Loading...
HomeMy WebLinkAbout09) September ENVIRONMENTAL MANAGEMENT CORPORATION 701 CHAMPION ROAD JEFFERSONVILLE, INDIANA 47130 812-285-6451 FAX 812-285-6454 October 11, 1994 C. Richard Spencer City-County Building Jeffersonville, IN 47130 Gentlemen: Enclosed please find Environmental Management Corporation's (EMC) ''Operations Report" for the month of September 1994, containing information on the following: 1.0 Effluent Quality 2.0 Facility Operations 3.0 Preventive and Unscheduled Maintenance 4.0 Facility Safety and Training 5.0 Sewer Collection System As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we are available to discuss this report, or any other aspect of our operations, at the convenience of the City. Sincerely, ENVIRONMENTAL MANAGEMENT CORPORATION ~J.~ Kendall S. Coleman Facilities Manager KSC:dmk cc: Greg Cobourn, EMC 1.0 EFFLUENT QUALITY During September, effluent quality was within NPDES permit limits. Table 1.1 summarizes effluent quality data. Attachment A contains Time Series Plots of daily BOD and TSS val ues. TABLE 1.1 MONTHLY EFFLUENT QUALITY DATA Permit Monthly Parameters Limi t Average mglL mglL Carbonaceous Biochemical 15 1 Oxygen Demand (CBOD) Total Suspended 18 6 Solids (TSS) E. Coliform 200 / mo. 95 (Colonies/ 100 011) 400 / wk 126 Chlorine Residual .02 daily 0.02 Flow (MGD) 5.2 4 2.0 FAcnJ.TY OPERATIONS Attachment B contains a list of septic haulers that discharged to the Facility during September. 3.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE Preventive maintenance was performed on all equipment as scheduled during September. A list of unscheduled maintenance work orders is contained as Attachment C. Maintenance and repair expenditures for September are detailed in Attachment D. Table 3.1 depicts the maintenance and repair expenditures of September and the year-to-date totals. TABLE 3.1 MAINTENANCE AND REPAIR EXPENDITURES TIME PERIOD AMOUNT BUDGET OVER EXPENDED (UNDER) September $10,145 $5,700 $4,445 1994 Year-to-Date $34,181 $28,500 $5,681.35 TABLE 3.2 REPAIR & REPLACEMENT EXPENDITURES TIME AMOUNT BUDGET OVER PERIOD EXPENDED (UNDER) September $18,999 $8,334 $10,665 1994 Year-to-Date $143,215 $100,000 $43,215 4.0 FACD.J'IY SAFETY AND TRAINlNG Safety inspections were conducted on September 26, 1994. The rating was 99%. A copy of the Safety Inspection Report is contained as Attachment F. Safety training for September was postponed due to an employee scheduling conflict. September training will be held October 11, 1994. 5.0 SEWER COLLECTION SYSTEM Table 5.1 presents the month and year-to-date totals for sewer projects. PROJECf THIS MONlH YEAR TO DATE Tap Inspections 7 61 Sanitary Sewer 12,950 47,175 Cleaned/ft. Storm Sewer 250 550 Cleaned/ft. Catchbasins Cleaned 4 30 (Handi -clams) ... Catchbasins Raised 0 11 Manholes Raised 21 66 Catchbasins Rebuilt 5 12 Sewer Repairs 3 21 Sewers Televised/ft. 300 . 3,785 Manhole Castings 4 8 Replaced TABLE 5.1 SEWER PROJECfS ATTACHMENT A TIME SERIES PLOTS JEFFERSONVILLE WASTEWATER FACILITY Effiuent CBOD & TSS 20 18 16 14 12 'ill 10 Ei 8 6 4,,, .......................,..",,, "1;' "'\" ;''''''''1'''''' .. '''''';'';'''''';'''''''''''''''1;''1'''''''' ..................1"".,1"'''"".;;.-.",..,...,."-"."",,,,..,, .,........ .............\.". 1- EFFLUENTCBOD - EFFLUENTTSS - PERMIT CBOD 2 +::'::::^:::X1X''';:J:;;..;;':"U'' .. . . ..,."-,.,..;;;..""".;;",.;,,,,;;,,;;;;\ I - PERMIT TSS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Date SEPTEMBER 1994 ATTACHMENT B SEP11C HA ULERS JEFFERSONVIlLE W ASTEW ATER TREATMENT PLANT SEPTIC HAULER REPORT SEPTEMBER 1994 LOADS DELIVERED TO TREATMENT PLANT: CURRENT MONTH HAULER TOTAL (Ym) Rumpke of Indiana 3 6 pfau 0 1 GRAND TOTAL 3 7 GALLONS DELIVERED TO TREATMENT PLANT: CURRENT MON1H HAULER TOTAL (Y1U) Rumpke of Indiana 3,300 5,800 Pfau 0 6,330 GRAND TOTAL 3,300 12,130 ATTACHMENT C UNSCHEDULED WORK ORDERS 10/03/94 JEFFERSONVILLE WASTEWATER TREATMENT FACILITY WORK ORDER HISTORY REPORT Page 1 ------------------------------------------------------------------------------------------------~-----------------..---------.------- -----------------------------------------------------------------------------------------------------------------...----------------- . ... ..... . TOTAL COST EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN lIME LABOR . COST MATERIAL COST -----------------------------------------------------------------------------------------------------------------_.*----------------- ------------------------------------------------------------------------------------------------------------------.------------------ , .. ..., i-BUILD TASK DESC 9400388 REPAIR BUILDING MAINT : REPAIR LEAK ABOVE OPERATORS OFFICE DOOR 09/01/94 0.000 ,TOTALS --------------------------------------------------------------------------------~---------------------------------~----------------- 17.29 (LABOR HOURS -) Total: 0.000 Reg: 1.00 Ot: 0.(0) 0.000 0.000".., ,,12.93 12.03 5.26 --~---------------------------------------------------------------------------------------------------------------.------------------ , .... . . ... .., ..... . EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 1.00 Ot: 0.00) 5.26 17.29 -------------------------------------------------------~---------------------------------------------------------_.~---------------_. -----------------------------------------------------------------------------------------------------------------_.~----------------- 1CL2BUILDINGl TASK DESC COt1t1ENTS 9400413 REPAIR CL2 BUILDING 09105/94 0.000 INSTALL Y STRAINER TO NON-POT WATER FOR CL2 SOLUTION TO CONTACT TANK INSTALLED STRAINER TO LINE IN HOPES OF USXNG NON-POTABLE FOR CL2 SOLUTION TO CL2 CONTACT. SCREENS ARE TO SMALL, NEED TO INSTALL ROUGHING SCREEN AHEAD OF FINE SCREEN FOR PROCESS TO WORK. TOTALS --~-------------------------------------------------------------------------~-------------------------------~-----.------------------ 111. 65 (LABOR HOURS -) Total: 0.000 Rel~: 6.00 Ot: 0.(0) 0.000 69.30 '~2.35 ----------------------------------------------------------~-------------------------------------------------------.------------------ EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 6.00 Ot: 0.(0) 0.000 69.30 '~2.35 111.65 ------------------------------------------------------------------------------------------------------------------.------------------ ------------------------------------------------------------------------------------------------------------------.------------------ 1CLARIFIER2 TASK'DESC COMMENTS 9400414 REPAIR SECONDARY CLARIFIER #2 REPAIR ADJ. BRUSHES, DRIVE SEAL, SWING ARM SUPPORT'ROD REPAIRED SWING ARM SUPPORT, REPLACED DRIVE SEAL AND REPAIRED ADJUSTABLE BRUSH SUPPORTS. TOTALS ---------------------------------------------------~--------------------------------------------------------------.------------------ 213.22 : (lABOR HOURS -) Total: 0.000 Reg: 19.50 Ot: 0.00) 0.000 213.22 0.00 ----------------------------------------------------------------------------~-------------------------------------.------------------ EQUIP TOTALS : (LABOR HOURS -) 'Total: 0.000 Reg: 19.50 Ot: 0.(0) 0.000 213.22 0.00 213.22 ==================================================================================================================================== . .. ... ,. , . ... ... ....... 1CLARIFIER3 TASK DESC 9400434 REPAIR SECONDARY CLARIFIER #3 REPAIR ELBOW TO DRAW OFF TUBE 09/21/94 0.000 TOTALS I ... '. , ------------------------~-------------------------------~~-~--~~~~-~-----~--~-----~--~~~--~~-~---~-~------------_.------------------ 138.30 : (LABOR HOURS -) Total: 0.000 Reg: 6.75 Ot: 0.00) 0.000 61.30 77.00 ---------------------------------------------------------------------------------------------------~-~-------------------------~---- EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 6.75 Ot: 0.(0) 0.000 61.30 77.00 138.30 ==================================================================================================================================== lCLARIFIER4 TASK DESC COMMENTS 09/13/94 9400433 REPAIR SECONDARY CLARIFIER #4 REPAIR ELBOW TO DRAW OFF LINE REPAIRED 'ELBOW TO 'DRAW OFF LINE AT #4 FIN~L CLARIFIER 0.000 ------------------------------------------------------------------------------------------------------------------------------------ '." . . ......'......,... ..........,... ,......,. .. ,... ....,.. ... ... ....,'..c (LABOR HOURS~) Total: 0.000 Reg: 7.000t: 0.00) 0.000 66.95 35.90 102.85 10/03/94 JEFFERSONVILLE WASTEWATER TREATMENT FACILITY WORK ORDER HISTORY REPORT Paoe 2 --~--------------------------------------------------------------------------------------------------------------------------------- --~-------------------------------------------------------~------------------------------------------------------------------------- MATERIAL COST TOTAL COST EQUIPtlENT NUMBER WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TH'lE LABOR COST =========~========================================================================================================================== 35.90 102. 8~, EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 7.00 Ot: O.OOl 0.000 66.95 =========================================================-========;==============================================::=================== iRAS2 TASK DESC COMMENTS 9400472 REPAIR RETURN ACTIVATED SLUDGE P REPLACE HYDRAULIC LINE AND FITTINGS .TO ~AS PUMP #2 REPLACED HUDRAULIC LINE, FITTINGS AND ADDED OIL. 09/28/94 0.000 TOTALS ----------------------------------------------------------------------------------------------------------------.-------------------- i 64.69 110.89 (LABOR HOURS -) Total: 0.000 Reg: 4.00 Ot: O.OOl 0.000 46.:20 ------------------------------------------------------------------------------------------------------------------------------------ . - - - - i EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 4.00 Ot: O.OOl 0.000 46.20 64.69 110.81 --------------------------------------------------------------------------------------------------------------_.~------------------- -------------------------------------------~------------------------------~--------------------------------------------------------. 4EMC-l TASK DESC COMt1ENTS 9400412 REPAIR 1989 B~~NEVILLE 09/21f94 ALLIGNMENT TO FRONT END AND REPLACE TIRES REPLACED FRONT TIRES AND BALANCED REAR'TIRES. SQEAK IN PASSENGER SIDE FRONT BRAKE ASSEMBLY, CLEANED BRAKE ASSEMBLY AND REGLUED PADS. 0.000 TOTALS -----------------------------------------------------------------------------------~----------------------------------------------- 163.40 196.6 : (LABOR HOURS -) Total: 0.000 Reg: 3.00 Ot: O.OOl 0.000 33.21 ----------------------------------------------------------------------------------------------------------------------------------- 4Et'1C -1 TASK DESC COMMENTS 9400473 REPAIR 1989 BONNEVILLE 09/27/94 TURN ROTORS AND DRUMS AND REPLACE FRON! PADS REPLACED BRAKE PADS TO FRONT ENDl TURNED ROTORS, DRUMS AND REPLACED REDIATOR OVERFLOW CAP. 0.000 TOTALS ----------------------------------------------------------------------------------------------------------------------------------- 34.55 62.2 (LABOR HOURS -) Total: 0.000 Reg: 2.50 Ot: 0.00) 0.000 27.68 ---------------------------------------------------------------------------------------------------------------.-------------------- EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Req: 5.50 Ot: O.OOl 0.000 60.89 197.95 258.E -------------------------------------------------------~--------------------------------------------------------------------------~ ----------------------------------------------------------------------------------------------------------------------------------- , 4VEHICLE05 TASK DESC COMMENTS 9400435 REPAIR 1991 FORD LNT-8tXiO SEMI # REPLACE TIRES ON REAR AND INSTALL TAIL LIGHT GOODYEAR INSTALL 4 NEW TIRES TO REAR 09f15/94 0.000 TOTALS --------------------------------------------------------------------------------------------------------------..-------------------. 893.34 932.1 : (LABOR. HOURS'-) Total: 0.000 Reg: 3.75 Ot: O.OO} 0.000 39.06 --------------------------------------------------------------------------------------------------------------.--------------------. EQUIP TOTALS : (LABOR HOURS -~ Total: 0.000 Reg: 3.75 Ot: 0.00) 0.000 39.06 893.34 n7~ 7.':u. ------------------------------------------------------------------------------------------------------------_.~------------------_. -------------------------------------------------------------------------------------------------------------.--------------------. 4VEHICLE06 TASK DESC Cot1MENTS 09/26/94 9400457 REPAIR 1987 DODGE RAMCHARGER ~43 STARTER IS NOT WORKING PROPERLY, INVESTIGATE AND REPAIR REPLACED STARTER. 0.000 TOTALS -------------------------------------------------------------------------------------------------------------.-------------------- 46.57 60 : (LABOR HOURS -) Total: 0.000 Reg: 1.25 Ot: 0.00) 0.000 13.84 --------------------------------------------------------------------------------------------------------------------------------- 10/03/94 JEFFERSONVILLE WASTEWATER TREATMENT FACILITY WORK ORDER HISTORY REPORT Page ~ ------------------------------------------.-------------------------------------------------------------------.-------------------- ------------------------------------------------------'---------------------------------------------------------------------------- EQUIPMENT NUMBER WORK ORDER l~ .0. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST T01 C[ ----------------------------------------------------------------------------------.----------.----------------.-------------------- ---------------------------------------------------------------------------------------------------------------------------------- EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 1.25 Ot: 0.(0) 0.000 13.84 46.57 60. ------------------------------------------------------~---------------------------~-_._._----------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------- 4VEHICLE07 TASK DESC TOTALS 9400474 REPAIR 1987 DODGE RAMCHARGER #43 REPAIR EMERGENCY BRAKE CABLE (LABOR HOURS -) Total: EQUIPTOTALS : (LABOR HOURS -) Total: 0.000 0.000 09/30/94 Reg: 2.25 Ot: 0.00) 0.000 0.000 0.000 24.91 24.91 2.25 27. Reg: 2.25 Ot: 0.00) 2.25 27. ---------------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------- 4VEHICLE09 TASK DESC COMMENTS TOTALS 9400386 REPAIR 1989 FORD F-800 JET TRUCK REPLACE SCREEN FROM HOLDING TANK TO PUMP REPLACED WATER SCREEN FROM HOLDING TANK TO WATER PUMP. (LABOR HOURS -) Total: EQUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 09/02/94 1.00 Ot: 0.(0) Reg: 1.~) Ot: O.~)) 0.000 0.000 0.000 11. 07 11.07 60.00 71. 0.000 60.00 7J -----------------------------------------------------------------------------------------------------------------------------.--- ------------------------------------------------------------------------------------------------------------~._------------------~ 4VEHICLE13 TASK DESC TOTALS 9400387 REPAIR REPAIR WATER PUMP (LABOR HOURS -) Total: EQUIP TOTALS : (LABOR HOURS -) Total: 1976 CASE 5aOCK BACKHOE ~ 0.000 0.000 09/01194 Reg: 4.75 at: 0.(0) 0.000 0.000 0.000 52.58 52.58 88.00 14( Reg: 4.75 ot: 0.00) 88.00 14( ====================================================='==================================:=======================================:= GRANDTOTALS: (LABOR HOURS -) Total: 0.000 Reg: 62.75 Ot: 0.(0) 0.000 671.35 1513.31 218~ ATTACHMENT D MAINTENANCE AND REPAIR EXPENSES Thursday, September 29, 1994 P.O.D 917/94 917/94 917/94 917/94 917/94 917/94 917/94 917/94 917/94 917/94 917/94 917/94 917/94 917/94 917/94 917/94 9n /94 917/94 917/94 917/94 917/94 917/94 917/94 917/94 9n /94 917/94 Page 1 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Description "NOTICE WATER NOT PORTABLE SIGNS CLOTHESLINE LAB MAINTENANCE LOCK AND HASP PLANT SIGNS WASHERS DEFLECTOR CHUTE GUARD Amount $15.75 $9.85 $3.94 $7.56 $7.56 $0.61 $18.94 $36.54 STRAINER FOR NON-PORTABLE WATER LINE TO CL2 SYSTEM $2.47 FOR REPAIR OF ROOF AT OFFICE BUILDING $3.78 FOR REPAIR OF ROOF AT OFFICE BUILDING AERATOR #4 CHECK OUT AERATOR #2 SOLID WASTE BUILDING TEMP HOOKUP OF AERATOR UNHOOK #3 AERATOR $468.76 $122.00 $184.49 $122.00 $61.00 $173.00 PROBE/CABLE ASSY- REPLECEMENT FOR D.O. METER $~!04.00 PROBE/CABLE ASSY- REPLECEMENT FOR D.O. METER 4 GRATES AND FRAMES 5 GRATES AND FRAMES $n1.44 $~~13.05 $37.70 #73 STOl\JE FOR COLLECTION SYSTEM REPAIRS ACETYLENE FOR WELDING VEHICLE REPAIR VEHICLE REPAIRS VEHICLE REPAIRS VEHICLE REPAIRS MAINTENENCE ON TIRES $16.12 ~~18.78 $8.00 $10.79 $26.91 $67.00 Thursday, September 29, 1994 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana P.O. Date 917/94 WATI;:R PUMP FOR #5868 bescription , 917/94 917/94 917/94 917/94 917/94 917/94 9/16/94 9/16/94 9/16/94 9/16/94 9/16/94 .9/16/94 9/16/94 9/16/94 9/16/94 9/16/94 9/16/94 9/16/94 9/16/94 9/16/94 9/16/94 9/16/94 9/16/94 9/23/94 9/23/94 FAB SCREEN FOR JET TRUCK. 10TH STREET STATION MILLCREEK RIVERPORT #2 UTICA STATION #2 REPORT ON PUMPS AT 10TH AND PLANT SERVICE OF FIRE EXTINGUISHER STARTER FOR AIR COMPRESSOR REDI BOLT ROD COUPLERS FOR #2 FINAL CLARIFIER STRAINER FOR NON PORTABLE CL2 LINE CLARIFIER WELDED ARM FOR SWEEPER MARKING PAINT FOUR BATTERIES FOR PORTABLE RADIOS ACETYLENE CONCRETE FOR SEWER REPAIR SHIMS FOR MOTOR MOUNTING FOR POWER HOUSE LIFT STATION MINI LAMP FOR SIDE MIRROR~ PM FOR VEHICLES VEHICLE PM TIRES FOR THE SEMI 72" SKID FOR BUSHOG DIESEL FUEL FOR EMERGENCY POWER GENERATORS REPAIR AT WILSON LIFT STATION REPLACE LOCK ON FILE CABINET 5 RING BUOY COVERS Page 2 Amount $84.39 $60.00 $4~S.79 $3,96.50 $85.50 $3;94.48 $350.00 $213.40 $63.79 $2.86 M4.75 $22.50 $81.27 $;~72.00 $28.84 $211.86 $'116.86 $3.57 $72.06 $12.34 $881.00 $35.86 $518.58 $418.54 $10.00 $73.24 Thursday, September 29, 1994 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 3 I P.O. Date I Description I ArhOI~ 9/23/94 GFCIADAPTER $132.77 9/23/94 REPAIR OF CLARIFIER $22.35 9/23/94 WIRE TIES FO~ CLARIFIER SIGNS $4.00 9/23/94 SCOTT AIR PACK ~;32.94 9/23/94 PVC PIPE FOR CLARIFIER $16.17 9/23/94 PVC PIPE FOR CLARIFIER ~;64.68 9/23/94 CHECKED HYDRAULICS ON DUMP TRAILER ~)87.00 9/23/94 REPLACE VALVE ON EATON MOTOR RESEAL FOR WATER TRUCK $1160.00 VEHICLE # 4459 9/23/94 REPAIR AT WILSON SCHOOL LIFT STATION $1119.18 9/23/94 CSO REPAIR AT GOYNE $4.25 9/23/94 GOYNE AVENUE STORM LINE REPAIR (REBAR) ~;20.00 9/27/94 MJ ACCESSORY SET FOR REPAIR OF AIR LINE IN PLANT $65.10 9/27/94 LADDER $1178.98 9/27/94 11 STONE $1133.32 9/27/94 CONCRETE $71.05 9/27/94 CONCRETE $1140.39 9/27/94 CONCRETE $204.20 9/27/94 CONCRETE $~~80 .78 9/27/94 VEHICLE # 4318 STARTER $49.48 9/27/94 2 WHEEL CHOCKS $46.50 Total: $10,145.16 ATTACHMENT E REPAIR AND REPLACEMENT EXPENDITURES Tuesday, October 11, 1994 P.O. Date 5/27/94 6/2/94 7/1/94 7/22/94 8/4/94 8/4/94 8/24/94 8/24/94 9/1/94 917/94 1 011/94 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Description 10TH STREET REPAIR & REPLACEMENT Budget REPAIR OF COURT & GRAHAM ST. VALVE REPAIR ON CLARIFIER OF #3 AT PLANT TV TRAILER REPAIR REPAIR OF JET TRUCK FREIGHT CHARGE REPAIR OF RAS PUMP REPLACE CONTROL VALVE FOR WATER TRUCK MILL CREEK PUMP REPAIR DISCHARGE VALVE ON THE #4 CLARIFIER Page 1 t $54}60.00 $0.00 $37,000.00 $15,E>50.00 $1,E>55.00 $3,421.00 $S62.55 $10,480.07 $687.50 $1 ,239.34 $17,J60.00 Total: $143,215.46 ATTACHMENT F SAFETY INSPECTIONS t .. MONTHLY SAFETY INSPECTION Plant ~tfL/oS Date ((~2(9 -?t(~ 1. 4'le rical control p..anels A. Dust free contacts - clean ~. B. Fuses in place ~ C. D~y area -JL- D. W~res (1) frayed (2) cracked (3) spliced (4) wire nuts or just taped Switches in good condition Obstructed panels '//E L F: 2. Ele7trical equipment ~ A. Guards in place B. Cords in good repair c. If down-tagged and locked out for repair ~ D. stop button on all machines ~ E. Over loaded outlets ~ F. Use of light extension cords instead of heavy duty 3. BU.Y'lding and,work areas // A. sta~r ways open -7> B. All areas well lighted Z c. Clean floors (1) no oil or grease (2) no pools of water D. Exitsmarked E. Appropriate fire extinguishers F. Hand rails on stairs G. supplies stored properly H. Broken steps I. Cross connections I 4. ~a areas . . A. Hand rails around tanks .11.-/ B. Chain guards in place as needed ~ C. Guards in, place over drive chains & gears ~ D. Walk ways open (1) no ice (2) no oils, water, greases, debris E. Properly anchored ladders F. If equipment being repaired - power supply G. Kick boards in place if 'needed H. No electrical cords stretched over tanks I. Broken steps locked out 1 ~ 5. c~orine room - if gas feed in confined area . . A. Exhaust fan either comes on when door opened or by switch located at entrance door . B. Ammonia hydroxide available to test for chlorine leaks . C. Self contained air supply available D. Chlorine wrench available to open valves E. Well lighted area F~ No petroleum or other chemicals stored in chlorine room Chlorine protected from direct sunlight, cool and dry Room clean, free of clutter Spare ~washers available on site Emergency number posted outside of chlorine room L ~~: I. . J. 6. Maintenance area : ~A. Floors free of grease & oil B. Tools stored properly C. supplies stored out of way ~ D. Hand tools in good repair-cords, / in place ~ E. Eye protection provided F. Proper power source available . G. Well lighted work bench -Z H. Hoist, lifts, jacks, air hoists, ~ available for lifting and moving ~ I. Mowing equipment (1) guards in place ~ (2) steering wheel in good repair J. Gas leaks K. Gas supply tank installation plugs, clean guards chains, pulleys large objects 7. pro~ective equipment available as needed ~/ A. Eye protection B. Gloves C. Boots D. Safety harness and rope"to enter confined spaces E. Wench or hoist to attach to safety harness F. Head protection G. Hearing protection 8. L7ratory area . . A. Safe storage of chemicals, well labeled and in original containers B. Clean area - not cluttered c. No cooking in laboratory.glassware D. Emergency shower (test) E. Emergency eye wash (test) F. Acid spill kit - do personnel know how to use kit eG. NQ overloaded outlets H. Floor clean and dry I. Eye protection i ~: '=Z M. -d- N. Gloves Aprons or jackets ventilation (fume hood) Tongs or gloves to move hot items No broken/chipped~ cracked glassware 9. t equipment A. Guards on gears, belts, pulleys, shafts B. Excessively hot operating temperature of equipment C. Excessive vibration of equipment D. Water or oil being "slung" from equipment ~~E. Worn or cracked conditions -4L F. Excessive dust 10. 11. 12. Lift station (plant) ~A. EXplosive proof lights in lift station ~ B. Well lite -L- c. Floors dry i D. Adequate dehumidifier and heater E. Access sturdy - non-slip tread F. Adequate ventilation G. Housekeeping H. Equipment guards -!- I. Hatch covers in place I~strial waste A. Know what does come to plant - industrial/chemical ---~ inventory records ~B. Know what could come to plant- industrial/chemical --JI inventory records ~ c. Know response to an accidental spill Sam~ing equipment ~. pole or rope sufficient to prevent climbing handrails B. Gloves over 13. Emergency preparations ~ A. Check to be certain supplies available for first aid :0: emergency . Emergency numbers posted c. Contact hours been made with appropriate response ~ groups D. Emergency information on all employees available E. MSDS q3 #Yes + NO J x 100 = qq' ~ o 8/9/93