HomeMy WebLinkAbout01) January
Operated By:
Environmental
Management
Corporation
Monthly Report
J aLJi:JL lLJ!laL~ lL '9 '9 .s
ENVIRONMENTAL
MANAGEMENT
CORPORATION
701 CHAMPION ROAD
JEFFERSONVillE. INDIANA 47130
812-285-6451
FAX 812-285-6454
February 13, 1995
C. Richard Spencer
City-County Building
Jeffersonville, IN 47130
Gentlemen:
Enclosed please find Environmental Management Corporation's (EMC) "Operations Report"
for the month of January 1995, containing information on the following:
1.0 Effluent Quality
2.0 Facility Operations
2.1 Pretreatment
3.0 Preventive and Unscheduled Maintenance
3.1 Maintenance & Repair Expenditures
3.2 Repair & Replacement Expenditures
3.3 Electrical Expenditures
4.0 Facility Safety and Training
5.0 Sewer Collection System
As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we are
available to discuss this report, or any other aspect of our operations, at the convenience of the
City.
Sincerely,
ENVIRONMENTAL MANAGEMENT CORPORATION
1(~~ ~------
Kendall S. Coleman
Facilities Manager
cc: Greg Coboum, EMC
1.0 Effluent Quality
During January, effluent quality was within NPDES permit limits for BOD and TSS
concentrations. Table 1.1 summarizes the effluent quality data. Attachment A contains Time
Series Plots of daily BOD and TSS values.
Table 1.1 Effluent Quality
Parameters Permit Limit Monthly
mg/L Average
mglL
Carbonaceous
Biochemical 25 2
Oxygen
Demand
(CBOD)
Total
Suspended 30 8
Solids (TSS)
E. Coliform
(Coloniesl 200/mo 80.29
100 mt) 400/wk 90.30
Chlorine .02 daily 0.00
Residual
Ammonia 3.0/mo 2.7
Flow 5.2 3.8
(MGD)
2.0 Facility Operations
Attachment B contains a list of septic haulers that discharged to the facility during January.
During January, the treatment process within the facility continued to perform excel.lent. The
No.2 clarifier drain valve was repaired and is back in service.
2.1 Pretreatment
During January, annual monitoring of five of the nine significant industrial users (Sill's) was
completed. The remaining industries will be sampled in February.
3.0 Preventative and Unscheduled Maintenance
Preventative maintenance was performed on all equipment as scheduled during January. There
were 23 unscheduled maintenance tasks performed. All were minor tasks, except for:
. Repair of the No.2 pump at Ewing Lane Lift Station.
JEFFERSONVillE. IN
A list of unscheduled maintenance work orders is included as Attachment C.
Maintenance and repair expenditures for the month of January are detailed in Attachment D.
Table 3.1 represents the total amount expended in January, and for the year. Table 3.2 includes
the same information for repair and replacement expenditures. Attachment E contains a detail
of repair and replacement expenditures for the year.
Table 3.1 Maintenance & Repair Expenditures
Time Period
January 1995
Year-to-Date
Budget
(Over)
Under
$5,700
$1,828
$51,300
($1,262)
Table 3.2 Repair & Replacement Expenditures
Time Period
January 1995
Year-to-Date
3.3 Electrical Expenditures
Budget
(Over)
Under
$8,334
$6,541
$100,000
($76,992)
Due to the electric bills being one month behind, table 3.4 relates to electrical expenditures
from May 1994 through December 1994.
Table 3.4 Electrical Expenitures
Time Period
December
Year-to-Date
4.0 Facility Safety and Training
Budget
(Over)
Under
$13,874.50
($1,036.44)
$114,451.00
($5,684.49)
Safety inspections were conducted on January 13, 1995. The rating was 99%. The deficiencies
reported were:
. All aspects of the Safety Program needs reviewed with the employees.
JEFFERSONVILLE, IN
A copy of the Safety Inspection Report is contained as Attachment F.
On January 17,1995 four employees attended electrical safety training at our EMC facility in
Seymour.
On January 18, 1995 we conducted safety training at the facility for all employees. The topic
was Self-Inspection checklist for Workplace Safety and Health.
A lost-time accident occurred on January 27, 1995. While descending down a ladder at the Mill
Creek Lift Station, Mike Arms slipped and fell against the ladder and fractured his right hip.
5.0 Sewer Collection System
During the month there wer ten sewer calls. Five of the calls were due to high level alarms at
various lift stations. All but one was a false alarm. Five calls were due to backup of sewer
lines. Only one of the calls was due to a problem with the City's main line.
Table 5.1 Sewer Projects
Tap Inspections 0 76
Sanitary Sewer 10,400 75,697
Cleaned/ft.
Catchbasins Cleaned 5 39
(Handi-c1ams)
Catchbasins Raised 0 13
Manholes Raised 3 88
Catchbasins Rebuilt 3 23
Sewer Repairs 2 29
Sewers Televised/ft. 0 4,935
Air Testing/Deflection 0 3,665
Testing
Manhole Castings 0 10
Replaced
ATTACHMENTS:
A Time Series Plots
B January Septic Haulers
C Unscheduled Maintenance Work Orders
D Maintenance & Repair Expenditures for January
E Repair and Replacement Expenditures
F Safety Inspection Report
JEFFERSONVillE, IN
ATTACHMENT F
Safety Inspection Report
JEFFERSONVillE, IN
ATTACHMENT A
Time Series Plots
JEFFERSONVillE, IN
Jeffersonville Wastewater Treatment Facility
January Effiuent CBOD &TSS
20
18
16
14
12
110
8
6
4
2
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Day
January 1995
- CBOD Effluent
-CBOD Permit
- TSS Effluent
-TSS Permit
ATTACHMENT B
January Septic Haulers
JEFFERSONVillE. IN
JEFFERSONVILLE WASTEWATER TREATMENT FACILITY
January 1995 Septic Hauler Report
Hauler Current Month Hauler Total
(YTD)
Rumpke of Indiana 1 14
Pfau 0 1
Total 1 15
Hauler Current Hauler Hauler Total
(YTD)
Rumpke of Indiana 900 13,300
Pfua 0 6,330.
Total 900 19,630
JEFFERSONVillE, IN
ATTACHMENT C
Unscheduled Maintenance Work Orders
JEFFERSONVillE. IN
02/14/95
WORK ORDER HISTORY REPORT
Page 1
EQUIPMENT
NUMBER
======================================================================================7===============================~=============
TOTAL
COST
--Top Level--
TASK DESC
COMMENTS
TOTALS
EQUIP TOTALS
WORK ORDER W.O.
NUMBER TYPE
EQUIPMENT
DESCRIPTION
TASK MTASK
NO. NO.
1.50 ot:
1.50 Ot:
DATE
CLOSED
01/30/95
0.00)
0.00)
DOWN
TIME
0.000
0.000
0.000
LABOR
COST
17.30
17.30
MATERIAL
COST
0.00
0.00
17.30
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
17.30
1-BUILD
TASK DESC
TOTALS
1-BUILD
TASK DESC
COMMENTS
TOTALS
EQUIP TOTALS
9500108
Overall Facility
0.50 ot:
REPAIR EXIT SIGN AT PROCESS BUILDING
EXIT SIGNS ARE WORKING, PROBLEM WAS DETECTED AT BREAKER.
01/12/95
0.00)
01/15/95
0.00)
0.00)
0.000
0.000
0.000
0.000
0.000
6.25
1.77
8.03
149.50
0.00
149.50
155.75
1.77
====================================================================================================================================
157.53
1ADMIN1
TASK DESC
TOTALS
EQUIP TOTALS
REPAIR
REPAIR FRONT GATE
GATE WAS OUT OF ADJUSTMENT, READJUSTED GUIDE BAR.
(LABOR HOURS ->
Total:
Reg:
0.25 ot:
0.75 Ot:
0.50 Ot:
0.50 ot:
01/12/95
0.00)
0.00)
0.000
0.000
0.000
6.01
6.01
5.30
5.30
11.32
====================================================================================================================================
11.32
1BARSCREEN1
TASK DESC
TOTALS
EQUIP TOTALS
0.000
(LABOR HOURS ->
Total:
0.000
Reg:
3.00 ot:
3.00 Ot:
01/04/95
0.00)
0.00)
0.000
0.000
0.000
28.69
28.69
0.00
0.00
28.69
====================================================================================================================================
28.69
1 BUILDINGS
TASK DESC
9500109
REPAIR
BUILDING MAINT
REPLACE SAFETY SWITCH(STOP) TO GRIT COMPACTOR
(LABOR HOURS ->
Total:
0.000
Reg:
9400631
REPAIR
BUILDING MAINT
(LABOR HOURS ->
Total:
0.000
Reg:
(LABOR HOURS ->
Total:
0.000
Reg:
9500038
REPAIR
ADMINISTRATION BUILDING
PATCH WALLS IN TOM'S OFFICE
(LABOR HOURS ->
Total:
0.000
Reg:
(LABOR HOURS ->
Total:
0.000
Reg:
9500037
REPAIR
BARSCREEN #1
BARSCREEN CHANNEL NEEDS CLEANED
(LABOR HOURS ->
Total:
0.000
Reg:
(LABOR HOURS ->
Total:
0.000
Reg:
9500039
REPAIR
FACILITY BUILDING MAINT
REPLACE SAFETY GLASS TO GRINDER
01/12/95
0.000
02/14/95
WORK ORDER HISTORY REPORT
Page 2
====================================================================================================================================
EQUIPMENT
NUMBER
WORK ORDER W.O.
NUMBER TYPE
EQUIPMENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATERIAL
COST
TOTAL
COST
TOTALS
====================================================================================================================================
EQUIP TOTALS
(LABOR HOURS ->
(LABOR HOURS ->
Total:
0.000
Reg:
Reg:
0.50 ot:
0.50 Ot:
0.00)
0.00)
0.000
0.000
6.01
6.01
0.00
0.00
6.01
====================================================================================================================================
6.01
1 CLARIFIER3
TASK DESC
9500107
REPAIR
Total:
0.000
01/28/95
0.000
TOTALS
------------------------------------------------------------------------------------------------------------------------------------
12.50
REPLACE SHEAR PIN
(LABOR HOURS ->
SECONDARY CLARIFIER #3
Total:
0.000
Reg:
1.00 ot:
0.00)
0.000
12.50
0.00
------------------------------------------------------------------------------------------------------------------------------------
EQUIP TOTALS
(LABOR HOURS ->
Total:
0.000
Reg:
1.00 ot:
0.00)
0.000
12.50
0.00
12.50
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
1ELEC CONTROLS
TASK DESC
9500104
REPAIR
REPLACE BURNED LAMPS FROM PANEL BOARDS
Total:
0.000
ELECTRIC CONTROL PANELS
01/13/95
0.000
TOTALS
----------------------------------------------------------------------------------------------------------------------------------~-
13.45
(LABOR HOURS ->
Reg:
0.50 ot:
0.00)
0.000
6.01
7.44
------------------------------------------------------------------------------------------------------------------------------------
EQUIP TOTALS
(LABOR HOURS ->
Total:
0.000
Reg:
0.50 Ot:
0.00)
0.000
6.01
7.44
13.45
====================================================================================================================================
1POLYMERMIX1
TASK DESC
9500098
REPAIR
POLYMAX POLYMER MIXER #1
01/06/95
0.000
TOTALS
------------------------------------------------------------------------------------------------------------------------------------
51.71
CLEAN AND REPAINT
(LABOR HOURS ->
Total:
0.000
Reg:
4.99 Ot:
0.00)
0.000
49.96
1. 75
------------------------------------------------------------------------------~-------~----------------~----------------~--------~~-
EQUIP TOTALS
(LABOR HOURS ->
Total:
0.000
Reg:
4.99 ot:
0.00)
0.000
49.96
1. 75
51.71
====================================================================================================================================
1POLYMERMIX2
TASK DESC
9500099
REPAIR
POLYMAX POLYMER MIXER #2
01/06/95
0.000
TOTALS
-------------------------------------------------------------------------------------------------------~-----------------------'--~--
51.71
CLEAN AND PAINT
(LABOR HOURS ->
Total:
0.000
Reg:
4.99 ot:
0.00)
0.000
49.96
1. 75
------------------------------------------------------------------------------------------------------------------------------------
EQUIP TOTALS
(LABOR HOURS ->
Total:
0.000
Reg:
4.99 ot:
0.00)
0.000
49.96
1. 75
51.71
1POLYMERMIX3
====================================================================================================================================
9500100
REPAIR
POLYMAX POLYMER MIXER #3
01/11/95
0.000
02/14/95
WORK ORDER HISTORY REPORT
Page 3
EQUIPMENT
NUMBER
====================================================================================================================================
WORK ORDER W.O.
NUMBER
TYPE
EQUIPMENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATERIAL
COST
TOTAL
COST
TASK DESC
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
TOTALS
EQUIP TOTALS
CLEAN AND PAINT
(LABOR HOURS ->
(LABOR HOURS ->
Total:
0.000
Reg:
Reg:
4.99 ot:
4.99 ot:
0.00)
0.00)
0.000
0.000
49.96
49.96
1. 75
1. 75
51.71
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
51.71
1 SKIMMER1
TASK DESC
COMMENTS
TOTALS
EQUIP TOTALS
9500103
REPAIR
REPAIR RUBBER TO SKIMMER ARM
RUBBER BLADE HAD TO BE REPLACED.
THICKENER SKIMMER #1
(LABOR HOURS ->
(LABOR HOURS ->
Total:
0.000
Reg:
Reg:
1.00 ot:
1.00 ot:
01/17/95
0.00)
0.00)
0.000
0.000
0.000
12.03
12.03
0.00
0.00
12.03
==========================~=========================================================================================================
12.03
4EMC-1
TASK DESC
COMMENTS
TOTALS
EQUIP TOTALS
Total:
0.000
9500105 REPAIR 1989 BONNEVILLE
HIGH BEEM HEADLIGHTS ARE NOT WORKING/INVESTIGATE AND REPAIR
FOUND TWO BAD CONNECTIONS IN WIRE LOOM.
(LABOR HOURS ->
(LABOR HOURS ->
Total:
0.000
Reg:
Reg:
14.00 ot:
14.00 Ot:
01/26/95
0.00)
0.00)
0.000
0.000
0.000
1 61. 56
161.56
0.00
0.00
161.56
====================================================================================================================================
161.56
4VEHICLE02
TASK DESC
TOTALS
EQUIP TOTALS
9500036
REPAIR
VAN WILL NOT START, INVESTIGATE AND REPAIR
1986 CHEVROLET C-10 VAN #
(LABOR HOURS ->
(LABOR HOURS ->
Total:
0.000
Reg:
Reg:
5.00 ot:
5.00 ot:
01/04/95
0.00)
0.00)
0.000
0.000
0.000
55.35
55.35
78.53
78.53
133.88
====================================================================================================================================
133.88
4VEHICLE08
TASK DESC
COMMENTS
TOTALS
9500035
REPAIR
Total:
0.000
Total:
0.000
Total:
0.000
REPAIR RIGHT SIDE HEADLIGHT
REPAIRED BAD CONNECTION AT HEADLIGHT.
1987 DODGE RAMCHARGER #43
(LABOR HOURS - >
Total:
0.000
Reg:
0.25 ot:
01/05/95
0.00)
0.000
0.000
2.77
0.00
2.77
02/14/95
WORK ORDER HISTORY REPORT
Page 4
------------------------------------------------------------~-----------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
EQUIPMENT
NUMBER
EQUIP TOTALS
WORK ORDER W.O.
NUMBER
TYPE
EQUIPMENT
DESCRIPTION
Total:
0.000
TASK MTASK
NO. NO.
Reg:
0.25 ot:
DATE
CLOSED
0.00)
DOWN
TIME
0.000
LABOR
COST
2.77
MATERIAL
COST
0.00
TOTAL
COST
====================================================================================================================================
2.77
4VEHICLE18
TASK DESC
TOTALS
EQUIP TOTALS
(LABOR HOURS ->
9500073 REPAIR 1975 DODGE D-200 UTILITY
VEHILCE WILL NOT START / INVESTIGATE AND REPAIR
(LABOR HOURS ->
(LABOR HOURS ->
Total:
0.000
Reg:
3.50 Ot:
01/05/95
0.00)
0.00)
0.000
0.000
0.000
38.75
38.75
65.91
65.91
104.65
====================================================================================================================================
104.65
5CRUMS LANE II
TASK DESC
COMMENTS
TOTALS
EQUIP TOTALS
9500096
REPAIR
Total:
0.000
Reg:
3.50 ot:
REPAIR DOOR AT LIFT STATION
GUIDE NEEDED WELDING AND HINGES REPLACED, DOOR WORKS OKAY NOW.
01/12/95
(LABOR HOURS - >
(LABOR HOURS ->
0.000
0.000
0.000
82.08
82.08
14.64
14.64
96.72
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
96.72
5EWING LANE
TASK DESC
COMMENTS
TOTALS
EQUIP TOTALS
9500097
REPAIR
CRUMS LANE II L.S.
Total:
0.000
Reg:
8.00 ot:
0.00)
0.00)
EWING LANE L.S. 01/17/95
NOT RUN/INVESTIGATE AND REPAIR
FROM STARTER TO MOTOR AND HAD MOTOR BEARINGS AND
0.000
0.000
0.000
104.70
104.70
81.97
81.97
186.67
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
186.67
5MILLCREEK
TASK DESC
COMMENTS
TOTALS
5MILLCREEK
TASK DESC
#2 PUMP MOTOR WILL
REPLACED LEAD WIRE
BUSHINGS REPLACED.
(LABOR HOURS ->
(LABOR HOURS ->
9500032
REPAIR
Total:
0.000
Reg:
8..00 ot:
0.00)
0.00)
01/11/95
Clean piping at transmitter/receiver location, relubricate and reinstall
REMOVED EQUIPMENT FROMPIPE AND CLEANED ALL SENSORS, REINSTALLED AND
WORKS PROPERLY NOW.
(LABOR HOURS ->
9500141
REPAIR
REPAIR COVER OVER GEAR BOX TO MAN-LIFT
MILL CREEK L.S.
Total:
0.000
Total:
0.000
MILL CREEK L.S.
Total:
0.000
Reg:
10.00 ot:
Reg:
10.00 ot:
Reg:
5.00 ot:
0.00)
01/31/95
0.000
0.000
0.000
54.17
0.00
54.17
02/14/95
WORK ORDER HISTORY REPORT
Page 5
====================================================================================================================================
EQUIPMENT
NUMBER
WORK ORDER W.O.
NUMBER TYPE
EQUIPMENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATERIAL
COST
TOTAL
COST
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
TOTALS
EQUIP TOTALS
(LABOR HOURS - >
(LABOR HOURS ->
Total:
0.000
Reg:
9.00 ot:
0.00)
0.00)
0.000
0.000
99.87
154.05
3.41
3.41
103.28
====================================================================================================================================
157.46
Total:
0.000
Reg:
14.00 ot:
5SPRING STREET 9500106 REPAIR SPRING STREET LIFT STATI
TASK DESC EMERGENCY GENERATOR IS NOT RUNNING/INVESTIGATE AND REPAIR
TOTALS
EQUIP TOTALS
(LABOR HOURS ->
(LABOR HOURS ->
Total:
0.000
Reg:
1.00 Ot:
01/26/95
0.00)
0.00)
0.000
0.000
0.000
11.98
11.98
55.06
55.06
67.04
67.04
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
1324.70
GRANDTOTALS
(LABOR HOURS ->
Total:
0.000
Total:
0.000
Reg:
1.00 ot:
Reg:
79.47 ot:
0.00)
0.000
857.69
467.01
02/14/95
WORK ORDER HISTORY REPORT
Page 1
EQUIPMENT
NUMBER
====================================================================================================================================
WORK ORDER W.O.
NUMBER TYPE
EQUIPMENT
DESCRIPTION
TASK MTASK
NO. NO.
DATE
CLOSED
DOWN
TIME
LABOR
COST
MATERIAL
COST
TOTAL
COST
5COLONIAL PARK
TASK DESC
====================================================================================================================================
. TOTALS
EQUIP TOTALS
9500093
PROJECT
COLONIAL PARK L.S.
ROCK INSIDE PERIMETER OF LIFT STATION
Reg:
6.00 ot:
01/05/95
0.00)
0.00)
0.000
0.000
0.000
65.70
65.70
19.69
19.69
85.39
====================================================================================================================================
85.39
5CRUMS LANE I
TASK DESC
TOTALS
EQUIP TOTALS
(LABOR HOURS ->
(LABOR HOURS ->
9500092
Total:
0.000
Total:
0.000
Reg:
6.00 ot:
01/05/95
0.00)
0.00)
0.000
0.000
0.000
65.70
65.70
19.69
19.69
85.39
------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------~------------------
85.39
5GOLFVIEW
TASK DESC
PROJECT
CRUMS LANE I L.S.
(LABOR HOURS ->
ROCK INSIDE PERIMETER OF LIFT STATION
0.000
Reg:
6.00 ot:
01/05/95
0.000
TOTALS
------------------------------------------------------------------------------------------------------------------------------------
85.39
(LABOR HOURS ->
Total:
Total:
0.000
9500095 PROJECT GOLFVIEW L.S.
ROCK INSIDE PERIMETER OF LIFT STATION
Reg:
6.00 ot:
0.00)
0.000
65.70
19.69
------------------------------------------------------------------------------------------------------------------------------------
EQUIP TOTALS
(LABOR HOURS ->
(LABOR HOURS ->
Total:
0.000
Reg:
6.00 ot:
0.00)
0.000
65.70
19.69
85.39
================================================================'====================================================================
5WILSON SCHOOL
TASK DESC
9500094
Total:
0.000
ROCK INSIDE PERIMETER OF LIFT STATION
PROJECT WILSON SCHOOL L.S.
Reg:
6.00 ot:
01/05/95
0.000
TOTALS
------------------------------------------------------------------------------------------------------------------------------------
85.39
(LABOR HOURS ->
Total:
0.000
Reg:
6.00 ot:
0.00)
0.000
65.70
19.69
-----------------------------------------------------------------------------------------------------------------------------~------
EQUIP TOTALS
(LABOR HOURS ->
Total:
0.000
Reg:
6.00 ot:
0.00)
0.000
65.70
19.69
85.39
GRANDTOTALS
====================================================================================================================================
(LABOR HOURS ->
Total:
0.000
Reg:
24.00 ot:
0.00)
0.000
262.80
78.75
341.55
ATTACHMENTD
Maintenance & Repair Expenditures
JEFFERSONVillE, IN
Monday, February 13,1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 1
P.O. Date Description Amount
1/6/95 ELECTRICAL MAT :j>4f.2U
1/6/95 PAINTING NECESSITIES FOR PROCESS BUILDING $7.56
1/6/95 FLOOR MATS FOR OFFICE $78.24
1/6/95 AIR FILTER FOR VEHICLE #2875 $9.24
1/6/95 BATTERY CELL TESTER $6.73
1/6/95 BATTERY FOR #8090 $62.93
1/6/95 BATTERY FOR VEHICLE #3412 $30.39
1/6/95 OIL HEATERS FOR VEHICLES $24.13
1/6/95 DUST COVER CAP FOR VEHICLE #6413 $5.78
1/6/95 ARMATURE SHORT AT MILL CREEK $475.19
1/13/95 TAXES ON PREVIOUS PURCHASES $1.05
1/13/95 ACETYLENE FOR WELDING $17.05
1/13/95 CABLE FOR RAS STATION $519.40
1/13/95 CONCRETE FOR CRUMS LANE FEEDER REPAIR $275.89
1/13/95 CONCRETE FOR PUMP BASE AT MILL CREEK $81.43
1/19/95 HOSES, CLAMPS FOR SUPPLY $53.80
1/19/95 KEYS FOR OFFICE $1.50
1/19/95 SAFETY GLASS FOR PROCESS BUILDING $5.50
1/19/95 PAINT AND SPACKLE FOR PLANT $15.17
1/19/95 SERVICE FOR COPIER $79.00
1/19/95 RETURN PUMP CABLE GLANDS $512.77
1/19/95 DEODERANT FOR PLANT $163.23
1/19/95 ROCK FOR CRUMS LANE, COLONIAL PARK, WILSON, AND GOLFVIEW $72.61
1/19/95 LANDSBERG FUSES, STARTER COIL, AND FLOAT FOR PUMP $39.90
1/19/95 HINGES FOR CRUMS LANE LIFT STATION $11.45
1/19/95 MOTOR REPAIR OF NO.2 MOTOR AT EWING LANE $363.32
1/27/95 HEAT GUN THERMOMETER $299.04
Monday, February 13,1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 2
I P.O. Date Description I Amount I
1/27/95 HOSE CLAMPS FOR SAMPLER $5.51
1/27/95 REPUBLIC INDUSTRIES - VALVE $28.01
1/27/95 ALIGN MOTOR/BLOWER COUPLING . $510.00
1/27/95 CARBORA TOR SPRAY $3.76
1 /27/95 DASH BOARD LIGHT SWITCH FOR #7677 $12.18
1/27/95 DIMMER SWITCH FOR #7677 $15.27
1/27/95 FILTER AND PVC VALVE FOR 4318 $9.11
1/27/95 GLASS FUSE #15 & 20 FOR SUPPLY $2.60
1/27/95 OIL FIL;fERS FOR #4318 $4.07
1/27/95 RADIATOR FLUSH FOR 7677 $1.04
1/27/95 THERMOSTAT, 0 RING SEAL FOR 7677 $6.28
1 /27/95 VACUUM TUBING FOR SUPPLY $2.25
1 /27/95 WIRE CABLE SUPPLY FOR USE ON TRUCKS $7.02
1/27/95 CARBORATOR PART FOR 4318 $5.76
Total: $3,872.36
ATTACHMENT E
Repair & Replacement Expenditures
JEFFERSONVillE. IN
Monday, February 13, 1995
MAINTENANCE & REPAIR EXPENSES
Jeffersonville, Indiana
Page 1
P.O. Date Description Amount
5/27/94 10TH STREET REPAIR & REPLACEMENT $54,760.00
6/2/94 Budget $0.00
7/1/94 REPAIR OF COURT & GRAHAM ST. $37,000.00
7/22/94 REPAIR TO NO 3 CLARIFIER DRAIN VALVE $15,650.00
8/4/94 TV TRAILER REPAIR $1,655.00
8/4/94 REPAIR OF JET TRUCK $3,421.00
8/24/94 FREIGHT CHARGE FOR RAS PUMP $562.55
8/24/94 REPAIR OF RAS PUMP $10,480.07
9/1/94 REPLACE CONTROL VALVE FOR WATER TRUCK $687.50
9/7/94 REHAB MILL CREEK PUMP NO.2 $1,239.34
1 0/1/94 REPAIR DRAIN VALVE TO CLARIFIER NO.4 $17,760.00
1 0/13/94 CLEANING OF MILL CREEK AND TENTH STREET $1,390.00
11/7/94 REHAB OF POWERHOUSE LIFT STATION NO.1 PUMP $1,375.00
11/7/94 FREIGHT CHARGE FOR RAS PUMP IMPELLERS (THREE IMPELLERS) $67.74
11/15/94 MANHOLE RISERS FOR 1994 STREET PAVING PROJECTS $2,232.00
11/15/94 REPAIR TO PUMP MOTOR AT CRUMS LANE 1 LIFT STATION $4,358.82
11/15/94 PUMPEX IMPELLER FOR RAS STATION $5,850.00
11/17/94 REPAIR, BALANCE AND SET IMPELLER FOR SPRING STREET PUMP $1,766.94
NO.2
12/7/94 NEW MILL CREEK PUMP, MODEL # 613A $11,517.00
1217/94 FITTING FOR NEW PUMP AT MILL CREEK $80.33
12/9/94 DIP & BAKE LINCOLN MOTOR 200 HP $2,865.00
12/22/94 INSTALL WIRING AND HOOK UP OF BLOWER MOTOR $481.58
1/6/95 INSTALLATION OF JUNCTION BOXES ON RAS PUMPS $1,038.80
1/6/95 FAB GASKETS FOR MILL CREEK $753.75
Total: $176,992.42
ATTACHMENT F
Safety Inspection Report
JEFFERSONVillE, IN
ENVIRONMENTAL MANAGEMENT CORPORATION
MONTHLY ,5'AFETY INSPECTION
CHECKOFF SHEET
JEFFERSONVILLE WASTEWATER TREATMENT FACILITY
701 CHAMPION ROAD
JEFFERSONVILLE, IN 47130
(812) 285-645 r
11130 p.1V\ I
~ 13}/99S-
uJ A<jtfJO;V '&tAJO - ;;111 Cc/aJ4({~
PE1?SON COMPLI~'TfNG INSPEC''llON:
I. Personnel Safety
A. Personal Protective Clothing
]. Safety Helmets Provided .
(for Pcrsonnel & Visitors)..................................@ NO
2. Hearing Protection
(for High Noise AreaS)......................................@ NO
3. Eye Protection - Goggles, etc.
(for Personnel & Yisitors).................................@ NO
4. Gloves
(for Personnel)........ ..... ................ ...................... ~ NO
5. Rubber Boots with Steel Toes
(provided for Personnel)...................................@ NO
6. Rain Suits Provided
(for Personnel).............. ..................................... 0~ NO
7. Is Respiratory Protection Provided including
ventilators and hoods over high dust areas, dust /:a
masks, etc. (for Personnel)...............................~ NO
B. Safety Devices and Equipment
I. Non-sparking Tools in arcas wherc flammable ~
or cxplosivc gascs may be prcsent?.....................@ NO
2. ~~r~1~:~~~~i.~~~~~'..~ ~~~~:.~. ~~.~:.~~~~~. ~~~.......~ NO
3. Self-contained Breathing Apparatus tor cntry ~
to chlorinc room.. ..... .......... ................ ..... ...... .....~ NO
4. Confined Spacc Entry Equipmcnt Availablc
such as and including Safcty Harncss, Portable
Wench, Hoist, etc..............................................@ NO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
'"" "", ~, . .'; r . ....':: .,1,::.., ',l' "I.~',~' ~ i,~._:~l.~;j,.'" .".'ni ,,:,;1,.;':' ~11f'''' '.:',' '!."'.'~',':'>,I;o;I(..,.~;,.t;t;( ,toj" ":.::':" '!:I,~,~" ,,'(.' t....,; ,;', _. . '....) ',_':'" ,', . > .'
Are Personnel trained in the use and location
of safety equipment at the plant..................... @ NO
Are there railings around all tanks with
openings chained off.. ............ .... .... ................ ~ NO
Are holes covered? Including all pits & wells, .
drains, valv~ holes, hatch covers in place........ ~ NO
Are explosion' proof fixtures used where
ncedcid.................................. ......................... @ NO
Arc all equipment guards in place? Including
mowing equipmcnL........................................ @ NO
Are dry wells ventilated and is ventilation
adequate in all areas.......................................j. NO
Arc emergcncy numbers posted & accessible.. S NO
Is proper liquid flammable storage used.......... YES NO
Is general plant cleanliness being practiced?
Including floors (No oil or grease or pools of
water), Storage Areas (No clutter & supplies
stored properly), Chlorine Room (Free of
clutter), LaboratOly........................................ @ NO
10. Are all walkways, exists and routes, &
stairways clear & unobstructed (No ice, oils,
water, grease, or debris)................................. ~ NO
I 1. Are all slippery surfaces posted and/or covered
with anti-skid material, including stair treads
and ramps, in good rcpair and covered with
non-skid surface.............................................. @ NO
12. Are all mats and mgs in good repair so as not
to bccome tripping hazards............................. ~ NO
13. Are work area layouts adequate...................... @> NO
14. Is lighting adequate in all areas (Work areas,
stairways, walkways, etc.)..............................
15. Arc noise levels within allowable limits or
danger areas posted......... ..................... ..........
1.
2.
3.
4.
5.
6.
7.
8.
9.
@' NO
@NO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
16. Are toilet facilities available & clean............... I" NO
17. Is safe drinking water available....................... NO
18. Is pest co~trol adequate.................................. E NO
19. Are all eXists properly marked......................... . NO
20. Is inclement weather protection provided at
entrances (mats, safety strips, de-icers, etc.).... @ NO N/A
21. Arc tripping hazards eliminated at all doors .
(threshold plates in good repair, etc.).............. cYiJ:> NO N/A
22. Is safety glass provided in all doors................. @ NO N/A
23. Are handrails provided on stairs (Both sides
. if necessary)........... ..... ...... ........... ................. ~ NO N/ A
. . ".,. '." .. ....".,~..^~;~"~..,';"',.;...;. ..........:..\!. ';'24:"'Are'Iadders'properIy"anchored'~~;~~~:~:::'~,~:,~~"'J~(N0i>.""/fW1N/ A~."''''';'"w'~!'''''f'''''':'' - . .
25. Are fixed ladders provided with safety cages
or safety side rails.........................:...............
26. Are all elevation differences between floors
clearly defined and properly lighted................
27. Are portable ladders in good condition...........
28. Kick boards in place ifneeded........................
29. No Broken steps............................................
30. Arc ashtrays provided and emptied regularly..
3 1. Arc trash cans covered and emptied regularly.
32. Arc portable hoists for lifting heavy equipment
in good repair................................................. E NO
33. Are plant personnel immunized for tetnus....... NO
~~: ~~ ~~:;:~~".or~s~tr~t~~e.d.~~~r.t~".~s::::::::: ~ ~~
36. Fuel supply tank in good condition................. ~ NO
37. No excessively hot operating temperature on
machinery or equipment................................ @ NO N/A
38. No excessive vibration of machinery or
equipment..................... ................... ............
39. No water or oil being "slung" from equipment
40. No worn or cracked equipment.....................
41. No excessive dust on equipment...................
42. Adequate dehumidifier and heaters where
needed.......................................................... @ NO N/ A
43. Emergency Medical Information on all
employees available for determination of job
assigntnents................................,................ .
44. Cross connections have been eliminated
between potable water supply and non-potable
source:
a. Pump & Mixer Seals................................. ~
b. Digester Heating System Makeup Water... ~
c. Vacuum Filtcr Watcr Sprays.....................~
NO
NO
NO
NO
NO
NO
NO
~NO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
NO N/A
NO (ff[l'5
NO N/A
d. Chemical Mixing Tank............................... @ NO N/A
e. Chlorinator Water souree..........................J!E NO N/A
f Dc-Chlorination Water Sourcc.................... .. NO N/A
g. Yard Hydrants........................................... .. NO N/A
h. Othcr.......................................................... YES NO N/A
III. Electrical Safety
Is all electrical circuitry enclosed and identifie~ NO
Is all wiring in good condition..........................~ NO
Are the number of outlets adequate................~ NO
Is equipment properly grounded or insulated...~ NO
Are extension cords in good condition and
lIsed properly..................................... ........... ...@ NO
6. Is electrical test equipmcnt available. Such as
voltmeter, ampmctcr, etc..... ........ ...., ......... ..... .@)NO
7. Are dielectric rubber mats presents for
electrical work............................................... ~ NO
8. All control panel switches in good condition.~ NO
9. All c~l1trol ~anels unobstructed.:.................... . NO
10. Are dlc)ectnc rubber gloves avatlable............. YE NO
II. Are ground fault interrupters used.................. @ NO
12. Arc warning or caution signs posted...............~ NO
I 3 . Is control panel area clean and dry.................. NO
14. Arc aIlncedcd fuses or breakers in place......... NO
15. Arc all contacts clean and dust frce.................~ NO
16. Is there emergency stop buttons on all
machines and equipment................................. ~ NO
17. Are personnel familiar with the electrical safety
such as lock out/tag out procedures................ ~ NO
18. Is power supply locked outl tagged out on ~ _
cquipmcnt prcsently being repaired................. ~O
I.
2.
3.
4.
5.
IV. Chlorine & Dechlorination Safety
I.
All standing cylinders chained in place and/or
lOll cylinders chocked................""..""".."". "&S' NO
All personnel rained in the use of eLz.............. . NO
Appropriate repair kits available...................... YES NO
Chlorine & dechlorination leak detector tied
into the facility alarm system...........................@ NO
Ventilator fan with outside switch present and
cither comes on when door opens or manually
with switch at entrance door...........................@ NO
2.
3.
4.
5.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ammonia and Sulphur for chccking chlorine &
dechlorination leaks ~vailable..........................~ NO
Are all safety precautIons posted....................~ NO
~:~~~~:I... ~.I.l.I.~.I:j.l.l.~. ~~~.~~~~.I~. ~~~~.i.I.~~~~..t.~ .~.l~.~~~...... .Q@) NO
~~~~;; .~).~~~~~.l.~.~. :~:~1.1.1. .~.i.I:~.~~. ~~I.1.1~~~~~~. ~~~~..cYlS) NO
I o. ~~:r~:o;~~:. ~r~th~ ~~e.~i~~s:s.to.r~ in..,.... ((fi) NO
11. Spare lead washers avaIlable on sIte...............@ NO
6.
7.
s.
<J.
V. Process Chcmical Safcty
N/A
N/A
N/A
N/A
N/A
N/A
Arc personnell raincd 10 handle all chemicals
properly................ .......... .... ..... ......... ..... ........ @ NO NI A
Is proper safety clothing present for the
chemical to be handled...................................@ NO N/A
Arc all containers, vats, and tanks properly
1~1~~~;1~;~~ .~~~~~.~;~. ~i~i~j~' ~~~~~~~d' ii~~i~;""".~ ~g ~~ ~
Are there proper containment of storage areas,
including curbing...........................................@ NO NI A
Arc managcmenl & cmployees aware of the
hazards of the materials be.ingused...... ...........Jf. ..' .NO N/A
Knows proper response to an accidental spill... Y NO NI A
All MSDS available and easily accessible....... . NO N/A
. Has' co mplied 'with" the" 6'1 employer'.'.w~'~\\'i.\."'.;,.'@"..,,"".~..,~.'"';'O;fillW,..t"'t.f,.."",'i',\."'.'i;.......'..,; 't." ,.,
responsibilities of the Worker Right to Know
Law? (SARA)... ............... ...............................@ NO NI A
.10. Emergency Action Plan on file with local Fire,
:;~~~~".Pilrtnl~~tsil~~..ppr~IJti..t".~ll'e.~~en~ NO N/ A
VI. Tools & Equipment
I.
2.
3.
4.
5.
6.
7.
8.
. . '9.'
l.
Are hand tools in good repair and stored
properly... ...... ... .... .... .... .... ..... ...... .............. ...C@ NO
Are power tools stored properly and in good ~
condition - cords, plugs, etc............................\..XEV NO
~;f~~~I~1~~~..IS ..deq~~t~. f~r. tll~. ~~~...t~.~e........1 NO
Arc defectIvc tools replaced as needed............ .. NO
Are tool guards in place.................................. YE NO
Arc employees trained in tlle proper use ofthe. ~
various tools they are expected to use............. ~ NO
2.
3.
4.
5.
6.
N/A
N/A
N/A
N/A
N/A
N/A
7.
Arc employees given additional instI1lction and
periodic reviews of specialized tools and
equipment.... ................... .......... ....... ....... ...... ..G~0 NO
~~~l~;~:~'... ~~:~~:~~ .~~~.I~.I~~~~~~.~.~~~.~~ .~~~.......... .....cifY NO
8.
Fire Safety & Protection
N/A
N/A
I. Arc fire/emergency evacuation plans posted.....QEj) NO' N/A
2. Are employees familiar with fire/emergency
evacuation plan........ ........... ........ ....... ........ ...... ,@) NO N/A
3. Are there sufficient number and types of fire
extinguishers.. ... ..... ... ... .......... .... ......... ..... .......~ NO N/A
II. Arc thefirc exlinguishers properly localed and
~;~l:~e~;~. ~~;i;;~~i;i;~;;. ~i;~~k~d.~~;;~~II;. ... .~;3 ~g N/A
5. N/A
6. Arc all of the llre extinguishers in working - .
condition....... ..................................................~ NO NIA
7. Are employees. trained in the proper use of the
extinguishers [0 be used..................................~ NO N/A
S. Are smoke detectors in working order............. YES NO cNfiC)
Laboratory Safely
:her Safety
1.
Emergency Eyewash & Shower Station are
presen~ and work properly and tested monthl~ NO
Fume hood is present......................................~ NO
All chemicals safely and properly stored, well
labeled and in original containers.....................@ NO
Laboratory Safety devices used such as: Pipette
suction bulbs, Eye Protection, Gloves, Aprons
or Jackets, & Tongs.......................................~NO
No brokenl chipped or cracked glaSSware.......~s NO
No overloaded outlets..................................... y.. NO
Acid spill kit available..................................... yES NO
Emergency procedures for acid spills posted
and used by all personneL............................. @NO
Laboratory Safety Rules posted and obeyed by
all personnel such as no cooking or eating from
laboratory glassware.... .............. .................... e~ NO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
,.~..fI,;!\ ~.;t. ,":,.,:. . '.', ~ ".,"r:'~' \" ':''''~'.,: ';; ,\;. ,;. :~: '_: . ,.t.... '''':\.;'':'.I~:J' t!::':'"i'IAt,li?iV;;!;".t\<l "tnl.ttf,'t~:I~,\~t..{~:.,:;~VM\tJ'.Jrl(:i/.~.JII.~~i.~(~i~~tif.~i'fl'~ 11~.~.it.~1~N~~.'(I~.fJ~.:ifa~h.~Jl'~~~'~;~MIi.*,.I;:'W:f.("~',"":~'~*'''~,.')~' ::.~~.,.;, ..." '/0,\' I . ..'
2.
3.
4.
5.
6.
7.
8.
9.
I.
Are the required safety programs presented ~
and/or attcnded during thc year......................~ NO
2. Is a suitable identification system used to
identify the plant's piping system...................... @ NO
:1. Has lhe operator laken steps to remove or
minimize safety hazards........................... ..... ..~NO
4. Are all personnel provided with a shower and
locker for their work clothes........................... ~ NO
5. Are personnel trained in First Aid & CPR........ @ NO
6. I-lave the following proper safety signs been
provided such as: Non-potable Water, Chlorine
l-lazard, No Smoking, High Voltage, Wateh ~
Your Step Signs in Certain Areas) & Exit Signs, '\(ES)' NO
7. Is your Facility safely program Up to Date
(Worksarc Program)........................................ YES @)
(ft YES) /33
100 - q q
%
x
(# YES + II NO)
)33 + ) ::t3i.f
N/A
N/A
N/A
N/A
N/A
N/A