Loading...
HomeMy WebLinkAbout08) August ENVIRONMENTAL MANAGEMENT CORPORATION 701 CHAMPION ROAD JEFFERSONVillE, INDIANA 47130 812-285-6451 FAX 812-285-6454 September 13, 1994 Board of Public Wooo and Safety City-County Building Jeffersonville, IN 47130 Gentlemen: Enclosed please find Environmental Management Corporation's (EMC) tUperations Reporfrtt for the month of August 1994, containing information on the following: 1.0 Effluent Quality 2.0 Facility Operations 3.0 Preventive and Unscheduled Maintenance 4.0 Facility Safety and Training 5.0 Sewer Collection System As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we are available to discuss this report, or any other aspect of our operations, at the convenien.ce of the City. Sincerely, ENVIRONMENTAL MANAGEMENT CORPORA nON ~v~~ ~........----- Kendall S. Coleman Facilities Manager KSC:dmk cc: Greg Coboum, EMC JEFFERSONVILLE WASTEWATER lREATMENT FACILITIES REPORT OF OPERA nONS AUGUST 1994 ~- ST. LOlliS, MO 1.0 EFFLUENT QUALITY During August, effluent quality was within NPDES permit limits. Table 1.1 summarizes effluent quality data. Attachment A contains Time Series Plots of daily BOD and TSS values. TABLE 1.1 MONTHLY EFFLUENT QUALITY DATA Permit Monthly Parameters Limit Average mglL mglL Carbonaceous Biochemical 15 1 Oxygen Demand (CBOD) Total Suspended 18 6 Solids (TSS) E. Coliform 200 ! mo. 148 (Colonies! 100 ml) 400 ! wk 200 Chlorine Residual .02 daily 0.02 Flow (MGD) 5.2 3.55 2.0 FACILITY OPERATIONS Attachment B contains a list of septic haulers that discharged to the Facility during August. 3.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE ~- ST. LOUIS. MO Preventive maintenance was performed on all equipment as scheduled during August. A list of unscheduled maintenance work orders is contained as Attachment C. Maintenance and repair expenditures for August are detailed in Attachment D. Table 3.1 depicts the maintenance and repair expenditures of August and the year-to-date totals. TABLE 3.1 MAINTENANCE AND REPAm EXPENDITURES TIME PERIOD AMOUNT BUDGET OVER EXPENDED (UNDER) August 1994 $6,127 $5,700 $427 Year-to-Date $22,490 $22,800 ($310) TABLE 3.2 REPAm & REPLACEMENT EXPENDITURES TIME AMOUNT BUDGET OVER PERIOD EXPENDED (UNDER) August 1994 $15,556 $8,334 $7,222 Year-to-Date $122,966 $100,000 $22,996 4.0 FACILITY SAFETY AND TRAINING Safety inspections were conducted on August 25, 1994. The rating was 94%. A copy of the Safety Inspection Report is contained as Attachment F. Emergency Response Procedures were reviewed on August 24, 1994. 5.0 SEWER COLLECTION SYSTEM Table 5.1 presents the month and year-to-date totals for sewer projects. -- ST. LOUIS. MO TABLE 5.1 SEWER PROJEcrs I PROJECf THIS MONm YEAR TO DATE Tap Inspections 19 54 Sanitary Sewer 7,625 34,225 Cleaned/ft. Storm Sewer 0 300 Cleaned/ft. Catchbasins Cleaned 9 26 (Handi-clams) Catchbasins Raised 3 11 Manholes Raised 0 45 Catch basins Rebuilt 1 7 Sewer Repairs 4 18 Sewers Televised/ft. 735 3,485 Manhole Castings 1 4 Replaced ST. LOUIS. MO ATTACHMENT A TIME 'SERIES PWTS ~- ST. LOllIS. MO r 10 JEFFERSONVILLE WASTEWATER FACILITY EJi',lJ;'LUEJ.~IT eRaD & TSS 20 18 16 14 12 8 6 4 2 o 10 U U nun U 17 U D Bun n M nun n >> u n DATE AUGUST 1994 - EFFLUENT CBOD .. - EFFLUENT TSS - PERMIT CBOD -PERMIT TSS ATTACHMENT B SEPTIC HAULERS -- ST. LOUIS. MO JEFFERSONVnLE W ASTEW A TER TREATMENT PLANT SEPTIC HAULER REPORT JUNE 1994 LOADS DELIVERED TO TREATMENT PLANT: CURRENT MONm HAULER TOTAL (YTD) Rumpke of Indiana 1 3 pfau 0 1 GRAND TOTAL 1 4 GALLONS DELIVERED TO TREATMENT PLANT: CURRENT MONm HAULER TOTAL (YTD) Rumpke of Indiana 500 2,500 pfau 0 6,330 GRAND TOTAL 500 8,830 ST. LOUIS. MO AttACHMENT C UNSCHEDULED WORK ORDERS ST. LOUIS. MO 09/08/94 JEFFERSONVILLE WASTEWATER TREATMENT FACILITY WORK ORDER HISTORY REPORT P~ge 1 ----------.-------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------.--------------------------------------------------- EflUIPt1ENT NUNBEH (.JaW ORDER ~J. O. NUNBER TYPE EQUIPMENT DESCRIPTION TASK t'iTASK NO. NO. DATE CLOSED DO\lJN TIME LABOR COST t'lA TER.I AL COST TDT AL COST 1-BUILD --------------------------------------------------------------~--------------------_._----------------------------------------------- ------~--------------------------------------------------------------.--------------------------------------------------------------- TASK DESC W1tiENTS 9400367 REPAIR BUILDING ~iMNT 08/25/94 REPAIR HANDRAIL GOING TO STORAGE Romi AT NAW! {iND AT t'iAIN OFFICE DOOR. REPAIRED HANDRAIL GOING UP TO STORE ROOM AND GOiNG INTO MAIN OFFICE. 0.000 ----------------------------_._--------.--------------;....-----_.._-.;....----------------_._---~--.---.-.---':""'------.-~----':""'---~--------------~----- 'i (., (,t:. ,;. \1 ~ '.1.... TOTALS (LABOR HOURS -) Total: 011000 Reg: O~75 Oti 0.00) 0.000 8.30 1. 75 _______..._____________________________._______________~.____________.______________.--c-----------------------:----------------.------------- 10.05 EQUIP TOTALS (LABOR HOURS -) Total: 0.000 Reg: o. 75 Ot~ t);(H)) 0.000 8.30 1. 75 ---------------------------------------------------------------~-------------------------------------------~------------------------ -------.-----------------------------------------------------------~----------------------------------------------------------------- lADt1INi T ASf;. DESC TOTALS Ei~UIP TOTALS 9400344 REPAIR ADMINISTRATION BUILDING REPAIR MACHO DRILL BOX LATCHES (LABOR HOURS -) Total: 0.000 Heo'~ Reg: 08/15/94 0.51 Ot: 0.(0) 0.51 Ot: 0.(0) 0..000 0;000 0.000 ~,,65 5.65 5.50 5.50 11.15 ------------------------------------------------------------------------------------------------------------------------------------ -------..---------------------------------------------------------------------------------------------------------------------------- 1 L15 IBLOllJERl TA~3K DESC Wit'lEWS TOTALS (LABOR HOURS -) Total: 0.000 Hei~: 9400324 REPAIR BLOWER #1 08/09/94 #i BLmlER WILL NOT HUN / INVESTIGATE mm REPAIR R.EPLACED BLOWN FUSE~ NETZGER WAS ON-SITE TO INVESTIGATE PROBLEl1 0.000 0.000 40.19 0.00 ;it., 10 "tv..J. i ---,----~-------------------------------------------------------------------------.-~---------------.------------------.----------------- . . . . ....... .. . 40.19 EQUIP TOTALS (LABOn HOUR~; -) Total: 0.000 Keo; 3.50 Ot~ O~OO) 3.50 Ot: O.OOi 0.000 40.19 0.00 -------~---------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------~-------------------------------------------------------------------- 1 BUNt~10l~j# 1 TASK DEE;C COt~n.1ENTs (LABOR HOURS -) Total: 0.000 08/02i94 011000 TOTALS --.--.--.-.....------------------------------------------------------------------------------------------------,-~-------------------------- 48.03 9400303 REPAIR BUNTON MOWER REPAIR BACK WHEEL DRIVE SHAFT REPAIRED BACK (~HEEL DRIVE SHAFT. (LABOR HOURS -) Total: 0.000 Reg: 3.00 Ot: O.OOi 0.000 36,09 11.94 -------------------------------------~-----~----------':""'--------,-------------------------------~-----------~------------------------ 1 BUNt1iJ\'J# 1 TASK .DESC 9400389 REPAIR BUNTON MOWER INSTALL DEFLECTOR GUARD 08/3i/94 (11'000 _______~______________________________________________--------':""'~:~~~--~-~--~---~-~-~--~~7--------7~~--~~------------------~~~--~~~~- 27.6'1 TOTALS (LABOR HOURS -) Total: 0.000 Req: 0.50 Ot: 0.001 0.000 6.01 21.67 ---------------------------------------------------------------~---------------------~---------------------------------------------- 75.72 EQUIP TOTALS (LABOR. HOURS -) Tota 1: 0.000 Re9: 3.50 Ot: 0.00) 0.000 42.10 33.6i ================================~============================~====================================================================== iCLAR.IFIER1 TASK DESC 9400391 REPAIR CHANGE BRUSHES SECONDARY CLARIFIER #1 08/31/94 0.000 TOTALS -----------------------------------------------------~-------~~~~~7~~~~-~-~~~~~~-~-~~~-~----------------------------,---------------- J",-: '7.-1 111 ..jL (U~BOR HOURS -) Total: 0.000 Keg: 1:00 Ot: O~OO) 0,,000 1'-) (il" ~.:... ..~l~ i05.29 -------------------------------------------------------------~------~-~-------------~--------------------------------~-------------- 09/08i94 JEFFERSONVILLE WASTEWATER TREATMENT FACILITY WORK ORDER HISTORY REPORT Pa;~e 2 EQUIPr~lENT ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------~------------------------------------------------..---------------------- NU~1BER ~JORK ORDER ~) . 0 . NUt1BER TYPE EQUIPMENT DESCRIPTION TASK mASK DATE Do('JN LABOR t1ATEHIAL TDTF1L NO. NO. CLOSED TI~IE COST COST CDST ==~~================================================================================================================================ 117.32 EqUIP TOTALS (LABOR HOURS -) Total: Reg: 1.00 Ot~ O:OOj 0.000 t2. 03 105:;29 ------------------------------------------------------------~----_.._------------------------------------------------~--------------- ------------------------------------------------------------------------------------------------------------------------------------ 1CLARIFIER.2 TASK DESC TOTALS EQUIP TOTfiLS 0.000 9400392 REPAIR SECONDARY CLARIFIER #2 CHANGE WEIR BRUSHES (LABOR HOURS -) Total: Reg: 08/31/94 1.00 Ot: ,\ iYli 'M'.'':'.'' o~ooo o~ooo o~ooo 12,03 i2,,03 105.29 105.29 117 , 32 ------------..----------------------------------------------~------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ i17~32 4VEHICLEOl TASK DESC COMt~ENTS TOTALS 4VEHICLEOi TASK DESC CCitr1t1ENTS 0.000 (LABOR HOURS -) Total: 0.000 Re'd: i..OO Ot; 0;(0) 08/12/94 (I" 75 Ot: 0.(0) 08i23/94 0,,000 THAT IS NO LONGER IN USEl AND 8.30 01100 8~30 TDTALS -----~------------------------------------------------------~-----------------------------------~------------------------------------ o ":;(j w ..'...},~. EQUIP TOTALS 9400345 REPAIR 1988 FORD F-700 DUMP REPLACE ELECTRONIC CONTROL TO DUMP TRUCK HEMOVED ELECTRONIC CONTROL FROM DUMP TRUCK PLACED ON 287~, TRue o ~ 75 0 t : (: II 00 ) i.50 Oti 0,00) 0,,000 0,,000 0..000 <),,000 U.-:Jl) 16,61 0.00 0.00 =================================================================================================================================.=== 16,61 4VEHICLE03 TASK DESC Cot'lt1ENTS TOTALS (LABOR HOURS -) Total: 0,000 Reg: 9400305 REPAIR 1991 DODGE SPIRIT #3629 08/05i94 REMOVE RADIO AND TELEPHONE CAR WAS TRANSFERED TO TOM EDWARDS AND HE WILL HAVE NO USE FOR RADIO OR TELEPHONE. 0.000 0.000 18138 o~oo ~o ~o .lv.'...}'..J ----------------------------------------------------------~---------------------------------~---------------------------------------- 18.38 EQUIP TOTALS 9400368 REPAIR 1988 FORD F-700 DUMP TRUC REPAIR RIGHT TAIL LIGHT AND WARNING SIGNAL REPAIRED BROKEN lHRE GOING TO TAILLIGHT (LABOR HOURS -) Total: 0.000 Reid: 1~66 Ot: 0.00) 1.66 Ot: 0.(0) 0.000 18.38 0.00 =====================================:============================================================================================== 4\iEHICLE06 TASt::: DESC Cot1MENTS (LABOR HOURS -) Total: Reg: 9400213 REPAIR 1987 DODGE RAi1CHARGER. #43 08/18/94 C:. 000 REPAIR GAS GAUGE AND CHECK FRONT SEAL ON TRANSMISSION/AND VARIOUS ITEMS REWORKED BRAKE SYSTEM TOTALS -_._--~-------_._----------------------------------------------.;....;.-_...._....;-_....'...._-----.;......_---....;---------~----------'--_......_------------.--.---------- 566;: 3L~ 0,000 (LABOR HOURS -) Total: 0.000 Reg~ (LABOR HOURS -) Total: 0.000 Reg: (LABOR HOURS -) Total: 0.000 Reg~ 39~OO Ot~ 0,00) 0:000 431$73 i ~? ij i 1 1\.1't11 O.l OSI/08/94 JEFFERSONVILLE W\STE(I)ATER TREATi'1ENT F{\CiLITY WORK ORDER HISTORY REPORT EQUIPMENT NUMBER -~-------------------------------------------------------~------------~_._---'------------------~-~-------------------~~~------------ -..------------------------------------------------------------------------------------..--------------------------------------------- Page 3 ~JORK ORDER ~4. O. NUMBER TYPE EQUIP~lENT DESCRIPTION TASK MT riSK DATE CLOSED DOWN TH1E LABOR COST MATERIAL COST TOTf\L CDST EQUIP TOTALS . " ," "" ." '" " , ., , , , -----------------------------------------------------------------------------------~-----~-----_.~---------~-----~--------~---~-~---- .~---------------------------------------------------------------------------------------------.-------------------------------------- 566,34 (LABOR HOURS -) Total: 0.000 Reg: NOll NO~ 39.00 Ot: 0,(0) OI<O{)1) 431~73 134.61 --------------------------------------------------------.-----------------------------------.---------------------------------------- -------------------------------------------------------------------------------_._--------------------~._----------------------------- 4VEHICLE14 TASK DESC COMt1ENTS 9400300 REPAIR 1990 DODGE D-250 PICKUP T REPAIR LEAK TO TIRE HOLE WAS TO BIG FOR PLUG: HAD TO PATCH ON INSIDE. 08/01/94 0,0()(i TOTALS ----------------------------------------------------------------------------------------------------~--------------~---------------- 22~t:l (LABOR HOURS -) Total: 0,000 Re'~: la50 Ot: O=00j 0.000 16,61 6.00 --------------------------------------------------'-------ooio______________~..;..,_____________'''__'___;.;.....;.....___.;.._o.,;...___'_...__';.;..____~._____'....____...;.....~._...;.___ EQUIP TOTALS (LABOR HOURS -) Total: 011000 Req: 1,500t: 0,(0) 0.000 16,61 6.00 22.61 ---------------------------------------------------------_________________N~____________________M_____________________~~________.____ ------------------------------------------------------------------~,----------------------------------------------------------------- GRANDTOTALS: (LABOR. HOURS -) Total: 0.000 Reg: 53~92 Ot~ OEOO) 0.000 6031;61 392.05 995;6/:., AlTACHMENTD MAINTENANCE AND REPAIR EXPENSES ST. LOUIS. MO Wednesday, August 31, 1994 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 1 P.O. Date Description Amount 8/4/94 PLANT REPAIRS $83.65 8/4/94 RENTAL FOR PUMP FOR CLARIFIER REPAIR $82.44 8/4/94 PAINT FOR PLANT REPAIRS $35.80 8/4/94 ANGLE IRON FOR LOCUST STREET COLLECTION REPAIR JOB $20.00 8/4/94 VEHICLE MAINTENANCE REPAIR $293.61 8/4/94 PLANT REPAIR $19.80 8/4/94 VEHICLE MAINTENANCE REPAIR $6.00 8/4/9,4 VEHICLE MAINTENANCE REPAIRS $28.84 8/11/94 FAN FOR SAFETY SHED AT PLANT $151.65 8/11/94 COLLECTION REPAIR JOBS $542.63 8/11/94 SUPPLIES FOR COLLECTION SYSTEM REPAIR $101.97 8/11/94 FUSES FOR 10TH STREET STATION $24.78 8/11/94 OIL AND FLUID FOR PLANT $283.70 8/11/94 DEODORANT FOR PLANT $300.03 8/11/94 TIRES FOR MOWER $30.86 8/11/94 PLANT REPAIR PARTS $16.80 8/11/94 REPAIR WATER PUMP $909.06 8/11/94 PARTS FOR SEWER COLLECTION JOB REPAIR $64.68 8/11/94 PAINT FOR PLANT REPAIR $79.55 8/11/94 VEHICLE REPAIRS $64.17 8/11/94 MOTOR REPAIR FOR POWERHOUSE STATION $281.90 8/24/94 AIR VALVE $2.05 8/24/94 DOOR STEPS $65.60 8/24/94 DOORS THROUGHOUT THE PLANT $37.38 8/24/94 FOR PAINTING $3.94 8/24/94 KEYS FOR OFFICE $10.55 Wednesday, August 31, 1994 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 2 , P.O. Date Description Amount 8/24/94 MAINTENANCE TOOLS $675.00 8/24/94 MISC. PM AT FACILITY $26.60 8/24/94 PAD LOCKS FOR STORAGE BUILDING $35.70 8/24/94 PAINT SUPPL Y $4.20 8/24/94 PAINTING EQUIPMENT $12.08 8/24/94 PAINTING SUPPLIES $14.10 8/24/94 RIVETS $5.15 8/24/94 ROLLER FRAME FOR PAINTING $11.66 8/24/94 SILICONE $10.75 8/24/94 TOOLS IN PLANT $9.00 8/24/94 FOR BRACES TO MAIN HOIST $36.02 8/24/94 GAS STORAGE CAB $2.05 6/24/94 MISC. ITEMS FOR FACILITY REPAIRS $4.12 8/24/94 ASSORTED BATTERIES FOR FLASHLIGHTS $16.45 8/24/94 FOR OLD ROD DING MACHINE $7.40 8/24/94 COVER FOR CLEA OUT AND REPAIR OF SERVICE LINE AT L:ANSBURG $29.50 8/24/94 TAX ON PREVIOUS COLLECTION REPAIR $11.42 8/24/94- GRASS SEED AND STRAW $5.50 8/24/94 GRASS SEED AND STRAW $17.70 8/24/94 ARTIC SPRING $39.90 8/24/94 EASTERN BLVD $41.74 8/24/94 FILTERS FOR PANEL BOARD TO AIR BLOWI;RS $11 .21 8/24/94 TUBING FOR SAMPLERS $26.25 8/24/94 COUPLING FOR PLANT WATER PUMPS $78.44 8/24/94 FOR J;:LI;CTRIC PANEL BOARD AT PRESS BUILDING $21.60 8/24/94 KD TOOL, KD TOOLS, SIGNAL STA, I'y1ARKR LAMP $34.55 Wednesday. August 31, 1994 P.O.D 8/24/94 8/24/94 8/24/94 8/24/94 8/24/94 8/24/94 8/24/94 8/31/94 8/31/94 8/31/94 8/31/94 8/31/94 8/31/94 8/31/94 8/31/94 8/31/94 8/31/94 8/31/94 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Description Page 3 Amount $32.85 $20.14 $37.50 $4.47 $92.27 $115.07 $150.00 $3.68 $2.42 $2.63 $6.18 $48.51 $148.00 $66.28 $38.00 $38.00 $549.83 $42.12 Total: $6,127.48 MISC. SERVICE TO VEH. 7561 BRAKE HOSE TO VEH. 4318 CALIPER KT, BEARING, LISLE TOOL HOUSING VEH. 4318 MISC. SERVICE TO VEHICLE 4318 OIL FOR PM OIL FOR PM HANDRAIL FOR STAIRS OVER THE KITCHEN LOCKS FOR STORAGE ROOM DOORS VINYL TUBING FOR INF SAMPLER FILTER FOR JET TRUCK LIFT ARMS FOR JET TRUCK CONVEYOR ROLLS WIRE UP PUMP MOTOR #2 CHECK TROUBLE ON GENERATOR BLOWER DOWN . GRATE AND FRAMES FOR COLLECTION FLOATER AND SUPPLY FOR #6690 ATfACHMENT E REPAIR AND REPLACEMENT EXPENDITURES ST. LOUIS, MO VVednesday, August 31, 1994 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 1 P.O. Date Description Amount 8/4/94 TV TRAILER REPAIR $1,655.00 8/4/94 REPAIR OF JET TRUCK $3,421.00 8/24/94 REPAIR OF RAS PUMP $10,480.07 Total: $15,556.07 A'ITACHMENT F SAFETY INSPECTIONS ST. LOUIS, MO MONTHLY SAFETY INSPECTION Plant ~ l:\-~€.tSoNV I (....Lt:' Date 1> I d..151 q.J 1. Electrical control panels ~ A. ~ B. ~ C. ~ D. ~ E. ~ F. Dust free contacts - clean Fuses in place Dry area Wires (1) frayed (2) cracked (3) spliced (4) wire nuts or just taped switches in good condition Obstructed panels 2. Electrical equipment ~ A. Guards in place ~ B. Cords in good repair ~ C. If down-tagged and locked out for repair n~ D. stop button on all machines ~ E. Over loaded outlets ~ F. Use of light extension cords instead of heavy duty 3. Building ~ A. ~ B. -:::::L C . ~ ~ ....+ y. --. 4 . Tank '-...J ~ ----.. '--.. ~ ':::::::i ~ .,~ ~ D. E. F. G. H. I. and work areas stair ways open All areas well lighted Clean floors (1) no oil or grease (2) no pools of water Exits marked Appropriate fire extinguishers Hand rails on stairs o f=. 1=-1 c.t: I Y'Vlflll"lC:jViI\rJ~e.. Supplies stored properly Broken steps Cross connections areas A. Hand rails around tanks B. Chain guards in place as needed C. Guards in place over drive chains & gears D. Walk ways open (1) no ice (2) no oils, water, greases, debris E. Properly anchored ladders F. If equipment being repaired - power supply locked out G. Kick boards in place if needed H. No electrical cords stretched over tanks I. Broken steps Chlorine room - if gas feed in confined area ~ A. Exhaust fan either comes on when door opened or by switch located at entrance door Ammonia hydroxide available to test for chlorine leaks Self contained air supply available Chlorine wrench available to open valves Wel1lighted area No petroleum or other chemicals stored in chlorine room Chlorine protected from direct sunlight, cool and dry Room clean, free of clutter Spare lead washers available on site Emergency number posted outside of chlorine room 5. --...\ ~ ~ ~\ ~ ~ ~ -~ ~ B. C. D. E. F. G. H. I. J. 6. Maintenance area ~ ~ -~ ~ ~ ~ =:::::L ~ - .~ ~ ~ A. B. C. D. Floors free of grease & oil Tools stored properly Supplies stored out of way Hand tools in good repair-cords, plugs, clean guards in place Eye protection provided Proper power source available Well lighted work bench Hoist, lifts, jacks, air hoists, chains, pulleys available for lifting and moving large objects Mowing equipment (1) guards in place (2) steering wheel in good repair Gas leaks Gas supply tank installation E. F. G. H. I. J. K. 7. Protective equipment available as needed --.......\ A . ~ B. '----\ C . ~ D. ~ E. ~ F. --::::::L G. Eye protection Gloves Boots Safety harness and rope"to enter confined spaces Wench or hoist to attach to safety harness Head protection Hearing protection 8. Laboratory area ~ A. Safe storage of chemicals, well labeled and in --- original containers ~ B. Clean area - not cluttered ..::::::L C. No cooking in laboratory.. glassware ~. D. Emergency shower (test) .~ E. Emergency eye wash (test) ~ F. Acid spill kit - do personnel know how to use kit ~ G. No overloaded outlets ~ H. Floor clean and dry ~ I. Eye protection ~ J. ~ K. .~ L. "-..1 M. ~ N. Gloves Aprons or jackets Ventilation (fume hood) Tongs or gloves to move hot items No broken/chipped, cracked glassware 9. ~lant equipment ~ A. Guards on gears, belts, pulleys, shafts ~ B. Excessively hot operating temperature of equipment ~ C. Excessive vibration of equipment ~ D. Water or oil being "slung" from equipment _ ~ E. Worn or cracked conditions ~ F. Excessive dust 10. Lift station (plant) ~A. B. C. D. E. F. G. H. I. Explosive proof lights in lift station Well lite Floors dry Adequate dehumidifier and heater Access sturdy - non-slip tread Adequate ventilation Housekeeping Equipment guards Hatch covers in place 11. ~dustrial waste A. Know what does come to plant - industrial/chemical inventory records ~ B. Know what could come to plant- industrial/chemical X inventory records C. Know response to an accidental spill 12. Sampling equipment ~ A. Pole or rope sufficient to prevent climbing over handrails -....... B. Gloves 13. Emergency preparations ~ A. Check to be certain supplies available for first aid ~ emergency B. Emergency numbers posted ~ C. Contact hours been made with appropriate response ~ groups D. Emergency information on all employees available -=:::::::::i E. MSDS 1{'g #Yes + NO Co 8/9/93 x 100 = ~%