Mo,nthly Report
APRIL 1996
/
ENVIRONMENTAL
MANAGEMENT
CORPORATION
701 CHAMPION ROAD
JEFFERSONVillE, INDIANA 47130
812-285-6451
FAX 812-285-6454
May 21, 1996
c. Richard Spencer, Jr.
City of Jeffersonville
City/County Building
Jeffersonville, IN 47130
Dear Dick:
~ Enclosed please find Envirornnental Management Corporation's (EMC) "Operations Report"
for the month of April 1996, containing information on the following:
1.0 Effluent Quality
2.0 Facility Operations
2.1 Pretreatment
3.0 Preventive and Unscheduled Maintenance
3.1 Maintenance & Repair Expenditures
3.2 Repair & Replacement Expenditures
3.3 Capital Improvement Expenditures
3.4 Electrical Expenditures
4.0 Facility Safety and Training
5.0 Sewer Collection System
0.:
: I
,~
As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we
are available to discuss this report, or any other aspect of our operations, at the convenience of
the City.
Sincerely,
ENVIRONMENTAL MANAGEMENT CORPORATION
~~~
Kendall S. Coleman
Facilities Manager
KSC:dmk
D
1.0 EFFLUENT QUALITY
During April, effluent quality was within NPDES permit limits for CBOD and TSS
concentrations. As reported at the May 20th Public Works Board meeting, effluent ammonia
loading limits were exceeded in April. The excursion was a result of the increased flows
due to the heavy rains throughout the month. This is an item that has been addressed with
IDEM in the past and should be corrected with the issuance of the new permit. Table 1.1
summarizes the effluent quality data. Attachment A contains Time Series Plots of daily
CBOD and TSS values.
Table 1.1
EFFLUENT QUALITY
Carbonaceous 25 5
Biochemical
Oxygen Demand
(CBOD)
Total Suspended 30 11
Solids (TSS)
Fecal Coliform 200/mo. 311mo.
[] (Colonies/lOa ml)
CWorine Residual .05 daily .03
Maximum
Ammonia 3.0/mo. 2.7/mo.
Flow 5.2 5.845
(MGD)
r
r1
L.J
[
2.0 FACILITY OPERATIONS
MOR
JEFFERSONVILLE, IN
f
L. Attachment B contains a list of septic haulers that discharged during the month of April.
During the month of April, the treatment processes continued to perform excellent. We
did experience high flows throughout the month due to the heavy rains and the high
elevation ofthe Ohio River causing backwater to enter the Tenth Street lift station. This
problem has been discussed previously with the City and will be addressed with this years
Capital Improvement submittal. This problem does create excessive wear on equipment,
increased electrical useage and the potential for hydraulic overload of the lift station and
treatment facility.
PRETREATMENT
During April, two industries received Notice of Violations. Wyandot and Philadelphia
Quartz Inc. reported Ph limits outside their Industial permit discharge limits. As a result
of the violations, the industries are required to report why the violations occurred and the
procedures they expect to put in place to prevent any reoccurance.
EMC will continue to work with all industries, to ensure compliance with their industrial
discharge permit limits.
3.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE
C Preventive maintenance was performed on all equipment as scheduled in April. There
were 51 unscheduled maintenance tasks performed. All were minor except for:
~ Rehab of 6" portable pump
~ Installation of 24 manhole risers at Rolling Fields
~ Rebuild of No. 2 pump at Powerhouse lift station
~ Repair of pump motors at Sunset Mobile Home lift station
~ Installation of new motor at Ewing Lane lift station
~ Upgrade of alarm monitoring system
A list of unscheduled maintenance work orders is included as Attachment C.
Maintenance and repair expenditures for the month of April are detailed in Attachment D.
Table 3.1 represents the total amount expended in April, and for the year. Table 3.2
includes the same information for repair and replacement expenditures. Attachment E
contains a detail of repair and replacement expenditures for the year.
ll"
I }
II
"",,;
MOR
JEFFERSONVillE, IN
Table 3.1
MAINTENANCE & REPAIR EXPENDITURES
o
Time
Period
April
Year-To-
Date
Budget
(Over)
Under
$4,200
($918)
$66,900
($537)
Table 3.2
REPAIR & REPLACEMENT EXPENDITURES
Time
Period
April
Year-To-
Date
3.3 CAPITAL IMPROVEMENT EXPENDITURES
Budget
(Over)
Under
$8,334
($16,262)
$100,000
$27,332
Attachment F details Capital Improvement expenditures for the contract period of May 1,
1995 through April 30, 1996.
lTJ
: I
J
MOR
JEFFERSONVILLE, IN
[
3.4 ELECTRICAL EXPENDITURES
Due to the electric bills being one month behind, table 3.4 relates to electrical
expenditures from May 1995 through March 1996.
Table 3.4
ELECTRICAL EXPENDITURES
Time Budget (Over)
Period Under
r
~
t "
March $14,766 ($2,178)
[
Year-to- $162,423 ($10,417)
Date
4.0 FACILITY SAFETY & TRAINING
Safety inspections were conducted on April 19, 1996. The rating was 97%. The
deficiencies reported were:
~ Materials have not been stored properly.
~ Trip hazards are present at maintenance building inner doorways.
~ All employees have not received first-aid and CPR training
A copy of the Safety Inspection report is included as Attachment G.
On April 22, 1996 CPR training was conducted by a representative of Red Cross at the
facility.
5.0 SEWER COLLECTION SYSTEM
During the month there were 45 sewer calls. The calls were related to the following:
~ Twenty- two calls were related to heavy rain
MOR
JEFFERSONVILLE, IN
ill
~ Twelve were due to blockages within the City's main line
2 were caused by roots
3 were related to the line colapse at Kehoe Lane
4 required rehab or repair of existing lines
~ Eleven were related to blockages within the residents line
Table 5.1, on the next page, details the data on April's sewer projects.
r
I
k
",~,
,
f
I
11.:..",....
Oi
l, ;
".,
[
['!
,,:
d
[i
. I
",
MOR
JEFFERSONVILLE, IN
Project Year-to-
Date
Tap Inspections 15
Sanitary Sewer 177,635
Cleaned CFt.)
Storm Sewer Cleaned 6,575
U CFt.)
Catch basins Cleaned 157
Catch basins Raised 1
,,~ Manholes Raised 97
I C
I
,;
Manholes Rebuilt 4
D Catch basins Rebuilt 13
Sewer Repairs 16
~ Sewers Televised 2,900
'I
I
.."l CFt.)
Utility Locates 745
ill
Table 5.1
SEWER PROJECTS
ATTACHMENTS -
D
o
A
B
C
D
E
F
G
TIME SERIES PLOTS
NOVEMBER SEPTIC HAULERS
UNSCHEDULED MAINTENANCE WORK ORDERS
MAINTENANCE & REPAIR EXPENDITURES FOR NOVEMBER
REPAIR & REPLACEMENT EXPENDITURES
CAPITAL IMPROVEMENT EXPENDITURES FOR 1995
SAFETY INSPECTION REpORT
JEFFERSONVILLE, IN
......
r
I
,
~..,
o
[
[
r
1
ill
JEFFERSONVILLE WASTEWATER TREATMENT FACILITY
November 1995 Septic Haulers
Hauler
Current Month
Hauler Total (YTD)
Rumpke of Indiana
Pfau
4
o
4
33
o
33
TOTAL
Hauler
Current Month
Hauler Total (YTD)
Rumpke of Indiana
Pfau
4,200
o
32,900
o
TOTAL
4,200
32,900
MOR
JEFFERSONVILLE, IN
0',
':.i
i
,
fl
U
fj
b
u
Time Series Plots
II
II
ATTACHMENT A
c
JEFFERSONVILLE, IN
~",-""Cl
rc-cCHl ._~]
f''''-l ,,,ccl
f'- ---
!f
~~P-l
- Jeffersonville Wastewater Treatment Facility -
Effluent TSS & CBOD
60
50
40
~ 30
E
20
10
o
- Effluent CBOD
- Effluent TSS
Permit CBOD
Permit TSS
~ N ~ ~ ~ ~ ~ ~ ~ 0 ~ N ~ ~ ~
_ '"""' _ .-l _ .....-l
~ ~ 00 ~ 0 '"""' N ~ ~ ~ ~ ~ ~ ~ 0 .-I
'"""' .-I .-I _ N N N N N N N N ~ N M M
Date
April 1996
ill
r
Ii,,~
ATTACHMENTB
Unscheduled Maintenance Work Orders
f""'1
t i
JEFFERSONVILLE. IN
n
li I
-,.. {1;:"ji~j<1l:;
:11
pa~Jf' j
r:l;;;;;t;;""""""""~;;;"~;~;;""~"~:"""""";;;;;:;;;""""""~;::"~~::";;;;;:;,;~;;~~~"";;-;;"""<O~""~~;;;'""";;~-;;;~=-=~";;;;~
ifUHBER jfGHBER TYpE DESCRIpTION NO. NO. CLOSED TIHE COST COST COST
fj=====7=============================================================================================================================
tJione- YbUU/ll:I pROJ~CT '(4)08)96 0.000
TASK DESC : AIR TEST NEw SEWER LINE ft~LLARD RUN
f],-;~;~~------~--{~~;~~;~-=~~--;~~~~~-----~~~~----~-~'-;~~~-----~~~~-~~~~--~~~~)------~~~~------~;~~;--------~~~~--------~;~~;
.,~--~~-~------------------------------------------~---~~-~----------------------------------------~----------------------------------
~QUIP TOTALS : (LAOOR HOURS -> total: 4.000 Reg: 4.000t: .0..00.)0.000 42.92 0.00 112.92
1,. '=====f===================== ==================.======================================================================================
t~ I
-iione- YbUUIl4 PRo..TECT u-4j16j96 D.OOO
TASKDESC : CLEANhD -(JETTED) TUBE CROSSING HERSHT LANE - ARTIe SPRINGS
! COfrM~-TS : REQUESTED' BY BOB' HILLER .
------------------------------------------------------------------------------------------------------------------------------------
TOTALS
n i
t ~----i-------------------------------~~~--~----------------------------------------------------------,------------------------------
l -None- 9600533 .u. _ PRo..TEfT 04/19/-960..000.
TASK DESC : INSTALL SIauS LANDSBERG COVE & ,CHERRY .CRREK
r- . . .
r -----~-----------------------------------------------------------------------------------------------------------------------------
. TOTALS : (LABOR HOURS ->Total: 4.000 Reg: 4.00 at: 0.00) 0.000 45.42 v.DO 45.42
: (LABOR, H(JURS ->
TotaJ:
2.QOQt:, 0.(0)
23.41
0.00
23.41
~,QOO
Reg:
0.000
----------------------------------------~-------~----------------~~-------~---------------------------------------------------------
r-None- 9600717 PR(ATECT 04/22/96 0.000
L TASK DESC ~TET CLEAN KEHOE LAUE ATTEUTH
. COf.IMENTS <TETTED' 275 FEET
r. PER BOB MILLER
L_-;~; ;G------~--( ~;;;~-;;~;~-~~---;~~~~~-----~~~~--------~;~~~ - ----~~~~-;~~---~~~)------~~~~r~~---~~~;;--------~~~~--------~~~;;
------------------------------------------------------------------------------------------------------------------------------------
~one-
LJ PARTS USED
TASK'DESC
COIDIENTS
9600719 PROcTECT
QTY USED ITEM h~MBER
1.0 10W30
8.0 15W40
1.0 33358
1.0 4D-XHD
1.0 51768
SERVICE 6" PORTABLE PUMP
HAS A SMALL LEAK IN FUEL LINE
04/30/96
0.000
DESCRIPTION
AIR FILTER OIL
MO'TOR OIL
FUEL FILTER
BATTERY
oItFILTER
COST
1.15
9.60
5.65
104.95
5.75
DATE
04/30/96
04/30/96
04/30/96
04/30/96
04/30/96
, I
------------------------------------------------------------------------------------------------------------------------------------
r TOTALS : (LABOR, HOURS -> Total;. ,.' 3.0QO" .Reg: ,.,J.QOot:. 0.00) 0.000 .34.62 127.10 161.72
L..: -~ --:-------------- -.;---------- -------- ---------------------- --------- -------- ------ ----------------~------------------------------
EQUIP TOTALS : (LABOR HOURS -> Total: 13.000 Reg: 13.000t:. 0...00)- 0.000 150.27 127.10 277.37
~==============================================================================~====================================================
! !
:LADMIN1 .
PARTS USED
C
D
9600521
QTY USED
1.0
PROlTECT ADMINISTRATION BUILDING
ITEM NUMBER DESCRIPTION
170-8932 9" ROLLER COVER RUFF SURFACE
04/18/96
0.000
COST
4.05
DATE
04/18/96
, ,
D..i I
.;:1 I
..~. I
05/14/96 Paae 2
, I '
: WORK ORDER HISTORY REPORT
fJ:====T=====================================7~======================================================================================
B~UIPMENT WORK ORDER W.O. EQUI~~ENT TASK MTASK DATE DOWN LABOR MATERIAL TOTAL
NUMBER NUMBER TYPE DESCRIPTION NO. NO. CLOSED TIME COST COST COST
~:====T~=============~===========~~7========~=======================================================================================
t .. PARTS USED : QTY USED ITEM NUMBER DESCRIPTION COST DATE
1.0 173-1660 9" ROLLER COVER 6 PAK 6.49 04/18/96
1.0 3042. 3" BRUSH : 4.99 04118/96
, ,
2.0 3787-99993 .SILVERPOINT PAINT 29.08 04/18/96
3.0 LINER TRAY LINER 2.25 04/18/96
, ,
1.0 TRAY 9" ROLLER TRAY. 1.99 04/18/96
f ' ,
TASK DESC : PAINT COLLECTIONS OFFICE
:~____L_______________________________________________--------------------~---------------------------------------------------------
TOTALS (LABOR HOURS -> Total: .8.000 Rea: 8.000t: 0.00\ 0.000 84.48 48.85 133.33
, "
r-
l r----r-~~--------------------------------------------------------------------------------------------------------------------------
! QUIP TOTALS : (LABOR HOURS -> Totai:. 8.000 Rea: 8.000t:. 0.00\ 0.000 84.48 48.85 133.33
'-....."" \ .; I
. . . ..
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
..-
,
: CL2BUILDING1
... PARTS USED :
TASK DESC
9600527- PRo..TECT.,CL2 BUILDING
QTY U~ED... . JTE~I HUMBER DESCRIPTION
3.0i'1~4" ':- .' VALVE.
0.5 .ffi,-15..-- ... . SCALE OIL
CALIBRATE SCALES .
04/26/96
0.000
COST
16.80
1.48
DATE
04/26/96
, ,
04/26/96
------ ------------- ------------------ -----------";;..-------------"------ ----- ."._------------------------- ------..------------------------
r:TOTALS : (LABOR HOURS -> Total: 8.400 Rea: 8.400t: 0.00) 0.000 100.63 18.27 118.90
tL____~__________~________________~_____~:_______~~__:--------~~-~~-----------------:-----------------------------------------------
t.J !
~QUIP TOTALS : (LABOR HOURS -> Total: 8.400 Reg.: 8.40 ot: 0.00) 0.000 100.63 18.27 118.90
Jir:::J":::::::""":::::::""""":::::::""":::::"::::::"::::"""""""""""""""""""""""::::::::"""":::::""""""""""""'"""'""""""","
, ,
TASK DESC SMOKE TEST ENTIRE LINE
COMMENTS DID NOT GET SMOKE FROM ROOF VENTS AT #55; 57; 64; OR 1833.
I
THESE NEED TO BE DYE TESTED.
------------------------------------------------------------------------------------------------------------------------------------
fTOTALS : (LABOR HOURS -> Total: 9.000 Rea: 9.000t: 0.00) 0.000 99.87 0.00 99.87
j I I ..I J
~~b~~~-~~;~~--~--~~~~;-;~~;~-=~---;~~~~~-----~~~~~---------;~~~-----~~~~-~~~---~~~~~------~~~~~------~;~;;--------~~~~--------;;~;;
- \ ..I I
====================================================================================================================================
[~RUMJ LANE I 9600535 PRo..TECT CRUMS LAUE I L.S.
TASK DESC CLEAN WET WELL
~-;6;~~;------~--~~~~~-;~~;;-=~---~~~~Y~-;~~-;~~~~-~"-----~;~~~--~~~;~~~-~~~---~~~~~------~~~~~-----;;~~;~--------~~~~--------;~~;~
""'~.".;, I .; I
--.-~--------------------------------------------~---------------~-~---~------~-~-;--~~----------~~--~------------------------------
04/16/96
, ,
0.000
c
ill
[
05/14/96 Paae 3
, , J
WORK ORDER HISTORY REPORT '
\"11
rb~~~~;;;;========~;~=~;~;;==;~~~======;~~~~~;;;==================;~;;=~~;;=======;~;;=====~======~~~;====~~;;;~~~========;;;~~
NUlffiER NUMBER TYPE DESCRIPTION NO. NO. CLOSED TIME COST COST COST
a__________________________________~__________________-----------------------------------------------------------------------------
._---~-----------------------------------------------------------------------------------------------------------------------------
lUIP TOTALS : (LABOR HOURS - )'" Total: '7.000
, .,'" \
Reg:
7.000t: 0.00)
0.000
81.94
0.00
81.94
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
9600721 PROJECT EWING LAN~,L.S. , 04/18/96 0.000
QTY USED ITEM NUMBER DESClUPTION COST DATE
1.0 G-291 5/8X10n EYE BOLT & NUT 15.41 04/18196
r-- I r I
Il:~~~l~~~_u~__~~~:~~~_~:~_~~~L~~:_~:_~~~~~_~~~:_~:~:~~~___u_________________u__u______u____u____uu__________________uu
TOTALS : (LABOR HOURS -> Total: 3.000 Reg: 3.00 ot: 0.00) 0.000 33.41 15.41 48.81
~~~t;-t~;i~~--~--~~~~;-;~~~~-=~---;~~~i~~----;~~~~---------;~~~-----;~~~-~~~---~~b~)------b~bbb------;;~~~-------~~~~~--------~;~;~
o.L' .,)_ \ .J i
..-
,
; \WING LANE
f ' <. ,.
.. PARTS USED
. ..
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
i ROLLING FIELDS 9600715. PROcTECT:ROLLING FIELDS L.S.
TASK DESC : RAISE '2UWlHOLES; WITH RIZERS
04/27/96 0.000
---------------------------.~r--------~~~-----7!-----~~-----------------------------------------------------------------------------
l TOTALS : . (LABOR HOURS- -> ..~-Total: 48.000 Reg: 48.00 ot: 0.00) . 0.000 - 561.84 0.00 561.84
L....",..,-----:----------...-------------------------------- ---,------------ --------- ---------------- --- ---- -------'------------------------ ------
EQUIP TOTALS : (LABOR HOURS -> Total:
48.000
Reg: --- 48.000t: 0.00)
0.000
561.84
0.00
561.84
"
~==================================================================================================================================
t.".j I
GRANDTOTALS: (LABOR HOURS -> Total: 100.400 Re~: 100.40 at: 0.00) 0.000 1155.35 209.63 1364.98
. ~ ~ ~~ r' l' '.'
......
! ~:. .~
:11
r-
r
,
..,....,
05/14/96 Paae 1
, , J
, WORK ORDER HISTORY REPORT
f=====F================= ======= =============,~=======================================================================================
-r,QUIPMENT WDRK ORDER IV .0. EQUIPMENT TASK MTASK DATE DOWN LABOR MATERIAL TOTAL
h~1fJBER NL1fJBER TYPE DESCRIPTION NO. NO. CLOSED TIME COST COST COST
r-=====F=============================================================================================================================
SLDGTRANSFER1 9600526 REPA1~ SLUDGE TRANSFER PL~P 11 04/01/96 0.000
.. I . I
PARTS USED QTY USED ITEM NUMBER DESCRIPTION COST DATE
D...,....'.. ..i 1.0 PUB ,113 TRUNNION; 119.00 04/01/96
[.! TASK' DESC REPLACE TRUNNIotI
--~~~-------------------------------------------_._--~~--------------~-~------------------------------------------------------------
TOTALS : (LABOR HOURS -) Total: 6.000 Reg: 6.000t: 0.00) 0.000 65.32 119.00 184.32
n1 . .
l-----i--------------~---~------------------------~-------------------------------------~--------------------------------------------
ubUIP'TOTALS : (LABOR HOURS -) Total: .' 6.000 Rea: 6.000t: 0.00\ 0.000 65.32 119.00 184.32
_, ";.J I
-----------------------------------------------------~------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
r VACTdR .':' 9600094 REPAIR 'Vi\C:TOR elET TRUCK
..".~ ,
TASK DESC BRAKES STILL CHATTERING
r; COW~ENTS RETURijED TO ALLSTATE f.ORD FOR.~A~RANTY REPAIR
tJ____J___________=~~~_~:~~~~~~~-~~~~=~.:~~-~~~~~~~---______________________________~~----~---~-~-~---~------------------------------
TOTALS : (LABOR HOURS -) Total: 0.000 . . Rea: O.ooot: 0.00\ 0.000 0.00 0.00 0.00
~----~-----------~--------------------~----------------------~--------------------_:_----------------------------------------------
, ~QUIP TOTALS : (LABOR HOURS -) Total: 0.000 Reg: 0.00 at: 0.00) 0.000 0.00 0.00 0.00
04/15/96
0.000
---------------------------------------~-------~----------------~~------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
p.. iVEHI~LE14
!i;."d 1 ...
PARTS USED
TASK DESC
I
COMMENTS
9600089 REPAIR 1990 DODGE'n-2"50 PICKUP T
QTY USED ITEM NUMBER DESCRIPTION
1.0 52004638 GAS GUAGE
REPLACE GAS GUAGE
WORK C~IPLETED BY VEHICLE MAINT.
04/03/96 0.000
COST
60.90
DATE
04/03/96
------------------------------------------------------------------------------------------------------------------------------------
~ TOT~LS : (LABOR HOURS -) Total: 1.000 Reg: 1.00 ot: 0.00) 0.000 11.54 60.90 72.44
l'",~--;...-~--------------- -------------------.---------------------------.---------- -----.--'---------------------------. ----------------------
EQUIP TOTALS : (LABOR HOURS -) . Total: 1.000 Reg: 1.00 ot: 0.00) 0.000 11.54 60.90 72.44
[c, '.====1=========================================================================================.=====================================
....... .1. . .. ..
SEWING LANE 9600522 REPAIR EWING LANE L.S. 04/19/96 0.000
, ,
TASK DESC : INSTALL NEW MOTOR - WELD UP HAND RAIL & LADDER
~____l________________________________________________-------~----------------------------------------------------------------------
~J TOThs : (LABOR HOURS -) Total: 16.000 Rea: 16.000t: 0.00\ 0.000 1&1.68 0.00 1&1.68
\ .I t
------------------------------------------------------------------------------------------------------------------------------------
[J~~;;f;~:::"":""!::~!"~~~:"::""";~::!:;";;!:;~~~"~;""""""~:;:""::!::~~"~:~"":;~~"~""""~;~"""""t:!;::""""""""~;~="""===!:!;::
9600319 REPAIR MILL CREEKL.S. LSGE ~4/04/96 0.000
, ,
: TENTH STREET L.S.
i4......MI LLC. REEK
LJ TASK DESC
'" i ,
,.-
,
r
L, ,
05/14 /96 Page 2
r ' WORK ORDER HISTORY REPORT
t.. f====f====================================='7;:============================= =========================================================
~u~UIPMENT WORK ORDER W.O. EQUIPMENT TASK MTASK DATE DOWN LABOR MATERIAL TOTAL
NUMBER NUMBER TYPE DESCRIPTION NO. NO. CLOSED TIME COST COST COST
r-.F====F. =~============~===========~~=========~=======================================================================================
LJ CQl.IMENTS : MADE HANGER FOR HOIST SWITCH
------------------------------------------------------------------------------------------------------------------------------------
r;TOTAlS : (LABOR HOURS ->,: Total: 0.667 :Rea: 0.670t:' o.bo) 0.000" ..., 7.42 0.00 7.42
~L t_"~--~------ ____~______...___ _____ _ _____ _____ -..---------:':-..:----~--------------:..------:-------- ..:--------!---------- ----------------- ---
l~~ILLCREEK 9600318 REPAIR MILL CREEKL.S. LSGE 04/10/96 0.000
TASK DESC : TENTH STREET L.S. "
F COMMENTS : REPAIRED LEAKING FLANGE 65 PUMP
~'....~---J----....----..--..------...---..---..- ---- -: ------------------------------------------------------------------------------------------
TOTALS : (LABOR HOURS -> Total: 0.667 Reg: 0.670t: 0.00) 0.000 7.42 0.00 7.42
~~----;---------------~~---------------------------------------------------------------~---------------------------------------------
.' !,
. burp ToTALS : (LABOR HOURS -> Total::' 1.333 Reg: 1.33 ot:' 0.(0) 0.000 14.85 0.00 14.85
Itt.,.,,,,, ; "-'.
-----------------------------------------------~------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
rPowERHOUSE
PARTS USED
9600455. REPAIR ,POWERHOUSE L.S. 04/16/96 0.000
QTY U~ED... . ITEM NUMBER DESCRIPTION COST DATE
1.0 " "'Hl II ...'! DUCT. FAN - DAYTON 46.65 04/16/96
r--. ' ..
tL~:~~_~~::___~_~~~~~:::_~~~~~~~=::~~~:_~::____~_._____-----------------------------------~----------~-------------------------------
bd I
TOTALS : (LABOR HOU~S -> Total: 2.000 Reg:" 2.000t: 0.00) 0.000 22.71 46.65 69.36
r-----j------------------------------------------------------------------------------------------------------------------------------
POWE~HOUSE 9600534 REPAIR. POWERHOUSE'L.S: . 04/23/96 0.000
l,; PAR~S USED : QTY USED ITEM NUMBER DESCRIPTION . . COST DATE
1.0 ADDIL LIGHTING 470.00 04/23/96
1.0 OMEGA COUPLING WOODS 32.00 04/23/96
1.0 POWER MONITOR 325.00 04/23/96
1.0 SPENCER MACHINE REBUILD PUMP 1600.00 04/23/96
n TASK DESC : REBUILD PUMP #2
~~}---1-----------------------------------------------------------------------..------------------------------------------------------
TOTALS : (LABOR HOURS -> . Total: 12.000 Rea: 12.00 ot: 0.00) 0.000 133.69 2427.00 2565.69
, -'
~----------------------------------------------------------------------------------------------------------------------------------
Iii I ,'" ' , , '
; OUIPTOTALS : ILABOR HOURS -> Total: 14.000 Rea: 14.00 ot: 0.00\ 0.000 161.40 2473.65 2635.05
t~~===J===========~============================================~=====================~==~============================================
[iSPRI~G STREET 9600319 REPAIR SPRING STREET LIFT STATI
l~". TASK DESC : TENTH STREET L.S.
COMMENTS : MADE HANGER FOR HOIST SI'JITCH
LSGE
04/04/96
, ,
0.000
~~---1----------------i------------~~~~t~-;~~----~~~~;-----~--~---(~~-~-----~---~--------------------~------~-----------------------
!' .". TOTALS : ILABOR HOURS -> Total: 0.667 Reg: 0.670t: 0.00) 0.000 7.42 0.00 7.42
L,.,,) I \
-------------------------------------------------~---------------~---~-~-----~--~~:--~=----------~---~------------------------------
~PRI~G STREET 9600318 REPAIR SPRING STREET LIFTSTATI '
~. .... TASK DESC : TENTH STREET L.S.
t~ COM'~ENTg : REPAIRED LEAKING FLANGE #5 PUMP
LSGE
~4/10/96
. .
0.000
------------------------------------------------------------------------------------------------------------------------------------
~ TOT~LS : (LABOR HOURS -> Total: 0.667 Reg: 0.670t: 0.00) 0.000 7.42 0.00 7.42
l~----+------------------------------------------------------------------------------------------------------------------------------
r
L
~
.
f
i 05/14 /96
Page 3
WORK ORDER HISTORY REPORT
fi____J______________________________________________________________________________________________________--------~----------------
i ';Q~i~~;;;--------;~~;-~~~;~--;~~~------;Q~i~;~;------------------;~~;-~;~;;-------~~;;-----~------~~;;~----~~;;~i~~--------;~~~
NUMBER NUMBER TYPE DESCRIPTION no. no. CLOSED TIME COST COST COST
~====~===============~===============================================================================================================
; EOUIP'l'OTALS : {LABl:m HOURS ->., Total: ' 1.333 Rea: 1.33 ot: 0.00\ 0.000 14.85 0.00 14.85
",-,-J .... \ J I
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
. '..
r
, 5SUUSET MOBILE
PARTS USED :
TASK DESC
9600525 REPAIR SUNSET MOBILE L,.S.'
QTY USED ITEM NUMBER DESCRIPTION
1.0 2HP 220V 3PH 145T
1.0 3B3.8 X 7/8n SH PUMP COUPLING
1.0 BAKE OUT 2 MOTORS
REPLACE COUPLING ON #2 MOTOR. AND MOTOR
04/22/96
0.000
COST
178.00
38.28
70.86
DATE
04/20/96
04/22/96
04/22/96
r, ----!---:-~------ ------- ----------------.-~- - ------ ---- ---- -- --- ------- --------------:--------------------------------------------------
tJ__=5~~:~_____:__~~~~~_~~~~:_=~___:~:~~:_____~~~~~__~~_____~=~:_____~~~~_~:___~~~~~______~~~~~______~~~~~______~~~~~~_______:~:~~~
9600731 REPAIR SUNSET MQBJLE ~.S.
QTY USED ITEM NUMBER. DESCRIPTION
1. Q- . - BAKE -BUT 2 MOTORS PHASE THREE
1. 0 ",REPAIR SPA~,E MOTOR, PHASE THREE
r-, TASK DESC :. SWAP MOTORS-& DRY- OU'l'MOTORS --FLOODED DRY WELL. .. .
tcj----i--------------------------------------------------------------------------------------------------------------~----------------
TOTALS : (LABOR HOURS -) Total: 4:000 Rea:--- 4.00 ot: 0.00\ 0.000 46.34 137.35 183.69
\ .> ~,
fj~---!----------------------------~------~-------~~--~-----------~---------------------------------------------------~---------------
EQUIP TOTALS : (LABOR HOURS -) Total: 6.000 Reg: 6.00 ot: 0.00) 0.000 69.05 424.49 493.54
t._~===~===============================================================================================================================
5SUNSET MOBILE
n PARTS USED
r5TENTH ST.
TASK DESC
COID.fElrI'S
04/26/96
0.000
COST
70.86
66.49
DATE
04/26/96
04/26/96
, ,
9600319 REPAIR TEh~ STREET L.S.
TENTH STREET L.S.
MADE HANGER FOR HOIST SWITCH
LSGE 04/04/96 0.000
~--;;t~~------~--(~~~;-;;~;~-:~---;~~~~~-----~~~~;---------;~~~-----~~~;-;~~---~~~~i------~~~~~-------;~~;--------~~~~---------;~~;
Ld I
------------------------------------------------------------------------------------------------------------------------------------
rtTENTH ST.
i; TA~K DESC
" COMMENTS
LSGE
04/10/96
0.000
9600318 REPAIR T~rrH STREET L.S.
: TENTH STREET L.S.
: REPAIRED LEAKING FLANGE #5 PL1fP
------------------------------------------------------------------------------------------------------------------------------------
f,; TOTALS : (LABOR HOURS -) Total: 0.667 Rea: 0.670t: 0.00\ 0.000 7.42 0.00 7.42
!;I '. ' ,_ " " , ,J ,', , ' ' ,I
~~---4---------------------------------------------------------------------~-------------~----~----~-~-----------~-------------------
t"" ,
EQUIP TOTALS : (LABOR HOURS -) Total: 1.333 Reg: 1.33 ot: 0.00) 0.000 14.85 0.00 14.85
[ :===I================~=============~~=,=~=~=~====~~=;~============~~===r====~====~===================~===============================
: .GRANDTOTALS: (LABOR HOURS -> Total: 47.000 Reg: 47.00 ot:- 1l_00).. 0.000 !533.53 3078.04 3611.57
t'1ay 13, 1996
3:3() pm
Page 1
Et'1C
u JEFFERSONVILLE SEWER DEPT.
701 CHAt'1PION RD
JEFFERSONVILLE,IN 47130
Line Segment/Manhole/Catch Basin Maintenance History
Selection Criteria:
Structure Number........All
Date (Date Completed)...04/01/96 to 04/30/96
Maintenance Code........AII
Type of Maintenance.....Preventive Maintenance
Structure Type....~.....All
=====================================================================
"'.:
Structure NLlmber Type Mai ntenance Code Last Date
------------------------- -----~------------------- ----.....----
4-40- .. .- 4-42 L .JET AND VACTORED ,)4/12/96
:rC-170A C JET AND VAC70RED 04/16/96
.- '-5 ""'5 ~t-36 L Ji::.T AND VACTORED, 04/17/96
.-....-..::,--
"~-36- 5-'39 L JET AND VACTORED 04/17/96
. ~~ - 3"6-- ..... '0-44 L JET- AND VACTORED' 04/17/96
~1-39- 5-41 L JET AND VACTORED 04/17/96
. 5-43- 5-44 L JEt AND VACTORED 04/17/96
49- 5"7 L JET AND VACTORED 04/17/96
...J
5-44- 5-46 L JET AND VACTORED ()4/17/96
5-46- 5-47 L JET AND VACTORED 04/17/96
5-44- 5-43 L JET AND VACTORED 04/17/96
5-38- 5-37 L JET AND VACTORED 04/17/96
1B-82 C JET AND VACTOR.ED 04/17/96
5-69- 5-71 L JET AND VACTORED 04/24/96
5-71- 5-70 L JET AND VACTORED 04/24/96
6-29- 6-13A L REMOVE ROOTS WITH CUTTER 04/26/96
5-92- 5-94 L JET AND VACTORED 04/26/96
======================'===============================================
. - , ~... t. 1'"
',.'"
:~:- ""
['0
i ,J
j i
r:
lJ
V',j
j'
"
D
ri
ti
o
ATTACHMENT C
fl
L!
Maintenance & Repair Expenditures for March
JEFFERSONVILLE, IN
c
Thursday, May 23, 1996
Page 1
0'1
:1
! i
~
~
L
f>i
tJ
f1
tJ
01
, I
.~:""'
c
P.O. 0
4/1/96
4/1/96
4/1/96
4/1/96
4/1/96
4/3/96
4/3/96
4/3/96
4/3/96
4/3/96
4/3/96
4/3/96
4/3/96
4/3/96
4/8/96
4/8/96
4/8/96
4/8/96
4/8/96
4/8/96
4/9/96
4/9/96
4/9/96
4/12/96
4/12/96
4/12/96
4/19/96
FUEL FOR
MAINTENANCE AND REPAIR EXPENSES
Jeffersonville, Indiana
Description
10TH ST. GENERATORS
Amount I
458.70
RAS PUMP OIL
$252.95
$75.80
$3.68
$9.16
$0.99
$343.10
$211.00
$334.10
$10.08
$21.81
$83.77
$17.33
$17.33
$29.12
$17.05
$175.29
$60.26
$3.77
$11.66
$7.12
$1.79
$10.48
$136.50
$395.84
$406.14
$17.75
CLUTCH SERVICE AND ADJUSTMENT
SCAN, KEY TO VEHICLE
MILL CREEK L.S. STARTER
KEY TO FRONT DOOR FOR STEPHANIE
DUMPSTER DISPOSAL FOR VACTOR PAD
GARAGE DOOR REPLACEMENT DOOR OPENER CARD. CIRCUIT
BOARD
DISC FOR SLUDGE TRANSFER PUMP #1
... tOU~T & SPRING STRE.ET CB REPAIR
.... ~ . . .
- .
LOUISE STREET LATERAL REPAIR - ROOT INTRUSION
WINDSHIELD WIPER MOTOR & WIRING & TAILGATE CABLE - VEHICLE
7155
GLOVES FOR SAFETY
GLOVES FOR OPERATORS
SCREW DRIVER SET FOR PLANT MAINTENANCE
WELDING GAS & AIR TANK RENTAL
REPLACEMENT VALVE FOR S02 FEED SYSTEM
BRAKE DRUM/ROTORS FOR VEHICLE 6413
BATTERY FOR FLASHLIGHT 6V
REPAIR PARTS FOR SEAL WATER SYSTEM SPRING ST. L.S.
OPERAnONALSUPPLlliS
PIPE PLUGS & BOLT FOR CEDARVIEW #1 PUMP--
AIR TOOL OIL AIR PUMP - CEDARVIEW
PLANT SAMPLER STRAINERS REPLACEMENT
WELDING ROD - ASSORTED & CANISTERS
TOW CABLE FOR VEHICLES 4306 & 4307
OIL 10ND FOR BUNTON MOWER 30 WND
JEFFERSONVILLE. IN
Total: $5,118.14
J~FF~RSONVILL~, IN
~
l!
n
[. i
'iJ
",.;,/
ATTACHMENT D
Repair & Replacement Expenditures
f!
lJ
C
[,
.,
C
[
f'
:..1
JEFFERSONVILLE, IN
Friday, May 24, 1996
I
. . ate
6/29/95
7/19/95
[
8/11/95
8/21/95
8/21/95
9/1/95
9/1/95
c
9/1/95
9/1/95
9/1 /95
9/1/95
9/1/95
O,j
" I
"oJ
9/1/95
9/20/95
9/22/95
9/25/95
9/25/95
1 0/9/95
1 0/9/95
10/9/95
1 0/9/95
1 0/9/95
10/9/95
["
, I
if
l_.;
1 0/9/95
1 0/9/95
1 0/18/95
~
[,.~
[,
REPAIR AND REPLACEMENT EXPENSES
Jeffersonville, Indiana
Description
..
INCUBATOR FOR LAB
NEW JET TRUCK HOSE
MILL CREEK L.S. - CLEANED & BAKED MOTOR
INSTALLATION OF TEMP. BYPASS AROOUND SENSING DEVICES AT
MILL CREEK
SUMP PUMP - CEDARVIEW L.S.
TEMPORARY HOOKUP AT TENTH STREET FOR EMERGENCY
OPERATION
PUMP REBUILD KIT FOR CEDARVIEW
SOLENOID FOR CEDARVIEW
BLOWER FOR CEDARVIEW
SUMP PUMP FOR CEDARVIEW
. ,.' ;. ~ : .
PIPE 'COUPLING F6R CEDARVIEW
SUB PUMP FOR CEDARVIEW
REPAIR BLOWER FOR CEDARVIEW
PVC FOR CEDARVIEW
MILL CREEK - ALL THREAD 3/4"
MILL CREEK SEAL LINE
MILL CREEK COUPLING HUBS
PLANT GENERATOR REPAIR
SCREWS & BOLTS FOR MILL CREEK LIFT STATION
PUMP PARTS FOR CAMP POWERS MOTOR
CHECK-VALVEFOR CAMP POWERS,FOR L.S.
GATE VALVE FOR CAMP POWERS LIFT STATION-
FLANGE & GASKET FOR MILL CREEK L.S.
PIPE FOR MILL CREEK REHAB.
PUMP RENTAL FOR CAMP POWERS
CAMP POWERS PUMP REHAB
CAMP POWERS LIFT STATION GATE VALVE
Page 1
$1,623.09
$637.14
$592.53
$7.45
$1,314.21
$125.78
$158.00
$60.58
$209.35
$7.45
$103.63
$327.89
$13.92
$5.72
$13.70
$37.00
$1,597.12
$115.52
$349.56
$546.99
$278.99
$55.56
$239.90
$191.60
$2,500.00
$314.21
JEFFERSONVILLE, IN
Friday, May 24, 1996
I
REPAIR AND REPLACEMENT EXPENSES
Jeffersonville, Indiana
Description
paWERS
10/25/95 MILL CREEK PUMP DISCHARGE spaaL PIECE
10/25/95 caN NECTaRS FaR CAMP paWERS
10/25/95 ELECTRICAL WIRES FaR MILL CREEK
11/13/95 LANDSCAPING aF PLANT
11/14/95 LANDSCAPING
11/14/95 LANDSCAPING
11/14/95 LANDSCAPING
11/14/95 ' LANSCAPING
11/14/95 ' MAN HaLE RISERS
12/15/95
12/28/95
12/31/95
fl
tJ
2/1/96
2/1/96
2/28/96
3/4/96
3/6/96
3/6/96
3/6/96
3/19/96
3/19/96
3/19/96
3/19/96
~
3/22/96
3/26/96
3/27/96
[,
..,
p,;;.
PRaViDE's' INSTALL GRaUp 7A caNTRaL PANEL
MANHaLE AND VALVE LaCATaR
REcaNDITlaNED MaTaR AT RIVERPaRT II L.S.
caMPUTER HARD DRIVE FRO. PLANT caMPUTER
REPLACE SHAFT & REBUILD #1 PUMP @ SPRING ST. L.S.
REPLACEMENT/UPGRADE aF PLANT PRaCESS caMPUTER
saFTWARE INSTALLATlaN FaR PLANT REPLACEMENT caMPUTER
EWING LN. L.S. ELECTRIC caNNECTlaNS
EWING LN. L.S. REPLACEMENT MaTaR
REPLACE paRT ABLE RADIO. - caLLECTlaNS
REPLACEMENT MOTOR-EWING LANE LS.
TIRES FaR SEMI & JET VEHICLES
CAMP paWERS L.S. caNT. PANEL, L1GHTS&PWR. MaNITaR
REPLACEMENT BELTS FaR FILTER PRESS-SHIPPING CHGS.
BRUSH'S FaR BARSCREEN Na.1 AT PLANT
UPGRADE aF waNDERWARE
BATTERY ANALYZER & ADAPTERS FaR paRT ABLE RADlas
Page 2
Amount
$600.00
$25.05
$9.74
$808.51
$89.25
$577 .50
$808.49
$3,937.50
$3,722.28
$3,727.36
$923.90
$1,081.22
$1,500.00
$2,500.00
$2,740.00
$350.00
$49.73
$883.88
$787.50
$914.92
$2,846.80
$2,035.00
$41 .26
$1,072.00
$900.00
$836.43
JEFFERSONVILLE, IN
c
c
r
[
Friday, May 24, 1996
I
!
REPAIR AND REPLACEMENT EXPENSES
Jeffersonville, Indiana
Page 3
P.O. Date Description Amount
4/8/96 REPLACEMENT BELTS FOR FILTER PRESS #1 $2,668.00
4/12/96 INSTALL REPAIRED CIRCUITBOARD IN VFD SPRING ST. L.S. $133.00
4/12/96 REPAIR CIRCUITBOARDS VFD SPRING STREET L.S. $615.00
"." .....,
4/19/96 PLANT & 3 MAIN LIFT STATION ALARM UPGRADE PHASE I $20,000.00
4/19/96 ELECTRIC PANEL ENCLOSURE FOR CAMP POWERS L.S. $178.80
4/25/96 MOUSE ADAPTOR (PERS. REIMB) $7.99
4/25/96 PC ANYWHERE SOFTWARE (PERS. REIMB.) $124.99
,
4/25/96 VOICE/DATA PORT (PERS. REIMB.) $73.99
4/29/96 INSTALLATION OF-ADDITIONAL LIGHTING AT POWERHOUSE L.S. $470.00
4/29/96 ". .POW~R MONITOR FOR POWERHOUSE L.S. $325.00
,OJ.. ..
.~~-- . ".
Total: $72,668.86
. . , ~,.!,' ~ .'
JEFFERSONVILLE. IN
r
L.
r
,
L
In
lc-oJ
r
I!
ri
LJ
o
[1
. ~.,~
fl
u
ATTACHMENTE
Capital Improvement Expenditures
JEFFERSONVILLE, IN
r
L,
f:l
, ';
,: J
t":"":
, :
:i,<c_~
[,:
;01
o
D
WASTEWATER TREATMENT FACILITY
Description Estimated Actual %
Cost Cost Complete
Installation of Equipment Storage Building $25,000 $20,543 100
Seal Drive & Parking Area $4,400 $4,500 100
Purchase 72" Finishinl! Mower $1.500 $2.550 100
COLLECTION SYSTEM
Description Estimated Actual %
Cost Cost Complete
Repair Manhole at Eighth & Meigs $70,000 $3,293 10
Repair Line at Eigth Street, Mechanic to Penn $85,000 Pending 5
Various Renairs to Downtown Area $45.000 $0 Hold
LIFT STATIONS
Description Estimated Actual %
Cost Cost Complete
Renlace Pumn at Middle School $20.000 $0 Hold
VEHICLES
Description Estimated Actual %
Cost Cost Complete
Purchase Vacuum/Jet Truck $146,000 $147,770 100
Convert 1990 Dodge D50 to a Utility Truck $3,500 $2,762 100
Renlace 1987 Ram with a Y2 Ton Pickun $17.000 $11.194 100
JEFFERSONVILLE, IN
["I
Ll
.,'1
[
rr
LJ
[
ATTACHMENTF
Safety Inspection Report
JEFFERSONVILLE, IN
ENVIRDNlvIENT AL MANA GEMENT CORPORA TION
MONTHLY SAFETY INSPECTION
CHECKOFF SHEET
JEFFERSONVILLE WASTEW ATERTREATMENT FACILITY
701 CHAMPION ROAD
JEFFERSONVILLE, IN 47130
(812) 285-6451
rpr~
'I-/9~9~
A.-- :gxrsoii'al \~otecti,,:~ Clothing
...--
,
r
i."
..,....,,,...,
1. Safety Helmets Provided .
(for Personnel & Visitors)..::.............................. @ NO N/A
2. Hearing Protection .
(for High Noise Areas)....................................... @ NO N/A
3. Eye Protection - Goggles, etc.
(for Personnel & Visitors).................................. @ NO N/A
4. Gloves
(for Personnel)................................................... @ NO N/A
5. Rubber Boots with Steel Toes
(provided for Personnel)..................................... @ NO N/A
6. Rain Suits Provided
(for Personnel)................................................... ~ NO N/A
7. Is Respiratory Protection Provided including
ventilators and hoods over high dust areas, dust
masks, etc. (for PersonneI)................................ ~ NO N/A
B. Safety Devices and Equ'ipment
: ~:. ..,
[
1. Non-sparking Tools in areas 'where flammable
or explosive gases may be present?..................... @ NO' N/A
2. Oxygen Deficiency, Toxic, & Explosive Gas .
indicator.. ............... ............ ............. ....... ............ ~ NO N/ A
3. Self-contained Breathing Apparatus for entry
to chlorine room................................................. @ NO N/A
4. Confined Space Entry Equipment Available
~~~~c~, ~~i~~,c~~:~~~.~~~~~~.~~~.~~~.~:.~~~~~.~.l.~. @ NO N/A
c
[
5. First Aid Kits with proper & adequate supplies
..,readily a:vailable fo~ any First Aid Emergency...@v NO N/A
6. Traffic Control Cones-Available........",.............. @ NO. N/A
1~ Ladders to enter manholes of wet wells )
(fiberglass or wooden for electrical work)......... @ NO N/A
8. Safety Buoys and Life Lines, Life Preservers
~a~~~~~ne:~~.c~~~.~~.(~~.~~~.~~~~:..~l~~~.f~~:~:... @ NO Nt A
II. General Plant Safety .
.'
1. Are Personflel trained in the use-and l'ocation
_; of safety equipment at the plant...................... @ NO N/A
;'';' 2. Ar,~there railings. around all tanks with
.--openings chained off..........;.............;;............ @ NO N/A
3. Are holes covered? Including all pits & wells,
drains, valve holes, hatch covers in place........ <YW NO N/A
4. Are explosion proof fixtures used where
needed........... ..... .......... ...:.... .................. ....... @ NO NI A
5. Are all equipment guards in place? Including
mowing equipment......................................... ~ NO N/A
6. Are dry wells ventilated and is ventilation
7. ~:;:'~~r~::~~ a~:b~;~.~~~~;d.&.~;;;;;~;ibi;.. m ~g
8. . Is proper liquid flammable storage used.......... YES @
9. Is general plant cleanliness being practiced?
Including floors (No oil or grease or pools of
water), Storage Areas (No clutter & supplies
stored properly), Chlorine Room (Free of
clutter), Laboratory........................................ YES ~ N/A
10. Are all walkways, exists and routes, &
stait\\1a'ys clear &'unobstructeCl (No ice, olls,
water, grease, or debris)............................__. .. YES @ N/A
...11. Are all slippery surfaces posted and/or covered
with anti-skid material, including stair treads
and ramps, in good repair and covered with
non -skid surface..............................................
12. Are all mats and rugs in good repair so as not
to become tripping hazards.............................
13. Are work area layouts adequate......................
14. Is lighting adequate in all areas (Work areas,
stairways, walkways, etc.)..... ........ ..... ............
15. Are noise levels within allowable limits or
N/A
N/A
N/A
&:1)
~
~
NO
N/A
NO
NO
N/A
N/A
NO
N/A
" NO N/A
danger areas posted....... ...................... ...........
16. Are toilet facilities available & clean............... NO N/A
17~, Is safe drinking water available....................... NO N/A
18. Is pest control adequate.................................. NO N/A
19,. Are all exists properly marked..........:............... E NO' N/A
I
20. Is inclement weatl1er protection provided at
. . entrances (mats, safety strips, de-icers, etc.).... @ NO N/A
21. Are tripping hazards eliminated at all doors
(threshold plates in good repair. etc.);............. ~ NO N/A
22. Is safety glass provided in all doors................. YES NO N/A
23. Are handrails provided on stairs (Both sides ~
if n'<~cessary) ..... ..... ........ ..... .............. ............. NO N/A
24. Are ladders properly anchored....................... NO N/A
..... 25~ Are.fixed laadersprovided with safety cages
f
L... _; or safety side rails......................................... @ NO N/A
:-....26. Are, all elev.ation differences between floors
..~deat1y defined and properly lighted..:............. NO N/A
27. Are portable. ladders in good condition........... NO N/A
28. Kick boards in place if needed........................ NO N/A
29. No Broken steps:............ ....:................. ......... NO N/A
30. Are ashtrays provided and emptied regularly.. NO N/A
31. Are trash cans covered and emptied regularly. YE NO N/A
..' 32. Are portable hoists for lifting heavy equipment
in good repair...................................... ........... y NO N/A
33. Are plant personnel immunized for tetnus....... Y NO N/A
34. No electrical cords stretched over tanks.......... E NO N/A
35. No gas leaks........................................... ........ Y NO N/A
36. Fuel supply tank in good condition................. ES NO N/A
37. No excessively hot operating temperature on
machinery or equipment................................ @ NO N/A
38. No excessive vibration of machinery or
equipment................................................... . NO N/A
39. No water or oil being "slung" .~roQ1 eqqipI11ent NO N/A
40. Nc) \Vornor cracked equipment..................... NO N/A
41. No excessive dust on equip~ent............;...;-.;- NO N/A
42. Adequate dehumidifier and. heaters where
needed......................................................... . @ NO N/A
43. Emergency Medical Information on all
employees available for determination 'of job @
assignments.............................. ~................... NO N/A
44. Cross connections have been eliminated
between potable water supply and non-potable
source:
a. Pump & Mixer Seals................................. @ NO N/A
b. Digester Heating System Makeup Water... YES NO (N/&>
[
c. Vacuum Filter Water sprays....................., NO N/A
d. Chemical Mixing Tank............................... E NO N/A
e. Chlorinator Water Source........................... Y NO N/A
.. f. De-Chlorination Water Source.................... I NO N/A
g. Yard Hydrants. .................. .............,........ ..... NO N/A
h. Other....... ..... ................................. ............. YES NO' N/A
.'. III. Electrical Safety
1. Is all eleCtrical circuitry enclosed and identifiel NO N/A
2. Is all wiring in good condition.......................... NO N/A
3. Are the number of outlets adequate.................. NO N/A
4. Is equipment properly grounded or insulated.... @ NO N/A
5. Are extensipn cords in good condition and @.
used proper! y................................................... NO N/A
..~ :~, 6. .j Is electrica~ test equipment available. Such as @
....... . " NO N/A
.._ ._yofiineter, ampmeter, etc...................;. ............
7. Are dielectric rubber mats presents for
electrical work................... :.:~.......................... NO N/A
r 8. All control panel switches in good condition.. NO N/A
9. All control panels unobstructed...................... NO N/A
10. Are dielectric rubber gloves available.....:....... NO N/A
... 11. Are ground fault interrupters used.................. NO N/A
12. Are warning or caution signs posted............... NO N/A
13. Is control panel area clean and dry.................. NO N/A
14. Are all needed fuses or breakers in place......... NO N/A
15. Are all contacts clean and dust free................. NO N/A
16. Is there emergency stop buttons on all @
machines and equipment................................. NO N/A
17. Are personnel familiar with the electrical safety
such as lock out/tag out procedures................ @) NO N/A
18. Is power supply locked outl tagged out on
equipment presently being repaired................. QEV NO N/A
, , ;i:;' '<
. ~ .. ~.. r' l'-
IV. Chlorine & Dechlorination Safety
r
r'
1. All standing cylinders chained in place and/or
ton cylinders ch?cke~...................................... cYEID NO
2. All personnel ramed m the use of CLz..:........... <:ffi) NO
3. Appropriate repair kits available...................... ~ NO
4. Chlorine & dechlorination leak detector tied
into the facility alarm system........................... c:YE' NO
5. Ventilator fan with outside switch present and
either comes on when door opens or manually
with switch at entrance door."........................ ~ NO
N/A
N/A
N/A
L,
N/A
N/A
6. Ammonia and Sulphur for checking chlorine &
dechlorination leaks available.................. ........~ NO N/A
7. Are all safety precautions posted..................... YE NO N/A
8. Proper Chlorine wrench availableto open
C val ves............................................................. @S) NO N/A
9. Chlorine protected from direct sunlight, cool
". and dry.. ....... ...... ........ ............... .... ..... ........... @ NO N/A
10. No petroleum or other chemicals store in
~~~~~~=:;:~~h~~;.~;~;i~bi~.~~.~i~~::::::::::::::.. g; NO N/A
11. NO N/A
[
[
n
L.-.
'.: .
V. Process Chemical' Safety
1.
-
.....~ 2.
3.
4.
5.
..
6.
7.
8.
9.
10.
Are personnel trained to handle all chemicals
properly............:.... ................. .... .................::.. @ NO
I~.proper' $qfety' clothing present for the .
chemical to be handled................................... QiS) NO
Are all containers, vats, and tanks properly
I~a~~;~~;~~.~;;;;~~~.~;;l;i~.~~~~;.;~;il;;;;i;~......~ ~g
Are there proper containment of storage areas,
including curbing............................................ @ NO
Are management & employees aware of the
hazards of the materials being used..................!. NO
Knows proper response to an accidental spill... YE NO
. All MSDS available and easily accessible........ YES NO
Has complied with the 6 employer
responsibilities of the Worker Right to Know
Law? (SARA)................................................. ~ NO
Emergency Action Plan on file with local Fire,
Police Departments and appropriate Emergency
Agency............................................................ @ NO.
: \";. .~
. . , ~.. r' ;0
. '...
I
VI. Tools & Equipment
Are hand tools in good repair and stored
properly................... ...... ................. ...... ..... ..... ~ NO
Are power tools stored properly and i~ good
condition - cords, plugs, etc............................ ~ NO
Are the tools adequate for the tasks to be
4. ~::~:ec~i~~.~~~i;.~~~i~~.~d.~~..~.~~d~d~~~~~~~~~~.. ~
5. Are tool guards in place.................................. ()CE~
6. Are employees trained in th~_proper use of the
1.
2.
3.
NO
NO
NO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
r
i
L
[
various'tools they are expected to use............. @
7. Are employees given additional instruction and
periodic reviews of specialized tools and
.. equipmLent.... ... .... ....... ........ ................ ... ..... ..... ...
Are proper lifting techniques used by
employees....................................................... .
8.
@
~~
NO!
VII. Fire Safety & Protection
1. Are fire/emergency evacuation plans posted.....@ NO
2. Are employees familiar with fire/emergency
evacuation plan................................................ @ NO
3. Are.there sufficient number and types of fire ,
extinguishers. .... .., ......... ..,...,......;.;;;....;...... .... .... @ NO
4. _; ~re t~~ fire extin~uishers properly located af.ld .
IdentIfIed...... ... .... .................. ....... ........ ............ ~ NO
:'~~5. ...Ar~_the fir~ extinguishers checked annually......@ID NO
6. Are all of the fire extinguishers in working
condition................ ........ ....::.. .........~... ..... ....... @D NO
7. Are employees trained in the proper use of the
extinguishers to be used................................... cW
8. Are smoke detectors in working order............. YES
NO
N/A
NO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
NO N/A
NO @
~..
VIII. Laboratory Safety
1. Emergency Eyewash & Shower Station are
~~~:h~~;::;:;::t~~l~.~~d..~~~~~.~~~~l~.at NO N/A
2. NO N/A
3. All chemicals safely and properly stored, well
labeled and in original containers..................... cY~~ NO N/A
4. Laboratory Safety devices used such as: Pipette
suction bulbs, Eye Protection, Gloves, Aprons
or Jackets, & Tongs......................................... NO N/A
5. .. . .. \::.,~ f ,. NO N/A
No-broken/ Chlppetl or cracked.glassware........
6. No overloaded outlets............... ..................__ NO I N/A
7. Acid spill kit available........;......................:...... NO N/A
8. Emergency procedures for acid spills posted
and used by all personneL.............................. @ NO N/A
9. Laboratory Safety Rules posted and obeyed by
all personnel such as no cooking or eating from
laboratory glassware.. ........ .................. ............ @ NO N/A
X. Other Safety
1. Are the required safety programs presented
and/or attended during the year........................ @ NO N/A
2. , Is a s~itable identification system used to
identify the plant's piping system......................@ NO
3. Has the operator taken steps to remove or
~i
minimize safet)'. hazards.................................. ~ NO
4. Are all personnel provided with a shower and ~
locker for their work clothes........................... ~ NO
5. Are personnel trained in First Aid & CPR........ YES @
6. Have the following proper safety signs been
provided such as: Non-potable Water, Chlorine
Hazard, No Smoking, High Voltage, Watch
Your Step Signs in Certain Areas, & Exit Signs@ NO
7. Is your F;:rcility safety program'Up fa Date
_. (Worksafe Program)..................................."....@ NO
x 100 = 9 7
~>>-€-~~~~~ ~
;jfl +#;z ~~i Y>J~ n,R)~
~,- c<~r~La~
~< 0, ffjd.,J; ~ ~ ~ ~ J-o ~
~ rf rP. R,
c
n
~ ;
r
L
~..,;~
! ~
. (# YES)-
1."5/ + if
(# YES + tj: NO)
%
~
I.J
[
c
r:
r
fi
L
4 I.~ ~.. t. ... .'
r ~ :. .~
N/A
N/A
N/A
N/A
N/A
N/A