HomeMy WebLinkAbout04) 2003 Capital Improvement Bond Issue
Jacobi, Toombs and Lanz, inc.
e
~
Consulting Engineers
120 Bell Avenue Clarksville, Indiana 47129
812 288-6646 FAX: 812288-6656
January 6, 2004
JEFFERSONVILLE DRAINAGE BOARD
2003 CAPITAL IMPROVEMENT
BOND ISSUE
PROCEEDS A V AILABLE from the Bon~ Issue for the three (3) projects:
$ 3,200,000
PRIORITY NO.1 PROJECT: Bonenberger Drainage Improvement
Low Bid by American Contracting: ) $ 1,446,000
Engineering and Construction Inspection: $ 148,500
Construction Contingency (:f: 5%): $ 72,500
Total $ 1,667,000 = $ -1,667,000
Balance remaining for Project No.2
(The Meadows Area) and
Project No.3 (The Winn-Dixie Floodwall Area)
$ 1,533,000
~..I
" . I
C'-5~dno~"wpdocs'-9'-9 705'-9 705 a "bond ;ssuo.wpd
John H. Toombs, Jr. P.E. Jorge I. Lanz, P.E.