January 9, 1995
C. Richard Spencer
City-County Building
Jeffersonville, IN 47130
Gentlemen:
Enclosed please find Environmental Management Corporation's (EM C) "Operations Report"
for the month of December 1994, containing information on the following:
1. 0 Effluent Quality
2.0 Facility Operations
2.1 Pretreatment
3.0 Preventive and Unscheduled Maintenance
3.1 Maintenance & Repair Expenditures
3.2 Repair & Replacement Expenditures
4.0 Facility Safety and Training
5.0 Sewer Collection System
As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and
we are available to discuss this report, or any other aspect of our operations, at the
convenience of the City.
Sincerely,
ENVIRONMENTAL MANAGEMENT CORPORATION
-f(~~~
Kendall S. Coleman
Facilities Manager
KSC:dmk
cc: Greg Coboum, EMC
1.0 EFFLUENT QUALITY
During December, effluent quality was within NPDES permit limits for BOD and TSS
concentrations. Table 1.1 summarizes the effluent quality data. Attachment A contains Time
Series Plots of daily BOD and TSS values.
TABLE 1.1
MONTHLY EFFLUENT QUALITY DATA
Permit Monthly
Parameters Limit Average
mg/L mg/L
Carbonaceous
Biochemical 25 1.68
Oxygen
Demand (CBOD)
Total
Suspended 30 5.68
Solids (TSS)
E. Coliform 200 / mo. 139.23
( Colonies/
100 ml) 400 / wk. 188
Chlorine Residual .02 daily 0.00
Ammonia 3.0/ mo. 2.42
4.5 / wk. 3.33
Flow (MGD) 5.2 4.19
2.0 FACILITY OPERATIONS
Attachment B contains a list of septic haulers that discharged to the Facility during
December.
During December the treatment process within the facility continued to perform excellent.
We continue to train the operators in monitoring and controlling equipment run times in order
to reduce electrical usage. With our energy management program we should realize
significant cost savings.
~
ST. lOUIS. MO
One problem did occur in December that had an affect on the facility. A shear pin that
connects the operating shaft to the No.2 Pinal Clarifier drain valve failed. This will not
allow us to place the clarifier in operation. Weare in the process of receiving bids to make
the necessary repairs. We anticipate the repairs to be completed by late February.
2.1 PRETREATMENT
During December there were two activities related to the pretreatment program. Voss Clark
Industries received a Notice of Violation for accedence of permit limits for arsenic
concentrations. Voss Clark has made a piping change within their process to reduce flow to
an equalization tank. We will continue working with Voss Clark to resolve this problem.
Industrial Water Recycling (IWR) requested a modification to their permit concerning daily
average flow limits. IWR requested the limits to be increased from .05 mgd to .1 mgd. The
increase in flow was approved.
3.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE
Preventive maintenance was performed on all equipment as scheduled during December.
There were 20 unscheduled maintenance tasks performed. All were minor tasks except for:
. Repair of No.3 blower motor at solids handling.
. Repair of No.1 process water pump.
. Replaced No.2 pump at Mill Creek lift station.
. Repair of No.2 pump motor at Mill Creek lift station.
A list of unscheduled maintenance work orders is included as Attachment C.
Maintenance and repair expenditures for the month of December are detailed in Attachffi4~nt
D. Table 3.1 represents the total amount. expended in December and for the year. Table 3.2
includes the same information for repair and replacement expenditures.
TABLE 3.1 MAINTENANCE AND REPAIR EXPENDITURES
TIME AMOUNT BUDGET OVER
PERIOD EXPENDED (UNDER)
December 1994 $4,514 $5,700 ($1,186)
Year -to- Date $48,690 $45,600 $3,090
~
ST. LOUI~), MO
TABLE 3.2 REPAIR & REPLACEMENT EXPENDITURES
TIME AMOUNT BUDGET OVER
PERIOD EXPENDED (UNDER)
December $14,944 $8,334 $6,610
1994
Year-to-Date $175,200 $100,000 $75,200
4.0 FACILITY SAFETY AND TRAINING
Safety inspections were conducted on December 15, 1994. The rating was 96%. The
deficiencies reported were:
. Fiberglass ladder is not available for working on electrical equipment.
. Proper storage of equipment and supplies, store room was cluttered.
. Knowledge of proper response to an accidental spill needs improvement.
. All areas of the Safety Program have not been addressed with the employees.
A copy of the Safety Inspection Report is contained as Attachment F.
On December 21, 1994 a review of all the safety equipment and its proper use, was held at
the facility.
Waymon Payne was appointed the Safety .Coordinator for the facility.
5.0 SEWER COLLECTION SYSTEM
During the month there were 19 sewer calls. Ten of these calls regarded sewer backups. Six
of the backups were due to blockages in the City's main lines, and two required minor
repairs. Four of the sewer calls required cleaning of catch basins. The health department
notified us of sewage being present in an open ditch. The problem was traced to a trash
dumpster at a local business. We notified the establishment of the problem, and helped in
resolving the concern.
-
ST. LOUIS, MO
Table 5.1 presents the month and year-to-date totals for sewer projects.
PROJECT THIS MONTH YEAR TO DATE
Tap Inspections 1 76
Sanitary Sewer 9,975 65,297
Cleaned/ft.
Storm Sewer 2,450 4,775
Cleaned/ft.
Catchbasins Cleaned 4 34
(JIandi-clams)
Catchbasins Raised 0 13
Manholes Raised 0 85
Catchbasins Rebuilt 2 20
Sewer Repairs 3 27
Sewers Televised/ft. 300 4,935
Air Testing/Deflection 0 3,665
Testing
Manhole Castings 1 10
Replaced
TABLE 5.1. SEWER PROJECTS
ATTACHMENTS
A - Time Series Plots
B - Septic Haulers
C - Unscheduled Work Orders
D - Maintenance & Repair Expenses
E - Repair & Replacement Expenditures
F - Safety Inspections
-
ST. LOUIS. MO
ATTACHMENT A
Time Series Plots
Jeffersonville Wastewater Treatment Facility
EFFLUE1VT CBOD & TSS
20
18
16
14
12
"6D1O
!3
8
6
4
2
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
DATE
December 1994
I
I
- EFFLUENT CBOD
- EFFLUENT TSS
1- PERMIT CBOD
- PERMIT TSS
ATTACHMENT B
Septic Haulers
JEFFERSONVILLE WASTEWATER TREATMENT PLANT
SEPTIC HAULER REPORT
December 1994
LOADS DELIVERED TO TREATMENT FACILITY:
HAULER CURRENT MONTH HAULER TOTAL
(YTD)
Rumpke of Indiana 2 13
Pfau 0 1
GRAND TOTAL 2 14
GALLONS DELIVERED TO TREATMENT FACILITY:
HAULER CURRENT MONTH HAULER TOTAL
(YTD)
Rumpke of Indiana 1,600 12,400
Pfau 0 6,330
GRAND TOTAL 1,600 18,130
-
ST. LOUIS, MO
ATTACHMENT C
Unscheduled Work Orders
01i05/95
WORK ORDER HISTORY REPORT
Page 1
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------~._----------------
TOTAL
COST
EQUIPMENT
NU~1BER
WORK ORDER W.O.
rUlBER TYPE
EQUIPrlENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TUlE
LABOR
COST
MATERIAL
COST
------------------------------------------------------------------------------------------------------------------~._----------------
__________________________________________________________________________________________________________________MO_________________
1-BUILD
TASK DESC
COt1t'lENTS
9400662 REPAIR BUILDING MAINT 12i01!94 0.000
REPAIR HEATING UNIT AT SOLIDS PROCESS BUILDING
WARE INC.WAS ON-SITE AND CHECKED HEATING UNIT, FOUND PROBLEM WITH
AUTO CONTROLS. WARE TOOK UNIT OUT OF CONTROL SEQUENCE AND RAN THRU
CYCLES. UNIT WORKED PROPERLY.
tOTALS
-------------------------------------------------------------------------------------------------------------------------------------
58.60
: (LABOR HOURS -) Total:
0.000
Reg:
5.25 Ot: 0.(0)
0.000
58.60
0.00
--~--------------------~-------------------------------------------------------------------------------------------------------------
,
EQUIP TOTALS: (LABOR HOURS -) Total:
0.000
Reg:
5.25 Ot: 0.(0)
0.000
58.60
0.00
58.60
== = == == = == === = == = == = == = ===== = == == = == = == === = == = == == = = = == = = = =I == === == = == == = == = == = == == = == == = === = = == = == = == == == = == == = === ::= == = == == = = == == = = =
lAIRC0t1P1
rASK DESC
9400714 REPAIR AIR COMPRESSOR
REPAIR WIRING TO AIR COMPRESSOR
12i16!94 0.000
TOTALS
-------------------------------------------------------------------------------------------------------------------~-----------------
15.08
: (LABOR HOURS -) Total:
0.000
Reg:
1.00 Ot: 0.(0)
0.000
11. 07
4.01
------------------------------------------------------------------~------------------------------------------------~-----------------
EQUIP TOTALS : (LABOR HOURS -) Total:
0.000
Reg:
1.00 Ot: 0.(0)
0.000
11. 07
4.01
15.08
------------------------------------------------------------------------------------------------------------------~._----------------
-------------------------------------------------------------------------------------------------------------------------------------
lBARSCREENl
tASK DESC
COMt1ENTS
9400004 REPAIR BARSCREEN #1
AERATE #1 CHANNEL TO REMOVE GRIT ACCUMULATION
USED AIR COMPRESSOR TO MOVE GRIT TO GRIT PUMP
12/14/94 0.000
TOTALS
--------------------------------------------------------------------------------------------------------~-------~-~~-----------------
56.01
: (LABOR HOURS -) Total:
0.000
Reg:
6.50 Ot: O.OO}
0.000
56.01
0.00
-----------------------------------------------------------------------------------------------------------------_.~-----------------
EQUIP TOTALS : (LABOR HOURS -) Total:
0.000
Reg:
6.50 Ot: 0.(0)
0.000
56.01
0.00
56.01
-------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------~-----~------------------
lBARSCREEN2
TASK DESC
CO~lMENTS
12i13i94 0.000
9400003 REPAIR BARSCREEN #2
AERATE CHANNEL TO REMOVE ACCUMULATION OF GRIT
USED PORTABLE AIR COMPRESSOR TO MOVE GRIT ,TO GRIT PUMP.
TOTALS
------------------------------------------------------------------------------------------------------------------~-------------~----
, . .. c. . . ...... .. .
179.52
: (LABOR HOURS -) Total:
0.000
Reg: 20.00 ot: 0.(0)
0.000
179.52
0.00
_____~_____________________________________~______________~________________________________________________________M_________________
EQUIP TOTALS : (LABOR HOURS -) Total:
0.000
Reg: 20.00 Ot: 0.00)
0.000
179 .~12
0.00
179.52
------------------------------------------------------------------------------------------------------------------.------------------
-------------------------------------------------------------------------------------------------------------------------------------
lBFPCONVEYORl
TASK DESC
COrmENTS
9400458 REPAIR BELT FILTER PRESS CONVEYO
BELT NEED'S HINGE REPAIRED
REPAIRED HENGE THAT WAS CAUSING TEAR IN B~LT.
12i06/94 0.000
TOTALS
------------------------------------------------------------------------------------------------------------------~~-----------------
230.08
: (LABOR HOURS -) Total:
0.000
Reg:
11.50 Ot: 0.(0)
0.000
128.38
101. 70
----------------------------------------------------------~-------------------------------------------------------------------------
,
lBFPCONVEYORl
TASK DESC
9400001 REPAIR BELT FILTER PRESS CONVEYO
: REPLACE ROLLER TO CONVEYOR
12i15/94
0.000
01/05/95
WORK ORDER HISTORY REPORT
Page 2
------------------------------------------------------------------------------------------------------------------..-----------------
------------------------------------------------------------------------------------------------------------------..-----------------
TOTAL
COST
EQUIPt1ENT
NUMBER
WORK ORDER W.O.
NUt1BER TYPE
EQU miENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOl~N
TIt1E
LABOR
COST
MATERIAL
COST
CO~iMENTS
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------.------------------
: REPLACED BAD ROLLER TO PRESS CONvEYOR.
TOTALS
------------------------------------------------------------------------------------------------------------------.------------------
31.16
: (LABOR HOURS -> Total:
0.000
Reg:
3.00 Ot: 0.(0)
0.000
31.i6
0.00
------------------------------------------------------------------------------------------------------------------------------------
EQUIP TOTALS : (LABOR HOURS -) Total:
0.000
Reg:
14.50 Ot: 0.(0)
0.000
159.54
101. 70
261. 25
------------------------------------------------------------------------------------------------------------------------------------
--~--------'-------------------------------------------------------------------------------------------------------------------------
lBLOWER3
TASK DESC
CONMENTS
9400661 REPAIR BLOWER 1f3 12/02/94 0.000
REMOvE 1f3 MOTOR AND SEND TO CLARK ELEC FOR REPAIR
PULLED MOTOR AND SENT TO CLARK ELECTRIC TO HAVE REBUILT. METZGER ELEC
REPLACED MAIN lEAD WIRE FROM MOTOR TO JUNCTION BOX AND HELPED LINE
MOTOR TO COUPLING. UNIT WAS PLACED BACK ON LINE 12/2/94. RUN AMPS = 130
TOTALS
------------------------------------------------------------------------------------------------------------------------------------
1751.38
: (LABOR HOURS -> Total:
0.000
Reg:
16.75 Ot: 0.(0)
0.000
186.38
1565.00
----------------------------------------------------------~-------------------------------------------------------------------------
1BLOWER3
TASK DESC
CO~lMENTS
9400002 REPAIR BLOWER #3
: INSTALL TAPER PINS AT #3 BLOWER MOTOR BASE
: TAPPER WHERE, INSTALLED TO ELLIMINATE VIBRATION.
12/14/94
0.000
TOTALS
----------------------------------------------------~-----~-------------------------------------------------------------------------
81.46
: (LABOR HOURS -) Total:
0.000
Reg:
3.50 Ot: 0.00)
0.000
38.75
42.71
----------------------------------------------------------~-------------------------------------------------------------------------
EQUIP TOTALS : (lABOR HOURS -) Total:
0.000
Reg:
20.25 Ot: 0.(0)
0,000
225.13
1607.71
1832.84
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
lELEC CONTROLS
TASK DESC
9500023 REPAIR ELECTRIC CONTROL PANELS
REPLACE SIGHT GLASS AT SCUM PUMP CT 64
12/19/94
0.000
TOTALS
-~--------------------------------------------------------~-------------------------------------------------------.------------------
9.63
: (LABOR HOUR.S -> Total:
0.000
Reg:
0.75 Ot: 0.(0)
0.000
8.78
0.85
------------------------------------------------------------------------------------------------------------------.------------------
EQUIP TOTALS : (LABOR HOURS -> Tot~l:
0.000
R.eg:
0.75 Ot: 0.(0)
0.000
8.78
0.85
9.63
=================================================================================================================::==================
lGRITBUILDINGl
TASK DESC
9500022 REPAIR GR.IT BUILDING
REPLACE LIGHTS TO ELECTRIC PANEL BOARD
12/15/94
0.000
TOTALS
______________________________________________________---l-------------------------------------------------------~~------------------
4 'v,
.7...
: (LABOR HOURS -) Tot~l:
0.000
Reg:
0.10 Ot: 0.00)
0.000
1.20
3.72
-~--~----------------------------------------------------------------~------------------------------------------_.~------------------
EQUIP TOTALS : (LABOR HOURS -> Total:
0.000
Reg:
0.10 at: 0.(0)
0.000
1.20
3.72
4.92
=================================================================================================================::==================
1LAB
TASK DESC
CO~1MENTS
9400667 REPAIR lAB EQUIPMENT 12/07/94 0.000
SEND D.O. UNIT TO FACTORY; METER FREEZES UP ON READINGS
SENTTO MANUFACTURER; PROBLEM WAS NOT DETECTED AT THEIR SHOP.
TOTALS
-------------------------------------~--------------------~--------------------------------------------------------------------------
4.79
: (LABOR HOURS -) Total:
0.000
Reg:
0.50 Ot: 0.00)
0.000
4.79
0.00
-----------------------------------------------------------------------------------------------------------------.-------------------
01105/95
WORK ORDER HISTORY REPORT
Page 3
----------~--------------------------------~------------------------------------~-------------------------------------~-------------
------------------------------------------------------------------------------------------------------------------------------------
TOTAL
COST
EQUIPMENT
NUMBER
WORK ORDER W.O.
NUMBER TYPE
EQUIPMENT
DESCRIPTION
T ASK ~1T ASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATERIAL
COST
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
4.79
EQUIP TOTALS : (LABOR HOURS -) Total:
0.000
Reg:
0.50 ot: 0.(0)
0.000
4,79
0.00
--------------------------------------------------------------------------------.----------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
1PLANTWATER1
TASK DESC
COMMENTS
9400009 REPAIR PLANT WATER PUMP #1
WATER IN OIL, SEND TO SHOP FOR REPAIR
REPLACED A FAULTY SEAL, UNDER WARRANTY BY SPENCER.
12/07/94 0.000
TOTALS
---~----------------------------------------------------------------------------------------------------------------.----------------
36.81
: (LABOR HOURS -) Total:
0.000
Reg:
3.75 Ot: 0.(0)
0.000
36.81
0.00
--------------------------------------------------------------------------------------------------------------------.----------------
3.75 Ot: 0.00)
EQUIP TOTALS : (LABOR HOURS -) Total:
0.000
Reg:
0.000
36.81
0.00
36.81
--------------------------------------------------------------------------------------------------------------------.----------------
--------------------------------------------------------------------------------------------------------------------.----------------
GRANDTOTALS: (LABOR HOURS -) Total:
0.000
Reg: 72.60 Ot: 0.(0)
0,000
741,46
1717.99
2459.45
01/05!9~,
WORK ORDER HISTORY REPORT
Pa.ge 1
======================================================::::::::::::::::::::::=:::::::::::::::::::::::::::::::=========================
COST
EQUlPt'lENT
NUMBER
~JORK ORDER l~ .0.
NUNBER TYPE
EQUIP~lENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATEF:IAL
COST
TOTAL
----------------------------------------------------------------------------------------------~---------------------.----------------
--------------------------------------------------------------------------------------------------------------------.----------------
12/05/94 0.000
5CRUMS LANE II 9500029 REPAIR CRUMS LANE II L.S.
TASK DESC : REMOVE GREASE ~ DEBRIS FROM WETWElL
COMMENTS : ESTES REMOVED DEBRIS FROM WETWELl AND DESPOSED AT IWR
TOTALS
-------------------------------------------------------------------------------------------------------------------~-----------------
203.34
: (LABOR HOURS -) Tota.l:
0.000
Reg:
4.00 Ot: 0.00)
0.000
43.34
160.00
---~-------------------------------------------------------------------------------------------------------------------------------~-
EQUIP TOTALS : (LABOR HOURS -) Tot~l:
0.000
Reg:
4.00 Ot: 0.01))
0.000
43.34
160.00
203.34
------------------------------------------------~------------------------------------------------------------.------..----------------
-------------------------------------------------------------------------------------------------------------------------------------
5l0UISE ST.
TASK DESC
CO~1t1ENTS
9500028 REPAIR LOUISE STREET L.S. 12/05/94 0.000
CLEAN DEBRIS FROM WETWELL
ESTES DISPOSAL REMOVED 1200 GALLONS FROM WETWELL AND DISPOSED AT IWR.
TOTALS
---~---------------------------------------------------------------------------------------------------------------------------------
i63.34
: (LABOR HOURS -) Total:
0.000
Reg:
4.000t: 0.(0)
0.000
43.34
120.00
-------------------------------------------------------------------------------------------------------------------------~-----------
EQUIP TOTALS : (LABOR HOURS -) Total:
0.000
Reg:
4.00 Ot: 0.00)
0.000
43.34
120.00
163.34
-------------------------------------------------------------------------------------------------------------------.-----------------
---~---------------------------------------------------------------------------------------------------------------.-----------------
, '
5MILLCREEK
TASK DESC
COt1t1ENTS
9500027 REPAIR tmL CREEK L.S. 12/14/94 0.000
REPLACE PUMP ~2 AT MILL CREEK L.S.
INSTALLED NEW AURORA PUMP AT MILL CREEK. FLANGE HAD TO BE FABRICATED
FOR NEW PUMP TO FIT.
TOTALS
----------------------------------------------------------------------------------------------~--------------------.-----------------
13188.54
: (LABOR HOURS -) Total:
0.000
Reg: 132.00 Ot: 0.01))
0.000 1403.62 1178~.92
---~---------------------------------------------------------------------------------------------------------------.-----------------
i
5MILLCREEK
TASK DESC
COt1t1ENTS
9500026 REPAIR MILL CREEK L.S. 12/19/94 0.000
REPAIR BRUSHES TO ~2 PUMP MOTOR
MOTOR WAS ARCHING DUE TO INSTALLATION OF N8~ PUMP. MOTOR WAS RUNNING IN
OPPOSITE DIRECTION AS BEFORE~ ARMATURE NEEDED REPAIRED AND BRUSHES
REPLACED AND BALANCED.
TOTALS
------------------------------------------------------------------------------------------------------------------------------------
217.78
: (LABOR HOURS -) Total:
0.000
Reg:
10.00 Ot: 0.00)
0.000
126.59
91.19
------------------------------------------------------------------------------------------------------------------------------------
5MILLCREEK
TASK DESC
COMMENTS
9500030 REPAIR MILL CREEK L.S.
: ROCK ROADWAY TO MIlLCREEK L.S.
: ROCKED ROADWAY GOING TO MILLCREEK L.S.
12/21/94
0.000
TOTALS
----------------------------------------------------------------------------~----------------------------------------------~--------
264.38
: (LABOR HOURS -) Total:
0.000
Reg:
8.00 Ot: 0.(0)
0.000
90.36
174.02
---------------------------------------------------------------------------------------------~--------------------------------------
EQUIP TOTALS : (LABOR HOURS -) Total:
0.000
Reg: 150.00 Ot: 0.0(1)
0.000 1620.57 12050.13
13670.70
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
5POWERHOUSE
TASK DESC
9500025 REPAIR POWERHOUSE L.S.
FABRICATE VALVE BOX FOR FORCEMAN VALVE
12/08/94 0.000
TOTALS
-------------------------------------------------------------------------------------------------------------------.-----------------
352.36
: (LABOR HOURS -) Total:
0.000
Reg:
8.00 Ot: 0.00)
12/12/94 0.000
0.000
90.36
262.00
------------------------------------------------------------------------------------------------------------------_._-~--------_._----
5POWERHOUSE 9500024 REPAIR POWERHOUSE L.S.
TASK DESC : REPAIR MOTOR BASE TO No. 1 PUMP
01105/95
WORK ORDER HISTORY REPORT
Pa.ge L
--------------------------------------_.~---------------------------------.-----------------------------------------------------------
--------------------------------------.----------------------------------------------------------------------------------------------
TOTAL
COST
EQUIPMENT
NUt1BER
WORK ORDER W.O.
NUMBER TYPE
EQUIPl1ENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATEIUAL
COST
Cot1MENTS
-------------------------------------------------------------------------------------------------------------------.-----------------
-------------------------------------------------------------------------------------------------------------------.-----------------
: WElDED CRACf::: AT ~1OTOR BASE TO PUt1P #1.
TOTALS
---~-------------------------------------------------------~-------------------------------------------------------.-----------------
,
40.84
:. (LABOR HOURS -j Total:
0.000
Reg:
4.00 ot: 0.001
0.000
40.84
0.00
-------------------------------------------------------------------------------------------------------------------.-----------------
5POWERHOUSE
TASK DESC
9500031 REPAIR POWERHOUSE L.S.
: REPLACE LEAD WIRE TO #1 PUMP MOTOR
12121/94
0.000
TOTALS
---~---------------------------------------------------------------------~----. --~---~--~--------------------------_._----------------
i.. ... ... ..... .... ... .. .
107.32
: (LABOR HOURS -} Total:
0.000
Reg:
8.00 Ot: 0.00)
0.000
85.32
22.00
-------------------------------------------------------------------~-----------------------------------------------.-----------------
. ..
EQUIP TOTALS : (LABOR HOURS -j Total:
0.000
Reg:
20.00 Ot: 0.(0)
0.000
216.52
284.00
500.52
-----------------------------------------------------------.------------------------------------------------------------------------
---~-~------------------------------------------------------------------------------------------------------------------------------
GRANDTOTALS: (LABOR HOURS -j Total:
0.000
Reg: 178.00 Ot: 0.0(l)
0.000
1923.77
12614.13
14537.90
01/05/95
WORK ORDER HISTORY REPORT
Paye 1
EQUIPI1ENT
NUt1P.ER
WORK ORDER \4.0.
NUI'1BER TYPE
EQUIPMENT
DESCRIPTION
------------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------;--------,------------------------------------------------------------------------
TOTAL
COST
TASK mASK
NO. NO.
DATE
CLOSED
Dm~N
TIr1E
LABOR
COST
MATERIAL
COST
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
l-BUILD
TASK DESC
9400630 PROJECT BUILDING MAINT
: INSTALL EXIT SIGNS AT GRIT }}. PROCESS BUILDING
12/19/94
0.000
TOTALS
(LABOR HOURS -) Tatal:
0.000
--------------------------------------------------------------------------------------------------------------------.----------------
22.98
Reg:
0.35 Ot: 0.(0)
0.000
2,98
20.00
-------------------------------------------------------------------------------------------------------------------~._-------~-------
EQUIP TOTALS : (LABOR HOURS -) Tatal:
0.000
------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------.----------------
i-BUILD
TASK DESC
9400669 PROJECT BUILDING MAINT
INSTALL EXHAUST FAN AT MAINT BUILD KITCHEN
Rey:
0.35 Ot: 0.(0)
0.000
0.000
2.98
20.00
22.98
TOTALS
(LABOR HOURS -) Tatal:
0.000
-------------------------------------------------------------------------------------------------------------------~._---------------
0.00
i2120i94
Reg:
0.00 Ot: 0.(0)
0.000
0.00
0.00
EQUIP TOTALS : (LABOR HOURS -) Tatal:
0.000
-----------------------------------------------------------------------------~-------------------------------------------------------
0.00
Hey:
0.00 Ot: 0.(0)
0,000
0.00
0.00
-------------------------------------------------------------------------------------------------------------------.-----------------
-------------------------------------------------------------------------------------------------------------------------------------
GRANDTOTALS: (LABOR HOURS -) Total:
0.000
Reg:
0.35 Ot: 0.(0)
0.000
2.98
20.00
:")':l 00
":"i.., tU
ATTACHMENT D
Maintenance & Repair Expenses
Wednesday, January 04, 1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 1
I P.O. Date I Description Amol~
1217/94 2 KEYS FOR LARRY'S OFFICE $1.50
1217/94 ACETYLENE ~,16.50
1217/94 CHECK MOTOR CAPACITORS ON 11 MOTORS AT PLANT $133.30
1217/94 LAMPS FOR EMERGENCY EXIT SIGNS $149.00
1217/94 PARTS FOR BELT PRESS ~;61.95
1217/94 REPAIR MANNUALS ~;55 .25
1217/94 TAKE AMP READINGS ON GRIT PUMP #1, AERATOR #3&4, RASIWAS $1157.23
PUMPS 1 &2, AND BLO
1217/94 CLEANER & PVC CEMENT FOR SLUDGE JUGS $4.40
1217/94 SEAL & GASKET KIT FOR BLOWER $83.15
1217/94 SEALS FOR CLARIFIER #4 $2.64
1217/94 DISPOSAL OF WASTEWATER LIFT STATION GREASE $'114.80
1217/94 3/8" BAR FOR OPEN DITCH ON GOYNE AVENUE ~p20.00
1217/94 AL TERNA TOR FOR VAN #3412 ~p38.27
1217/94 CYLINDER FOR COLD STARTS ~p25.42
1217/94 FILTER FOR OIL CHANGE #7677 $4.59
1217/94 FLAT REPAIR AND MOUNTING FOR #4306 :p18.00
1217/94 INNER TUBE FOR BUNTON $7.24
1217/94 LAMPS FOR TURN SIGNALS AND RUNNING LIGHTS $2.84
1217/94 RADIATOR CAP FOR JET TRVCK #4459 $3.06
1217/94 STEERING COUPLING FOR VEHICLE #6413 :$58.86
1217/94 LIFT STATION GREASE REMOVED FROM CRUMS II & LOUISE STREET $:280.00
1217/94 ANCHOR BOLTS FOR MILL CREEK $7.35
1217/94 BATTERY AND BOLTS FOR MILL CREEK :$14.95
1217/94 EASTBROOK MONITORING DUE TO PUMPS TRIPPING $342.00
1217/94 REPLACE CONTROL FLOATS FOR AUTOMATICE OPERATION @ $:215.50
LOUISE STREET
1217/94 REPLACE STARTER AND THRU THE DOOR OVERLOAD RESET ON $479.92
PUMP @ LOUISE STREET
Wednesday, January 04, 1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 2
.0. Date Description Amount
12/13/94 COBOL T DRILL SET FOR TOOL ROOM ~)34.71
12/13/94 FLAGS FOR LOCATES AND LABELS FOR SAFETY ~)65.63
12/13/94 THREAD OIL FOR DRILLING METAL ~)16.01
12/13/94 CLEANED CONTACTS AND TESTED DO METER $1122.70
12/13/94 PRESSURE GUAGE FOR LAB ~)11.14
12/13/94 TAPER PINS FOR BLOWER MOTOR ~)28.30
12/13/94 BATTERY FOR 4342 ~)30.39
12/13/94 ONSIGHT INSPECTION AND ESTIMATE FOR 580C BACKHOE M8.50
12/13/94 SIGNAL LIGHTS FOR SEMI #4306 ~)18.61
12/13/94 WIPER REFILLS FOR 7677 $5.89
12/13/94 FLANGE FOR MILL CREEK $214.12
12/13/94 PVC FOR MILL CREEK $~109.19
12/13/94 WOOD COUPLINGS FOR MILL CREEK $31.50
12/22/94 CABLE TIES AND GLUE FOR WINDSOCK $7.10
12/22/94 CALIBRATED AND TESTED GAS METERS $:~04.43
12/22/94 EXIT SIGNS AND WINDSOCK $'109.20
12/22/94 HIP BOOTS ~p85 .20
12/22/94 PAINT AND BRUSHES FOR POLYMER MACHINE $5.09
12/22/94 RAINSUIT ~P4 7.20
12122/94 RAINSUITS $'110.43
12/22/94 SOCKETS FOR RAS PUMPS $6.08
12122/94 TUBING CUTTER FOR DONNIE'S TOOL BOX $8.98
12/22/94 50 FT. TUBING FOR PRETREATMENT $'175.00
12/22/94 CHECK ROOF AND RESET STATS $:~52.00
12/22/94 LABOR CHARGES FOR CALIBRATION OF METTLER ANALYTICAL ~~90.00
BALANCE
12/22/94 SEALS FOR NO.2 BAR SCREEN ~~14.08
Wednesday, January 04, 1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 3
P.O. Date Description Amount
12/22/94 SILICONE FOR RAS STATION ~j19.90
12/22/94 DYE $128.00
12/22/94 AIR FILTER FOR #8945 $9.24
12/22/94 BATTERY CABLE ENDS ~)1 0.50
12/22/94 REPAIR STARTER LINE #7139 $4.21
12/22/94 ~ATTERY FOR MILLCREEK $2.72
12/22/94 C>OPPER, VALVE, AND FITTING FOR MILL CREEK $12.29
12/22/94 FASTENERS FOR MILL CREEK AND STOCK $65.99
12/22/94 WIRING FOR MILL CREEK LIFT STATION $12.14
Total: $4,514.19
ATTACHMENT E
Repair & Replacement Expenses
Wednesday, January 04,1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 1
P.O. Date Description I Amount
5/27/94 10TH STREET REPAIR & REPLACEMENT $54,'i'60.00
6/2/94 Budget $0.00
7/1/94 REPAIR OF COURT & GRAHAM ST. $37,CIOO.00
7/22/94 REPAIR TO NO 3 CLARIFIER DRAIN VALVE $15,650.00
8/4/94 TV TRAILER REPAIR $1,El55.00
8/4/94 REPAIR OF JET TRUCK $3,421.00
8/24/94 FREIGHT CHARGE FOR RAS PUMP $S62.55
8/24/94 REPAIR OF RAS PUMP $10,480.07
9/1/94 REPLACE CONTROL VALVE FOR WATER TRUCK $E)87.50
917/94 REHAB MILL CREEK PUMP NO.2 $1,239.34
1 0/1/94 REPAIR DRAIN VALVE TO CLARIFIER NO.4 $17,Jr60.00
1 0/13/94 CLEANING OF MILL CREEK AND TENTH STREET $1 ,~~90.00
1117/94 FREIGHT CHARGE FOR RAS PUMP IMPELLERS (THREE IMPELLERS) ~p67.74
1117/94 REHAB OF POWERHOUSE LIFT STATION NO.1 PUMP $1 ,:~75.00
11/15/94 MANHOLE RISERS FOR 1994 STREET PAVING PROJECTS $2,232.00
11/15/94 PUMPEX IMPELLER FOR RAS STATION $5,asO.00
11/15/94 REPAIR TO PUMP MOTOR AT CRUMS LANE 1 LIFT STATION $4,:~58.82
11/17/94 REPAIR, BALANCE AND SET IMPELLER FOR SPRING STREET PUMP $1,"766.94
NO.2
1217/94 FITTING FOR NEW PUMP AT MILL CREEK $80.33
1217/94 NEW MILL CREEK PUMP, MODEL # 613A $11,S17.00
12/9/94 DIP & BAKE LINCOLN MOTOR 200 HP $2,865.00
12/22/94 INSTALL WIRING AND HOOK UP OF BLOWER MOTOR $481.58
Total: $175,'199.87
ATTACHMENT F
Safety Inspections
ENVIRONMENTAL MANAGEMENT CORPORATION
MONTHLY SAFETY INSPECTION
CHECKOFF SHEET
JEFFERSONVILLE W ASTEW A TER TREATMENT FACILITY
701 CHAMPION ROAD
JEFFERSONVILLE, IN 47130
(812) 285-6451
1. Personnel Safety
wrrfr
r~f~
PERSON COMPLETING INSPECTION:
A. Personal Protective Clothing
1. Safety Helmets Provided
(for Personnel & Visitors).................................@ NO N/A
2. Hearing Protection
(for High Noise Areas)...................................@ NO N/A
3. Eye Protection - Goggles, etc.
(for Personnel & Visitors).................................@:> NO N/ A
4. Gloves
(for Personnel).. ..... ........ ...... ....... ..... ...... ....... ....@ NO N/ A
5. Rubber Boots with Steel Toes .
(provided for PerSonnel)...................................@ NO N/ A
6. ~~: ~~~~:~~~~~..J.......................................@ NO N/A
7. Is Respiratory Protection Provided including \
ventilators and hoods lover high dust areas, dust ~
masks, etc. (for Personnel)...............................~ NO N/A
!
I
B. Safety Devices and Equipme~t
1. Non-sparking Tools in areas where flammable
or explosive gases maybe present?..................@ NO N/A
2. Oxygen Deficiency, Toxic, & Explosive Gas
indicator.... .... ........... ..... ........ ....... ....... .... ...... ...... ~ NO N/A
3. Self-contained Breathing Apparatus for entry
to chlorine room.... ...... ..... ... .... ...... .......... .... .... ..@ NO N/A
4. Confined Space Entry Equipment Available
such as and including Safety Harness, Portable
Wench, Hoist, etc..............................................@ NO N/ A
5. First Aid Kits with proper & adequate supplies ,,','
readily available for any First Aid Emergency.~ NO NI A
6. Traffic Control ConesAvailable.......................@ NO N/A
7. Ladders to enter manholes of wet wells
(fiberglass or wooden for electrical work)......... YES
II. General Plant Safety
Are Personnel trained in the use and location ~
of safety equipment at the plant......................~ NO N/A
Are there railings around all tanks with
openings chained off..................................... @ NO N/A
Are holes covered? Including all pits & wells,
drains, valve holes, hatch covers in place....... ~ NO NI A
Are explosion proof fixtures used where ~
needed... ...... ....... .... ...... ..... ...... ..... ... ......... .....@ NO N/A
Are all equipment guards in place? Including
mowing equipment............................ .............@ NO N/A
Are dry wells ventilated and is ventilation
~=~~~~~~~:b~~~~~t~d&~~;~;bl~: ~ ~g
Is proper liquid flammable storage used.......... ~ NO
Is general plant cleanliness being practiced?
Including floors (No oil or grease or pools of
water), Storage Areas (No clutter & supplies
stored properly), Chlorine Room (Free of
clutter), Laboratory........................................ YES @ NI A
10. Are all walkways, exists and routes, &
stairways clear & unobstructed (No ice, oils, ~
11. ::e:il ~~i~;:~o;u~;~~~~~~~~~d. ~d)~~' ~~~~';~}-5 NO NI A
with anti-skid material, including stair treads
and ramps, in good repair and covered with
non-skid surface............................................. (@ NO NI A
12. Are all mats and rugs in good repair so as not
to become tripping hazards.............................~ NO N/ A
13. Are work area layouts adequate...................... @:> NO N/A
14. Is lighting adequate in all areas (Work areas"
stairways, walkways, etc.)..............................~ NO N/A
15. ~::e~i:~~:;~~s~d~~. ~~~~.~~~~~. ~.i~~~ .~~......GV NO NI A
1.
2.
3.
4.
5.
6.
7.
8.
9.
N/A
N/A
N/A
16. Are toilet facilities avail&ble & clean............... NO
17. Is safe drinking water available....................... NO
18. Is pest control adequate.................................. NO
19. Are all exists properly marked.... .. .. .. .. .. .... .. .... NO
20. Is inclement weather protection provided at
entrances (mats, safety strips, de-icers, etc.)....@ NO
21. Are tripping hazards eliminated at all doors
(threshold plates in good repair, etc.)..............~ NO
22. Is safety glass provided in all doors................. @J NO
23. Are handrails provided on stairs (Both sides
24. ~:~:;~~~~~;;;;~h~~~d................~ ~g
25. ~es~~ ~~~~~l~~~~.~.~~.~~~.~~~~~.~~~~~.. GNO
26. Are all elevation differences between floors
clearly defined and properly lighted.. . . . . ... . . .. . . .
27. Are portable ladders in good condition...........
28. Kick boards in place ifneeded........................
29. No Broken steps................................... .........
30. Are ashtrays provided and emptied regularly..
31. Are trash cans covered and etnptied regularly. 0
32. ~;:::;:;~~.~.i.~~~..~~~.~~~~~ .~~~~ .~~~~~~~~ GiS) NO
33. Are plant personnel immunized for tetnus.......INO
~~: ~~ ;~~~~.~~.~~~.~~~~~~~~~.~~~~.~~~~:::::::::: YE ~g
36. Fuel supply tank in good condition................. NO
37. No excessively hot operating temperature on
machinery or equipment...................... .... .. .... @ NO
38. No excessive vibration of machinery or
39. :'~::~~~ii bci;;;; ;~i;;;;i fr~;;;;;;;~i_1 ~g
40. No worn or cracked equipment..... ................ NO
41. No excessive dust on equipment................... YE NO
42. Adequate dehumidifier and heaters where
needed.......................................................... @NO
43. Emergency Medical Information on all
employees available for determination of job
assignments.......... ..... ............. .... .... .... ...... .,.. @)No
44. Cross connections have been eliminated
between potable water supply and non-potable
source:
a. Pump & Mixer Seals....................... .......... @ NO
b. Digester Heating System Makeup Water... YES NO
c. Vacuum Filter Water Sprays..................... ~O
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
~
N/A
\
III. Electrical Safety
d. Chemical Mixing Tank....,.,...".................'I. NO N/A
e. Chlorinator Water Source........................... . NO NI A
f. De-Chlorination Water Source.."".",.,..".... E' NO N/A
g. Yard Hydrant.... ............. ....... ..................... . NO Nt A
h. Other..........................,.................,.....,....". YES NO NI A
Is all electrical circuitry enclosed and identified NO
Is all wiring in good condition......................... NO
Are the number of outlets adequate....,............. NO
Is equipment properly grounded or insulated... NO
Are extension cords in good condition and
used properly,...,."..,',..."..,',...."...."....,.....,....@ NO
Is electrical test equipment available, Such as
voltmeter, ampmeter, etc.......,..............,...".... ~NO
Are dielectric rubber mats presents for
electrical work.................................,..........,.. ~NO
All control panel switches in good condition.. ~ NO
All control panels unobstructed. , ., ...., , ..... ,.... ,. @!) NO
Are dielectric rubber gloves available.......,..... YES NO
Are ground fault interrupters used.................. S NO
Are warning or caution signs posted............... NO
Is control panel area c1eanand dry.................. NO
Are all needed fuses or breakers in place......... NO
Are all contacts clean and dust free................. . NO
Is there emergency stop buttons on all
machines and equipment................................. ~NO
17. Are personnel familiarwith the electrical safety
such as lock out/tag out procedures........ ........ ~ NO
18. Is power supply locked outl tagged out on
equipment presently bejng repaired................. ~O
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
IV. Chlorine & Dechlorination Safety
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1. All standing cylinders chained in place and/or
ton cylinders chocked........................... ..,..... '~. YE NO
All personnel rained in the use ofCLz............. NO
Appropriate repair kits available........,.....,....." YE NO
Chlorine & dechlorination leak detector tied
into the facility alarm system.......................... ~ NO N/ A
either comes on when door opens or manually .. '. ..
with switch at entrance door........................... @NO N/ A
2.
3.
4.
N/A
N/A
N/A
6. Ammonia and Sulphur for checking chlorine &
dechlorination leaks available.......................~ NO
7. Are all safety precautions posted...................~ NO
8. Proper Chlorine wrench available to open
valves........................ ...... ........................... ...@) NO
9. Chlorine protected from direct sunlight, cool
and dry.......... ....... ..... ..... .............................. .@::>NO
10. No petroleum or other chemicals store in .
chlorine room................................................ .cm::)NO
11. Spare lead washers available on site..............~ NO
V. Process Chemical Safety
Are personnel trained to handle all chemicals
properly...................................................... .&J NO
Is proper safety clothing present for the
chemical to be handled...................................@ NO
Are all containers, vats, and tanks properly ~
4. I~~~;t~;~~~~~bj;;~~;;;;;dU;;;;i;.~ ~g
5. Are there proper containment of storage areas,
including curbing.......... ................. ...... ....... ...~ NO
6. Are management & employees aware of the
hazards of the materials being used................ ~ NO
7. Knows proper response to an accidental spill... YES @J
8. All MSDS available andeasily accessible.........@ NO
9. Has complied with the 6 employer
responsibilities of the Worker Right to Know
Law? (SARA). .... ....... ...... ................... ........... .@NO
10. Emergency Action Plan on file with local Fire,
Police Departments and appropriate Emergency:
Agency.........................................................~ NO
1.
2.
3.
VI. Tools & Equipment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1. Are hand tools in good repair and stored
properly....................... ...................................~ NO N/ A
2. Are power tools stored properly and in good
condition ~ cords, plugs, etc............................c:m:> NO N/ A
3. Are the tools adequate for the tasks to be
performed....................................................... c::m:> NO N/ A
4. Are defective tools replaced as needed............~ NO N/A
5. Are tool guards in place... .... ..... ... ..... ..... .. .. ... ~ NO N/ A
6. Are employees trained in the proper use of the
various tools they are expected to use............. @)No N/ A
7. Are employees given additional instruction and
periodic reviews of specialized tools and
equipment........ ..............................................@ NO N/ A
8. Are proper lifting techniques used by
employees........................................................@9 NO N/ A
VII. Fire Safety & Protection
1. Are fire/emergency evacuation plans posted...~ NO
2. Are employees familiar with fire/emergency
evacuation plan... ............. .... ....... ....... .... ........@ NO
3. Are there sufficient number and types of fire
extinguishers... ....... ...... ... ......,.... ........ ...... .......@ NO
4. Are the fire extinguishers properly located and
identified... ..... . .. .., . .. . .. .... . . ... . . . .. . . . . . . .. . . . ..... ... . . <:::YES) NO
5. Are the fire extinguishers checked annually..... @) NO
6. Are all of the fire extinguishers in working
condition........................................,...............@ NO
7. Are employees trained in the proper use of the
extinguishers to be used. ..................................~ NO
8. Are smoke detectors in working order............. YES NO
VIII. Laboratory Safety
1. Emergency Eyewash & Shower Station are
present and work properly and tested montW~ NO
2. Fume hood is present.......................................@ NO
3. All chemicals safely and properly stored, well .
labeled and in original containers................"..CiEV NO
4. Laboratory Safety devices used such as: Pipette
:':~~~ ;::g~~te<:ti~~~l~~~~~O~~o
5. No broken! chipped or cracked glassware.......'.(YES=::~~O
6. No overloaded outlets.................................,...~O
7. Acid spill kit available..................................... @[) NO
8. Emergency procedures for acid spills posted
and used by all personnel................................ ~ NO
9. Laboratory Safety Ru1es posted and obeyed by
all personnel such as no cooking or eating from .
laboratory glassware...................................... ~ NO
X. Other Safety
1. Are the required safety programs presented ~
and! or attended during the year.. ....... .... .. .... .. . ~ NO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A -
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2.
Is a suitable identification system used to
identify the plant's piping system................... .CYEV NO
3. Has the operator taken steps to remove or
minimize safety hazards................................@ NO
4. Are all personnel provided with a shower and
locker for their work clothes..........................~ NO
5. Are personnel trained in First Aid & CPR....... ~ NO
6. Have the following proper safety signs been
provided such as: Non-potable Water, Chlorine
Hazard, No Smoking, High Voltage, Watch
Your Step Signs in Certain Areas, & Exit Sign@ NO
7. Is your Facility safety program Up to Date
(W orksafe Program)........................................ YES @
N/A
N/A
N/A
N/A
N/A
N/A
12-,
(#YES)
x 100= 'tlo .%
(# YES + # NO)
12.; ., ,.W\J'\k~'
W~ MQ ':.";;-~~:-J""1i:, <f(t ~/#zt
J~. ~I~~I~~~_/~~~
~~-IA)D OM~~~rr~~