..A..pr5i1L Jl995
ENVIRONMENTAL
MANAGEMENT
CORPORATION
701 CHAMPION ROAD
JEFFERSONVILLE, INDIANA 47130
812-285-6451
FAX 812-285-6454
May 12, 1995
C. Richard Spencer, Jr.
City of Jeffersonville
City-County Building
Jeffersonville, IN 47130
Dear Dick:
Enclosed please find Environmental Management Corporation's (EMC) "Operations Report"
for the month of April 1995, containing information on the following:
1.0 Effluent Quality
2.0 Facility Operations
2.1 Pretreatment
3.0 Preventive and Unscheduled Maintenance
3.1 Maintenance & Repair Expenditures
3.2 Repair & Replacement Expenditures
3.3 Electrical Expenditures
4.0 Facility Safety and Training
5.0 Sewer Collection System
As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we are
available to discuss this report, or any other aspect of our operations, at the convenience of the
City.
Sincerely,
ENVIRONMENTAL MANAGEMENT CORPORATION
~~ ~----
Kendall S. Coleman
Facilities Manager
cc: Greg Coboum, EMC
1.0 EFFLUENT QUALITY
During April, effluent quality was within NPDES permit limits for BOD and TSS concentrations. Table 1.1
summarizes the effluent quality data. Attachment A contains Time Series Plots of daily BOD and TSS
values.
Table 1.1
EFFLUENT QUALITY
Carbonaceous Biochemical 25 2
Oxygen Demand (CBOD)
Total Suspended Solids 30 4
(TSS)
E. Coliform 200 / mo. 32 / mo.
(Colonies/ 100 mI)
Chlorine Residual .02 daily .00
Ammonia 3.0 / mo. 1.9/ mo.
Flow 5.2 2.6
(MGD)
2.0 FACILITY OPERATIONS
Attachment B contains a list of septic haulers that discharged during the month of April.
During April, the treatment processes continued to perform excellent. We continue to experience
problems with the diffused air system at the solids digester units. The diffusers' air port plugs are not
allowing the proper air transfer with the liquid in the tank. This reduces the mixing capability and
creates a low dissolved oxygen concentration which can cause the sludge to become septic. We have
contacted the manufacturer of the diffusers in hopes of finding an economical solution to the problem.
2.1 PRETREATMENT
During April, one industry was cited with a Notice of Violation (NOV) from the pretreatment
coordinator. Table 2.2 recognizes the industry who received the NOV and a description of the exceeded
MOR
JEFFERSONVILLE. IN
discharge permit limits.
Table 2.2
INDUSTRIAL NOV's FOR APRIL
Wyandot
Oil & Grease
We will continue to work with the industries to ensure compliance with permit limits.
3.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE
Preventive maintenance was performed on all equipment as scheduled in April. There were 14
unscheduled maintenance tasks performed. All were minor except for the seeding and strawing
of the facility grounds to help improve appearance. A list of unscheduled maintenance work
orders is included as Attachment C.
Maintenance and repair expenditures for the month of April are detailed in Attachment D. Table
3.1 represents the total amount expended in April, and for the year. Table 3.2 includes the same
information for repair and replacement expenditures. Attachment E contains a detail of repair
andreplacement expenditures for the year.
MOR
JEFFERSONVILLE, IN
Time Period
March 1995
Y ear- To-Date
Time Period
April 1995
Year-To-Date
MOR
Table 3.1
MAINTENANCE & REPAIR EXPENDITURES
Budget
$5,700
$68,400
Table 3.2
REPAIR & REPLACEMENT EXPENDITURES
Budget
$8,334
$100,000
(Over)
Under
$375
$387
(Over)
Under
$8,115
($102,706)
JEFFERSONVillE, IN
3.3 ELECTRICAL EXPENDITURES
Due to the electric bills being one month behind, table 3.4 relates to electrical expenditures from
May 1994 through March 1995.
Table 3.4
ELECTRICAL EXPENDITURES
Time Period
Budget
(Over)
Under
March 1995
$13,849
$2,058
Y ear-to- Date
$142,175
($5,076)
4.0 FACILITY SAFETY & TRAINING
Safety inspections were conducted on April 10, 1995. The rating was 99%. The only deficiency
reported was that employees have not covered all phases of the facility's safety program. A copy
of the Safety Inspection report is included as AttachmentF.
On April 19 and April 26, 1995, Susan Tomiesello with the American Red Cross conducted First
Aid and CPR instruction for employees of the facility, and several personnel from various City
departments .
5.0 SEWER COLLECTION SYSTEM
During the month there were 11 sewer calls. Six of these calls were regarding sewer backups.
One of the backups was due to blockage of the City's main line. The remaining calls were due to
drainage problems in various locations of the City. Table 5.1, on the next page, shows the data
on the months sewer projects.
MOR
JEFFERSONVillE, IN
1
ATTACHMENT E
REPAIR & REPLACEMENT EXPENDITURES
JEFFERSONVILLE, IN
ATTACHMENT A
TIME SERIES PLOTS
JEFFERSONVILLE, IN
Jeffersonville Wastewater Treatment Facility
Effluent CBOD & TSS
20
18 -I- . . . . . . . - - . - . . - . . - . . . . . . - . - - . . - - . - . . . - . . . . . . - - . - . . . . . . . . . . - - - - - - . . - . . - . - - - - - - - . . . - - - - . .
16
14
12
~ lOr / ,
.
.' . ,
, . .
,
I
8-1- I , ,
" I . .
, , "
" I . ,
, ,
, ,
, , ..
. . , . " "
6 -I- .- , I , , . .. .. '" , . . I , ,
, " . , . . I , " I
, . , , I
'. , , , I . I , , ' I ,
. " , I , I . . , . I ,
I I
, . . . I , , , ,
I . , I I
. . . I , ' .. I , , . I ,
4": , . , I , , I , , , I ,
. ,
, I , I , , . , I , " , ,
I , . I . I " , , . , ,
, . .
''-1 , . , .
. I . , "~ .. ,
. , , , '~ .'.~ I EFFLUENT CBOD
. , , ,
" ,I , , . , . . , , .
" . . , , ' . . . . . .EFFLUENT TSS
2 -J---..,. ~ .- ... .. .. ..' ,
^ . / , ^ .. .. .. , .
PERMIT CBOD
I - - - - . . PERMIT TSS
I I
II 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Date
April 1995
ATTACHMENT B
APRIL SEPTIC HAULERS
.~,.
JEFFERSONVillE, IN
JEFFERSONVILLE WASTEWATER TREATMENT FACILITY
April 1995 Septic Haulers
Hauler
Current Month
Hauler Total (YTD)
TOTAL
1
o
1
22
1
23
Rumpke of Indiana
Pfau
Hauler
Current Month
Hauler Total (YTD)
TOTAL
1,100
o
1,100
20,900
6,330
27,230
Rumpke of Indiana
Piau
JEFFERSONVILLE. IN
ATIACHMENTC
UNSCHEDULED MAINTENANCE WORK ORDERS
JEFFERSONVillE, IN
05/02/95
WORK ORDER HISTORY REPORT
Page 1
EQUIPMENT
NUMBER
====================================================================================================================================
WORK ORDER W.O.
NUMBER TYPE
EQUIPMENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATERIAL
COST
TOTAL
COST
;--Top Level--
PARTS USED
====================================================================================================================================
TASK DESC
COMMENTS
TOTALS
--Top Level--
PARTS USED
TASK DESC
COMMENTS
TOTALS
EQUIP TOTALS
9500287 REPAIR Overall Facility
QTY USED ITEM NUMBER DESCRIPTION
1.0 3G272 WHEEL
REPAIR WHEEL TO DUMPSTER BY MAINT BUILDING
PURCHASED NEW WHEEL FROM GRANGER
(LABOR HOURS ->
Total:
1.500
Reg:
1.50 Ot:
04/04/95
0.00)
04/13/95
0.00)
0.00)
0.000
0.000
0.000
0.000
0.000
110.94
128.25
17.31
COST
2.5.45
25.45
COST
60.00
60.00
85.45
DATE
04/04/95
42.76
DATE
04/13/95
170.94
====================================================================================================================================
213.70
1 BUILDINGS
TASK DESC
TOTALS
EQUIP TOTALS
9500308 REPAIR Overall Facility
QTY USED ITEM NUMBER DESCRIPTION
24.0 BATTERIES
REPAIR TRAFFIC BARRICADES
REPAIRED BROKEN WOOD BARRICADES AND REPLACED FLASHERS.
(LABOR HOURS ->
Total:
10.000
Reg:
10.00 ot:
11.50 ot:
0.33 ot:
0.33 ot:
04/07/95
0.00)
0.00)
0.000
0.000
0.000
3.81
3.81
0.00
0.00
3.81
====================================================================================================================================
3.81
1 BUNMOW#1
PARTS USED
TASK DESC
(LABOR HOURS ->
Total:
11.500
Reg:
04/11/95
0.000
COST
8.51
DATE
04/11/95
---------------------------------~-------------------------------------------~-------------------------------,-~---------------------
37.36
TOTALS
EQUIP TOTALS
9500313 REPAIR FACILITY BUILDING MAINT
REPAIR OVERHEAD DOOR AT PRESS BUILDING
(LABOR HOURS ->
Total:
0.330
Reg:
2.50 ot:
2.50 ot:
0.00)
0.00)
0.000
0.000
28.85
28.85
8.51
8.51
====================================================================================================================================
37.36
1 BUNMOW#2
PARTS USED
TASK DESC
(LABOR HOURS ->
Total:
0.330
Reg:
9500312 REPAIR BUNTON MOWER
QTY USED ITEM NUMBER DESCRIPTION
1.0 PULLEY
REPLACE IDLER PULLEY
(LABOR HOURS ->
Total:
2.500
Reg:
(LABOR HOURS ->
Total:
2.500
Reg:
9500311 REPAIR MOWER
QTY USED ITEM NUMBER
1.0 TOGSWCH
MOWER WILL NOT RUN
DESCRIPTION
TOG SWITCH
04/12/95
0.000
COST
5.02
DATE
04/12/95
05/02/95
WORK ORDER HISTORY REPORT
Page 2
m===================================================================================================================================
TOTAL
COST
EQUIPMENT
NUMBER
WORK ORDER
NUMBER
EQUIPMENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATERIAL
COST
====================================================================================================================================
19.45
W.O.
TYPE
TOTALS
------------------------------------------------------------------------------------------~-----------------------------------------
(LABOR HOURS ->
Total:
1.250
Reg:
1.25 ot:
0.00)
0.000
14.42
5.02
------------------------------------------------------------------------------------------------------------------------------------
EQUIP TOTALS
(LABOR HOURS ->
Total:
1.250
Reg:
1.25 ot:
0.00)
0.000
14.42
5.02
19.45
====================================================================================================================================
1 BUNMOW#3 9500283 REPAIR BUNTON MOWER #3 04/04/95 0.000
PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE
2.0 BELTS 29.16 04/04/95
2.0 BLADES 24.28 04/04/95
1.0 TOG TOGGLE SWITCH 4.78 04/04/95
1.0 WIREND WIRE ENDS 0.76 04/04/95
TASK DESC MOWER IS NOT RUNNING
TOTALS
------------------------------------------------------------------------------------------------------------------------------------
76.29
(LABOR HOURS ->
Total:
1.500
Reg:
1.50 Ot:
0.00)
0.000
17 .31
58.98
------------------------------------------------------------------------------------------------------------------------------------
EQUIP TOTALS
(LABOR HOURS - >
Total:
Reg:
1.50 ot:
0.00)
0.000
17.31
58.98
76.29
==================================================~=================================================================================
1ELEC CONTROLS
TASK DESC
COMMENTS
TOTALS
EQUIP TOTALS
1.500
9500309 REPAIR ELECTRIC CONTROL PANELS
INSTALL COVER TO ELECTRIC PANEL AT SAFETY BUILDING
USED AN OLD COVER AND MODIFIED TO EXISTING BOX.
(LABOR HOURS -> Total:
2.000
Reg:
2.00 ot:
2.00 Ot:
04/13/95
0.00)
0.00)
0.000
0.000
0.000
23.08
23.08
0.00
0.00
23.08
============================================================================================================================~=======
23.08
4VEHICLE05
PARTS USED
TASK DESC
(LABOR HOURS ->
2.000
Reg:
04/24/95
0.000
COST
54.00
32.00
DATE
04/24/95
04/24/95
------------------------------------------------------------------------------------------------------------------------------------
145.46
TOTALS
EQUIP TOTALS
Total:
9500354 REPAIR 1991 FORD LNT-8000 SEMI #
QTY USED ITEM NUMBER DESCRIPTION
3.0 FLAT REPAIR
2.0 SWITCH
REPAIR HOSE TO TRAILER HYD LIFT AND REPAIR FLAT
(LABOR HOURS ->
Total:
Reg:
5.33 ot:
5.33 ot:
0.00)
0.00)
0.000
0.000
59.46
59.46
86.00
86.00
====================================================================================================================================
145.46
4VEHICLE06
TASK DESC
5.330
(LABOR HOURS ->
Total:
Reg:
5.330
9500314 REPAIR 1987 DODGE RAMCHARGER #43
VEHICLE IS RUNNING ROUGH / INVESTIGATE AND REPAIR
04/10/95
0.000
05/02/95
WORK ORDER HISTORY REPORT
Page 3
======================================================================================~==~=~=~======================================
MATERIAL
COST
TOTAL
COST
EQUIPMENT
NUMBER
WORK ORDER W.O.
NUMBER TYPE
EQUIPMENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
COMMENTS
====================================================================================================================================
TOOK TO VEHICLE MAINT AND ADJUSTED TUNING.
TOTALS
------------------------------------------------------------------------------------------------------------------------------------
0.00
23.08
(LABOR HOURS -> Total:
2.000
2.00 ot:
0.00)
0.000
23.08
------------------------------------------------------------------------------------------------------------------------------------
EQUIP TOTALS
Reg:
(LABOR HOURS -> Total:
2.000
2.00 ot:
0.00)
0.000
23.08
0.00
23.08
====================================================================================================================================
4VEHICLE09
PARTS USED
TASK DESC
Reg:
9500348 REPAIR 1989 FORD F-800 JET TRUCK
QTY USED ITEM NUMBER DESCRIPTION
1.0 HOSE
REPLACE HYD HOSE ON JET TRUCK
04/30/95
0.000
COST
47.85
DATE
04/30/95
TOTALS
---~-----------~-----~--------------~---~------------------------------------~------------------------------------------------------
47.85
59.26
(LABOR HOURS -> Total:
1.000
1.00 ot:
0.00)
0.000
11 .41
---------------------------------~-------~------------------------------------------------------------------------------------------
EQUIP TOTALS
Reg:
(LABOR HOURS -> Total:
1.000
1.000t:
0.00)
0.000
11.41
47.85
59.26
====================================================================================================================================
Reg:
4VEHICLE13 9500349 REPAIR 1976 CASE 580CK BACKHOE # 04/28/95 0.000
PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE
1.0 1/2" CRIMP 1.00 04/28/95
1.0 CRIMP 13.34 04/28/95
1.0 RH TI ROD TIE ROD 27.25 04/28/95
1.0 RH TI ROD 2 27.25 04/28/95
1.0 WEAH24512 HOSE 40.44 04/28/95
TASK DESC REPAIR HYD HOSE TO REAR BOOM AND REPLACE BROKEN TIEROD
TOTALS
------------------------------------------------------------------------------------------------------------------------------------
109.28
166.64
(LABOR HOURS -> Total:
5.000
5.00 ot:
0.00)
0.000
57.36
------------------------------------------------------------------------------------------------------------------------------------
EQUIP TOTALS
Reg:
(LABOR HOURS -> Total:
5.000
5.00 ot:
0.00)
0.000
57.36
109.28
166.64
====================================================================================================================================
Reg:
5WILSON SCHOOL 9500307 REPAIR WILSON SCHOOL L.S. 04/07/95 0.000
PARTS USED QTY USED ITEM NUMBER DESCRIPTION
1.0 CLEAN FLUID
1.0 CYL HON
1.0 KIT
1.0 KIT2 I
TASK DESC
COMMENTS
REPAIR SPARE VACUUM PUMPS
REPAIRED SPARE VACUUM PUMPS FOR USE WITH CONTROL SYSTEM AT WILSON SCHOOL
COST DATE
4.95 04/07/95
28.00 04/07/95
39.00 04/07/95
39.00 04/07/95
TOTALS
----~-------------------------------------------------------------------------------------------------------------------------------
110.95
145.57
(LABOR HOURS ~> Total:
3.000
3.00 Ot:
0.00)
0.000
34.62
------------------------------------------------------------------------------------------------------------------------------------
Reg:
05/02/95
WORK ORDER HISTORY REPORT
Page 4
====================================================================================================================================
TOTAL
COST
EQUIPMENT
NUMBER
WORK ORDER
NUMBER
W.O.
TYPE
EQUIPMENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATERIAL
COST
====================================================================================================================================
145.57
EQUIP TOTALS
(LABOR HOURS ->
Total:
3.000
Reg:
3.00 Ot:
0.00)
0.000
34.62
110.95
====================================================================================================================================
913.70
GRANDTOTALS
(LABOR HOURS ->
Total:
35.410
Reg:
35.41 ot:
0.00)
0.000
401.66
512.04
05/02/95
Page 1
WORK ORDER HISTORY REPORT
====================================================================================================================================
EQUIPMENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATERIAL
COST
TOTAL
COST
EQUIPMENT
NUMBER
WORK ORDER W . O.
NUMBER TYPE
1 GROUNDS
TASK DESC
=============================================================~========~=============================================================
04/06/95
0.000
9500315 PROJECT GROUNDS AT ~ACILITY
MULCH THE DIFFERENT AREAS OF THE FACILITY
TOTALS
----------------------------------------------------------------------------------------------------------------------------------~-
(LABOR HOURS ->
Total:
16.000
16.00 ot:
0.00)
0.000
168.96
0.00
168.96
Reg:
------------------------------------------------------------------------------------------------------------------------------------
EQUIP TOTALS
(LABOR HOURS ->
Total:
16.000
16.00 ot:
0.00)
0.000
168.96
0.00
168.96
Reg:
====================================================================================================================================
0.000
1 GROUNDS
PARTS USED
TASK DESC
9500350 PROJECT GROUNDS AT FACILITY
QTY USED ITEM NUMBER DESCRIPTION
6.0 MULCH CU/YARDS
MULCH FLOWER BEDS IN PLANT
04/06/95
COST
84.00
DATE
04/06/95
TOTALS
------------------------------------------------------------------------------------------------------------------------------------
(LABOR HOURS ->
Total:
12.000
12.00 ot:
0.00)
0.000
126.72
84.00
210.72
Reg:
------------------------------------------------------------------------------------------------------------------------------------
1 GROUNDS 9500357 PROJECT GROUNDS AT FACILITY 04/28/95 0.000
PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE
1.0 DIRT 30.00 04/28/95
1.0 SEED GRASS SEED 495.70 04/28/95
1.0 SPREADER 29.95 04/28/95
1.0 STRAW 195.75 04/28/95
1.0 TOP SOIL 600.00 04/28/95
TASK DESC SEED AND STRAW BARE SPOTS IN PLANT
TOTALS
-------------------------------------------------------------------,-----------------------------------------------------------------
(LABOR HOURS ->
Total:
78.00 ot:
0.00)
0.000
849.02
1351.40
2200.42
78.000
Reg:
----------------------------------------------~-------------------------------------------------------------------------------------
EQUIP TOTALS
(LABOR HOURS ->
Total:
90.000
90.00 Ot:
0.00)
0.000
975.74
1435.40
2411.14
Reg:
====================================================================================================================================
106.000
Reg:
GRAND TOTALS
(LABOR HOURS ->
Total:
106.00 ot:
0.00)
0.000
1144.70
1435.40
2580.10
ATIACHMENT D
MAINTENANCE & REPAIR EXPENDITURES FOR APRIL
JEFFERSONVILLE, IN
, Thursday, May 11, 1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 1
I P.O. Date II Description II Amount I
4/6/95 PAINT FOR CONFERENCE ROOM $23.60
4/6/95 BLADES FOR LAWNMOWER $4.83
4/6/95 PAINT BRUSHES $1.05
4/6/95 PAINTING SUPPLIES FOR SIGN $37.96
4/6/95 TAPE MEASURE $8.07
4/6/95 TILLER FOR GROUNDS KEEPING $42.00
4/6/95 OIL FILTER FOR DODGE SPIRIT $4.36
4/6/95 STARTING FLUID FOR LAWN MOWER $8.15
4/13/95 OIL FOR STOCK $0.89
4/13/95 GRASS SEED $213.82
4/13/95 PVC SUPPLY $268.42
4/13/95 REPAIR ON ROBIN LANE ($7.11)
4/13/95 ACETYLENE $17.05
4/13/95 DUMPSTER WHEELS $24.45
4/13/95 FAN MOTOR $17.74
4/13/95 REPAIR OF BACHRACH UNIT $523.12
4/13/95 REPLACEMENT NOZZLE FOR JET CLEANER $181.39
4/13/95 LATERAL TIE-IN AT 208 RIVERSIDE $200.00
4/13/95 WATER PLUG FOR BLANCHEL TERRACE OVERFLOW $23.98
4/13/95 SEWER REPAIR $32.54
4/13/95 CATCHBASIN REPAIR $179.73
4/13/95 LAWN MOWER SUPPLIES $124.01
4/13/95 FILTER'S FOR VEHICLE #4340 $8.95
4/13/95 WIRE/CABLE FOR MOWER $5.02
4/13/95 CARWASH FOR TOM $10.00
4/13/95 TOOL FOR LIFT STATION PUMPS $29.17
4/13/95 BATTERY FOR MILL CREEK $69.16
Thursday, May 11, 1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 2
P.O. Date Description Amount
4/13/95 MILL CREEK BATTERY TERMINALS $9.39
4/13/95 REPAI OF WILSON L.S. VACUUM PUMP $10.70
4/13/95 REPAIR OF WILSON L.S. VACUUM PUMP $5.20
4/21/95 FLOAT HANGER FOR MAGNOLIA L.S. $1.47
4/21/95 COMPUTER FOR MOMS SEWER PROGRAM $584.00
4/21/95 PUMP REPAIR KIT $89.29
4/21/95 CALI BRA TION OF THE FLOW METER $1,063.00
4/21/95 TENTH & WALNUT CATCHBASIN REPAIR $53.00
4/21/95 INVESTIGATION OF SEWER PROBLEM $330.00
4/21/95 LATERAL REPAIR AT 208 RIVERSIDE DRIVE $17.79
4/21/95 PARTS FOR LAWN MOWERS $168.59
4/21/95 BRAKE CLEANER FOR #7155 $2.09
4/21/95 BRAKE PADS FOR #7155 $36.78
4/21/95 ELECTRICAL FOR VEH #7155 $65.51
4/21/95 REPAIR ON VEHICLE #7155 $59.20
4/21/95 RETAINERS FOR DISC BRAKES $5.17
4/21/95 PARTS FOR #702 $32.78
4/21/95 BATTERIES FOR L.S. $63.00
4/21/95 EWING LANE L.S. #2 PUMP BREAKER $9.62
4/21/95 EWING LANE L.S. #2 PUMP BREAKER $479.85
4/21/95 SWITCH FOR MAGNOLIA L.S. $1.75
4/21/95 SAFETY SIGNS $34.49
4/28/95 FLOWERS FOR PLANT $6.25
4/28/95 FLOWERS FOR PLANT $38.85
4/28/95 EMERGENCY PLANNING VIDEO $105.00
Total: $5,325.12
Thursday, May 11, 1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 1
P.O.Da Description I Amount I
5/27/94 10TH STREET REPAIR & REPLACEMENT $54,760.00
6/2/94 Budget $0.00
7/1 /94 REPAIR OF COURT & GRAHAM ST. $37,000.00
7/22/94 REPAIR TO NO 3 CLARIFIER DRAIN VALVE $15,650.00
8/4/94 TV TRAILER REPAIR $1,655.00
8/4/94 REPAIR OF JET TRUCK $3,421.00
8/24/94 FREIGHT CHARGE FOR RAS PUMP $562.55
8/24/94 REPAIR OF RAS PUMP $10,480.07
9/1 /94 REPLACE CONTROL VALVE FOR WATER TRUCK $687.50
9/7/94 REHAB MILL CREEK PUMP NO.2 $1,239.34
1 0/1 /94 REPAIR DRAIN VALVE TO CLARIFIER NO.4 $17,760.00
1 0/13/94 CLEANING OF MILL CREEK AND TENTH STREET $1,390.00
11/7/94 REHAB OF POWERHOUSE LIFT STATION NO.1 PUMP $1,375.00
11/7/94 FREIGHT CHARGE FOR RAS PUMP IMPELLERS (THREE IMPELLERS) $67.74
11 /15/94 MANHOLE RISERS FOR 1994 STREET PAVING PROJECTS $2,232.00
11 /15/94 REPAIR TO PUMP MOTOR AT CRUMS LANE 1 LIFT STATION $4,358.82
11 /15/94 PUMPEX IMPELLER FOR RAS STATION $5,850.00
11/17/94 REPAIR, BALANCE AND SET IMPELLER FOR SPRING STREET PUMP $1,766.94
NO.2
12/7/94 NEW MILL CREEK PUMP, MODEL # 613A $11,517.00
12/7/94 FITTING FOR NEW PUMP AT MILL CREEK $80.33
12/9/94 DIP & BAKE LINCOLN MOTOR 200 HP $2,865.00
12/22/94 INSTALL WIRING AND HOOK UP OF BLOWER MOTOR $481.58
1 /6/95 INSTALLATION OF JUNCTION BOXES ON RAS PUMPS $1,038.80
1/6/95 FAB GASKETS FOR MILL CREEK $753.75
2/14/95 LABOR TO EXPOSE VALVE FOR PIN REPLACEMENT AND WELD ROD $17,750.00
TO VALVE STEM
3/8/95 REPAIR OF BACKHOE $3,156.46
3/8/95 INSTALLATION OF JUNCTION BOXES $1,941.72
Thursday, May 11, 1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 2
I P.o. Date I Description Amount
3/8/95 INSTALLATION OF JUNCTION BOXES $2,152.50
3/9/95 CHECK CRUMS LANE FLOATS $494.00
4/12/95 REPAIR OF BROKEN WATER LINE ON ROBIN LANE $218.68
Total: $202,705.78
ATTACHMENT F
SAFETY INSPECTION REpORT
JEFFERSONVILLE, IN
....~ .
ENVIRONMENT AI.. MANAGEMENT CORPORA TION
MONTHLY SAFETY INSPECTION
CHECKOFF k\lIEET
JEFFERSONVILLE WASTEWATER TREATMENT FACILITY
701 CHAMPION ROAD
JEFFERSONVILLE, IN 47130
1(--10 "1 S (812) 285-6451
PERSON COMPLETING INSPECTION: W~ ~~
1. Personnel Safety
A. Personal Protective Clothing
1. Safety Helmets Provided ~ .
(for Personnel & Visitors)..................................~ NO
2. Hearing Protection
(for High Noise Areas).......................................@ NO
3. Eye Protection - Goggles, etc.
(for Personnel & Visitors)..................................@ NO
4. Gloves
(for Personnel)..................................................@ NO
5. Rubber Boots with Steel Toes
(provided for Personnel)......:.............................. @ NO
6, Rain Suits Provided ".~
(for Personnel)....................................... .;.. :'.......@ NO
7. Is Respiratory Protection Provided including
ventilators and hoods over high dust areas, dust
masks, etc. {for Personnel)................................ @ NO
B. Safety Devices and Equipment
N/A
N/A
N/A
NtA
NtA
N/A
NtA
1. Non-sparking Tools in areas where flammable
or explosive gases may be present?..................... @ NO Nt A
2. Oxygen Deficiency, Toxic, & Explosive Gas
indicator........................................................... .@ NO N/ A
3. Self-contained Breathing Apparatus for entry
to chlorine room............................................... @ NO Nt A
4. Confined Space Entry Equipment Available
. such as and including Safety Harness, Portable
, Wench, Hoist,etc...............................................@ NO Nt A
. ..'.;,<,;.',....:r;.,'.)'.\..I-......;.!....'l.i('!.."'..-';.:':~'.>:..li' .....:. ",..,-.,.1. ':.;~ ::':' .~,'.:..'
1 . Are Personnel trained in the use and location
of safety equipment at the planl..................~... @ NO N/A
2. Are there railings around all tanks with
openings chained off...................................... @ NO N/ A
3. Are holes covered? Including all pits & wells, ~
drains, valve holes, hatch covers inplace........ ~ NO N/A
4. ~~:r.l0~~'fP(~~~ ~~I~r~s.us~d.~ll~r~... (~ NO N/ A
5. Are all equipment guards in place? Including
mowing equipment.......................~................. 6~ NO N/A
6. Are dry wells ventilated and is ventilation
adequate in all are. as............... ..........~. y~ NO
Are emergency numbers posted & accessible.. NO
Is proper liquid flammable storage used.......... YES NO
Is general plant cleanliness being practiced? .
Including floors (No oil or grease or pools. of .~.
water), Storage Areas (No clutter & supplies
stored properly), Chlorine Room (Free of
clutter), Laboratory........................................ CvE~ NO N/A
10. Are all walkways, exists and routes, &
stairways clear & unobstructed (No ice, oils,
water, grease, or debris)................................. eYED NO N/A
11. Are all slippery surfaces posted and/or covered
with. anti-skid material, including stair treads.
and ramps, in good repair and covered with
non-skid surface.............................................. @~ NO N/A
12. Are all mats and rugs in good repair so as not
n::&~~~;~~fLi~~~:t=~j~~~&.~~j~i~;::.;.
14. Is lighting adequate in all areas (Work. areas, ..
. stairways,,~~1~a}'~,et~.)............~................. @ NO N/A
15. Are noise levels within allowable limits or
danger are~rp(j'ste?......... ....................... ................ @ NO N/ A
;.'.J,,,,"',,, ....,.-__.......i,.....,.,.-.___-' ........-">.--,."..,....,,..~..;.-.,-........., '..' '-'''-'''''.'''. '.,'..'.'.,.'. '- ..<.-,...,., ......,.. -' "'''''' ,....,..... ,',
i
5. First Aid Kits with proper & adequate supplies ~
readily available for any First Aid Emergency....~ NO
6. Tratlic Control Cones Available........................@) NO
7. Ladders to enter manholes of wet wells
(fiberglass or wooden for electrical work)......... @ NO
8. Safety Buoys and Life Lines, Life Preservers
at all open structures (02 Ditches, Clarifiers,
. Lagoons, etc:....................................................~ NO
II. General Plant Safety
7.
8.
9.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
l< \,<~:>
1-..-.:,-,-:>,;:,,,,:',:--,,,,,:::::,;';,-- ' ,~' ',' '.--, ,.---~-"-"-,._,.,-~_.-'--"-::,'--'- "":'--'--'>'" --,--:,,':,<:--',,",
\i [~~~;f;iE;;::e~le~uj/::'Ii .~~. E~
20. Is inclem~nt weather protection provided at ~
entrances (mats,'safety strips, de-icers, etc.)...~ NO N/A
21. Are tripping hazards eliminated at all doors
(threshold plates in good repair, etc.).............. QiS) NO N/A
22. Is safety ~lass provided in all doors................~ NO N/A
23. ~;:::;s~:~).~~~~~~~~..~.~..~~~~~~..~~~.~.~~~~~..~YE NO N/A
"' "', \'~!",''' ~"'"',r..,.."'.\'~&m>>w~,~'*',.1I.>,~...~~..24':.1"Are\.ladd~rs.'properlyY,anchored~~~~~::~'t.~~' o:v.ES' N0'~N/A'll"'*I>,"'!;.\1"'..,.'i'''''''w. ." .. .
. ' ,.I
25. Are fixed..Ia?der~provided with safety cages
or safct~sidc<rails................................ ~........ @ NO NI A
26. Are all elevation differences between floors
..1.,..,'...,..",,,,.........'.,..,.,,,,","
clearly defined and properly lighted................ E NO
27. Are portable ladders in good condition........... S NO
28. Kick bo~iasin place ifneeded........................ S NO
29. No Broken steps............................................ E NO
30. Arc ashtfaysprdvided and empticd rcgularly.. YES NO
31, Are trash9a~s9()V.~r~~andemptied regularly. YES NO
.1.....,.."'"...,.. ." .",,0"",'"
.;,f;"n;;:'M'~~;l'<f.'~1J.~jj~;.~\\"?,j~~(~fl!?,\;~;'1~*'~~t~;?i.hiA'.')~l+,~!:;i.'*:J~;,;~;;~~4'~~tt~~~~.for lifting .heayr, ..e9.MiRU,1~nt.,
. 111 good 'repair..... .............: ...'.;~'.;.... .~'.....::..,..::.. '
33. Are pla~tperson:nel immunized for tetnus........ YES
"I.. ......
34. No electrical cords stretched over tanks.......... YE
I,' , ',~ ".', ,',c:
35. No gas leaks...............................................'.... YE
36. Fuel sup!ply tank in good condition................:'. YES NO
37. ~:c~~~~~i~~l~q~~~::~.t.i.~~. ~.~~~~~~~~~~ .~.l~. (yES) NO NI A
38. No exc~ssive vibration of machinery or
.."I.,.. '
equipment............. ...... ..... ............................ NO
39. No water or oil being "slung" from equipment NO
40. No work orcracke<lequipment..................... NO
41. No exc~ssiveduston equipment................... YES NO
42. Adequa.'fedehumidifier and heaters where
needed.L..........:.:........,...............:;............;..... @ NO N/A
43. Emerge,hcY.Mcdical Information on all
employ~es available for determination of job
assignnr~flis.......... ::........ .......... .................... ~~ NO NI A
44. Cross C~i1nections have been eliminated
,1<<' . .
.,\.....,;<b.~~.~~~~,. P:8.~~~!~,~~.l~;~S,~"'~~~B.!)i~~~"~gJl~R~t~~<(\~>;,l;,;i:,\:,'\',l+Hi;.i.,....';"u..".,.
source:! . . .. ...... ....., ........... ........ '. '..
a. PurrtP & Mlxer $e(lJs................................. ~ NO
b. Dig~st~~l-I~~tingSystemMakeup Water... YES NO.
c. Vac~uin FilferWater Sprays..................... @) NO
" ,- ,;,- ;,',:~.,.,';,,~,,<,'~.(.,',-,'-~
" ~;~- ';,:,~~'~>;s.; /<;~;:~r,;}::t\;~yt::'x; ~:.>i.< ?,.>r-:+/;.
,-'i'''->' ,,?":J ,.,~,j -' "
':c>.':::L: ,.)." :t,
N/A
N/A
N/A
N/A
N/A
NI fit.!
N/A
N/A
NO N/A
@
. ~ ".; "
N/A
N/A
N/A
N/A
N/A
@
N/A
d. N/A
e. N/A
f N/A
g. N/A
h. N/A
Ill. Electrical Safety
IV.
1. Is all
2. 'Is all
3. Are the
4. Is
5. Are in good condition and
used ........................... ........... ........ .:. .@ NO
6. Is electrical test equipment available. Such as
voltmeter, ~mpmeler, etc.............."................... @ NO
7. Are d~elect,~ic ru~ber lnats presents for
electncal wo'rk............................................... NO
8. All control ;pa1lelswitches in good condition.. NO
9. All control 'panels unobstructed...................... NO
10. Are dielectric rubber gloves available............. NO
.d., , "....,. ..... .
II. Are ground,t~~ltinterrl1pteisused.................. NO
12. Arc warninkbt caution signs posted............... NO
13. Is control panel area clean and dry.................. YE NO
14. Are all nee~edfl1ses{)r~reakers in place......... YES NO
15. Are all contacts clean and dust free................. . S NO
16. Is there em~rgency stop buttons on all
machines apd equipment................................. CYEID NO
17. ~:::=~~~L~~V;~~u7;~:.d~:In."."I.~~~~ NO
18. Is power supply locked out! tagged out on
equipmenf~~~s~~tly~~i~g :e.~aired............... ..@ NO
...k "'..i.....hi...'..,..;/;k;j;...,/.k. ... ...'. ...., . .......;....
Chlorine & Dechlorinatio~S~fety
'...i;:.....;./.>i......~.;'... ..,... ...,.:..>........../;';//) ..................:....... ... .............. .... .... ......
1. All standili~ cylinders chained in place and/or
~~:;~~~~~~J'aJ~~i~I~~?-~:...::.:.:.:.\1 ~g
Chlorine &' dechlorination leak detector tied
into the fa~ilityaI~rl11system.. .."......""., ..,... ..C~"1) NO
5. Ventilator fan with outside switch present and
. either when door opens or
with at entrance door.........................
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2.
3.
4.
N/A
N/A
N/A
N/A
N/A
L '>, :'-: ~""';:' ,~,,:,;- ,"" \' -', ,:' '- -;:' -; :-
6. Ammoniakn~Sulphur for checking chlorine &
dechlorination 'leaks available........................~~. NO
7. Are all safety precautions posted...................~ NO
8. Proper Chlorine wrench available to open
valves..... ..1..... ... ...................... ...... .................. 6'E:D NO
9. Chlorine protected from direct sunlight, cool
and dry.. ..:.:.................... .~": .....::.. :'.. .... ..','........ .... cr~ NO
10. No petroleum or other chemicals store in .
I L . ~~I:~~:::::;h~;~~~~i;bi~~~.;it~:::::::: :~ ~g
.
--'I
V. Process Chemical Safety.1
N/A
N/A
N/A
N/A
N/A
N/A
Are persortnel trained to handle all chemicals.
properly. ;:'...... ......... ...... ...... ..... ...... .................@ NO N/ A
~~~~~~:~ :t~~h~~;~:~ ~'.~eJ1t.fort~~ .nn ~ NO NI A
1~~;zJ:!~~:Z::~:~::;2~=:~;...fi> ~g ~~
~;;l~~~~; ~~~b~~g~~~~~i.~.~~~~. ~~ ~.~~~~~~. ~~~~~~ ~ NO N/ A
...h,.".~.., ." '.
Are management & employees aware of the
hazards of the materials being used................~. Y NO N/A
7. Knows pr6~;ef'respo'f1sel()anacCidental spill... YES NO N/A
. ~: ~~::~~:li~~a~i~~~h~~.~~~o~~i~~~~.?l~.:.:~.:.~,:.;,.~. .... ~~""'!'.~?V'''i''~i.:':..., .'o,.j'
~~~(~;).~~.t~e~~r~~r~~:~.~~~~:n@ NO N/A
10. Emergency ActIOn Plan on file wIth local FIre,
Police Departments and appropriate Emergenc~
Agency.... .t. .;;...... ........ 0'.... ..........; ...... ........... ..@ NO N/ A
I.
2.
3.
4.
5.
6.
VI. Tools & Equipment
i
.
d.d
1.
Are hand t6:()ls in good and stored
properly... . d..,::':" ..... ... ::.:.'.'.':','.: "::::,:...:::::;...,.......:.. @ NO
Are power tools stored properly and in good ~
condition -~pr~s,plugs,etc............................ ~ NO
Are the too~sadequatefor the tasks to be I
.d .'
performed..I...;.;...., ....... NO
Are defecti~et6ois replaced as needed............ ES NO
Are tool guards in plaCe.......... ............ ..... ....... YE NO
Areemploy~es trained in the proper use of the
various tools they are expected to use.............
~.,. .
i
2.
3.
4.
5.
6.
"i,
,
.' > c..~/:' ;<L ,'.' - '~'
N/A
N/A
N/A
N/A
N/A
N/A
7. Are employees given additional instruction and
~~:i;%~~;,~.i.~~~. ~~~ .~~~.~~~I.i.~~~. ~~~~~. .~~~.......... ~ NO N/ A
8'~~::;:e~.~~~~~~.~~~~~~:~~.~.~~~~.~~................@D NO N/A
VII. Fire Safety & Protection
I. Are fire/emergency evacuation plans posted....@
2. 1\.re employees familiar with fire/emergency
evacuation plan................................................@
3. Are there sufficient number and types of fire
extinguishers.........,.....,......,....,..........,....,...... ..@)
4, Are the tircextingllishcrs properly located and
5. ~::;:~e;:;~ ~~;i~~~i~h;;~ ~h~';k~d;';;;;~;;jl;.... .~
6, Are all of the fire extinguishers in working ,
condition.,. ,..... ..... ..... .... ..... ...... ...... ....,..... ....... @
7. Are employees-trained in the proper use of the
extinguishers to be used................................... &Es:>
8. Are smoke detectors in working order...........:. YES
VIII. Laboratory Safety
NO N/A
NO N/A
NO N/A
NO N/A
NO N/A
NO N/A
NO~
NO 'A
1. Emergency Eyewash & Shower Station are
~~~:n~~~~ :;~~:,~~~~I~8Jl~ t~..te~ ~~~~l~.~ ~g N/A
2. N/A
3. All chemicals safely and properly stored, well ,-
labeled and in original containers................ ...... ~ NO N/A
4. Laboratory Safety devices used such as: Pipette
suction bulbs, Eye Protection, Gloves, Aprons
or Jackets, & Tongs......................................... NO N/A
5. No brokenl chipped or cracked glassware........ NO N/A
6. No overloaded outlets................;.................... NO N/A
7. Acid spill kit available..,.................................. S NO N/A
8. Emergency procedures for acid spills posted @
and used by all personneL.............................. NO N/A
9. Laboratory Safety Rules posted and obeyed by
all per,sonnel such as no cooking or eating from
laboratory glassware............. ...........................@ NO N/A
X. Other Safety
1. Are the required safety pr9grams presented B
and! or attended during the year.;.................... . YES . NO N/A
',i':i,,;:""i""!.:~''''~;:#.f~~.~~IliiW'.i~I0.::.r~;i<f;~(,..)..,.'il,,(\:~ii:,\,"':'''''''i'.';'~'Fr:'\~'.;,!I''WI'A':l'il~iV>li~t~.r~"$ll1t!f:lf><Wit\\~~m\~A~~~~~~l\Y:~'ltI~~'I/#i~~ki0!#:~,1.f~.wo?l<~i.!liI6~V~S;~,'#l~,j;l~("i'~\o<Y."!,\i;',"';" ' '
2. Is a suitable identification system used to
identify the plant's piping system......................@ NO
3. Has the operator taken steps to remove or
minimize safety hazards.................................. ~ NO
4. Are all personnel provided with a shower and
locker fO,r their work clothes........................... ~ NO
5. Are personnel trained in First Aid & CPR........ ~ NO
6. Have the following proper safety signs been
provided such as: Non-potable Water, Chlorine
Hazard, No Smoking, High Voltage, Watch '
Your Step Signs in Certain Areas, & Exit Signs@ NO
7. Is your Facility safety program Up to Date.
(Worksafe Program)......................................... YES @
(# YES)
/3).+ I x 100 = tj f %
(# YES + # NO)
N/A
N/A
N/A
N/A
N/A
N/A
,~'