HomeMy WebLinkAboutMonthly Report Jeffersonville Wastewater Treatment Facility Monthly Operations Report 1.0EFFLUENT QUALITY During February, effluent quality was within NPDES permit limits for CBOD, TSS and NH-3. Table 1.1 summarizes the effluent quality data. Attachment A contains Time Series Plots of Carbonaceous Biochemical Oxygen Demand (CBOD) and Total Suspended Solids (TSS) values. Attachment B contains Time Series Plots of Aeration Mixed Liquor Suspended Solids (MLSS) and Sludge Volume Index (SVI). Table 1.1 Monthly Average Effluent Quality Permit Limit Actual Parameters Carbonaceous Biochemical 25 mg/l 6.4 mg/l Oxygen Demand (CBOD) Total Suspended Solids 30 mg/l 8.9 mg/l (TSS) Fecal Coliform MPN 2000 colonies/100ml 361.5 colonies/100ml Ammonia 3.0 mg/l 3.9 mg/l Average Flow 6.0 design 5.7 MGD Table 1.2 Wet Weather vs. Dry Weather Number of Wet Days * 14 Average Flow of Wet Days 7.491 MGD Number of Dry Days 14 Average Flow of Dry Days 5.110 MGD *Wet Day = Rain (>0.1 in) and three days after 2.0DESIGN LOADINGS LIMITS The Flows and Loadings report for May 1994 through February 2007 can be found in Attachment C. 3.0FACILITY OPERATIONS During February, the treatment processes performed very well. All parameters were will within IDEM limits. Average influent flow was 104% of plant design capacity. Removal rates for the month were BOD removal – 96.7%, TSS removal – 96.2%, Ammonia removal – 99.5%. 1 Jeffersonville Wastewater Treatment Facility Monthly Operations Report 3.1PRETREATMENT Pretreatment activities for the month included the following: ? Badd, Inc. on New Middle Road was visited due to an inquiry made to IDEM. Samples were taken and we’re awaiting a decision from IDEM. ? Atrip was made to Jeffboat to follow up on a complaint to IDEM. 4.0 SEWER MAINTENANCE CALLS Table 4.1 represents all sewer maintenance calls for the month. Table 4.1 Monthly Sewer Call Report, Residential Responsibility Footage Date Resident Address Complaint In CSO Cleaned Area? 02/26/07 Jason Geary 420 E. Market Tap locate Y 1825 Artic 02/21/07 Mr. Dogarisingh Tap locate N Springs 02/15/07 Richard Jackson 608 Kewanna Tap locate N 02/12/07 Chris Vissing 1506 Francis Ave Tap locate N 1043 Nachand 02/01/07 Lisa Turner Backup – main ok N Lane 02/02/07 Helen Pendergraft 300 Pearl Street Backup – main ok Y 1414 High 02/02/07 Alisa Washington Backup – main ok N Meadows 3602 Jacklyn 02/05/07 Stemlers Backup – main ok N Trail 02/06/07 Rick Stone 2007 Hamburg Blockage- city N 4186 Silverslate 02/07/07 Jim Furber Odor N Drive 02/08/07 Mike Shenen 2911 Biship Rd Back-up-main ok N 1430 Ridgeway 02/09/07 Stemlers Backup – main ok N drive 829 Morningside 02/09/07 Wesley Wolf Back-up- City N Drive 02/10/07 Drainbusters 1252 Gail Drive Blockage N th 02/11/07 Dorothy Bower 1616 E. 8 street Back-up 1:50 pm main ok N th 02/11/07 Dorothy Bower 1616 E. 8 Street Back-up 10:35 pm City N 02/12/07 Metro Plumbing 898 Camelot Ct Back-up- City N 02/12/07 Drainbusters 815 Ohio Ave back-up main ok Y 02/12/07 Brad Cantor 720 Fulton Street Blockage- main ok Y 02/12/07 Judy 898 Camelot Ct back-up-main ok N 02/13/07 Stemlers 414 Francis Ct Back-up-main ok N th 02/13/07 Cavanaugh 932 E 7 Street Back-up-main ok Y 1005 French 02/14/07 Stemlers Back-up- City Y Street 200 W. Park 02/14/07 Frank Bains Back-up-main ok Y Place 02/15/07 Stemlers Back-up-main ok N 209 Mockingbird 2 Jeffersonville Wastewater Treatment Facility Monthly Operations Report Footage Date Resident Address Complaint In CSO Cleaned Area? Drive 02/16/07 Jessica Hartman 3530 Lindytrail back-up-main ok N 02/16/07 Stemlers 824 marigold Back-up- main ok N 02/16/07 Stemlers 1417 Duncan Ave Back-up- main ok N 02/17/07 Stemlers 1617 Brigman Back-up-main ok N th 02/19/07 Drainbusters 402 E. 8 street Back-up- main ok Y 02/19/07 Stemlers 307 Mockingbird Back-up-main ok N 02/19/07 Stemlers 134 Spring Street Back-up-main ok Y 02/20/07 Mike Lanham 724 Maple Back-up-main ok Y 1545 E. 10 th 02/21/07 Metro Plumbing Back-up-main ok N street 02/22/07 Stemlers 1709 N. Larkspur Back-up-main ok N 02/23/07 Ken Keller 725 Wall Street Back-up-main ok Y 02/24/07 Drainbusters 814 Sandra Drive Blockage-main ok N 02/26/07 Stemlers 1408 Blackwood Back-up-main ok N 117 N. Front 02/26/07 Stemlers Back-up-main ok N Street Service station, th 02/26/07 Drainbusters 8 and Main Back-up-main ok Y street 02/27/07 Stemlers 802 Foxglove Back-up-main ok N 02/27/07 Stemlers 1506 Francis Ave Back-up-main ok Y 02/28/07 Jennifer Kemp 1050 Main Street Back-up-main ok N 4.1 ELECTRICAL EXPENDITURES Table 4.6 represents the facility electrical expenditures for the month as well as providing a year to date total. Table 4.6 Facility Electrical Expenditures Amount Time Period Expended February $17272.78 Year-To-Date $215000.66 5.0 FACILITY SAFETY & TRAINING Training for the month of February was on Confined Work Spaces, presented by David Rainwater. 3 Jeffersonville Wastewater Treatment Facility Monthly Operations Report A safety inspection was conducted on February 6, 2007. The rating was 99%. There were no deficiencies reported. Our plant is still in excellent shape. There was a training class on Confined Space. 6.0SEWER COLLECTION SYSTEM AND PREVENTATIVE MAINTENANCE Lift station and collection system ? Crews cleaned 9,511 ft. of sanitary sewers. (YTD 89187) ? Crews cleaned 5,196 ft. of storm/CSO sewers. (YTD 68760) ? Crews televised 1,059 ft. of sewer lines. (YTD 16059) ? All 23 trouble spots were cleaned and or checked during the month. ? Crews cleaned and vactored 2 M/H and 0 C/B. In the month of February crews made 39 sewer calls 34 being residents or other problems and 5 being city’s lines. ? 2007 Hamburg Pike crews cleaned 75’ to remove blockage. ? 829 Morningside Dr. crews cleaned 150’ to remove blockage. ? 898 Camelot Ct. crews cleaned 200’ to remove debris in line. ? 1005 French St. crews cleaned 150’ to remove blockage. ? 814 Sandra Dr. crews cleaned 75’ from C/O to main line, full of roots. th ? 1616 E. 8 St. crews cleaned 326’ in all directions to try and help resident, will need a plumber. ? 725 Wall St. crews cleaned 100’ to try and help Businesses, will need a plumber. Collection crews worked with different departments of the city on various projects and a few businesses jobs around town. ? Crews cleaned out 3 floor drains for fire department on Wall St. ? Crews worked vactoring out M/H and ditch for construction crew on Chestnut St. and Pearl St. city putting in line from the old River Falls lounge. ? Crews televised storm lines on Marietta Dr. looking for vaults, damages and blockage for Mike L. ? Crew vactored out salt mixer for Kenny M. on the street department. ? Crew televised 165’ again on Ruck Dr. the contractor call Jerry C. said they couldn’t find the line. ? Crew televised 107’ at 420 E. Market St. to locate tap for Jay’s plumbing. ? Crew televised 15’ in M/H to see how for stub went across the road for Mike L. ? Crew vactored out M/H on Hertzsch Rd. for Bob G. Collection crews street pre-maintenance schedule ? Trouble spot list was completed 7,706’of sewer lines cleaned and vactored. ? Crew cleaned and vactored 4,625’of Woodland Ct. for Bob M. ? Crew vactored out 7 wet wells due to build up of grease and solids. ? Crew cleaned and vactored 600’ on Larkspur Dr. and Foxglove Dr. ? Crew cleaned and vactored 550’ in alley of Francis Dr. ? Crew televised 549’ in alley of Francis Dr. to locate tap at 1506. ? Crew televised 223’ to locate tap at 608 Kewanna Dr. ? All CSO gates were greased and exercised. 4 Jeffersonville Wastewater Treatment Facility Monthly Operations Report ? Crew cleaned 150’ at alley of 720 Fulton Dr. ? Crew put deodorizer in C/B all down Spring St. to odor. Collection crews station pre-maintenance schedule ? All lift stations floats, switches, pumps, alarms and electrical, mechanical components were cleaned, exercised and inspected for proper operations. th ? Generators at Mill Creek, Spring St. and 10 St. were operated, inspected and exercised for proper operation. th ? Crew pulled pump #3 out at 10 St. the impeller came loose took to Spencer’s for repair. ? Crew pulled pumps 1 & 2 at Crums Lane #2 removed rags tested and put back on line. ? Crews had to pull both pumps at Colonial Park station pumps full of debris, tested put back on line. ? Crew pulled pump 2 out of filtrate station in plant for repairs. ? Crew pulled pump 1 apart at Mill Creek station to remove debris tested and put back on line. th ? Crew cleaned transducer and still well in 10 St. wet well. ? Crew cleaned transducer and still well in Ashley Springs wet well. ? Bar screens were cleaned as needed. Repairs made in the collection system ? Vehicle maintenance put a new radiator in one of the sludge trucks. ? Vehicle maintenance put new air cylinder for brakes on one of the sludge trucks. ? Crew installed both new rebuilt pumps 1 & 2 in Scum Pit at the plant. ? Crew installed new power supply on Scada Alarm system at Georgia Crossing. ? Crew installed a ladder rack on boom truck. ? Crew installed a new circuit board on the overhead door at the Press Room in plant. ? Crew installed a new main breaker on Aerator #1 in plant. ? Crew changed out 2 floats in Happy Valley stations wet well. 5 Jeffersonville Wastewater Treatment Facility Monthly Operations Report 6