HomeMy WebLinkAbout02) February Operated By: Environmental Management Corporation Monthly Report ~~b~a..~ 1995 ENVIRONMENTAL MANAGEMENT CORPORATION 701 CHAMPION ROAD JEFFERSONVILLE. INDIANA 47130 812-285-6451 FAX 812-285-6454 March 8, 1995 C. Richard Spencer City-County Building Jeffersonville, IN 47130 Dear Mr. Spencer: Enclosed please find Environmental Management Corporation's (EMC) "Operations Report" for the month of February 1995, containing information on the following: 1.0 Effluent Quality 2.0 Facility Operations 2.1 Pretreatment 3.0 Preventive and Unscheduled Maintenance 3.1 Maintenance & Repair Expenditures 3.2 Repair & Replacement Expenditures 4.0 Facility Safety and Training 5.0 Sewer Collection System As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we are available to discuss this report, or any other aspect of our operations, at the convenience of the City. Sincerely, ENVIRONMENTAL MANAGEMENT CORPORATION -i:~ ~~____ Kendall S. Coleman Facilities Manager KSC:dmk cc: Greg Coboum, EMC 1.0 EFFLUENT QUALITY During February, effluent quality was within NPDES permit limits for BOD and TSS concentrations. Table 1.1 summarizes the effluent quality data. Attachment A contains Time Series Plots of daily BOD and TSS values. Table 1.1 EFFLUENT QUALITY Carbonaceous Biochemical 25 1.7 Oxygen Demand (CBOD) Total Suspended Solids 30 7 (TSS) E. Coliform 200/mo. 23.96 (Colonies/ 100 ml) 400/wk. 70.56 Chlorine Residual .02 daily .00 Ammonia 3.0/mo. 1.3 Flow 5.2 2.9 (MGD) 2.0 FACILITY OPERATIONS Attachment B contains a list of septic haulers that discharged during the month of February. During February, the treatment processes continued to perform excellent. We did encounter problems within the aeration ditches that had an impact on effluent quality during the week of February 13 through February 18. We believe that a toxic substance entered the plant and destroyed the micro-organism population within the aeration ditches. However, due to prompt reactions by the operators and making the necessary process control adjustments, we were able to regain control of the process and avoid permit violations. 2.1 PRETREATMENT During February, annual monitoring of the remaining four significant industrial users (SID's) was completed. The pretreatment coordinator performed annual inspections of Voss Clark and Industrial Water Recycling (IWR). Table 2.2 recognizes those industries who received Notice of Violation (NOV) for exceeding discharge permit limits. MOR JEFFERSONVillE. IN Table 2.2 INDUSTRIAL NOV's FOR FEBRUARY Industrial Water Recycling Voss Clark Nickel Arsenic Wyandot Nu- Yale Oil & Grease pH and Oil & Grease We will continue to work with the industries to insure compliance with permit limits. 3.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE Preventive maintenance was performed on all equipment as scheduled in February. There were 10 unscheduled maintenance tasks performed. All were minor except for: .. Repair of Wilson School lift station electric control panel. .. Repair of No.2 final clarifier drain valve. .. Repair of Mill Creek lift station electric control panel. A list of unscheduled maintenance work orders is included as Attachment C. Maintenance and repair expenditures for the month of February are detailed in Attachment D. Table 3.1 represents the total amount expended in February, and for the year. Table 3.2 includes the same information for repair and replacement expenditures. Attachment E contains a detail of repair and replacement expenditures for the year. MOR JEFFERSONVILLE, IN Time Period February 1995 Y ear- To-Date Time Period February 1995 Year-To-Date Table 3.1 MAINTENANCE & REPAIR EXPENDITURES Budget (Over) Under $5,700 $1,241 $57,000 ($21) Table 3.2 REPAIR & REPLACEMENT EXPENDITURES Budget (Over) Under $8,334 ($9,416) $100,000 ($94,742) 3.3 ELECTRICAL EXPENDITURES Due to the electric bills being one month behind, table 3.4 relates to electrical expenditures from May 1994 through January 1995. MOR JEFFERSONVILLE. IN Table 3.4 ELECTRICAL EXPENDITURES Time Period Budget (Over) Under January 1995 $13,874.50 ($1,606.68) Year-to-Date $128,325.50 ($7,133.38) 4.0 FACILITY SAFETY & TRAINING Safety inspections were conducted on February 8, 1995. The rating was 99%. The only deficiency reported was that employees have not covered all phases of the facility's safety program. A copy of the Safety Inspection report is included as Attachment F. On February 23, 1995, Bob Tackett, our Evansville Facility Manager, conducted confined space training for our facility and several personnel from various departments of the City. 5.0 SEWER COLLECTION SYSTEM During the month there were 19 sewer calls. Ten of these calls were regarding sewer backups. Five of these backups were due to blockages of the City's main lines. Two of the calls required repair of catch basins, and one call resulted from Wilson School lift station not operating. Wilson School lift station required work to the electric control panel. Table 5.1, on the proceeding page, shows the data on the months sewer projects. MOR JEFFERSONVILLE. IN Table 5.1 SEWER PROJECTS Project Year-to-Date Tap Inspections 80 Sanitary Sewer Cleaned 84,500 (Ft. ) Storm Sewer Cleaned 4,775 (Ft.) Catch basins Cleaned 34 (Handi -clams) Catch basins Raised 13 Manholes Raised 85 Manholes Rebuilt 23 Catch basins Rebuilt 26 Sewer Repairs 33 Sewers Televised (Ft.) 4,900 Air/Deflection Testing 4,330 Manhole Castings Replaced 10 ATTACHMENTS - A TIME SERIES PLOTS B FEBRUARY SEPTIC HAULERS C UNSCHEDULED MAINTENANCE WORK ORDERS D MAINTENANCE & REPAIR EXPENDITURES FOR FEBRUARY E REPAIR & REPLACEMENT EXPENDITURES F SAFETY INSPECTION REpORT MOR JEFFERSONVillE. IN ATTACHMENT A Time Series Plots JEFFERSONVILLE, IN Jeffersonville Wastewater Treatment Facility February Effluent CHOD & TSS 20 18 16 14 12 ~1O e 8 6 4 1- EFFUi~NT CBOD i- EFFLlJENT TSS i-PEIWITCBOD 2 j;,,,..... ...........".. I ..."""".:::::":::I::::::::::':":""""'~": "'\.:,,,,:.,,:~":.........."".:.;,. ..........:"""":"'^-,:,,,,::,,,,:~ I-PElu.n.:~' TSS 2 3 " 5 6 7 8 9 10 11 12 13 14 15 16 17 J8 19 20 21 22 n 24 25 26 21 28 Date February 1995 ATTACHMENT B January Septic Haulers JEFFERSONVillE, IN JEFFERSONVILLE WASTEWATER TREATMENT FACILITY February 1995 Septic Haulers Hauler Current Month Hauler Total (YTD) TOTAL 4 o 4 18 1 19 Rumpke of Indiana Pfau Hauler Current Month Hauler Total (YTDj Rumpke of Indiana Pfau TOTAL 3,200 o 3,200 16,500 6,330 22,830 JEFFERSONVILLE, IN ATTACHMENT C Unscheduled Maintenance Work Orders JEFFERSONVILLE. IN 03/01/95 Page 1 WORK ORDER HISTORY REPORT ==================================================================================================================================== EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION DOWN TIME TOTAL COST LABOR COST MATERIAL COST TASK MTASK NO. NO. DATE CLOSED ==================================================================================================================================== 1CLARIFIER1 9400623 REPAIR SECONDARY CLARIFIER #1 02/01/95 0.000 PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE 1.0 IS0220/0IL 0.58 1.0 U21/0IL SEAL 3.87 TASK DESC REPLACE SEALS AT DRIVE BOX TOTALS (LABOR HOURS -> Total: 6.000 6.00 Ot: 0.00) 0.000 75.00 4.45 79.45 Reg: ----------------------------------------------------------------------------------------~-----------------------------------------~- Reg: EQUIP TOTALS 1CLARIFIER1 PARTS USED TASK DESC TOTALS EQUIP TOTALS (LABOR HOURS -> 6.00 ot: 79.45 0.00) 0.000 75.00 Total: 6.000 4.45 9500185 QTY USED 1.0 1.0 1.0 02/28/95 0.000 SECONDARY CLARIFIER #1 REPAIR ITEM NUMBER 6 DESCRIPTION 6" TOP SPILLWAY ANGLE BRUSH GUIDE BRUSH COST 7.32 17.08 7.32 DATE 02/28/95 02/28/95 02/28/95 FOURTEEN " SIX " REPALCE BRUSHES TO SWEEP ARM (LABOR HOURS -> 0.00) 0.000 12.50 31.72 44.22 Total: 1.000 1.000t: Reg: (LABOR HOURS -> 0.00) 44.22 0.000 12.50 31.72 Total: 1.000 Reg: 1.00 ot: =================================================================================================~================================== 1 CLARIFIER2 9400617 REPAIR SECONDARY CLARIFIER #2 02/02/95 0.000 VENDOR LABOR: VENDOR NO. VENDOR NAME REG HRS OT HRS DATE COST PERFORMED BY IRISH IRISH PARK, INC. 1. 00 0.00 02/02/95 17750.00 L.RICE PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE 1.0 U-JOINT 28.00 02/02/95 TASK DESC COMMENTS TOTALS EQUIP TOTALS CONTACT CONTRACTOR TO REPAIR DRAIN VALVE SHEER PIN IRISH P[ARK COMPLETED JOB ON 2/2/95. U-JOINT WAS INSTALLED ON ROD FOR FLEXABILITY. (LABOR HOURS -> Total: 2.00 ot: 17763.48 17791.48 28.00 0.00) 0.000 2.000 Reg: (LABOR HOURS -> 2.000 2.00 ot: 28.00 17791.48 0.00) 0.000 17763.48 Total: Reg: ---------------------------------------------------~-------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------ 1 CLARIFIER3 9500186 REPAIR SECONDARY CLARIFIER #3 02/28/95 0.000 PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE 1.0 FOURTEEN .. ANGLE BRUSH 17.08 02/28/95 1.0 SIX TOP SPILLWAY 7.32 02/28/95 03/01/95 WORK ORDER HISTORY REPORT Page 2 EQUIPMENT NUMBER EQUIPMENT DESCRIPTION ==================================================================================================================================== WORK ORDER W.O. NUMBER TYPE PARTS USED TASK DESC QTY USED ITEM NUMBER 1. 0 SIX" REPLACE BRUSHES DESCRIPTION GUIDE BRUSH TOTALS (LABOR HOURS -> 1.000 Total: EQUIP TOTALS (LABOR HOURS -> 1.000 ==================================================================================================================================== 44.22 Total: TASK MTASK NO. NO. Reg: 1.00 ot: DATE CLOSED 0.00) 0.00) DOWN TIME 0.000 0.000 LABOR COST 12.50 12.50 MATERIAL COST COST 7.32 31.72 31.72 TOTAL COST DATE 02/28/95 44.22 1ELEC CONTROLS 9500184 REPAIR ELECTRIC CONTROL PANELS 02/27/95 0.000 PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE 4.0 1 20PSB BULBS 5.40 02/27/95 TASK DESC REPLACE BURNT BULBS AT CONTROL PANELS TOTALS (LABOR HOURS -> 0.660 Total: EQUIP TOTALS (LABOR HOURS -> 0.660 ==================================================================================================================================== 13.65 Total: 5MILLCREEK 9500181 REPAIR MILL CREEK L.S. VENDOR LABOR: VENDOR NO. VENDOR NAME READY READY ELECTRIC PARTS USED QTY USED ITEM NUMBER DESCRIPTION 3.0 #10 BOLTS 3.0 #10 WASHERS < 3.0 #2 LUGS TASK DESC REPLACE LUGS TO PUMP #1 DISCONNECT TOTALS (LABOR HOURS -> 14.000 Total: EQUIP TOTALS (LABOR HOURS -> 14.000 ==================================================================================================================================== 335.29 Total: 5WILSON SCHOOL PARTS USED TASK DESC 9500177 REPAIR WILSON QTY USED ITEM NUMBER 1.0 K247 REPAIR VACUUM PUMP SCHOOL L.S. DESCRIPTION SEAL KIT TOTALS (LABOR HOURS -> 3.000 Total: 5WILSON SCHOOL 9500176 REPAIR WILSON SCHOOL L.S. Reg: 1.00 ot: Reg: 0.66 ot: Reg: 0.66 ot: REG HRS 6.00 Reg: 14.00 ot: Reg: 14.00 ot: Reg: 3.00 ot: 0.00) 0.00) 02/01/95 OT HRS 0.00 0.00) 0.00) 02/03/95 0.00) 02/16/95 0.000 0.000 0.000 DATE 02/01/95 0.000 0.000 0.000 0.000 0.000 8.25 8.25 COST 232.50 326.86 326.86 34.62 5.40 5.40 PERFORMED BY JIM COST 0.12 0.06 8.25 8.43 8.43 COST 83.00 83.00 13.65 DATE 02/01/95 02/01/95 02/01/95 335.29 DATE 02/03/95 117.62 03/01/95 EQUIPMENT NUMBER Page 3 WORK ORDER HISTORY REPORT WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST TOTAL COST VENDOR LABOR: VENDOR NO. VENDOR NAME REG HRS OT HRS DATE COST PERFORMED BY METZ METZGER ELECTRIC 26.00 0.00 02/16/95 988.00 JACK PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE 1.0 14DP32AA STARTER 208.00 02/16/95 2.0 20108-84 RELAY 43.20 02/16/95 1.0 73612 ONloFF FLOAT 86.00 02/16/95 3.0 75DF14 CONTACT KIT 84.36 02/16/95 1.0 G582DX VAC PUMP 493.50 02/16/95 1.0 IG1DO CONTROL 123.97 02/16/95 TASK DESC COMMENTS TOTALS EQUIP TOTALS PUMPS ARE NOT OPERATING 1 INVESTIGATE AND REPAIR FOUND PROBLEM WITH ELECTRIC CONTROLS. METZGER ELECTRIC ORDERED PARTS AND INSTALLED. (LABOR HOURS -> Total: 38.000 38.00 ot: 0.00) Reg: 0.000 1121.16 1039.03 2160.19 (LABOR HOURS -> Total: 41.000 41.00 Ot: 0.00) Reg: 0.000 1155.78 1122.03 2277.81 GRANDTOTALS ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 0.000 (LABOR HOURS -> Total: 65.660 65.66 Ot: Reg: 0.00) 19354.37 1231.75 20586.12 03/01/95 Page 1 WORK ORDER HISTORY REPORT EQUIPMENT NUMBER ==================================================================================================================================== EQUIPMENT DESCRIPTION WORK ORDER W.O. NUMBER TYPE TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST TOTAL COST 5CRUMS LANE II PARTS USED ==================================================================================================================================== 0.000 TASK DESC 9500180 QTY USED 1.0 PROJECT CRUMS LANE II L. S. ITEM NUMBER DESCRIPTION ROCK 02/06/95 COST 29.21 DATE 02/06/95 ROCK INSIDE PARAMETER OF FENCE ------------------------------------------------------------------------------------------------------------------------------------ 57.91 TOTALS (LABOR HOURS -> Total: 2.500 2.50 ot: 0.00) Reg: 0.000 28.70 29.21 ------------------------------------------------------------------------------------------------------------------------------------ 57.91 EQUIP TOTALS (LABOR HOURS -> Total: 2.500 2.50 ot: Reg: 0.00) 0.000 28.70 29.21 --------------------------------------------------------------------------------------------------------~-------~------------------- ------------------------------------------------------------------------------------------------------------------------------------ 5RIVERPORT I 9500178 PROJECT RIVERPORT I L.S. 02/06/95 0.000 PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE 1.0 ROCK 25.82 02/06/95 TASK DESC ROCK INSIDE PARAMETER OF LIFT STATION TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 118.06 (LABOR HOURS -> Total: 8.000 8.00 Ot: Reg: 0.00) 0.000 92.24 25.82 --------------------------------------------------------------------------------------------~----------,-------------~--------------- EQUIP TOTALS (LABOR HOURS -> Total: 8.000 8.00 ot: Reg: 0.00) 0.000 92.24 25.82 118.06 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 0.000 5RIVERPORT II PARTS USED TASK DESC 9500179 PROJECT RIVERPORT II L.S. 02/06/95 QTY USED ITEM NUMBER DESCRIPTION 1.0 ROCK ROCK INSIDE PARAMETER OF LIFT STATION COST 32.60 DATE 02/06/95 ------------------------------------------------------------------------------------------------------------------------------------ 84.71 TOTALS (LABOR HOURS -> Total: 4.500 Reg: 4.50 ot: 0.00) 0.000 52.11 32.60 -----------------------------------------------------------------------------------------------~----_._--------------------------~--- 84.71 EQUIP TOTALS (LABOR HOURS -> Total: 4.500 Reg: 4.50 ot: 0.00) 0.000 52.11 32.60 GRANDTOTALS ==================================================================================================================================== 15.00 ot: (LABOR HOURS -> Total: 15.000 Reg: 0.00) 0.000 173.05 87.63 260.68 ATTACHMENT D Maintenance & Repair Expenditures JEFFERSONVillE. IN Tuesday; February 28,1995' .,.;. MAINTENANCE&RE~AIR EXPENSES , :.' .~,', ",:,,--_:,,:,,'::"~>t'. /::~ "',-'~':::i"'-:" :'':','''-\>,.: <,- ':,,:. -:',:, JeffersonviUe;lndiim;.i' ' P.O. Date -Description 2/3/95 TIE DOWN STRAPS, FOR SEMI 2/3/95 2/3/95 2/3/95 2/1 0/95 2/1 0/95 2/10/95 2/1 0/95 2/10/95 2/10/95 2/1 0/95 2/10/95 , 2/1 0/95 2/21/95 2/21/95 2/21/95 2/21/95 2/21/95 2/28/95 ' 2/28/~5 " 2/28/95 2/28/95 2/28/95 , 2/28/95' 2/28/95 Page 1 HANGERS AND ADAPTERS ' EMERGENCY STOP SWITCHES ATGfUr~lJILDING REPAIRED HEAT;R BL90CK AT SPRING STREET ANCHOR KIT FOR PLANT STOCK SILICONE FOR PLANT PM ACETL YLENE FOR WELDING FILTERCAP FOR #1, BLOWER FEEDER REPAIR AT CLARK STREET, SEWER REPAIR ATINDUSTI;:lIAL PARKWAY CLUTCH Rt::PAIR FOR DUMP TRUCK #3341 ' , FLY WHEEL FOR DUMP TRUCK #3341' HINGE FOR MILL CREEK GLOVES GAS TECH METER' , I " "~I ROCK FOR LIFT STATIONS REPAIRED SEWER LATERAL AT 319 RIVERSIDE DRIVE '" REPLACE VACUUM PUMP TO EVALUATE AIR IN PUMPING POT AT WILSON ' , LIFT STATION ELECTRICAL REPAIRS FORPOWE,RHOUSE, LANDSBERG, MILL CREEK " "'" COKES FOR SAFETY TRAINING PIZZA FQR CONFINED SPACE TRAINING WIRE TIES FOR PLANT CONVEYOR ROLLS FOR PRESSES' /~ . CRUMS LN CHECKED TERMINATIONS ON MOTOR CRUMS LN CLEANED BURNT UP CONTACTS " CRUMS LN INSTALLED NEW SET OF CONTACTS CRUMS LN RECONDITIONED STATIONERY CONTACTS' $4.60 $188.10 $303.96 $8.35 $3.95 $17.05 $4.71 $87.31 $116.66 $~O.OO $3.41 $31.50 " $3.87 $87.63 $52.23 $493.50 .' $868.83 , $28.79 $85.00 $6.30 " '$222.00 $183.00 $207.90 $976.79 $274.50 ' Tuesday,February28,1995 /c . .!/'. MAINTENANCE & R'EPAIR EXPENSES 'Jefferson\lill~, Indial1~' Page 2 Total: $4,459.15 ",. " i , . , .' . '., \ ATTACHMENT E Repair & Replacement Expenditures JEFFERSONVILLE, IN Wednesday, March 08,1995 MAINTENANCE & REPAIR EXPENSES Jeffersonville, Indiana Page 1 ~ Date Description Amount 5/27/94 lVI H STREET REPAIR & REPLA $54,760.00 6/2/94 Budget $0.00 7/1/94 REPAIR OF COURT & GRAHAM ST. $37,000.00 7/22/94 REPAIR TO NO 3 CLARIFIER DRAIN VALVE $15,650.00 8/4/94 TV TRAILER REPAIR $1,655.00 8/4/94 REPAIR OF JET TRUCK $3,421.00 8/24/94 FREIGHT CHARGE FOR RAS PUMP $562.55 8/24/94 REPAIR OF RAS PUMP $10,480.07 9/1/94 REPLACE CONTROL VALVE FOR WATER TRUCK $687.50 9/7/94 REHAB MILL CREEK PUMP NO.2 $1,239.34 1 0/1 /94 REPAIR DRAIN VALVE TO CLARIFIER NO.4 $17,760.00 1 0/13/94 CLEANING OF MILL CREEK AND TENTH STREET $1,390.00 11/7/94 REHAB OF POWERHOUSE LIFT STATION NO.1 PUMP $1,375.00 11/7/94 FREIGHT CHARGE FOR RAS PUMP IMPELLERS (THREE IMPELLERS) $67.74 11/15/94 MANHOLE RISERS FOR 1994 STREET PAVING PROJECTS $2,232.00 11/15/94 REPAIR TO PUMP MOTOR AT CRUMS LANE 1 LIFT STATION $4,358.82 11 /15/94 PUMPEX IMPELLER FOR RAS STATION $5,850.00 11/17/94 REPAIR, BALANCE AND SET IMPELLER FOR SPRING STREET PUMP $1,766.94 NO.2 12/7/94 NEW MILL CREEK PUMP, MODEL # 613A $11,517.00 12/7/94 FITTING FOR NEW PUMP AT MILL CREEK $80.33 12/9/94 DIP & BAKE LINCOLN MOTOR 200 HP $2,865.00 12/22/94 INSTALL WIRING AND HOOK UP OF BLOWER MOTOR $481.58 1 /6/95 INSTALLATION OF JUNCTION BOXES ON RAS PUMPS $1,038.80 1 /6/95 FAB GASKETS FOR MILL CREEK $753.75 2/14/95 LABOR TO EXPOSE VALVE FOR PIN REPLACEMENT AND WELD ROD $17,750.00 TO VALVE STEM Total: $194,742.42 ATTACHMENT F Safety Inspection Report JEFFERSONVillE. IN ......- .. ENVIRONMENTAL MANAGEMENT CORPORATION MONTHLY SAFETY INSPECTION O~ -(18 - 7S- CHECKOFF SHEET JEFFERSONVILLE WASTEWATER TREATMENT FACILITY 701 CHAMPION ROAD JEFFERSONVILLE, IN 47130 (812) 285-6451 PERSON COMPLETING INSPECTION: w~fr -Inn ~ 1. Personnel Safety A. Personal Protective Clothing 1. Safety Helmets Provided (for Personnel & Visitors)..................................@NO N/A 2. Hearing Protection (for High Noise Areas).......................................@ NO N/A 3. Eye Protection - Goggles, etc. (for Personnel & Visitors)..................................@ NO N/A 4. Gloves (for Personnel)................................................... @> NO N/A 5. Rubber Boots with Steel Toes (provided for Personnel)..................................... @ NO NI A 6. Rain Suits Provided (for PersonneI)................................................... @ NO N/A 7. Is Respiratory Protection Provided including ventilators and hoods over high dust areas, dust masks, etc. (for Personnel)................................@ NO N/A B. Safety Devices and Equipment 1. Non-sparking Tools in areas where flammable or explosive gases may be present?..................... @ NO 2. Oxygen Deficiency, Toxic, & Explosive Gas indicator.............................. ............... ................ @ NO 3, .~~~~~~~;~~::~~~~l.~i.~~. ~~~~~~.~~.~. ~~~..~~~~~...... @ NO 4. Confined Space Entry Equipment Available such as and including Safety Harness, Portable Weneh, Hoist, ete.............................................. @ NO N/A N/A N/A N/A 5. First Aid Kits with proper & adequate supplies readily available for any First Aid Emergency.... ~ NO N/A 6. Trame Control Cones Available........................ @ NO N/A 7. Ladders to enter manholes of wet wells (fiberglass or wooden for electrical work)......... @ NO N/A 8. Safety Buoys and Life Lines, Life Preservers at all open structures (02 Ditches, Clarifiers, @ Lagoons, etc..................................................... NO N/A II. General Plant Safety 1. Are Personnel trained in the use and location @ of safety equipment at the plant...................... NO N/A 2. Are there railings around all tanks with openings chained off........................,............ @ NO N/A 3. Are holes covered? Including all pits & wells, drains, valve holes, hatch covers in place........ ~ NO N/A 4. Are explosion proof fixtures used where @ needed... ...... .... .. . .... . .. ... ..... . ........... .. .............. NO N/A 5. Are all equipment guards in place? Including @ mowing equipment.. ..... .............;................ .... NO N/A 6. Are dry wells ventilated and is ventilation adequate in all areas........................ ............... ~NO N/A 7. Are emergency numbers posted & accessible.. NO N/A 8. Is proper liquid flammable storage used.......... YES NO N/A 9. Is general plant cleanliness being practiced? Including floors (No oil or grease or pools of water), Storage Areas (No clutter & supplies stored properly), Chlorine Room (Free of ~ clutter), Laboratory.......... ...... ...... ........ .......... NO N/A 10. Are all walkways, exists and routes, & stairways clear & unobstructed (No ice, oils, 8 A:;e;il ~~i~;:~o;u~~~;:~~~~~~~i~~di~~.~~~~.;~d YES NO N/A 11. with anti-skid material, including stair treads and ramps, in good repair and covered with @ non-skid surface.............................................. NO N/A 12. Are all mats and rugs in good repair so as not to become tripping hazardsuuuuuuuuuu ~ NO N/A 13. Are work area layouts adequate...................... YES NO N/A 14. Is lighting adequate in all areas (Work areas, stairways, walkways, etc.).............................. @ NO N/A 15. Are noise levels within allowable limits or danger areas posted............... ................ . ..... .. . @)NO N/A 16. Are toilet facilities available & clean............... 17. Is safe drinking water available..... .:................. 18. Is pest control adequate.................................. 19. Are all exists properly marked......................... YES 20. Is inclement weather protection provided at entrances (mats, safety strips, de-icers, etc.).... @ NO N/A 21. Are tripping hazards eliminated at all doors (threshold plates in good repair, etc.).............. rYES:> NO N/A 22. Is safety glass provided in all doors........,........ @> NO N/A 23. Are handrails provided on stairs (Both sides . ."~.,,.~,.,''''~''__il''''''~~4'"''.~~~~~:~~;~;;~~;;;;;~ii6;;,d~~~-~1-~"",,,.,..," 25. Are fixed ladders provided with safety cages or safety side rails......................................... Q~ NO N/A 26. Are all elevation differences between floors clearly defined and properly lighted................ 27. Are portable ladders in good condition........... 28. Kick boards in place if needed..... ................... 29. No Broken steps............................................ 30. Are ashtrays provided and emptied regularly.. 31. Are trash cans covered and emptied regularly. 32. Are portable hoists for lifting heavy equipment in good repair................................................. NO 33. Are plant personnel immunized for tetnus....... NO 34. No electrical cords stretched over tanks.......... NO 35. No gas leaks................................................... NO 36. Fuel supply tank in good condition................. YES NO 37. No excessively hot operating temperature on machinery or equipment................................ @ NO N/A 38. No excessive vibration of machinery or 39 :,:::~t~;~ii bci~;;;'~.i~~~';' fr~'~' ~~.'~ip";;'~t is~g 40. No worn or cracked equipment..................... S NO 41. No excessive dust on equipment................... S NO 42. Adequate dehumidifier and heaters where needed.......................................................... @ NO N/A 43. Emergency Medical Information on all employees available for determination of job assignments.. ..... ............ ........... ....... ....... ...... @ NO NI A 44. Cross connections have been eliminated between potable water supply and non-potable source: a. Pump & Mixer Seals................................. b. Digester Heating System Makeup Water... c. Vacuum Filter Water Sprays........... .......... NO NO NO NO NO NO NO NO NO NO @ NO YES NO. @NO N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0JS; N/A N/A N/A N/A N/A .~ N/A d. Chemical Mixing Tank............................... c. Chlorinator Water Source........................... r. De-Cblorii1ation Water Source.................... g. Yard Hydrants............................................. h. Other..........................................................1 YE Is all electrical circuitry enclosed and identifiCdi Is all wiring ingood condition.......................... Are the number of outlets adequate................. Is equipment properly grounded or insulated.... YE Are extension cords in good condition and used propcrly.................................................. @ Is electrical test equipment available. Such as voltmeter, ampmeter, etc.................................@ Are dielectric rubber mats presents for electrical work...................... ...... ................... 8. All control panel switches in good condition.. 9. All control panels unobstructed...................... 10. Are dielectric rubber gloves availablc............. 11. Are ground fault interrupters uscd.................. 12. Arc warning or caution signs posted............... 13. Is control panel area clean and dry.................. 14. Are all needed fuses or breakers in place......... 15. Are all contacts clean and dust free................. YES 16. Is there emergency stop buttons on all machines and equipment................................. @ 17. Are personnel familiar with the electrical safety such as lock out/tag out procedures................ @> 18. Is power supply locked out/ tagged out on equipment presently being repaired................. @ All standing cylinders cbained in place and/or ton cylinders chocked......................................I. S N.O All personnel rained in t~e use ofCLz.............. Y S NO Appropriate repair kits available...................... YE NO Chlorine & dechlorination leak detector tied into the facility alarm system........................... ~ NO Ventilator fan with outside switch present and either comes on when door opens or manually with switch at entrance door........................... ~ NO Ill. Electrical Safety 1. 2. 3. 4. 5. 6. 7. IV. Chlorine & Dechlorination Safety 1. 2. 3. 4. 5. ". NO NO NO _ NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A. N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 6, Ammonia and Sulphur for checking chlorine & dec~lorinatio n leaks available........ ................. @ NO 7. Are all safety precautions posted....................~ NO 8. Proper Chlorine wrench available to open valves................................ ......................,......@ NO 9. Chlorine protected from direct sunlight, cool and dry. ............................ ...... .......................@ NO 10. No petroleum or other chemicals store in I L ~~l;~~::~':.;h~;;~~~ii~bi~ ~~;i;~:::::~ ~g V. Process Chemical Safety I. Are personnel trained to handle all chemicals properly..................,.............................. ...... ..@ NO 2. Is proper safety clothing present for the chemical to be handled................................... @ NO 3. Are all containers, vats, and tanks properly 4. l~a~~;1~;;;;;~~~~;~;~ ~i;hi~~~~~~;~d ii;~i;;' ~ ~g 5. Are there proper containment of storage areas, including curbing. ..... ..... ......,....................... ...@ NO 6. Are management & employees aware ofthe ~a.zards ofthe.m. ate..n'als b.o eing use.. d........................I..E .... NO 7. Knows proper response to an accidental spill... E NO 8. All MSDS available and easily accessible......... S NO 9. Has complied with the 6employer';'"'''' ., . """'" responsibilities of the Worker Right to Know Law? (SARA)................................................. @ NO 10. Emergency Action Plan on file with local Fire, Police Departments and appropriate Emergency Agency........................................................... .@.0 NO VI. Tools & Equipment 1. Are hand tools in good repair and stored . properly.......... ........... .................. ................. ..@ NO Are power tools stored properly and in good condition - cords, plugs, etc............................ (Y".E] NO Are the tools adequate for the tasks to be ~~:~'::'~i;~;~~i~';~~i~~~d'~'~.;~. ~d;;;j'::: ~ ~g Are tool guards in place.................................. ~ NO Are employees trained in the proper use of the various tools they are expected to use............. @ NO 2. 3. 4. 5. 6. N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Are employees given additional instruction and periodic reviews of specialized tools and equipment................ ...................... ............ ......@ NO Are proper lifting techniques used by employees..................................................... .-(:~ NO VII. Fire Safety & Protection 7. 8. N/A N/A I. Are fire/emergency evacuation plans posted.....@ NO N/A 2. Are employees familiar with fire/emergency evacuation plan............................................. ...@ NO N/A 3. Are there sufficient number and types of fire extinguishers.................................................... @ NO N/A II Are the fire extinguishers properly located and ~~::;:~e~;~ ~;;i~~~i~h~;~ ~h;;';k;;d~~~~~ii;...::~ NO N/A 5. NO N/A 6. Are all of the fire extinguishers in working condition........................................................ .@ NO N/A 7. Are employees.trained in the proper use of the extinguishers to be used................................... ~ NO ~ 8. Are smoke detectors in working order............. YES NO /A VIII. Laboratory Safety 1. , Emergency Eyewash & Shower Station are ~~~:n~;~~ ~~~~:e~~~~lr.an~.t~ste~ ~~~t~lr.~ ~g All chemicals safely and properly stored, well labeled and in original containers..................... @' NO Laboratory Safety devices used such as: Pipette suction bulbs, Eye Protection, Gloves, Aprons ~:~~~~~% ~I~;;::;;~;~~k~d~i~~~;;~. ~ ~g No overloaded outlets..................................... ~ NO Acid spill kit available..................................... @> NO Emergency procedures for acid spills posted and used by all personnel................................ @ NO Laboratory Safety Rules posted and obeyed by all personnel such as no cooking or eating from laboratory glassware............. ...... .................. ...~ NO 2. 3. 4. 5. 6. 7. 8. 9. X. Other Safety 1. Are the required safety programs presented and/or attended during the year................:.......@ NO N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A .:;' ',', -'.~"t<.. >;-.'::; :',,~ '.<<, .\;~~J;~:.~~'f;:.:~{~~.v.;~~':r..~.{}tJ;~.',';'\'j:.~!.:~\; ~-.,':,'yi);.;_':,~-.;-..'.'""~,',:'r.'....~~,;';~/~~':l~~o;\~;.,~'....i~':;~ /.~ -A~..-;'.;.~,;~;i;<~!~~..~I:(::;?~J~f~~i~~i.~Wp.1>~?N1j'n~;\'tt&)j~~{~.~~?s~W!;f.*./~~~~':~\ft~~1~~H4t:~.t:~%~t,~~~iT;.~t';>>dt~~'W1JIt~~..~'~~;~~..i,..~~~~~.~:.y~~i~:~f.~:; :~'~,; .....~:':"., -. ,.. ~. 2. Is a suitable identification system used to identify the plant's piping system...................... @ NO N/A 3. Has the operator taken steps to remove or minimize safety hazards.................................. @ NO N/ A 4. Are all personnel provided with a shower and locker for their work clothes........................... ~ NO N/A 5. Are personnel trained in First Aid & CPR........ @) NO N/ A 6. Have the following proper safety signs been provided such as: Non-potable Water, Chlorine Hazard, No Smoking, High Voltage, Watch Your Step Signs in Certain Areas, & Exit Signs.@ NO N/ A 7. Is your Facility safety program Up to Date (Worksafc Program)........................................ YES ~ N/A (# YES) = IJ:, x 100 = '19 % (# YES + # NO) 133 + I =-/~.1/