Loading...
HomeMy WebLinkAbout05) April Operated By: Environmental - Management Corporation Monthly Report ..A..pr5i1L Jl995 ENVIRONMENTAL MANAGEMENT CORPORATION 701 CHAMPION ROAD JEFFERSONVILLE, INDIANA 47130 812-285-6451 FAX 812-285-6454 May 12, 1995 C. Richard Spencer, Jr. City of Jeffersonville City-County Building Jeffersonville, IN 47130 Dear Dick: Enclosed please find Environmental Management Corporation's (EMC) "Operations Report" for the month of April 1995, containing information on the following: 1.0 Effluent Quality 2.0 Facility Operations 2.1 Pretreatment 3.0 Preventive and Unscheduled Maintenance 3.1 Maintenance & Repair Expenditures 3.2 Repair & Replacement Expenditures 3.3 Electrical Expenditures 4.0 Facility Safety and Training 5.0 Sewer Collection System As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we are available to discuss this report, or any other aspect of our operations, at the convenience of the City. Sincerely, ENVIRONMENTAL MANAGEMENT CORPORATION ~~ ~---- Kendall S. Coleman Facilities Manager cc: Greg Coboum, EMC 1.0 EFFLUENT QUALITY During April, effluent quality was within NPDES permit limits for BOD and TSS concentrations. Table 1.1 summarizes the effluent quality data. Attachment A contains Time Series Plots of daily BOD and TSS values. Table 1.1 EFFLUENT QUALITY Carbonaceous Biochemical 25 2 Oxygen Demand (CBOD) Total Suspended Solids 30 4 (TSS) E. Coliform 200 / mo. 32 / mo. (Colonies/ 100 mI) Chlorine Residual .02 daily .00 Ammonia 3.0 / mo. 1.9/ mo. Flow 5.2 2.6 (MGD) 2.0 FACILITY OPERATIONS Attachment B contains a list of septic haulers that discharged during the month of April. During April, the treatment processes continued to perform excellent. We continue to experience problems with the diffused air system at the solids digester units. The diffusers' air port plugs are not allowing the proper air transfer with the liquid in the tank. This reduces the mixing capability and creates a low dissolved oxygen concentration which can cause the sludge to become septic. We have contacted the manufacturer of the diffusers in hopes of finding an economical solution to the problem. 2.1 PRETREATMENT During April, one industry was cited with a Notice of Violation (NOV) from the pretreatment coordinator. Table 2.2 recognizes the industry who received the NOV and a description of the exceeded MOR JEFFERSONVILLE. IN discharge permit limits. Table 2.2 INDUSTRIAL NOV's FOR APRIL Wyandot Oil & Grease We will continue to work with the industries to ensure compliance with permit limits. 3.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE Preventive maintenance was performed on all equipment as scheduled in April. There were 14 unscheduled maintenance tasks performed. All were minor except for the seeding and strawing of the facility grounds to help improve appearance. A list of unscheduled maintenance work orders is included as Attachment C. Maintenance and repair expenditures for the month of April are detailed in Attachment D. Table 3.1 represents the total amount expended in April, and for the year. Table 3.2 includes the same information for repair and replacement expenditures. Attachment E contains a detail of repair andreplacement expenditures for the year. MOR JEFFERSONVILLE, IN Time Period March 1995 Y ear- To-Date Time Period April 1995 Year-To-Date MOR Table 3.1 MAINTENANCE & REPAIR EXPENDITURES Budget $5,700 $68,400 Table 3.2 REPAIR & REPLACEMENT EXPENDITURES Budget $8,334 $100,000 (Over) Under $375 $387 (Over) Under $8,115 ($102,706) JEFFERSONVillE, IN 3.3 ELECTRICAL EXPENDITURES Due to the electric bills being one month behind, table 3.4 relates to electrical expenditures from May 1994 through March 1995. Table 3.4 ELECTRICAL EXPENDITURES Time Period Budget (Over) Under March 1995 $13,849 $2,058 Y ear-to- Date $142,175 ($5,076) 4.0 FACILITY SAFETY & TRAINING Safety inspections were conducted on April 10, 1995. The rating was 99%. The only deficiency reported was that employees have not covered all phases of the facility's safety program. A copy of the Safety Inspection report is included as AttachmentF. On April 19 and April 26, 1995, Susan Tomiesello with the American Red Cross conducted First Aid and CPR instruction for employees of the facility, and several personnel from various City departments . 5.0 SEWER COLLECTION SYSTEM During the month there were 11 sewer calls. Six of these calls were regarding sewer backups. One of the backups was due to blockage of the City's main line. The remaining calls were due to drainage problems in various locations of the City. Table 5.1, on the next page, shows the data on the months sewer projects. MOR JEFFERSONVillE, IN 1 ATTACHMENT E REPAIR & REPLACEMENT EXPENDITURES JEFFERSONVILLE, IN ATTACHMENT A TIME SERIES PLOTS JEFFERSONVILLE, IN Jeffersonville Wastewater Treatment Facility Effluent CBOD & TSS 20 18 -I- . . . . . . . - - . - . . - . . - . . . . . . - . - - . . - - . - . . . - . . . . . . - - . - . . . . . . . . . . - - - - - - . . - . . - . - - - - - - - . . . - - - - . . 16 14 12 ~ lOr / , . .' . , , . . , I 8-1- I , , " I . . , , " " I . , , , , , , , .. . . , . " " 6 -I- .- , I , , . .. .. '" , . . I , , , " . , . . I , " I , . , , I '. , , , I . I , , ' I , . " , I , I . . , . I , I I , . . . I , , , , I . , I I . . . I , ' .. I , , . I , 4": , . , I , , I , , , I , . , , I , I , , . , I , " , , I , . I . I " , , . , , , . . ''-1 , . , . . I . , "~ .. , . , , , '~ .'.~ I EFFLUENT CBOD . , , , " ,I , , . , . . , , . " . . , , ' . . . . . .EFFLUENT TSS 2 -J---..,. ~ .- ... .. .. ..' , ^ . / , ^ .. .. .. , . PERMIT CBOD I - - - - . . PERMIT TSS I I II 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Date April 1995 ATTACHMENT B APRIL SEPTIC HAULERS .~,. JEFFERSONVillE, IN JEFFERSONVILLE WASTEWATER TREATMENT FACILITY April 1995 Septic Haulers Hauler Current Month Hauler Total (YTD) TOTAL 1 o 1 22 1 23 Rumpke of Indiana Pfau Hauler Current Month Hauler Total (YTD) TOTAL 1,100 o 1,100 20,900 6,330 27,230 Rumpke of Indiana Piau JEFFERSONVILLE. IN ATIACHMENTC UNSCHEDULED MAINTENANCE WORK ORDERS JEFFERSONVillE, IN 05/02/95 WORK ORDER HISTORY REPORT Page 1 EQUIPMENT NUMBER ==================================================================================================================================== WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST TOTAL COST ;--Top Level-- PARTS USED ==================================================================================================================================== TASK DESC COMMENTS TOTALS --Top Level-- PARTS USED TASK DESC COMMENTS TOTALS EQUIP TOTALS 9500287 REPAIR Overall Facility QTY USED ITEM NUMBER DESCRIPTION 1.0 3G272 WHEEL REPAIR WHEEL TO DUMPSTER BY MAINT BUILDING PURCHASED NEW WHEEL FROM GRANGER (LABOR HOURS -> Total: 1.500 Reg: 1.50 Ot: 04/04/95 0.00) 04/13/95 0.00) 0.00) 0.000 0.000 0.000 0.000 0.000 110.94 128.25 17.31 COST 2.5.45 25.45 COST 60.00 60.00 85.45 DATE 04/04/95 42.76 DATE 04/13/95 170.94 ==================================================================================================================================== 213.70 1 BUILDINGS TASK DESC TOTALS EQUIP TOTALS 9500308 REPAIR Overall Facility QTY USED ITEM NUMBER DESCRIPTION 24.0 BATTERIES REPAIR TRAFFIC BARRICADES REPAIRED BROKEN WOOD BARRICADES AND REPLACED FLASHERS. (LABOR HOURS -> Total: 10.000 Reg: 10.00 ot: 11.50 ot: 0.33 ot: 0.33 ot: 04/07/95 0.00) 0.00) 0.000 0.000 0.000 3.81 3.81 0.00 0.00 3.81 ==================================================================================================================================== 3.81 1 BUNMOW#1 PARTS USED TASK DESC (LABOR HOURS -> Total: 11.500 Reg: 04/11/95 0.000 COST 8.51 DATE 04/11/95 ---------------------------------~-------------------------------------------~-------------------------------,-~--------------------- 37.36 TOTALS EQUIP TOTALS 9500313 REPAIR FACILITY BUILDING MAINT REPAIR OVERHEAD DOOR AT PRESS BUILDING (LABOR HOURS -> Total: 0.330 Reg: 2.50 ot: 2.50 ot: 0.00) 0.00) 0.000 0.000 28.85 28.85 8.51 8.51 ==================================================================================================================================== 37.36 1 BUNMOW#2 PARTS USED TASK DESC (LABOR HOURS -> Total: 0.330 Reg: 9500312 REPAIR BUNTON MOWER QTY USED ITEM NUMBER DESCRIPTION 1.0 PULLEY REPLACE IDLER PULLEY (LABOR HOURS -> Total: 2.500 Reg: (LABOR HOURS -> Total: 2.500 Reg: 9500311 REPAIR MOWER QTY USED ITEM NUMBER 1.0 TOGSWCH MOWER WILL NOT RUN DESCRIPTION TOG SWITCH 04/12/95 0.000 COST 5.02 DATE 04/12/95 05/02/95 WORK ORDER HISTORY REPORT Page 2 m=================================================================================================================================== TOTAL COST EQUIPMENT NUMBER WORK ORDER NUMBER EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST ==================================================================================================================================== 19.45 W.O. TYPE TOTALS ------------------------------------------------------------------------------------------~----------------------------------------- (LABOR HOURS -> Total: 1.250 Reg: 1.25 ot: 0.00) 0.000 14.42 5.02 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS (LABOR HOURS -> Total: 1.250 Reg: 1.25 ot: 0.00) 0.000 14.42 5.02 19.45 ==================================================================================================================================== 1 BUNMOW#3 9500283 REPAIR BUNTON MOWER #3 04/04/95 0.000 PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE 2.0 BELTS 29.16 04/04/95 2.0 BLADES 24.28 04/04/95 1.0 TOG TOGGLE SWITCH 4.78 04/04/95 1.0 WIREND WIRE ENDS 0.76 04/04/95 TASK DESC MOWER IS NOT RUNNING TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 76.29 (LABOR HOURS -> Total: 1.500 Reg: 1.50 Ot: 0.00) 0.000 17 .31 58.98 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS (LABOR HOURS - > Total: Reg: 1.50 ot: 0.00) 0.000 17.31 58.98 76.29 ==================================================~================================================================================= 1ELEC CONTROLS TASK DESC COMMENTS TOTALS EQUIP TOTALS 1.500 9500309 REPAIR ELECTRIC CONTROL PANELS INSTALL COVER TO ELECTRIC PANEL AT SAFETY BUILDING USED AN OLD COVER AND MODIFIED TO EXISTING BOX. (LABOR HOURS -> Total: 2.000 Reg: 2.00 ot: 2.00 Ot: 04/13/95 0.00) 0.00) 0.000 0.000 0.000 23.08 23.08 0.00 0.00 23.08 ============================================================================================================================~======= 23.08 4VEHICLE05 PARTS USED TASK DESC (LABOR HOURS -> 2.000 Reg: 04/24/95 0.000 COST 54.00 32.00 DATE 04/24/95 04/24/95 ------------------------------------------------------------------------------------------------------------------------------------ 145.46 TOTALS EQUIP TOTALS Total: 9500354 REPAIR 1991 FORD LNT-8000 SEMI # QTY USED ITEM NUMBER DESCRIPTION 3.0 FLAT REPAIR 2.0 SWITCH REPAIR HOSE TO TRAILER HYD LIFT AND REPAIR FLAT (LABOR HOURS -> Total: Reg: 5.33 ot: 5.33 ot: 0.00) 0.00) 0.000 0.000 59.46 59.46 86.00 86.00 ==================================================================================================================================== 145.46 4VEHICLE06 TASK DESC 5.330 (LABOR HOURS -> Total: Reg: 5.330 9500314 REPAIR 1987 DODGE RAMCHARGER #43 VEHICLE IS RUNNING ROUGH / INVESTIGATE AND REPAIR 04/10/95 0.000 05/02/95 WORK ORDER HISTORY REPORT Page 3 ======================================================================================~==~=~=~====================================== MATERIAL COST TOTAL COST EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST COMMENTS ==================================================================================================================================== TOOK TO VEHICLE MAINT AND ADJUSTED TUNING. TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.00 23.08 (LABOR HOURS -> Total: 2.000 2.00 ot: 0.00) 0.000 23.08 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS Reg: (LABOR HOURS -> Total: 2.000 2.00 ot: 0.00) 0.000 23.08 0.00 23.08 ==================================================================================================================================== 4VEHICLE09 PARTS USED TASK DESC Reg: 9500348 REPAIR 1989 FORD F-800 JET TRUCK QTY USED ITEM NUMBER DESCRIPTION 1.0 HOSE REPLACE HYD HOSE ON JET TRUCK 04/30/95 0.000 COST 47.85 DATE 04/30/95 TOTALS ---~-----------~-----~--------------~---~------------------------------------~------------------------------------------------------ 47.85 59.26 (LABOR HOURS -> Total: 1.000 1.00 ot: 0.00) 0.000 11 .41 ---------------------------------~-------~------------------------------------------------------------------------------------------ EQUIP TOTALS Reg: (LABOR HOURS -> Total: 1.000 1.000t: 0.00) 0.000 11.41 47.85 59.26 ==================================================================================================================================== Reg: 4VEHICLE13 9500349 REPAIR 1976 CASE 580CK BACKHOE # 04/28/95 0.000 PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE 1.0 1/2" CRIMP 1.00 04/28/95 1.0 CRIMP 13.34 04/28/95 1.0 RH TI ROD TIE ROD 27.25 04/28/95 1.0 RH TI ROD 2 27.25 04/28/95 1.0 WEAH24512 HOSE 40.44 04/28/95 TASK DESC REPAIR HYD HOSE TO REAR BOOM AND REPLACE BROKEN TIEROD TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 109.28 166.64 (LABOR HOURS -> Total: 5.000 5.00 ot: 0.00) 0.000 57.36 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS Reg: (LABOR HOURS -> Total: 5.000 5.00 ot: 0.00) 0.000 57.36 109.28 166.64 ==================================================================================================================================== Reg: 5WILSON SCHOOL 9500307 REPAIR WILSON SCHOOL L.S. 04/07/95 0.000 PARTS USED QTY USED ITEM NUMBER DESCRIPTION 1.0 CLEAN FLUID 1.0 CYL HON 1.0 KIT 1.0 KIT2 I TASK DESC COMMENTS REPAIR SPARE VACUUM PUMPS REPAIRED SPARE VACUUM PUMPS FOR USE WITH CONTROL SYSTEM AT WILSON SCHOOL COST DATE 4.95 04/07/95 28.00 04/07/95 39.00 04/07/95 39.00 04/07/95 TOTALS ----~------------------------------------------------------------------------------------------------------------------------------- 110.95 145.57 (LABOR HOURS ~> Total: 3.000 3.00 Ot: 0.00) 0.000 34.62 ------------------------------------------------------------------------------------------------------------------------------------ Reg: 05/02/95 WORK ORDER HISTORY REPORT Page 4 ==================================================================================================================================== TOTAL COST EQUIPMENT NUMBER WORK ORDER NUMBER W.O. TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST ==================================================================================================================================== 145.57 EQUIP TOTALS (LABOR HOURS -> Total: 3.000 Reg: 3.00 Ot: 0.00) 0.000 34.62 110.95 ==================================================================================================================================== 913.70 GRANDTOTALS (LABOR HOURS -> Total: 35.410 Reg: 35.41 ot: 0.00) 0.000 401.66 512.04 05/02/95 Page 1 WORK ORDER HISTORY REPORT ==================================================================================================================================== EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST TOTAL COST EQUIPMENT NUMBER WORK ORDER W . O. NUMBER TYPE 1 GROUNDS TASK DESC =============================================================~========~============================================================= 04/06/95 0.000 9500315 PROJECT GROUNDS AT ~ACILITY MULCH THE DIFFERENT AREAS OF THE FACILITY TOTALS ----------------------------------------------------------------------------------------------------------------------------------~- (LABOR HOURS -> Total: 16.000 16.00 ot: 0.00) 0.000 168.96 0.00 168.96 Reg: ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS (LABOR HOURS -> Total: 16.000 16.00 ot: 0.00) 0.000 168.96 0.00 168.96 Reg: ==================================================================================================================================== 0.000 1 GROUNDS PARTS USED TASK DESC 9500350 PROJECT GROUNDS AT FACILITY QTY USED ITEM NUMBER DESCRIPTION 6.0 MULCH CU/YARDS MULCH FLOWER BEDS IN PLANT 04/06/95 COST 84.00 DATE 04/06/95 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ (LABOR HOURS -> Total: 12.000 12.00 ot: 0.00) 0.000 126.72 84.00 210.72 Reg: ------------------------------------------------------------------------------------------------------------------------------------ 1 GROUNDS 9500357 PROJECT GROUNDS AT FACILITY 04/28/95 0.000 PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE 1.0 DIRT 30.00 04/28/95 1.0 SEED GRASS SEED 495.70 04/28/95 1.0 SPREADER 29.95 04/28/95 1.0 STRAW 195.75 04/28/95 1.0 TOP SOIL 600.00 04/28/95 TASK DESC SEED AND STRAW BARE SPOTS IN PLANT TOTALS -------------------------------------------------------------------,----------------------------------------------------------------- (LABOR HOURS -> Total: 78.00 ot: 0.00) 0.000 849.02 1351.40 2200.42 78.000 Reg: ----------------------------------------------~------------------------------------------------------------------------------------- EQUIP TOTALS (LABOR HOURS -> Total: 90.000 90.00 Ot: 0.00) 0.000 975.74 1435.40 2411.14 Reg: ==================================================================================================================================== 106.000 Reg: GRAND TOTALS (LABOR HOURS -> Total: 106.00 ot: 0.00) 0.000 1144.70 1435.40 2580.10 ATIACHMENT D MAINTENANCE & REPAIR EXPENDITURES FOR APRIL JEFFERSONVILLE, IN , Thursday, May 11, 1995 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 1 I P.O. Date II Description II Amount I 4/6/95 PAINT FOR CONFERENCE ROOM $23.60 4/6/95 BLADES FOR LAWNMOWER $4.83 4/6/95 PAINT BRUSHES $1.05 4/6/95 PAINTING SUPPLIES FOR SIGN $37.96 4/6/95 TAPE MEASURE $8.07 4/6/95 TILLER FOR GROUNDS KEEPING $42.00 4/6/95 OIL FILTER FOR DODGE SPIRIT $4.36 4/6/95 STARTING FLUID FOR LAWN MOWER $8.15 4/13/95 OIL FOR STOCK $0.89 4/13/95 GRASS SEED $213.82 4/13/95 PVC SUPPLY $268.42 4/13/95 REPAIR ON ROBIN LANE ($7.11) 4/13/95 ACETYLENE $17.05 4/13/95 DUMPSTER WHEELS $24.45 4/13/95 FAN MOTOR $17.74 4/13/95 REPAIR OF BACHRACH UNIT $523.12 4/13/95 REPLACEMENT NOZZLE FOR JET CLEANER $181.39 4/13/95 LATERAL TIE-IN AT 208 RIVERSIDE $200.00 4/13/95 WATER PLUG FOR BLANCHEL TERRACE OVERFLOW $23.98 4/13/95 SEWER REPAIR $32.54 4/13/95 CATCHBASIN REPAIR $179.73 4/13/95 LAWN MOWER SUPPLIES $124.01 4/13/95 FILTER'S FOR VEHICLE #4340 $8.95 4/13/95 WIRE/CABLE FOR MOWER $5.02 4/13/95 CARWASH FOR TOM $10.00 4/13/95 TOOL FOR LIFT STATION PUMPS $29.17 4/13/95 BATTERY FOR MILL CREEK $69.16 Thursday, May 11, 1995 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 2 P.O. Date Description Amount 4/13/95 MILL CREEK BATTERY TERMINALS $9.39 4/13/95 REPAI OF WILSON L.S. VACUUM PUMP $10.70 4/13/95 REPAIR OF WILSON L.S. VACUUM PUMP $5.20 4/21/95 FLOAT HANGER FOR MAGNOLIA L.S. $1.47 4/21/95 COMPUTER FOR MOMS SEWER PROGRAM $584.00 4/21/95 PUMP REPAIR KIT $89.29 4/21/95 CALI BRA TION OF THE FLOW METER $1,063.00 4/21/95 TENTH & WALNUT CATCHBASIN REPAIR $53.00 4/21/95 INVESTIGATION OF SEWER PROBLEM $330.00 4/21/95 LATERAL REPAIR AT 208 RIVERSIDE DRIVE $17.79 4/21/95 PARTS FOR LAWN MOWERS $168.59 4/21/95 BRAKE CLEANER FOR #7155 $2.09 4/21/95 BRAKE PADS FOR #7155 $36.78 4/21/95 ELECTRICAL FOR VEH #7155 $65.51 4/21/95 REPAIR ON VEHICLE #7155 $59.20 4/21/95 RETAINERS FOR DISC BRAKES $5.17 4/21/95 PARTS FOR #702 $32.78 4/21/95 BATTERIES FOR L.S. $63.00 4/21/95 EWING LANE L.S. #2 PUMP BREAKER $9.62 4/21/95 EWING LANE L.S. #2 PUMP BREAKER $479.85 4/21/95 SWITCH FOR MAGNOLIA L.S. $1.75 4/21/95 SAFETY SIGNS $34.49 4/28/95 FLOWERS FOR PLANT $6.25 4/28/95 FLOWERS FOR PLANT $38.85 4/28/95 EMERGENCY PLANNING VIDEO $105.00 Total: $5,325.12 Thursday, May 11, 1995 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 1 P.O.Da Description I Amount I 5/27/94 10TH STREET REPAIR & REPLACEMENT $54,760.00 6/2/94 Budget $0.00 7/1 /94 REPAIR OF COURT & GRAHAM ST. $37,000.00 7/22/94 REPAIR TO NO 3 CLARIFIER DRAIN VALVE $15,650.00 8/4/94 TV TRAILER REPAIR $1,655.00 8/4/94 REPAIR OF JET TRUCK $3,421.00 8/24/94 FREIGHT CHARGE FOR RAS PUMP $562.55 8/24/94 REPAIR OF RAS PUMP $10,480.07 9/1 /94 REPLACE CONTROL VALVE FOR WATER TRUCK $687.50 9/7/94 REHAB MILL CREEK PUMP NO.2 $1,239.34 1 0/1 /94 REPAIR DRAIN VALVE TO CLARIFIER NO.4 $17,760.00 1 0/13/94 CLEANING OF MILL CREEK AND TENTH STREET $1,390.00 11/7/94 REHAB OF POWERHOUSE LIFT STATION NO.1 PUMP $1,375.00 11/7/94 FREIGHT CHARGE FOR RAS PUMP IMPELLERS (THREE IMPELLERS) $67.74 11 /15/94 MANHOLE RISERS FOR 1994 STREET PAVING PROJECTS $2,232.00 11 /15/94 REPAIR TO PUMP MOTOR AT CRUMS LANE 1 LIFT STATION $4,358.82 11 /15/94 PUMPEX IMPELLER FOR RAS STATION $5,850.00 11/17/94 REPAIR, BALANCE AND SET IMPELLER FOR SPRING STREET PUMP $1,766.94 NO.2 12/7/94 NEW MILL CREEK PUMP, MODEL # 613A $11,517.00 12/7/94 FITTING FOR NEW PUMP AT MILL CREEK $80.33 12/9/94 DIP & BAKE LINCOLN MOTOR 200 HP $2,865.00 12/22/94 INSTALL WIRING AND HOOK UP OF BLOWER MOTOR $481.58 1 /6/95 INSTALLATION OF JUNCTION BOXES ON RAS PUMPS $1,038.80 1/6/95 FAB GASKETS FOR MILL CREEK $753.75 2/14/95 LABOR TO EXPOSE VALVE FOR PIN REPLACEMENT AND WELD ROD $17,750.00 TO VALVE STEM 3/8/95 REPAIR OF BACKHOE $3,156.46 3/8/95 INSTALLATION OF JUNCTION BOXES $1,941.72 Thursday, May 11, 1995 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 2 I P.o. Date I Description Amount 3/8/95 INSTALLATION OF JUNCTION BOXES $2,152.50 3/9/95 CHECK CRUMS LANE FLOATS $494.00 4/12/95 REPAIR OF BROKEN WATER LINE ON ROBIN LANE $218.68 Total: $202,705.78 ATTACHMENT F SAFETY INSPECTION REpORT JEFFERSONVILLE, IN ....~ . ENVIRONMENT AI.. MANAGEMENT CORPORA TION MONTHLY SAFETY INSPECTION CHECKOFF k\lIEET JEFFERSONVILLE WASTEWATER TREATMENT FACILITY 701 CHAMPION ROAD JEFFERSONVILLE, IN 47130 1(--10 "1 S (812) 285-6451 PERSON COMPLETING INSPECTION: W~ ~~ 1. Personnel Safety A. Personal Protective Clothing 1. Safety Helmets Provided ~ . (for Personnel & Visitors)..................................~ NO 2. Hearing Protection (for High Noise Areas).......................................@ NO 3. Eye Protection - Goggles, etc. (for Personnel & Visitors)..................................@ NO 4. Gloves (for Personnel)..................................................@ NO 5. Rubber Boots with Steel Toes (provided for Personnel)......:.............................. @ NO 6, Rain Suits Provided ".~ (for Personnel)....................................... .;.. :'.......@ NO 7. Is Respiratory Protection Provided including ventilators and hoods over high dust areas, dust masks, etc. {for Personnel)................................ @ NO B. Safety Devices and Equipment N/A N/A N/A NtA NtA N/A NtA 1. Non-sparking Tools in areas where flammable or explosive gases may be present?..................... @ NO Nt A 2. Oxygen Deficiency, Toxic, & Explosive Gas indicator........................................................... .@ NO N/ A 3. Self-contained Breathing Apparatus for entry to chlorine room............................................... @ NO Nt A 4. Confined Space Entry Equipment Available . such as and including Safety Harness, Portable , Wench, Hoist,etc...............................................@ NO Nt A . ..'.;,<,;.',....:r;.,'.)'.\..I-......;.!....'l.i('!.."'..-';.:':~'.>:..li' .....:. ",..,-.,.1. ':.;~ ::':' .~,'.:..' 1 . Are Personnel trained in the use and location of safety equipment at the planl..................~... @ NO N/A 2. Are there railings around all tanks with openings chained off...................................... @ NO N/ A 3. Are holes covered? Including all pits & wells, ~ drains, valve holes, hatch covers inplace........ ~ NO N/A 4. ~~:r.l0~~'fP(~~~ ~~I~r~s.us~d.~ll~r~... (~ NO N/ A 5. Are all equipment guards in place? Including mowing equipment.......................~................. 6~ NO N/A 6. Are dry wells ventilated and is ventilation adequate in all are. as............... ..........~. y~ NO Are emergency numbers posted & accessible.. NO Is proper liquid flammable storage used.......... YES NO Is general plant cleanliness being practiced? . Including floors (No oil or grease or pools. of .~. water), Storage Areas (No clutter & supplies stored properly), Chlorine Room (Free of clutter), Laboratory........................................ CvE~ NO N/A 10. Are all walkways, exists and routes, & stairways clear & unobstructed (No ice, oils, water, grease, or debris)................................. eYED NO N/A 11. Are all slippery surfaces posted and/or covered with. anti-skid material, including stair treads. and ramps, in good repair and covered with non-skid surface.............................................. @~ NO N/A 12. Are all mats and rugs in good repair so as not n::&~~~;~~fLi~~~:t=~j~~~&.~~j~i~;::.;. 14. Is lighting adequate in all areas (Work. areas, .. . stairways,,~~1~a}'~,et~.)............~................. @ NO N/A 15. Are noise levels within allowable limits or danger are~rp(j'ste?......... ....................... ................ @ NO N/ A ;.'.J,,,,"',,, ....,.-__.......i,.....,.,.-.___-' ........-">.--,."..,....,,..~..;.-.,-........., '..' '-'''-'''''.'''. '.,'..'.'.,.'. '- ..<.-,...,., ......,.. -' "'''''' ,....,..... ,', i 5. First Aid Kits with proper & adequate supplies ~ readily available for any First Aid Emergency....~ NO 6. Tratlic Control Cones Available........................@) NO 7. Ladders to enter manholes of wet wells (fiberglass or wooden for electrical work)......... @ NO 8. Safety Buoys and Life Lines, Life Preservers at all open structures (02 Ditches, Clarifiers, . Lagoons, etc:....................................................~ NO II. General Plant Safety 7. 8. 9. N/A N/A N/A N/A N/A N/A N/A l< \,<~:> 1-..-.:,-,-:>,;:,,,,:',:--,,,,,:::::,;';,-- ' ,~' ',' '.--, ,.---~-"-"-,._,.,-~_.-'--"-::,'--'- "":'--'--'>'" --,--:,,':,<:--',,", \i [~~~;f;iE;;::e~le~uj/::'Ii .~~. E~ 20. Is inclem~nt weather protection provided at ~ entrances (mats,'safety strips, de-icers, etc.)...~ NO N/A 21. Are tripping hazards eliminated at all doors (threshold plates in good repair, etc.).............. QiS) NO N/A 22. Is safety ~lass provided in all doors................~ NO N/A 23. ~;:::;s~:~).~~~~~~~~..~.~..~~~~~~..~~~.~.~~~~~..~YE NO N/A "' "', \'~!",''' ~"'"',r..,.."'.\'~&m>>w~,~'*',.1I.>,~...~~..24':.1"Are\.ladd~rs.'properlyY,anchored~~~~~::~'t.~~' o:v.ES' N0'~N/A'll"'*I>,"'!;.\1"'..,.'i'''''''w. ." .. . . ' ,.I 25. Are fixed..Ia?der~provided with safety cages or safct~sidc<rails................................ ~........ @ NO NI A 26. Are all elevation differences between floors ..1.,..,'...,..",,,,.........'.,..,.,,,,"," clearly defined and properly lighted................ E NO 27. Are portable ladders in good condition........... S NO 28. Kick bo~iasin place ifneeded........................ S NO 29. No Broken steps............................................ E NO 30. Arc ashtfaysprdvided and empticd rcgularly.. YES NO 31, Are trash9a~s9()V.~r~~andemptied regularly. YES NO .1.....,.."'"...,.. ." .",,0"",'" .;,f;"n;;:'M'~~;l'<f.'~1J.~jj~;.~\\"?,j~~(~fl!?,\;~;'1~*'~~t~;?i.hiA'.')~l+,~!:;i.'*:J~;,;~;;~~4'~~tt~~~~.for lifting .heayr, ..e9.MiRU,1~nt., . 111 good 'repair..... .............: ...'.;~'.;.... .~'.....::..,..::.. ' 33. Are pla~tperson:nel immunized for tetnus........ YES "I.. ...... 34. No electrical cords stretched over tanks.......... YE I,' , ',~ ".', ,',c: 35. No gas leaks...............................................'.... YE 36. Fuel sup!ply tank in good condition................:'. YES NO 37. ~:c~~~~~i~~l~q~~~::~.t.i.~~. ~.~~~~~~~~~~ .~.l~. (yES) NO NI A 38. No exc~ssive vibration of machinery or .."I.,.. ' equipment............. ...... ..... ............................ NO 39. No water or oil being "slung" from equipment NO 40. No work orcracke<lequipment..................... NO 41. No exc~ssiveduston equipment................... YES NO 42. Adequa.'fedehumidifier and heaters where needed.L..........:.:........,...............:;............;..... @ NO N/A 43. Emerge,hcY.Mcdical Information on all employ~es available for determination of job assignnr~flis.......... ::........ .......... .................... ~~ NO NI A 44. Cross C~i1nections have been eliminated ,1<<' . . .,\.....,;<b.~~.~~~~,. P:8.~~~!~,~~.l~;~S,~"'~~~B.!)i~~~"~gJl~R~t~~<(\~>;,l;,;i:,\:,'\',l+Hi;.i.,....';"u..".,. source:! . . .. ...... ....., ........... ........ '. '.. a. PurrtP & Mlxer $e(lJs................................. ~ NO b. Dig~st~~l-I~~tingSystemMakeup Water... YES NO. c. Vac~uin FilferWater Sprays..................... @) NO " ,- ,;,- ;,',:~.,.,';,,~,,<,'~.(.,',-,'-~ " ~;~- ';,:,~~'~>;s.; /<;~;:~r,;}::t\;~yt::'x; ~:.>i.< ?,.>r-:+/;. ,-'i'''->' ,,?":J ,.,~,j -' " ':c>.':::L: ,.)." :t, N/A N/A N/A N/A N/A NI fit.! N/A N/A NO N/A @ . ~ ".; " N/A N/A N/A N/A N/A @ N/A d. N/A e. N/A f N/A g. N/A h. N/A Ill. Electrical Safety IV. 1. Is all 2. 'Is all 3. Are the 4. Is 5. Are in good condition and used ........................... ........... ........ .:. .@ NO 6. Is electrical test equipment available. Such as voltmeter, ~mpmeler, etc.............."................... @ NO 7. Are d~elect,~ic ru~ber lnats presents for electncal wo'rk............................................... NO 8. All control ;pa1lelswitches in good condition.. NO 9. All control 'panels unobstructed...................... NO 10. Are dielectric rubber gloves available............. NO .d., , "....,. ..... . II. Are ground,t~~ltinterrl1pteisused.................. NO 12. Arc warninkbt caution signs posted............... NO 13. Is control panel area clean and dry.................. YE NO 14. Are all nee~edfl1ses{)r~reakers in place......... YES NO 15. Are all contacts clean and dust free................. . S NO 16. Is there em~rgency stop buttons on all machines apd equipment................................. CYEID NO 17. ~:::=~~~L~~V;~~u7;~:.d~:In."."I.~~~~ NO 18. Is power supply locked out! tagged out on equipmenf~~~s~~tly~~i~g :e.~aired............... ..@ NO ...k "'..i.....hi...'..,..;/;k;j;...,/.k. ... ...'. ...., . .......;.... Chlorine & Dechlorinatio~S~fety '...i;:.....;./.>i......~.;'... ..,... ...,.:..>........../;';//) ..................:....... ... .............. .... .... ...... 1. All standili~ cylinders chained in place and/or ~~:;~~~~~~J'aJ~~i~I~~?-~:...::.:.:.:.\1 ~g Chlorine &' dechlorination leak detector tied into the fa~ilityaI~rl11system.. .."......""., ..,... ..C~"1) NO 5. Ventilator fan with outside switch present and . either when door opens or with at entrance door......................... N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2. 3. 4. N/A N/A N/A N/A N/A L '>, :'-: ~""';:' ,~,,:,;- ,"" \' -', ,:' '- -;:' -; :- 6. Ammoniakn~Sulphur for checking chlorine & dechlorination 'leaks available........................~~. NO 7. Are all safety precautions posted...................~ NO 8. Proper Chlorine wrench available to open valves..... ..1..... ... ...................... ...... .................. 6'E:D NO 9. Chlorine protected from direct sunlight, cool and dry.. ..:.:.................... .~": .....::.. :'.. .... ..','........ .... cr~ NO 10. No petroleum or other chemicals store in . I L . ~~I:~~:::::;h~;~~~~i;bi~~~.;it~:::::::: :~ ~g . --'I V. Process Chemical Safety.1 N/A N/A N/A N/A N/A N/A Are persortnel trained to handle all chemicals. properly. ;:'...... ......... ...... ...... ..... ...... .................@ NO N/ A ~~~~~~:~ :t~~h~~;~:~ ~'.~eJ1t.fort~~ .nn ~ NO NI A 1~~;zJ:!~~:Z::~:~::;2~=:~;...fi> ~g ~~ ~;;l~~~~; ~~~b~~g~~~~~i.~.~~~~. ~~ ~.~~~~~~. ~~~~~~ ~ NO N/ A ...h,.".~.., ." '. Are management & employees aware of the hazards of the materials being used................~. Y NO N/A 7. Knows pr6~;ef'respo'f1sel()anacCidental spill... YES NO N/A . ~: ~~::~~:li~~a~i~~~h~~.~~~o~~i~~~~.?l~.:.:~.:.~,:.;,.~. .... ~~""'!'.~?V'''i''~i.:':..., .'o,.j' ~~~(~;).~~.t~e~~r~~r~~:~.~~~~:n@ NO N/A 10. Emergency ActIOn Plan on file wIth local FIre, Police Departments and appropriate Emergenc~ Agency.... .t. .;;...... ........ 0'.... ..........; ...... ........... ..@ NO N/ A I. 2. 3. 4. 5. 6. VI. Tools & Equipment i . d.d 1. Are hand t6:()ls in good and stored properly... . d..,::':" ..... ... ::.:.'.'.':','.: "::::,:...:::::;...,.......:.. @ NO Are power tools stored properly and in good ~ condition -~pr~s,plugs,etc............................ ~ NO Are the too~sadequatefor the tasks to be I .d .' performed..I...;.;...., ....... NO Are defecti~et6ois replaced as needed............ ES NO Are tool guards in plaCe.......... ............ ..... ....... YE NO Areemploy~es trained in the proper use of the various tools they are expected to use............. ~.,. . i 2. 3. 4. 5. 6. "i, , .' > c..~/:' ;<L ,'.' - '~' N/A N/A N/A N/A N/A N/A 7. Are employees given additional instruction and ~~:i;%~~;,~.i.~~~. ~~~ .~~~.~~~I.i.~~~. ~~~~~. .~~~.......... ~ NO N/ A 8'~~::;:e~.~~~~~~.~~~~~~:~~.~.~~~~.~~................@D NO N/A VII. Fire Safety & Protection I. Are fire/emergency evacuation plans posted....@ 2. 1\.re employees familiar with fire/emergency evacuation plan................................................@ 3. Are there sufficient number and types of fire extinguishers.........,.....,......,....,..........,....,...... ..@) 4, Are the tircextingllishcrs properly located and 5. ~::;:~e;:;~ ~~;i~~~i~h;;~ ~h~';k~d;';;;;~;;jl;.... .~ 6, Are all of the fire extinguishers in working , condition.,. ,..... ..... ..... .... ..... ...... ...... ....,..... ....... @ 7. Are employees-trained in the proper use of the extinguishers to be used................................... &Es:> 8. Are smoke detectors in working order...........:. YES VIII. Laboratory Safety NO N/A NO N/A NO N/A NO N/A NO N/A NO N/A NO~ NO 'A 1. Emergency Eyewash & Shower Station are ~~~:n~~~~ :;~~:,~~~~I~8Jl~ t~..te~ ~~~~l~.~ ~g N/A 2. N/A 3. All chemicals safely and properly stored, well ,- labeled and in original containers................ ...... ~ NO N/A 4. Laboratory Safety devices used such as: Pipette suction bulbs, Eye Protection, Gloves, Aprons or Jackets, & Tongs......................................... NO N/A 5. No brokenl chipped or cracked glassware........ NO N/A 6. No overloaded outlets................;.................... NO N/A 7. Acid spill kit available..,.................................. S NO N/A 8. Emergency procedures for acid spills posted @ and used by all personneL.............................. NO N/A 9. Laboratory Safety Rules posted and obeyed by all per,sonnel such as no cooking or eating from laboratory glassware............. ...........................@ NO N/A X. Other Safety 1. Are the required safety pr9grams presented B and! or attended during the year.;.................... . YES . NO N/A ',i':i,,;:""i""!.:~''''~;:#.f~~.~~IliiW'.i~I0.::.r~;i<f;~(,..)..,.'il,,(\:~ii:,\,"':'''''''i'.';'~'Fr:'\~'.;,!I''WI'A':l'il~iV>li~t~.r~"$ll1t!f:lf><Wit\\~~m\~A~~~~~~l\Y:~'ltI~~'I/#i~~ki0!#:~,1.f~.wo?l<~i.!liI6~V~S;~,'#l~,j;l~("i'~\o<Y."!,\i;',"';" ' ' 2. Is a suitable identification system used to identify the plant's piping system......................@ NO 3. Has the operator taken steps to remove or minimize safety hazards.................................. ~ NO 4. Are all personnel provided with a shower and locker fO,r their work clothes........................... ~ NO 5. Are personnel trained in First Aid & CPR........ ~ NO 6. Have the following proper safety signs been provided such as: Non-potable Water, Chlorine Hazard, No Smoking, High Voltage, Watch ' Your Step Signs in Certain Areas, & Exit Signs@ NO 7. Is your Facility safety program Up to Date. (Worksafe Program)......................................... YES @ (# YES) /3).+ I x 100 = tj f % (# YES + # NO) N/A N/A N/A N/A N/A N/A ,~'