Loading...
HomeMy WebLinkAbout05) May [ r __ I.,," Operated By: Environmental [ Mailageme~~rpOration L [ r I L~ [ r- t ~..;;I r l t.. r I ..."" [ r L r L..." r rr- ~ i r r r: ~'''" Monthly Report 1996 ,-, I ~ _"C'.'- r""l :;:1 ".",-1 [ ENVIRONMENTAL MANAGEMENT CORPORATION 701 CHAMPION ROAD JEFFERSONVILLE. INDIANA 47130 812-285-6451 FAX 812-285-6454 June 24, 1996 c. Richard Spencer, Jr. City of Jeffersonville City/County Building Jeffersonville, IN 47130 Dear Dick: Enclosed please find Environmental Management Corporation's (EMC) "Operations Report" for the month of May 1996, containing information on the following: 1.0 Effluent Quality 2.0 Facility Operations 2. 1 Pretreatment 3.0 Preventive and Unscheduled Maintenance 3.1 Maintenance &" Repair Expenditures 3.2 Repair & Replacement Expenditures 3.3 Capital Improvement Expenditures 3.4 Electrical Expenditures 4.0 Facility Safety and Training 5.0 Sewer Collection System As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we are available to discuss this report, or any other aspect of our operations, at the convenience of the City. r Ld Sincerely, ENVIRONMENTAL MANAGEMENT CORPORATION ~d~ Kendall S. Coleman Facilities Manager f1 t.: KSC:dmk r: Lj ~ I L. D c ~ tU D [' , j ',J [,; .::~ C r ! L.c~ 1.0 EFFLUENT QUALITY During May, efl1uent quality was within NPDES permit limits for CBOD and TSS concentrations. Efl1uent ammonia (N.H3) concentration, TSS and NH3loading limits were exceeded in May, Table 1.1 summarizes the effluent quality data. Attachment A contains Time Series Plots of daily CBOD and TSS values. Table 1.1 EFFLUENT QUALITY Parameters Permit Limit Monthly Average mglL mglL Carbonaceous 15 5 Biochemical Oxygen Demand (CBOD) Total Suspended 18 12 Solids (TSS) Fecal Coliform 200 102 (Colonies/ 100 ml) Chlorine Residual .05 daily 0,04 Maximum Ammonia 1.5 2 Flow 5.2 8.169 (MGD) MOR JEFFERSONVILLE, IN [ f"i ':.1 ..,,~ 2.0 FACILITVOPERATIONS Attachment B contains a list of septic haulers that discharged during the month of May. High flows were experienced throughout the month due to the heavy rains and the high elevation of the Ohio River. The high river elevation causes backwater to enter the Tenth Street lift station and the treatment facility. Along with this, the high water elevation of the Ohio River caused inflow and flooding of the Meigs Avenue, Spring Street, and Graham Street Combined Sewer Overflows (CSO's). All of this excess water enters the sewer system and gravity flows to the Tenth Street lift station and is then pumped to the facility for treatment. This problem causes excessive wear of equipment, increased electrical usage which creates extra cost, and hydraulic overload of the lift station and treatment facility. The hydraulic overload does have an adverse effect on the treatment processes and effluent quality. As discussed previously, The NH3 concentration, NH3 and TSS loading limits were exceeded during May. The NH3 concentration excursion was created by the high peak flows and the need to run the aerators at reduced speed. Running the aerators in the low or off position, allows the operators to control sludge blankets and potential bulking of the final clarifiers during the high peak flow events. This procedure left limited time for increased aeration to recover biological nitrification, which is necessary for NH3 removal. The NH3 and TSS loading limits were exceeded due to treating flows in excess of our design daily average flow of5.2 MGD. The actual daily average was 8.169 MGD. The loading limits are not attainable when the monthly average flow exceeds the 5.2 MGD design average flow. The loading limit should be calculated from the design peak flow of 22.8 MGD. This issue has been discussed with IDEM officials and they agree that this limit should be changed. PRETREATMENT During May, all of the industries were in compliance with their discharge permit. Custom Plating was sampled and inspected and found to have minor deficiencies. Some of the deficiencies were, improper sampling procedures and handling of samples, inadequate access to the sample point for compliance sampling, lack of solids removal, and housekeeping. As a result of the deficiencies, they have agreed to a compliance plan to address the problems within 90 days. EMC will continue to work with all industries, to ensure compliance with their industrial discharge permit limits. MOR JEFFERSONVILLE. IN 3.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE Preventive maintenance was performed on all equipment as scheduled in May. There were 58 unscheduled maintenance tasks performed. All were minor except for: ~ Replace trunnion on #2 sludge transfer pump ~ Grit cyclone cone replacement ~ Relay replacement at Louise St. lift station ~ Repair of#3 Bunton mower ~ Replaced Power monitor at Silver Creek lift station ~ Unplugged pumps and cleaned wetwell at Magnolia St. and Louise St. lift station. A list of unscheduled maintenance work orders is included as Attachment C. Maintenance and repair expenditures for the month of May are detailed in Attachment D. Table 3.1 represents the total amount expended in May, and for the year. Table 3.2 includes the same information for repair and replacement expenditures. Attachment E contains a detail of repair and replacement expenditures for the year. Table 3.1 MAINTENANCE & REPAIR EXPENDITURES Time Period Amount Budget (Over) Expended Under May $4,370 $4,200 ($170) Year-To-Date $4,370 $4,200 ($170) ......- o MOR JEFFERSONVillE. IN r- L Table 3.2 REPAIR & REPLACEMENT EXPENDITURES Time Period Amount Budget (Over) Expended Under May $4,309 $8,334 $4,025 Y ear- To-Date $4,309 $8,334 $4,025 3.3 CAPITAL IMPROVEMENT EXPENDITURES Attachment F details Capital Improvement expenditures for the contract period of May 1, 1996 through April 30, 1997. 3.4 ELECTRICAL EXPENDITURES Table 3.4 relates to electrical expenditures for May, 1996. Table 3.4 ELECTRICAL EXPENDITURES Time Period Amount Budget (Over) Expended Under May 17,658.32 14,765.75 (2,892.57) (estimated) Year-to-Date 17,658.32 14,765.75 159,530.32 , n MOR JEFFERSONVILLE, IN r L r"J .' ! 'lJ D 4.0 FACILITY SAFETY & TRAINING Safety inspections were conducted on May 23, 1996. The rating was 98%. The deficiencies reported were: .. Materials have not been stored properly. .. Trip hazards are present at maintenance building inner doorways. .. All employees have not received first-aid and CPR training A copy of the Safety Inspection report is included as Attachment G. On May 22, 1996 CPR training was conducted by a representative of Red Cross at the facility. 5.0 Sewer Collection System During the month there were 39 sewer calls. The calls were related to the following: .. Twenty- seven were related to heavy rain. .. Nineteen reported sewer backup's. .. Six were due to blockages within the City's main line 2 were caused by roots. .. Fifteen were related to blockages within the residents line Three were due to odor complaints. Table 5.1, on the next page, details the data on May's sewer projects. MOR JEFFERSONVILLE. IN o c r-"' L j L Table 5.1 MONTHLY COLLECTION SYSTEM ANALYSIS Project May Year to Date Sanitary Sewer Cleaned I Feet 13,840 13,840 Storm Sewer Cleaned I Feet 937 937 ~ Catchbasins Cleaned Grate Tops = 90 Grate Tops = 90 Vactored = 12 Vactored = 12 Catchbasins Raised 1 1 Manholes Raised 5 5 Wetwell Cleaned 2 2 Force Main Repair 1 1 Catchbasins Rebuilt 1 1 Sewer Televised I ft 4,581 4,581 Sewer Tap Inspections ......- Dye Testing 4 4 Manhole Castings Replaced 1 1 Air'T'.-.... Complaints Backup Odor Main Block Resident Storm Received Problem Related 39 19 3 6 15 16 Locates Roots Catch Basin (;Q ? 11 MOR JEFFERSONVillE, IN C,: ,.1 1 l'l !...<\ 1..1 Jj ATTACHMENTS - A TIME SERIES PLOTS B MAY SEPTIC HAULERS C UNSCHEDULED MAINTENANCE WORK ORDERS D MAINTENANCE & REPAIR EXPENDITURES E REPAIR & REPLACEMENT EXPENDITURES F CAPITAL IMPROVEMENT EXPENDITURES FOR 1996 G SAFETY INSPECTION REpORT MOR JEFFERSONVILLE. IN [ n L1J [I , : ,_':'","i ~ l~ JEFFERSONVILLE W ASTEW A TER TREATMENT FACILITY May 1996 Septic Haulers Loads Delivered To Treatment Facility -. ,..~. --- Hauler May Hauler Total --- IY,/,/U Rumpke of 5 5 Indiana TOTAL 5 5 ",,",,___n_..____ -- - ~ .. ----'"'.....---..- -.......'""'--.. .....-- --- -- ---. .---- -- _u. --- -- ~;, : -'''"""_''0'--- -- .<..""".- -- -"-_."._~::~-,:"~ --- " .------".---- -' ::.:::",,,,:;:;~:"~:' --- -... Gallons Delivered To Treatment Facility -- .- Hauler May Hauler Total ---- IV""1l Rumpke of 4,030 4,030 Indiana TOTAL 4,030 4,030 MOR JEFFERSONVillE, IN [ 0"'1 /11 ":.] II ATTACHMENT A Time Series Plots ..... .] JEFFERSONVILLE" IN 1" '~'l"."J "'~"""1 ' 1 P] . Jeffersonville Wastewater Treatment Facility Daily CBOD & TSS 135 --l 1 115 95 75 ~ 55 , - EFFLUENT CBOD - EFFLUENT TSS 35 I_PERMIT CBOD -PERMIT TSS \(HHHHHHHl , Ji........................... . ... H............H.......................................................................HJy\HH~........... ................ 15 ~5 May 1996 ATTACHMENT B Unscheduled Maintenance Work Orders i JEFFERSONVILLE. IN 06/18/96 Page WORK ORDER HiSTORY REPORT ===:==============:============~==================================================================================================: EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR MATERIAL COST COST TOTI cm EQUIPMENT NUMBER WORK ORDER W.O.. NUMBER TYPE ==================================================================================================================================: 05/07/96 0.000 -None- 9600720 REPAIR PARTS USED : QTY USED ITEM NUMBER 2.0 10W30 1.0 27002 1. (I SP-3(1 TASK DESC SERVICE 3/1 PUMP - PORTABLE DESCRIPTION OIL FUEL LI NE BATTERY COST 2.30 . 0.90 15.75 DAl OS/07/S 05/07/9 05/07/9 TOTALS ----------------------------------------------------------------------------------------------------------------------------------- : (LABOR HOURS -) Total: 2.000 Reg: 2.00 Ot: 0.00) 0.000 23.08 18.95 42.0 w_____________________________________________________--------------------------------------~--------------------------------------. EQUIP TOTALS : (lABOR HOURS -) Total: 2.000 Reg: 2.00 Ot: 0.00) 0.000 23.08 18.95 42.0 ===========================================================================================================:======================:. -None- 9600727 REPAIR 05/08/96 0.000 PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATI 1.0 R-1642 MH LID 62.00 05/08/9/ 1.0 Rl642 MH FRAME 82.00 05/08/9/ TASK DESC REPLACE CASTING AND LID ON MANHOLE AT POINT LIQUORS TOTALS ------------------------------------------------------------------------------------------------------------------------------------ : (LABOR HOURS -) Total: 4.500 4.50 Ot: 0.00) 0.000 50.85 144.00 194.B~ Reg: , ..' . ------------------------------------------------------------------------------------------------------------------------------------ i-None- 9600748 REPAIR OS/20/96 0.000 ! PARTS USED QTY USED ITEM NU11BER DESCRIPTION COST DATE 1.0 STRING HEAD 38.00 OS/20/96 : TASK DESC ReplACE HEAD ON WEED EATER !---~----------------------------------------------------------------------------~-----------------~------~~------------------------- TOTALS : (lABOR HOURS -) Total: 0.500 Reg: 0.50 Ot: 0.00) 6.25 38.00 44.25 0.000 ~------------------------------------------------------------------------------------~---------------~----~------------------------- i EQUIP TOTALS : (LABOR HOURS -) Total: 5.00(1 Reg: 5.000t: 0.00) 0.000 57.1b 182.00 239.10 ~===================:=============================================================================================================== [l [J 1 BARSCREEN 1 I TASK DESC COMMENTS 9600530 REPAIR BARSCREEN Ul UNPLUG COMPACTOR RAM JAMMED WITH BOARDS & ROCKS 05/01/96 0.000 T----------------------------------------------------------------------------------------------------------------------------------- i TOTALS : (LABOR HOURS -) Total: 2.000 Reg: 2.00 Ot: 0.00) 0.000 25.00 0.00 25.00 ---------------------------------~-----------------------------~---------~-----------------------~-------------------------~------- EQUIP TOTALS : (lABOR HOURS -) Total: 2.000 Reg: 0.000 25.00 0.00 25.00 2.00 Ot: 0.00) , ~======================================~==:================================~===============================~=======================: i 1 BUNMOWI 1 TASK DESC COMMENTS 9600742 REPAIR BUNTON MOWER WON'T RUN FULL SPEED SCREW NEEDED TO BE ADJUSTED & TIGl-ITENED OS/24/96 0.000 I TOTALS ~---------------------------------------------------------------------------------------------------------~------------------------- , 0.500 : (LABOR HOURS -) Total: Reg: 0.50 Ot: 0.00) 6.25 6.25 0.00 0.000 JEFFERSONVILLE. IN 06/18/96 WORK ORDER HISTORY REPORT Page 2 =================================================================================================================================:: TOTAl CDS' EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR MATERIAL COST COST ======================================================================================================================:============: EQUIP TOTALS : (LABOR HOURS -> Total: 0.500 Reg: 0.50 at: 0.001 0.000 6.25 0.00 6.2: 1===================================================================================================================================: lBUNMOWK2 PARTS USED TASK DESC 9600745 REPAIR MOWER QTY USED ITEM NUMBER 1.0 36" - 2 18" CHANGE BLADES 05/16/96 0.000 COST DATE 05/16/9t DESCRIPTION BLADES 22.03 ------------------------------------------------------------------------------------------------------------------------------------ 33.91 TOTALS : (LABOR HOURS -) Total: 1.000 Reg: 1.00 Ot: 0.00) 0.000 11.88 22.03 ------------------------------------------------------------------------------------------------------------------------------------ 33.91 'EQUIP TOTALS : (LABOR HOURS -) Total: 1.000 Reg: 1.00 Ot: 0.001 0.000 11.88 22.03 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 9600747 REPAIR BUNTON MOWER ~3 QTY USED ITEM NUMBER DESCRIPTION 1.0 BTN 0622 PULLEY 1.0 BTN 1126 1. 0 BTN 6140A ASSEMBLY CUTTER . 1 .0 BTN 643 V BEL T 1.0 BIN 821 PULLEY i TASK DESC REPLACE PULLEYS, SHAFTS: BEARINGS: & BELT L______________________________________________________---------~----------------------------~-----------------------------~-------- 1 BUNMOWlt3 PARTS USED TOTALS 05/10/96 0.000 DATE 05/10/96 05/10/96 05/10/96 05/10/96 05/10/96 143.93 ------------------------------------------------------------------------------------------------------------------------------------ 143.93 COST 26.57 1.72 21.00 14.50 14.30 : (LABOR HOURS -) Total: 5.500 Reg: 5.50 Ot: 0.001 0.000 65.84 78.09 i . ~QUIP TOTALS : (LABOR HOURS -> Total: 5.500 Reg: 5.50 Ot: 0.001 0.000 65.84 78..09 ===========================================================================================================:======================== iCLARIFIER3 ! PARTS USED i TASK DESC TOTALS 9600749 REPAIR SECONDARY CLARIFIER 113 QTY USED ITEM NUMBER DESCRIPTION 1.0 WEIR BRUSHES ASSORTED (8) REPLACE BRUSHES OS/20/96 0.000 DATE OS/20/96 178.32 ------------------------------------------------------------------------------------------------------------------------------------ 178.32 COST 153.32 : (LABOR HOURS -) Total: 2.000 Reg: 2.00 Ot: 0.001 0.000 25.00 153.32 EQUIP TOTALS : (LABOR HOURS -) Total: 2.000 Reg: 2.00 Ot: 0.00) 0.000 25.00 153.32 ===================================================================================================================:=:=:======:===== 05/13/96 0.000 lGRITCYCLONE1 9600737 REPAIR GRIT CYCLONE I PARTS USED QTY USED ITEM NUMBER DESCRIPTION 1.0 50707AG CONE I TASK DESC REPLACE CONE COST 89.00 DATE 05/13/96 TOTALS , -r------------------------------------~----------------------~---~---------------~-------~------------------------------------------ 139.00 : (LABOR HOURS - > Tota 1: 4.000 4.00 Ot: 0.001 0.000 50.00 89.00 -------------------------------------------------------.----------------------------------------------------------------------------- ~ [J Reg: JEFFERSONVILLE, IN 06/18/96 WORK ORDER HISTORY REPORT Page 3 =================================================================================================================================== TOTA CDS EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED LABOR MATERIAL COST COST ====================================================================================================================:============== 89.00 139.0 DOWN TIME EQUIP TOTALS : (LABOR HOURS -) Total: 4.000 Reg: 4.00 Ot: 0.00) 0.000 50.00 ==============================================================~==================================================================== 05/06/96 0.000 lSlDGTRANSFER2 9600531 REPAIR SLUDGE TRANSFER PUMP n2 PARTS USED : QTY USED ITEM NUMBER DESCRIPTION 1.0 DISK SUCTION 1.0 PUD 113 TRUNNION TASK DESC REPLACE SUCTION DISK & TRUNNION COST 330.10 119.11 DATI 05/06/91 05/06/9/ TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 510. O~ : (LABOR HOURS -) Total: 5.300 Reg: 5.30 Ot: 0.00) 0.000 60.83 449.21 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -> Total: 5.300 Reg: 5.30 Ot: 0.00) 60.83 449.21 0.000 510.04 ========~=========:============;=====================================================================:============================== 4VEHICLE23 PARTS USED TASK DESC 9600733 REPAIR FORD F-150 PICK-UP ~7155 QTY USED ITEM NUMBER DESCRIPTION 1.0 E8TZ-9943052-A CABLE ASSEMBLY 1.0 F4PZ-14A411-C WIRING KIT 1.0 F5HZ-175Q8-A MOTOR ASSEMBLY CHECK CLUTCH: WIPERS: & SAFETY SWITCH OS/29/96 0.000 DATE OS/29/96 OS/29/96 OS/29/96 ------------------------------------------------------------------------------------------------------------------------------------ I I TOTALS : (LABOR HOURS -) Total: 1.000 Req: 1.000t: 0.00) 0.000 11.54 83.77 95.31 COST 13.17 17.99 52.61 fQUIP TOTALS : (LABOR HOURS -) Total: 1. 000 Reg: f==================================='================================================================================================ I 95.31 1.00 Ot: 0.00) 11.54 83.77 0.000 n LJ 5eRUMS LANE II 9600730 REPAIR CRUNS LANE II L.S. ! TASK DESC CLEAN WETWELl & PULL #2 PUMP 05/10/96 0.000 TOTALS I ~------------------------------------------------------------------------------------------~--------~--------~-----~-----~--------- 124.60 : (LABOR HOURS -) Total: 11.000 124.60 0.00 1----------------------------------------------------------------------------------------------------------------------------------- Reg: 11.00 Ot: 0.00) 0.000 EQUIP TOTALS : (lABOR HOURS -) Total: 11.000 Reg: 11.00 Ot: 0.00) 0.00 124.60 =========================.==========:================================================================================================ 5'LOUISE ST. i PARTS USED TASK DESC COMMENTS 0.000 124.60 9600735 REPAIR LOUISE STREET l.S. QTY USED ITEM NUMBER DESCRIPTION 1.0 READY ELECTRIC TROUBLESHOOT 1.0 RELAY Repair CONTROLS NOT WORKING PROPERLY #2 PUMP WAS PLUGGED- ROOTS CLEANED WETWElL - lOTS OF GREASE AND GRIT 05/16/96 0.000 DATE 05/16/96 05/16/96 , , -T---------------------------------------------------------------------------------------------------------------------------------- TOTALS : (lABOR HOURS -) Total: 13.500 Reg: 13.500t: 0.00) 0.000 151.56 206.01 357.57 COST 159.49 46.52 ------------------------------------------------------------------------------------------------------------------------------------ r- JEFFERSONVillE, IN 06118/96 WORK ORDER HISTORY REPORT Page 4 =====================================================================================================================:============: TOTI W EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR MATERIAL COST COST ==================================================================================================================================: 151.56 206.01 357 .~ EQUIP TOTALS : (LABOR HOURS -) Total: 13.500 Reg: 13.50 at: 0.00) 0.000 ==================:================================================================================================================ r I I L, 5MAGNOLIA 5T TASK DESC 9600532 REPAIR. MAGNOLIA ST. l.S. CLEAN WETWELL: UNPLUG PUMPS: CLEAN STATION 05/01/96 0.000 TOTALS ----------------------------------------------------------------------------------------------------------------------------------- 575.19 0.00 575.1 [ : (LABOR HOURS -) Total: 46.000 Reg: 34.00 Ot: 12.(0) 0.000 ----------------------------------------------------------------------------------------------------------------------------------- 5MAGNOLIA ST TASK DESC COMMENTS 9600729 REPAIR MAGNOLIA ST. L.S. : SUMP NOT WORKING PROPERLY : FOUND PIPING PROBLEM TIGHTENED 05/09/96 0.000 TOTALS -----------------------------------------------------------------------------------------------------------------------------------. 34.75 0.00 34.7: : (LABOR HOURS -) Total: 3.000 Reg: 3.00 Ot: 0.00) 0.000 -----------------------------------------------------------------------------------------------------------------------------------~ 5MAGNOLIA ST TASK DESC COMMENTS 9600513 REPAIR MAGNOLIA ST. L.S. 05/13/96 0.000 PULL WORST PUMP FOR MECHANICAL SEAL RETROFIT/ REBUILD CLEANED WETWELL LOTS OF GREASE REMOVED DEBRIS FROM BOTH PUMP VOLUTES STATION IS WORKING MUCH BETTER HOLD ANY REVISION PLANS - EVALUATE , TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 279.89 0.00 279.8S : (LABOR HOURS -) Total: 25.000 Reg: 25.00 Ot: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ i 'EQUIP TOTALS : (LABOR HOURS -) Total: 74.000 Reg: 62.00 Ot: 12.00) 0.000 889.84 889.84 0.00 ---.-----.--------------------------------------------------------------------------------------------------------------------------- -----------------------.------------------------------------------------------------------------------------------------------------ 'SPOWERHOUSE PARTS USED u , i TASK DESC 9600734 REPAIR POWERHOUSE L.S. QTY USED ITEM NUMBER DESCRIPTION 1.0 N/O FLOAT REPLACE LAG PUMP FLOAT 05/08/96 0.000 COST 30.00 DATE 05/08/96 TOTALS ---------------------------------------------------------------------------------------------~----------~-~~------------------------ 23.17 30.00 53.17 : (LABOR HOURS -) Total: 2.000 2.00 Ot: 0.(0) 0.000 ------------------------------------------------------------------------------------~---------------------~~------------------------ i 5POWERHOUSE PARTS USED TASK DESC Reg: 9600728 REPAIR POWERHOUSE L.S. QTY USED ITEM NUMBER DESCRIPTION 1.0 FLOAT NORMALLY OPEN LAG PUMP NOT COMING ON 05/09/96 0.000 COST 30.00 DATE 05/09/96 ---------------------------------------------------------------------------------------------------------------------~-------------- TOTALS : (LABOR HOURS -> Total: 3.000 Reg: 3.00 Ot: 0.(0) 0.000 34.75 30.00 64.75 1--------~---------------------------------------------------~---------------------------------------------------------------------- EQUIP TOTALS : (LABOR HOURS -> Total: 5.000 Reg: 5.000t: 0.00) 0.000 57.92 60.00 117.92 ==================================================================================================================================== , i 5SIlVER CREEK PARTS USED TASK DESC 9600736 REPAIR SILVER CREEK L.S. QTY USED ITEM NUMBER DESCRIPTION 1.0 PHASE LOSS RELAY VIA READY ELECTRIC REPLACE PHASE MONITOR - BURNT OUT 05/17/96 0.000 COST 122.20 DATE 05/17/96 ------------------------------------------------------------------------------------------------~----------------------------------- I TOTALS : (LABOR HOURS -> Total: 7.500 Reg: 3.500t: 4.00) 0.000 93.47 122.20 215.67 _1_________________ ----------------------------------------------------------------------------------------------------------------- JEFFERSONVILLE, IN ~,j _; I :~ '''; ~ LJ [l rU D" j'".1 , I "d 06/18/96 WORf~: ORDER HISTORY REPORT Page 5 ===========================================================================:===============================:======================:; EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST TOTAL COSl EQUIP TOTALS : (LABOR HOURS -) Total: 7.500 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 215.67 Reg: 3.50 Ot: 4.001 0.000 93.47 122.20 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ GRANDTOTALS: (LABOR HOURS -) Total: 139.300 Reg: 123.30 Ot: 16.00) 0.000 1653.91 1464.58 JEFFERSONVILLE, IN 3118.49 r tlJ 06/12/96 Paoe 1 (J i WORK ORDER HISTORY REPORT . t.,' J: ==== 4== ===== ========= == === == = = = = = === = == == === === = = == = == = == = = = == = === = == ===== === == = = = == == ===== = = = = == ====== == === ===== ==== ===== ======== = 'EQUIPMENT WORK ORDER W.O. EQUIPMENT TASK I1TASK DATE DOWN LABOR MATERIAL TOTAL ~UI1BER NUMBER TYPE DESCRIPTION NO. NO. CLOSED TIME COST COST COST ~i____~________________________________________________c____________________________________________________~________________________ Id~~~~~~-~~~~~~---~~~~;;~-----~~~~~~----~~~~~~--~~~~~~-~~~~-~~~~~---------------;;;~~;~~----~~~~~------------------------------------ TASK DESC : CUT OFF PINS ON WALL - SAFETY HAZARD r " t,.-~~~~[~------~--~~~BO~-~~~;~-=;---~~~~~~-----;~~~~---------~~~~-----;~~;-;~~---;~~~~------;~;;;------;~~~-------~;~;~--------;~~~~ ------------------------------------------------------------------------------------------------------------------------------------ ~UlP tOTALS : (LABOR HOURS -) Total: 2.000 Reg: 2.000t: 0.00) 0.000 21.46 0.00 21.46 ~f====f============================================================================================================================= GRANDTDTALS: (LABOR HOURS -) Total: i 2.000 Reg: 2.00 Ot: 0.(0) 0.000 21.46 0.00 21. 46 [ ~ fl 1:1 D fi [J D;1 i.! : ~ [,I )"j J< '-,"'; JEFFERSONVILLE, IN e/12/J6 Page 1 WORK ORDER HISTORY REPORT -~~----~---------======-=========================================================================================================== ~~~i;~~~i--------~ORK OR~ER W.O. EQUIPMENT TASK MTASK DATE ,DOWN LABOR MATERIAL TOTAL NUMBER NUMBER TYPE DESCRIPTION NO. NO. CLOSED TIME COST COST COST =~i=====i=========================================================================================================================== _~i\llp lev~l-- 9600740 PROJECT Overall Facility 05/31/96 0.000 TASK DESC : KILL WEEDS ARROUND PLANT --f4-------------------------------------------------------------------------------------------------------------------------------- ~... 'TALS : (LABOR HOURS -) Total: 0.500 Reg: 0.500t: 0.(0) 0.000 6.25 0.00 6.25 __~~L____l__________________________________________________________________________________________________________________________ EQUIP TOTALS : (LABOR HOURS -) Total: 0.500 Reg: 0.500t: 0.(0) 0.000 6.25 0.00 6.25 ==~;=============================================================================================================================== -None- 9600722 PROJECT 05/02/96 0.000 r-lTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE l[j i 1.0 6" CAM LOCK FITTING 45.62 05/02/96 TASK DESC INSTALL FITTINGS & PREPARE HOSES FOR USE --~~L;--~---~--iL~~~-~~~~~-=;---~~~~~~-----;~;;~---------~~~~-----;~;;-~~~---~~~~~------~~~~------;:~~~--~----~;~:;--------~~.8~ __J=='_________________________________________________________________________________________________________________-------------- EQUIP TOTALS : (LABOR HOURS -) Total: 3.250 Reg: 3.250t: 0.001 0.000 36.18 45.62 81.80 ===[j================================================================================================================;============== ~lFIlTRATEPUMP2 9600738 PROJECT FILTRATE PUMP #1 05/30/96 0.000 P~....,S US~.D :QTY USED ITEM NUMBER DESCRIPTION COST DATE [I i 1. 0 CHAIN CONNECTORS 5.98 05/30/96 oJ' 2.0 EYE BOLTS 1.56 05/30/96 TASK DESC : HANG CHAIN IN WETWELL - FILTRATE TO DIGESTERS ~__J, ~____L__________________________________~_____________________________________________________________________________________ T~:1s ! : (LABOR HOURS -) Total: 3.000 Reg: 3.000t: 0.00) 0.000 35.56 7.54 43.10 .-----------------------------------------------------------------------------------------------------------------------~----------- 'QUlnOTALS: (LABOR HOURS -) Total: 3.000 Reg: 3.000t: 0.00) 0.000 35.56 7.54 43.10 Ii,! ' ;==~::===r:======;================================================================================================================ POl~RMIX2 9600743 PA(' i USE9 : QTY USED ~~: 4.0 TASK DESC : CLEAN .--~----~------------------------------------------------------------------------------------------_______________~l_____________ ro~:_'S ': (LABOR HOURS -) Total: 0.500 Reg: 0.500t: 0.(0) 0.000 6.25 3.5b 9.81 PROJECT POLYMAX POLYMER MIXER U2 ITEM NUMBER DESCRIPTION BLEACH OS/24/96 0.000 COST 3.56 DATE OS/24/96 ---------------------------------------------------------------------------------------------------------------------------------- J~~~~~~~~L_:__!~~~~~_~~~~~_=~___~~~:~~_____~~~~~_________~:~~_____~~~~_~~:___~~~~~______~~~~~_______~~:~________~~~~_________~~~! ---': r----r---~------------------------------------------------------------------_________________________________________________ L! . RTIHPRINGS fASI: lESe . : :OMK..,hs 9600716 PROJECT ARTIC SPRING L.S. VACUUM 2 MANHOLES ON CSO #14 JETTED 24" LINE 40 FEET PER BOB MILLER ._-~----j---------------------------------------------------------=---------------------------~--------------------------------- l" I OOTA ': (LABOR HOURS-) Total: 3.000 Reg: 3.000t: 0.(0) 0.000 33.54 0.00 33.54 05/07/96 0.000 -------------------------------------------------------------------------------------------------------------------------------~- TI C r"'?l..........: R I NGp :1 I .J i 9600389 PROJECT ARTIe SPRING L.S. 05/13/96 0.000 JEFFERSONVILLE. IN n 6l/96 Page 2 WORK ORDER HISTORY REPORT ;~~~~~;========~~;~=~~~~~==~:~:======~~~;;~~~;==================;~~~=~;~;~=======~:;~=====;~:~======~~;;~====~:;~~;~~========;;;~~ UMBER NUMBER TYPE DESCRIPTION NO. NO. CLOSED TIME COST COST COST =;, ~=~;~J===;==~~;=;;~;=;;;:=;;~=:~~=;'=;~;;======================================================================================= C~ENTS : JET CLEANED LINES DYED 57 & 1833 OK _~j[J_____l_____~~_~::~~~:~_~~~~_::_:_~~_______________________~___________________________________________________________________ TOTALS : (LABOR HOURS -) Total: 6.000 Reo: 6.00 Dt: 0.00) 0.000 65.28 0.00 65.28 __~_____L________________________________________________~_~_____________________________________________________________________ ~UI~)OTALS : . (LABOR HOURS. -) Tatal: 9.000 Reg: 9.00 Dt: 0.00) 0.000 98.82 . 0.00 98.82 ~---------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------- 'JTIrD I 9600528 PROJECT UTICA STATION I PA~,S USEO : QTY USED ITEM NUMBER DESCRIPTION 3.0 SILICONE CAULK Tr DESC' : SEAL DOORS FROM RIVER INFILTRATION ~..--~,L.,:.l_---+-----------------"':......;.---------------------------------~----------___;..;..;.._._.________..;.._____...:__.______.;....;___~__....____..;.,.____________ 05/01196 0.000 COST 12.45 DATE 05/01196 TOTALS : (LABOR HOURS -) Total: 2.000 Reg: 2.00 Ot: 0.0(1) 0,000 21.46 12.45 33.91 ._-~._----~----------------------------------------------------------------------------------------------------------------------- IUI(mALsi : (LABOR HOURS -) Total: 2.000 Reg: 2.000t: 0.00) 0.000 21.46 12.45 33.91 :=~z====~=======:================================================================================================================== GRR~!TOTALS: (LABOR HOURS -) Total: w 18.250 Reg: 18.25 at: 0.00) 0.000 204.52 69.17 273.69 IJIi.E JEFFERSONVILLE, IN Jun 1::::, 1996 "7: 16 pm Pa<z.je 1. El"1C JEFFERSONVILLE SEWER DEPT. 70:1. CI.-jAI1P ION RD JEFFERSONVILlE,IN 47130 Unscheduled Maintenance History Selection Criteria: Str'uctun:e NumbE~r"..."".. "nIl Date (Date Completed)... .05/01/96 to 05/31/96 t1aintenance Code....... .(~ll Type of Maintenance...".Unscheduled Maintenance Structure Type. ..... ....AIl ======================:==================:============================= Hequest Number Structure Type/Number Date Complete Type of Problem ~53 --------- -------------------.---.--.-.-------- --------- --------.------------------ 056 05/6 5-'-06 5/8 :109 058 0509 5-1LJ. <YS 15 :'515 0:516 52c) L- ",:":\ ...J.._ 523 0525 528 529 530 531 43 51.6 c C L r"l L L i'" lyl 1'1 L I... ("' L. 1'1 C L C C C i"l P P 05/03/96 CATCHBASIN CLOGGED 05/06/96 CATCHBASIN CLOGGED 05/07/96 BASEMENT FLOODED 03/07/96 MANHOLE COMPLAINT 8-1.8 05/08/96 CITY SEWER CLOGGED 6-14 05/09/96 SEWER EVALUATION 05/09/96 MANHOLE COMPLAINT 05/09/96 MANHOLE COMPLAINT 05/14/96 MANHOLE COMPLAINT 05/15/96 BUSINESS COMPLAINT 05/16/96 CONFIHM SEWER CONNECTION 05/16/96 CATCHBASIN CLOGGED OS/20/96 CITY SEWER CLOGGED OS/21/96 MANHOLE COMPLAINT OS/23/96 CATCHBASIN CLOGGED OS/25/96 RESIDENT COMPLAINT OS/28/96 CATCHBASIN CLOGGED OS/29/96 RESIDENT COMPLAINT 05/30/96 CATCHBASIN CLOGGED 05/31/96 MANHOLE COMPLAINT 05/12/96 PIPING PROBLEM 05/16/96 MANHOLE NEEDS CLEANING 'iBl:j1.l. E:-2C;'-- 6.-1..- 6-:5 6-6 II. fi U ==========~===========::=::==::=============::=========================== r t L.. r I . L. JEFFERSONVILLE, IN Jun 12, 1 tiC?/J /'~18 pm Page 1 r L-,J Ei'IC JEFFERSONVILLE SEWER DEPT. "7 ():L C:;H(~IYIP I UN F{D JEFFERSONVILLE, IN 4/'130 Line Segment/Manhole/Catch 8asin Maintenance History Selection Criteria: StructurE~ Number....... .r:111 Date (Date Completed>...05/01/96 to 05/31/9/J Maintenance Cod,~....... .(..'111 Type of Maintenance.....All Structur'~ TypE~........... .(-)ll -------.---.--....-.-----.....--.--.-..--......--.----------.-.-----.-.-.------------------------------ ---------.-----.------.---.--------.----.-------------------------------~-~--- Structure Number Pump Maintenance Code Last Date ~:5 -- ~5 -- 3-,,11 113-..'!-4 L L TELEVISE LINE SEGMENT T~LEVISE LINE SEGMENT 05/17/'76 OS/20/96 18-67- ====================~================================================ r , , I..~ JEFFERSONVILLE, IN ,....... fl') I l__ JUfl 1.2, 19()6 '7::L~j pm Page 1 E!"y! C JEFFERSONVILLE SEWER DEPT. 701 CH{4I'iFlIOI\I RD JEFFERSONVILLE, IN 47130 Unscheduled Maintenance History Selection Criteria: Structure Number........All Date COate Completed).. .05/01/96 to 05/31/96 Maintenance Code. .......0013 Type of Maintenance.....Unscheduled Maintenance StT'UCtUT"'f:o' Tyopc,?......."" Ca tcl"'i Da~";:i. n -----.-----..--.---.---...---......-.-..---.-.....--.--...--..---------.--....-----.-..-------------------------- --------------------..---------.-.--.---.------------------.------------------------ Heque~; t Number Structure Type/Number DatEo) Complete Type of Problem --------- ---.--------------.-------------- --------- ---------------------------- c 0' ,:-,1 , i ,,'.-] ~:I 2.') c c: 05/03/96 0::i/06/96 05/16/96 O::i /2:")/96 05/:028/96 05 /~:50/96 CATCH8ASIN CLOGGED CATCH8ASIN CLOGGED CATCHBASIN CLOGGED CATCH8ASIN CLOGGED ( CATCH8ASIN CLOGGED CATCHBASIN CLOGGED 056 0:':.; 1 6 c C C 5:23 ~'i28 530 C~ ==============~====================================================== [ JEFFERSONVILLE, IN r"' , L L. r ....; [ c D fj lL1 O:i :'. I "j C ATTACHMENT C Maintenance & Reoair Exoenditures JEFFERSONVILLE, IN [.: l:.::'1 fi ~:,,:J Tuesday, June 18, 1996 MAINTENANCE AND REPAIR EXPENSES Jeffersonville, Indiana Page 1 P.O. Uate Description AmoUlll 5/2/96 VALVES FOR CHLORINE & S02 SCALE CALIBRATION $11.03 5/2/96 MATS FOR OFFICE $55.80 5/2/96 REPLACEMENT BRUSHES FOR PLANT BAR SCREENS $564.97 5/2/96 RAKES & SHOVELS FOR CA TCHBASIN CLEANING $132.70 5/2/96 BAKEOUT MOTORS SUNSET MHP LIFT #1 &#2 PUMPS $70.86 5/2/96 EMERGENCY REPAIR/REPLACEMENT ON FRONT TIRE ON 4306 $224.38 5/2/96 REPLACEMENT LOCKS FOR LIFT STATIONS $413.90 5/2/96 SUNSET MH PARK L.S. PUMP COUPLINGS $216.85 5/2/96 POWER HOUSE L.S. MOTOR COUPLING #2 PUMP $201.73 5/2/96 SUNSET MHP SPARE MOTOR REPAIR $66.49 5/8/96 OIL FILTER FOR PUMP $5.45 5/8/96 PORTABLE PUMP FAN $0.90 5/8/96 BOLTS FOR BUSH HOG $1.01 5/8/96 CHLORINE SCALE VALVE FOR CALIBRATION $5.76 5/8/96 KEY REPLACEMENT FOR DONNA $3.32 5/8/96 SUNSET MHP LIFT STATION PIPE COUPLINGS $2.71 5/8/96 OXYGEN FOR WELDER $23.63 5/8/96 TANK RENTAL WELDING & SCBA'S $16.50 5/8/96 REPLACEMENT BATTERIES FOR PORTABLE PUMPS $120.70 5/8/96 FUEL FILTERS PORTABLE PUMP $11.45 5/8/96 SUNSET LIFT STATION MOTOR SERVICE $70.86 5/8/96 CARBURATOR PARTS FOR VEHICLE 2875 $40.83 5/8/96 CARBURATOR PARTS FOR VEHICLE 4945 $41.70 5/8/96 CREDIT ($6.50) 5/8/96 CREDIT ($4.00) 5/8/96 ROLL PINS FOR SEMI TARP $1.22 5/8/96 UTICA STATION #1 SILICONE SEALANT $12.44 JEFFERSONVillE, IN D'" ij c ,) [ [ [ r, f : L~ Tuesday, June 18, 1996 Page 2 MAINTENANCE AND REPAIR EXPENSES Jeffersonville, Indiana I P.o. Date II Description II Amount I 5/8/96 COUPLING FOR POWERHOUSE L.S $40.43 5/8/96 DRY MOTOR SUNSET L.S. $66.79 5/8/96 COLONIAL PARK L.S. FORCE MAIN REPAIR $96.79 5/10/96 MULCH FOR PLANT $18.80 5/1 6/96 SHEAR PINS FOR CLARIFIERS $5.40 5/16/96 ROPE REPLACEMENT ON FLAG POLE $26.15 5/16/96 SILICONE FOR PUMP #2 - SLUDGE TRANSFER $8.30 5/16/96 BUNTON MOWER #3 REPAIR $135.34 5/16/96 PLUG 15" FOR BLANCH ELL TERRACE CSO $256.71 5/16/96 OIL FOR CEDARVIEW L.S. PUMPS $15.72 5/16/96 HEATER REPLACEMENT COLONIAL PARK L.S. $32.52 5/16/96 DRY MOTOR SUNSET L.S. $84.79 5/20/96 SUMP PUMP REPAIR PLANT - USED ON 10TH STREET REPAIR WINN $203.17 DIXIE 5/20/96 CAM LOC FITTING FOR 6" SUCTION HOSE $48.57 5/20/96 SUCTION HOSE FOR 6" PORTABLE PUMP DIG CLEANING $484.17 5/20/96 RENTAL 6" PORTABLE PUMP FOR HIGH FLOWS - WET WEATHER $530.00 5/20/96 MIDDLE SCHOOL L.S. CAP FOR 6" SEWER $4.88 5/20/96 CLEVIS'S FOR PULLING PUMPS $5.72 Total: $4,370.94 JEFFERSONVillE, IN [ ATTACHMENT D Revair & Replacement Exvenditures JEFFERSONVILLE, IN ~ ..- " f LJ Tuesday, June 18, 1996 5/8/96 REPAIR AND REPLACEMENT EXPENSES Jeffersonville, Indiana roJect Description UMP AT POWER HOUSE L.S. Project # 96029 - REPLACEMENT BELTS FOR FILTER PRESS #2 Page 1 $2,709.26 Total: $4,309.26 JEFFERSONVILLE, IN [ [ ATTACHMENTE Caoital Improvement Expenditures ......~ JEFFERSONVILLE, IN C-! ';' ,J fJ r:!'l L- r L [ [ [ [ ~ ~~".'" Vi L! [ n li'1 i, , iLl 1996 Capital Improvement Expenditures Wastewater Treatment Facility Actual % Priority Description Estimated Cost Complete 2 Main Power Line Capacitors (project No. 96025) $25,000 0 2 Valve Actuators - 10 (project No. 96026) $35,000 0 ... -'."- Total Expenditures for Wastewater Facility $0 Collection System . 1 Portable Sampler with Flow Meter (project No. 96012) $6,500 0 1 Replace 3" Portable Pump with 6" Portable Pump $12,500 0 (project No. 96013) Total Expenditures for Collection System $0 , - "'..-.- , ..-.-..- -.....,. ..~^" ,.~ - . . ~ ~~.,. '..-. .. .-. .. ---"^_. .. .~- -- ,- ..' .,. . ,~.. .~,. .. .. .. , .- ..,,- ..... JEFFERSONVILLE. IN Q". ....:-J " 1996 Capital Improvement Expenditures -- Lift Stations Actual % Priority Description Estimated Cost Complete 1 Alarm System Upgrade Phase II (project No, 96014) $120,000 0 1 Sensors and flow metering for 10th Street, Spring Street $95,000 0 & Mill Creek Lift Stations, redundant control system (project No. 96015) 1 Riverport II, Increase Capacity (project No. 96016) $17,500 0 1 Upgrade Colonial Park (project No. 96017) $32,000 0 2 Replace Rolling Fields With Gravity Sewer (project No. $50,000 0 96018) 2 Relocate Barscreen and Install Sluice Gate's at lOth $45,000 0 Street (project No. 96019) 2 Painting of Spring Street, Mill Creek and Louise Street $15,300 0 (project No. 96021) Total Expenditures For Lift Stations $0 .- Vehicles 1 Trailer to Transport Backhoe (project No. 96022) $5,800 0 2 Replace 1987 Ram with 4x4 pickup (project No. 96023) $18,500 0 Total Expenditures on Vehicles $0 [ JEFFERSONVillE, IN r L [ [If . . . sa;::;::: ~.. '=~ ,m,~==J fl LJ JEFFERSONVILLE, IN r l ! , ., r ENVIRONA1ENTAL .MANAGEMENT CORPORATION MONTHLY SAFETY INSPECTION ClIECKOFFSlIEET JEFFERSONVILLE WASTE\VATER TREATMENT FACILITY 701 CHAMPION ROAD JEFFERSONVILLE, IN 47130 (812) 285-6451 f ; r PERSON COMPLETING INSPEC1YON: _LJ~ r[ 1. Personnel Safety S/cJ.3J9~ / / A. Personal Protective Clothing 1. Safety Helmets Provided (for Personnel & Visitors).................................. @. NO N/A 2. Hearing Protection (for High Noise Areas)....................................... @ NO N/A 3. Eye Protection - Goggles, etc. (for Personnel & Visitors)..................................@. NO N/A 4. Gloves (for Personnel)..............................'..................... @ NO N/A 5. Rubber Boots with Steel 'foes (provided for Personnel)..................................... @ NO N/A 6. Rain Suits Provided (for Personnel)................................................... @ NO N/A 7. Is Respiratory Protection Provided including ventilators and hoods over high dust areas, dust masks, etc. (for PersonneI)................................ @ NO N/A B. Safety Devices and Equipment r 1. Non-sparking Tools in areas where flammable or explosive gases may be present?.....................@ NO N/A 2. Oxygen Deficiency, Toxic, & Explosive Gas indicator........................... ..... ...... ......... .............. cir~ NO NI A 3. Self-contained Breathing Apparatus for entry to chlorine room.......................:......................... @' NO N/A 4. Confined Space Entry Equipment Available such as and including Safety Harness, Portable Wench, Hoist, ete............................................... @ NO N/A r [ r 5. First Aid Kits with proper & adequate supplies ~ readily available for any First Aid Emergency..~ NO 6. Traffic Control Cones Available........................ G'~ NO 7. Ladders to enter manholes of wet wells (fiberglass or wooden for electrical work)......... @ NO 8. Safety Buoys and Life Lines, Life Preservers at all open structures (02 Ditches, Clarifiers, Lagoons, etc..... ................................ ................ @ NO II. General Plant Safety 1. ,....... , Are Personnel trained in the use and location of safety equipment at the plant...................... @ NO 2. Are there railings around all tanks with openings chained ofL.................................... @ NO 3. Are holes covered? Including all pits & wells, drains, valve holes, hatch covers in place........ YES @ Are explosion proof fixtures used where needed.......................................................... . Are all equipment guards in place? Including mowing equipment............................. ............ Are dry wells ventilated and is ventilation adequate in all areas....................................... ~ NO Are emergency numbers posted & accessible.. @ NO Is proper liquid flammable storage used.......... ~ NO Is general plant cleanliness being practiced? Including floors (No oil or grease or pools of water), Storage Areas (No clutter & supplies stored properly), Chlorine Room (Free of clutter), Laboratory........................................ @ NO 10. Are all walkways, exists and routes, & stairways clear & unobstructed (No ice, oils, water, grease, or debris)................................. @ NO 11. Are all slippery surfaces posted and/or covered with anti-skid material, including stair treads and ramps, in good repair and covered with non-skid surface.............................................. (YE~ NO 12. Are all mats and rugs in good repair so as not to become tripping hazards............................. ~ NO Are work area layouts adequate...................... @ NO Is lighting adequate in all areas (Work areas, . stairways, walkways, elc.).............................. @ NO 15. Are noise levels within allowable limits or ,-- f r 4. 5. @ cY~ NO NO 6. 7. 8. 9. ;-- , , r f t r 13. 14. r N/A N/A N/A N/A N/A N/A N/A NIA N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A . c:TIS> danger areas posted.............. ..... ........ ..... ........ NO N/A 16. Are toilet facilities available & clean............... CYEl) NO N/A 17. Is safe drinking water available....................... ~ NO N/A 18. Is pest control adequate.................................. < NO N/A 19. An; all exists properly marked......................... ~ NO N/A 20. Is inclement weather protection provided at entrances (mats, safety strips, de-icers, etc.).... @ NO NIA 21. Are tripping hazards eliminated at all doors (threshold plates in good repair, cLc.)~............. <YES) NO N/A 22. Is safety glass provided in all doors................. <TIP NO N/A 23. Are handrails provided on stairs (Both sides r if necessary)............. .................... ................. ~ NO N/A f f @ tr 24. Are ladders properly anchored....................... NO N/A 25. Are fixed ladders provided with safety cages or safety side rails......................................... @ NO NIA 26. Are all elevation differences between floors clearly defined and properly lighted................ ~ NO N/A 27. Are portable ladders in good condition........... NO N/A 28. Kick boards in place if needed........................ NO N/A 29. No Broken steps............................................ NO N/A 30. Are ashtrays provided and emptied regularly.. NO N/A 31. Are trash cans covered and emptied regularly. ES NO N/A 32. Are portable hoists for lifting heavy equipment in good repair...... .................................... .......1 NO NIA 33. Are plant personnel immunized for tetnus....... YE NO NIA 34. No electrical cords stretChed over tanks.......... YE NO NIA 35. No gas leaks................................................... E NO N/A 36. Fuel supply tank in good condition................. @ NO N/A 37. No excessively hot operating temperature on machinery or equipment................................ @ NO N/A 38. No excessive vibration of machinery or equipment... ............................ ........ ........ ..... <YW NO NIA 39. No water or oil being "slung" from equipment @ NO N/A ...... 40. No worn or cracked equipmenL..................... ~ NO N/A ~ No excessive dust on equipment................... .-<S t 41. NO N/A 42. Adequate dehumidifier and heaters where needed......................................................... . GS) NO N/A 43. Emergency Medical Information on all employees available for determination of job ass ignments.................................................. @ NO NIA 44. Cross connections have been eliminated between potable water supply and non-potable source: GiS) a. Pump & Mixer Seals................................. NO N/A b. Digester Heating System Makeup Water... YES NO @ ...- : ,.- c. Vacuum Filter Water Sprays..................... NO N/A d. Chemical Mixing Tank............................... NO N/A e. Chi orina tor Water Source........................... NO N/A f. De-Chlorination Water Source....... ............. NO N/A (~ Yard H y d ran ( s. . .., .. . .. .. .. .. .. .. . . .. . .. .... .. .. ... .. .... NO N/A o' h. Other................................................. ......... NO N/A III. Electrical Safety I. Is all electrical circuitry enclosed and identifie~ NO N/A 2. Is all wIrIng 111 good condItIOn......................... E NO N/A 3. Are the number of outlets adeqUate..................~ NO N/A 4. Is equipment properly grounded or insulated.... ES NO N/A 5. Are extension cords in good condition and used properJ y................................................... C@ NO N/A 6. Is electrical test equipment available. Such as voltmeter, am pmeter, etc................................. @ NO N/A 7. Are dielectric rubber mats presents for electrical work............................................... NO N/A 8. All control panel switches in good condition.. NO N/A 9. All control panels unobstructed...................... NO N/A 10. Are dielectric rubber gloves available............. NO N/A II. Are ground fault interrupters used.................. NO N/A 12. Are warning or caution signs posted............... y S NO N/A 13. Is control panel area clean and dry.................. I> NO N/A 14. Are all needed fuses or breakers in place......... . S NO N/A 15. Are all contacts clean and dust free................. E NO N/A 16. Is there emergency stop buttons on all machines and equipment................................. @ NO N/A 17. Are personnel familiar with the electrical safety such as lock out/tag out procedures................ c:ill) NO N/A 18. Is power supply locked out/ tagged out on equipment presently being repaired................. Q@ NO N/A IV. Chlorine & Dechlorination Safety 1. All standing cylinders chained in place and/or ton cYli.ndcrs c. .l~? cke~. ..........:............................1. :: NO N/A 2. All pelsonnelltlll1ed 111 the use of CLz.............. ES NO N/A 3. Appropriate repair kits available...................... ~S NO N/A 4. Chlorine & dechlorination leak detector tied into the facility alarm system........................... @ NO N/A 5. Ventilator fan with outside switch present and either comes on when door opens or manually with switch at entrance door........................... @ NO N/A 6. Ammonia and Sulphur for checking chlorine & de~hlorinati~n leaks availabk...... ................ ..~ NO 7. Au:: all satet) plecautlOns posted.................... S NO 8. Proper Chlorine wrench available to open valves.............. ... ........ ..... .............. ..... ............ @ NO 9. Chlorine protected from direct sunlight, cool and dry...... ....... ..... ........ ................................ @ NO 10. No petroleum or other chemicals store in 'chlorine room.. ..... ........................... ............... ~ NO 11. Spare lead washers available on site...............~ NO V. Process Chemical Safety N/A N/A N/A N/A N/A N/A 1. Arc personnel trained to handle all chemicals properly......................................................... @ NO N/A 2. Is proper safety clothing present for the chemical to be handled................................... @ NO N/A .... Are all containers, vats, and tanks properly J. labeled............................................................ ~ NO N/A 4. Is employee exposure within accepted limits..~ NO N/A 5. Are there proper containment of storage areas, including curbing......... ............................... ....@ NO N/A 6. Are management & employees aware of the hazards of the materials being used.................. ~ NO N/A 7. Knows proper response to an accidental SPill...~ NO N/A 8. All MSDS available and easily accessible........ . YES NO NIA 9. Has complied with the 6 employer r-- responsibilities of the Worker Right to Know , , La\v? (SARA)......................... .................. ...... CY~~ ! NO NIA 10. Emergency Action Plan on file with local Fire, Police Departments and appropriate Emergency Agency.. ................................ .......... ................ @ NO N/A VI. Tools & Equipment 1. Are hand tools in good repair and stored pro perl y......... .............. ............................. ...... ~E~ NO Ate power toob stored properly and in good condition - cords, plugs, etc............................. @ NO Are the tools adequate for the tasks to be ~~~~;::~i~~~~~i;;~~i;~~d~;~.~~d~d::::::. ~ ~g Ale tool guards U1 place.................................. @ NO Are employees trained in the proper use of the 2. 3. 4. 5. 6. r t r I . NIA N/A N/A NIA N/A VII. Fire Safety & Protection Are fire/emergency evacuation plans posted..@ Are employees familiar with fire/emergency evacuation plan....... ......... ..... ........................... @ Are there sufficient number and types of fire cxtingu ishers.......................;. .......... ... .............. ~~ Are the fire extinguishers properly located and identified.......................................................... ~ Are the fire extinguishers checked annually....~ Are all of the fire extinguishers in working condition... ................. .............................. ....... @ Are employees trained in the proper use of the extinguishers to be used................................... @ Are smoke detectors in working order............. YES 7. various tools they are expected to use............. 0~ NO Arc employees given additional instruction and ~~2i~~~~~.~.i.~.~~ .~~. ~.~.~.~~.~~~~~~. ~~~~~. .~.l~.~........ ~ NO Arc proper lifting rcchni(]uc:'i U:'iccl by em p loyees......................... '" ............................ @ NO N/A NIA NIA 8. 1. 2. NO N/A NO N/A NO NIA NO N/A NO N/A NO N/A NO N/A NO~ 3. 4. 5. 6. 7. 8. Vlll. Laboratory Safety 1. Emergency Eyewash & Shower Station arc . present and work properly and tested mOnthlY,~ NO N/A 2. Fume hood is presenl....................................... NO N/A 3. All chemicals safely and properly stored, well labeled and in original containers..................... cYE~ NO NIA 4. Laboratory Safety devices used such as: Pipette suction bulbs, Eye Protection, Gloves, Aprons or Jackets, & Tongs......................................... NO N/A 5. No brokenl chipped or cracked glassware........ NO N/A 6. No overloaded outlets..................................... NO N/A 7. Acid spill kit available..................................... NO N/A 8. Emergency procedures for acid spills posted and used by all personneL............................. @ NO NIA 9. Laboratory Safety Eules posted and obeyed by all personnel such as no cooking or eating from laboratory glassware.......... ..................... ..;...... ~ NO .NIA X. Other Safety [ 1. Arc the required safety programs presented r I l and/or attended during the year........................ @ NO N/A r-, I Is a suitable identification system used to identify the plant's piping system......................@ NO Has the operator Laken steps to remove or minimize safety hazards.................................. @ NO Are all personnel provided with a shower and locker for their work clothes........................... ~ NO 5. Are personnel trained in First Aid & CPR........ YES @ 6. I-lave the following proper safety signs been provided such as: Non-potable Water, Chlorine Hazard, No Smoking, High Voltage, Watch Your Step Signs in Certain Areas, & Exit Sign@ NO Is your Facility safeLy program Up Lo Date (Worksafe Program)........................................ @ NO 2. ~... ") .). 4. ~,._~ r- 7. (# YES) /3:3 .+ ~ x 100 = (# YES + # NO) 1 ~ % N/A N/A N/A N/A N/A N/A UJR ~ I~~ ~-~ c/~ - ~ ~ ~~t~ ~ eonJ7I' ok-~ PT k ~ ~ C,P.R