Loading...
HomeMy WebLinkAbout10) October L:: L' i.. "'< "~ 'n .- .. ~ - t t ~ H'I, "- ~ -, '.'.' ," u -'. ~ 1n g.E~:.~I< ." .~, ,.t "'F .: ,,< ,,- .."." '" ~, .-' . ," c":_ :'1'"'' ~. ", ...'.......... - ,. ....'.....-.....:... ~ ~' '~I ~f ;: J j ()p<<lItated <Bg: Environmental Management Corporation Monthly Report ~~1t:<=>b~:r= 1 994- November 9, 1994 C. Richard Spencer City-County Building Jeffersonville, IN 47130 Gentlemen: ENVIRONMENTAL MANAGEMENT CORPORATION 701 CHAMPION ROAD JEFFERSONVillE. INDIANA 47130 812-285-6451 FAX 812-285-6454 Enclosed please find Environmental Management Corporation's (EMC) "Operations Report" for the month of October 1994, containing information on the following: 1.0 Eft1uent Quality 2.0 Facility Operations 3 .0 Preventive and Unscheduled Maintenance 3. 1 Maintenance & Repair Expenditures 3.2 Repair & Replacement Expenditures 4.0 Facility Safety and Training 5.0 Sewer Collection System As always, we appreciate the. opportunity to be of service to the City of Jeffersonville, and we are available to discuss this report, or any other aspect of our operations, at the convenience of the City. Sincerely, ENVIRONMENTAL MANAGEMENT CORPORATION G~~~ Kendall S. Coleman Facilities Manager KSC:dmk cc: Greg Cobourn, EMC 1.0 EFFLUENT QUALITY During October, efiluent quality was within NPDES permit limits for BOD and TSS concentrations. Table 1.1 summarizes the efiluent quality data. Attachment A contains Time Series Plots of daily BOD and TSS values. TABLE 1.1 MONTHLY EFFLUENT QUALITY DATA Permit Monthly Parameters Limit Average mgIL mgIL Carbonaceous Biochemical 15 1 Oxygen Demand (CBOD) Total Suspended 18 6 Solids (TSS) E. Coliform 200/ mo. 82 (Colonies/ 100 ml) 400 / wk 245 Chlorine Residual .02 daily 0.00 Flow (MGD) 5.2 3.71 2.0 FACILITY OPERATIONS During October the facility performed excellent. Two activities occurred during the month that affected facility's performance in a positive way. . We converted the makeup water system for chlorination from potable water to the use of plant efiluent. This will reduce the cost of water usage in the future. . Repair of number four clarifier drain valve was completed in October, thus allowing us to place the clarifier back into service. During October there were two enforcement activities relating to the Pretreatment Program. Nu- Yale Industries received a Notice of Violation, due to accedence of permit limits for oil and grease concentrations. Voss Clark Industries received a Notice of Violation for accedence of permit limits for arsenic concentrations. Voss Clark has been asked to increase the frequency of ""'~-~ SEYMOllR. IN their monitoring from once a month to a weekly basis, in hopes of finding the cause and a solution of the excursions in a more timely manner. Attachment B contains a list of septic haulers that discharged to the facility during October. 3.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE Preventive maintenance was performed on all equipment as scheduled during October. A list of unscheduled maintenance work orders is included as Attachment C. Maintenance and repair expenditures for the month of October are detailed in Attachment D. Table 3.1 represents the total amount expended in October and for the year. Table 3.2 includes the same information for repair and replacement expenditures. TABLE 3.1 MAINTENANCE AND REPAIR EXPENDITURES TIME AMOUNT BUDGET OVER PERIOD EXPENDED (UNDER) October 1994 $10,145 $5,700 $4,445 Year-to-Date $34,181 $28,500 $5,681.35 TABLE 3.2 REPAIR & REPLACEMENT EXPENDITURES TIME AMOUNT BUDGET OVER PERIOD EXPENDED (UNDER) October 1994 $18,999 $8,334 $10,665 Year-to-Date $143,215 $100,000 $43,215 4.0 FACILITY SAFETY AND TRAINING Safety inspections were conducted on October 26, 1994. The rating was 98%. A copy of the Safety Inspection Report is contained as Attachment F. On October 11, 1994, Lesher Fire Protection was on-site to administer Fire Prevention and Fire Extinguisher training. Fifteen employees attended, and received certifications from Lesher. -~ SEYMOUR, IN 5.0 SEWER COLLECTION SYSTEM During the month of October there were nine sewer calls, two of which involved odor complaints. Both complaints were resolved by implying masking agents. The remaining seven calls were due to backups. Three of the backups were due to blockages in the main, and the remaining four 'were residential problems. Table 5.1 presents the month and year-to-date totals for sewer projects. PROJECT THIS MONTH YEAR TO DATE Tap Inspections 5 66 Sanitary Sewer 5,997 53,172 Cleaned/ft. Storm Sewer 675 1,225 Cleaned/ft. Catchbasins Cleaned 0 30 (Handi-clams) Catchbasins Raised 0 11 Manholes Raised 16 82 Catchbasins Rebuilt 4 16 Sewer Repairs 2 23 Sewers Televised/ft. 450 4,235 Air Testing/Deflection 1,665 1,665 Testing Manhole Castings 0 8 Replaced TABLE 5.1 SEWER PROJECTS ATTACHMENTS A - Time Series Plots B - Septic Haulers C - Unscheduled Work Orders D - Maintenance & Repair Expenses E - Repair & Replacement Expenditures F - Safety Inspections ~ SEYMOUR, IN ATTACHMENT A Time Series Plots ~: SEYMOUR, IN Jeffersonville Wastewater Treatment Facility Effluent CROD & TSS 20 18 16 14 12 "Sn 10 S 8 6 4 2 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Date October 1994 EFFLUENTCBOD - EFFLUENT TSS PERMIT CBOD PERMIT TSS ATTACHMENT B Septic Haulers SEYMOUR, IN JEFFERSONVILLE WASTEWATER TREATMENT PLANT SEPTIC HAULER REPORT OCTOBER 1994 LOADS DELIVERED TO TREATMENT PLANT: HAULER CURRENT MONTH HAULER TOTAL (YTD) Rumpke of Indiana 2 8 Pfau 0 1 GRAND TOTAL 2 9 GALLONS DELIVERED TO TREATMENT PLANT: HAULER CURRENT MONTH HAULER TOTAL (Y'l'P). Rumt>ke of Indiana 2.000 ...... .7,8QOd ...,... d.... ....d .. . Pfau 0 6330 .. ... .. . ....'d.. .. GRAND TOTAL ... d2~Qo.p 14J~Qd . ~ SEYMOUR, IN ATTACHMENT C Unscheduled Work Orders ~~ SEYMOUR, IN 11/02/94 JEFFERSONVILLE WASTEWATER TREATMENT FACILITY WORK ORDER HISTORY REPORT EQUIPMENT NUMBER = = = ==:: = == = = = = == = ==:::::::: ==:::::::::::::::::::::: ===:: ==:::::::: == ==:::: == =='::':::= == === :':':: ==:: ==:::::::::::: == ::::::::: ==:: ====='=== ==:: ==:::::= === ::::::::: ==:::: ==:::: ==::::::::::: === Page 1 WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST i-BUILD TASK DESC ---------------------------------------------------------------------------------------------------~-------------------------------- ------------------------------------------------------------------------------------------------------------------------------------ TOTAL COST 9400531 REPAIR BUILDING MAINT : REPAIR ROOF VENT AT BLOWER ROOM 10/18/94 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 7.70 : (LABOR HOURS -) Total: 0.000 Reg: 0.25 Ot: 0.00) 0.000 3.01 4.69 -~----~------------------------------------------------------~--------------------------------------~------------------------------- EQUIP TOTALS : (LABOR HOURS -) Total: 0.i)00 0.25 ot: 0.00) 0.000 3.01 4.69 7.70 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ lCL2BUILDINGl TASK DESC COMMENTS Reg: 9400511 REPAIR CL2 BUILDING 10/14/94 0.000 INSTALL 1/16th MESH SCREEN TO eL2 LINE INSTALLED SCREEN TO CL2 LINE FOR USE OF NON-POTABLE WATER TO CHLORINATE EFFLUENT. --- TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 245.58 : (LABOR HOURS -) Total: 0.000 Reg: 6.00 Ot: 0.00) 0.000 72.18 173.40 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -) Total:. 0.000 Reg: 6.00 ot: 0.00) 0.000 72.18 173.40 245.58 ==============================================================='===================================================================== lLAB TASK DESC 9400613 REPAIR LAB EQUIPMENT RECALIBRATE TEMP. SETTINGS TO INCUBATOR 10/28/94 0.000 TOTALS ---------------------------~-------------------------------------------------------------------------------------------------------- 74.28 : (LABOR HOURS -) Total: 0.000 6.00 Ot: 0.(0) 0.000 74.28 0.00 ------------------------------------------------------------------------------------------------------------------------------------ Reg: EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 0.000 74.28 0.00 74.28 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ lPLANTWATERl TASK DESC COMMENTS 6.00 Ot: 0.(0) 9400530 REPAIR PLANT WATER PUMP i1 REPLACE SPIDER COUPLING INSTALLED NEW BUSHING REPLACED RUBBER BUSHING WITH TEFLON. 10/20/94 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 126.77 : (LABOR HOURS -) Total: 0.000 Reg: 2.75 Ot: 0.(0) 0.000 29.42 97.35 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 2.75 Ot: 0.00) 0.000 29.42 97.35 126.77 ======================================================================================================================-============== 1 RASSTATI ON TASK DESC COMMENTS Reg: 9400512 REPAIR RAS PUMP STATION INSTALL SUMP PUMP AT DRY WELL OF PUMP STATION OLD PUMP OVERHEATED AND HAD TO BE REPLACED. 10/12/94 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 120.86 : (LABOR HOURS -) Total: 0.000 Reg: 2.00 Ot: 0.00) EQUIP TOTALS : (LABOR HOURS -) T ota I: 0.000 Reg: 0.000 0.000 23.10 23.10 97.76 97.76 ==================================================================================================================================== 120.86 4VEHICLE02 2.00 Ot: 0.00) 9400196 REPAIR 1986 CHEVROLET C-l0 VAN # 10/18/94 0.000 11/02/94 JEFFERSONVILLE WASTEWATER TREATMENT FACILITY WORK ORDER HISTORY REPORT Page 2 -------------------------------------------------------------------------------------------------------------.---------------------- -------------------------------------------.----------------------------------------------------------------------------------------- EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYPe EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST TOTAL COST ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------~----------------------------------------------------------------------------------------------------- TASK DESC : REPAIR BRAKES TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 53.31 : (LABOR HOURS -) Total: 0.000 Reg: 0.75 Ot: 0.00> 0.000 8.30 45.01 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 0.75 Ot: 0.00) 0.000 8.30 45.01 53.31 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 4VEHICLE07 TASK DESC COMMENTS 9400493 REPAIR 1987 DODGE RAMCHARGER #43 REPAIR BRAKES TO RAMCHARGER 4340 INSTALLED NEW MASTER CYLINDER. 10/10/94 0.000 TOTALS --------------------------------------------------------~--~-----~-~--~~------~-----~---------~-----~~-------------------------- 42.41 : (lABOR HOURS -) Total: 0.000 Reg: 1.50 Ot: 0.(0) 0.000 16.61 25.80 -----------------------------------------------------------------~---------------------------------------------------------------~-- EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 1.50 Ot: 0.00> 0.000 16.61 25.80 42.41 ------------------------------------------------------------------------------------------------------------------------------------ --------------------------------------------------.--------------------------------------------------------------------------------- 4VEHICLE08 TASK DESC 9400492 REPAIR 1987 DODGE RAMCHARGER #43 REPAIR CHARGING SYSTEM TO RAMCHARGER #4342 10/12/94 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.00 : (LABOR HOURS -) Total: 0.000 Reg: 0.00 Ot: 0.00) 0.000 0.00 0.00 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 0.00 Ot: 0.00) 0.000 0.00 0.00 0.00 ==:================================================================================================================================= 4VEHICLE14 TASK DESC 9400533 REPAIR 1990 DODGE D-250 PICKUP T REPLACE UPPER RADIATOR HOSE 10/26/94 0.000 TOTALS -----------------------------------------------------------------------------------------------------------------.------------------- 23.75 : (LABOR HOURS -) Total: 0.000 Reg: 0.33 Ot: 0.00) 0.000 3.65 20.10 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 0.33 Ot: 0.00> 0.000 3.65 20.10 23.75 ------------------------------------------------------------------------------------------------------------------------------------ _________________________________________________________________________________________________________________.M__________________ 4VEHICLE23 TASK DESC COMMENTS 9400411 REPAIR FORD F-150 PICK-UP ,#7155 10/10/94 F-150 PICKUP - REPAIR BATTERY CABLE, HORN AND SHIFTER PIN MADE REPAIRS TO BATTERY CABLE, HORN AND INSTALLED NEW SHIFTER PIN. 0.000 TOTALS -.---------------------------------------------------------------------------------------------------------------.------------------- 13.84 (LABOR HOURS -) Total: 0.000 Reg: 1.25 Ot: 0.00> 0.000 13.84 0.00 ------------------------------------------------~-------------------------------------~---------------~---------------~----------~ EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 1.25 Ot: 0.00) 0.000 13.84 0.00 13.84 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 4VEHICLE25 TASK DESC 9400409 REPAIR VAN#3412 REMOVE 2WAY RADIO AND REPLACE BATTERY CABLE (ENOl 10/17/94 0.000 11/02/94 JEFFERSONVILLE WASTEWATER TREATMENT FACILITY WORK ORDER HISTORY REPORT Page 3 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ TOTAL COST EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYP~ ------:------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ EQUIPMENT DESCRIPTION TOTALS (LABOR HOURS -) Total: : REMOVED RADIO AND REPLACED BATTERY CABLE. 0.000 COMMENTS TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST --------------------------------------------------------------------------------------------------------------~--------------------- Reg: 0.50 Ot: 0.00) 0.000 5.54 0.69 6.22 -------------------------------------------------------------~----------------------~~----------~--~--~----~----------------------- EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 0.50 Ot: 0.00) 0.000 5.54 0.69 6.22 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 714.72 GRANDTOTALS:, (LABOR HOURS -) Total: 0.000 Reg: 21.33 at: O.OO} 0.000 249.92 --- 464.80 ATTACHMENT D Maintenance & Repair Expenses ~ SEYMOUR, IN P.O. Date Description Amount 1 017/94 LOCK OUT TAG OUT (DO NOT OPERATE) $42.00 1 017/94 KD TOOLS & RAZOR BLADES SUPPLY $17.61 . 1 017/94 SUPPLY OF NUTS, BOLTS, WASHERS, ErC. $13.79 1 017/94 2 FITTINGS FOR #2 CHECK RAS STATION $7.58 1 017194 HYDRAULIC HOSE $52.81 1 017194 STRAINER FOR CL2 LINE $179.03 1 017/94 #7 PADLOCKS FOR LOCKOUT TAG OUT $41.65 1 017/94 BELT PRESS REPAIR -.- $5.53 1 017194 REPLACE IMAGING UNIT IN THE COPIER $356.00 1 017194 DELIVERY OF GLOVES & HELPED WI UNDERGROUND DUCT WORK $38.00 1 017/94 DUTCH LANE INVESTIGATION OF PROBLEM WI AERATOR $114.00 1 017194 MAIN PLANT AERATOR #3 CHECKED OUT TRIPPED BREAKER AND $114.00 RESET 1 017/94 2" RISERS FOR MANHOLES, SPRING STREET PROJECT $945.00 1 017194 TIRES FOR PORTABLE CEME~T MIXER $7.35 1017/94 HOSE CLAMPS FOR SAMPLERS\ $4.73 1 017/94 NIPPLES AND TEFLON TAPE FOR TENTH STREET $3.36 1 017194 FHP BELT FOR VAC ALL UNIT $6.29 1 017194 CONCRETE @ WINDSOR CIRCLE BY MAPLE SCHOOL $151.86 1017/94 6" PALMER BACKWATER VALVE, SEWER TEE WYE, PVC PLUG & PVC $175.94 FLEX CPL 1 017/94 WAGNER BRAKE PARTS FOR VEHICLE #4340 $23.27 1 017194 CREDIT ($12.60) 1017/94 CREDIT ($12.20) 1 017194 CREDIT ($0.58) 1 017194 STAR SOCKET TO REMOVE CALIBERS $6.10 1017/94 REMOVE, REPLACE VALVE ON EATON MOTOR RESEAL FOR WATER $160.00 TRUCK 1 017194 VALVES & BUSHINGS FOR TENTH STREET PUMPING STATION $33.76 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 1 Friday, October 28, 1994 P.O. Date Description Amount 1 OrT /94 SERVICE GUAGE PSI FOR CHECKING RAS & TENTH ST PUMPS $97.20 1 017/94 ASPHALT AND AJCK POST FOI1 REPAIR WORK AT POWER HOUSE LS $40.89 ROOF & SPRING ST. D 1017/94 WILSON PUMP #1 REPAIRED VACUUM PUMP THAT WAS LOCKED $428.66 OUT. RECONDITIONED OLD 1 0/13/94 SAFETY SIGNS AND EQUIPMENT $88.15 1 0/13/94 6 PADLOCKS FOR SAFETY LOCKOUTS $37.49 1 0/13/94 SAFETY AND PLANT SUPPLY (LOCK, ROPE, AND BUCKETS) $18.27 10/13/94 SNAP HOOKS FOR SAMPLER HANGERS $12.50 1 0/13/94 ACETYLENE FOR WELDING --- $16.50 1 0/13/94 DUCT TAPE FOR SUPPLY $28.19 1 0/13/94 TOOL FOR CLAMPS ON SAMPLERS $3.10 1 0/13/94 SEWER CHECK VALVE $38.00 10/13/94 ARMOR ALL FOR CLEANING VEHICLES $4.53 1 0/13/94 FILTER FOR #7155 $2.81 1 0/13/94 MASTER CYLINDER AND BRAKE FLUID FOR #4340 $40.99 1 0/13/94 SPARK PLUGS FOR #7155 $20.72 1 0/13/94 WIPER REPLACEMENT FOR #7155 $5.89 10/13/94 CABLE ASSEMBLY $11.11 1 0/13/94 REPAIRS AT CAMP POWERS LIFT STATION $30.03 10/13/94 POWERHOUSE LIFT STATION SUMP PUMP DISCHARGE REPLACED $21.36 10120/94 VINYL TUBING FOR SAMPLERS $52.50 10120/94 MOUSE TRAPS $1.00 10120/94 GREASE FOR PLANT FOR PM OF EQUIPMENT $94.45 1 0120/94 CEILING TILES $63.74 10/20/94 SLIT RINGS FOR CL2 SCREEN $4.40 10120/94 CL2 SCREEN AND STOCK SCREWS $3.60 10/20/94 RADIO SHACK (FUSE) $1.35 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 2 Friday, October 28, 1994 Friday, October 28, 1994 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 3 P.O. Date Description Amount 10/20/94 PUMP FOR RAS STATION AT PLANT $114.28 10/20/94 STONE FOR SEWER REPAIRS $70.40 . 10/20/94 STONE FOR SEWER REPAIRS $82.01 1 0/20/94 BATTERY TERMINAL FOR #3412 $0.69 10/20/94 CHARGED THE WRONG VENDOR ($17.44) 10/20/94 RADIATOR HOSE FOR #155 $7.61 10/20/94 RETURN OF WIPER BLADES ($13.10) 10/20/94 SWITCH AND FILTER FOR #3412 ~.- $18.69 10/20/94 JIM O'NEAL (VEHICLE #7155) $10.55 10/20/94 TOWING OF DODGE RAM FROM UTICA TO PLANT $35.00 1 0/20/94 POWERHOUSE LIFT STATION- BEARINGS, DISASSEMBLE AND CLEAN $136.12 MOTOR 10/20/94 AUTO WASTE MATE FOR STATIONS (SUMP PUMP) $507.53 10/20/94 7TH AND MICHIGAN SEWER BROKE BY WATER COMPANY $87.35 10/27/94 URETHANE INSERT FOR DRYWELL CHLORIIELF PUMP $103.19 1 0/27/94 6 BOLTS FOR CLARIFIERS $3.78 10/27/94 REPAIR TO SUMP PUMP AT CLARIFIERS $5.21 10/27/94 PUMP & STRAINER FOR SAMPLER $248.69 10/27/94 TIRE REPAIR FOR VEHICLES $39.83 10/27/94 2 FLANGES, SHELF & PIPE FOR POWERHOUSE VALVE $357.37 Total: $5,439.47 ATTACHMENT E Repair & Replacement Expenses ~ SEYMOUR, IN ATTACHMENT F Safety Inspections =-~-- SEYMOUR, IN '. MONTHLY SAFETY INSPECTION P J.ant 3"e FFe:<<.c;.t>N" 11.'- E:' Date 10 (-u,{ql.J. 1. Electrical control panels ~ A. Dust free contacts - clean "i B. Fuses in place ~ C. Dry area ~ D. Wires (l) frayed {2} cracked (3) spliced (4) wire nuts or just taped ~ E. Switches in good condition ~ F. Obstructed panels 2. Electrical equipment ~ A. Guards in place ~ B. Cords in good repair ~ C. If down-tagged and locked out for repair ~ D. stop button on all machines ~ E. Over loaded outlets ~ F. Use of light extension cords instead of heavy duty ---- ~ D. ~ E. ~ F. ---.a G . ~ H. -4 I. and work areas stair ways open All areas well lighted Clean floors (l) no oil or grease (2) no pools of water Exits marked Appropriate fire extinguishers Hand rails on stairs Supplies stored properly Broken steps Cross connections 3. Building ~ A. """ B . "'-\ C . 4. T~ areas A. Hand rails around tanks . B. Chain guards in place as needed , . C. Guards in. place over drive chains & gears D. Walk ways open --- (1) no ice i (2) no oils, water, greases, debris E. Properly anchored ladders . ~/ F. If equipment be~ng repaired - power supply locked out ~ G Kick boards in place if needed :;/'H: No electrical cords stretched over tanks I. Broken steps. 5. Chlorine room - if gas feed in confined area ~ A. Exhaust fan either comes on when door opened or by switch located at entrance door . "l B. Ammonia hydroxide available to test for chlorine leaks ~ C. Self contained air supply available ~ D. '. Chlorine wrench available to open valves ~ E. Well lighted area ~ F. No petroleum or other chemicals stored in chlorine room ~ G. Chlorine protected from direct sunlight, cool and dry ~ H. Room clean, free of clutter ~ I. Spare lead washers available on site ~ J. Emergency number posted outside of chlori~room Maintenance area ~ A. Floors free ofg~ease & oil ~ B. Tools stored properly C. Supplies stored out of way ~ D. Hand tools in good repair-cords, in plac~ . Eye protection provided Proper power source available Well lighted work bench Hoist, lifts, jacks, air hoists, available for lifting and moving I. Mowing equipment ' (1) guards in place (2) steering wheel in good repair Gas leaks Gas supply tank installation 6. "" ~ ~ "::::::J ./ //'J. v K. plugs, clean guards E. F. G. H. chaim?, pulleys large objects 7. Protective equipment available as needed ~ A. Eye protection ~ B. Gloves ~ C. Boots ~ D. Safety harness and rope"to enter confined spaces ~ E. Wench or hoist to attach to safety harness ~ F. Head protection ~ G. Hearing protection 8. Laboratory area ~ ~ ~ ~ ~ ~ '" ""'i A. Safe storage of chemicals, well labeled and in original containers Clean area - not cluttered No cooking in laboratory,glassware Emergency shower (test) Emergency eye wash (test) Acid spill kit - d~ personnel know how to use kit N~ overloaded outlets Floor clean and dry Eye protection B. C. D. E. F. G. H. I. ~ ~ :~ ~;:; J. K. L. M. N. Gloves Aprons or jackets ventilation (fume hood) Tongs or gloves to move hot items No broken/chipped, cracked glassware p~t equipment A. Guards on gears, belts, pulleys, shafts . -L-/.. B. Excessively hot operating temperature of equipment ~~c. Excessive vibration of equipment ~ D. Water or oil .being "slung" from equipment ~E. Worn or cracked conditions L/ F. Excessive dust 9. 10. Lift station (plant) -- ~A. B. c. D. E. F. G. H. I. Explosive proof lights in lift station Well lite Floors dry Adequate dehumidifier and heater Access sturdy - non-slip tread Adequate ventilation Housekeeping Equipment guards Hatch covers in place 11- Industrial waste ~ A. Know what does come to plant - industrial/chemical inventory records '" B. Know what could. come to plant- industrial/chemical inventory records ~ c. Know response to an accidental spill 12. Sampling equipment ~ A. Pole or rope sufficient to prevent climbing over --- handrails "'-l B. Gloves 13. Emergency preparations ~ A. Check to be certain supplies available for first aid emergency ~ B. Emergency numbers posted ~ c. Contact hours been made with appropriate response groups ~ D. Emergency information on all employees available ~ E. MSDS ens #Yes + NO Z- 8/9/93 x 100 = q~ ~ o