Loading...
HomeMy WebLinkAboutStrand update Page 1 of 1 Cindy Gardner From: Sneve, Mark [Mark.Sneve@strand.com] Sent: Wednesday, May 09, 2007 11:00 AM To: Cindy Gardner; Rob Waiz; j.caldwell@insightbb.com; Bill Cc: Jorge Lanz; Len Ashack Subject: Jeff Sewer board 5/15 brief update from Strand Brief Strand update for Jeff Sewer Board meeting 5/15/07.   CSO Flow meters:   Today they are installing the flow meter in the 96-inch sewer downstream of the TSPS.   By the end of today all CSO flow meters except the one at Spring Street CSO are installed and operational.  Contractor has Spring Street planned for Friday or Monday                                         (Weather dependant).   Integration of computer and SCADA continues.   CSO LTCP:   Conference call with EPA/DOJ/IDEM is scheduled for Tuesday 5/15 at 11 AM.   CMC Pump Station:   Revisions made to pump selection.  70 HP, 1750 RPM will deliver 825 gpm at start of pump cycle.   Advertised for Bids to be received 5/29   Our current contract only covers design, as previously discussed.  A separate e-mail will include request for bidding & construction phase engineering services.     Local Limits:   Historical data request made to EMC   Thanks, MAS   5/9/2007