INDIANA
C:OUNTY OP FlOYD
VTr.mR n IINRlIH
ss:
being duly sworn, deposes and says that he is
r,
----P.BEStIlENT of the above lilAC CIlN!'iTRlIr.TTIlN &: EXCA\lATTNr:, TNffaJ1d that the
" " (Tille) (Name 01 Organization)
s,afehl€rtls contained in tne foregoing bid, certifi::.-<0on ~affidavit are true an,d(cprrect.
Subscribed and sworn to before me this "p(,?l- --7. day, ~ ~
I . " .-r~ ~ary p/J
-t!l""::~s.
Q~
My Comission Expires:
County of Residence:
2-1-09
SCOTT
B-103
II
11-
, f
ACCEPTANCE
The above bid is accepted this
101l0wing conditions:
day 01
,19_, subject to the
Contracting Authority Members:
PART II
(Complete sections 1,11,111, and IV for all state and local
public works projects as required by statutes.)
Governmental Unit: CITY OF JEFFFR!iII\I\lTI IF, TNnTANA nRAT~"r:F RnARD
Bidder (Firm): IYIAC fllNSTRlIr.TTnN & FlCr.A\/ATT~G, INC
Date:
These statements to be submitted under oath by each bidder with and as a part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. What public works projects has your organization completed?
Contract Amount Class of Work When Completed Name and Address 01 Owner
[]I....""'.... .......... ,
2. What public works projects has your organization now in process of construction?
Contract Amount
Class 01 Work
When to be
Completed
Name and Address of Owner
3.
Have you ever failed to complete ar.'i '.'/ark awarded 10 you?
If so, where and why?
PLEASE SEE ATTAaiED
4. List references from private firms lor which you have performed work.
PLEASE SEE ATTAa-lED
B-I04
,f
" .
r-\
~'
SECTION II PLAN ND EQUIPMENT QUESTIONNAIRE
1, Explain your plan or layout for periorming proposed work. PLEASE SEE ATTACHED
2. If you intend to sublet any portion of the work, state the name and address of each subcontractor, equip-
ment to be used by the subcontractor, and whether you expect to require a bond. PLEASE SEE ATTACHED
3. What equipment do you intend to use for the proposed project? PLEASE SEE ATTACHED
4. Have you made contracts or received offE!rs for all materials within prices used in preparing your proposal?
PLEASE SEE ATTACHED
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachmenf of bidder's financial statement is mandatory. Any bid submitted without said financial state-
ment as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the
governing body awarding the contract must be specific enough in detail so that said governing body can make -
a proper determination of the bidder's capability for completing the project il awarded.
PLEASE SEE ATTACHED SCHOU-E "0"
SECTfON IV OATH AND AFFIRMATION
I'
I hereby affirm under the penalties of perjury that the facts and information contained in the ioregoing bid
for public works are true and correct to the best of my knowledge and belief.
2-ZAlD day of ~ _,HI~3
~~~~
B&~e~: .~
PRESIDENT VICTOR. O. UNRUH
(Tille 01 Person Signing)
Dated at NEllI AlBANY. INDIANA
this
[
I r,
ACkNOWLEDGEMENT
I
STATE OF
COUNTY OF
INDIANA
Fl.OYO
ss:
I
\lTr:TrlR n. IINRlIH being duly sworn, deposes and says that he is
PRESIDENT of the above I'IAC Cll\ISTRUCTIll\I & EXCAVATING.arllllGilt the
{Tille} (Name of Organizalion)
answers to the questions in the foregomg qUeSli~nnair.?l,?DP~atements therein ~ained are true and correct.
Subscribed and sworn to belore me this ;..()( . day of ~ ~3
~ !It:~pJ) ~~
My Commission Expires:
County of Residence:
2-1-09
SCOTT
r\'
B-105
I 'Y
I...~
t
j \
I
I
I
I
I
I
Ie
I
I
I
I
I
I
1(\
I
I
TO THE BIDDER -
The following Form 96a is not required by the State Board of Accounts. However, the bidder
must either use this form or one similar to it prepared by their accountant.
C: \:3ydncy\wp(lC'lcs\nl iscell.llleCllts\m;'l.slt::r\Ji\.B. 'l"pJ
B-106
JACOBI, TOOMBS AND LANZ, INC.
I
I-
-_.i
r
I
I
I
I
I
I
I
Ir-
I
I
I
I
I
-
-
-
I
..~
'">.
General Form No. 96-a
Prescribed by the St~te
Board of Accounts of
Indiana. Revised 1949
STANDARD QUESTIONNAIRES AND
FINANCIAL STATEMENT FOR BIDDERS
Prescribed by
THE STATE BOARD OF ACCOUNTS OF INDIANA
For use in investigating and determining the qualifications of bidders on public
construction when the aggregate cost of any such work or improvement will be
Five Thousand Dollars or more.
These statements to be submitted under oath by each bidder with and as a part of
:~b:~~~~prO~305' ~agZf19~7:.........................................
VICTOR O. UNRLJ-I
By .......t'!Ak..gJ!!SIRUCJ.l.Il.L~L~kIW!HJ~.G,..JNk,............._____.......... ........ ....... ~ ~~~:a~~:~~i p
An individual
Address ......J.~~__~.r~.~I:!..~I..........,........................___............................... ......_................................. ....
.. .... .~..mJ;I.BJ\I.Y.,.. .INP.;J;AH!}.... .471.51.,,61137... ............ ... ................... ....... ...... .... .......... ......... ..........
Date submitted..........___...........~~t.1~.........~~............ 20t?.~.....__.
Filed
p..._.... _.... ... _... ... .0- "0_..... ...____. .~...o ..."... _. ......_.... ....0...... ... .0.... _0._...0.. _.. ..... _"_0
A.E. BOYCE, MUNCIE, IND
c: \SydncY\"-1}d()cs\m iscellnncot1~\m ilsLcr\Jiv B. wpd
B-107
I Submi~ted by ............~!;...~~~J:rnJCU.~..!L(XC!:\V.{\IIN~....lHC............................................................................:.................. {A ~~::~:~~shit
.(, An Individual
I Principal Office at ......................J~.~..~mJtI...~..............;...........................................................................................................................................
'-(\ NEbI' '. 7. .
, ..... ................. .......... ....... ................ ,.... ..8L6J.\l11Y.. ..INDIANA....~ ~ 151,,61.8.7............ ................................ .......... ...................... ...............................................
I'
EXPERIENCE QUESTIONNAIRE
I The signatory of this questionnaire guarantees the truth and accuracy of all statements and of all answers tc
interrogatories hereinafter made.
I 1.
I 2.
3.
I
I
I
I.... .,
/~
I
I
1
How many years has your organization been in business as a general contractor under your present business name:
23 YEARS
H~.;;..~;;.~~y..y~~;;.~.~p~;i~;;~~..i~..~~~~~;~~~i~;;.:;b;k."i~~.~..y.~~;..~.~.g~~i.~~~ib~..h;d..(~)..~~..~..g~~~;;i..~~.~~;;~~b;;..~~~d..(b.
as a sub co n tracto r ? ..... ......!.\J. .?~. .xtoos. ............. .......... ..JO.. .?;$.. X(!.\6S....... ............................. ................ .............................. .................................
What projects has your organization completed? ....~~~..~.I;;..S~...~{\~.....................................................................................
CONTRACT AMOUNT CLASS OF WORK WHEN COMPLETED NAME AND ADDRESS
OF OWNER
.............................................................. ...................--.....................--.................. ....-.--..................................................-... ...-..................................--......................
................................................................ .....................-.................................--..... ..................................-...........-..........---_. ......-..-...............-................-.-.....-...........
.
I
What projects does your organization now have in process of construction?
C~NTRACT AMOUNT CLASS OF WORK WHEN COMPLETED NAME AND ADDRESS
OF OWNER
... ..... ~.......... ................ .--_...... ..---.-........... . P.L.EI:\SE.. SEE.. SJ:I:IEII.U:.. !!B~............. ....................................................-......... ...............--.............-..............................
...-....... ......-..................-.-....................... ..........-.................-................................. ...............-.............................................. ..........-....................-..............................
,
I 4. Have you ever failed to complete any work awarded to you? If so, where and why.
.......... ........m..................... ............ .00................. ........................................... ............. ............... ......... ........... ......................... ............ ......................... ...n......
I
I
I 6.
................-..-..-...............................................................................:............................................................................................................................-......--.......
................................................................................................-.........-................-...............-..........................."......-.............---..................-.................-........-......
5.
Has any officer or partner of your organization ever been an officer or partner of some other organization tha
failed to complete a construction contract? If so, state name of individual, other organization and reason therefor
............. ...... ............. ......... ............. .NO.......................... ............. .............. ............................................. ................... ................... ...... ..m.......... ........................
.............-...................-..........-.-.....................................-..-.-..........-..:..................................................................-.............-..............................................................
Has any officer or partner of your organization ,ever failed to complete a construction contract handled in his/he
own name? If so, state name of individual, name of owner and reason therefor.
I ........................ ....... ........ .............. ..NO.... .... ........... ............. ............. ..... ...... ........ .......... ......................... ......... ................... ................... .................. ....... ..........
...................................-........................................................._..................'.............................................................................................................................................
> ~\ ! Tn what other lines of business are you financi~lly interested?
I. t 'I....... ........ ............................... ....... ..N[JII[....... ............... ............... !............. ............... .......... ............. ......... ............ ................. ..................................................
...................--...................................................................................................................................................................................................--.........................
I
C :\SyJne)'\'t\lJJOCS\Jllisr.:dlaneous\11l aster\Jiv B ."t\1)J
B-I08
8. For what corporations or individuals have you performed work, and to whom do you refer?
"':
.0............- .... _............. _0- ...................... ................... ..._..... ....... ..~ ..... ......... no _._._....._... P' ......_... ... _._........ .....-... .... ........ ........... -.-.... -........ ....-....... .....-................ O'
............... .:..... ................. ..':J::'I.,.EI;\s.E..SEE.. .SCl:\EIlLE..~!E.~";':;'::':';.;::;.::::::. ..::.:. ;;";::::;::::':':.-,""'''''.'''''' .......... ........................... .............. ............. ............... ..........
........................................................................................................................................................................--...................................................................
...............................................................................................t............................................................................................................................................
9.
.n.. n. nn...... ........n............... ..........0........ ... ............... ............... t ..............0. .........0... ...........n .......... ...... ....................... ..... ........0. ...n.h..... ............. ..... 0...........
For what cities have you performed work and to whom do you refer?
...............................................................................................t.............................................................................................................................................
......n...... ....... ... .... .... .n.........ew;;AS(...~..~..~~f.~...,.... .................... ...... n.... ................n........................................n.. .......................n.. .......... ....
...... ... . . ........ .. . ...... ....................... ................ ............ ~.... ........... ~ . ... ..... ........... ..... ........................... .............. .. ..................... .. ........... ... ...... .. . ........ .. .. .. . ...... .. .. .
...............................................................................................r............................................................................................................................................
10. F~;..~.h.~~. .~~.~.;~i.~~. .h~;~ .y~~' p~~f~.;~~d.-.;;;~;k..;~.~f.t~..~.h.~~.d~..y~;..;~f;;?................................ ........n... ............ ........n.....h..
.... ..... .............. ............... ........ ..... ............. ...... ............. ............~ .... ............... ..... ............... .......... ..... ....... ................... ...... ...... ... ........... ... ................. ..............
...n.......................................I?I..~~..se;;..~..~~~..........................................................................................................n.....................h............
.. ... .... ........... ..... ............. ... ....... ... ........ ................... ... ............. .,....... ....... .................. ..... .... ....... .... ....... .... .................. .......... ..................... ....~........ .......... .......,
............................................................................................................................................................................................................................................
.................................................................................................:............................................................................................................................................
11. For what State bureaus or departments hav~ you performed work and to whom do you refer?
................................................................................................;.............;................................................................................................................................-
.............. .............. ............... .PLEASE..SEE.. SCI:IEIlI.ILE. .!!H.~..., n.' ...... .................h.h.............n n..... ........... .............. .... ... ......... ". ... ............ n............... ........
...................................................................................,............................................................................................................................................................
...................................................................................................'................................................................................................................................................
12. H;~.~.y~.~..~;~;.p~~f~.;~~.~C;~.y..;~.;k..f~.;..t.h~.i.1j""S:.'G;;~.~';~'~~~~~?'.i{~;;:..~.h';~.~~d.~;';;h~.~.'d~. y;;~.~~f~~.?.........
...................................................................................................:............................................................................................................................................
...........................................~..~...~..~~J.~..................................................n.........................................................................................
.......... ........ ....... ................. ...... ..... n...... ................... ........... ..... ~............. ....... ..................... ....... .... ........ ............ ................ .... .... ............. .~...~.... ... .......................
.~... ...... ....... ........ ............... ...................... .... ..... ............ ......... ...... .....~............ ....... ..... .~............ ....... ...... ... .............. .................... .~. ............. ... ............. .... ..................
,
.. --............................ ........ .......~........... ................... .......... .......... ............... ............ .................. ............. ......~~ ....... ......... ........ ............... .... .~......... ..... .....................
13 What is the construction experience of the principal individuals of your organization?
PRESENT YEARS OF
POSITION OR CONSTRUCTION MAGNITUDE AND
OFFICE EXPERIENCE TYPE OF WORK
INDIVIDUALS
NAME
IN WHAT
CAP ACITY
.................................................. ...~.~..~..~..~~~ ................................................. ................................................. ....n...................................
........... ....... .... .......... ....... ........... ................ ." .............. ................ .... ........ .......... ... .................. ........ .. ....................... .... ............... ...... ~............... .... ......................
~............. .................................. .. .. ................................................. ...................................................... .............. ~.. .. ..... .... ........................ ............................................
..... ... .................. .,........................ ......... ..... ....... ................. ... ~.......... ..... ...... ......, .... ........... .... ................ ........... ....... ................. ................ ........ ......... .........................
... ...................... ..................... ..... ...... ............ .................... ............ ......... .................. ............. .... ...... ... ........... ............... .... ............. ... . .....~........ ..... .............. .......
................................... ... ..... ....... ........._..... ................... ......... ..~... . ................... ... ....... ........ ... ........ .. ........... ............. ......... ...... ..~....... . .................................. n....
......oo. ... ......_......... ... .................... .............. ........... .... ..... ...... ....-...... .....~.... ........ ......... .... ...~. ................... ..... ................. ............... ...... ........ ......... ............... ................
...... ......... ................... ............... ... .. ........ .......... ... ................. .......... ...'......... .~............., .... ..................... ..... ......... ................ ........ ....... ..... . ..... ........... ........................
.. ............................ ..... ........ ................ .... ............ ~.... ......--....... ... ...................... ................... ....... .... ...... ................ ~.........,... .......... .. .................................... ...
C: \SydneY\"'11Jocs\nl isccllill1cl1us\u\asler\(liv B. t\1)J
B-109
"\
SCHEDULE "E"
I
MAC CONSTRUCtION & EXCAVATING, INC.
1908 UNRUH COURT
NEW ALB~NY, INDIANA 47150
(812)941-7895 Phone
(812) 941-0699 Fax
8. For what corporations or individuals have you performed work, and to
whom do you refer?
Qk4 (Previously Presnell Associates, Inc.) - Wendell Wright
815 West Market Street, Suite 300
Louisville, Kentucky 40202
Koetter Construction, Inc. - Jack Koetter
7393 Pete Andres Road
Floyds Knobs, Indiana 47119
Smith & Roberts, LLC - Barry iSmith
1004 Main Street
Shelbyville, Kentucky 40065
/r.. "
I
~,
')
SCHEDULE "F"
I
I
MAC CONSTRUCtION & EXCAVATING, INC.
1908 UNRUH COURT
NEW ALBANY, INDIANA 47150
(812)941-7895 Phone
(812) 941-0699 Fax
9. For what cities have you performed work and to whom do you refer?
City Of Carrollton, Kentucky
City of New Albany, Indiana
City of Louisville, Kentucky
Town of Clarksville, Indiana
City of Shelbyville, Kentucky
-f':
I
f'
.,~
y
10.
SCHEDULE"G"
I
!
MAC CONSTRUCtION & EXCAVATING, INC.
1908 UNRUH COURT
NEW ALBANY, INDIANA 47150
(812) 941-7895 Phone
(812) 941-0699 Fax
For what counties have you performed work and to whom do you refer?
Louisville & Jefferson County - Mr. Derrick Guthrie, Director of Engineering
Metropolitan Sewer District
700 West Liberty Street
Louisville, Kentucky 40203
Jefferson County Public Works - Mr. Steve Tucker
Jefferson County Public Schools
Oldham County Fiscal Court
/r'i
f'
F' '
SClIEDULE"H"
I
MAC CONSTRUCtION & EXCAVATING, INC.
1908 UNRUH COURT
NEW ALBANY, INDIANA 47150
(812)941-7895 Phone
(812) 941-0699 Fax
11. For what State bureaus or departments have you performed work and to
whom do you refer?
Indiana Department of Transportation - M. R. Buechel (317) 232-5095
100 North Senate Avenue, N855
Indianapolis, Indiana 46204
Kentucky Transportation Cabinet - Mr. Rick Stansel (502) 564-3500
Kentucky Department of Highways, District 5
977 Phillips Lane
Louisville, Kentucky 40207
Indiana Port Commission - Mr: John Hughes (219) 787-8636
6625 S. Boundary Drive
Portage, Indiana 46368
/~..
, .
/.
'l
SCHEDULE "I"
i
,
MAC CONSTRUCTION & EXCA VATING, INC.
1908 UNRUH COURT
NEW ALBANY, INDIANA 47150
(812)941-7895 Phone
(812) 941-0699 Fax
12. Have you ever performed any work for the U.S. Government? If so, when
and to whom do you refer?
1997 & 2003
U. S. Army Corps of Engineers
Louisville District
P.O. Box 59
Louisville, Kentucky 40201
", . ~".~ . , '., ..... , Ij~:';~7"~:,:--> . ..,.1 . , :-:::r" .... ,.,~;:/....::;:,....\:
..,.,.;; ....; r ";:.::C::~<,Y.'. .;d":',:'["'''''' .<.,d,~,,>>',~;t:},:(<""" :. .. ::-;":,i;
": :'~'..:,":7 . ....,'. .,n)'>:i:::'::i,~";. ,':;~" ,,' /:<J.,.:::::..,>><'):..:i<~:..>"~::'::';;::.<,;""':;;>!;~ "';'.;::..::
" '.... , .... ", '.' "'::"Y,;;';; .::'.;:;';'>"'.;,(::: '
. '" .?:;.:..f;,:....:.~..~;".:h~.~...,.,.:'..,/.;.;.'~';',.,' ;'..,t.,,".,.,,;;.; ,. "'" .~"i' J: ;;J..........".. .;;:.~., .,>::;'.
.... .:<<.. ..'..~...; .';:,'.." .::.,.... C.... .,..."./.., ;',.....;....., . /',::: '.;" ':' .\ ;.;. .... ,'.'J " :-'.;' ,';'>' . ......
, , ' < ," , "'" ' h 't.' , ;.;' <: '. ./' ,c;:, ,:t ~:' ,', ,,' '</<';", C'/; ;'
, " ;;>: ,~:' :"",' <i:~ ': "";;;",'; , , ,. ,; :" ,,: ,,' ,;,. '.~~"" ".. ;
. . i'. :,. .:...." .~/:, . ':.)':"':;, ;:>.<,';'., . ',' .... ,:,;..; )", "":;': :1:,:.".
',.' "'{,;:~ ",: ,:,;", ,.' ., " 7" ' " ',,'<;,,';. ',:(',,', ,"', ,:,..',
. r ,.. ;",. 0.: ,.:c:-"" ',' ';;'. :::.. .:.}:,).~:.", :,"i..,,"',,' ".'..;'.: .::,. .;::'::.,...",....S', .
. I ; '.,'.:;: :C;'.,;... '. ,,'::' .,' '. .,..;, " " , \"~~:;~Y' .~. <, :." ':c.~:f",;~~!';,::!,\,:
'I ": " ' ,,:: ,(\;,,;< ' " ':: ,~,,:,"; ,: :~r:~: '. " ' . ;" ; :.,,'
r", ... <>:/,,~., ..... ".' '\;:..~ . :;:.,"~J 'C'. :,::::' :;.... ,;,,', '.". ;'\::' :~.; .''::;',: ,',. ., .' (:,/,:;>':'
, . . ", -. ' . .... ", ' . : '.,. , . ' , . ;. '
. ," ~ ':,:,< "I ~:~/ ':" ,,'::':';/:.}:")'~'.' :.',:" .::':, ',.: :z ..' ".:; i:~'<: ;\<'~,; ":;' ,: '::,:,"':::" ",' ;,:;:: ;.
. ~ II ,,; ,'. ,; ~~8unruh Court' " " ':: ~., ; \ , ;:';/~:: ',;? , " ,'., ;' ,";,i~,,: "
,,' p.o. ~,o;x 67~1, .' ' .:."'~:;:: ;;:'" ":;,':: ,,;'.. ":,',i+,,:,, ,;:",;';;\;::;},~;;t;;;:~; }": :/,.':'" >:"; J'" -' ~::
, ". .' NewA)ba~y, IN 1715~. ~?'7$?: .' ,'~ < .,.. ,,,,' '" ~AnEqual 'OpportDni!Y'EmployerMlFjf)!V" " " ';<~:?";"~':"
" . Phone 812-941-7895, ....' .' . . :.. . ,:.> " .,:,' :' .';, .~:,:, " ,- . ;, -:"'::':,'_~/(~'>';':; :;::<': ,':-'" :}:;c . ';:.'" .
" . - F" 81294~ 0699 ,v..J". . .:' .1,:';+ . , ,.. ~, ';'~i:i\;:J' . ',)
" ;,@, . ax. 812~941:~9a49 '.":::' /' .:"; '~";"~~::":'k:;: ~:: /;'~'::~:,>-~ r::'..'.<,:,: :';'.:): ,';:/>: "',. :;;;'::~"
" '. I': '~"" '..:,,:,}:" >;.,'" '.' , . ";c":,,i:f;;,.:fL:;;r/:L'> .' """':;;;:::<> :,;,:.'f~,,;,. ':,t>,.; /<-.,,(,'
: '. I" .. ,'f'''..;.' :",,' .' ,.i.',' f ",..' '., '.' ",t' ,(: . '.:', '. ,., ~ :"",:.,: ,:l, -:.' "'''.:..
" >:.I~::,.-: , .,.; ,,'" ." ::,.,.,..... C,.;:' ", .' x.,'.-, ,;:<.' . _ ,: ..::-':" ,::.".,,'. ':' ,r'{:~.:? : .\.\ ,;, .'.~ /' ," .:-',.', ,'"''
, . ,
I
PLAN AND EQUIPMENT QUESTIONNAIRE
The" ~ignatory of this questionnaire guarantees "the "truth and accuracy of all statements and of all answers to
I interrogatories hereinafter made.
I i
tn what manner have you inspected this propos~d work? Explain in detaiL
I
I
I 2.
I
I
I
I
I r
.'
I 4.
I
I 5.
I
I 6.
I
I
[,
I
I
:-~~~~z~.~~~~~~(.~~.
...................................................................................................-..........................................................................-.....................................................................
E.~pi';i;;.y~~; .pi';~.~.;.i';y~~~.f~.;.p~~f~.~.~i~.g.~h~.p~~p~.~.~.~i.;;~.~.k.......................... ............... ............... ........... ................................ ........
1_--__._..._...._.-..Aliii(;~=.g~.;;n;;i"-2,.......~(?~/~...2i.4.2iii:::;;-..-...-........-.._..--.--.........
::::::::::::::::::::::::::~P:~::~~:::::::::::~))~:;;::::m:;;iiiii:~:::::::~hi.::::~:::::::::::::::::::::::::::::::::::::::::::::
~...o.... 0.......0..... ..................... ..._.........._.. ,- ......... _...0._ ,_... ............ ...._--.~ -.. ._0.... .... ............-....... ......... ............... .................................. ..... ..... ..... ....... ................. ........
.........................................................................................................................................................................................................................................................
, '
,..............................................................................................................................................................................................................................................................
...........................................................................................................:............................................................................-....................................................................
" '
............................................................................................................,..............................................................................................................................................
I
~ ........... ........... ..... ................ ............ ......... .............. ........ .........".... ..'0-... .",.' .0-........ '.' '.~..'.' '_... ..~ ~....... .............................. ........... ..... ........... ...................... .... ...............0-..........
.........................................................................................................:.............................................................................................................................................
:.........................................................................................................:...............................................................................................................................................
~....... ........ ........... ......................... .................... ......... ............ ...... ...... .~............. ....... ............ ..................... .... ............... .... ....... ... ........ ............... .................. ........ .....-......
,
f.::::...........,.....................................................................................!...........................................................................................................................................
iThe work, if awarded to you, will have the personal supervision of whom? '
i...............................................Vt.C:rZ?&....C:!&avtft:.....................................................................................................................................................
.................................................~.......~.v.~..................................................................................................................................................
,~ Do you intend to do the hauling on the proposed work with you own forces? If so, give amount and type of
equipment to be used. "', ,.
..,..........,.................................................#/A...................................................................................................................................................................
;..........................................................................................................~...............................................................................................................................................
':. If you intend to sublet the hauling or perform it through an agent, state amount of subcontract or agent contract
and, if known, the name and address of subcoI;1tractor or agent, amount and type of his equipment, and financial
responsibility.
........ ........ ..................................... .........~(I!:...... .......................'........................... ............................................... ............................................. ,....................
.......................................................................................................................................................................................................................................................
............................................................................................................................................................................................................................................................
..................................................................................................H...........................................................................................................................................................
':. Do you intend to do the grading on the proposed work with your own forces?
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::V~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.
........ .... ........ .......... ............ ..... ....... .... ...... .... ............ ........ ............. ..~....... ... ......... ... ......... .............. .... ......... ..... '..' ........ ...... ...... ..... ........... .............. ...................... ......
...... ....... ... ............ ... ...................... ........... .... ............. ......... ............ .....~..... ......... .............. ..... ..................... ... ............... .......... ............... ................ ............ .....................
;;....i;~~~~.4:.5:. 6.~.~~j'i.~;y.~~;.b~ ';pp'li~;bi~';~ .~ii b~ildi~.g.~~~;~;~;~: "if .~~;:~;;,;;:. ......... ................... ..................... ............. ........ .................................................................
c: \S)dl1eY\'tIl,docS\lll isc~ll,] Ilt~l'U5\m <lsler\Ji\'B. 'tI'l,J
B-110
I 7.
I'
F\
~
I
I
I
I
I
., If you intend to sublet the grading or perfbrm it through an agent, state amount of subcontract or agent'
contract and, if known, the name and address of subcontractor or agent, amount and type of his equipment ani
financial responsibility.
...................... .,. ....... .................................... .....NZ1F..~:.~.:~..~::.........................................................................................................................................
......... ....0..... ........._... .... ............ ........ ...... .......... ........ .-.... ................~ .......... .............. .............................. .......... ... .-.......... .0........ _0_.... ............0 -... ... ...... ..................
.....................................................................................................;........................................................................-.................-......----....---................................
8.
D.~..y.~~..i~~~.~~f~.~..~~bi"~.~..~~y.;~h~~.p;~i;~;.;Eh~.;.~~k?..i{;~.:.~~~~~..~~;~~~..~.f".~.~b~.~~~;~~~..~~~i",..Xk~.~~~.,..~h
name and address of the subcontractor, amount and type of his equipment and financial responsibility.
-~~~~~~~~~-
9.
F.~.~~..;;hi~h..~.~b~.~~~;~~~;~;.;;.;g~~~~..d~..y~~..~~p~.~~..~.~..;~q~.i~~..;.b;~~f?..................... ............................. ...................................
............................... .... ...... ....... ........ ... 4ou."E.... ............ ................. ...... ......... ........ ............ ............ ............... ......... ........................ ......... ......... .............
.................................................................._.............._..................~....................................u.....................................................................--....--.........................
......... ... ...... ............................................................ .. ............... ......;............_.............. _... ~............................._.. _... ... _............ _"_" ................ _.....0_.............. .. .... .. .. .
..........................................................................................................................-......-.....................................................................................................................
What equipment do you own that is available for the proposed work:>
DESCRIPTION,
SIZE, CAPACITY, CONDITION
ETC.
10.
"T
QUANTITY
ITEM
YEARS OF
SERVICE
PRESENT
LOCA TION
II ........ .,. ........ ...................... .~..~................ .....~c.~................................. ....... ................................. ......... ...................... ......... .................................... ...
r-
I
I
I
I
.......-...............-.................... ...--................................. ............................................-. ......................................... ............................................ .........................................
........-......................... ..............................-............ .......-.......................,.................. ....-...................................... .........-.....................-......-.... .......................................
....j...................................... ........................................ ....................................-........ ..............................-................ .....-......................--............. ........................................
.....f.................................... .......................................... ............................................... ..................-.......-..................... .................................-......... .......................................
... .~... ....... ... ".'''.'..' ...'.' ,......... ........... .-... .... ..................... ....... ....... .................... ....-.......... .. ..-..... ....... .............. ............. . .....-............................ ......... ............ ...... .-...... ........... .....
........................................... ...................................-... ..-................................................ ....-...................-................ ..........................-................. .........................................
,
.... ................................ ........................................ ................................................. ............................................ .-.......................-................. .........................................
.... ............................. ......................................... ............................................. .. ...................................... ....... .....-................................ .............................. ........
.......................................-. .........................................-. ......-..-................................-... .........-..................-............ ..................--............-...-...... ................--...................
........... .-.........................--. ...-.... ...............-...-.......... ...................-.......................... .......................................... ......... ............-................... ...........-..........................
I .......................................... ...................................... ......... .................................. ........................................ ........................................ ................ ........... ........
I
I
r\,
II.'
I
........_.....-............. ....................................... ..........-..................................... .......................................... ......-.....-..................-......... .....................................-
C: \3yJnc)'\1l..pdm:s\111 isceJ j;'tI1Cotl5\lll.1sler\div B. wpd
B-ll1
11. What e ui ment do vou intend to urchase for use on the ro osed work, should the contract be awarded to ow
APPROXIMA TE
COST
QUANTITY
ITEM
DESCRIPTION, SIZE CAPACITY, ETC.
........................... ...........-............................. ...........................................................................................................................-.. .........................-...............
10
........t-............................... ..................-..................-... ............--..............:..................................................................................----............ ..........................--.............
........i................................ .......................-............----. ............................:................................................................................................. .........................................
......................................... ......................................... ............................:.................................................................................................. ......................-....-.............
12. How and when will you p~ for the equipment purchased? '
,..................................................M...&....................................,...........................................................................................................................................
............................ ............ ......... ....:"../... ........... ....... ............. ....... .................. ............... ........ ................... ..... ........... ...... ................. ...... ..... ........ ............... .........
/VO
,......................................................................................................,............................................................................................................................................
............ ...... ..... .............. .............. ... ........ .................. .......... ..... ...... ..~.. .... .......... .......... .'.......... .......... ....... ...... ............ ... .......... ......... ...'. ..... ....... ........ .........................
.. ................ .... ..... ....... .... ............. ..... .......... .............. .... ........~........ ....... ~...... ........... ....... ..... .., ......... ..... ....... ..... .... ............. ... ....... ...... .......... ....... .... ......... ..~... .................
14. Have you made contracts or received firm offers for all materials within prices used in preparing your proposal;
Do not give names of dealers or manufacturers,
PRESIDENT
........ .................. ......... .......... ...(T;~i~. ;["r ~;;~~'s;g~;~gj"""""""""""'''''''''' ... ...... ......
STATE OF ............INDIANI:\.............................)
) SS:
COUNTY :9 F, FLOYD )
i .' .,. ...,........,.............................................
.......~....,...........!.:;.:'.............;.\lICIOIl.O'..JJNRLIH.........................~........................being duly sworn, deposes and says that he is a member 0:
....:.:L..l'IAt...Cll\iSIRIJ.crI~..&..EXCAVATmG,...INc.............................~..............and that the answers to the questions in the foregoing
I
C :\SyJneY\"l,docs\m isccll.:menus\m ':\sler\divB. ~11d
B-112
I
CONTRACTOR'S FINANCIAL STATEMENT
I
(.1
I .'
To...... .C.ITY...Of. .JEfF.ERSll\I\lILLE.. .II\IDIANA... DRAINAGE.. BllAtIl.............. .......... ......................... ...... .......................... ............ ......................... ........ .........
I Conditions at close of business
T
I 1
2
I 3
4
'I 5
6
I 7
8
I 9
10
1/-
,
.1.
I 13
1
I
I 2
3
I 4
5
6
-
7
-
1
- 2
3
4
C I
I
PlEASE SEE SlJiEDlLE "D"
ASSETS
Cash: (a) on hand L.........................jb) m bank L......................................Jc) elsewhere L.......................
Notes receivable (a) due within 90 days .....................,....................................................................................
(b) due after 90 days ............................................................................................................
(c) past due ........................................................................... ............................................ ......
Accounts receivable from completed contracts, exclusive of claims not approved for payment..............
Sums earned on uncompleted contracts as shown by engineer's or architect's estimate
(a) Amount receivable after deducting retain age ....................................................
(b) Retainage to date, due upon completion of contracts ...............................................
Accounts receivable from sources other than construcpon contracts ....................................................
Deposits for bids or other guarantees (a) Recoverable within 90 days .....................................
(b) Recoverable after 90 days .....................................
Interest accrued on loans, securities, etc. ..........................................................................................................
Real Estate: (a) Used for business purposes................................................................................................
(b) Not used for business purposes.....................................................................................
Stocks and bonds: (a) Listed. present market value .........................................................................
(b) Unlisted. present value .........................................................................
Materials 1ll stock not included m Item 4 (a) for uncompleted contracts (present value) ..............
(b) other materials (present value) ............................
Equip ment, boo k value........ ................. ............ ..................,..... ...................... ............ ................. _.... .......................
Furniture and fixtures, book value ................................'.....................................................................................
Other assets
Dollars
Cts
,.......-.....................................................................................-.-.........................--................................---
Total Assets
LIABILITIES
Notes payable (a) to banks regular..........................................,....,........,................................................;:'
(b) to banks for certified checks .....................................................................................
(c) to others for eqUlpment obligations .........................................................................
(d) to others exclusive of equIpment obligations...............................................................
Accounts payable (a) Not past due ...............................................................................................................
(b) Past due '" ................... ................. ....................................................................... .......
Real estate encumb rances ..................... ............................................. ..,....................... .................. .......................
Other liab iliti es ............ ............ ........... ................................................ .......................... ............... .........................
Reserves .............. .................................. ................................................. .......................... ................ ........................
Capital stock paid up (a) Common ...........................................................................................................
(b) Co mmo n .................... ..'.................. .......................... .........................................
(c) Preferred ................. .....,....... ........... ........................... ............... ........... ..............
(d) Preferred ....................................... ......................... ................ ...... .....................
S urp 1 us (net worth)............ ............ ...... ............................... ............ ........ ......................... ............... ........... ......... .......
Total Liabilities
CONTINGENT LIABILITIES
Liability on notes receivable, discounted or sold................................................................................................
Liability on accounts receivable, pledged, assigned or sold .........................................................................
Liab ili ty as bondsman .... ............. ................... ................. ......... ........................... ..................... ................................
Liability as guarantor on contracts or on accounts of others .........................................................................
Other co n tIngen t liab ili ties ........... .............. ...................... ......................... ........................ ....... ....... ......... ....... .......
Total Contino-ent Liabilities
C :\~ )'Jl1e)'\"1'Jt'lCs\ll1isc~1I<<nc(lu.s\m<lslct'\ji\' B. ~'pJ
B-l13
(a) 0 n hand ........... .............. ............................................................................ ........................ $ .................................. .................
(b) deposited. in banks named.helow:::...................;...;.,........................................... $ ................... ............... .................
(c) elsewhere - (state where) ......................................................................................... $ ...................................................
:
r ~AME OF BANK
\\ I
DETAILS RELATIVE TO ASSETS
~ 1
Cash
LOCATION I
DEPOSIT IN NAME
AMOUNT
~.......
...... ........................... ............................. ........................ ....... ............................... ....... ................................. ........... ........... ..... ..... ....... ................................... ...........
........ .,. ...... ............ .... ............... .... .......... ................... .... ....................... ................ ................. .............. .......... ............... ...... ..................................................... ... .......
.................. ......... ...... ............. ............... ....... ........................................ ............... . ....... ...................................................... ................................. ..............................
2.'(.
-,
(a) due within 90 days ................................................................................... $ ...................................................
Notes receivable (b) due after 90 days ....___.................................................................................. $ ...................................................
(c) past due ............................................................................................................. $ ...................................................
FOR DA TE OF MATURITY
WHAT HOW SECURED
AMOUNT
RECEIV ABLES FROM: NAME AND ADDRESS
.................................................... .......................... ............. ......... ................ ....... ................... .... ........................ ................. ............. .. ...............................................
................... ..... ....... ........... ........................................... .................................. ........................................................................................................................... ...... .....
3 ".
-, Accounts receivable from completed exclusive of claims approved for
contracts not payment..............................
NA TURE OF AMOUNT OF -~
~ ME AND ADDRESS OF OWNER AMOUNT RECEIVABLE
I CONtRACT CONTRACT
........................................................................................ ......................-..........-.............. ..........................................--.....-- .......... _.... _........... ........... ..... ...... '... ~."';;;. 0";...." .". .-..
n...................................................................................... ...............-...---........................ .........................................,....... ...........................--.....................................
........ ~... ~...... ...... ..... .................. ................ ........................ .............................................. ................................................ ..................................................................
. . . . . . . . ~ .. .. . . . . . . .. . . . .. .. . . . . . . . . . . . . . . . . ... ........ . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. . ............................................... ................................................ ..................................................................
1 I
........,........................................................................................................'..........................................................-.................................................................................
Sums earned on uncompleted contracts, as shown by engineer's or architect's esttmate
4 "
-,. (a) Amount receivable after deducting retainage................................. ................ .... ......... $
..................................................
(b) Retainage to date due upon completion of co n tract... .................. ........................... $
.................................................
DESIGNA TION OF AMOUNT OF AMOUNT AMOUNT RET AINAGE AMOUNT
CONTRACT AND NAME CONTRACT EARNED RECENED EXCLUSIVE OF
AND ADDRESS OF OWNER WHEN DUE AMOUNT RETAINAGE
........,..................................................... ..........................-....... ............................ ................................ ............................ ......................... ..................................
........:..................................................... .................................. ............................ ................................ ..........................., ......................... ..................................
............................................................ .................................. ............................ ................................ ..........-......... ........ ......................... ..................................
.............................................................1..................................1.............,..............1................................ ............................ ......................... -.................................
I
...........................................................................................-.........................................................................................................................................................
"parately each item amounting to 10 percent or more of the total and' combine the remainder.
C: \:3ydncy\'tvplh:s\ll1isccllilllCClUS\lll.lslcr\Ji....B- t\1l(l
B-114
I
I
r
I:
5 .' I
... Accounts receivable from $ ,
not constructIon contracts
, , ...................................................... ................................................ -
\.-: RECEIV ABLES FROM: NAME AND
, _e__ FOR WHAT WHEN DUE AMOUNT
ADDRESS
-
.................................................................................................... ............--................................ .............................................. .............................................
...................................................................................................... .............................................. .............................................. .....................-...-...................
.......j.............................-.....................................-.........-........................ ..-..........-..-.............................. .................................-............ .............................................
I 'v7har amount, if any, is past due h...........................h........:.........................................h................................... $..........................h..........................
6 ".
., Deposits with bids otherwise $
or as guarantees
.........................................-.......................... ........................................-..............
DEPOSITED WITH: NAME AND ADDRESS FOR WHAT WHEN AMOUNT
RECEIV ABLE
........................................................................-.......................-.............. ......-....................................... ..............-................-................ .............................................
........'................-.............................................................-.......................... ........................-..................... .....................-........................ .....................-.......................
..........................................................-................-.......-............................. .............................................. ........-........................................ ...............................................
..n............................_............................................-.................................. ...........u................................. ............................................... ...................-...-.....................
, 7
Interest accrued on loans, secuntIes, etc. $
.................................-.....................-.................... ......................................-...............
ON WHAT ACCRUED TO BE PAID WHEN AMOUNT
...........................-..............................-...........-...-......-............................................................................ ..........................-................................. ........-................................-....
.........................................-..............................................-........................................................... ...................................-...................... .............................................
,
............-.-...........................................................................................................-............... .......................................-................... .................................-............
..........................................................................................................................-............... ..........................................-............... ..............................................
, I .
8 Real estate { (a) used for business purposes $
.-............................................................... ..............................-......................
book value (b) not used for business purposes $
.. .... ..-.......... ........... ~ ......... ..... -.. ...... .... .....~.......... .-.. ........... ._................
IMPROVEMENTS TOTAL BOOK
DESCRIPTION OF PROPERTY NA TURE OF BOOK VALUE VALUE
IMPROVEMENTS
1
.........n.....u.._..................................~........._...._................_._........_._... .-..............-.............-..........-........ .................................... ..............................-..............
2
.-...........-.........................................................................-............... ..-.............................-................. .................................... .............................................
3
.........................-.............................................................................. ..-.............................-.-............... ....................._.........n... ........................-....................
4
............................-.............-...........................................--.-............. .............................-.......-..........-. .....-......-..................-.... .............................................
5
.......................................................................................---............. ... ............................. ..~............... ..............................-..... ...n........................................
6
............... ........ ...~.......... ............. ..... ............... ....... ........ ............ ..-.... .................................................- .................................... ...-.........................................
7 ,
LOCA TION HELD IN WHOSE ASSESSED AMOUNT OF
, NAME VALUE ENCUMBRANCES
1
...............................................--...........................................-.......... .....-............................................ .................................... .............................................
2
....................................-.....................................................-............. .................................................. .................................... .....................--....-.................
3
................................................................................-............-........... .................................................. .. ..~........... ......... ........... .........................--..................
4
.............................................-................................-......................... .................................................- .........-.-..................-..... ..............--.............................
5 ..................--................ ............-................................
................................................................-...........-...............-......t... .................................................-
.... .... ...................................................... ......................... .... .............. ~.... .................................................. .................................... .........-...................................
i
I
I
I
I
I
I;~
I
I
I
I
I
~
I
,
F'
I ; 'f List separately each item amounting to 10 percent or more of the total and combine the remainder.
I
c; \S~.dllcy\l\'pJ0CS\lUisccllancnUE\m i'lskr\dh' B. wpJ
B-115
r
I
I
I'
I
I
I
I
I
I
I~
!
I
I
I
I
I
I
I
It'
I
DETAILS RELATIVE TO ASSETS (Continued)
9 Stocks and bonds (a) Listed - present market value $
...............................--............... ...................................................
. (b) Unlisted - present value $
, .........-................-.......................-...... .................--............__..................
..... ...... . ........
.,
LIST NT.
OR DIV. PAR PRESENT
...JESCRIPTION ISSUING CO MP Al'-,TY PAID MARKET QUANTITY AMOUN
VALUE
VALUE
DATE %
1 ...................................... .....n................................................... ...---...................... ................-.......... -.......................... .......-.--.................. ................... ..
2 ...................................... .......................................................... ............................. ........................... ........................... ............................. ......................
3 ...................................... .......................................................... ............................. ........................... ........................... ............................. .........--...........
4 ...................................... .......................................................... ............................. ........-................. ........................... ........-..-................. .....................
5 ...................................... .........-.....-.......................................... ............................. ........................... ........................... .............................. ...................-..
6 ...................................... ................-....-..............................-..... ..............-............. .......................... ........................... ............................. ..........-...........
7
AMOUN
WHO HAS IF ANY ARE PLEDGED OR IN ESCROW, STATE FOR WHOM AND PLEDGE
POSSESSION? REASON OR IN
ESCRO\
1 ...................................... ............................................................................................-......-...........................................................................
......................
2 ...................-........................................................-.................................................................................................
...................................... ......................
3
...................................... .............................................................................................................................................................................. ......................
4
...................................... ....................................... -....................... ..................... ............... -............ ..................... ........ ~................................... ......................
5
......................-.............-. ...............................................................................-.........-.-............-...........-....-..............-....................................... ......................
6
...................................... .........................................................................................-........................................................................-...-........ ......-..-..-.........
-
Materials In stock and not included In Item 4, Assets:
1 0 (a) For use on uncompleted contracts (present value) $
........................ ............-...-...................................._.........
(b) Other materials (present value) $
.....................................~................... -...- ............---...............................................-
PRESENT VALUE
DESCRIPTION OF MATERIAL QUANTITY FOR UNCOMPLETED OTHER MATERIALS
CONTRACTS
.................................................................................. ...-........................................ ........................-................-................... ..........................-...............................
...........................................................--..................... .....-........--....................-.--..-. ................................-..-.....-................... .....-........-..........................................,
.................................................................................. .....................................-....... ............................................................... ...........................................................
............ .... ..... .... ._............. ,....0'.." ......... ...... ......~.. ....... ............................................ ..................................-........................... ..........................................................
1 1 "
~.- Equipment book value $
at
................................................................................................-.......... .....-................................-..............
QUANTITY DESCRIPTION AND CAPACITY OF AGE OF PURCHASE DEPRECIATION BOOl
ITEMS ITEM PRICE CHARGED OFF VALU
............................... ..................................................................................................... .................... ................................ ................-................_........ ................
............................... ................................................................-..................................... .................... ........................-....... .......................................... -.-....-........
............................... ..................................................................................................... .................... ..........................-..... .....................................-..-- _..u...........
,
j
there any liens against the above? If so, state total amount.......................................................... $ :..................................................
or more items are lumped above, give the sum of their ages.
c: \Sydncy\wpd~~cs\miscell., nC~"'u.s\m01.stcr\Jiv B .'t\1)ll
B-116
DETAILS RELATIVE TO ASSETS (Continued)
I
I
r\
I'
...............................................................................................................................................................................-............... ............................................................
I
I
I
-
-
-
-(~
II
I
I
-
I
I
I
-"
Furniture and fi:A'tures at book value ................................. $
. .... ....,. .... P" ....... ....................:.::::::.......:.................
.
J2
13
Other assets
$
.............--........................................---............................................................................
DESCRIPTION
AMOUNT
................................................................................................................................................................................... ...........................................................
r Total Assets:
(a) To banks, regular $
...................................................................................................... .................................................
1 { (b) To banks for certified checks $
............................................................................... .................................................
(c) To others for eqUIpment o b li gati 0 ns............ ..... ...... .......................................... $
.................................................
(d) To others exclusive of eqUIpment obligatio ns......... ..................................... $
.................................................
TO WHOM: NAME AND ADDRESS WHAT SECURITY WHEN DUE AMOUNT
............................................................................................... ................................................ ............................................... ...........................................................
................................................................................................ ............................................... ............................................... ...........................................................
2 { (a) Not past due $
...................................4....................-.....-.............................................................................. ...................................................
(b) Past due $
........-............................................................................................................................ .................................................
TO WHOM: NAME AND ADDRESS FOR WHAT DATE PAYABLE AMOUNT
,........................................................................................... .................................................. .................................................... ............................................................
.................................................................................... .................................................. .................................................. ..........................................................
3 Real estate encumbrances (see Item 8, Assets) $
................................................................. ........................................................
4 Other liabilities $
........................................................................................................................................... '.'.~""" ... ... ....-. ... .... '.'-' -..... ....................
DESCRIPTION AMOUNT
.................................................................................................................................................................................................................. ...........................................................
..................................................................................................................................................................................................... ..........................................................
5 Reserves $
................................................................................................................................................... ........................................................
INTEREST INSURANCE BLDGS & FIX PLANT DEPT. TAXES BAD DEBTS
$ $ $ $ $ $
6 up{ (a) Common $
Capital Stock paid ............................................................................................ ...............................................
(b) Preferred $
............................................................-....... .................~........ ...............................................
7 Surplus $
............................................................................................................................................................ .-........................-...........................
Total Liabilities:
DETAILS RELATIVE TO LIABILITIES
I
C : \8YI\nC).\tvpdocs\m i,;cellollleI1u~\11l;'\5l~r\JivB. wpJ
B-117
I If a ~~rpDration, answer this:
I Am 0 un t for w hi ch inco rp 0 rat ed ..... ............ ......... ....................... .......... ............... .......... .... ......... ............. ........... ......... ..... ....... ........... .... ............ .............
f""
I \, ,al paid in cash...... .... ........................................ .................................... .................................................... $ ................ .................................... ....... .....
When inco rp 0 rated ............... .......19BO'.......... ............................................ ............................................................................................................................
I In what state ... ................................ II\IDIl\NA................ .... .............. ...... ............... ........ ............ ................ .... .............. ...... ......................... .... .............................
Names and titles of all persons having authority to execute and receipt estimate vouchers and to conduct other business
for the corporation, including its officers, the signatures of whom are legally binding.
.............. ..................... .... ........................ ...VIC1IIR. .0.. .1.II\IBl.IH.. ................... ................. ........... .... ..........P.RE5JJlENT............. .... ............ ...... ......... .......... .....................
............. ........... .......... ........................... .... .JEAN..l'I~..I.INRUH... ...................... ................ ......... ....... ..........a-JIEf. ..EXEaJ:rIYE..oF.F.ICER............... ................. ............
I ...................... ........... ................... ....... .......IIIIlfl'IAN.. c... .KElI.IER.................... .................. ........ .... ........ .....a-JIEF....f.I-NANC-IAl-..oF.F.ICER/Sli:CREtl\RY........................
........................................................................................................................................................................................................................................................................
...........................................................................................................-..................................................-..................................-...................................-.............................
Do you have the necessary "certificate of authority" to transact corporate business in this state, under the terms of
Chapter 215, Acts of 1929, and acts amendatory thereto? .......yES..................................................................................................................
If '" co-partnership, answer this:
{'
D ate of 0 rganiza ti 0 n .................. ...:. ..... ................ ........ ........ ................... .............. ........... ..... .... ........... ................... ....... ............... ............... ....................... ...
State whether co-partnership is general, limited or association .......................................................................................................................
Give the names, addresses and proportional interests of all parties...............................................................................................................
NAME
ADDRESS
SHARE
$
.................................................................... .............-.................................................-........................-......................... ......................................-......................
$
.............................-..................................... ............................................-..................................................................... ...................................-........................
$
............................................-...................... .................................................................................................................. ............................................................
$
...........:......................................................... ..........__.......~..............................................................................-.........-..... ............................................................
$
.....................................................-............. ................................................................................................................-. ...................................................-........
$
..............................................................................-...................................
$ .
r~...........................................................
..................................................................................................................
$
..........................................................:........................................................
c: \S)'dnC)'\'=\11docs\misccll.incous\m<lslcr\J iv B. ~11d
B-118
I The n~me of the partnership firm under which the above partners are operating is.....................................................................................................
:i.,~:~_...-........................................................................................................................................-.....................................................................................................
,Give names and titles of all persons having authority to execute and receipt estimate vouchers and to conduct other business for thepartnersh
the signatures of whom are legally binding.
I
r
( \
I
..::::::::::::::::::::~~:::::f4i~::::jf.i.q;;:Ziii~:::::;;t€~ij~~:::::::7g/;y~::::::::::::::::::::::::::::::::::::::::::::::::
Th~' '~~d~~~i'g~~'d 'h~;~b'y 'd~~i~~~~'~h~~ '~h~'f~'~~g~i~g' i~"~'~~~'~~~~~'~~~~'~f' ~h~' f;~~~~i;J '~~~'di~i-;~' ~f'~h~"i;di~'id~~i:'~~~'p;~~~;;hip"~ ;'~;;p~~;~;:
herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitt
to award the submitter a contract; and that any depository, vendor or other agency herein named is hereby authorized to supply such par
with any information necessary to verify this statement.
I
I
NOTE: A co-partnership must give firm name and signature of all partners. A
corporation must give full corporate name, signature of official and affix
corporate seal.
..~~~,.. ...... ~....~~...~.J. .......... ...:...........
. . ................
.... . ............... .. ... ..... .... .... ...........---.....................
::::::W~(i::t!ii.(jj(ll~:~P~~t.=:::::::::::
I
Affidavit for Individual
I.
COUNTY OF
........................................................ )
) 55:
............... .................. ....................... )
STATE OF
I
...........................................................................................................................being duly sworn, deposes and says thereof that the foregoing financi
statement, taken from his books, is a true and accurate statement of his financial condition as of the date thereof and that the answers to
the foregoing interrogatories are true.
,........................................................--.......................
(Applicant must sign here)
I Subscribed and sworn to me this...................................... day of ...................... 20 ...............
...........................................................--.........................--....................................
rr-- ~
)
Notary Public
Affidavit for Co-Partnership
'EOF
............................ ............................ )
) 5S:
...... .......... ............ .............. ......... ..... )
I
COUNTY OF
I
...........................................................................................................................being duly sworn, deposes and says that he is a member of the firm 0
...........................................................................................................................andthat he is familiar with the books of said firm showing its financi
condition; that the foregoing financial statement, taken from the books of said firm, is a true and accurate statement of the financial conditi
of said firm as of the date thereof and that the answers to the foregoing interrogatories are true.
........................................................................--.......
(Member of firm must sign here)
I Subscribed and sworn to me this......................................day of ...................... 20 ...............
............................................................-.................................................................
I
N otal)T Public
Affidavit for Corporation
I
ST A TEOF (' ............INDIMUL..........................)
) 55:
COUNTY OF ...........Jl.9.m.................................)
I ...,.................,................::......\f.I~m!l.g....J).I\~IJ,tI:L...................................being duly sworn, deposes and says that he is a member of the corporatior
lYiftC..milJstmlc.T.tJ:w..&..EXCA\LAlING,....INC..........................................described in and which executed the foregoi "statement; that he is famil
witb the books of said corporation showing its financial condition; that the foregoing financial state nt, taken from the ks of ~
cocpo~"ion i, a true ,;,d ","un" "a"m'nt of the financial condition of "lid oocp",,rion " of;h, ~ ~~d char ~~
I foregomg mterrogatones are true. ~ . . ~~.......... .~..........
r, /)()..-q:::', (Officer must sign here)
.. .~'~;7e;e~:~~fmm 2093m Wcn>tz. U.uIZ4Ml- ~ /,rje.<>
I
C :\8yd nc:y\"t\TIJ()CS\ll1 isccll<tneClus\111"slcr\Ji\.B. "'1,J
B-119
(\
~
.
,.
MINUTES OF THE
SPECIAL DIRECTORS MEETING
OF
MAC CONSTRUCTION & EXCAVATING INC.
Pursuant to Waiver of Notice (copy of which is attached), a special meeting of the Board of
Directors was held on November 4, 2002 at the corporation's place of business.
1. QUORUM. The following Directors, constituting a quorum of the Board, were present:
Victor O. Unruh
Jean M. Unruh
Also present was Norman C. Kruer, Chief Financial Officer and Secretary ofthe Corporation.
II. ELECTION OF CHAIRMAN & SECRETARY. Victor O. Unruh acted as chairman
of the meeting and Norman C. Kruer, Secretary and Chief Financial Officer acted as secretary.
III. PURPOSE OF SPECIAL MEETING. The purpose of the special meeting was to re-
elect the officers of the Corporation and to revise the Corporation's Contractual Authorizations
as previously vvritten in the minutes for the Annual Board of Directors meeting held on February
25, 2002. This was necessitated by the resignation of Edward Morris as an employee of the
Corporation.
IV. ELECTION OF OFFICERS. The following were elected as officers to serve the
Corporation during the ensuing year and until the next annual meeting of the Board of Directors
or until election and qualification of their successors:
Name:
Office:
Jean M. Unruh
Chief Executive Officer
Name:
Office:
Victor O. Unruh
President
Name:
Office:
Norman C. Kruer
Secretary and Chief Financial Officer
V. CONTRACTUAL AUTHORI,ZATION.
(a) The President, the Chief Executive Officer, and Chief Financial Officer/Secretary
are the only individuals granted the authority to sign any and all contractual obligations of the
Corporation.
(b) The President and Chief Executive Officer may grant to other Officers or to other
representatives ofthe Corporation certain powers and authority as they deem necessary. .4ny such
authorities will be identified in writing and attached as an Addendum to these minutes.
c
"
,'I
Vr:---ADJOURN. There being no further business to come before the Board of Directors~ the
meeting v.:as adjourned.
//!// //~./--'.. ~/ A'"
/'. ./.' /
/ / . ... / /" .
/./ .......-~ ( / ./,.",'-'- (
'\Tictor o. u~ Chairman
--,.t . _ .,.--r- i/
), (c"-",}~""1..c.......- L-- . 1J..)1'1..'--~
NOITnan C. Kruer, Secretary
F:\USER\U THY"'\lINUTES\''v1AC1DIR 11 :!OO:!.DOC
r'l
,
\j: ~
"
,.
'WAIVER OF
I'
NOTICE OF SPECIAL TvIEETING OF THE
DIRECTORS
OF
MAC CONSTRUCtION & EXCAVATING INC.
The undersigned DIRECTORS of the above corporation hereby waive(s) notice of the
SPECIAL meeting of the BOARD OF DIRECTORS held on November 4, 2002 at the
office of the Corporation.
j'" .-/'
~ .. '" .~~
;. -f",t>. '
,//.f ~. ~ ,./ I~ (.. "
Date'
{/IDL{16~
Datd \
/".. ~.-
~,.. .
.~ /. ". /
,.........4~,
;.~ .4 - />/ //,,/ ...-,
/~//. { /.....>-- ..~- _~I
'VICTORO. uNRmf (
DIRECTOR
JE~.~
DIRECTOR
I
F:\USER\KA THY\MINUTES\MAC\WVRD I 12002DOC
r
'"
SIGNATURE AUTHORIZATIONS
(As authorized by the Board of Directors)
MAC CONSTRUCTION & EXCAVATING, INC.
i
The following is a listing of various project-related documents with the names of
specific individuals who are authorized to sign on behalf of MAC.
The specific authorities listed below apply to all construction projects, including
asphalt and directional boring, unless a specific exception is stated.
Bids and Quotes:
Vic Unruh and Bryan Winslow are the only individuals authorized to sign
bids as long as the bid does not become a contract. If the bid should also
become the contract as in thE7 case of municipal work, then Vic Unruh,
Jeannie Unruh or Norman Kruer will sign the bid. If the bid should also
become the contract as in thE7 case of private work, then Vic Unruh,
Jeannie Unruh or Norman Kruer will sign the bid.
Jeff Hawes will sign asphalt proposals. Bryan Winslow is authorized to
sign asphalt proposals in the event Jeff Hawes is not available. When a
proposal is accepted it becomes a contract; however, if a signature of an
officer or of a representative other than the individual signing the proposal
is required, then Vic Unruh, Jeannie Unruh, Norman Kruer and Jeff Hawes
are authorized to sign.
Vic Unruh is the only person authorized to sign a directional boring quote
or contract.
Contracts with Owners where MAC is the General Contractor:
Vic Unruh, Jeannie Unruh and Norman Kruer are the only individuals
authorized to sign generally; however, Vic Unruh will sign all directional-
boring contracts.
Contracts with a General Contractor where MAC is the Subcontractor:
Vic Unruh, Jeannie Unruh and Norman Kruer are the only individuals
authorized to sign generally; however, Vic Unruh will sign all directional-
boring contracts.
Prepared/Revised 06/01/2003
1
r",
/
~
'" ! ~
..
1"!.
i
SIGNATURE AUTHORIZATIONS
(As authorized by the Board of Directors)
MAC CONSTRUCTION & EXCAVATING, INC.
i
i
Schedule of Values:
Schedule of Values will be prepared by Project Managers after
discussions with and reviews by Bryan Winslow and the Superintendents.
Budqets:
Budgets will be prepared by the Project Managers after discussions with
and reviews by Bryan Winslow and the Superintendents.
Budqet Revisions:
Budgets are prepared by the Project Managers and reviewed by the
Superintendents.
MRC (Mac Request For Chanqe) To Owners:
I
MRCs are to be prepared by the Superintendent, are to be reviewed by
Bryan Winslow and are to be signed by Vic Unruh.
I
Chanqe Orders with the Owner or General Contractor:
Vic Unruh and Superintendents for their designated jobs are authorized to
sign Change Orders to the Owner or General Contractor.
Subcontract Aqreements with our Subcontractors:
Ben Jones, Steve Stinnett and Vic Unruh are authorized to sign.
However, if the subcontract amount is for $5,000.00 or more and is not in
the budget it must be reviewed by Bryan Winslow and signed by Vic
U nru h.
Prepared/Revised 06/01/2003
2
r--.
f
,:
I',
'/
~
r
SIGNATUR~ AUTHORIZATIONS
(As authorized by the Board of Directors)
MAC CONSTRUCTION & EXCAVATING, INC.
I
I
Chanqe Orders to our Subcontract Aqreements:
Ben Jones, Steve Stinnett and Vic Unruh are authorized to sign.
However, if the subcontract amount is for $5,000.00 or more and is not in
the budget it must be reviewed by Bryan Winslow and signed by Vic
Unruh.
Purchase Orders:
Ben Jones, Steve Stinnett and Vic Unruh are authorized to sign.
However, if the purchase is for $5,000.00 or more and is not in the budget
it must be reviewed by Bryan Winslow and signed by Vic Unruh.
Chanqes to our Purchase Orders:
Ben Jones, Steve Stinnett anp Vic Unruh are authorized to sign.
However, if the purchase is for $5,000.00 or more and is not in the budget
it must be reviewed by Bryan Winslow and signed by Vic Unruh.
Contract Billinqs:
Norman Kruer, Vic Unruh or Jeannie Unruh must sign all contract billings;
Jeff Hawes can sign asphalt contracts. For asphalt billings where a
signature is not required, Jeff Hawes must review and approve.
Vendor Invoices:
Ben Jones, Steve Stinnett and Vic Unruh are authorized to sign vendor
invoices for MAC jobs. Project Administrators are authorized to sign
invoices for called in purchase orders less than $500.00. Jeff Hawes will
sign all asphalt invoices for asphalt work done all jobs, including MAC
jobs. Bryan Winslow is authorized to sign asphalt invoices in the event
Jeff Hawes is not available.
Prepared/Revised 06/01/2003
3
SIGNATURE AUTHORIZATIONS
I
(As authorized by the Board of Directors)
~ !
MAC CONSTRUCTION & EXCAVATING, INC.
I
Subcontractor Pay Estimates:
Ben Jones, Steve Stinnett anc;l Vic Unruh are authorized to sign
subcontractor estimates and invoices for MAC jobs. Jeff Hawes will sign
those for asphalt work done on all jobs, including MAC jobs. Bryan
Winslow is authorized to sign asphalt subcontractor estimates and
invoices in the event Jeff Hawes is not available.
General:
Vic Unruh, Jeannie Unruh and Norman Kruer are granted the authority to
sign any and all documents on behalf of MAC.
Vic Unruh must review and approve anything in the directional boring
area.
('\
Bryan Winslow or other estimator, the project manager and the
superintendent must read all contracts and contract specifications and
conditions for MAC jobs. For asphalt contracts, Jeff Hawes and Steve
Hile will do this. '
Backcharges to suppliers or subcontractors must be adequately
documented and explained and must be agreed to by the subcontractor.
Revenue projections will be done monthly, or as needed, by Bryan
Winslow working with Darlene Cochran.
Any and all project correspondence that is adversarial must be reviewed
and approved by Victor Unruh.
Project e-mails must be treated like any other correspondence. Outgoing
and incoming e-mails should be filed in the appropriate project files. A
cron file for e-mails will be maintained at the front desk along with the cron
file for regular letters.
Prepared/Revised 06/01/2003
4
CONTRACTORS BID FOR PUBLIC WORKS
PART II - SECTION 1
1. WHATPROJECTS HAS YOl)R ORGANIV\TION COMPLETED?
SEE ATTACHED SCHEIXJLE "A"
2. WHAT PROJECTS HAS YOUR ORGANIV\TION NOW IN PROCESS OF
CONSTRUCTION?
SEE ATTACHED SDlj::DlLE "B"
3. HAVE YOU EVER FAILED TO COMPLETE ANY WORK AWARDED TO
YOU? IF SO, WHERE AND WHY?
NO
4. LIST REFERENCES FROM PRIVATE FIRMS FOR WHICH YOU HAVE
PERFORMED WORK.
PRESNELL ASSOCIATES - DAVID PRESNELL
717 WEST MAIN ST.; LOUISVILLE, KY 40202
KOETTER CONSTRWCTION, INC. - JACK KOETTER
7393 PETE ANDRES ROAD; FLOYDS KNOBS, IN 47119
PINNACLE PROPERTIES - JOHN MIRANDA
P.O. BOX 43957; LOUISVILLE, KY 40253
<<
SCHEDl..LE "A"
J:ISYMACCT\JOBI52C02.XLS. :' ; : : ,
Preoaredm:~vised 1/2fft03 . . : ! , !
,
MAC cblTRUCTION & EX~V~TING. INC. t , : ,
IWORK EXPERIENCE FOR PREQUALlFlCATION PURPOSES : :
. , , : , : :
, I
....,---- I , ,
r . I ,
: PRIME CONTRACT PERCEN~----r5ATEOF--
TYPE OF WORK OWNER i PROJECT NAME ; , OR SUB AMOUNT ! ; COMPLETE: COMPLETION
, I I : , ! ; ;
! I
, : , I I I , i : !
IN PROCESS AT 12131102 I I I : i : I
, . I , I ! i i 1
,
: 'SEWER I iMETRO SEWER DISTRICT -LOUISVILLE. KY ICane Run West IPRIME I I 2.087.0061 20.30% i IIN PROCESS
:SIDEWALKS . , 'CITY OF CARROLL TON. KY 1Carrollton Sidewalks IPRIME I I 238.0001 I 83.50% i IIN PROCESS
-. iSITE 'CLARK COUNTY AIRPORT-SELLERSBURG. IN I I Clark Co Almor! i ,PRIME I I 761.3561 I 15.90%: ilN PROCESS
,
;PUMP STATION !CITY OF CRESTWOOD. KY 1 ICrestwood Pumo Station , !PRIME , 135.2101 I 94.20%1 ilN PROCESS
IPUMP STATION iMETRO SEWER DISTRICT-LOUISVILLE. KY I Edith Purno Sta Revision PRIME I 41.3231 i 56.20% i UN PROCESS
-- lSITE 'CITY OF LOUISVILLE. KY Extreme Park Restroom IPRIME 1 297.5001 , 1.20%1 IIN PROCESS
: !PUMP STATlON IMETRO SEWER DISTRICT-LOUISVILLE. KY Fisherville Rd Pump Sta IPRIME I 1.778.7371 I 3.40%1 :IN PROCESS--
I . SITE , IJEFFERSON CO PUBLIC SCHOOLS-LOUISVILLE. KY Hazelwood School IPRIME 1 705.6441 I 80.30% IIN PROCESS
iWATER ! I LOUISVILLE WATER CO-LOUISVILLE. KY LWCo-Gaoin Knob Watennl IPRIME I 405.5001 I 26.00% I IIN PROCESS
: JWATER iLOUISVILLE WATER CO-LOUISVILLE. KY , I L WCO-KY Hwv 329 IPRIME I 771.3191 I 86.70%1 !IN PROCESS
: ; WATER !LOUISVILLE WATER CO-LOUISVILLE, KY L WC0-16th Street PRIME I 740.924 j I 78.40%1 IN PROCESS
! I WATER i I LOUISVILLE WATER CO-LOUISVILLE. KY LWC0-3rd St Main Rolann! PRIME 268,470 I 20.50% 1 IN PROCESS
IWATER I LOUISVILLE WATER CO-LOUISVILLE, KY LWCO-West=rt 48" Main PRIME 2.161.377 I 94.80%1 IN PROCESS
: !SEWER 1 I METRO SEWER DISTRICT -LOUISVILLE, KY Oaklawn Sewers PRIME i 765.862 I 66.50% IN PROCESS
!SITE !METRO SEWER DISTRICT-LOUISVILLE. KY Ohio River Levee Phs 2 PRIME , 581.306 i 93.90%1 IN PROCESS
: :SEWER : iMETRO SEWER DISTRICT-LOUISVlLLE. KY IORFM Cross Connections I IPRIME 1.936.704 I 79.10%1 IN PROCESS
,SITE I :COMMUNITY BUILDERS- LOUISVILLE.KY 34th Street P.O. ! ISUB 1 2.258.507 81.10%1 IN PROCESS
I SITE i !COMMUNITY BUILDERS-LOUISVlLLE. KY IWatterson P.O. ! !SUB i 1.567.6581 , 27.40%, IJN PROCESS
, SITE IREGIONAL AIRPORT AUTHORITY.LOU1SV1LLE,KYI RAA Herltaoe Creek Phs 2: IPRIME 1.485,445, 19.80%1 IIN PROCES~ ._
,
'SITE I REGIONAL AIRPORT AUTHORITY .LOUISVILLE,K'I RAA Herltaoe Creek Sec 6 1 IPRIME , 842,127; : 91.20%1 : IN PROCESS
_.- "~OADS I !CITY OF LOUISVILLE, KY 2nd Street Widenino 1 PRIME I 2.319.0621 12.00%1 IIN PROCESS
!SITE I ICITY OF LOUISVILLE. KY Waterfront Phase 2 I PRIME I ! 7.305.3231 i 48,70%1 i1N PROCESS
1 I ! 1 ! 1 ,
I j : 1 I I I :
I , : "I I !
I I ! 1 1
1 !SEWER ! IMETRO SEWER DISTRICT-LOUISVILLE, KY MSD West Co Emer Inflow IPRIME 1 167.1881 1 70.60%i IIN PROCESS
: i I , I I I I 1 ,
I
I i 1 I 1 I , 1 i
,
i ! ! I 1 i ! i
-r ;ASPHALT ! !NEW ALBNYIFLOYD CO SCHOOLS~EW ALBNY.IN I Asnh-NA Rovd Schools IPRIME I I 519.900i ! 36.60%i IIN PROCESS
,ASPHALT , IDSR INC-FISHERVILLE. KY 1 IAsph-Ridgewood Punchlist 1 IPRIME I i 4.6801 i 0.00%1 'IN PROCESS
- IASPHAL T ! IBRECK JONES-LOUISVILLE. KY , IAsoh-Stoll Hill IPRIME I I ; IN PROCESS
1 15,0001 1 72.60%1
: i i 1 I ! ! I I' I
I 1 I , I j 1 I . 1
I
! I , 1 I I ! 1 ! I 1
I : , I i I I I ! ;
COMPLETED 01/01/02 THRU 12131/02 1 , ! : , ;
I , 1 1 1 i i I i
. 1 1 I 1 I 1 ; I
, : 1 ! ! 1 I I I ! I 1
! 'SITE i :APPLE PATCH COMMUNITY-LOUISVILLE. KY I 'IApple Patch 'PRIME i 1 410.3791 ; 100.00%. ! COMPLETED
,SITE : CITY OF LOUISVILLE. KY i i !PRIME : 1.113.2291 -r--.----
, ! Baringer Hill : 100.00%, iCOMPLETED_
, CONCRETE i FORTIS GROUP-LOUISVILLE. KY 1 Bluearass Center DP-1 ! IPRIME i 1 13,030; 1 00.00% i I COMPLETED
I CONCRETE 'FORTIS GROUP-LOUISVILLE. KY , 1 Bluegrass Center DP-3 : IPRIME i 19,160: : 100.00%1 ICOMPLETEO-"
--.-.
n ..~9.!3-YWALLJMASONRY . CIRCUIT CITY STORES-RICHMOND. VA 'Circuit City Wall Repair 'PRIME 19,659 ,. -'00.00%":" .COMPLETED'
.. SEWER ,METRO SEWER DISTRICT -LOUISVILLE. KY I :Claremore Acres ; :PRIME : , 144,ij6i- _.n . iOO.0004: . : COMPLETED .-
,SEWER : iMETRO SEWER DISTRICT-LOUISVILLE. KY 1 IDeering Road Collectors I IPRIME : : 1,999,532 ' 100.00%: iCOMPLETED
_.
I ROADS : ,JEFFERSON CO PUBLIC WORKS-LOUISVILLE,KYI IDorsev Lane Culvert I iPRIME 1 188,5501 1 100.00%' ICOMPLETED
i SEWER 1 IMETRO SEWER DISTRICT-LOUISVILLE. KY. Edith Ave. I \PRIME I 784,473\ 1 100.00%; I COMPLETED
, I SEWER I IMETRO SEWER DISTRICT-LOUISVILLE. KY 11 th & Rowan I PRIME I 141,121 I I .100.00%1 ICOMPLETED
- . I CONCRETE/SITE ICITY OF LOUISVILLE. KY I Extreme Soorts Park i IPRIME ! 2,320,6431 I 100.00% I I COMPLETED --
i ROADS : I CITY OF LOUISVILLE. KY I Fourth Street-600 Block : !PRIME 1 l 144,751 i ! 100.00%\ : COMPLETED
, ,PUMP STATION 1 ICARROLLTON UTILlTIES-CARROLL TON. KY I Gallatin Co, Sewers I IPRIME i 1.542.3121 : 100.00%; ICOMPLETED
; SEWER ; i METRO SEWER DISTRICT -LOUISVILLE, KY 1 Grafton Sewer EasVWest I PRIME i I 5.555.7561 I 100.00%; I COMPLETED
: ROAD/SITE ! :TOWN OF CLARKSVILLE. IN I Greentree Blvd Phase 2 I PRIME 1 I . 1.053.924\ i 100.00%1 ! COMPLETED
, : ROAD ;NEW ALBANY REDEVELOPMENT-NEW ALBANY.IN 1 Hausfeldt Lane I IPRIME 1 870.588 : , 100.00% i : COMPLETED
: SEWER : 1 METRO SEWER DISTRICT -LOUISVILLE, KY 1 Ilndian Hills North i IPRIME 1 i 3.279,9841 1 100.00%: I COMPLETED
_._-~
, SEWER . METRO SEWER DISTRICT -LOUISVILLE, KY I iJohnsontown Road iPRIME , 878.366 t , 100.00%: ; COMPLETED
-
SITE 'TOWN OF CLARKSVILLE,IN I 1 Koetter Dr. Drainage i 'PRIME ! 23.325 i 100.00%, !COMPLETED
I
: i CURB/SIDEWALK : ~KROGER FACILmES MGMNT-LOUISVILLE, KY ! I Krtloer Granlline IPRIME 1 , 43,4351 ! 100.00%1 I COMPLETED
,
i SITE/SEWER IMETRO SEWER DISTRICT -LOUISVILLE. KY I -ILetterle 'PRIME ! 1,607,4911 I 100.00%1 I COMPLETED
: SEWER : METRO SEWER DISTRICT-LOUISVILLE. KY lLono-Run Interceptor !PRIME I ! 97.3131 100.00%1 ' COMPLETED
: lSEWER 'METRO SEWER DISTRICT-LOUISVILLE. KY I I Lono Run Sec 2 ; :PRIME ! I 550,855 i 100.00%' 'COMPLETED
: WATER LOUISVILLE WATER CO-LOUISVILLE, KY , ILWCO-Avon Road 1 'PRIME 1 1 268,165: , 100.00% i 'COMPLETED
'WATER LOUISVILLE WATER CO-LOUISVILLE. KY ! ! L WCO-Beechrnont Main , :PRIME : , 1,614,338; 100.00%; : COMPLETED
-. i
WATER . LOUISVILLE WATER CO-LOUISVILLE. KY , 'LWCO-Forest Drive : . PRIME , 155,4651 100.00% : ,COMPLETED
_r- . WATER LOUISVILLE WATER CO-LOUISVILLE, KY ! ,LWCO-24" Transmission Main IPRIME 1,977,5191 100.00% : iCOMPLETED
-- WATER . LOUISVILLE WATER CO-LOUISVILLE. KY iLWCO Watterson Trail :PRIME 321.531 100.00% COMPLETED
SIDEWALKS ,JEFFERSON CO PUBLIC WORKS-LOUISVILLE. KY : Manslick Road !PRIME 93.845 i 100.00%, . COMPLETED
.'.'_ ",:PU~ STAI!O~ SHELBYVILLE SEWER &. WATER-SHELBYVL. KY 'Meadowbrook Subdivision 'PRIME --. 1.208.383 100.00% 'COMPLETED
SEWER PLANT OAK PARK CONSERVANCY-JEFFERSONVL. IN Oak Park TrE;atmenl Plant PRIM'~: .'.262:146-' '_h'; oD.oo.i~--COMPLE;-ED'-
..... SITE - COMMUNITY BUILDERS- LOUISVILLE.KY - ; Park DuValle Phs 3 SUB 2.056.780. 100.00%, COMPLETED
.-
-SiTE' ---- COMMUNITY BUILDERS- LOUISVIU..E.KY ,4B P.D. SUB 177,666 100.00% COMPLETED
J:ISYMI\CCruOB'BEC02.xLS
PreoaredlRevised 1/20/03
, ':L,; :
MAC CONSTRUCTION & EXCAVI\TING,INC,
,
! l
i ~
:
l I i
IWORK EXPERIENCE FOR PREQUALIFICI\TION PURPOSES
--
: '1
PRIME
, OR SUB
,
!PRIME
jPRIME
iPRIME
IPRIME
IPRIME
IPRIME
I ISUB
1 IPRIME
i IPRIME
I IPRIME
I IPRIME
1 IPRIME
ISUB
IPRIME
TYPE OF WORK
PROJECT NAME
OWNER
'SEWER 'METRO SEWER DISTRICT-LOUISVILLE, KY '
:WATER TRTRMT PLNT 'PROLOGIS. LLc-LOUISVILLE, KY i
'StTE :REGIONAL AIRPORT AUTHORITY.LOUISVILLE,KYt
iSITE H(ARZAN.LI\NGON-BURRU5-LOUISVILLE, KY !
,ROAD :JEFFERSON CO PUBLIC WORKs-LOUISVILLE. KY
:SIDEWALKS ,:CITY OF SHELBYVILLE, KY I
,WATER ' !KOETTER CONSTRUCTlON-FLOYDS KNOBS, IN I
iStTE I STEWART PERRY CO.-BIRMINGHAM, AL I
SEWER i :STlNNETT RV-ClARKSVILLE. IN I
; IStTE :J C TAlIAFERRO-lOUISVILLE, KY I
,SITE IRUBLOFF DEVELOP GROUP-ROCKFORD,IL !
!S1TEIASPHALT 'IUNIVERSITY OF LOUISVlLLE-LOUISVILLE, KY i
:SEWER 'WEHR CONSTRUCTORS-LOUISVILLE, KY !
'SEWER IMETRO SEWER DISTRICT -LOUISVILLE. KY
I Pleasure Ridge ,
, ! Prologis WWTP :
, lRAA-Demo/SiteworldAbateml
, I River Road Subdivision i
1St Anthony Church Rd Bridoe
I Shelbwille Streetscape
ISionature Pari<: Water
I Stewart PerrY
I Stinnett RV Drainaoe
ITaliaferro Erosion Control
T ar'Qet Bashford Manor
U of L Hospital Pari<: Lot
Wehr-2nd & Broadwav
IWoodlawn Pari<: Drainage I
; !
, I
,ROAD
ROAD
SEWER
I
IPRIME
PRIME
PRIME
, I I
I JEFFERSON CO PUBLIC WORKS-LOUISVILLE,KY J.C. Maintenance '9912000 1
I !JEFFERSON CO PUBUC WORKS-LOUISVILLE,KY J.C, Maintenance 2001120021
I IMETRO SEWER DISTRICT-LOUISVlLLE, KY MSD.Shelbvville Rd. EmerQ I
I : I
! I 1
: I I
;ASPHALT '!BAUMFIELD BROS-MT STERLING, KY 'Asoh-ABF/Baumneld Brcs I IPRIME
, iASPHALT ISTONEGATE MOB HOME COMMUNITY-LOUISVL.KY Asph-Alvey Pari<: Dr IPRIME
'IASPHALT ; !PEABODY PARTNERSHIP-LOUISVlLLE. KY I Asoh-ASR Services 1 IPRIME
: IASPHAL T IJOHN CORSO- LOUISVilLE. KY I iAsoh-Austin BIde i IPRIME
i ;ASPHALT II\VII\TlON FACIUTlES-LOUISVILLE. KY 1 Asph-Aviation Fac. Co. I PRIME
!ASPHALT I FORTIS GROUP-LOUISVlLLE, KY I Asph-BlueQrass Center i PRIME
, iASPHAL T : I ERVIN MOTT ENTRPRISEs-LOUISVILLE, KY Asoh-Bradbe Forest i I PRIME
iASPHALT !SMITH CONTRl\CTING-LAWRENCEBURG. KY Asph-Cane Run Rd. ISUB
IASPHALT ! :MCMILLAN LANDSCAPING-FISHERVlLLE, KY Asph-Chadco I SUB
; ,ASPHALT : DUANE REALTY CO-lOUISVILLE. KY Asph-Clari<: Food Service I IPRIME
iASPHALT ! ICRAlG & LANDRETH lNC-LOUISVILLE, KY 1 Asph-Craig & Landreth IPRIME
iASPHAL T ICITY OF CRESTWOOD. KY IAsoh-Citv of Crestwood I IPRIME
!ASPHAL T 'IS&S ASSOCII\TEs-LOUISVlLLE, KY I IAsph-Danev Drive 1 IPRIME
iASPHAL T I INEW PLI\N REALTY TRUST CO-VERSAILLES, KY I iAsph-Eastgate Phs 2 1 PRIME
1 iASPHALT i INEWPLAN REALTY TRUST CO-VERSAILLES. KY IAsoh-EastoatelPicadilly I PRIME
II\SPHAL T iJEFFERSON CO PUBLIC SCHOOLs-LOUISVILLE,KY IAsph-Enolehard E1em I PRIME
: IASPHALT I iCB RICHARD ELLIS NICKLlES-LOUISVILLE, KY I IAsoh-The Festival I SUB
jASPHALT 1 iFOREMAN FUNERAL HOME.JEFFERSONTWN.KYI IAsph-Foreman Funen Home I PRIME
, ,ASPHALT iCB RICHARD ELLIS NICKLlES-LOUISVILLE, KY I IAsph-GardnerLn Shoo Coo I !SUB
I iASPHAL T IGREATR FRIENDSHIP CHURCH-LOUISVILLE. KY 1 IAsph-Greatr Friendship Church IPRIME
! iASPHALT I IJIM HENRY BUILDER5-TAYLORSVILLE. KY I IAsph-Jim Henrv Builder 1 ISUB
i ASPHALT I CITY OF HURSTBOURNE, KY I IAsoh-Hurstboume Rd. Rprs I IPRIME
I IASPHALT i IIGA-TAYLORSVILLE, KY IAsoh-lGA Tavlorsville I IPRIME
!ASPHALT : IKlR DEVELOPMENT.flROSPECT. KY I IAsph-lndian Hffls Green : :PRIME
!ASPHALT :JEFERSON CO PUBLlCSCHOOLS-LOUfSVILLE,KY IAsoh-lndian Trail Elem I IPRIME
';ASPHALT ,ICITY OF JEFFERSONTOWN. KY . I IAsph-City of J-Town i IPRIME
_'h.__.:~l'HALT iCITY OF JEFFERSONTOWN, KY , !Asph-J-Town Streets '02 i ,PRIME
__.I\SPHI\LT JEFERSON CO PUBLIC SCHOOLS-LOUISVILLE,KY . iAsph-Johnsontown Elem iPRIME
.___.:.~SPHA11-_ ._1._ : NEW PLAN REALTY TRUST CO-VERSAILLES, KY I IAsoh-Kmart E.town T&M i IPRIME
_. 'I\SPHALT : !PRESNELL CM LLG-LOUISVILLE. KY i IAsph-Kroger Middletown i PRIME
. ASPHALT 1 FORTIS GROUP-LOUISVILLE, KY I IAsoh-Louisvl Space Center I PRIME
,ASPHI\LT IDRISCOLL ENTERPRlSES-TAYLORSVILLE. KY I IAsph-Mic-Zees Car Wash I IPRIME
ASPHALT 'TAJ ENTERPRISES-LOUISVILLE. KY I IAsph-Monteray Place IPRIME
: ASPHAL T 'MOREL CONSTRUCTION-LOUISVILLE. KY ; !ASph-Murphy Lane EJern ~SUB
._. _ ASPHALT .RON METTS CONST CO-LOUISVILLE., KY ' . ,Asph-New Birth Church ISUB
:ASPHAL T lOR CRAIG PFEFFER-LOUISVILLE. KY , IAsoh-Craig Pfeffer Ofc ,IPRIME
,ASPHALT ; IGUERIN,INC.-GEORGETOWN,IN I IAsph-Providence House I IPRIME
ASPHALT !MCMILLI\N LANDSCAPING-FISHERVILLE, KY I IAsph-Reformed Baptist Ch i SUB
__, ,ASPHALT i iDSR INC-FISHERVILLE. KY I iAsph-Ridgewood Farms 1 PRIME
__~ 'ASPHALT .RIVER METALS RECYCLE.LOUISVILLE. KY I. IAsph-River Metais IPRIME
._ ! :ASPHALT "ROLLING HILLS PLAZA-LOUISVILLE, KY I IAsph-Rplling Hills T&M I I PRIME
jASPHALT :MCMILLAN LANDSCAPING-FISHERVILLE. KY i IAsph-Seven Oaks 1 ISUB
:ASPHALT :SOUTHEND MINI STORAGE-LOUISVILLE. KY i IAsph-Southend Mini Storagei IPRIME
'ASPHALT :DR JAMES STRONG-TAYLORSVILLE. KY ! Asph-Strong Pari<:ing Lot I IPRIME
I\SPHAL T ILI\URICE SAMUELSIL YNNE KELL Y-LOUISVILLE, KY iAsph-SuloravelSamuels I PRIME
ASPHALT 'CB RICHARD ELLIS-LOUISVILLE. KY ! iAsoh-TradepointT&M i jPRIME
. ASPHALT JIM HENRY ING-TAYLORSVILLE, KY ;Asph-Training Wheels ! :SUB
ASPHALT i . COMMERCIAL PROPERTIES-LOUISVILLE, KY " iAsph-Villaoe Center : IPRIME
.~ :ASPHALT : WATTERSON TRIAL IND PARK-LOUISVILLE, KY ' I Asph-Watterson Traillnd Pri<: IPRIME
ASPHALT WILDWOOD COUNTRY CLUB-LOUISVILLE,KY !' IAsph-Wildwood Country Club 'PRIME
: : i I I I
I
/
--.
-.
CO~PLETED. 01101/01 THRU 12/31/01
, ,
CONTRACT : PERCENT
AMOUNT ' ; COMPLETE'
i
I I
~ 1
I
i 1
i I
I 1
1 1
I !
: !
i !
1 I
i
1
I
I
I
I
I I
I I
I
I
I
I I
I I
I
, I
I I
i I
I
,
i !
. !
1,794,502:
744,931 :
1,084,987:
260,1191
424.412:
362.559 :
43.7681
66.445
25.150
8.594
1,982.611
378.074 i
13.200:
1,341.5151
I
I
1,098,959 I
201.7971
13.1531
I
i
I I
2.5501 i
7.0401 i
11.8781 !
7,7581 ,
100,3821 ;
15.4001 :
34,0561
19,6461 I
12.5601 !
3.2001 I
14.0301 I
39,6451 1
13.8481
17,3701 '
60,7621 I
4.9801 I
5.8651 i
16.060! !
12.1321 '
15,8551' ,
2,9601 !
88,6781 I
9.4771 i
6,5001 ,
27,1631 I
35,9711 !
533.340 '
21.1971
500:
56,659 :
85,8781 :
8,4661 I
4 ~.2341
69,044 i ,
22,7001
7,7761 1
01 I
1,728!
90,647 :
'29,502~ l
3,5871
11.258: !
34,3131 1
5,762:
4,0001
2,959: ,
8,138:
6,400' ,
2,3761
4,840;
1
I
I
100,00"10 :
100,OO"loi
100.00"10'
100,00"101
100.00"10,
1 00.00"10 i
100.00"101
100,00"101
100.00"101
100.00"101
100.00%,
100.00%'
100.90%:
100.00%.
!
: '
100.00%:
100.00%1
100.00%1
I
I
I
100.00%1
100.00%1
100.00%1
100.00%1
100.00%i
100.00%1
100.00%;
100.00%1
100.00%1
100.00%
100.00%1
100.00% 1
100.00%1
100.00%1
100.00%:
100.00%1
100.00%1
100.00%1
100.00%1
100.00%i
100.00%1
100.00%1
100.00%1
100.00%
100.00%1
100.00%i
100.00%1
100.00%i
100,00%1
100.00%1
100,00%,
. 100.00%1
100.00%1
100,00%:
100.00%;
100.00%;
.100.00%1
100.00%1
100,00%:
100.00"10'
100.00%1
100.00% !
100.00%1
100.00%;
100.00% :
100.00% :
100.00%
100.00% :
100.00% :
100.00% :
DI\TE OF --
COMPLETION
;COMPLETED
COMPLETED
'COMPLETED' -
,COMPLETED
I COMPLETED
: COMPLETED
'COMPLETED
I COMPLETED
I COMPLETED
COMPLETED
I COMPLETED
I COMPLETED
: COMPLETED
ICOMPLETED'" .
COMPLETED
COMPLETED
COMPLETED
1 COMPLETED
COMPLETED
COMPLETED__
COMPLETED
COMPLETED
! COMPLETED
! COMPLETED
i COMPLETED
I COMPLETED
I COMPLETED
I COMPLETED
I COMPLETED
1 COMPLETED
i COMPLETED
i COMPLETED
1 COMPLETED
I COMPLETED
I COMPLETED
iCOMPLETED"-
I COMPLETED
, COMPLETED
1 COMPLETED
! COMPLETED
I COMPLETED
I COMPLETED
1 COMPLETED
, COMPLETED ..
I COMPLETEP ..._
I COMPLETED
: COMPLETED
! COMPLETED
I COMPLETED
I COMPLETED
. COMPLETED
i COMPLETED
I COMPLETED
,COMPLETED
'COMPLETED
: COMPLETED
, COMPLETED
, COMPLETED
!COMPLETED
: COMPLETED
I COMPLETED
: COMPLETED
, COMPLETED
. COMPLETED
. COMPLETED
: COMPLETED
; COMPLETED
J:\SYMACCT\JOB"OEC02.XLS, I I I i
PrenaredlRevised 1120103 I ;
, .{ i , ,
MAC CONSTRUCTION & EXCAVATING. INC. iWORK EXPERIENCE FOR PREQUALIFICATION PURPOSES
I; !
/-. ,
'. ,
,
I- : : , PRIME CONTRACT PERCENT DATE OF
! TYPE OF WORK ; : OWNER i , PROJECT NAME ; i OR SUB i AMOUNT : COMPL<=TE I COMPLETION
i , : i i 1 1 ! i I , i i
ISITE 'AOUASOURCE INC-CLARKSVILLE,IN iAauaSource Frankfort ! IPRIME , 20,6361 100.00% : COMPLETED
iSITE .AOUASOURCE INC-CLARKSVILLE.lN IAQuaSource Goshen I IPRIME I 1 8,8111 100.00% i COMPLETED
,CONCRETE ,CITY OF LOUISVILLE-LOUISVlLLE. KY 1 Belvedere Renov. I IPRIME I 4,079.7751 ! 100.00%1 i COMPLETED
!ROAD : 'NTS CORP-LOUISVILLE. KY I Blankenbaker Crossing I !PRIME i 1 37.3281 100.00%1 1 COMPLETED
!SITE iKIEL BROS Oil-COLUMBUS. IN . IBP Sta-Brentlinoer Lane ! PRIME ! 5.100' 100.00%1 : COMPLETED
: STORM/SEWER . METRO SEWER DISTRICT-LOUISVILLE. KY i Bruce Creek Restoration , IPRIME , 1.205.564 100.00%: :COMPL~
. , 'SIDEWALKS .CllY OF CARROLLTON. KY , ! Carrollton Streetscape : !PRIME : 283.270. 100.00%. ; COMPLETED
:SITE ,JOHN CLARK-LOUISVILLE. KY IClark Driveway Repairs IPRIME 8.&44! 100.00%i ; COMPLETED .-
i i
, ;SEWER i i METRO SEWER DISTRICT -LOUISVILLE. KY i IMSD CSO 3A,B,C IPRIME i 263.381 : 100.00% . ,COMPLm5-
iSEWER jMETRO SEWER DISTRICT-LOUISVlLLE. KY IMSD CSO 206 ~ IPRIME , 521.027 : '1'00.00% ; I COMPLETED .-
: i i
iSEWER i METRO SEWER DISTRICT -LOUISVILLE. KY I Dixdale Ave : . PRIME i 568.984; , 100.00%: I COMPLETED ..
!SEWER IMETRO SEWER DISTRICT-LOUISVILLE. KY D. Eisenhower Sewers I PRIME ! I 1.600.3841 I 100.00%, COMPLETED
. SEWER ,METRO SEWER DISTRICT-LOUISVILLE. KY Garvdon Drive PRIME ! I 351.751 ! , 100.00%1 : COMPLETED
! ISITE , !WEST EDELEN DEV-LOUISVILLE. KY Grev Hawk Patio Homes PRIME 1 '376.6071 1 100.00%1 I COMPLETED
I I SEWER I I METRO SEWER DISTRICT -LOUISVILLE. KY Hollow Creek Collectors IPRIME 2.191.4841 1 100.00%: COMPLETED
! I SEWER 1 IMETRO SEWER DlSTRICT-LOU1SVILLE. KY Hurstboume Creek Phs 1 IPRIME ! 774.3191 100.00%: !COMPLETED
, I SITE 1 I LLOYD-BILYEU CONST.CO-LOUISVILLE.KY Hurstboume Shoooes 1 PRIME 1.217.7751 I 100.00%1 I COMPLETED
!WATER i i INDIANA AMERICAN WA TER-JEFFERSONVILLE,IN 165 till Eastem Blvd. I 1 PRIME I 489.2761 100.00%! COMPLETED
,
.WATER I ; INDIANA AMERICAN WATER-JEFFERSONVILLE. IN 165 @ Marriott Dr. I PRIME I 258.8311 100.00%1 COMPLETED
, ;WATER I I INDIANA AMERICAN WA TER-JEFFERSONVILLE,IN 165@ SR 131 I PRIME 1 398,2801 1 100.00%1 I COMPLETED
I !WATER I I INDIANA AMERICAN WATER-JEFFERSONVILLE,IN 165 New Albanv Section I PRIME 1 109,5491 100.00%1 !COMPLETED
, :SEWER lTOWN OF CLARKSVILLE, IN ! .1-65 Sanitary Sewers 1 1 PRIME 1 27.9651 ! 100.00%1 1 COMPLETED
-
: 'WATER , I GREG ANDRES-NEW ALBANY. IN IIndiana Ct. Waterline i IPRIME 5.7001 i 100.00%1 'COMPLETED
, !ROAD I IJEFFERSON CO PUBLIC WORKS-LOUISVILLE,KY J.C,PoW. Chamberlain Ln I PRIME 184.6631 100.00%1 COMPLETED
1 ;SEWER : IBORNSTEIN BUILDERS. LOUISVILLE, KY Jewish Comm.Ctr. I SUB 31.8171 100.00%1 COMPLETED
! I SITE 1 I PRESNELL CM,LLC-LOUISVILLE.KY Kroger-Shelbwille,KY I PRIME 84,7021 100.00%1 COMPLETED
ISEWER I IMETRO SEWER DISTRICT-LOUISVILLE. KY Laroo Channel J 1 PRIME 145.3181 100.00% COMPLETED
I WATER I ILOUISVILLE WATER CO-LOUISVILLE. KY 1 LWCO-Avoca Road ! PRIME 254.5001 I 100.00% I COMPLETED
! !WATER I rLOUISVILLE WATER CO-LOUISVlLLE. KY I LWCD-20"MN Critt'den Dr 1 IPRIME 183.0481 I 100.00% COMPLETED
, :WATER ILOUISVILLE WATER CO-LOUISVILLE. KY 1 LWCO-Main St. 1s1-6th I PRIME I I 553.7171 : 100.00% COMPLETED
,
--1-,: SITE : !RDT INC.- LOUISVILLE, KY I IOffice Deoot-Hurstboume IPRIME 1 556.594 : 100.00%. COMPLETED
, ;SEWER .METRO SEWER DISTRICT-LOUISVILLE, KY 1 IOhio River Levee Trail PRIME 1 485.4361 100.00%1 ! COMPLETED
, ISITE iYMCA OF LOUISVILLE.KY 1 100dham Co. Tumlane I PRIME i 123.4821 I 100.00%j iCOMPLETED_
- ;SITE , ICOMMUNllY BUILDERS.-LOUISVILLE,KY Park DuValle SUB ! i 1,471.6781 100.00%i iCOMPLETED
: SITE IGREATER CLARK CO SCHOOLS. JEFFERSONVL.IN iParkview Middle Sch ; IPRIME : I 683.2101 , 100.00%: : COMPLETED
-, ~iTE :TOWN OF CLARKSVILLE. IN ! I Pond Imorov-Clarksville IPRIME ! 30.8741 100.00%1 COMPLETED
, ,
, :PUMP STATION : iMETRO SEWER DISTRICT-LOUISVILLE, KY 1 . IPooe Uck Pmo Sta I IPRIME I 1,690,564/ ; 100.00./.1 COMPLETED
I ; SITE :REGIONAL AIRPORT AUTHORllY,LOU1SVILLE,KY1 I RAA-Force Main I PRIME , 1 3.123,7011 : 100.00% : i COMPLETED
1 ISITE i I REGIONAL AIRPORT AUTHORllY,LOUISVILLE.KYI IRAA-Heritaoe Creek Phs III I IPRIME I I 1,668.3131 I 100.00%/ I COMPLETED
i :SITE i ! REGIONAL AIRPORT AUTHORITY .LOUISVILLE,KY1 . ! RAA-H eritaoe Creek Phs 4 I IPRIME I I 972,4581 100.00%1 i COMPLETED
ISITE , I REGIONAL AIRPORT AUTHORllY .LOUISVILLE,KYI 1 RAA-Heritaoe Creek Phs 5 ! IPRIME I 712.816/ I 100.00% , i COMPLETED
: I"OAD I ICITY OF LOUISVILLE. KY ' I RJorw Imorov-C.itv of.Lsvl ! PRIME , I 01 I 100.00%1 I COMPLETED
I
! I SITE i IRUMPKE OF KY-LOUISVILLE. KY I IRumpke ofKY 1 PRIME I 78,2201 100.00%1 1 COMPLETED
i ; ROAD KY DEPT OF TRANSPORTATION-FRANKFORT,KYI 17th Street Widenina IPRIME I I 5,556.6201 i 100.00%: !COMPLETED
:SITE I :SCHNELL CONTRACTlNG-LOUISVlLLE. KY ! !Schnell-Wdlow Ave. SUB I 1 2.500! ! 100.00%: . COMPLETEO- -
-~..
SEWER 'METRO SEWER DISTRICT-LOUISVILLE. KY ! ! Sneads Branch Relief i iPRIME I 1.040.655 : 100.00% I ' COMPLETED---
. SITE , :WAFFLE HOUSE-NORCROSS. GA 1 PRIME ! 133.4041 100.00% i COMPLETED ..
IWaflle House I ,
:SEWER !METRO SEWER DISTRICT-LOUISVILLE, KY I IWrtawanga Ave ! I PRIME i i 740.430: [ 100.00%1 I COMPLETED
. SEWER : METRO SEWER DISTRICT-LOUISVILLE. KY :Zom Ave. Sidewalks IPRIME ; 182,655i 100.00% : I COMPLETE!?.. .._
-.- ..
I I i , i ! I , I ,
; : I I 1 : ! i
I I
1 : I ! I 1 I i
! 'ROAD , iJEFFERSON CO PUBLIC WORKS-LOUISVILLE.KY' iJ.C. Maintenance 2000/20011 IPRIME I 244.6941 100.00%: . I COMPLETED
:SEWER I ICllY OF NEW ALBANY. IN I INew Albanv T&M '01 I (PRIME , 29.3301 ! 100.00%: I COMPLETED
: SEWER JCllY OF NEW ALBANY. IN I INew Albany Lump Sum '01 ! IPRIME 88.1691 : 100.00%, 1 COMPLETED
:SEWER IMETRO SEWER DISTRICT-LOUISVILLE. KY I 1St Matthews T&M I I PRIME : ! 246.1721 i 100.00%; ! COMPLETED
SEWER ; IMETRO SEWER DISTRICT-LOUISVILLE. KY 1 ISwift Foods-MSD (1'&11.1) I iPRIME I I 108.375/ i 100.00% ! I COMPLETED
; ! I : I ! i I !
; : ! ! , I :
-
-..' ; , ; i , '.
BORING :JIM SKAGGS. INC.-BOWLING GREEN, KY I ! Bore-Black Pond ;SUB : 13.195: , 100.00% . . COMPLETED
____ n -
.. ..-. BORING COBALT TELECOM.INC.-DUDLEY .GA : Bore-GA-Level 3JGregory ;SUB 214.785. 100.00% . 'CDMPLELEi?-
BORING :METRO SEWER DISTRICT-LOUISVILLE. KY ' ! Bore-Larkgrove Elem ; ;PRIME I ; 284,485 : 100.00%! : COMPLETED
-,--..- i
-. , : : ; i ;
,
, i : I ; ,
! ! !
- !
- .
, , I I
! ,
.ASPHAL T ;PENDLETON PAVING-LOUISVILLE, KY : iAsoh-Ashlev Polnte , ISUB : 23.892 ' 100.00%1 COMPLETED
- 'ASPHALT 'LEXUS GROUP-LOUISVILLE.KY ! 'Asph-Beulah Church-Lexus : :SUB 20.777 ' 100.00% : . COMPLETED
-
i- ASPHALT S&S ASSOCIATES-LOUISVILLE, KY ' : Asph-Birchwood SUB 8.550: , 100.00% . COMPLETED
ASPHALT S&S ASSOCIATES-LOUISVILLE. KY , ' !Asph-Bradbe Road , :SUB I 500! ; 100.00%. : COMPLETED
ASPHALT ,CULVER CONST-LOUISVILLE. KY ' .Asphalt-Buckinaham Estates' SUB 12.672: 100.00% . COMPLETED
- ----;;;:SPHAL T 'SMITH CONTRACTORS-LAWRENCEBURG, KY ' IAsoh-Buckner Pump Sta SUB 8.70a: 100,00%. COMPLETED
--. ASPHALT RED BIRD PAVING-LOUISVILLE. KY : I Asph-Cedar Point Subdiv ISUB 4.300' 100,00% . COMPLETED
-'
ASPHALT PINNACLE PROPERTIES-LOUISVILLE. KY Asoh-Char1estown Crosslna . PRIME i 5,073' 100.00% . COMPLETED
J :ISYMACCi\JOBDEC02.XLS ,
Prepared~evised 1/20/03 I ,
: ; i
MAC CONSTRUCTION & EXCAVATING. INC. WORK EXPERIENCE'FOR PREQUALlFICATlON PURPOSES
~, " :
. ' , i
-' " , ; ! , ,
, DATE-~
, " i : PRIME , CONTRACT i PERCENT , i
I
TYPE OF WORK OWNER I i PROJECT NAME , , OR SUB i AMOUNT ! : COMPLETE: , COMPLETION
,
, I I : I I : :
,
ASPHAlT iCITY OF HURSTBOURNE-LOUISV1LLE. KY I IAsoh-Cilv of Hurstboume IPRIME , 1.0001 100.00'/.: : COMPLETED
iASPHALT ,DAVID O. COODE. LOUISVilLE. KY , 'Asoh-Coode Drivewav ! IPRIME . . 5.3101 100.00%; i COMPLETED
;
,ASPHALT : BERRY CONTRACTING-LOUISVILLE. KY ! IAsoh-Oeeo Dale Lane TSUB ! i . 3.782i 100.00%; I COMPLETED
:ASPHAlT iRED BIRD PAVlNG-LOUISVILLE. KY ! IAsoh-Dennvs & Hooters l!!l131 ISUB i I 9.3451 : 100.00%: 'COMPLETED
,
; iASPHAlT iRED BIRD PAVING-LOUISVILLE. KY I IAsoh-Dennvs Duoont : ,SUB , I 10.6001 100.00%: . COMPLETED
i ,ASPHALT :AlAN FROULA- LOUISVILLE. KY 1 IAsohalt-Derbvshire See 2 I IPRIME - I I 15.4001 I 100.00%1 i COMPLETED
! iASPHAl T , IDIERUF HARDWARE CO.-lOUISVILLE. KY , IAsoh-Dieruf Bundina I IPRIME 14.0001 : 100.00%, [COMPLETED
,
iASPHAl T !ERVIN MOTT ENTERPRISES-LOUISVILLE. KY I IAspha"-Dixie Vallev i PRIME , 13,9121 100.00%1 1 COMPLETED
iASPHAlT IPENDLETON SEALING-LOU1SVILLE,KY 1 1 Asoh-Estes-Pendleton I SUB 1 11,2591 I 100.00%1 !COMPLETED
, 'ASPHAlT : ;JEFFERSON CO PUB SCHOOLS-LOUISVILLE, KY I !Asoh-Fem Creek Hiah School PRIME I 7.6501 I 100.00% I !COMPLETED
IASPHAl T i IFIRST BAPTIST CHURCH-TAYLORSVILLE. KY I IAsoh-First Baotist Church PRIME i i 1,2801 100.00% I COMPLETED
iASPHAl T , :DARRELL CLEM-LOUISVILLE. KY Asphall-Goodwill Store ! IPRIME 1 : 11.400' 100.00%1 ! COMPLETED
iASPHAl T IPMC OF LOUISVILLE LLC. LOUISVILLE, KY 1 IAsph-Green Valley Subdiv I IPRIME I 12.4021 : 100.00%1 iCOMPLETED
,ASPHAlT 'PINNACLE PROPERTlES-LOUISVILLE, KY I IAsoh-Greene Way IPRIME i , 25.400 I 100.00% ,ICOMPLETED
: 'ASPHAlT IMTN CONSTRUCTION-BRANDENBURG. KY ! IAsph-Helck Ave. 1 SUB I i 10.0091 100.00%: ,COMPLETED
ASPHAlT IH. WAYNE SMITH- ELlZABETHTOWN. KY I Asnhall-Hi<lhooint Lot 10 ! jPRIME 35.685 i 100.00% i ICOMPLCTED--
IASPHAl T ; !HIDDEN HOLLOW CONST-BARDSTOWN. KY , iAsohall-Home Decot N.A. iSUB i , 213.2361 , 100.00%/ !COMPLETED
I ASPHAl T , IPENDLETON SEAUNG-LOUISVILLE,KY I Asoh-Hooters Dixie ! SUB ! , 4.8601 i 100.00%/ 1 COMPLETED
; ASPHAlT iRED BIRD PAVING-LOUISVILLE. KY Asoh-Hurstboume Gardens . 'SUB i , 7.2801 100.00%1 1 COMPLETED
,ASPHAlT ; JCITY OF HURSTBOURNE-LOUISVILLE. KY I Asohalt-Hurstboume Rd Rnr PRIME I 100.3981 i 100.00%/ I COMPLETED
i \ASPHAlT ! HIDDEN HOLLOW CONST -BARDSTOWN. KY Asoh-Hwv 62 SUB 1 9.0001 I 100.00%1 I COMPLETED
, iASPHAl T I I HUNTER ASSOClPUROFIRST-LOUISVILLE, KY Asoh-!J'DCIuois Post Office PRIME I 20.417T 1 100;00%1 1 COMPLETED
! IASPHAl T I JCITY OF JEFFERSONTOWN,KY Asoh-Jlown Resurfacino PRIME I 125.4641 , 100.00%1 I COMPLETED
IASPHAl T ! IJEFFERSON CO PUB SCHOOLS-lOUISVILLE, KY Asoh-JCPS 2001 Pko 1 PRIME 1 76,6101' I 100.00%, I COMPLETED
1 ASPHAlT iJEFFERSON CO PUB SCHOOLS-LOUISVILLE, KY Asoh-JCPS Runnina Tracks 1 PRIME 35.0001 I 100.00% I 'COMPLETED
, ;ASPHAl T ! iJEFFERSON CO PUB SCHOOLS-LOUISVILLE, KY Asph-JCPS Shacldette Eleml PRIME 1 I 13,8291 ! 100.00% I iCOMPLETEO-
, :ASPHAlT ISMITH CONTRACTORS-LAWRENCEBURG. KY IAsoh-Jeff WWTP I ISUB 1 I 5.580. I 100.00% ; !COMPLETED
,
iASPHAlT ! ICITY OF JEFFERSONTOWN,KY I Asoh-J-town Veterans Park I PRIME I 15.7561 ! 100.00%1 I COMPLETED
, ; ASPHAlT : iCULVER CONST-LOUISVILLE. KY I Asoh-Kellennan Place ! ISUB : I 13.530/ ! 100.00% ICOMPL.J:TED
, iASPHAlT IBERRY CONTRACTlNG-LOUISVILLE.KY I Asoh-Kennedv Drive 1 SUB 9.6501 , 100.00% 1 I COMPLETED
, iASPHAlT : ,SMITH CONTRACTORS-LAWRENCEBURG. KY , IAsoh-Kramers Ln No. 1 I SUB 14.3991 1 100.00% I I COMPLETED
: iASPHAl T IKROGER FACILITY ENG.- LOUISVILLE. KY Asohall-Krooer Dixie Hwv i PRIME 33.438 T 1 100.00% I I COMPLETED
J 'I,ASPHAlT 1 IKROGER FACILITY ENG.- LOUISVILLE. KY AsohaU-Krooer EaS10ate 1 PRIME 11.1901 I 100.00%1 1 COMPLETED
ASPHAlT IKROGER FACILITY ENG.- LOUISVILLE. KY AsDhall-Krooer State Sl N.A. IPRIME 37.7871 100.00% I I COMPLETED
-'1 IASPHAl T I IPINNACLE PROPERTIES-LOUISVILLE. KY Asph-LDI Pinnacle ProD I ISUB , 8.715, 100.00% 1 COMPLETED
IASPHAl T , 'JEFFERSON CO PUB SCHOOLS-LOUISVILLE. KY iAsoh-Lowe Elem School I PRIME T 1,5841 100.00% I I COMPLETED
!ASPHAl T 1 CULVER CONST-LOUISVILLE, KY AsDh-Madie In I SUB I 9.1001 100.00%1 ICOMPLETED
, iASPHAl T I IPENDLETON SEALING-LOUISVILLE. KY I Asph-Maiistic Oaks I ISUB 1 1 5,0751 I 100.00%! ICOMPLETED
'ASPHAlT , :MCMILLAN LANDSCAPING-FISHERVILLE. KY I ,Asoh-McMeans Warehouse I ISUB I I 6,4681 I 100.00%1 I COMPLETED
; ASPHALT i NTS CORP-LOUISVILLE, KY I IAsph-NTS Sams Blankebaker IPRIME , ! 47.4491 i 100.00%' ,COMPLETED
. .---.- ,ASPHAlT I INORTH RIDGE FARMS-CRESTWOOD, KY 1 i Asphalt-North Ridge Farms ; 'PRIME , 60.297 : i 100.00./.1 iCOMPLt:IED
IASPHAl T : iOWL DEVELOPMENT-LAGRANGE. KY i IAsohall-Oldham Woods i IPRIME I 36.715; ; 100.00%TTco'MPLEfEb .--
-.-.. 1 ASPHAlT iNTS CORP-LOU1SVILLE, KY I Asoh-Plainview Point I !PRIME I I 4.420 \ 100.00%1 ICOMPlETED
,ASPHAlT i L & T PROPERTIES, LOUISVILLE. KY i Asoh-Plum Creek Estates i IPRIME T I 27.2031 I COMPLETED .-
, 1 100.00%1
-.- iASPHAl T I R&BT CORP-LOUISVILLE, KY I IPRIME
! IAsphalt-R&BT Corp. , 142.3821 100.00%1 I COMPLETED
:':>;SPHAl T !LLOYD BILYEU CONST-LOUISVILLE. KY i IAsoh-Rack Room Shoes I ISUB ; 7.6001 100.00% I I COMPLETED
; 'ASPHAlT I IEIC TECHNOLOG1ES-LOU1SVILLE. KY AsDh.Safetran I ISUB 4,137\ 100.00%1 I COMPLETED
i !ASPHAL T ! ICULVER CONST-LOUISVILLE. KY , IAsph-St. Anthanasius ilsUB ! I 6.8401 ! 100.00%\ _ICOMP~
- ,
- -." ._.. ASPHAlT 'S&S ASSOCIATES-LOUISVILLE. KY ! IAsphalt-St. Charles/SI. Francis ISUB 5.522: 100.00%. .COMPLETED .
,A$PHAl T ,COMMERCiAl PROPERTIES. LOUISVILLE. KY I IAsoh Sorino Station I IPRIME I 33.774 i i 100.00%1 I COMPLETED
;A$PHAl T .... , !MCMILLAN LANDSCAPING-FISHERVIlLE. KY I IAsoh-21st & Macazine I ISUB ! 1.9S6T ! 100.00% I COMPLETED
,ASPHAlT IMCMILLAN LANDSCAPING-FISHERVILLE. KY I IAsph- Trinity Chapel I ISUB : I 11.685 I ; 100.00%1 I COMPLETED
- -
'ASPHAlT : iTRINITY CHAPEL ASSMBL Y OF GOO- L YNDON,KY IAsohalt-TC Assemblv of God IPRIME I ! 19.2891 : 100.00% i : COMPLETED
1 ASPHAlT , ITRUCK PARTS & SRVC-LOUISVILLE. KY IAsphalt-Truck Parts & Srvc I 'PRIME i 1 24.670 I i 100.00./.1 'COMPLETED
-- IASPHAl T !LARRY DOWELL. iNC.-LOUISVILLE. KY I Asohalt-UPS Koetter Dr. 1 ISUB i 1 12.4461 100.00%: iCOMPLETED
,ASPHAlT I PARAMOUNT PROPERTIES-LOUISVllLE, KY IAsoh-ViIlaoe S<l T&M I 'PRIME I I 8.982! : 100.00%1 I COMPLETED
; ASPHAl T I IWEIHE CONSTRUCTION-GOSHEN. KY IAsoh-Watterson Trail '1 ISUB r 1.8001 i 100.00% . 1 COMPLETED
I ASPHAlT : IWATTERSON TRAiL INDUS PARK-LOUISVILLE. KY AsDh-WatterSon Tn Indus Prk IPRIME 4.0251 100.00%1 COMPLETED
! iASPHAl T !WATTERSONWOODS-LEXINGTON. KY 1 IAsoh-Watterson Wcods -I IPRIME 1 20.0281 100.00%1 1 COMPLETED
: I 1 J : ! I
! : I
, 1 : :
I , I
,
MAJOR PROJECTS COMPLETED 01/00-12/00 ; I ; : :
I ; I I , : ; ! i
: SEWER ;METRO SEWER DISTRICT-LOUISVILLE. KY : I Allston Ave . IPRIME 264,245 ' 100.00%1 ! COMPLETED __
:SITE ,ROBERTS & SMITH LLC. SHELBYVILLE KY : Breighton Bus. Ctr :PRIME 1.777 .806' 100.00%; . COMPLETED
SEWER i .KETRA CONSTRUCTION. LOUISVILLE. KY i Candlewood Hotel !SUB : 184,070: 100.00%' ; COMPLETED
---
SITE 'INDIANA-AMERICAN WATER,JEFFERSONVILLE.IN : Cherry Creek Condos , ,PRIME 47.259 100.00%, ! COMPLETED
--:- .i'-OAD ,CITY OF NEW AlBANY. IN ,Clarl<:lLocust Repairs i IPRIME 7.465 : 100,00% i ; COMPLETED
-
-- 'ROAD :CfTY OF NEW ALBANY, IN ~ Clark/Locust Str-Sidewalks :PRIME 313.394 ' - 100.00%1 . COMPLETED
" SEWER-- TOWN OF CLARKSVILLE. IN ; Clarl<:sville Sewers , 'PRIME 5.829,825, 100.00%, . , COMPLETED
..--_. .BRICK PAVING DAVID ENGINEERING,LOUISVILLE, KY ! David Engineering-Pavers ,PRIME ; 15.871 ' 100..00%: COMPLETEQ._
-'.-
BRICK PAVING EZ CONSTRUCTiON. LOUISVILLE. KY : EZ Construction 'PRIME 2.550 100.00% COMPLETED
-.,,-- SITE CITY OF LOUISVILLE. KY ,PRIME 1.687.852 100.00% ~COMPLETED n_
: Flood Wall 2-B 100:00%. . COMPLETED .-.
'CONCRETE CITY OF LOUISVILLE. KY Fourth Str Improvements ; 'PRIME 745.781.
CONCRETE CITY OF NEW ALBANY. IN "Grantiine Road Sidewalks , IPRIME 305.769 100.00%; 'COMPLETED
~
~
J:ISYMACCTlJOBDEC02.XLS
PreparetllRevised 1/20103
,-
MAC CONSTRUCTION & EXCAVATING. INC.
I
'WORK EXPERIENCE FOR PREQUAlIFICATION PURPOSES
TYPE OF WORK
: ROAD
WATER
,BRICK PAVING
!ROAD
. SEWER
. SEWER
,SITE
"SITE
'WATER
,WATER
:WATER
'WATER
iPUMP STATION
:SITE
: BRICK PAVING
: SEWER
'SEWER
!BRICK PAVING
!ROAD
IBRICK PAVING
!SITE
ISITE
; SITE
!ROAD
: SITE
: WATER
:, IBRICK PAVING
I ROAD
I SITE
BRICK PAVING
!SITE
/ !
_ iSEWER
, iROAD
iSEWER
'SEWER
: I SEWER'
I I SEWER
I 'SITE
!SEWER
IBORING
! 'BORING
: BORING
" BORING
BORING
.. . -"'BORING ---.-
_.....=.~7B6RiNG
BORING
:BORING
':BORING
! BORING
: BORING
:BORING
" BORING
. BORING
: BORING
.. __ ---':~QRING
,ASPHAlT
ilASPHALT
iASPHAL T
;ASPHAL T
"ASPHALT
,ASPHALT
; ASPHALT
, ASPHALT
~-
CURB
CURB
i;
; ,
OWNER
PROJECT NAME
i :
, '
iTOWN OF ClARKSVILLE, IN
. INDIANA AMERICAN WATER CO,JEFFERSONVL,IN
IC DOUGLAS HENSLEY, LOUISVILLE, KY I
'TOWN OF CLARKSVILLE, IN !
'KLR DEVELOPMENT, PROSPECT, KY !
. METRO SEWER DISTRICT -LOUISVILLE, KY
'KOETTER DEVELOPMENT, FLOYDS KNOBS, IN
!TOWN OF CLARKSVILLE, IN i
: !LOUISVILLE WATER CO-LOUISVILlE, KY I
,LOUISVILLE WATER CO-LOUISVILLE, KY
:LOUISVILLE WATER CO-LOUISVILLE, KY
j I LOUISVILLE WATER CO-LOUISVILLE. KY
I METRO SEWER DISTRICT -LOUISVILLE, KY
'CITY OF LOUISVILLE, KY
'CITY OF LOUISVILLE, KY
I METRO SEWER DISTRICT-LOUISVILLE, KY
i I METRO SEWER DISTRICT-LOUISVILLE, KY
ITOM MURPHY, LOUISVILLE, KY
j OLDHAM CO FISCAL COURT -lAGRANGE, KY
:TED A PULLEN, LOUISVILLE, KY
i REGIONAl AIRPORT AUTHORITY
iREGIONAl AIRPORT AUTHORITY
TREGIONAL AIRPORT AUTHORITY
: ICITY OF LOUISVILLE,KY
IDURRETT BUILT HOMES, JEFFERSONTOWN, KY I
'INDIANA AMERICAN WATER CO-JEFFERSONVL,IN
iSTINNETT & STINNETT ENT, ClARKSVILLE, IN
ICITY OF NEW ALBANY, IN
i iCITY OF LOUISVIllE, KY
!lCITY OF LOUISVILLE, KY
iAMSTAR INC.. LOUISVILLE, KY
i Greentree Blvd
I Grevhound
1 Henslev Res-Pavers
!Highway 131 Tum Lane
Ilndian Green Storm
I Indian Hills South
IJBI Lift Station
t.armlno Parle Sian
ILWCO-Bardstown Rd.
ILWCO-Herr Lane
ILWCO-Relocate Water
LWCO-Seatonville Rd
McNeelv Lake Pmp. Sta.
IMain & 13th Str
1 Main Str Pavers
I MSD A1lev Job
MSD Lowet Hunters
Tom Mumhv Pavers
Oldham Co. Road
Pullen Residence
I RAA-Cedar Creek Road
RAA-Hentaae Creek I & II
RAA-Pavment Ror
R/OIW Imorov-City pf Lou.
Silver Creek Subdivision
Stansifer Ave.
!Tom Stinnett Residence
Vincennes Str Sidewalks
Waterfront Phs III
West Main Curb & Pavers
Xerox Sidewalks
'TOWN OF CLARKSVILLE, IN
IJEFFERSON CO PUBLIC WORKS-LOUISVILLE,KY
i ICITY OF NEW AlBANY, IN
I CITY OF NEW AlBANY, IN
!CITY OF NEW ALBANY,IN
: CITY OF NEW AlBANY, IN
(SCHNELL CONTRACTORS, LOUISVILLE, KY
I METRO SEWER DISTRICT-LOUISVILLE, KY
I
1
IClarksville Emera. Ror (T&M)
j Jefferson Co. Road &M \ I
INA Flood LS :;2000 ,
NA Flood T&M 2000 i
NA Maintenance Lumo Sum
NA Main!. 2000 (T&M) I
,737 S. Third StrT&M
US42 Emeraehcy Ron &M)
,
IPRIME
1 IPRIME
I IPRIME
I IPRIME
,PRIME
i iPRIME
, IPRIME
i !PRIME I '
!PRIME i
I IPRIME 1
I IPRIME I
j I PRIME
i IPRIME 1 I
, IPRIME 1
IPRIME
i ,PRIME
IPRIME
I PRIME
IPRIME
jpRIME
I IPRIME
IPRIME
I IPRIME
IPRIME
;IPRIME
!. IPRIME
I !PRIME
I IPRIME
IPRIME
i IPRIME
I ISUB
1 I
IPRIME
jpRIME
IPRIME
IPRIME
IPRIME
IPRIME
ISUB
IPRIME
I
ISUB
!SUB
ISUB
:SUB
:SUB
'SUB
ISUB
ISUB
ISUB
'SUB
,SUB
ISUB
I :SUB
1 ISUB
I ISUB
(SUB
ISUB
I CAIN ELECTRIC, LOUISVILLE, KY I I Bellarmine College
1 GILBERT-SOUTHERN CORP, SMYRNA. TN 1 I Bore-Bowlino Green
I COBALT TELECOM, DUDLEY, GA i I Bore-Cobalt-Roswell, GA
!INDIANA AMERICAN WATER, JEFFERSONVILLE,IN I Bore-Fioyd Street
. GILBERT-SOUTHERN CORP, SMYRNA, TN I. IBore-G/S Elizabeth,lN . 1
GILBERT-SOUTHERN CORP, SMYRNA, TN ., ,Bore-GIS lrvington, KY
,GILBERT-SOUTHERN CORP, COLLEGE PARK, GA I Bore-GIS Tennessee
:VARIOUS : I Bore-KY Year 2000
!LOUISVILLE WATER CO.-LOUISVILLE, KY I IBore-Lou. Zoo
'AMSTAR INC.. LOUISVILLE, KY -, IBore-Power Creative
i L.D. RICE CONSTRUCTION, ClARKSVILLE, IN 1 1 Bore-Rice Excav
I BRITTHAVEN INC., PROSPECT, KY 1 I Britthaven of Prospect
: C-TRAX CONTRACTING, JEFFERSONVILLE, IN , IC-Trax Borden Burst
. UTILITY SERVICES & ASSOC, ELlZABETHTOWN, KY IVol1 Harrison
: UTILITY SERVICES & ASSOC, ELlZABETHTOWN, KY IVolt Louisville
: UTILITY SERVICES & ASSOC, ELIZABETH TOWN , KY IVol1 Phs II & III
I UTILITY SERVICES & ASSOC, ELlZABETHTOWN, KY IVol1 Telecom
j ~
i ,
CHAMPION TRUCKING, NEW AlBANY, IN I IAsoh-Champion Lot 1 IPRIME
:HAPS AERIAL ENTERPRISES-SELLERSBURG.IN 1 iAsoh-Clark Co. Airoort I IPRIME
IJEFFERSON CO PUBLIC SCHOOLS, LOUISVILLE.KYIASoh. -JCPS Pko #1 ! !PRIME
:JEFFERSON CO PUBLIC SCHOOLS, LOUISVILLE,KY iAsph-JCPS Eastem HS ':PRIME
,NEW AlBANY PUBLIC SCHOOLS, NEW ALBANY,IN IAsph. - New Albany Sch '00 I 'PRIME
. LOUISVILLE PHYSICAL THERAPY, LOUISVILLE,KY 'Asph--Lsvl Physical Theraoy ; IPRIME
JEFFERSON CO PUBLIC SCHOOLS, LOUISVILLE,KY ;Asph. - Schaffner Elem. :PRIME
EXCEL MANAGEMENT, COLUMBUS. OH IAsph.-Valley Media "SUB
T&C CONTRACTING-LOUISVILLE. KY
T&C CONTRACTING-LOUISVILLE. KY
I i
:Curb-KDOT Central Ave.
Curb-Old Henry Rd
:SUB
SUB
PRIME
OR SUB
I
, I
i !
I 1
II
, 1
I I
! 1
: 1
j I
I (
!
I
I
1
I
CONTRACT
: AMOUNT
'j
,
1,418,573: ,
13,9251
1,8801
28.890 :
6,086,
2.886,7701
3,7531 ;
4,3001
53,800! ~
298,750 i
13,7141 :
29,0001 1
2.123,6211 i
271,8071 1
8,1541 i
30,1091 I
1 ,300.5661 !
01 I
391,868 1
6,909, !
955,585 i I
1,881,1581 ,
156,0041 i
01 I
390.475; j
60,8151 :
22.853 I
129,152! i
1,320,9761 i
4.465 j
20,350 i !
I 1
I 1
7,6521 i
781,997 i
21,8151 1
60.5181 1
237,7441 !
92,7551 1
2,740 !
9,4981 I
,
I
I
I
i
1
1
PERCENT
! COMPLETE.
100.00%.
100.00%;
100.00%;
100.00% i
100.00%.
100.00%i
100.00%1
100.00%!
100.00%:
100.00%1
100.00%:
100.00%1
100.00%1
.100.00%1
100.00%1
100.00%1
100.00%1
100.00% I
100.00%1
100.00%,
100.00%1
100.00%i
100.00%1
100.00%1
100.00%1
100.00%!
100.00%1
100.00%1
100.00%1
100.00%1
100.00%1
--
D.A:TEof--
, COMPLETION
iCOMPLETED
: COMPLETED
I COMPLETED
i COMPLETED
, COMPLETED
; COMPLETED
: COMPLETED
! COMPLETED
: COMPLETED
I COMPLETED
, COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
i COMPLETED
I COMPLETED
COMPLETED
COMPLETED
: COMPLETED
I COMPLETED
COMPLETED
1 COMPLETED
!IN PROCESS
I COMPLETED
! COMPLETED
1 COMPLETED
i COMPLETED
I COMPLETED
1 COMPLETED
1 COMPLETED
, I
, --
! I
100.00%1 !COMPLETED
100.00%1 1 COMPLETED
100.00%1 I COMPLETED
100.00%1 1 COMPLETED
100.00%1 I COMPLETED
100.00% I COMPLETED
100.00% I COMPLETED
100.00% I COMPLETED
I ;
4,4001 100.00%, iCOMPLETED
298,0751 I 100.00%; ICOMPLETED_
68,8001 : 100.00%, I COMPLETED
19,7401 ; 100.00%, lCOMPLETED_
305.4001 I 100.00%1 'COMPLETED
112.6101 "1"";00.00%"- . COMPLETED --
333,6001 I 100.00%1 ,COMPLETE'D---
6,6751 , 100.00% iCOMPLETED
51,3651 1 100.00% ,COMPLETED
9,8401 i 100.00%: :COMPLETED
15,2601 i 100.00%: I COMPLETED
19,3281 ! 100.00%, ,COMPLETED....
29,6891 I 100.00%; ICOMPLETED"-
72,2961 1 100.00%, ICOMPLETED'-
141,3481 : 100.00%1 ICOMPLETED
216,4421 I 100.00%1 !COMPLETED ..
48,3231 100.00%' iCOMPLETED
I
I
2,8001
37,3501
77,5001
4,415 ~
163,4221
6,580!
11,8001
1,250
160,069,
4.162
100.00%
100.00%1
100.00%1
100.00%,
100.00%
100.00% :
100.00%.
100.00% .
I COMPLETED
I COMPLETED
I COMPLETED
: COMPLETED
, COMPLETED
'COMPLETED
'COMPLETED
: COMPLETED
100.00%, 'COMPLETED
100.00% COMPLET~
"
J :\SYMACCT\JOBDEC02.XLS
Preoa:JedlRevised 1/20/03
MAC CONSTRUCTION & EXCAVATING. INC.
.
-------,=yPE OF WORK
OWNER
.
MAJOR PROJECTS COMPLETED 01/99 - 12/99:
1-.
:WATER
'SEWER
:SITE
'SITE
:SITE
:SITE
.SEWER
'SEWER
: SEWER
'SITE
SITE
.SITE
i SEWERS
I iROAD
1 ISITE
1 SITE
i SEWERS
!SITE
! EARTHWORK
, SEWERS
'SITE
. SITE
:WATER
: WATER
'WATER
'SITE
: SEWERS
i SEWERS
1 ROAD
: SEWERS
,ROAD
ISITE
ISNOW REMOVAL
1 SEWER/ROAD
!SITE
ISITE
SEWER
SITE/SEWER
,_i
-...l i SITE
,SITE
! iSITE
! ISITE
SITE
=~~ ~SITE
-- ;ASPHAL T
,ASPHALT
.." '~SPHAL T
~~:~-=- ~__~!"HACf--
.. . ASPHALT
_.... :ASPHAL T
~~SPHALT
CURB
.GREENFIELD BUILDERS. GREENFIELD, IN
. METRO SEWER DISTRICT-LOUISVILLE. KY
, T&C CONTRACTING-LOUISVILLE. KY
, :AMSTAR.INC.-LOUISVILLE. KY
I : CITY OF JEFFERSONVILLE. IN
IAMSTAR. INC.-LOUISVILLE. KY .
; i METRO SEWER DISTRICT -LOUISVILLE. KY
I METRO SEWER DISTRICT -LOUISVILLE. KY
, !METRO SEWER DISTRICT-LOUISVILLE, KY
,PINNACLE PROP.-LOUISVILLE. KY
iGLENMARY WEST LLC--LOUISVILLE, KY
!GLENMARY PATIO HOMES ASSOC--LOUISVILLE.KY
!METRO SEWER DISTRICT-LOUISVILLE. KY
i 'IN DEPT OF TRANS-INDIANAPOLIS, IN
j AMSTAR. INC.-LOUISvtLLE. KY
j IKLR DEVELOPMENT, PROSPECT, KY
!CITY OF NEW ALBANY, IN
! !KOETTER CONSTR-FLOYDS KNOBS, IN
; JKOSMOS CLAY HARVEST 99
, !METRO SEWER DISTRICT-LOUISVILLE. KY
!LOUISVILLE DEVELOP AUTH-LOUISVILLE, KY
i ICITY OF LOUISVILLE-LOUISVILLE. KY
, : LOUISVILLE WATER CO.-LOUISVILLE. KY
I LOUISVILLE WATER CO.-LOUISVILLE, KY
! !LOUISVILLE WATER CO.-LOUISVILLE, KY
I iSHOOK-INDIANAPOLlS,IN
ICITY OF NEW ALBANY, IN
: ,CITY OF NEW ALBANY,IN
,NEW ALBNY-FLOYD CO SCHOOL-NEW ALBANY.IN
: I CITY OF NEW ALBANY. IN
i ICITY OF NEW ALBANY. IN '
, !KP. MEIRING CONST.-INDIANAPOLlS,IN 1
: IKY DEPT OF TRANSPORTATION, FRANKFORT,KY
I IBRECKINRIDGE GROUP-LOUISVILLE, KY
! iMTN CONSTRUCTION-BRANDENBURG, KY
! METRO CONSTRUCTION-LOUISVILLE. KY
; : METRO SEWER DISTRICT-LOUISVILLE, KY
I .GLEN MAR DEVELOP,-LOUISVILLE, KY
IMETRO CONSTRUCTION--LOUISVILLE. KY
,BOWEN ENGINEERS-INDIANAPOLIS. IN '
I BRAMCO PROPERTIES-LOUISVILLE, KY 1
!KOETTER CONSTRUCTION-FLOYDS KNOBS, IN :
FMSM ENGINEERS-LOUISVILLE, KY 1
:WEST-EDELEN DEVELOPMNT-LOUISVILLE. KY !
I
:T&C CONTRACTING-LOUISVILLE. KY
:JIM SKAGGS INC.-BOWLING GREEN. KY 1
;WOODALL CONSTR-LEXINGTON, KY i
!CITY OF NEW ALBANY, IN I
,HAYDEN CONSTRUCTION-OWENSBORO. KY :
:COMPLETE COMPUTER SOLU-FLOYDS KNOBS. IN
iT&C CONTRACTING-LOUISVILLE. KY
:T&C CONTRACTING-LOUISVILLE. KY
,"
fi~.QB..~ROJECTS COMPLETED 01/98 - 12/98:
SITE
. SEWER
'ROAD/SEWER
: ROAD/SEWER
'WATER
: ROAD
: SEWER
CURB
CITY OF LOUISVILLE-LOUISVILLE. KY
METRO SEWER DISTRICT-LOUISVILLE, KY
'PRESNELL ASSOCIATES-LOUISVILLE, KY
PRESNELL ASSOCIATES-LOUISVILLE, KY
PRESNELL ASSOCIATES-LOUISVILLE, KY
.BRAMCO PROPERTIES. LOUISVILLE KY
METRO SEWER DISTRICT-LOUISVILLE, KY
C-TRAX-FLOYDS KNOBS. IN
;
! , .
!WORK EXPERIENCE FOR PREQUALlFICATION PURPOSES
PROJECT NAME
i i
:
,
i i Bennett House
i ! Big Run BR-8C
I Bore-Mill Creek
Bore-Rescare
Bore-RockY's
Bore-Xerox
Cedar Creek
Chris Drive
I Dixie Collectors
I Eaale Creek III
Glenmar;i-Sec 17 i
Glenmarv Patio Homes I
Graston Court I
Green Vallev Rd i
Honeywell Repair I
Indian Hills Green I
Jackson Street Sewer I
Jefferson Blueqrass ParK I
Kosmos Clav Harvest 99 1
Lar>lO Ditch Box Culvert
I LOA-Sian Removal
1 I Loaan Fuel Site
I LWCO-Cane Run Rd
I 1 LWCO-Everoreen Rd
,LWCO-Relocate Water
I Meiiers-Jeffersonville I
New A1banv Maintenance I
New Albany Flood Control
New A1banv Hioh ParK Lot ,
I New A1banv Peart Street
Reno Ave. Sidewalks
Sheraton Four Points
Snow Removal - KDOT
Stoll Hill Subdivision
,Susan Lane Drainaoe
I IVillaoe Farms
, IWindlno Falls
I IWoods of Fox Creek
I
I
I
I
I
I
I
Ashby Ln F.M T&M
Boeina Enoineerino T&M
I Bramco Phs II T&M I
I Koetter Bluegrass Ind T&M I
ISix Mile Ln T&M
!Watterson Place T&M
,
Freeoort Drive
Harold Ave. Trench Patch
Hickory Hollow
1 New Albany Asphalt
i Riverglo Plaza
IShonna's Driveway
i Universal Coach Parts
I
I
I ISR 329
I i
I 1
4TH Ave. Widening
IBlo Run
! I Blankenbaker
i Blankenbaker Channel
I Blankenbaker Valve
, . Bramed Road
: Bulchertown Gmwy Trt
'C-Trax Home Deoot
~SUB
IPRIME
.SUB
ISUB
1 ISUB
I ISUB
! IPRIME
I IPRIME
:PRIME
!PRIME
IPRIME
IPRIME
IPRIME
IPRIME
!SUB
PRIME
PRIME
SUB
SUB
IPRIME
IPRIME
I PRIME
IPRIME
IPRIME
IPRIME
!PRIME
!PRIME
IPRIME
IPRIME
IPRIME
IPRIME
I ISUB
I IPRIME
IPRIME
i ISUB
I IPRIME
1 IPRIME
I IPRIME
1
IPRIME
IPRIME
PRIME
ISUB
IPRIME
IPRIME
ISUB
;SUB
,SUB
'SUB
,SUB
jPRIME
.SUB
ISUB
i
PRIME
'PRIME
: ;PRIME
!PRIME
,PRIME
,PRIME
IPRIME
'PRIME
PRIME
OR SUB
;
I
i i
1 I
1 I
1 I
I I
1 I
1 I
I
I '
I
1 I
I I
+
1 I
I i
! I
CONTRACT
AMOUNT
I :
I
I
1
1
1
, i
1
I 1
I 1
I
1.903:
1,430,0381
6,0001
31,1581 :
27.1901
12,499
1,178.094 i
271,576 I
2,445,382 I
247,3891 ;
752.3421
.8.1251 I
194,3061
1,306,605 ,
34,792 1
111,665 I
28,725 I
640,943 '
156,3381 ;
118,359 i
2,0001
828.0981
160.1261 ;
8.8901 i
13,080 I
3,251.8671 '
1.784,0401 j
265.1661 1
19,8501 :
146.7901 :
175,5511 I
70,0551 I
3,211,8691 1
255.326 !
26.3771 i
1,043.2391
1,507,3631 !
982.230 I
I
I
I
1
I
O!
1,168/ 1
49,3081 I
2,911/ 1
12,4731 :
7,604i
71,4741
9,015' :
44.762 :
58.022 ;
56.0681
8.5001
68.1471 :
51,4131
; 1
894.530,
4.142.738,
1,299,784
17 .260
2,100
40.155
109.680
1.960
. ;
PERCENT .
COMPLETE'
100.00% .
100.00% ;
100.00% :
100.00%i
100.00%1
100.00%;
100.00%1
100.00%1
100.00%,
100.00%:
100.00%;
100.00% :
100,00%
100,00% I
100.00%1
100.00%1
100.00%1
100.00%1
100.00%1
100.00%1
100.00%\
100.00%,
100.00%
100.00%
100.00%1
100.00%1
100.00%1
100.00%1
100.00%1
100.00%:
100.00% !
100.00% '
100.00% .
100.00%1
100.00%1
100.00% 1
100.00%1
100.00%1
DATE OF
COMPLETION
-----
. COMPLEi:E5-
. COMPLETED --
i COMPLETED
iCOMPLETED
I COMPLETED
: COMPLETED
I COMPLETED
! COMPLETED
i COMPLETED
; COMPLETED
iCOMPL.ETEO-
iCOMPLETED
COMPLETED
1 COMPLETED
I COMPLETED
I COMPLETED
I COMPLETED
COMPLETED
ICOMPLETED
ICOMPLETED
I COMPLETED
I COMPLETED
COMPLETED
COMPLETED
I COMPLETED
!COMPLETED
!COMPLETED
I COMPLETED
1 COMPLETED
iCOMPLETED
!COMPLETED
'COMPLETED
'COMPLETED
iCOMPLETED
I COMPLETED
1 COMPLETED--
I COMPLETED
I COMPLETED
,
100.00%! 1 COMPLETED
100.00%1 I COMPLETED
100.00% I COMPLETED
100.00% 1 1 COMPLETED
100.00% i : COMPLETED----
10_0.00oii 'COMPLEfED.._
; --
I I
100.00%: 1 COMPLETED-
100.00%.:. 'COMPLETED
100.00%, :COMPLETEO--
'100.00%;-" : COMPLETED -.--
100.00%. iCOMPLmiJu
100.00%1 !COMPLETED
100.00%, I COMPLETED
,
: ,
,
! !
100.00%: ICOMPLETED .~
100.00%,
100.00%,
100.00%:
100.00%,
100.00%,
100.00%:
100.000/"
100.00'%,
--
'COMPLETED
. COMPLETED
COMPLETED
COMPLETED
COMPLETED
: COMPLETED
COMPLETED
. COMPLETED
..
J:\SYMACCruOt3DEC02.XLS ~ I
PreparedlRevised 1120/03 , ,
--
--'---<'-- . iWORK EXPERIENCE FOR PREQUALlFICATION PURPOSES
MAC CONSTRUCTION & EXCAVATING, INC. --
'--
~
, PRIME i CONTRACT PERCENT , DATE'OF'-
- TYPE OF WORK OWNER I PROJECT NAME , : OR SUB I AMOUNT , COMPLETE: COMPLETION
I I
: I I i i I I ! ;
; ROAD CITY OF NEW ALBANY, NEW ALBANY, IN , I Gamo Street I IPRIME I , 29,759! 100.00%; iCOMPLETED
I
!CONCRETE 'CARDINALCONDOS-LOUISVILLE, KY I I Cardinal .Condos ! IPRIME I I 29.7531 100.00% i I COMPLETED
,SITE :STATE OF INDIANA , IChariestown Park : !PRIME I i 1,388,3741 i 100.00%/ I COMPtETED
: SITE 'PINNACLE PROP.-LOUISVILLE, KY 1 eaDie Creek ! iPRIME r 1,001,2581 i 100.00% i ICOMPLETED
WATER :LOUISVILLE WATER CO.-LOUISVILLE. KY IEnolish SI Rd : ,PRIME : ; 1,752,282 ! , 100.00%. : COMPLETED
----- SITE 'PINNACLE PROP.-LOUISVILLE, KY ,Evergreen Park !PRIME , I 18,7841 100.00% , ; COMPLETED
;
'CONClLANDSCAPE. 'CITY OF LOUISVILLE-LOUISVILLE, KY ; : Ft. Nelson Park :PRIME 317,536; . 100.00%, : COMPLETED
, ;SEWERS , 'METRO SEWER DISTRICT-LOUISVILLE, KY i : Fegenbush 'PRIME 259.945' '~60:(ioo/;:-TC5MPLETED-'
--
.SITE ! GODSEY ASSOG-LOUISVlLLE. KY i Godsey Shot Rock ; iPRIME 13,657 , 100,00%, ,COMPLETED'-
, 290,500 I '-'100:00% , . iCOMP'LE'i:ef;-
ROADfBRIDGE iKY DEPT OF TRANS-FRANKFOR:r, KY : : Goldsmith Bridae I IPRIME , :
.CURBIWALKS 'STATE OF INDIANA i IVincennes Road ! PRIME , 1 1,212,747: 100.00%; I COMPLETED
-. :ROAD REPAIRS iJEFFERSON CO. PUBLIC WORKS-LOU., KY I Jefferson Co. Maintenance I PRIME 217,0491 I 100.00%! ! COMPLETED
!
. EARTHWORK : IKOSMOS CEMENT-LOUISVILLE. KY 1 I Kosmos Harvest '98 ! SUB , I 211,0321 i 100.00%1 I COMPLETED
,
:SITE : .!HURSTBOURNE PROP.-LOUISVILLE, KY ; I La-Z-Bov Site I PRIME 310.921 f 100.00%' 1 COMPLETED
'SEWER ! I METRO SEWER DISTRICT-LOUISVILLE, KY ! IMSD FM-Camo Gmd ! PRIME 11,490 ! 100.000/" I COMPLETED
'SEWER I ICITY OF NEW ALBANY-NEW ALBANY, IN Market Street . IPRIME I 131,7751 I 100.00%; 1 COMPLETED
: ;SEWER 'CITY OF NEW ALBANY-NEW ALBANY, IN I Market Street-Sewer PRIME i 22.0271 , 100.00%: 1 COMPLlETEb
iSITE ! ISHOOK-INDIANAPOLlS. IN 1 1 Meiiers #164 PRIME 1 1,507.6851 : 100.00%1 1 COMPLETED
I ISITE ISHOOK-INDIANAPOLlS. IN 1 Meiiers Erosion Control PRIME 8,9241 ! 100.00%: ,COMPLETED
!CONCRETE I CITY OF NEW ALBANY, NEW ALBANY. IN New Handicao Ramo PRIME 4,2321 100.00% ! COMPLETED
I BLASTING I iHOLLOWAY CONTRACTlNG-LOUISVILLE, KY Oxmoor Mall PRIME 9,6821 , 100.00%/ !COMPLETED
:SITE. 1 REGIONAL AIRPORT AUTHORlTY-LOU., KY RAA BOX CULVERT PRIME 12,952,0051 I 100.00%/ I COMPLETED
, :SITE ; I LAW ENGINEERING-LOUISVILLE, KY Smith Farms PRIME 85,800 I ! 100.00%/ i COMPLlETED
: ISITE I IEMJ CORPORATION-CHATTANOOGA, TN Sorinohurst PRIME 7,097.361 1 100.00%' I COMPLETED
; ISEWER I ICITY OF NEW ALBANY, NEW ALBANY. IN ITenth Str. Sewer Plant PRIME 54,000 , 100.00% I COMPLETED
! !STORM/SEWER IMETRO SEWER DISTRICT-LOUISVILLE, KY ITextile Avenue PRIME 864,750 i 100.00% I COMPLETED
I 'SITE ! I GREENFIELD BUILlERS ITradeooint Center I SUB 566.141 I 100.00% I COMPLETED
IROAD : 'CITY OF JEFFERSONVILLE-JEFFERSONVILLE IN ivoat Valve PRIME 198,134 I 100.00% I COMPLETED
! ISITE ICITY OF LOUISVILLE-LOUISVILLE. KY I I Waterfront PRIME I 4,016,528 I 100.00% 1 COMPLETED
! I , I , I , !
I I T I , , , i
i 1 i : --
, I i i ,
, IASPHALT 'BETHANY CEMETARY-LOUISVILLE. KY , Bethanv Cemetarv IPRIME I 26,2611 i 100.00%1 COMPLETED
----,,"" ..... ; ASPHALT iT&C CONTRACTING-LOUISVILLE. KY ! 1 Cambridoe Site I ISUB ! i 76,500 i 100.00%1 1 COMPLETED
I
.J ASPHALT , IPINNACLE PROP.-LOUISVILLE, KY , 1 Eagle Creek ,SUB --r 102,771 ! 100.00%1 I COMPLETED
,
I ASPHAL T , I LOUISVILLE WATER CO-LOUISVILLIE, KY i 1 Enolish Station 1 SUB I i 4,6871 , 100.00% ' I COMPLETED--
iASPHALT 1 GLENMARY WEST LLC-LOUISVILLE. KY ., IGlenmarv I SUB ! i 36,5031 , 100.00% 1 COMPLETED
!ASPHAL T I ID.F. CRANE-LOOGOOTEE,IN IHamoton Inn I SUB + I 57,2861 100.00%1 I COMPLETED
,ASPHALT iCJ McBROOM-LOUISVILLE, KY , 1 McBroom Drivewav I PRIME i , 9,7501 i 100.00%1 !COMPLETED
: ASPHALT i I MEINEKE MUFFLER-LOUISVILLE KY i I Meineke Muffler IPRIME I 1 4,3551 ! 100.00%1 ,COMPLETED
.-. ,ASPHALT ;T&C CONTRACTING-LOUISVILLE, KY : Riveroort Lot 151 ISUB : 93,8061
: ! 100.00%1 i COMPLETED
. ASPHALT , !HAYDEN CONSTR.-oWENSBORO, KY i TRivemort Plaza SUB I 80,5321 I 100.00%1 ! COMPLETED
, iASPHALT ! :T&C CONTRACTlNG-LOUISVlLLE, KY I Riveroort -T&C SUB T 355,4881 1 100.00% ! COMPLETED
I : ASPHALT I EXCEL MANAGEMENT -COLUMBUS, OH IVallevRecords ISUB T 138,5601 I 100.00% I I COMPLETED
! , 1 I I :
I ICURB i IAPEX TRAILER-JEf"FERSONVILLE, IN I Aoex-Evansville I IPRIME i , 3,9041 100.00%1 I COMPLETED
,
!CURB I 10. SMITH CONSTR-LOUISVILLE, KY I TDel Mini Whse I ISUB I I 3.6451 , 100.00%' COMPLETED
CURB I ILlEXUS GROUP-LOUISVILLE, KY I Forest Green 1 ISUB I ! 16,821 : i 100.00%, 1 COMPLETED
---
.CURB ;PETERS CONSTR-oWENSBORO, KY I 1 Hilton Blankenbaker !SUB I : 16,496i 100.00%1 ! COMPLETED
..----;cliR8---. : iFL YNN BROTHERS-LOUISVILLE. KY I I Meijers - Hurstboume I ISUB i i 81,6201 I 100.00%1 1 COMPLETED
-....- - T
-- CURB ,T&C CONTRACTING-LOUISVILLE, KY I I Meiiers - Preston i ISUB I 87,3951 I 100,00% I i COMPLETED
CURB , IT&C CONTRACTING-LOUISVILLE, KY I Micro Comouter 1 ISUB I I 22,5161 1 100.00%1 I COMPLETED
- : I I I I I l I ,
j.t. I , T i I , I : I i
MAJOR PROJECTS COMPLETED 01/97 - 12197: i I I I i ; I ;
, .--....-
I ; ,
, , ; i i ! I ; ,
, I COMPLETEO-
' SEWER 1 METRO SEWER DISTRICT-LOUISVILLE, KY 1 iBio ToWers I IPRIME I I 288,8131 100.00%'
iBLASTING I ROCKFORD CONSTRUCTION-LOUISVILLE, KY lSlast-Sorinahurst , IPRIME I i 48,8291' : 100.00%1 !COMPLETED --
: BRIDGE IJEFFERSON CO PUBLIC WORKS-LOU. KY I IBlevins Gao I PRIME T . 135,2001 I 100.00%1 ! COMPLETED
, 1 DRAINAGE 1 iMETRO SEWER DISTRICT-LOUISVILLE, KY i ! Cont. Acres-2 , PRIME I I 472,650 i 100.00% I 1 COMPLETED
: WATER 'U.S, ARMY CORPS OF ENGINEERS 1 1Ft. Knox I iPRIME I 1 2,863.919 ; 100.00%1 !COMPLETED
.-
'SEWER METRO SEWER DISTRICT-LOUISVILLE, KY I i Fairmon! Road i iPRIME 835,576 ; 100.00%1 iCOMPLETED
--_.~.~- iPRIME 629,468 ; - 100.00%: ,COMPLETED
,D&W INVESTMENT GROUP-LEXINGTON, KY 'Grandel Farms ; ! ,
ROAD IN DEPT. OF TRANS-INDIANAPOLIS, IN : 'Green Valley Rd , 'PRIME , , 1,139,841 , 100.00%: 'COMPLETED
---SiTE GREENFIELD BUILDERS-GREENFJELD. IN , : Greenfield , :PRIME , 111,6831 100.00%1 'COMPLETED
-.-
ROAD . KY DEPT. OF TRANS-FRANKFORT, KY i ,Hardin Co Tum Ln ,PRIME : 249.881 i 100.00%; i COMPLETED
--
SITE . CH&S PROPERTIES-LOUISVILLE, KY ! :Hillcrest Subdjv. , iPRIME ! 1,818,661 ; 100.00%. . COMPLETED
, :PRIME i I 84,830 ; 100.00%1 I COMPLETEr)-
. SEWER !CITY OF NEW ABANY-NEW ALBANY,IN i i Jay Street
SEWER : CITY OF NEW ABANY-NEW ALBANY, IN ! !Market St. T & M : :PRIME 13,469 ; 100.00% : COMPLETED
. EARTHWORK KOSMOS CEMENT-LOUISVILLE, KY , I Kosmos '97 : iPRIME ; 199,077' 100.00%: 'COMPLETED
_______"lLASTING YOUNG FUEL & ENVIRONMENTAL , 'Meiiers Convenient i IPRIME 23,908 : 100.00%. COMPLETED
EWER CITY OF NEW ALBANY-NEW ALBANY,IN iNA 27" Sewer i IPRIME ! 224,379, 100.00%: . COMPLETED
..ITE JEFFERSON CO PARKS-LOUISVILLE, KY :Olmsted Park ; :PRIME 3.229.731 : 100.00%. : COMPLETED
SITE PAPA JOHNS USA-LOUISVILLE. KY PAPA Johns 'PRIME 1.030,402. 100.00% COMPLETED
"'-SiTE" PAPA JOHNS USA-LOUISVILLE. KY . Papa Johns Erosion PRIME 99,444 100,00% COMPLETED --
---- DITCH REPAIR PINNACLE PROPERTIES-LOUISVILLE, KY Plainview Ditch , PRIME 21,905 100.00%. COMPLETED
-.. . PROFESSIONAL FENCE-CRESTWOOD, KY . Prof Fence Crestwood 'PRIME 3.500' 100.00% COMPLETED
I
J:ISYMACCruOBDEC02.XLS
PreoaredfRevised 1/20/03
~
MAC CONSTRUCTION & EXCAVATING.INC.
,
TYPE OF WORK
.SITE
'MGMT
:SITE
!EROSION CONTROL
:SNOW RMVL
: WATER
; BLASTING
iFLOOD RELIEF
:FLOOD RELIEF
-
TENANT FINISH
TENANT FINISH
: TENANT FINISH
'TENANT FINISH
, iTENANT FINISH
!TENANT FINISH
;TENANT FINISH
ITENANT FINISH
iTENANT FINISH
TENANT FINISH
I TENANT FINISH
iTENANT FINISH
, IBLDG
1 IBLDG
! ICONCRETE
!TENANT FINISH
'TENANT FINISH
:TENANT FINISH
,TENANT FINISH
,TENANT FINISH
'BLDG
ITENANT FINISH
ITENANT FINISH
TENANT FINISH
ITENANT FINISH
'TENANT FINISH
(ROAD
'SITE
:TENANT FINISH
iTENANT FINISH
_:
"'7
, iASPHALT
! :ASPHAL T
IASPHAL T
IASPHAL T
iASPHALT
,ASPHALT
, !ASPHALT
,ASPHALT
iASPHAL T
IASPHAL T
IASPHALT
IASPHALT
I ASPHALT
,ASPHALT
,ASPHALT
_.2SPHAlT
:ASPHAl T
,,,
_..
CURBS
CURBS
'CURBS
:CURBS
,CURBS
iCURBS
. !CURBS
OWNER
:CITY OF LOUISVILLE-LOUISVILLE. KY
. SCHNA TTER MANAGEMENT-lOUISVIllE. KY
SCHNATTER MANAGEMENT-lOUISVlllE. KY
: LAW ENGINNERING-lOUISVllLE. KY
IKY DEPT OF TRANS-FRANKFORT. KY
ilOUISVlllE WATER CO-lOUISVllLE. KY
iHOllOWAY CONSTR-LOUISVlllE. KY
!VARIOUS IN COMPANIES
iVARIOUS KY COMPANIES
i 'ANTHEM BLUE CROSS-lOUISVlllE. KY
;ANTHEM BLUE CROSS-lOUISVlllE. KY
IANTHEM BLUE CROSS-lOUISVllLE. KY
iANTHEM BLUE CROSS-lOUISVlllE. KY
i IANTHEM BLUE CROSS-lOUISVllLE. KY
I ! INNERSPACE-LOUISVlllE. KY
I IINNERSPACE-LOUISVllLE. KY
: !INNERSPACE-LOUISVlllE. KY
; IINNERSPACE-LOUISVlllE. KY
: IINNERSPACE-LOUISVllLE. KY
I IINNERSPACE-LOU1SVILLE. KY
I MODERNFOLD-LOUISVILLE. KY
j I FARMERS STATE BANK-LANESVILLE. IN
: IFlOYD CO SCHOOlS-NEW ALBANY. IN
i iGLENMARY WEST llC-LOUISVlllE. KY
I IINNERSPACE-LOUISVllLE. KY
IINNERSPACE-lOUISVlllE. KY
IINNERSPACE-lOUISVIlLE. KY
1 IINNERSPACE-LOUISVllLE. KY
, ICITY OF lOUISVILLE-LOUISVILLE. KY
i : CITY OF JEFFERSONTOWN-J-TOWN. KY
IARCHITECTURAL SALES-LOUISVILLE. KY
PAPA JOHNS USA-LOUISVllLE. KY
I PAPA JOHNS USA-lOUISVllLE. KY
IINNERSPACE-LOUISVILLE. KY
IINNERSPACE-lOUISVllLE. KY
! I PAPA JOHNS USA-LOUISVllLE. KY
I ;CITY OF JEFFERSONTOWN-J-TOWN. KY
: SE CHRISTIAN CHURCH-lOUISVlllE. KY
I I BELL SOUTH MOBlllTY-lOUISVIllE, KY
I BAPTIST HOSPITAL EAST -LOUISVillE. KY
, IKY DEPT OF TRANSP.-FRANKFOR.T, KY
1 ICHENOWETH HillS INC.-PROSPECT, KY
: IFARMERS STATE BANK-LANESVlllE.IN
! 'CHAMPIONSHIP COURT-CRESTWOOD, KY
I GLEN MARY WEST llC-LOUISVIllE, KY
:GREENTREE MAll-GLARKSVlllE. IN
ICH&S PROPERTIES-lOUISVlllE. KY
:DANCOR CORP-lOUISVlllE, KY
NE CHRISTIAN CHURCH-lOUISVlllE. KY
liTHE POINTE-SEllERSBURG, IN
; IPAPAJOHNS USA-lOUISVlllE. KY
: PAPA JOHNS USA-lOUISVlllE. KY
,EMJ CORP.-CHATTANOOGA. TN
, :MISC TIME & MATERIAL JOBS
!MISC TIME & MATERIAL JOBS
ICITY OF LOUISVlllE-lOUISVlllE, KY
AIRGUARD INDUSTRIES-lOUISVlllE. KY
.BCD INC-BARDSTOWN, KY
'CH&S PROPERTIES-lOUISVlllE. KY
:DANCOR CORP-lOUISVlllE. KY
,SHOOK-INDIANAPOLIS. IN
,BCD INC-BARDSTOWN, KY
'ST CLAIR CONSTRUCTION-LOUISVlllE. KY
'SEWER
"7~EWER
= _~!.ORM
...."_./ :WATER
PILING
STORM
. EARTHWORK
SEWER
WATER
MAJOR PROJECTS COMPLETED 07/96 - 12/96:
. METRO SEWER DISTRICT -LOUISVillE. KY
CAVELAND SANIT. DIST.; CAVE CITY. KY
METRO SEWER DISTRICT-lOUISVlllE. KY
HARDIN CO. WATER DISTRICT-E-TOWN, KY
J.B. SPEED-LOUISVillE, KY
METRO SEWER DISTRICT-LOUISVilLE. KY
KOSMOS CEMENT-lOUISVlllE. KY
LAGRANGE UTILITIES COMM-LAGRANGE, KY
LOUISVILLE WATER CO.-lOUISVlllE. KY
.
, i
, 1
;WORK EXPERIENCE FOR PREQUALlFICATION PURPOSES
.
, :
PROJECT NAME
I
i Riverwalk
i Schnatter Management
i ISchnatter Construction
iSmith Fanns
i Snow Removal
!Tavlor Blvd.
tWatterson Trail Blastine
iFlood IN
1 Flood KY
1
BCBS Admistar 306
BCBS Penthouse
BCBS 5/6th Ar
BCBS Dispatch Off.
BCBS Boiler Rm
1 BRG Disoatch
IBRG Whse W. Trail
Centre Bide 7th Fl.
Centre BldQ 6th Fl.
Centre Bide Rescare
Centre Bldg Vsn 2000
Conwav M School
Fanners Bank
Geometown Elem.
Glenmarv Patio Hms
Grindmaster Dakota
Innersoace COrD Off.
Ilnnerspace GE Capti
Innersoace Mtr Mail
Jeff Co Clerks Off
J- Town Park
Modemfold Arch Sls
IPaoa Johns Tenant
Paoa Johns Mock Uo
iPlainview Plaza
I Rescare Sidewalk
IShnatter Residence
ISkyview Ballfield
I SE Christian Church
Whittinoton Pkwv
I
!
Baotist E Parkino lot
Brownsboro 22
Chenoweth Run
F arrners Bank
FC Tennis Crt
Glenmarv
Greentree Mall
I Hillcrest
IK-Mart
! NE Christian Church
The Pointe
IShnatter Resid.
1 1 Shnaller Street
I Springhurst
IT&M IN '96
,Taylor Blvd
I i Waterfront
I I
lAirguard
1 Fr Five Star
: Hillcrest
iK-Mart 131
1 Meiiers Dixie Hwv
! Nelson County
IRevcD- Fern Creek
I
i
; Bio-Towers
; Cave City
. Edgewood Drainage
. Hardin Waterline
J .B. Soeed
Kenwood Drainaee
Kosrnos Clay/Sand
laGranoe WWTP
lWCO-N. Basin
i
I
PRIME
! i OR SUB
.
,
.
CONTRACT PERCENT DATE OF
: AMOUNT 1 i COMPLETE ; COMPLETION
IPRIME
'PRIME
'PRIME
JPRIME
IPRIME
\PRIME
I :PRIME
IPRIME
PRIME
;
i
!
1 I
I IPRIME
i IPRIME
I IPRIME
! IPRIME
1 IPRIME
IPRIME
I IPRIME
I IPRIME
I IPRIME
IPRIME
PRIME
PRIME
PRIME
PRIME
! PRIME
PRIME
1 PRIME
IPRIME
!PRIME
IPRIME
PRIME
1 IPRIME I I
1 IPRIME i I
IPRIME I !
1 !PR1ME i I
IPRIME i 1
! IPRIME I 1
JPRIME
IPRIME 1 I
IPRIME 1 I
I 1
1
1
i
1
I
1 1
! 1
1
I
i
I
I
SUB
SUB
SUB
I ISUB
I ISUB
I ISUB
SUB
!SUB
I \SUB
1 :SUB
1 ISUB
1 ISUB
i ISUB
ISUB
'SUB
;SUB
!SUB
I i
1 1
! I
1 i
!
i 1
1 :
,ISUB "
: ISUB ,
,SUB ::
ISUB I:
ISUB 1
ISUB 1 1
ISUB I 1
i I i
iPR1ME
IPRIME I
IPRIME
PRIME
PRIME
PRIME .
PRIME I
PRIME
PRIME I
I
1
I
1 1
1
1,851 ,990 ~ :
3.3901
9.4581 I
85,800,
2.234,331 '
424,046; I
49.722' I
26,561 I 1
583,137, i
! !
123.1361 I
'3.3001 i
120.361! 1
18.5951 I
5,3691 1
2,3491 :
2.3431 ;
4,1451 1
36,1461 '
29.5691 I
11.3211
3.1141
468.3141
6.154.3941 I
29.260 i (
4,6021
67,0951
59,0781
3,6271
65,7571 t
1.099,2701
5,6601 I
58,0971 1
6,2461 I
10.6531
5.5661 i
218.8181 i
39,4781 I
12,583! 1
73,2841
! I
13,7921 I
97,5561 1
10;5001 1
19,1281 ,
20,502 f ~
32.6751 1
33.434 : i
105,106 i
102.5371
6,2001 I
8.6841 I
4.9681
10,2781 i
880,644! !
5.2331 !
16.1801
69.061: :
4,800!
5,0931
59,635 i
47.2481 :
78,433, :
6.191 i 1
15,675i I
i
562,713
1,558,485
199.756
1.037.765
91.641
743.472
158,504
803,026
264 .709
100.00%,
100.00% i
100.00%1
100.00%:
100.00%.
100.00%:
100.00%;
100.00%1
100.00%.
100.00%:
100.00%1
100.00%,
100.00%
100.00%
100.00% 1
100.00%1
100.00% 1
100.00%1
100.00% I
100.00% i
100.00%1
100.00%1
100.00%
100.00%1
100.00%1
100.00%1
100.00%1
100.00%
100.00%1
100.00"1ai
100.00%1
100.00%1
100.00%1
100.00%1
100.00%1
100.00%1
100.00%1
100.00%
100.00%
100.00%
100.00%1
100.00% '
100.00%;
100.00%:
100.00%:
10o.0o%i
100.00% 1
100.00%1
100.00%:
100.00% 1
100.00% i
100.00% i
100.00% i
100.00% 1
100.00% i
100.00%; .
100.000/"
100.00% ;
100.00%:
100.00% i
100.00%'
100.00%:
100.00%,
100.00% ;
100.00%'
100.00%
100.00%
100.00%
100.00%
100.00%,
100.00% .
100.00%
'COMPLETED
I COMPLETED
I COMPLETED
tCOMPlETED
: COMPLETED
iCOMPlETED
'COMPLETED
iCOMPlETED
I COMPLETED
'COMPLETED
I COMPLETED
I COMPLETED
ICOMPlETED
1 COMPLETED
I COMPLETED
I COMPLETED
I COMPLETED
COMPLETED
I COMPLETED
1 COMPLETED
iCOMPLETED
I COMPLETED
I COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
I COMPLETED
! COMPLETED
I COMPLETED
i COMPLETED
! COMPLETED
! COMPLETED
I COMPLETED
! COMPLETED
1 COMPLETED
1 COMPLETED
1 COMPLETED
!
I COMPLETED
1 COMPLETED
I COMPLETED
i COMPLETED
ICOMPLETED
I COMPLETED
:COMPLETED_. _
: COMPLETED
; COMPLETEO--
iCOMPLETED
1 COMPLETED
i COMPLETED
I COMPLETED
1 COMPLETED'
1 COMPLETED
, COMPLETED
1 COMPLETED
iCOMPlETED
, COMPLETED
. COMPLETED
I COMPLETED
1 COMPLETED
,COMPLETED
I COMPLETED
. COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
i COMPLETED
: COMPLETED
COMPLETED
"
J :\SYMACCT\JOBDEC02.XLS
PreoaredlRevised 1/20/03
"'.
MAC CONSTRUCTION & EXCAVATING. INC.
TYPE OF WORK
OWNER
: SITE
. CONCRETE
'STORM
'CITY OF NEW ALBANY-NEW ALBANY. IN
'REGIONAL AIRPORT AUTH.-LOUISVILLE, KY
i METRO SEWER DISTRICT -LOUISVILLE. KY
I
, IANTHEM BLUE CROSS-LOUISVILLE, KY
iBELL SOUTH MOBILITY-LOUISVILLE, KY
lVENCOR - LOUISIVLLE, KY
'TENANT FINISH
~ I TENANT FINISH
: ROOF
:A~GROCK QUARRIES-SELLERSBUR~. IN
!CITY OF CLARKSVILLE-CLARKSVILLE, IN
,CITY OF NEW ALBANY-NEW ALBANY, IN
ICRISTIANI EXCAVATING-CLARKSVlLLE,IN
.CITY OF NEW ALBANY-NEW ALBANY,IN
:COLLINS FORD-LOUISVILLE. KY
1 ICRISTIANI EXCAVATING-CLARKSVILLE, IN
!WOODFIELD STABLES-NEW ALBANY, IN
! iESSROC-SELLERSBURG, IN
IJOHN GARRETT -CLARKSVILLE, IN
: ID&W INVESTMENT GROUP-LEXlNGTON, KY
I ICITY OF JEFFERSONTOWN-J-TOWN, KY
IMETRO SEWER DISTR.-LOUISVlLLE, KY
; lOAN COR CORPORATON-LOUISVlLLE, KY
; :LAGRANGE UTlLlT1ES COMM-LAGRANGE, KY
i ICRISTIANI EXCAVATING;SELLERSBURG, IN
j iTHOM & CONNER DEV.-JEFFERSONVILL, IN
I ICITY OF NEW ALBANY-NEW ALBANY, IN
I lOUR LADY OF PERPETUAL HELP-N.A., IN
i CRISTIANI EXCAVATlNG-CLARKSVILLE,IN
, ICRlSTIANI EXCAVATING-CLARKSVILLE, IN
I jCRISTIANI EXCAVATING-CLARKSVlLLE, IN
I I
, !
..',- i I !
MAJOR PROJECTS COMPLETED IN FISCAL YEAR 07/95-06196:
I :SEWER , IWEHR CONSTRUCTORS, INC.-LOUISVILLE. KY
! !SITE WORK 1LEX.-FAY. CO. AIRPORT BOARD-LEX., KY
I 'CONCRETE ICITY OF NEW ALBANY: NEW ALBANY, IN
: ISITE WORK ICITY OF NEW ALBANY; NEW ALBANY. IN
'SITE WORK 'iC.F. FLAUGHER, INC.-FISCHERS IN
I CONCRETE :TOWN OF CLARKSVILLE-CLARKSVILLE, IN
: I SEWER I :METRO SEWER DISTRICT-LOUISVILLE. KY
---:- ISITE WORK :CITY OF LOUISVILLE-LOUISVILLE, KY
: SEWER . 'METRO SEWER DISTRICT-LOUISVILLE, KY
iROAD :JEFFERSON CO PUBLIC WORKS-LOU., KY
! !WATER !LOUISVILLE WATER CO-LOUISVILLE, KY
I 'ROADWAY I IKY. TRANS. CABINET-FRANKFORT, KY
IGEN CONSTR ICITY OF JEFFERSONTOWN-J-TOWN. KY
'SITE ! ICITY OF WATTERSON-WATTERSON, KY
IBUILDING ; !REGIONAL AIRPORT AUTHORITY..LOUISVILLE, KY
_.~AJl=~_. ILOUISVILLE WATER CO.-LOUISVILLE. KY
_w !RENOVATION ,!CITY OF LOUISVILLE-LOUISVILLE. KY
__ iHWYIBRDGES IIN DEPT OF HIGHWAYS-INDIANAPOLIS, IN
:SITE IWEHR CONSTRUCTORS; LOUISVILLE, KY
:SEWER 1 I CITY OF NEW ALBANY. NEW ALBANY, IN;
: SEWER , .LOUISVILLE GAS & ELECTRIC-LOU., KY
. :SITE WORK . REGIONAL AIRPORT AUTH.-LOUISVILLE, KY
i :SITE WORK . :REGIONAL AIRPORT AUTH.-LOUISVILLE, KY
! ,SITE WORK ; ILOU & JEFF CO RIVERPORT-LOUISVILLE, KY
i : STORM SEWER ! IMETRO SEWER DISTR1CT4-0UISVILLE, KY
i iSfTE WORK 1 CITY OF WATTERSON-WATTERSON, KY
iSEWER : METRO SEWER DISTRICT-LOUISVILLE, KY
, : CONCRETE .JEFFERSON CO PUBLIC WORKS-LOU.. KY
; 'HWY/BRDGES "JEFFERSON CO. FISCAL CRT-LOU. KY
iASPHALT :LAGRANGE UTILITIES COMM-LAGRANGE, KY i
: ASPHALT ,JEFFERSON CO PARKS-LOUISVILLE. KY
ASPHALT AGGROCK QUARRIES-SELLERSBURG, IN
- _. 'ASP_8A~. VICTOR UNRUH-NEW ALBANY, IN
,ASPHALT
:ASPHAL T
iASPHAL T
: ASPHALT
,ASPHALT
. ASPHALT
, ASPHALT
jASPHAL T
!ASPHALT
iASPHAL T
IASPHAL T
1 iASPHALT
T IASPHALT
ASPHALT
lASPHAL T
iASPHAL T
iASPHAL T
iASPHAL T
, IASPHAL T
iASPHAL T
iASPHAL T
IASPHALT
i
~
~.,....:.--..
t.
M.iUOR PROJECTS COMPLETED IN FISCAL YEAR '94f95:
SEWER
SEWER
SEWER
:HWY/BRDGES
METRO SEWER DISTRICT-LOUISVILLE. KY
METRO SEWER DISTRICT -LOUISVILLE, KY
METRO SEWER DISTRICT-LOUISVILLE, KY
'IN DEPT OF HIGHWAY-INDIANAPOLIS, IN
I
.
, I
,WORK EXPERIENCE FOR PREQUALlFICATION PURPOSES
; i j I!
PROJECT NAME
, i
1 ! N.A. Amohitheatre
! !RAA-UTILlTlES
, 'Scottsdale
i 1
i 1 BCBS-Linn Sta.
I Bell South Mobilitv
I !Veneer Reoencv
I 1
!
AOarock
Akers Street
N .A. Amphitheatre
i lAutumn Hills
! I Bohannon Str.
I 1 Collins Ford
i -TCristiani
I Deer Run
I Essroc
I Garrett Whse
Grandel Farms
J-Town Center
Kenwood Draimiloe
K-Mar!
L.al:1ranoe WWTP
Mallard Run
Mallard Run 2
N.A. Riverfront
OLPH
Riveroaks
ISav-a-Steo
Vallev View
Bantist Hos". - East
Blueorass Airport
1 Chadwood ReI. Wall
I Cherrv SI.
Circuit Citv
Clarksville Pool
Confederate Acres
Covenant Develooment
Emerald Drive Sewer
Evernreen Rd.
Hiohlands
Hurstboume Lane
J-Town Balloark
Kosmos Cement
KYANG FIRE STATION
LWCO-Pum" Station
. Main St-800 Blk
1 Middle Road
1 Middletown Church
INew Albanv Sewer
Pininn-Trimble Co.
: I RAA Runwav 17635
! IRAA-TunRoad
I 1 Riveroor!
I I Sallv Drive
I Stober Road
,Treasure Island
ITucker Station
IWatterson Trail
I LaGranoe WWTP
!Olmsted Park
:AMrock
, Springfarm
2nd & Arbor
Ash-Crawford Sewer
Dover Road
Charlestown SR3
: PRIME
! OR SUB
i
iPRIME
PRIME
I IPRIME
! i
IPRIME
, IPRIME
! IPRIME
1 I
1 1
1 ISUB
: ISUB
ISUB
:SUB
ISUB
1 !SUB
I ISUB
I ISUB
I SUB
! SUB
SUB
I SUB
! SUB
! ISUB
I SUB
I SUB
: SUB
I SUB
I SUB
I ISUB
, ISUB
SUB
i
i I
: ISUB
'PRIME
IPRIME
I !PRIME
PRIME
IPRIME
!PRIME
! IPRIME
j IPRIME
PRIME
IPRIME
I IPRIME
IPRIME
! IPRIME
I IPRIME
PRIME
PRIME
PRIME
SUB
PRIME
IPRIME
I 'PRIME
: ,PRIME
i IPRIME
I IPRIME
1 !PRIME
,PRIME
IPRIME
:PRIME
:SUB
.SUB
:SUB
:SUB
PRIME
PRIME
PRIME
PRIME
I :
I
I
I
I
! I
I
I
I
I I
I ;
i I
1
, ,
I
CONTRACT
AMOUNT ,
I 1
;
196,2371
1,350,418 :
339,7601
! :
! i
9,0461 I
4,7121 I
10,6301 I
1 '
! I
! 1
14,714:
42.1361
1'1,170!
16,3831
11,560!
97,4161
3.507:
23,275
17,391
17,250
23 ,46!!
60,670
13,068
8,270 I
11,4421 !
84,484
24,099
4,100
10,3781
9,5311
35,347
2,470
I
I
I
1
I
I
I
I
I
I
I
,
,
1,546,9141 I
3.524,4131 :
19,5501
38,515 ,
415,9471
2,396,7001 I
263,4831 I
192,8861 1
1,863,597. I
156.449 !
277.022 1
2.864,867 I
1,752,747 I
158,504 1
2,856,802 I
152,5251
1,025,8631 I
1,622,8671 '
53,783i ;
55,1001 i
37,0001 I
10,194,8641 I
335,5461 i
1,064 ,8031 I
310.1001
455.072 i
509,7461 ,
82.0501 I
1,834,9081
11,4421
1.094:
14.714:
17,800,
1
I
I 1
I I
576,130 ;
488.421 i
454.079 '
236,189:
100.00%' I COMPLETED
100.00%1 ICOMPLETED
100.00%: 'COMPLETED
100.00%7' -~COMPLETED
100.00oi;]' .. iCOMPLETE!2~:
100.00%: 'COMPLETED
100.00%1 1 COMPLETED
100.00%1 [COMPLETED
100.00% II COMPLETED
100.00%1 'COMPLETED
100.00% COMPLETED
100.00%1 COMPLETED
100.00% COMPLETED
100.00%! COMPLETED
100.00%1 COMPLETED
100.00%1 COMPLETED
100.00%1 I COMPLETED
100.00%1 1 COMPLETED
100.00%, I COMPLETED
100.00% . I COMPLETED
100.00% 1 COMPLETED
100.00%1 COMPLETED
!
PERCENT .
. COMPLETE
100.00%.
100.00'10,
; 100.00%;
100.00'10 :
100.00%:
100.00%1
I
,
i
I
!
I
I
1
i
I
!
1
:
100.00%1
100.00%i
100.00%1
100.00%1
1 00.00% !
100.00"10 i
100.00"10 i
100.00%1
100.00%1
100.00'10;
100.00%1
100.00%1
100.00% 1
100.00%1
100.00%1
100.00%1
100.00%i
100.00% ;
100.00% I
100.00%1
100.00%;
100.000/.0
100.00%1
100.00% :
100.00%1
100.00% :
100.00%;
100.00% i
100.00% ;
100.00% :
100.00% ;
100.00% ,
100.00% .
100.00%:
100.00%;
100.00%;
100.00% :
.
DATE OF
COMPLETION
COMPLETEO-
! COMPLETED
: COMPLETED
I COMPLETED
iCOMPLETED
i COMPLETED
I
, :
! COMPLETED
I COMPLETED
[COMPLETED
I COMPLETED
I COMPLETED
I COMPLETED
I COMPLETED ..
I COMPLETED
TCOMPLETED
!COMPLETED
I COMPLETED
I COMPLETED
COMPLETED
COMPLETED
I COMPLETED--
! COMPLETED
COMPLETED
,COMPLETED
,COMPLETED
I COMPLETED
COMPLETED
1 COMPLETED
COMPLETED
I COMPLETED
'COMPLETED
: COMPLETED
. COMPLETED
iCOMPLETED
I COMPLETED
!COMPLETED .
: COMPLETED
COMPLETED
. COMPLETED
---
COMPLETED
. COMPLETED
I COMPLETED
. COMPLETED
.,
J:ISYMACCT\JOBDEC02.XLS
Prepamp/Revised 1/20/03
/~ CONSTRUCTION & EXCAVATING, INC.
TYPE OF WORK
IHWYIBRDGES
! . SEWER
: ,SITE WORK
: SEWER
; !ROADWAY
,CONCRETE
, ,WATER
;SEWER
SITE/CONCRETE
: SEWER
: CONCRETE
, I SITE WORK
:SNOW RMVL
OWNER
ilN DEPT OF HIGHWAY-INDIANAPOllS,IN
'METRO SEWER DISTRICT-LOUISVillE, KY
: 'FRANKLIN STUBBE DEVELOPMENT
I METRO SEWER DISTRICT-LOUISVILLE, KY
!IN DEPT OF HIGHWAYS-INDIANAPOLIS, IN
:WEHR CONSTRUCTORS, INC.-lOUISVILLE, KY
, 'KY-AMERICAN WATER CO.-LEXINGTON, KY
!METRO SEWER DISTRICT-LOUISVILLE, KY
ICTTY OF LOUISVillE-LOUISVILLE. KY
: ,CITY OF NEW ALBANY, NEW ALBANY, IN
: :POLLUTION CONTROL-SHELBYVILLE, KY
1ST. PATRICK'S CHURCH-LOUISVIllE, KY
KY DEPT OF TRANSP.-FRANKFORt, KY
MAJOR PROJECTS COMPLETED IN FISCAL YEAR '93f94:
'SITE WORK
:SITE WORK
: CONCRETE
WATER
. WATER
!SITEWORK
!SEWER
iSEWER
: SITE/CONCRETE
!SEWER
! SEWER
!SEWER
1
,REGIONAL AIRPORT AUTH.-LOUISVILLE. KY
I DUERST & MOERT-LOUISVILlE, KY
iJEFFERSON CO. FIS. CRT.-lOUISVILLE. KY
INDIANA CITIES WATER-NEW ALBANY,IN
iLOUISVILlE WATER CO.-lOUISVILLE, KY
,JEFF. CO. PUBLIC WRKS-lOUISVILLE, KY
i 10RCHARD GRASS UTILITY-lOUISVILLE, KY
1 IClARKSVILLE SEWER-CLARKSVILlE. IN
U.S. NAVAL ORDINANCE-LOUISVILLE, KY
INELSON COUNTY FORCE-NELSON CO..KY
ILOU/JEFF CO. RIVERPORT-lOUISVlLlE, KY
!METRO SEWER DISTRICT-LOUISVILLE. KY
i
,
ty-" 1
~ " PROJECTS COMPLETE~ IN FISCAL YEAR '92193:
iSEWER
I ROADWAY
REST AREA
i IDRAINAGE
I SEWER
: SITE WORK
1 ROADWAY
: SEWER
!WATER
~ SEWER
! SITE/CONCRETEE
1 ROADWAY
~._..JLANDFILL
, SewER
- -'-:$iTE.d--
---- :WATER TREATMENT
=-~~9RAiNAGE I
';WATER '
IMETRO SEWER DISTRICT-LOUISVILLE, KY
KY TRANS. CABINET-FRANKFORT, KY
KY TRANS. CABINET-FRANKFORT, KY
METRO SEWER DISTRICT-LOUISVILLE, KY
CITY OF NEW ALBANY, INDIANA
I CITY OF LOUISVILLE. KENTUCKY
IIN DEPT OF HIGHWAYS-INDIANAPOLIS, IN
I REJTH-RlLEY GEN'L-NEW ALBANY. IN
I IMETRO SEWER DISTRICT-lOUISVILLE, KY
CITY OF LEBANON. KENTUCKY
!METRO SEWER DISTRICT-LOUISVILLE, KY
!CITY OF LOUISVILLE. KENTUCKY
KY TRANS. CABINET-FRANKFORT, KY
INELSON CO. KY COURT
'METRO SEWER DISTRICT-LOUISVILLE. KY
,ASSOCIATED RAILROAD-LOUISVILLE. KY
I CITY OF SHELBYVILlE. KENTUCKY
IKYTRANS. CABINET-FRANKFORT, KY
ILOUISVILLE WATER CO.-lOUISVILLE, KY
i i
, !
MAJOR PROJECTS COMPLETED IN FISCAL YEAR '91f92:
IDRAINAGE 'METRO SEWER DISTRICT-LOUISVILLE, KY
.SEWER i lMETRO SEWER DISTRICT-LOUISV1LLE. KY
"SUBDIVISION ! I SOUTHEAST DEVELPMENT-lOUISVILLE, KY
, WATER , :LOU. WATER CO.-lOUISVILlE. KY
WATER , ;LOU. WATER CO.-LOUISVILLE, KY
SEWER :CITY OF NEW ALBANY, INDIANA
!DRAINAGE ,METRO SEWER D1STRICT-lOUISVILLE, KY
:SUBDIVISION ISO. IN. LAND CO.-NEW ALBANY, INDIANA
iSlTE WORK : GEUPEL DEMARS, INC.-JEFFERSONVILLE.IN
WATER : 'RUST OF KY,INC.-LEBANON, KY
WATER TOWN OF SELLERSBURG, INDIANA
,PUMP STATION HFH, INC.-LOUISVILLE, KY
_r-- SITE & SEWERS ,OAKLAND PARTNERSHIP-LOUISVILLE, KY
1-:.
WORK EXPERIENCE FOR PREOUALlFICATION PURPOSES
I i PROJECT NAME
1
I IEdwardsville SR62
I I Falls Creek
i iFemwood
! IGoldsmith Ditch
I IIDOH-St. Road 111
1 iJewish Hosoital
I fLex Water Relocation
I ILittle Goose Creek
I Main Street-South
IOld Ford Road
I Pollution Control
1St. Patricks
Snow Removal
I
r )
, i
I I Airoort Parkino
IAuburn Oaks
I I Becklev Station
Daisv Lane
, I Factorv Lane
I Grade Lane-II & III
11-71 Rest Area
Johnson Lane
Naval Ordinance
Nelson Co. Force
Riveroort Sewers
I Shadv Villa
I
I
Amoldtown Road
Blankenbaker Lane
Bullitt Courrtv
Camo Tavlor
I Grantline Force
j Hamaton Place
! 1-64
i
I Kellwood Pumo Sta.
Lebanon
i L vndonlColonial
I I Main St.-North
I I Manslick Road
I I Nelson Landfill
i I Ohio River Force
! I Railroad Sour
I I Shelbwille WTP
! ! South Park
I ITaylorsville Road
, I
I. I
136th & 37th
IAshbv Bethanv
IBav Run Sub.
! I Bishoo Lane
1 Breckenridge Lane
, I Cherry Street
I IDouolas Hills
I I Eastwood Estates
!, I Riverpointe
lRust Companies
i I Servend
i ISpringhurst 2
'Woodlawn
.
MAJOR PROJECTS COMPLETED IN FISCAL YEAR '90f91:
REST AREA 'IN DEPT OF HIGHWAYS-INDIANAPOLIS, IN
SITE & DRAINAGE CHRIST GOSPEL CHURCH.JEFFERSONVILLE, IN
SITE & WATER IN OEPT OF HIGHWAYS-INDIANAPOLIS. IN
--siTE & CONCRETE CIRCUIT CITY
CHALLENGER CORP-GEN'L-INDIANAPOLlS.lN
HENRYVLE REST AREA
CHRIST GOSPL CHRCH
'NEW CASTLE ROADS
CIRCUIT CITY
,
_.. .--. .-_._.__._---~
.-- .-
PRIME ,CONTRACT
; OR SUB i I AMOUNT
, i
1 ISUB
IPRIME
I PRIME
I 'PRIME
: IPRIME
;SUB
I IPRIME
: IPRIME
, !PRIME
, I PRIME
I IPRIME
I PRIME
/ IPRIME
T
I ,
TI
I
1 I
: ,PRIME
i IPRIME
! I PRIME
I JPRIME
IPRIME
IPRIME
IPRIME
TPRIME
IPRIME
IPRIME
TPRIME
!PRIME
T
1
1
1
I !PRIME
PRIME
I jpRIME
1 1 PRIME
1 IPRIME
I IPRIME
T ISUB
, 1
j IPRIME
j !PRIME
IPRIME
IPRIME
IPRIME
I IPRIME
I IPRIME
, IPRIME
! IPRIME
!PRIME
, IPRIME
: !
IPRIME
: PRIME
I IPRIME
I IPRIME
I IPRIME
, IPRIME
I IPRIME
, !PRIME
1 ,PRIME
i iPRIME'
IPRIME
i IPRIME
:PRIME
; 'PRIME
PRIME
,PRIME
,sue
I
I 1
, I
I
I
I
I
T
I
I
: I
;
249,0331
942,6191
182.7621
917,700 I
2,695,495 :
441.911 !
80,4891
2,486.903i
753,526 !
960,8011
375,114/ I
328,341/
497,697/ '
I
I i
3,062,7451
438.731.
215.727 i
263,3601
345,633 i !
1.249,052 I
240,391 I
534,8501 i
449,180 ;
235,662' /
103,8791 i
566,280 :
i
1/
I I
! i
I
1,136,8841
1.778,530 1
3.841,475
2.303,751 I 1
1,162,4491 ,
401,0121
2,804,023
, I
I
I
I
562,172: I
1 071.7151
1,360,231 i I
784,355 i
1,595,286 ;
273.331 ' i
2.751,6661
167,0781 1
529,3231 I
254.7431 '
364,948 i :
1 I
IT
1 I
1 I
IT
I :
i I
I
I I
i
I
i
,
153.2631
742.2861
183,0681
454,4421
438.2021
239.695 i
106.4611
104,6591
353.797 !
234,375 :
919.929 :
333,525 ;
977 ,924,
5,518,362
393,303 '
5,159,728
1.156,657
. PERCENT.
: COMPLETE:
100.00%1
100.00%i
100.00%1
100.00%;
100.00%,
100.00% .
100.00%1
100.00%,
100.00%:
100.00%1
100.00%/
100.00%1
100.00%1
, 1
I :
1
,
1
I
1
100.00%1
100.00%'
100.00%1
100.00%1
100.00%,
100.00%1
100.00%1
100.00%1
100.00%,
100.00%1
100.00%1
100.00%:
: ;
100.00%;
100.00% i
100.00%1
100.00% I
100.00% I
100.00%:
100.00%1
; :
100.00%1
100.00%1
100.00%:
10'0.00%;
100.00%'
1pO.00%.
100.00%,
100.00%:
100.00% i
100.00% i
100.00%i
100.00% ,
100.00% :
100.00% i
100.00% 1
100.00% I
100.00% ,
100.00% ;
100.00% ,
100.00%;
100.00% ,
100.00%1
100.00%1
100.00%.
100.00%.
100.00%
100:00%
100.00%
DATE OF
COMPLETION-
,COMPLETED
iCOMPLETED
'COMPLETED
; COMPLETED
COMPLETED -
-.
,COMPLETED
I COMPLETED--
I COMPLETED
, COMPLETED
i COMPLETED
I COMPLETED
ICOMPLETED
I COMPLETED
i COMPLETED
_ ICOMPLETED
'COMPLETED
I COMPLETED
1 COMPLETED
I COMPLETED
I COMPLETED
COMPLETED
f COMPLETED
I COMPLETED
i COMPLETED
I COMPLETED
,COMPLETED
'COMPLETED
iCOMPLETED
I COMPLETED
COMPLETED
I COMPLETED
ICOMPLETED
iCOMPLE'fEi::i
'COMPLETED' -.
j COMPLETED --
I COMPLETED -=
I COMPLETED
!COMPLETED
COMPLETEO-
; COMPLETED- -=
!COMPLETED
I COMPLETED
, ICOMPLETED
COMPLETEO-'
: COMPLETED
'COMPLETED
: COMPLETED
,COMPLETED
lCOMPL~
,COMPLETED
!COMPLETED
: COMPLETED
: COMPLETED
'COMPLETED
: COMPLETED
iCOMPLETED
--
'"'"'"--
. COMPLETED
.- CO-MPLEfEO-
. COMPLE~SQ.._
COMPLETE'2._
"
..
I
J:\SYMACCT\JOBDEC02.XLS ,
PreparedlRevised 1120103 , ! -
" I
M4l: CONSTRUCTION & EXCAVATING, INC. ,WORK EXPERIENCE FOR PREQUALIFICATION PURPOSES
.
, PRIME i , CONTRACT PERCENT DATE OF
TYPE OF WORK OWNER PROJECT NAME OR SUB . AMOUNT COMPLETE COMPLETIO'N-
. !
'SITE & SewER -STM DEVELOPMENT -LOUISVILLE, KY , SUTHERLAND ,PRIME ; i 697.543, 100.00% . :COMPCEi~
:SEWER LINES CITY OF NEW CASTLE, INDIANA , i NEW CASTLE SEWERS -PRIME i ; 236,202 ! 100.00% COMPLETED -
LOADOMETER KY TRANS. CABINET-FRANKFORT, KY ,KENTON CO" KY :PRIME i 3,927,279 ! 100.00% : 'COMPLETED
;ROAD RELOCATION JEFFERSON CO., KY PUBLIC WORKS iGRADE LANE IPRIME , 1,236,350 . 100.00%. ' COMPLETED
;
- SITE & ROAD 'RIVRPORT AUTH OF LOUISVILLE, KY !RIVERPORT !PRIME ! 394,232 : 100.00% . . COMPLETED
. -
i I i
; : , , j : :
r
r'
)
Sa-lEllI.Lf "')"
'\Y
J:ISYMACCl\ONHANDXLS
MAC CONSTRUCTION & EXCAVATlNG,INC,
WORK ON HAND
~ - ....
CONTRACT MAC MAC CONTRACT BALANCE
JOB COMPLETION COMPLETION PROJECT CONTRACT
JOB NAME TYPE OF WORK DATE DATE OWNER ENGINEER/ARCHITECT MANAGER AMOUNT MAC SUBS TOTAl
--- -_.---- .-------- ------,..,..---- -,-
UNDER CONTRACT:
203307 AMMO PLANT SITE 12/15103 12106103 INAAP REUSE AUTH QK4 SCHMIDT 453,469 43,626 64,812 108,438
203247 CANE RUN PCC ROAD 12/15103 12/15103 KDOT KDOT STINNETT 1,637,295 110,512 265,072 375,564
203304 CHAPEL HILL SEWER 03/31104 03131104 METRO SEWER DISTRICT PALMER SCHMIDT 811,989 532,617 279.372 811,989
203234 CLAYTON TERRACE SEWER 02101104 02101104 METRO SEWER DISTRICT KHAFRA JONES 869,732 280,634 95,016 375,650
203322 EMINENCE STREETSCAPE SITE 05/15104 05/15104 CITY OF EMINENCE CMW. INC. JONES 352,300 186,081 155.109 321.190
202265 EXTREME SPORTS PRK RESTROOM SITE 12/19103 12/19103 CITY OF LOUISVILLE LUCKETT & FARLEY SCHMIDT 297,864 88,699 73,965 162,664
202185 FISHERVlLLE RD PUMP STATION PUMP STA 12/23103 11/30103 METRO SEWER DISTRICT HNTB SCHMIDT 1.829,463 37,252 20,591 57,843
202126 FLOYD MIDDLE SCHOOL ASPHALT 07130104 07130104 NEW ALBANYIFLOYD CO SCHOOLS MICHELL, TIMPERMAN,RITZ cooK/HILE 527,616 197,189 74,082 271,271
202218 HERITAGE CREEK PHS 2 SEC 1 SITE 12/25103 12/25103 REGIONAl AIRPORT AUTHORITY DAILY & ASSOCIATES STINNETT 1,507,763 68,130 15,860 83,790
203217 MORRIS FOREMAN WWTP SEWER 07101104 07101104 METRO SEWER DISTRICT CH2M-HILL COOK 3,110,000 1,644,563 1,243,404 2,887,967
203233 OHIO RIVER GREENWAY SITE 05/31104 05/31104 CORP OF ENGINEERS CORP OF ENGINEERS COOK 583,440 86,797 42,447 109,244
203274 OLD HENRY FORCE MAIN SEWER OS/22/04 05122104 METRO SEWER DISTRICT SABAK-WlLSON STINNETT 2,456,091 953,929 1,147,897 2,101.826
201211 ORFM CROSS CONNECTIONS SEWER 12/31103 12/31103 METRO SEWER DISTRICT PDR STINNETT 2,552,525 312,624 , 2.897 315,521
103338 RAA PAVEMENT REPAIRS SITE 12/22/03 12/22103 REGIONAL AIRPORT AUTHORITY REGIONAL AIRPORT AUTH JONES 43,790 38,433 5,357 43,790
203135 RIVER ROAD PAVERS SITE 01/20104 01/20104 CITY OF LOUISVILLE CONSTRUCTION SOLUTIONS JONES 698,353 268,228 1,710 269,938
203282 RIVERSIDE GARDENS SEWER 05/31104 05131104 METRO SEWER DISTRICT PALMER JONES 2,937,000 2,301,845 635,155 2.937,000.,
202172 2ND STREET REPAIR STREET 12130103 12/30103 CITY OF LOUISVILLE HMB SCHMIDT 2,729,954 328,012 81,680 409,692
203163 SOUTHSIDE INFRASTRUCTURE RD SITE 12130103 12/30103 SHELBY CO SCHOOLS KERRY MAGAN STINNETT 399,294 1,037 0 1,037'
103027 SPRINGHURST VILLAGE SITE 04101104 04101104 ICON PROPERTIES LD&D JONES 1,717,776 240,376 18,567 256,943,
202287 SUGARTREE HILL PUMP STA 05/31104 05131104 LOUISVILLE WATER CO LOUISVILLE WATER CO. JONES 423,000 91,876 31,229 123,105
103269 THIXTON PUMP STATION SEWER 04/30104 04/30104 THIXTON PROPERTIES SABAK-WILSON STINNETT 934,760 869,288 265.472 934,780
203237 TUCKER STATION SEWER 05/17104 05/17104 METRO SEWER DISTRICT CORRADINO STINNETT 1,549,295 638,842 321,559 960,401
103028 WAL-MART RUCKRIEGEL SITE 12130103 12130103 J A FIELDEN CMW STINNETT 757,687 27,271 0 27,271
202006 WATERFRONT PARK A-2 SITE 12105103 12105103 CITY OF LOUISVILLE HARGREAVES SCHMIDT 7,495,225 109,296 200,000 309,296
103213 WOODS OF LAFAYETTE SITE 12/28103 12/28103 WIND DANCE FARMS JOHN BRINKWORTH SCHMIDT 682,998 115,298 10,151 125,449
SUBTOTAL 37,358,479 9,332,455 5,051,204 14,383.659
PENDING CONTRACT:
o
o
~
04
o
SUBTOTAL
37,358,479
9,332,455
5,051,204
14,383.659
TOTAL
...
f'
CONTRACTORS BID FOR PUBLIC WORKS
PART II - SECTION II
PLAN AND EQUIPMENT QUESTIONNAIRE
1. Explain your plan or layout for performing the proposed work.
N10g/?/~ ~ ey:.CAV.,4-'l/O~ - 5A-AJrrfr12c( ~70~
h/V,(/t1 - ~77:>tff.e - Cv-~- A:5/l~-tJ/U'Ctf~ - ~~
2. If you intend to sublet any portion of the work, state the
name and address of sub-contractor, equipment to be used by
sub-contractor and whether you expect to require bond.
r
3. What equipment do you intend to use for the proposed project?
SEE ATTACHED Sr.HFrID F "r."
4. Have you made contracts or received offers for all materials
within prices used in preparing your proposal?
~
F:\USER\LETTERS\PREQ~~l
.
SCI-IEDI.l.E "e"
...
MAC CONSTRUCTION & EXCAVATING, INC.
PREQUALlFICA TION
Construction Equipment Listing
DECEMBER 31,2002
ACQUISITION ACCUMULATED
PAGE DESCRIPTION COST DEPRECIATION
1 AUTO 126,409.21 55,241.33
2-4 HEAVY EQUIPMENT 5,464,749.90 3,389,137.31
5 JOB TRAILER 207,862.17 156,034.40
6-8 LIGHT EQUIPMENT 590,694.43 416,938.91
9 PICK UP TRUCKS 530,618.08 282,309.66
10-11 SNOW EQUIPMENT 593,768.49 572,798.74
12-13 TRUCKS 1,181,279.58 450,168.33
8,695,381.86 5,322,628.68
r\
I
I
I
..
BOOK
VALUE
71,167.88
2,075,612.59
51,827.77
173,755.52
248,308.42
20,969.75
731,111.25
3,372,753.18
lanuarl23, 2~03
MAC CONSTRUCTION & EXC., INC. Page: 1
EQUIPMENT LISTING FOR PREQUALIFICA TION
r\ ACCUMULATED NET BOOK
C. -,S DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
A '02 CHEVY TAHOE A 0.00 0.00 0.00
A '02 CHEVY TAHOE A 36,570.16 .10,056.79 26,513.37
A '2000 LEXUS R..\:300 A 37.971.59 25567.54 12.404,05
A '99 FORD EXPEDITION A 26.463.15 9.328.26 17,134.89
A '99 FORD F-250 SUPERCAB A 25,404.31 10.288.74 15,115.57
Class = A
Subtotal 126.409.21 55.241.33 7l,l67.88
r'.
~
JanUJJ): 28.2003 MAC CONSTRUCTION & EXC., INC. Page' 2
.... EQUIPMENT LISTING }i"OR PRE QUALIFICATION
~ ACCUMULATED NET BOOK
9L-~~ DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
t I
H '95 BLA W KNOX ROAD WIDNER A 12.720.00 7.422.12 5.297.88
H '00 KOIvLA.TSU PC128 EXCAVATOR A 91.1-+0.00 47,597.87 43,542.13
H '98 HAMM DRUM ROLLER A 12.1 90.00 4.936.95 7.253.05
H WACKER RD 11 ROLLER A 11.313.75 3,988.10 7,325.65
H '00 WACKER GENERATOR A 10.395.00 2,858.63 7,536.37
H '02 MINI ASPHALT DISTRIBUTOR A 7.631.30 1.907.82 5,723.48
H HOE PAC COMPACTOR UC-I0 A 4.165.00 4.165.00 0.00
H HOE RAM ALLIED 730 PAV-BR A 16.170.00 16.170.00 0.00
H CAT 12G GRADER A 102.212.00 102.212.00 0.00
H 1986 ROLLER SP-56 A 52.947.00 52.947.00 0.00
H REP AlRS-1450 DOZER A 1.578.10 1.578.10 0.00
H FELCO CONVEYOR MODEL CD A 26,270.00 26.270.00 0.00
H 1990 FIAT ALLIS 65B GRADER A 50,684.40 50.684.40 0.00
H AUGER FOR 843 W/3 BITS A 0.00 0.00 0.00
H 1988 DYNAP AC ROLLER A 73.928.00 73,928.00 0.00
H '00 580SL CASE BACKHOE A 42.596.14 26.598.0 I 15,998.13
H '00 580SL CASE BACKHOE A 42.596.14 26.598.01 15,998.13
H 1995 CAT D4H DOZER A, 62.263.07 62.263.07 0.00
H ALLIED 730 HA1v1MER A 16,800.00 16,800.00 0.00
H ALLIED 8700C HOE PAC A 3,675.00 3,675.00 0.00
H TRAMAC HOE RAM A 38.690.00 38,690.00 0.00
H '97 FORD F800 DISTRIBUTOR TRUCK A 73,000.00 73.000.00 0.00
H 1996 BLAW-KNOX PAVER A 164.424.4 7 164,424.47 0.00
I: 1996 IIR DD24 ROLLER AI 28.245.00 28.245.00 0.00
,
H 1996 IIR DD90 ROLLER A 74.681.25 74.681.25 0.00
H PLATE COMPACTOR - MVC 90L A 1.891.55 1,891.55 0.00
H 1994 DYNAPAC ROLLER A 25.200.00 25.200.00 0.00
H 1996 BOBCAT LOADER A 25.200.00 25.200.00 0.00
H 1995 CAT D6H TRACTOR A 143,627.65 143.627.65 0.00
H '00 580SL CASE BACKHOE A 40.611.63 25.358.84 15,252.79
H '99 10 670 GRADER A 110,250.00 68,842.65 41,407.35
H PC 220 RIPPER TOOTH A 0.00 0.00 0.00
H GROVE CARRY DECK CRPu~E A 24.739.08 24.739.08 0.00
H BOBCAT SWEEPER A 14.310.00 14.310.00 0.00
H. 1997 BROCE POWER BROOM A 29.159.00 29,159.00 0.00
H 1997 CAT D6R DOZER A 110.611.38 110.611.38 0.00
H 1997 CAT D6M DOZER A 88.387.88 88.387.88 0.00
H 18" PC150 BUCKET A 2.190.80 2.1 90.80 0.00
H ASPHALT ZIPPER A 63.154.00 55.347.31 7.806.69
H KOMATSU WA-180 LOADER A 58.300.00 50.318.05 7,981.95
H FUSION UNIT (BORING MACHINE) A 13.217.75 11.408.08 1,809.67
H V ACTRON (POT HOLER) DRILL TEST MA A 21.315.00 18.114.56 3,200.44
H '98 KOMATSU PC-220 A 138,726.08 116.067.49 22,658.59
H '98 KOMATSU PC-220 A 48.346.93 41,087.64 7,259.29
H '98 KOMATSU PC-220 A 69.077.90 58,705.85 10,372.05
H 9' LOADER BROOM A 9.964.00 7,732.06 2,231.94
.
H '98 KOMATSU WA180 I A 95,966.14 69,515.47 26,450.67
H '98 KOMATSU PC220 I A 79.254.00 57,409.62 21.844.38
1;'- '98 KOMATSU PC220' A 96.049.30 69.575.71 26,473.59
h '96 REED RILL 300 .( A 230.833.80 170.174.77 60,659.03
H '98 CAT 963 LOADER A 157,500.00 116.111.80 41,388.20
H '96 PETTIBONE FORKLIFT A 39.900.00 28.902.56 10.997.44
J~nU;lrY 28. :003 MAC CONSTRUCTI00i & EXC., INC. Page: 3
... EQUIPMENT LISTING fOR PRE QUALIFICATION
ACCUMULATED NET BOOK
(>'-ASS DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
f ':rl-' SCREED A 1.643.00 1.148.12 494.88
H '98 KOtvlATSU \\'..\-180 A 72.15 I. 13 49.499.29 22,651.84
H '99 CASE 580 BACKHOE A 4 JA61.05 27.917.11 13,543.94
H '00 BLA W KNOX PAVER A 166,609.25 106,761.45 59,847.80
H '98 KOMATSU PC-220 A 130.456.06 83.594.87 46.891.19
H '99 KOMATSU PC-300 A 130.456.06 83.594.87 46,861.19
H '99 KOMATSU PC-220 A 130.456.06 83,594.87 46,861.19
H '99 KOMATSU PC-220 A 158.809.60 101,763.52 57,046.08
H '00 580SL CASE BACKHOE A 47.489.64 29,653.62 ] 7,836.02
H '00 580SL CASE BACKHOE A 40.611.64 25.358.84 15,252.80
H '00 580SL CASE BACKHOE A 40,611.64 25,358.84 15,252.80
H '00 580SL CASE BACKHOE A 40,611.64 25.358.84 ] 5,252.80
H '00 580SL CASE BACKHOE A 41.452.76 25,884.06 ]5,568.70
H '00 580SL CASE BACKHOE A 41.452.76 25.884.06 ]5,568.70
H '00 580SL CASE BACKHOE A 40,611.64 25.358.84 15,252.80
H '00 580SL CASE BACKHOE A 61,828.20 38,606.96 23,221.24
Class = H
Subtotal 3,944.811.62 3.100.968.76 843,842.86
(":
I
I
r'\
I
..
January 2&, 2003
...
unruh e-Quip., lIe
Page: 4
EQUIPMENT LISTING FORPREQUALIFICATION
ACCUMULATED NET BOOK
Ck~C:; DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
-1
H '01580 CASE BACKHOE A 54,150.00 10.830.00 43,320.00
H '02 HYDRAULIC HAMMER A 47,358.00 0.00 47,358.00
H '00 KOMATSU PC 228 EXCA V A TOR A 137,500.00 36.666.67 100,833.33
H '97 580 CASE BACKHOE A 24,000.00 12,000.00 12,000.00
H '00 KOMATSU PC 228 EXCAVATOR A 13 7,500.00 36.666.67 100,833.33
H '00 VERMEER NA VIGA TOR A 165,463.00 82,731.50 82,731.50
H '00 KOMATSU PC128 EXCAV A 65,983.00 9.897.45 56,085.55
H '01 580 CASE BACKHOE A 54.150.00 10.830.00 43,320.00
H '03 8" CONCRETE SCREED A 13,944.28 232.41 13,711.87
H '02 BLAW KNOX PAVER A 203,200.00 3,386.67 199,813.33
H KOMATSU W A 180 LOADER A 54.200.00 12,646.67 41,553.33
H KOMATSU WA 180 LOADER A 61.200.00 14,280.00 46,920.00
H '02 VOLVO MINI EXCAVATOR A 51,275.00 7,691.25 43,583.75
H '02 VOLVO MINI EXCAVATOR A 51,275.00 7,691.25 43,583.75
H '02 WACKER ROLLER DRUM A 11,000.00 1,466.67 9,533.33
H '00 CAT D6 DOZER A 148.000.00 32,066.67 115,933.33
H '01 KOMATSU PC300-6 A 180,140.00 6,004.67 174,135.33
H V ACTRON A 15,400.00 3,080.00 12,320.00
H '00 KOMATSU 038 DOZER A 44,200.00 0.00 44,200.00
Class = H
Subtotal 1.519.938.28 28.8,1 68.55 1,23l,769.73
~
!
f'"
1
J anuarv 28. 2003 MAC CONSTRUCTI.oN& EXC., INC. PJgc 5
EQUIPlVIENT LISTING FOR PREQUALIFICATION
ACCUMULATED NET BOOK
CLASS DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
r
J :WOO SHADOWMASTER TRAILER A 3.134.25 1. 63 6.87 1.497.38
J 1 8' TR.:c\ILER A 2.100.00 1.034.25 1,065.75
J '02 6X12 HUNT TRAILER A 1.548.75 348.47 1.200.28
J '02 18' TRAILER A 2.047.50 307.13 1,740.37
J '02 GOLDSTAR 16' UTILITY TRLR A 1.512.00 189.00 l,323.00
J 8'X40' STEEL CONTAINER A 1.908.00 238.50 1.669.50
J '81 FRUEHAUF TRcA.ILER A 1,473.00 1,473.00 0.00
J UTILITY TRAILER A 725.00 725.00 0.00
J TRAILER A 1.985.00 1.985.00 0.00
J '81 FREUHAUF TRAILER A 1.985.00 1.985.00 0.00
J ACTON-OFFICE TRAILER A 6.763.00 6.763.00 0.00
J TOOL TRAILER A 4.950.00 4.950.00 0.00
J 26' KING TRAILER (YR 2000) A 9.870.00 7.276.34 2,593.66
J '82 HOBBS 27' PUP TRAILER A 1,700.00 1,700.00 0.00
J '78 FRUEHAUF TRAILER A 1.650.00 1.650.00 0.00
J PINES 28' TOOL TRAILER A 1.575.00 1.575.00 0.00
J '80 F'HAUF 4'X6' MINI TRAILER A 0.00 0.00 0.00
J '00 TRAILKING ROLLBACK A 27,161.30 17,847.54 9,313.76
J '00 TRAIL KING ROLLBACK A 27.161.29 17.847.53 9,313.76
J '81 FREUHAUF TOOL TRAILER A 1,700.00 1,700.00 0.00
J '85 MILLER MOB OFF TRLR A 8,400.00 8,400.00 0.00
J '00 40FT WELLS CARGO TRLR A 17,587.50 11.269.88 6,317.62
J '89 WINSTON TRAILER A 5,000.00 5.000.00 0.00
J .- '83 TOOL TRAILER A 1.942.50 1.942.50 0.00
J t '83 FRUEHAUF TOOL TRAILER A 1.890.00 1.890.00 0.00
J '81 MONON TOOL TRAILER A 1.890.00 1.890.00 0.00
J '83 FRUEHAUF TOOL TRAILER A 1.890.00 1.890.00 0.00
J 24' UTILITY TRAILER A 7.654.50 7.654.50 0.00
J 40' FLA TB ED TRAILER A 3.990.00 3.990.00 0.00
J '98 FLATBED TRAILER A 1.365.00 1.365.00 0.00
J V ACTRON TRAILER A 3.360.00 3.360.00 0.00
J 16' TRAILER A 1.277.23 1.277.23 0.00
J '99 SHADOWMASTER TRAILER A 3,381.00 2.579.80 801.20
J '99 HUDSON TRAILER A 4.075.80 3.004.75 1.071.05
J '98 CLASSIC TRAILER A 4.200.00 2.934.94 l.265.06
J '99 TRAILKING 24' TRLR A 13.842.68 9.673.18 4,169.50
J '2000 TRAILKING TRLR A 19.754.85 13.301.60 6,453.25
J GENERA TOR ON TRLR 2018 A 5A12.02 3.379.39 2,032.63
Class = J
Subtotal 207.862.17 156.034.40 51.827.77
I
I
".!
~ ;
(
~
hnu:lr; :::S. 2003 l\TAC CONSTRC.CTION & EXC., INC. P:lge: 6
EQUIPl\''IENT LISTING FOR PREQUALIFICA TION
~ ACCUMULATED NET BOOK
CLASS DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
r,
~
L AIR MONITOR & ACCESS A LI 10.60 675.24 435.36
L MCLAUGHLIN LOCATOR A 2.809.00 1.707.87 1,101.13
L '00 K.A. W ASAKI 4 WHEELER A 10.500.00 5.998.13 4,501.87
L Fr:NN STRAW BLOWER A 15.671.25 8.376.28 7,294.97
L BURNER KETTLE A 2.763.75 1.409.52 1.354.23
L GAS MONITOR A 2.125.62 1.046.86 1,078.76
L PIPE LASER A 6.825.00 3.003.00 3,822.00
L GPS NIACHINE SYSTEM A 48.896.74 2l.514.57 27,3 82.17
L GPS BASE SYSTEM A 26.743.80 11.767.27 14,976.53
L GPS BASE STATION A 20.511. 75 4.615.15 15.896.60
L G P S RADIO KIT A 3.978.08 895.06 3.083.02
L GPS ROVER KIT A 24.877.65 5.597.47 19,280.18
L '97 FORD TRACTOR A 8.637.74 1.295.66 7.342.08
L '00 8' SWEEPSTER BROOM A 6.825.00 511.88 6,313.12
L SPREADER BOX JERSEY 103 A 4.000.00 4.000.00 0.00
L E-Z DRILL-MODEL 200 A 5.985.00 5,985.00 0.00
L VERMEER-3" HAMMER HD MOLE A 5.724.00 5.724.00 0.00
L 4" HYDRAULIC PUMP A 3.310.15 3.310.15 0.00
L 12T VEHICLE LIFT A 8.610.00 8.610.00 0.00
L GPS ROVER SYSTEM A' 27.337.40 12.028.46 15,308.94
L PIPE LASER A 4.149.25 2.846.60 1,302.65
L LIFELINE/RETRIEV AL SYSTEM & ACCES: A' 2.376.69 2.376.69 0.00
L GRADER LASER A 20.160.00 20.160.00 0.00
L'-'" FORD TRACTOR A 16.927.3 I 16.927.3 I 0.00
[ POWER RAKE A 5.880.00 3.575.04 2.304.96
L WHITCO PRESSURE WASHER A 4.740.75 4.740.75 0.00
L PIPE LASER A 3.764.25 2.582.46 1,181. 79
L 12" CONCRETE SAW W/BLADES A 0.00 0.00 0.00
L SEISMOGRAPH A 4.702.33 4.702.33 0.00
L ROME TBW24 DISC/HARROW A 11,159.68 1 l,159.68 0.00
L PAINT BOOTH A 34.051.33 34.051.33 0.00
L CLEMCO SANDBLASTER A 1.590.00 1,590.00 0.00
L LASER RECEIVER A 2,432.70 2.432.70 0.00
L LASER PLANE 220 A 1.042.00 1.042.00 0.00
L. HYDRAULIC HOSE MACHINE A 6.383.52 6.383.52 0.00
L BERM MACHrNE W/ATTACHMENTS A 6.630.30 6.630.30 0.00
L POWER UNIT FOR 6" PUMP #5232 A 20.245.15 20.245.15 0.00
L 6" HYDRAULIC PUMP A 4,046.55 4,046.55 0.00
L LrNE LOCATOR A 2.226.00 2.226.00 0.00
L LINE LOCATOR A 2.226.00 2.226.00 0.00
L 1991 CASE TRACTOR A 32.805.81 30.519.30 2.286.51
L MOWER/CASE TRACTOR A 10.500.00 9.768.17 731.83
L LrNE LOCATOR A 1.942.50 1.942.50 0.00
L LINE LOCATOR A 1.942.50 1.942.50 0.00
L LrNE LOCATOR A 1.942.50 1.942.50 0.00
L LINE LOCATOR A 1,942.50 1,942.50 0.00
L 1981 rNT'L TRACTOR A 14.700.00 13.276.83 1.423.17
L MIG WELDER A 1.102.40 1.102.40 0.00
Lri 14' STORAGE SHED ' A 2.835.00 2.835.00 0.00
L '98 MCLAUGHLIN PIT tAUNCHER A 56.700.00 47.439.00 9.261.00
L LrNE LOCATOR A 1.680.00 1.680.00 0.00
L LrNE LOCATOR A 1.680.00 1.680.00 0.00
hnuan23.200}- MAC CONSTRC<110N .& EXC., INC. Page: 7
EQUIPMENT LISTING FOR PREQUALIFIC~t\TION
ACCUMULATED NET BOOK
. CLASS DESCRIPTION C ORIGINAL COST DEPRECIA TJON VALUE
Lr PLATE COMPACTOR A 1.534.88 1.114.62 320.26
L LINE LOCATOR A 1.226.00 2.101.35 124.65
L ATLAS COPCO AIR COMPRESSOR A 11.362.50 8.669.88 2,692.62
L LINE LOCATOR A 1.961. 00 1.420.50 540.50
L LINE LOCATOR A 1.961.00 1.420.50 540.50
L LINE LOCATOR A 1.961.00 1.420.50 540.50
L LINE LOCATOR A 1.961.00 1.420.50 540.50
L 20' CONTAINER BOX A 1.785.00 1.785.00 0.00
L 20' CONTAINER BOX A 1.785.00 1. 785.00 0.00
L BUCKETIFORKS FOR FORKLIFT A 2.077.60 2.077.60 0.00
L MCLAUGHLIN LOCATOR A 1.809.00 2.809.00 0.00
L LINE LOCATOR A 1.961.00 1.395.39 565.61
L PIPE LASER A 3.764.15 2.582.46 U81.79
L PIPE LASER A 3.764.15 2.582.46 1.181.79
L PIPE LASER A 3,764.15 2.582.46 1,181.79
L LASER FOR GR..-illER A 5.946.65 3.615.57 2.331.08
Class = L
Subtotal 572.373.93 411.969.47 159.404.46
I
I
..
January 28. 2003 unruh ~-Quip., He Page 8
EQUIPMENT LISTING ~OR PREQUALIFICATION
, ACCUMULATED NET BOOK
CLASS DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
r\i
L NEW HOLLAND TRACTOR A 18.320.50 3.969.44 14,351.06
Class = L
Subtotal 18.320.50 3.969.44 14,351.06
0!
I
I
!\
(
~
..
lVI~-\CCO~STRUCTION--& E:XC_~ I~C_ P3gC: 9
EQUIPMENT LISTING FOR PRE QUALIFICATION
Januar. 28. 2003
ACCUMULATED NET BOOK
CLASS DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
{ "
\
P 2000 FORD F150 PICK UP A 22,050.00 11.515.62 10,534.38
P '99 FORD F350 PICK UP A 25,987.50 13,571.97 12.415.53
P 98 CHEVY PICK UP A 20,475.00 9,367.31 11.107.69
P '00 FORD F-250 PICKUP A 27.825.00 8,347.50 19.477.50
P '01 CHEV. SILVERADO PICKUP A 25.224.28 9,774.41 15,449.87
P 2001 CHEV SIL VERADO PICKUP A 23,406.78 7,841.27 15,565.51
P '02 CHEVY SIL VERADO TRUCK A 29.271.27 9.293.63 19,977.64
P '01 CHEVY PICKUP A 30.398.07 6,079.61 24,318.46
P '02 CHEVY PICKUP A 29,896.12 5.979.23 23.916.89
P '01 DODGE 35004X4 A 32,740.15 19,1 03.88 13,636.27
p '96 FORD F-450 PICKUP A 24,368.80 24.368.80 0.00
p '94 FORD F-250 PICKUP A 12,650.50 12.650.50 0.00
P '97 FORD F-150 PICKUP TRUCK A 20,830.75 20.830.75 0.00
P '97 FORD F-250 PICKUP A 12,360.39 8,121.95 4,238.44
P '97 FORD F-250 PICKUP A 11,604.91 7.625.53 3,979.3&
P '98 FORD F-250 SUPERCAB A I U 98.53 8,087.82 3,110.71
P '98 FORD F-250 SUPERCAB A 1 U 98.53 8,087.82 3,110.71
P '98 FORD F-250 SUPERCAB A 1 U 98.53 8.087.82 3,110.71
P '98 FORD F-250 SUPERCAB A I U 98.53 8,087.82 3,110.71
P '98 FORD F-250 SUPERCAB A 1 U 98.53 8,087.82 3,110.71
P '98 FORD F"250 SUPERCAB A 11.198.53 8.087.82 3,110.71
P '98 FORD F-250 SUPERCAB A 1 U 98.53 8,087.82 3,110.71
P '98 FORD F-250 SUPERCAB A 1 U 98.53 8,087.82 3,110.71
p/- '98 FORD F-250 FWD TRK A 12.992.76 9,383.66 3,609.10
r1 '99 FORD F-250 FWD TRK A 12,992.77 9.383.66 3,609.11
P '99 FORD F-250 SUPERCAB A 17.113.45 4,706.21 12,407.24
P '97 FORD R..-'\.NGER SUPERCAB A 12,904.50 7.512.05 5.392.45
P '99 FOR F-250 SUPERC.AB A 8,331.08 1.041.38 7,289.70
P '2000 FORD F-250 PICKUP A 10,700.76 0.00 10,700.76
P '99 FORD RANGER SUPERCAB A 16,905.00 IU08.18 5.796.82
Class = P
Subtotal 530.618.08 282.309.66 248,30&.42
I
I
(\
,
~
January 28. 2003 MAC CONSTRCLTION & EXC., INC. Page: 10
1-. -.-' .- -'. ,'.',
. . EQUIPMENT LISTING POR PRE QUALIFICATION
ACCUMULATED NET BOOK
CLASS DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
r\'
, . I
S SNOW PLOW A 3.278.11 1.671.83 1.606.28
S SNOW PLOW A 3.242..+0 972. 72 2,269.68
S SNOWPLOW 10' X 34" A 5.325.20 0.00 5,325.20
S HENDERSON SPREADER A 8.325.20 0.00 8,325.20
S SNOW BLADE A 3,501.75 58.36 3,443.39
S SPREADER BOX A 8.186.00 8.186.00 0.00
S SPREADER BOX A 8, I 86.00 8.186.00 0.00
S SPREADER BOX A 8.1 86.00 8.186.00 0.00
S SPREADER BOX A 8.186.00 8.186.00 0.00
S SPREADER BOX A 8.186.00 8,186.00 0.00
S SPREADER BOX A 8.186.00 8.186.00 0.00
S SPREADER BOX A 8.186.00 8.186.00 0.00
S SPREADER BOX A 8,186.00 8,186.00 0.00
S SPREADER BOX A 8,186.00 8,186.00 0.00
S SPREADER BOX A 8.186.00 8.186.00 0.00
S SPREADER BOX A 8,186.00 8.186.00 0.00
S SPREADER BOX A 8.186.00 8,186.00 0.00
S SPREADER BOX A 8.186.00 8.186.00 0.00
S SPREADER BOX A 8,186.00 8,186.00 0.00
S SPREADER BOX A 8,186.00 8.186.00 0.00
S SPREADER BOX A 8,186.00 8.186.00 0.00
S SPREADER BOX A 8,186.00 8,186.00 0.00
S SPREADER BOX A 8.186.00 8,186.00 0.00
S.- SPREADER BOX A 8.186.00 8.186.00 0.00
S' SPREADER BOX A 8.186.00 8.186.00 0.00
S SPREADER BOX A 8,186.00 8.186.00 0.00
S SPREADER BOX A 8.186.00 8.186.00 0.00
S SPREADER BOX A 8.186.00 8.186.00 0.00
S SNOW PLOW 12 X 42 A 14,908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 A 14.908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 A 14,908.00 14.908.00 0.00
S SNOW PLOW 12 X 42 A 14.908.00 14.908.00 0.00
S SNOW PLOW 12 X 42 A 14.908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 A 14.908.00 14.908.00 0.00
S SNOW PLOW 12 X 42 A 14,908.00 14.908.00 0.00
S SNOW PLOW 12 X 42 A 14.908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 A 14.908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 A 14,908.00 14,908.00 . 0.00
S SNOW PLOW 12 X 42 A 14.908.00 14.908.00 0.00
S SNOW PLOW 12 X 42 A 14.908.00 14.908.00 0.00
S SNOW PLOW 12 X 42 A 14,908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 A 14.908.00 14.908.00 0.00
S SNOW PLOW 12 X 42 A 14,908.00 14.908.00 0.00
S SNOW PLOW 12 X 42 A 14,908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 A 14,908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 A 14,908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 I A 14,908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 I A 14,908.00 14.908.00 0.00
S SNOW PLOW 12 X 42 ~ A 14,908.00 14,908.00 0.00
r\ SNOW PLOW 12 X 42 A 14,908.00 14,908.00 0.00
S SNOW PLOW 12 X 42 A 14.908.00 14,908.00 0.00
S LlFT TRAILER A 3.675.00 3,675.00 0.00
<.
MAC CONSTRU5=!IQN&t EXC., INC. Page: 11
EQUIPMENT LISTING liOR PRE QUALIFICATION
JanuJ.r\ 28. 2003
ACCUMULATED NET BOOK
CLASS DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
-r~ SNOW BLADE (LOADER) 7.311.94 7.311.94 0.00
S: A
S SNOW BLADE (LOADER) A 7.248.50 7.248.50 0.00
S SNOW BLADE (LOADER) A 6.899.46 6.899.46 0.00
S SNOW BLADE (LOADER) A 6.899.46 6.899.46 0.00
S SNOW BLADE (LOADER) A 6.899.47 6.899.47 0.00
Class = S
Subtotal 593.768.49 572.798.74 20,969.75
{\
I
I
r\
,
~
Januarv 28, 2003
r
r\
,
MAC CONsTRtte'TION & EXC..lNC. Page: 12
EQUIPMENT LISTING FOR PREQUALIFICATION
I
I
(
4
Januarv :28. :2003
unruh,e-Qu.ip.,!lc Page: 13
EQUIPMENT LISTING FOR PRE QUALIFICATION
.
ACCUMULATED NET BOOK
CLASS DESCRIPTION C ORIGINAL COST DEPRECIATION VALUE
r\
T '99 VOLVO DUMP TRUCK A 167,000.00 66,800.00 100,200.00
T '99 VOLVO DUMP TRUCK A 167,000.00 66.800.00 100.200.00
Class = T
Subtotal 334.000.00 133.600.00 200,400.00
I
I
r\
~
(\
~
SCHEDUlE "0"
MAC CONSTRU~TION & EXCAVATING, INC.
AND AFFILIATES
New Albany, Indiana
REPORT ON AUDITS OF
CONSOLIDATED AND COMBINED
FINANCIAL STATEMENTS
for the years ended
Decembe~ 31, 2002 and 2001
I
I
"
- -".
, (,t
.'~~
-\ --:
C 0 ;N TEN T S
Independent Auditors' Report
Consolidated and Combined Financial Statements:
1
Statements of Income
2
3
4
5
6 - 14
Balance Sheets
Statements of Equity
Statements of Cash Flows
Notes to Financial Statements
~
r\
-; .;i- :'".-.... "'1
p~ '/ -1- I:.. t~_,.~. L Z i .I" ..{:. ;.. f
~....-'"
'."-:
::;;~.;-t.
~~~~~:':
. f.~t::'.;'<>' -\
,,~....~.
_ \i Z, j'::'~:) L-L....L~...:.T ~<: :~-~..;i;:.N~:~2;.:. !..L~~
.;' ;--,~O':! :-~ ~~:-~',.' .~~;~.;"..~,.; ~" ~":'.~' ..}'.~;,..:,1:
_.
.' .
. -,:
...;.........'
:~~~:~~-
.' .':.: :: "", '.' . I,. _ .' ~..' .
INDEPENDENT AUDITORS' REPORT
To the Board of Directors and Stockholders of
I
MAC Construction & Excavating, Inc. and Affiliates
New Albany, Indiana
We have audited the accompanying consolidated and combined balance sheets of
MAC Construction & Excavating, Inc. and Affiliates as of December 31, 2002
and 200l, and the related consolida~ed and combined statements of income!
equity, and cash flows for the years then ended. These consolidated and
combined financial statements are the responsibility of the Corporation's
I
management. Our responsibility is to express an opinion on these consolidated
and combined financial statements b~sed on our audits.
We conducted our audits in accordan~e with auditing standards generally
accepted in the United States of Am~rica. Those standards require that we
plan and perform the audit to obtain reasonable assurance about whether the
consolidated and combined financial statements are free of material
misstatement. An audit incl1.ldes ex~ining, on a test basis! evidence
supporting the amounts and disclosu~es in the consolidated and combined
financial statements. An audit also,includes assessing the accounting
principles used and significant estimates made by m~~agement! as well as
evaluating the overall financial st~tement presentation. We believe that our
audits provide a reasonable basis f9r our opinion.
In our opinion, the consolidated an9 combined financial statements referred
to above present fairly! in all material respects! the financial position of
MAC Construction & Excavating, Inc. and Affiliates as of December 31! 2002
and 200l, and the results of their operations and their cash flows for the
years then ended! in conformity with accounting principles generally accepted
in the United States of America.
I
d::~l~S~::: L: cry,
Certified pUblic Accountants
I- L- C-
Jeffersonville, Indiana
January 23, 2003
!
I
r"
~
., ". ..-'
...- ........ -.
. ; . . .' " ;. : ~ . .
-,,"
i.":.:.i .', _..'.1
.., ~!ji';'
"""-';':.-".:: _;!f,
. ;. . " ~~ .':, .:.1'. i:. ;'.' .
MAC CONSTRUCTION & EXCAVATING, INC. AND AFFILIATES
CONSOLIDATED .~ ~OMBINED BAIJu~C3 SHEETS
December 31, 2002 and 2001
ASSETS
CURRENT ASSETS
Cash
Contract receivables
Costs and estimated earnings in excess of
billings on uncompleted contracts
Miscellaneous redeivables'
Prepaid expenses
TOTAL CURRENT ASSETS
2002 2001
$ 3,511,736 $ 888,350
3,372,556 5,623,906
337,719 1,046,949
20,047 15,210
84,562 51,866
7,326,620 7,626,281
10,387,668 9,874,034
(6,081,030) (5,184,012)
4,306,638 4,690,022
104,430 104,274
60,000 60,000
$11,797,688 $ 12,480,577
PROPERTY AND EQUIPMENT
Property and equipment
Less accumulated depreciation
PROPERTY AND EQUIPMENT, NET
OTHER ASSETS
.Insurance receivable
Investment property
TOTAL ASSETS
r>
LIABILITIES AND EOUITY
CURRENT LIABILITIES
Current portion of long-term debt
Accounts payable and accrued expenses
Billings in excess of costs and estimated
earnings on uncompleted contracts
TOTAL CURRENT LIABILITIES
$ 454,454 $ 764,753
2,612,043 2,825,015
995,155 683,202
4,061,652 4,272,970
500,000 500,000
1,607,533 2,071,635
6,169,185 6,844,605
870,041 566,990
Revolving line of credit
Long-term debt, less current portion
TOTAL LIABILITIES
EQUITY
Members' equity
StockhOlders' equity:
Common stock, no par value; $20 per share stated
value; 1,000 shares authorized; 400 shares issued
and outstanding
Additional paid-in capital
Retained earnings
.
f"
,
TOTAL
f
I
LIABILITIE'S AND
of /
8,000
7,044
4,743,418
8,000
7,044
5,053,938
TOTAL EQUITY
5,628,503
EQUITY
5,635,972
$11,797,688
$ 12,480,577
See notes to consolidated ~~d combined financial statements.
2
MAC CONSTRUCTION & EXCAVATING, INC. AND AFFILIATES
!
CONSOLIDATED AND COMBINED STATEMENTS OF INCOME
for the years ended December 31, 2002 and 2001
r
REVENUE
Contract revenue
Lease income
TOTAL REVENUE
DIRECT COSTS
Materials
Subcontractors
Direct labor
Equipment costs
Other direct costs
Total direct costs
r\
Gross margin
SELLING, GENERAL AND
ADMINISTRATIVE ~~PENSES
OTHER INCOME (EXPENSES)
Interest income
Miscellaneous income
Gain on sale of equipment
Interest expense, indirect
Total other income, net
Income before profit sharing
and bonuses
Profit sharing and bonuses
NET INCOME'
i
i
~
2002
Amount
$ 33,768,689
33,668
$
33,802,357
9,134,008
8,291,153
7,535,536
3,936,171
842,298
29,739,166
4,~63,191
2,4;04,099
1,84;9
42,282
87,836
(5,4;73)
126,494
1,785,586
414,055
1,371,531
2001
Percent
Amount
99.90
0.10
$ 31,546,251
113,067
100.00
31,659,318
27.02
24.53
22.29
11.64
2.49
7,111,973
7,512,109
7,314,185
4,266,744
743,377
87.97
26,948,388
12.03
4,710,930
7.11
2,406,927
0.01
0.13
0.26
(0.02 )
11,670
30,824
62,087
(15,112)
0.38
89,469
5.30
2,393,472
1. 24
491,366
4.06
$
1,902,106
See notes to consolidated and combined financial statements.
3
Percent
99.64
0.36
100.00
22.46
23.73
23.10
13 .48
2.35
85.12
14.88
7.78
0.04
0.10
0.20
(0.05)
0.29
7.39
1. 55
5.84
MAC CONSTRUCTION & EXCAVATING, INC. AND AFFILIATES
i
CONSOLIDATED ~~ C00BINED STATEMENTS OF EQUITY
for the years ended December 31, 2002 and 2001
~\
~ i
Balance,
December 31, 2000
Net income for 2001
Distributions
Balance,
December 31, 2001
Net income for 2002
~Distributions
Balance,
December 31, 2002
Members'
Equity
$ 228,734
338,256
566,990
453,051
(150,000)
$ 870,041
I
1
Stockholders' E~ity
Common Stock
Number
of Shares
400
400
400
Am01.L.""'lt
$ 8,000
8,000
$ 8,000
Additional
Paid-in
Capital
$ 7,044
7,044
$ 7,044
Retained
Earnings
$4,248,288
1,563,850
(758,200)
5,053,938
918,480
(1,229,000)
$4,743,418
See notes to consolidated and combined financial statements.
4
Total
Equity
$ 4,492,066
1,902,106
(758,200)
5,635,972
1,371,531
(1,379,000)
$5,628,503
(500,000)
500,000
(1,829,935) (1,347,310)
(1,379,000) (758,200)
(2,708,935) (2,605,510)
2,623,386 (1,194,125)
888,350 2,082,475
$ 3,511,736 $ 888,350
r
MAC CONSTRUCTION & EXC~VATING, INC. AND AFFILIATES
CONSOLIDATED F~~ COMBIkED STATEMENTS OF CASH FLOWS
!
for the years ended pecember 31, 2002 and 2001
2002
OPERATING ACTIVITIES
Net income
Adjustments to reconcile net income ~o net cash
provided by operating activities:
Depreciation
Gain on disposal of equipment
(Increase) decrease in:
Contract receivables
Costs and estimated earnings in excess of billings
Miscellaneous receivables
Prepaid expenses
Insurance receivable
Increase (decrease) in:
Accounts payable and accrued expenses
Billings in excess of costs and ~stimated earnings
Deferred income
$ 1,371,531
1,318,901
(87,836)
2,251,350
709,230
(4,837)
(32,696)
(156)
(212,972)
311,953
Net cash provided by operating activities
5,624,468
INVESTING ACTIVITIES
Purchases of property and equipment
Proceeds from sale of property and equipment
i
I
Net cash used for investing activities
(398,897)
106,750
(292,147)
FINANCING ACTIVITIES
Net line-of-credit borrowings (repayments)
Proceeds from issuance of long-term debt
Repayment of long-term debt
Distributions to stockholders
Net cash used for financing activities
INCREASE (DECREASE) IN CASH
CASH
Beginning of year
End of year
SUPPLEMENTAL SCHEDULE OF NONCASH INVESTING AND
FINANCING ACTIVITIES
Acquisition of equipment:
Cost of equipment
Net book value of trade-ins I
Equipment purchased with debt
$
(981,501)
27,070
555,534
Net!cash used to acquire equipment
i
$
(398,897)
SUPPLEMENTARY IN~ORMATION
Interest paid
$
123,133
See notes to consolidated .and combined financial statements.
5
2001
$ 1,902,106
1,330,739
(62,087)
(1,738,309)
137,789
29,699
6,957
90,062
(196,630)
67,018
(20,120)
1,547,224
(486,096)
350,257
(135,839)
$ (1,896,278)
1,410,182
$ (486,096)
s
177,518
MAC CONSTRUCTION & EX~AVATING, INC. &~ AFFILIATES
I
I
NOTES TO CONSOLIDATED ~~ COMBINED FINANCI.~ STATEMENTS
NOTE l-SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
,
This summary of significant accounting policies of MAC Construction &
Excavating, Inc. (the company), M C Leasing, Inc. (the Subsidiary) and Unruh
Equip, LLC (the Affiliate), collectively (the Corporation), is presented to
assist in understanding the consoli~ated and combined financial statements.
The consolidated and combined finan~ial statements and notes are
representations of the corporation'F management, who is responsible for their
integrity and objectivity. These accounting policies conform to accounting
principles generally accepted in th~ united States of America and have been
consistently applied in the preparation of the consolidated and combined
financial statements.
The more significant accounting policies are as follows:
r'\1
Nature of Operations
The Comp~~y is engaged primarily in the business of excavation, site
preparation, and utility construction for commercial and municipality
projects in the states of Kentucky and Indiana. The work is performed
principally under fixed-price cont~acts, although some jobs are done on a
cost-plus basis. The length of the Company contracts varies but are typically
less than one year. The contract-r~lated items in the balance sheet have been
classified as current because they have realization and liquidation periods
of less than one year. M C Leasing, Inc. is engaged primarily in aircraft
leasing. Unr1Lh Equip, LLC is engaged in leasing of construction and
excavating equipment.
Principles of Consolidated and Combined Financial Statements
The consolidated and combined fina:d.cial statements include. the accounts of
I
MAC Construction & Excavating, Inc., its wholly-owned subsidiary, M C
Leasing, Inc., and an affiliate, Unruh Equip, LLC, which is related by common
ownership and management. All significant intercompany transactions and
bal~Dces have been eliminated.
Use of Estimates
The preparation of financial state~ents in conformity with accounting
principles generally accepted in tpe United States of America requires
management to make estimates and aFsumptions that affect the reported amounts
of assets and liabilities (and disclosure of contingent assets and
liabilities, tf any) at the date o~ the financial statements and the reported
amounts of rev-enues and expenses dl.l.ring the reporting period. Actual results
could differ4from those estimates.
T"'.
6
MAC CONSTRUCTION & EXC~VATING, INC. AND AFFILIATES
TO CONSOLIDATED AND CO~INED =IN;U~CIAL STATEMENTS-Continued
NOTES
NOTE l-SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES-Continued
Revenue and Cost Recognition
Revenues from fixed-price and modified fixed-price construction contracts a~e
recognized on the percentage-of-completion method, measured by the percentage
of cost incurred to date to estimat~d total cost for each contract. This
method is used because management cdns~ders total cost to be the best
available measure of progress on th~ contracts.. Because of inherent
uncertainties in estimating costs, it is at least reasonably possible that
the estimates used will change within the near term.
Contract costs include direct labor, materials, subcontract costs, outside
I
equipment rentals and other direct costs applied to the job. Selling,
,
general, and administrative costs ate charged to expense as incurred.
provisions for estimated losses on uncompleted contracts are made in the
I
period in which such losses are determined. Changes in job performance, job
conditions, and estimated profitabi~ity may result in revisions to costs and
income, which are recognized in the period in which the revisions are deter-
mined. Changes in estimated job profitability resulting from job performance,
job conditions, contract penalty provisions, claims, change orders, and
settlements are accounted for as chfnges in estimates in the current period.
r\
The asset, "Cost and estimated earn~ngs in excess of billings on uncompleted
contracts," represents revenues recognized in excess of amounts billed. The
liability, "Billings in excess of cbsts and estimated earnings on uncompleted
contracts," represents billings in ~xcess of revenues recognized.
Cash Equivalents
The Corporation considers all short-term investments with an original
maturi ty of three months or less to, be cash equivalents. There were no cash
equivalents at December 31, 2002 a~d 2001.
Property and Ecruipment
Property and equipment are stated at cost. Maintenance and repairs are
charged to expense as incurred; renewals or betterments are capitalized. Gain
or loss on retirements or disposition of assets is credited or charged to
operations, and respective costs a~d accumulated depreciation are eliminated
from the accounts.
Depreciation ~s provided on the ba~is of estimated useful lives of the assets
using the str~ight-line and declining-balance methods. The estimated useful
lives a=e gen4rally 3 to 5 years f9r vehicles, ai=craft, office furniture and
equipment, l~sehold improvements ~nd 3 to 7 years for ccnst=uction
contraccing equipment. .
{"j
7
r,
NOTES
MAC CONSTRUCTION & EXCAVATING, INC. .AED AFFILIATES
I
I
TO CONSOLIDATED AND COMBINED FINAi~CI~ STATEMENTS-Continued
~ l-sUMMARY OF SIGNIFICAET ACCOUNTING POLICIES-Continued
~rtis ing
~rtising costs totaling $10,904 and $23,797 for the years ended
~mber 31, 2002 and 2001, respectively, were charged to operations when
lrred.
~ 2-CONTRACT RECEIVABLES
)ecember 31, 2002 and 2001, contract receivables consisted of the
~owing :
2002
Completed contracts
Contracts in progress
Retainage
$ 542,615
1,813,985
1,015,956
53,372,556
2001
$1,211,485
3,169,418
1,243,003
$5,623,906
cr\}:ation utilizes the allowance method for recording bad debts. The
Jora..tion considers accounts receivable to be fully collectible.
Jrdingly, management has determined no allowa~ce for doubtful accounts
required at December 31, 2002 and 2001.
~ 3-UNCOMPLETED CONTRACTS
)ecember 31, 2002 and 2001, costs and estimated earnings on uncompleted
:racts were as follows:
$ 337/719 $ 1,046,949
(995, 155) (683,202)
5 (657,436) 5 363,747
:s incurred on uncompleted contracts
i.mated earnings
Jet
3: billings to date
2002
$15,185,688
1,861,878
17,047,566
17,705,002
'otal
$
(657,43~
above amounts are included in the
companying balance sheet as the following:
:osts and estimated earnings in excess of
billings on uncomplete~ contracts
,I
lill~ngs in excess of cqsts and estimated
e~'ings or.. uncomplec~d contract:s
'otal
8
2001
$22,312,894
2,845,619
25,158,513
24,794,766
$
363,747
c'~
C'
r
\-'
MAC CONSTRUCTION & EXCAVATING, INC. AND AFFILIATES
!
NOTES TO CONSOLIDATED Al.'ID C00BINED FINAi.\fCIAL ST.ll..TEHENTS-Continued
NOTE 4-PROPERTY AND EQUIPMENT
At December 31, 2002 and 2001, property and equipment consisted of the
following:
Leasehold improvements
Contracting equipment
Office furniture and equipment
Transportation equipment
2002
$ 152,658
8,004,302
249,676
1,981,032
2001
$ 152,658
7,547,334
246,225
1,927,817
Total
$10,387,668
$ 9,874,034
Total depreciation expense was $1,318,901 and $1,330,739 for the years ended
December 31, 2002 and 2001, respectively.
NOTE 5-BANK BORROWINGS
The Company has an equipment revolving line-of-credit arrangement expiring
April 30, 2005, with maximlli~ borrowings allowed of $2,000,000. The line of
credit bears an interest rate of prime (4.25% at December 31, 2002). These
borrowings are collateralized by first liens on construction contracting
equipment purchased. Borrowings were $500,000 at December 31, 2002 and 2001,
respectively. The revolving line-of-credit does not expire within one year,
thus borrowings have been classified as long-term on the balance sheet.
Additionally, the Company has a worxing capital line-of-credit arrangement,
due on demand, with maximum borrowings allowed of $1,000,000. The line-of-
credit bears an interest rate of prime (4.25% at December 31, 2002). The note
is guaranteed by the Corporation'S stocxholders. There were no borrowings
outstanding under the worxing capital line-of-credit at December 31, 2002 or
2001.
NOTE 6-LONG-TERM DEBT
Long-term debt is summarized as follows:
2002
2001
Komatsu Financial:
Various installment notes payable in monthly
installments of $21,243, non-interest bearing,
maturing be~ween September 2003 ~nd December
2004. Secur~d by construction equipment.
$ 328,199 $ 580,127
~
(Continued)
9
,_ _.. _.._~__~-----,------.--c----~"-_.----:,"--'-'--
r
. .
MAC CONSTRUCTION & EXCAVATING, INC. AND AFFILIATES
I
NOTES TO CONSOLIDATED .~~u COJBINED FINANCIAL STATEMENTS-Continued
NOTE 6-LONG-TERM DEBT-Continued
GMAC Financial Services:
Installment note payable in monthly installments of
$775, non-interest bearing, maturing December, 2004.
Secured by Chevy Silverado. $
Volvo Commercial Finance:
Installment note payable in monthly installments of
$3,759, non-interest bearing, maturing April 2004.
Secured by 2 excavators.
Caterpiller Financial Services:
Installment note payable in monthly installments of
$6,177, non-interest bearing, maturing December, 2003.
Secured by construction equipment.
(\
New Holland Credit Company:
Installment note payable in monthly installments of
$470, non-interest bearing, maturink November, 2004.
Secured by construction equipment.
Case Credit:
Installment note payable in monthly installments of
$3,011, non-interest bearing, maturing December 2004.
Secured by construction equipment.
Citicapital:
Installment note payable in monthly installments of
$5,820, including interest payable at an annual rate
of 2.07%, maturing December 2005. ?ecured by
construction equipment.
Stockholders:
Term promissory note, due November 4009, principal
payments are not required during t~e terms, interest
payments are payable at least annually at 6.31%.
Secured by transportation equipment.
Total long-term ~ebt
Less current porltion of long-te:=rn debt
I
Total noncu:=:=en~ debt
10
2002
18,588
60,137
67,948
10,810
72,267
203,200
1,300,838
2,061,987
(454,454)
$1.607,533
2001
$
.2 7 , 8 8 2
142,073
15,451
345,888
1,723,967
2,836,388
(764,753)
$2,071.635
"
'.
,
r'\
MAC CONSTRUCTION & EXGAVATING, INC. AND AFFILIATES
i
NOTES TO CONSOLIDATED _~ COMEINED FIN&~CIAL STATEMENTS-Continued
NOTE 6-LONG-TERM DEBT-Continued
Long-term debt matures as follows:
December 31:
2003
2004
2005
2006
2007
Thereafter
$ 454,454
237,604
69,091
1,300,838
$2,061,987
NOTE 7-DEFERRED COMPENSATION
The Company terminated its unfunded, non-qualified deferred compensation agree-
ment during the year ended December 31, 2001. Deferred compensation expense was
$8,000 for the year ended December 31, 2001. The key employees benefiting under
these arrangements received cash payments upon the termination of the plan.
1\ NOTE 8-RETIREMENT PLAN
,
The Company has a 401(k) profit sha~ing plan for th~ benefit of the
employees. The Plan provides that t~e employees may contribute amounts to the
Plan to be matched by the employer in amounts or percentages as determined by
the Board of Directors. The Plan alpc provides that additional contributions
may be made each year as determined, and approved by the Board of Directors,
but not to exceed the amount deductible for federal income tax purposes. The
Company I s matching contribution for, the years ended December 31, 2002 and
2001, was $108,304 and $113,830 respectively.
NOTE 9-TRANSACTIONS WITH RELATED PARTIES
i
The Company leases its adrninistrati~e office and shop faciliti~s from the
stockholders and a related limited :liability company under operating leases
expiring in 2004 and 2005. Total lease expense charged to operations under
these leasing arrangements was $199,243 and $195,188 for the years ended
December 31, 2002 and 2001, respectively. In addition, the Company is
responsible for payment of all rep~irs and maintenance, property taxes,
insur~~ce, and utilities. See Note ,10 for additional lease information.
The Corporation has long-term borrowings from its stockholders totaling
$$1,300,838 a~& $1,723,967 at December 31, 2002 and 2001, respectively. See
Note 6 for ad4itional informatio:c..
I
I
As discussed in Note 1, all significant intercompany transactions and balances
have been eliminated in the consolid~ted and combined financial statements.
11
.,.
,'t
"
.'^
MAC CONSTRUCTION & EXCAVATING, INC. AND AFFILIATES
I.. .
I
NOTES TO CONSOLIDATEDJl..Nb COMBINED FINAL'\ICIAL S7ATEME:N'"TS-Contim:ed
NOTE lO-LEASED PREMISES AND EQUIPMENT
The Corporation leases property, equipment and vehicles under operating
leases expiring in various years through 2005. Total lease expense, under
these operating leases, was $211,868 and $225,559 for the years ended
December 31, 2002 and 2001, respectively.
Future rental payments ~~der operating leases having remaining terms in
excess of one year are:
For the year ended December 31,
2003
2004
2005
2006
2007
$187,312
60,000
25,000
Total future mini~um rental payments
$272,312
Additionally, the Corporation leases property, equipment and vehicles on a
short-term basis. The expense for these short-term leases totaled $60,282 and
$65,495 for the years ended Decembe,r 31, 2002 and 2001, respectively.
See Note 9 for additional lease information.
r.
NOTE II-SIGNIFICANT CONCENTR-~TION OF CREDIT RISK
Cash Concentration Risk
The Company maintains cash in dema~d deposit accounts with federally insured
financial institutions. At times, the balances in these accounts may be in
excess of federally insured limits. Additionally, the Company has invested
cash in a money market fund that i~ not federally insured. At December 31,
2002, the Company had uninsured ca~h of approximately $3,600,000.
Customer Accounts Receivable
The Corporation grants credit, genJrally without collateral, but usually
eligiblecfor the filing of a contractor's lien against the property on which
work was performed, to customers i~ Kentucky and Indiana. Consequently, the
Corporation's ability to collect the amounts due from customers is affected
by the economic fluctuations in this geographic region.
NOTE l2-INCOME TAXES
r\
Effective July'l, 1996, the Company with the consa~t of its stockholders, elected
to be taxed as~an S corporation under provisions of the Internal Revenue Code.
Under those provisions, taxable income is reported en the tax retu-YilS of the
individual st~ckholders. Additionally, the states, in which the Comp~~y operates,
recognize the S corporation status. ~ccordingly, no provision has been made for
federal or state income t~< in the a~companying financial stata~ents.
12
""
~',+ '\:
t>
MAC CONSTRUCTION & EXCAVATING, INC. AND AFFILIATES
I
NOTES TO CONSOLIDATED &~ COMBINED F:N&~CIAL STATEMENTS-Continued
NOTE 12-INCOME TAXES-Continued
Effective September 1, 1999, the Company elected to treat its wholly owned
subsidiary, M C Leasing, Inc., as a Qualified Subchapter S corporation. Thus,
all assets, liabilities and items o~ income, deduction and credit for the
subsidiary are treated as owned by the Company for tax return purposes.
The Company is potentially subject through 2006 to a built-in gains tax. The
tax will be imposed should the Company dispose of assets which were owned on
the effective date of the S election. The tax would be calculated on the
excess of fair market value over the tax basis of the asset as determined on
I
the effective date of the S electiop. For the years ended December 31, 2002
and 2001, the Company paid built-in gains tax of $29,467 and $15,244,
respectively.
The amount of taxable income passed through to the Company's shareholders for
the years ended December 31, 2002 and 2001 is $894,688 and $1,156,705
respectively. For the years ended December 31, 2002 and 2001, the Company
distributed $1,229,000 and $758,200, respectively.
(,
Due to various timing differences, income is recognized in different periods
for tax reporting purposes than for financial statement purposes. The
cumula~ive deferred taxable income ,and the resulting approximate cumulative
deferred taxes that would have bee~ recognized if the Company were not
considered a pass through entity are comprised of the following:
December 31, 2002
Cumulative Cumulative
Timing Differences Deferred Taxes
Detriment (Benefit):
Differences in depreciation methods
Contract income recognition differences
$1,353,000
5,000
$524,000
2,000
$526,000
$1,358,000
December 31, 2001
Cumulative Cumulative
Timing Differences Deferred Taxes
r
Detriment (Benefit):
I
Difference~ in depreciation methods
Contract i~come recognition diff~rences
$1,202,000
22,000
$481,000
9,000
$1,224,000
$490,000
13
~
>
"
t,
MAC CONSTRUCTION & EXCAVATING, INC. AND AFFILIATES
i
NOTES TO CONSOLIDATED ;U~ COMBINED FIN~~CIAL STATEMENTS-Continued
NOTE 12-INCOME TAXES-Continued
During 2000, the Affiliate was formed under the laws of Indiana as a limited
liability company. However, the Affi~iate elected to be t~<ed as an S
corporation under provisions of the Internal Revenue Code. Under those
provisions, taxable income is reported on the federal tax returns of the
individual members. AcCordingly, no provision has been made for federal
income t~~ in the accompanying financial statements.
The amount of taxable income passed through to the Affiliate's members was
$143,500 and $96,521 for the years ended December 31, 2002 and 2001,
respectively. For the year ended December 31, 2002, the Affiliate distributed
$150,000 to its members. No distrib~tions were made to members for the year
ended December 31, 2001.
Due to various timing differences, income is recognized in different periods
for tax reporting purposes than for financial statement purposes. The
cumulative deferred taxable income ~nd the resulting approximate cumulative
deferred taxes that would have been recognized if the Affiliate were not
considered a pass through entity ar~ comprised of the following:
('
December 31, 2002
Cumulative Cumulative
Timing Differences Deferred Taxes
Detriment (Benefit)
Differences in depreciation methods
$550,000
~'L..Q.Q.Q
December 31, 2001
Cumulative Cumulative
Timing Differences Deferred Taxes
Detriment (Benefit)
Differences in depreciation me~hods
$241,000
$89,000
NOTE 13-LEGAL CONTINGENCIES
various legal
which, in the
Corporation'S
claims arise from time to time in the normal course of business
I
opinion of management, will have no material effect on the
financial statements.
NOTE 14-RECLAS~IFICATION
I
r
Certain items~have been reclassifi~d for 2001 to conform with the
classifications in 2002: Such reclassifications had no effect on earnings or
equity as previously repor~ed.
14
I
r~' .
,..
12.0 BID FORMS
NOTE: INSERT AND ATTACH TO FORM 96, DO NOT USE THE
CONTRACTOR'S BID SECTION ON FORM 96. BE SURE TO SIGN
I
BID, NOTARIZE BID AND EXECUTE NON-COLLUSION
AFFIDAVIT.
CONTRACTOR'S BID FORM
JEFFERSONVILLE DRAINAGE BOARD
4TH FLOOR, CITY-COUNTY BUILDING
501 EAST COURT AVENUE
JEFFERSONVILLE, INDIANA 47130
RE: BONENBERGER'S OAK GROVE SUBDIVISION DRAINAGE PROJECT
JOB NO. 9705A
Gentlemen:
We submit, herewith, our sealed proposal to furnish all necessary labor, material and
equipment to construct the above captioned project, in accordance with the subject plans and
specifications at the unit prices listed herein.
r I
f'
~
W~ Ac/?AI~W'e-ePc:;€: A-tb(Je,utJuM I 7.)~ /~-/t:.- ~3
hO~A.tI)t.tM # -z: O~/Z--18-t!)3
. -4- :5 1J ~ (2--' fi-CL:)
M IJe>> I) u IV!
C,\Syd""Y\wl'docs\9\970S\970S.\&ecUon 02."'I,J
I
;\-205
1
I
I
1
I
t (>
J
I
I
I
I
'BONENBERGER'S OAK GROVESUBDIYISION
D~~~~~_~~~~~~-----_------__--__-_---------------------___________~~~_~~~_~7_~~~
ITEM APPROXIMATE DESCRIPTtON WITH UNIT PRICE TOTAL AMT.
NO. QUANTITY UNIT PRICE IN FOR BID
WRITTEN iN WORDS NUMBERS ITEM
.--------------------------------------------~-----------------------------------~~------------~
1 0 TONS Crushed Limestone
(Misc. Sizes)
For...$!..~.~...~.'?............
P::.~~;:........,......... Dollars $ / t, - . $ 0 (~
.______________________________~-------------r--------~----------------------------------------
2 0 TONS Bank Run Sand
For...GW?~..~P.........
...l':l~./I.~g,.................. Dollars . ~
Per Ton $ It - $ 0
.____________________________________________1"________---- -~-----------------------------------
3 0 CY Formed Concrete
N on-Reinforced
For...~..~.!Y.{?B:5fP.....
1.h!.?...(y.1~/tQ!l.......... Dollars . /
Per Cubic Y 4fd $ 400 - $ 0
,--------------------------------------------~~---~--------------------------------------------
4
OCY
Non-Formed Concrete
Non-Reinforced
For..J.~...~.J:Y.~:rY f7v6
~1>...!'!.~.It.'?J?........... Dollars
Per Cubic Yard $ -Z Z 5' -
o
/
$
._------------------------------------------1--------------------------------------------------
ReinfCfing Steel
For.........'(:o!~...."~P................ .
......~It.9.Q.................. Dollars
Per Pound $ I - $ 0
.-------------------------------------------i--------------------------------------------------
5
o LBS
/
6
OSY
Sod
For..."r;;!M:-....~p..............."...
....N:O..JL~.9................. Dollars
Per Square Yard
o
/
$ 1-
$
._-------------------------------~----------I--------------------------------------------------
7 7 EA Type 'B' Manhole
For...J.~.~!j..f!.l~...I&.~OJ2G()
h-!.I,)..~~/!.~.............. Dollars /
Per Each . $ '2~ qOo- $ 20,300-
.-------------------------------------------t--------------------------------------------------
8 1 EA ~t.=~.~ai.t~/.
.~...~It.~............. Dollars'
Per Each $ 3, SOO- $ 3, svo-
._______________,___________________________r_________-----------------------------------------
C: \SyJl1t."Y\wpJocs\9\9705\9705o. \section aZ.wpJ
A-206
I
t,
I
i.' {\
:,:_;;;~::-';
'~"';'<-,:.-- " ,.'h: '
,',,,-,
f
I
~
~
I
~
iI',
I
I
1/-
I
I
I
I
I
I
I
f":
I
E
BONENBERGER'S OAK GROVE SUBJ)IVISION
DRAINAGE PROJECT' JOB NO. 9705A
._________________________________~------~-1~~~~~~~~~-~~----------------------------------------
. ITEM APPROXIMATE DESCRIP:TION WITH UNIT PRICE TOTAL AMT.
NO. QUANTITY UNIT PRICE IN FOR BID
WRITTEN IN WORDS' NUMBERS ITEM
._-----------------------------------~-----~----~--------------------------------------~--------
9 20 EA Adjust Marlhole Casting to
Grade ~
For..T~........................T~r.I
. .~f>....~h.~9,............. Dollars" /
Per Each $ Z 30 - $ 4 v 00 -
.------------------------------------------T---~~--~-~------------------------------~---------
10 1656.90 LF 12" PVC Sanitary Sewer
F or..(;.~~ij:r.i...6..~~..................
tM!p...:~::~!I!.'!..~........... Dollars
. Per Linear Foot $~.s - $ /40 S 3& ~ /
.----------------------".--:--".--------------t".--".".---~~".~--~:-".--".".---".....".:--".-----...--............+....------
11 329.12 LF 8" PVC Sanitary Sewer
For...S.~r:t...TfA!.~...~.......
..~.~.b.~.~................... Dollars . /
Per Linear Foot $ (" 2 - $ 20 4-05 ~
.------------------------------------------------------------------------------------~--------
6" Property Service
Connection Pipe with
Cleanout
For..9.!:'..~..TH5Y:~..~
~i)...~~Af?p............. Dollars
. Per Each $ I o'ro - $ 4-1 17'60- ,,/
.__________________________________________:-______________________JL___________________~_______
13 2 EA
12
39EA
Connect 12" Diameter Pipe
~o:.S;::~.~=.~TIH~
.~Q...':'!.?l(.~!?......... Dollars
Per Each . $ 7 ~o - $ I 4Vo ~ /
._---------------------------------------~-".-~---~~--".-~----".--------------".-....-------~~--------
14 2 EA Connect 24" Diameter Pipe
to an Existing ~cture .
For..7k~~...........~~
~t>.....':!.~kf).~.......... Dollars
. Per Each . $ ',200 - $]... 4-"00- /,
.____ ---------------------------_:----------i-- ___________~--~-----".".--_:".__"."."."....------...::l---------...-
15 1 EA Connect 8" Diameter Pipe
to an Existjng Structure
For..1!.)S...!.~('t.~..'?~
. "::~~:=~'!1umu'm.u Dollars $ &70- $ (, ~ _ /
._----------------------------------------~-------------------------------------------- -------
C ,\Syd""Y\Wl'doc,\9\9705\9705. '..eelio" .2''''l'd
A-207
I .
I
~
r
I
f
!
I
I
I
I
I
I
I
I
I
I
I
~.
~
(',
~
BONENBERGER'S OAK GROVE SUBDJVISION
p~~~_<!~_~!!Q~~!----------------------------------------____________I9}}}~!.9.:_~J_<<!.~~
ITEM APPROXIMATE DESCRIPTION WITH UNIT PRICE TOTAL AMT.
I
NO. QUANTITY UNIT PRICE IN FOR BID
WRITTEN IN WORDS NUMBERS ITEM
._------------------------------------------~~------~-------------------------------~--~------~-
16 1 EA Connect 6" Diameter Pipe
to an Exit.e Structure
For..,$.\!5...........!?~..~r.t
.~.9...~!.!.l?~.;........... Dollars /
._------------------------------~~!_~~~~-----------------~---_!_-~-~-Q~------~----~~~-~---
Catch Basin ,Type C
For...T~.@.~....~~~. .
A-w.D..~.~.l!.~........... Dollars /
Per Each . $ J ~OO - $ 2.......~ t) 0 -
.------------------~--------~---------------r---------_____________L --------------------------
18 29 EA Catch Basin Type D
For.T~...{~~
~.~...~~~lf.~.Q........ Dollars
Per Each $ I. '300- $ 3+,7'00 - ,,/
.----------------------------------~--------r~~--~-----------------~---~-----------------------
19 5 EA Catch Basin Type J
- . f4w..,
For..l.!ii~..............b.(Yf;p
:I,)E:~h.~.Q.......... Dollars $ I 3.00- $ "i.,,;;;; - /'
.__________________________________---------,---------_____________~-----------------~4~~-~-:~
20 8 EA Catch Basin TY~
For..~1..~..............~~
~P.....':'!:.'!.h.r;?9......... Dollars .
PerEach. $ 'I~OO- $/2<<000.... /
.--------------------------------------~---l----------_______________________________1_________
21 1 EA ~~~'~~~.TI:e;..~~.1)UD
AtY.t>....~.f?.IH'~,Q......... Dollars
Per Each
17
19 EA
$ 3.'ioo-
$ ~ 1300 - ,,/
,----------------~-------------------------~---------------------------------------------------
22 1 EA Special MHA/CB21
For.T~N..Q.~...~P.4_6i>
~~....~.~!.!.~.9............ Dollars ./
.-------------------------------~~!-~~~~--r-----------________~__~i~~-~~------~--~!!-9-~~-~
Special CB53A
For.Th...~.t1...~.~.~..~t.'!.~
A~...~I.~~......... Dollars . /
Per Each . $ 3,100D- $ 3800-
._-~----~--~-------------------------------~---------------------------------------------------
23
1 EA
C: \SyJney\wpJocs\9\9705\9705n \section ...2. wpJ
A-208
I.
I
I
,r,
~i '
.
i
~.
r
I
I
.0
I
~
BONENBERGER'S OAK GROVE SUBDIVISION
DRAINAGE PROJECT JOB NO. 9705A
._------------------------------------------~---------------------------------------------------
ITEM APPROXIMATE DESCRIP1'ION WITH UNIT PRICE TOT AL AMT.
NO. 'QUANTITY UNIT PRICE IN FOR BID
WRITTEN IN WORDS. NlJMBERS ITEM
.---------------------------------------------------------------------------~-------------------
24 1 EA Special Catch Basin No. 56
For..T't.!~!':t..~l~...~d.P.fU!I>
~...':!!.!.~y............. Dollars /'
Per Each . $ 3 ~ 60- $:3 q, 0-
.__________________________________________~----------______________~----------------L---------
25 8 EA 12" Metal End Section
For..~Q..tM.t!.~...8.f.!Y.
.~r;?..~.~.h~~........... Dollars
Per Each . $ '2Sl>- $ Z ()o<;> - /'
.-----------------------------------------------------------------------------------~----------
26 1 EA 18" Metal End Section
For..TH!1:-.~..t&.~I;?~..~f"ry
~.!iL~f!..f~........ Dollars ,.-
Per Each $ '3 S?J- $ 3 St> - /
._----------------------------------------~----------------------------------------------------
27
1 EA
~~~..~~~~=fP~1V
~q....~.b.f!.9........... Dollars
Per Each $ 8 4-0 -
$ 9 4-0-
.....-/
/
.----------------------------------------------------------- ---------------------- -------------
28 2215.73 LF 12" Reinforced Concrete
Pipe, Class 3
For..TJ:f1~r.t......~P.......-. (pl..P 4-1 J (I qo
.......'::!.~.b~.Q................ Dollars. . )/
Per Line"r Foot $ 3D" $ vI, 4"":J I ~
----------------------------------------,--------------------------------------------~-------
29 2247.25 LF 15" Reinforced Concrete
Pipe, Class 3
For.T~....~............
~~....~~l1.f!Q........ Dollars
Per Linear Foot . $ 34 - $ ?-{, 4'0 ~ %2-/
________________________________________--------------_______________________________L________
30 1620.49 LF 18" Reillforced Concrete
Pipe, Class 3
For...&..~....~O'.................
~!)....~.~!l~.O'...... Dollars
_______________________________~~:_!:~'l~~~~~~__________----~---~~:=------~-~,~~~~
(' :\Syd.nl.')'\W].Klocs\9\9705\9705n \seclion .:12. wpJ
A- 209
a
.~
.
k-
.
.
I'
. ,
>j
!
Ii
~lll
BONENBERGER'S OAK GROVE SUBpIVISION
DRAINAGE PROJECT JOB NO. 9705A
.______________________________________~---I----------------------------------------------------
ITEM APPROXIMATE DESCRIPTION WITH UNIT PRICE TOTAL AMT.
I
NO. QUANTITY UNIT PRICE IN FOR BID
WRITTEN IN WORDS NUMBERS ITEM
.__________________________________________i______~-----------------~----------------------------
24" Reinforced Concrete
Pipe, Class 3
For...5.P.t1..T~~....~p.......
~:'~;~;"F'~~~"" Dollars $ 6"3 - $ / ttl Ck;C,?J. /
._________________________________________1__________________________________________~-J-~-----
32 40 LF 36" Reinforced Concrete
Pipe, Class 3
For...~~.~.......~~~.............. ./
~.~...~l~!?............ Dollars
Per Linear Foot $ e-<o - $ '3 s 2.0 -
.-----------------------------------------T----------~-~-----~~---~--------------~--cJ-~=~-----
33 193 LF Mill 2" Deep and 2' Wide for
Pavin,g.
For....h..~.....t.r.::.~.P........
.....~~.h~9................._. Dollars
Per Linear Foot
31
358.43 LF
$ Z.S"i's- /
I
-----------------------------------------r--~--------------------------------~--------------~-
$
/s-
34 20,073 LF 2' Concrete Curb and Gutter
For...td./~~......fY:.!..~.............
p~;i~:~~.F~~~.... DOllars. $ ~ ~ $ /q 4 7-0~ 10/
.-----------------------------------------r--------------------------------------------~------
35 1,482 TONS INDOT Asphalt Surface
HMA No~ 9 for Roadways
For..TIt.~~:tt._.T~9................
~Q...~."-~.9........... Dollars /
Per Ton $ 32..- $ 41 4z4-
._--~------------------------------------,--------------------------------------------~-------
36 4,446 TONS INDOT Base Asphalt
Intermedipte No. 8 for
Roadways
F or..Tffl. t?:r::!... ..Q~9................
~.~...~l!.~g.......... Dollars
Per Ton . $ 31 €J!. $ I ~ ~ - /
.________________________________________~------------_________________________________J_______ .
37 12,730 TONS INDOT pGA Type '0',
Size 53 for Roadways
For..C~~....~.!?.......
.....~Ir.~................. Dollars /
._______________________________~~!_~~~_,-------------________~___l~~_______~_l~~J__~_~~
c: \SyJney\t'l'pJocs\<-J\9705\9705.. ~ecljol1 <12. wpJ
A-21O
, .-.,- ~'- .._~~:"J-',:....~T~:.~JLL1!l[IIn:C.~~:~_".."" ~"._..,.~',"N~..,~_~4,.~.+,=.~....=I:_~,~ =u,~,,,,~_L..~~~o~,:' _ ...e".~,:"~"~':'~.:'-~:~::::.~"~;::~_i--~-~=n:-;~=~::~=;::~~'~-~~:-::~i~
I
~
r
I'
~.
,
I'
I
I'
I
I
I
I
I
I
[
r
r'
BONENBERGER'S OAK GROVE SUBpIVISION
DRAINAGE PROJECT' JOB NO. 9705A
._-----------------------------------------~---~----------------~-~-~-----------------~---------
ITEM APPROXIMATE DESCRIPTION WITH UNIT PRICE TOTAL AMT.
I
NO. QUANTITY UNIT PRICE . IN FOR BID
WRITTEN IN WORDS NUMBERS ITEM
I .
._--------------------------~--------------+-----------------~----------------------------~-----
38 10,775 GALS INDOT Prime Coat r
F~.......~~....~.t?.......... q t SCl .1 s
p~~~:;;~~'.mm... Dollars $ 0 ~ $ q J se 2$' ,/
._~----------------------------------------~----------------------------------------~----------
39 1,347 GALS INDOT Tack Coat
For....~g....&Y.f:?..............
p~~7!:i~~............... Dollars $ 0 ~ $ I 0 I 0 ~ /
.__________________________________________~----------____________________________~-J-------___
40 4,777 SYS Gravel Driveway
Replacement .
For.....~.t'6......~................
. ...f~lt9.Q................... Dollars' '0 ~ ./
._______________________________~~_r..?_'!~~~~""~-a!~-----_________~____(g_::_______~__?:.~~J-~~:.::- .
41 2,580 SYS Asphalt Driveway
Replacement
For...$~~.~.............
;;~'~~~:(~:~d" Dollars $ 17Q2 $ 43 .etPo-./
.-------------------------------------_____~----------________________________________J________
42 645 SYS Concrete Driveway
Rep~ement
For...J..*~bf......$:.':X............
~~.~~:!I;:~d.. Dollars $ "3 &> ~ $ Z ~~ 22-0 - /
._-----------------------------------------~---------------------------------------------------
43 10,432 LF Linear Grading
For...~~!Y...T..~.... . /
~.J?..':'!~/{.9.o......... Dollars
Per Linear Foot $ Z 3 - $ Z3Q q '3(, -
.---------------------------------------------------------------------------------------~------
44 3 EA Lower Existing Sanitary
Sewer Lateral 18" to Avoid
~~r.1?J~=:~~~
~!>.....':f.~...b.PQ....... Dollars /
_______________________________~~!_~~~~______________________~__LJ_~~~~____~__~_!~~~_~__
C :\8yJn~~'\1:\1.JO's\9\9705\9705i1 'v:ediOll ..2.w1xl
.. A-211
I
~" ,
~.;.;.,
'~l
!
I
f'
:r
I
,
.
Ie
II
.
BONENBERGER'S OAK GROVE SUBDIVISION
~~~~_~~~~~~~~-----------------~-----------------------___________~~~_~~~_~7_~~~
ITEM APPROXIMATE DESCRIPTION WITH UNIT PRICE TOTAL AMT.
NO. QUANTITY UNIT PRICE IN FOR BID
WRITTEN IN WORDS NUMBERS ITEM
~--------------------------------------------------------------------------------~--------------
45 1 EA Alter MH7A
For...ON.~...T~.~..~.~
._______________c_______c______;;~~t~~~~~=~_~~~~:~_____~__~~_()~_____~_JL()-~9_~_~
46 48 LF Heavy Galvanized Chain,
with Lock
For...~~...~.~..............
J~.b!>>....................... Dollars /
Per Linea~ Foot $ 4.!2. $ I q (p ~
._----------------------------------------:----------------------------------------------------
47 4 EA Power Pole Posts, Min. 8"
Diameter by 7' Long,
Drilled and Installed
ForT.~..~. __~f.!.~ /
f.r.:!.p......~~l1.~........ Dollars
Per Each . $ Z qO ... $ J , \0 0 -
._________________________________________~-----------______________________________J__________
48 4.53 ACRES Seed, Fertilize and Mulch
Disturbed Areas ;J.".
For.7it:f.~.A.....~~
Ft::::-::::-__~/I'!9-- Dollars $', :$ 50- $ (p 1/ s:;i!! /
.________________________________________l_____~------_________________________~______J--------
49 1,000 LF Silt Fence, Installed
For....~lw??.....~.9.................
.....r:!.t?.. .~~~............... Dollars /
Per Linear Foot $ Z. - $ Z. 000-
.____________________________________________________________________________________1_________
TOTAL BID PRICE FOR ITEMS 1 THRU 49 = $/,41~"q80, -71