HomeMy WebLinkAbout09) September
, r-
-
Jf jJF;: E,<RS., "'0,' )Ni rV'I"LIL'
'j . ._, " " J ,,_', ,,' __,,' , . "., __ i
W",'A' S' iT' !!E:i,W'i',.,A'T/'E,'!,R"
/' _ . ..-'" .............! ,_ ( '. - _, . I ,'." .
TR! _TMEN-T'FACII
Monthly Operations Rep
September 2000
Prepared for:
Peggy Wilder
October 16, 2000
r--
I
....c....,..
j~>,~
r
r'
f 11
r
ENVIRONMENTAL
MANAGEMENT
CORPORATION
October 16, 2000
701 CHAMPION ROAD
JEFFERSONVillE, INDIANA 47130
812-285-6451
FAX 812-285-6454
Peggy Wilder
CITY OF JEFFERSONVILLE
City/County Building
Jeffersonville, IN 47130
Dear Ms. Wilder:
i
I
I
Enclosed please find Environmental Management Corporation's (EMC) "Operations
Repore' for the month of September 2000, containing information on the following:
1.0
2.0
3.0
Effluent Quality
Design Loading Limits
Facility Operations
3.1 Pretreatment
I
Preventive and Unscheduled Maintenance
I
4.1 Maintenan~e & Repair Expenditures
4.2 Repair & Replacement Expenditures
4.3 Electrical Expenditures
Facility Safety and Training
Sewer Collection System .
4.0
5.0
6.0
As ahvay.s, we appreciate the opportunity to be of service to the City of Jeffersonville, and we
are'available to discuss this report, or any other aspect of our operations, at the convenience
of the City.
Sincerely,
ENVIRONMENTAL MANAGEMENT CORPORATION
{i:~~
Project Manager
JET;sb
'e
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
. .0 E FL.UENT QUALITY
I ....,
Du.ring Sep'~emb~(,effluent quality was within NPDES permit limits for CBOn, TSS and NH-3. Table 1.1
summarizes the effluent quality data. Attachment Acomains Time Series Plots of daily Carbonaceous
Biochemical Oxygen Demand (CBOD) and Total Suspended Solids (TSS) values. Attachment B contains Time
Series Plots of Aeration Mixed Liquor Suspended Solids (MLSS) and Sludge Volume Index (SVI).
D
n
, I
t ,
n
ti. i
1.,";
,.....,
r i
U
Table 1.1
EFFLUENTQUALITY
- ... .-.,..- ".,"",.
Parameters Permit Limit Monthly Average
mg/L mg/L
"
Carbonaceous 25 6
Biochemical Oxygen
Demand (CBOD)
Total Suspended Solids 30 6
(TSS)
"
E-Coli 235 13
(Colonies! 100 ml)
-
Chlorine Residual .05 daily .01
Maximum
Ammonia 3.0 0.160
Average Dry Weather 5.2 See Table 1.2
'Flow
,.
Table 11.2
WET WEATHER VS. DRY WEATHER
Nu.mber of Wet Days * 19
" '" .",~ -~."
Average Flow of Wet Days 4.31 MGD
, '" ..
N umber of Dry Days 11
... .. .. '" ..""."""""-"-"".,..".,,",,,-,,,,,~....,.,,"...,"....~,=-- n__ ..
Average Flow of Dry Days 3.53 MGD
I
tWet IOay = Rain (> O.()5 in) and one day after
~.O D~SIGN LOADING LIMITS
J
I
n"'i
~, >l
:!!
The F ows and Loadings report for September 1994 through September 2000 can be found in Attachment C.
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
-
n
.0 FA.CILITY OPERATIONS
I ,i ,: '
, , .
I' . '1" \
Attachment D contains a list of septic haulers that discharged at the facility during the month of September.
c
,
During September the treatment processes performed very well. The facility experiem:ed normal rainfall for the
month.
The sludge settleability and Sludge Volume Indexes (SVIs) in the secondary treatment process were normal for
'I '
the month of September.
I
~
U
This darifier project is nearing completion. The clarifier should be completed near the end of October.
; i
i
I
3.1 PRETREATMENT
ketr1tment activities for the month of September include:
1- - I !
i I. . i
! ~. An annual inspection was performed at George Pfau.
~ Annual sampling was performed at VogI' Valve and Alumnitec.
J Annual Total Toxic Organic's (TIO's) sampling were performed at VogI' Valve, Voss Clark, Cargo
Clean, IWR, and Galvpro.
. On September 19,2000, a shaft on the sludge collection system of the Wyandot dissolved air
floatation (DAF) unit failed. Maintenance crews at Wyandot responded immediately to initiate
repair of the unit. They slowed production down and used an emergency storage tank as long as they
could. They did bypass for a hour, estimating a volume of 15,000 - 20,000 gallons.
. r.O P , ':E~'fIVE ~ND UNSCHEDULED MAINTENAiCE
Preventive maintenance was performed on all equipment as scheduled for September. There were 15
unscheduled maintenance tasks performed.
A list of unscheduled maintenance work orders and sewer calls is included as Attachment E.
1vfain~enance. & Repair expenditures for the month of S~ptember are detailed in Attachment F . Table 4.1
presents the amount expended in September. Table 4.2 Includes the same information for Repair &
fM.1 Replacement expenditures. Attachment G contains detail of Repair & Replacement expenditures for
r ii September.
L."J !
n
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
n
. ,
\,.j
Table 4.1
MAINTENANCE & REPAIR EXPENDITURES
I
',. "
Time Period Amount Budget (Over)
ExpmJed Under
September
$3,657 $4,200 $543
August $5,698
Year-To-Date $23,226 ,000 ($2,226)
,.-.
~, I
i .
t
r-:
t
,
~
r
t
Table 4.2
,
REPAIR & REPLACEMENT EXPENDITURES
Time Period Amount Budget (Over)
September $8,105 $8,334 $229
August $16,174
I
~ "' .'.'"".,""". -
Y ear- To-Date $97,170 $41,670 ($55,500)
I
I
I
4.3 ELECTRICAL EXPENDITURES
I
Tablei~.4 presents total electrical expenditures for September 2()OO. The next table presents facility electrical
rnau,",,,, Seprember 2000.
n
! I
t-_J
,.......
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
t ~
fJ
I
l
t
,
Time Period Amount Budget (Over)
Expentied Under
September $13,221 $12,953 ($268)
(actual)
.
Year-to-Date $69,210 $64,765 ($4,445)
(actual)
~-~- - - - -- "0""__"_---
Table 4.4
FACILITY ELECTRIC.s\L EXPENDITURES
SEPTEMBER 2000
, I
,....,
to...,;
,
t
'--
, p
r
~.
j t:
i
5.0 FACILITY SAFETY & TRAINING
k,.fe~ impecrion was rondo=! on Seprembe, 29, 1999. The ..ring was 100%. There we<e no deficieoci",
teporred. Our plant is in great shape.
I
A cop of the Safety Inspection report is included as Attachment 1.
I_c. .... .
Safe training was provided by our Safety Coordinator on Fire Protection Safety for the month of September.
I
6.0 S WER COLLECTION SYSTEM
~""ing ~ ~onm there were 25 rewer a&s. The a&s we<e <eia@l '" me t<,lJpwing;
! I', tl,', ,"
. Residential problems 9
. Bl()<::kages in the City's main line 3
. Catchbasins 6
. Odor <:omplaints 2
. Roots 0
. Other reasons 5
. Storm Related 0
I · Backup 0
, I
ColleJtion system personnel have been cleaning and performing preventive maintenance work at various liftstations.
~eve~lstations have been painted inside and out. Catch basins have been checked and cleaned as needed. ':;our of the
~SO gates have been repaired and are scheduled to be put ba<:k in place during October. The remaining thirteen
tso ptes are being lubricated and operated and will be put on a quarterly exercising schedule. Check valves and
other routin~ maintenance i~ernsare being completed. Lift stations are continuing to be painted as we scheduled them
(see list month's report for list).
,
I
Jeffersonville Wastewater Treatment Facility
Monthl 0 erations Report
I,. ,.
Table 6.1
MONTHLY COLLECTION ANALYSIS REpORT
Project September Year to Date
""
Feet of Sanitary Sewer 1,716 14,508
Cleaned
Feet of Storm Sewer Cleaned 0 1,058
Catch basins Cleaned Grate Tops = 17 Grate Tops = 119
Vactored = 12 Vactored = 149
Catchbasins Raised 0 0
Feet of Sanitary Sewer 1,748 9,174
Televised
Sewer Tap Inspections 4 17
Dye Tests 0 1
Manhole Castings Replaced 0 0
Air Tests 19 30
Manholes Sealed 0 0
-- -- -- - "-- -------- -- - -. - "-
I .'
"ServIce Calls Backup Odor Main Resident Stonn
Received Block Problem Related
Backups
25 0 2 3 9 0
Locates R(J(Jts Other Catch Basin
" " , ".
85 0 5 6
r:--.
.--
~.
.
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
~TTACHMENTS -
I I !..
. , . 1., ',;;inrne SeriesPI~ts - rnon .8ll'SS
. \.. 'I'
B Time Series Plp.ts - MLSS & SVI
C Flows ~ Lo.ldings Report - September 1994 through September 2000
D Septic Haulers Report .
E Unscheduled Maitlt.enan:ce Work Orders 8l Sewer Calls
F Mainten:l.l1ce & Repair fu:penditures
G Repair & Replacement fu:penditures
H Safety Inspection Report
I II.
Attaclunent A
TiIne Series Plots
CBOD &.. TSS
26
21
16
11
6
')
~~'l
~~-]
~'-.l
_.:] ..,."..-]
J effersollville W ~ste~ater Tre~tme~t Facility. .
Effluent CBOD I TSS
.
- Effluent CBOD - Effluent TSS
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
September 2000
Attachment B
Thne Series Plots
MLSS & SVI
[
.--+.- )
~-l
.......]
r::J r::J:==:J
::--~)
)
JeffersonvilIeW astewater lirealIrieritFacility------
.- __ Aeration Mixed Liquor
~uspended Solids (MLSS) mgll
- MLSS mgil - Design Limit MLSS
4500
4000
3500
3000
2500
2000
1500
1000
500
0
1 2 3 4 5 6 7 8
9 10 II 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
September 2000
Operated and Maintained by:
Environmental Management Corporation
:::!,"'")
J effersonville-W-aste-water-T-r-eatment-Facility---
Aeration Mixed Liquor
Sludge Volume Index (SVI) mllgm
- SVI mllgm - Design Limit SVI
160
140
120
100
80
60
40
20
0
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324 25 26 27 28 29 30
September 2000
Operated and Maintained by:
Environmental Management Corporation
,..-:
t. i
,fA
r
'AttachInent C
Hows &. Loadings Report
May 1994 ~ SepteI11ber 2000
-~~l ""'7:1 .-"~:l
-_..--._--~---
Jeffersonville Wastewater Treatment Facility
~May 199~eptember 2000
-...
. .
Design - --"% Design % Design % Total
Month Flow (MGD) Limit . Desi~ TSS (Ibs) Limit Desi~ BOD (Ibs) Limit Desi~ Rain
May 1994 4.50 5.2 . 87% 6,042 10,105 60% 3,490 10,581 33% 2-.35
June 3.84 5.2 74% 8,038 10,105 80% 3,843 10,581 36% 3.70
July 3.68 5.2 71% 8,311 10,105 82% 3,913 10,581 37% 2.25
Aug 3.55 5.2 68% 7,668 10,105 76% 3,819 10,581 36% 2.40
Sept 3.81 5.2 73% 8,726 10,105 86% 4,798 10,581 45% 3.65
Oct 3.71 5.2 71% 8,493 10,105 84% 4,356 10,581 41% 2.20
Nov 4.09 5.2 79% 9,483 10,105 94% 4,025 10,581 38% 3.85
Dee 4.19 5.2 81% 10,434 1O,105 103% 3,886 10,581 37% 4.45
Jan 1995 3.81 5.2 73% 9,231 10,105 91% 3,864 10,581 37% 3.75
Feb 2.92 5.2 56% 6,393 10,105 63% 2,710 10,581 26% 1.60
March 2.87 5..2 55% 5,572 10,105 55% 2,480 10,581 23% 2.05
April 2.63 5.2 51% 4,211 10,105 42% 2,178 10,581 21% 2.80
May 3.46 5.2 67% 3,593 10,105 36% 1,622 10,581 15% 10.25
June 2.79 5.2 54% 4,824 10,105 48% 2,683 10,581 25% 3.35
July 2.31 5.2 44% 4,244 10,105 42% 1,809 10,581 17% 2.50
Aug 3.22 5.2 62% 6,338 1O,105 63% 3,491 10,581 33% 3.45
Sept 2.33 5.2 45% 5,962 10,105 59% 3,022 10,581 29% 1.60
Oct 2.87 5.2 55% 6,235 10,105 62% 3,124 10,581 30% 5.25
Nov 2.64 5.2 51% 7,449 1O,105 74% 2,519 10,581 24% 2.75
Dee 3.22 5.2 62% 9,211 10,105 91% 3,620 10,581 34% 5.85
Jan 1996 4.29 5.2 83% 8,229 1O,105 81% 7,084 10,581 67% 5.00
Feb 3.28 5.2 63% 8,480 10,105 84% 6,620 10,581 63% 2.63
March 5.45 5.2 105% 11 ,091 10,105 110% 9,045 10,581 85% 5.98
April 5.85 5.2 113% 12,148 10,105 120% 9,075 10,581 86% 6.50
May 8.17 5.2 157% 14,513 10,105 144% 10,902 10,581 103% 7.30
June 5.74 5.2 110% 12,447 10,105 123% 10,149 10,581 96% 3.72
July 4.36 5.2 84% 11,672 10,105 116% 9,345 10,581 88% 3.40
Aug 3.83 5.2 74% 11,148 10,105 110% 10,312 10,581 97% 1.90
Sept 4.96 5.2 95% 12,865 10,105 127% 9,928 10,581 94% 9.02
Oct 4.25 5.2 82% 11,059 10,105 109% 8,4 71 10,581 80% 2.60
Nov 4.80 5.2 92% 13,771 10,105 136% 11 ,689 10,581 110% 4.10
Dee 5.77 5.2 111% 14,725 10,105 146% 11,020 10,581 104% 4.90
Jan 1997 5.59 5.2 108% 19,581 1O,105 194% 16,597 10,581 157% 3.85
Fcb 5.84 5.2 112% 22,892 10,105 227% 15,732 10,581 149% 12.25
March 10.62 5.2 204% 22,586 10,105 224% 13,197 10,581 125% 6.30
April 5.63 5.2 108% 17,584 10,105 174% 10,330 10,581 98% 2.31
May 6.27 5.2 121% 18,145 10,105 180% 9,726 10,581 92% 7.15
June 7.05 5.2 136% 13,347 10,105 132% 8,937 10,581 84% 5.05
July 4.32 5.2 83% 13,979 1O,105 138% 12,862 10,581 122% 0.55
Aug 4.43 5.2 85% II ,925 10,105 118% 11,817 10,581 112% 3.95
Operated and Maimed by:
Environmental Management Corpora/ion
Month
Sept
Oct
Nov
Dee
Jan 1998
Feb
March
April
May
June
July
Aug
Sept
Oct
Nov
Dee
Jan 1999
Feb
March
April
May
June
July
Aug
Sept
Oct
Nov
Dee
Jan 2000
Feb
March
April
May
June
July
August
Sept
Flow (MGD)
3.84
3.60
3.81
4.23
4.71
5.31
4.77
5.62
5.57
5.83
4.90
5.04
4.03
3.62
4.01
4.67
6.63
5.36
6.00
5.70
5.35
6.45
5.57
5.49
3.96
3.77
3.80
4.49
4.51
7.26
5.45
5.49
4.03
4.17
3.67
3.92
4.03
Design
Limit
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
Jeffersonville Wastewater Treatment Facility
-~MayT9~tenibet~OOO---
.
-. . % Design % Design % Total
. Desi~n TSS (lbs) Limit Desi~ BOD (lbs) Limit Desi~ Rain
. 74% 9,166 10,105 91% 10,160 10,581 96% 1-.47
69% 12,539 10,105 124% 10,439 10,581 99% 1.47
73% 8,516 10,105 84% 10,359 10,581 98% 3.35
81% 9,208 10,105 91% 8,290 10,581 78% 4.30
91% 10,920 10,105 108% 8,838 10,581 84% 4.15
102% 7,661 10,105 76% 8,636 10,581 82% 1.65
92% 9,309 10,105 92% 11,656 10,581 110% 5.85
108% 9,187 10,105 91% 8,812 10,581 83% 7.60
107% 8,640 10,105 86% 10,917 10,581 103% 4.71
112% 10,016 10,105 99% 10,794 10,581 102% 7.46
94% 8,418 10,105 83% 6,661 10,581 63% 7.90
97% 8,112 10,105 80% 7,356 10,581 70% 4.22
78% 8,302 10,105 82% 8,100 10,581 77% 0.05
70% 7,216 10,105 71% 6,612 10,581 62% 2.40
77% 7,525 10,105 74% 7,659 10,581 72% 2.60
90% 10,399 10,105 103% 8,919 10,581 84% 3.35
128% 13,381 10,105 132% 10,064 10,581 95% 11040
103% 9,566 10,105 95% 7,868 10,581 74% 2.50
115% 9,508 10,105 94% 7,756 10,581 73% 3.40
1l0% 12,360 10,105 122% 10,126 10,581 96% 3.32
103% 10,976 10,105 109% 9,281 10,581 88% 2.10
124% 11,404 10,105 113% 10,759 10,581 102% 6.30
107% 8,362 10,105 83% 9,523 10,581 90% 0.70
106% 7,921 10,105 78% 9,569 10,581 90% 0.95
76% 5,945 10,105 59% 6,209 10,581 59% 0.70
73% 6,949 10,105 69% 7,703 10,581 73% 2.70
73% 8,050 10,105 80% 7,796 10,581 74% 2.70
86% 9,287 10,105 92% 7,564 10,581 71% 6.17
87% 8,839 10,105 87% 6,883 10,581 65% 4.65
140% 10,354 10,105 102% 9,324 10,581 88% 6.10
105% 8,727 10,105 86% 8,045 10,581 76% 2.75
106% 8,608 10,105 85% 6,227 10,581 59% 3.70
78% 7,932 10,105 78% 7,293 10,581 69% 1.00
80% 8,347 10,105 83% 7,512 10,581 71% 4.11
71% 8,172 10,105 81% 6,183 10,581 58% 4. II
75% 6,800 10,105 67% 6,310 10,581 60% 4.11
78% 6,756 10,105 67% 5,478 10,581 52% 4.11
2
Operated and Mainted by:
Environmental Management Corporation
r
15,
AttachInent D
Septic Haulers Report
SepteI11ber 2000
r>
U
r
r
.
t "
r
.
i )
n
i ·
\ '"
..-,
~..i
LJ
r"'
II
~ !
r
I I
t
,......
f I'
I'
,......
f
f
,......
!,
! I
SEPTIC HAULERS REPORT
,
September 2000
II.
- -,
Loads Delivered To Treatment Facility
'ji""'~~;::;:r.;:J1:J:~",
Hauler September Hauler Total (YTD)
~~><Wi~LliiWllll<lii~ ........~,:IllliHiJI"illllllili~~' , '^ ,~..-<~
Rumpke of Indiana 5 34
,-,~ l!!!:'-'=.c....,....," -.....--. _'_"'"''''_"~"''~'''~_'''''"'''I!lill!\l'~!!~
TOTAL 5 34
Gallons Delivered To Treatment Facility
,~.~~~...J.."..:""",..~:::::il~=::;::=
!lllIltiIl U!lllQ~ ~;Illl&r",,:m
Hauler September
Hauler Total (YTD)
"~~""I"""'",,,",W=i-"",,,,,,,~
Rumpke of Indiana
'. ' " TOTAL
7,000
7,000
42,900
42,900
"________~ _ _.__~_____ .~--.-*---M ___ _ "--'"- ___~ __
Attachrnent~
Unscheduled Maintenance Work Orders
""'..,', ,......._.._._.... ,'..,.,........ _..,,',.. ,...__.,'.""..L,..'V,...._.,"",."f.;:.....,"'_~.:,.__>...',.:._._. ".............".........;......,.....:;.:_. ;,_,...; '. ._.,yi.:<,.:,*'..:_,.i.:,:'.:."".~_,..
&
Sewer Calls
r::=-;::,1
Work Order History Comprehensive Work Order History Comprehensive
10/912000 Page 2
1(N 9/2000 Page I
R__ Time (Minutes)
I TELEVISING LINES WO No. 9803984 a..e Date 912212000 I Dela1 Descriptioo
EquIpment Nom TELEVISING
Task No. TV mUCK Originator EquIpment Descriptioo SEWER I.INFS TV
WOTwe Telephone No.. 1_- M.... Be DoWl> No
Assigned By Extension SUb-lo<atioo J _ Estimated Down. Time
AssIgned'fo Request Date 9/812000 00:48:05 Sub-ln<atIna2 - nown Time
Seheduled Surt Date Completion Date 9/812000 SUb-1...tioo 3 - R_forOUlage
Scheduled t1nish Date Completlnn Time 00:48:41
EsI. DunlIInn (da15) Conunents
Actual Dorallnn (da1s) Emplo1"" Lahnr Hours 24.00 STARTED TO TI/ ST. RD. 62
Priority 3.00 Contraet Labor Hoors WENT TO SHOP TO FIX TV CAMERA. THEN WENT' TO ROMA DRIVE TO TV FOR BOB MILLER' S CREW THE REST OF
DAY.
Perform by Wacranty No Tolal Labor Hours 24.00
Expense aa.s TI/'D - 530.4'
Response Time (Days) TI/'D - 358'
Response Eme (Hours) I Employee Code ThjuipmeDl No. Work Date First Name J.astName Regular HOOfS Overtime I
Respo_ Time (Minutes) Boo..
Delay Descriplion
00 TELEVISING 9I2!N2000 DONNIE GRIFFIN 8.00
Equipment Nwn TELEVISING m TELEVISING 9120/2000 JOIl HEMBREE &00
Equipment DescrlpIInn SEWER LINES TV KJ TELEVL~INO 9f2!N2000 KENNElH S. JAMES 8.00
Loo:aIInn - M.... Be Dowa No
Sub-localioa 1 _ Estimated Dowu Time
Sub-1o<a1lnn2 - DoWft Tune I TELEVISING LINES WONo.. 9804002 a..e Date 9f2212OOO I
Sub-loo:allnn 3 . Reason for Oulage
Comments Task No. TV mUCK Originator
WENT TO PENN STREET TO TI/ AND LOCATE TAP FOR 814 WOTwe Telephone No.
AFTER DINNER WENT TO 201 KEWANNA TO LOOK UP TAP TO SEE IF WE HAVE ANY PROBLEMS WITB OUR MAIN LINE Asslgnc<I By E~
WENT TO STREET DEPARTMENT TO CLEAN OUT PIT. Asslgucd To RequeslDate 9/13/2000 08:21:37
TI/'O - 341' Sellcd_ Slart Date Cnmpletlna Date 9/1312000
I Employee Code Ov:l _led t1u/sb Date Completlna TUlle 08:22:06
Equipment No. Work Dale FIISI Name Last Name Regular Hool1l EsI. Doralin.. (days)
Actual Dunltioo(days) F.mpIn1"" Lahnr Hours 24.00
KJ TF.!JiVlSINO 9/812000 KENNETH S. JAMES 8.00 PrioriI)' 3.00 Cootract Labor Hours
9/812000 JOE HEMBREE 8.00 Perform by W3I'rant1 No T_LaborHours 24.00
JH TELEVISING Expense aa.s
IlG TELEVISING 9/812000 DONNIE GRifFIN &00 Response 'lime (Days)
~TIme<H"'rs)
I TELEVISING LINES Close Date 9122/2000 I ~ Eme(Mlnutcs)
WO No. 9803986 Dela1 Descriplioa
Task No. TV mUCK Originator EqulpmcDt Nwn GENERAL MAINTENANCE
WOTwe Telepho"" No. EquIpment Descrlplioa GENBtAL MAINTENANCE WORK
AssIgnedB1 Exfeos(on Locatioo . M.... Be Dowa No
A5slgned To Request Date 9n!N2000 00:52:37 SUb-I_l . F_ted Down nmc
_SIartDote Completion Date 9f2!N2000 SUb-Io<aIiOB 2 . Down 'lime
_t1nlsh Date Cnmplctioo Em< 07:51:52 Sab-Io<alion 3 . R_forOUIage
EsI.DoraIina(da1s) Conunenls
ActualDo_(da1s) Emplo1"" Labor Hours 24.00
l'rIniit1 3.00 Contract 'Jabor Hours
Perform by Warranty No Tolal Labor Hours 24.00
E.penseCInss I
Response Time (Da1S) - - I TELEVlSlNOUNES WO'Nt>. 9804002 Close Date 9f2212OOO
Respoose TIme <Hours)
-. -.
--
Work Order History Comprehensive
10/9/2000
Page 3
Task No. 'IV TRUCK
WOType
AssIgned By
AssIgIled To
Scheduled Start Dale
Sdleduled FlDIsb Dale
Est._ (days)
AeIuaI Durall... (d!lys)
PrIoril)' 3.00
Perform I>y WamJDly No
Expense Class.
Response TIme (Days)
Response Time (Hours)
Respoase TIme (MlDolls)
Delay llescriplIoa
Orlglnntor
Tefepl>oae No.
Extension
Req_ Dute 9/1312000 08:21:37
CompIellOD Date 9/13/2000
Completion TIme 08:22:06
Employee LaI>or Hoors 24.00
Contracll.nl>or Hours
Tolal LnI>or Hours 24.00
Equipmenl Nom Ul.EVlSING
Equipment Descri,,- SEWER LINES 'IV
Loca_ -
SulHocallon 1 _
Su........_: -
Su_oa) -
Comments
TV'D LINE AT MAPLE << WALNUT TO LOCATE TAP - 400'
Must Be Down No
Fstirrr.ted Down TIme
Down Time
Reasoo for Oulage
CHECKED LINE AT 200 BLOCK OF MECJlANIC ~ REFERRED TO BOB WAlZ
CHECKED CIRCUIT AT GATEWAY FOR STEPHANIE FOR TELEPHONE
WENT TO CRUMS LANE 1 TO (PICKED UP n PUMP AT SPENCERS) INSTALLED (7001.34 HRS) #2 NOW OFF LINE -
ELECTRICAL PROBLEMS, PARTS ORDERED.
Employee Code Equipmeal No. WorkDaIC FJfSt Name u..t Name Regular Hours Overtime
Hours
MA lELEVlSING 911312000 MIKE ARMS 8.00
IH lELEVlSING 9/13/2000 lOE HEMBREE 8.00
DO 1ELEVISlNG 9113/2000 DONNIE GRIFRN 8.00
Grand Total Down Time 0.00
Graud Tolal Employee Hours 72.00
Grund TolalCoolrnct LnI>or H...... 0.00
Grnnd ToW Lal>or Hours 72.00
,
Work Order History Comprehensive
Work Order History Comprehensive
101912000
Page 2
1019/2000
Page 1
I wo No. 9803982 CkJse Dale 9122J2OOO I
C::HECK LIFT STATION
Response TIme (Mlnules)
Delay DeseriplioB
Task No. LSMAlNT
WOType
Assigned By
AssIgaed To
Scheduled Start Dale
Scheduled F1nlsb Dole
FA DnralIon (days)
Actual Duralkm(days)
Priurily 3.00
Perform by WDmlnly No
ExJlODS"C_
Res_TIme(Doys)
Res_TIme (Hours)
Res_ TIme (M1nuks)
Delay Descrlpllon
Originator
Telephone No.
Extension
Request Dole 9/9/2000 07:40:24
Completion Dole 9/1012000
CompleUon TIme 01:42:45
EquipmenlNnm LIFT STATIONS
Equlpmenl Deseripl10n CHECK LIFT STATIONS
Loo:aIloR-
Sub-localioB t _
Sub-locaUon 2 -
Sub-localioB 3 -
Comments
WORKED IN RlVERWOODS / CLEl\NED AND TV'D LINE
WORKED AT 9TH & PENN - CLEANED LINE - 31'
WORKED IN PLANT ON WATER PUMP CONTROLS
ORDERED DRIVE GASKET FOR VACTOR / 2 LEAD HOSES FROM DEEDS AND SKIDS FROM BROWN EQUBPMENT
CALLED SPENCER MACHINE ON CRUMS LANE I
MuslBeDown No
Estlmaled Down TIme
Down Time
Reason for Outage
Fmployee Labor Hours 24.00
ConlraCI Labor Hours
Tolal Labor Hours 24.00
EquIpment Num 51ENTH S,..
F.qulpmcnt Descrlpl10n
Locatlcnt - Musl Be Down No
5ob-loca_ t _ EsUmnled DowR TIme
Sub-loca_ 2 - Dowa TIme
5ob-_3 - Reason for OUtage
Comments
CHECKED CSO'S AND WENT TO 10TH STREET LIFT STATION TO SEE IF DUMPSTERS HAD BEEN DUMPED. HAD TO
REBOOT RUGID. WENT BACK INTO PLANT TO RESET U AND #4 AND CAME BACK AT B,55 P.M.
I Employee Code Equipment No. Work Dale l'lrst Name Las! Name Regular Hours Overtime I
H""",
MA LIFT STATIONS 8/30/2000 MIKE ARMS 7.50
KJ LIFT STATIONS 813012OOO KENNETH S. JAMES 7.50
DG LIFT STATIONS 813012000 DONNIE GRIFFIN 7.50
I WO No. 9804003 CkJse Dale 9/22/2000 I
CHECK LIFf STATION -
KJ 51ENTH ST.
9/912000
KENNETH S. JAMES
8.00
16.00
Task No. LSMAJNT
WOType
AssIgned By
AssIgned To
_Start Dale
Scheduled Finish Dale
Est. DuraIloB(days)
Actual Dornllon (days)
Priorily 3.00
Perform by Warranly No
E.pense~
R_Thne(Doys)
Res_TIme (Hours)
Response TIme (MInules)
Delay Descrlpllon
Originator
Telephone No.
ExtensiOIl
Requesl Dole 9/1412000 08:32:26
Complellon Dole 9/14/2000
Completion TIme 08:33: 18
CAME IN AT 2:35 FOR FALSE ALARM. TURNED GRIT PUMP ON.
AT 5: 3 5 AM FALSE ALARM
CAME IN TO RUN CSO' S
HAD HIGH FLOW IN PLAT AT 5 :0, A.M.
I Employee Code Equipment No.
Work Dale
FirslName Las!Name
Regular Hours
Overtime .1
HOUR
Employee Labor Hours 16.00
Conlracl Labor llours
Total Labor Hours 16.00
I WO No. 9803995 Close Dole 9/2212000 I
CHECK LIFT STATION
Task No. LSMAJNT
WOType
AsslgnedBy
AssIgaed To
Scheduled SIBrt Dale
Scl1ednled FInIsb Date
Est. Do....- (days)
A_Durnllon (clays)
PrIorily 3.00
Perform by Warranly N<>
ExpenseC_
Response Thne(Days)
R_ TIme (H.....)
Origlnalor
Telephune No.
Exlenslon
Request Dole 9/1/2000 01:48:07
Complellon Dole 9/ 112000
Completion roue 01:49:51
Equipment Num LIFT STATIONS
Equipment Deseriptlo.. CHECK LIFT STATIONS
LocaI!oR -
Sub-locatIcnt 1 _
Sub-_2 -
Su~)-
MuslBeDow.. No
_led Down TIme
Down Thne
Reason for Oulage
Employee Labor Hours 22.50
Contract Labor Hours
Tolal Labor Hours 22.50
Comments
CHECKED SILVER CREEK AFTER POWER FAILURE (ltl SEAL LEAK - NEEDS PULLED)
UTICA I - ALARM FAILURE (FROM STATION CRECK) FOUND ALARM FLOAT BAD - ClIANGED OUT
UTICA II - ALARM FAILURE & 112 RESE'l' (FROM STATION CHECK) CHECKED AMPS. E'l'C. - OKAY. CHECKED ~
AT PLANT AND IT WORKS _ CALLED AMERI'l'ECH TO REPAIR CIRCUIT.
HIGH MEADOWS WITH BILL DIXON - GA'l'ES STILL NOT ACCEPTABLE
CEDARVIEW - CHECKED U - RESET - CHECKED CONTACTOR. AMPS. COMPASTOR - ALL OKAY
,
WOI'k Order History Comprehensive
10/9/2000 Page 3
Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
MA LIFt" STATIONS 9/1412llOO MIKE ARMS &.00
JH LIFT STATIONS 911412000 JOE HEMBREE &.00
Work Order History Comprehensive
10/9/2000
Page 4
I WONo. 9&04006 CIoseDate 912'1f2fXX} t
CHECK LIFT STATION
Est. DuralioD (days)
Actual Durallo.. (days)
PrIority 3.00
Perform by WarraDty No
Expease CIlISs
RespoDSO TIme (Days)
RespoDSO Time (Hoors)
Response TIme (Minutes)
Delay DoscrIplloo
F..mpklY'" Labor Hoors 16.00
Contract Labor Hows
T_LaborHours 16.00
1'''''' No. LSMAINT
WO Type
Assigned By
Assigoed Ta
Scheduled Start Date
Scbed<>led Finish D-.te
Est. Durallon (days)
AetuaJ DuradoD (days)
Prlorily 3.00
Perform by WarraDty No
Expease CJass
R..ponse Time (Days)
Response TIme (Hoors)
RespoDSO TIme (MI..tes)
Delay _rlp_
Originator
Telephone No.
Extensloo
Req...t Date 9119/2000 0&:49:17
Completio. Dale 9119/2000
Completion TIme 0&:51:5&
Eq.lpment N.m GENERAL MAINTENANCE
Eq.ipment _rtp_ GENERAL MAIN'ffiNANCE WORK
1,...._ .
S.I>-I...._1 .
Sub-I....tioo Z .
S.b-I....lloo 3 .
Must Be Duw. No
Eslimnted Duwn TIme
DuwD Time
Reason for Outage
Employee Labor Hours 12.00
Conlract Labor Hours
Total Labor Hours 12.00
Camments
CEDARVIEW . CHECKED H PUMP & MOTOR 1 CAP & AMPS CHECKED . RUNNING OKAY . ONLINE.
LOUISE STREET - CHECKED PUMPS 1lND MOTORS - .2 PUMPING GOOD (102 TRIPPED ON MONDAY'S STATION CHECKS
10TH STREET - CLEANUP OF BOTH MANUAL AND AUTO BAR SCREENS & ROOM
MIDDLE SCHOOL - FLOOR DRY . NEW STATION PROGRESSING
Eq.Ip....t Nwu LIFT STA'1l0NS
Equlpmeul DoscrIptlo.. CHECK LIFT STATIONS
f....._ .
Sub-localiool .
SUb-locaU68 Z .
Sub-_d0lt3 .
Must Be DuwD No
Estimated Down Time
DoWR Time
Reasou for Oulage
Employee Code Eq.ipme.t No. Work Date First Name Last Name Regular Hours Overtime
HOOIS
MA GENERAL 9121/2000 MIKE ARMS &.00
MAlN'ffiNANCE
JH GENERAL 9121/2000 JOE HEMBREE &.00
MAlN'ffiNANCE
Comments
WORKED AT POWERHOUSE - '1 PUMP KEY WAY OUT ~ PUT BACK IN AND ALSO FOUND MOTOR BASE WELD BROKE.
WELDED BACK
WORKED AT 10TH STREET. CHECK OF PUMP H & n. FOUND n OKAY (AMP, ETC. OKAY)
1t1 TRIPS BREAKER (PULLED) FOUND TO BE STOPPED UP WITH GRIT~ CLEANED OUT, RECHECKED, SAME LOW
AMPS. CHECKED OIL, SEAL LEAK 1lND WATER IN OIL. CLEANED UP PUMP, CABLE, CHAIN AND AREA. WILL
TAKE TO SPENCERS TOMORROW~
I WO No. 9&04020 Close Date 101312000 I
CHECK LWT STATION
Employee Code Equipment No.
Work Date
Frrsl Name
Last Name
Regular Hours
Overtime
Task No. LSMAINT
WOType
AssigoedBy
Assigoed To
Scbeduled Start Dale
Scheduled Finish Date
Est. Duraliou(days)
Actual Durad... (days}
PrIority J.OO
Perform by WarraDly No
Expease Class
Response TIme (Days)
Response TIme (Hours}
Response TIme (Minutes)
De/ay DoscrIp-
OriglI1ator
TeIepbone No.
Extension
Request Date 9/22/2000 12:31:B
CompleUou Date 9/2212(100
Comp1eU68 Time 12:31:26
MA
IH
LIFT STATIONS
UFf SJ'ATIONS
911912000
9/1912000
MIKE
JOE
ARMS
HEMBREE
&.00
4.00
Empkly... Labor Hours 14.50
Coatra<t Labor Hours
T_LaborHows 14.50
I wo No. 9&()4()19 Close Date 10/3/2000 I
CHECK LIFT STATION
T"'" No. LSMAINT Originator
WO Type Telephone No.
Assigned By Extensiou
AssignedTD ReqU<SIDate 9/21/2000 12:2&:57
Scbeduled Start Date Completion Dale 9/2tnOOO
Scheduled FI.1sh Dale ComplelioD Time 12:29: 10
l - I
__L___ n ._ - I
'''''',",,01
~'."""1
Work Order History Comprehensive
Work Order History Comprehensive
1019/2000
Page 5
1019/2000
Page 6
Equipment Nom GENERAL MAIN1ENANCE
Equipment Destrlplloa (,'ENERAL MAIN1ENANCE WORK
Locatio.. -
Sub-loca1lo.. 1 .
Sub-loca_Z .
Sub-loca_ 3 -
Comments
CRUMS Ll\NE II - CLEANED WET WELL
CHECKED STATIONS & ALARMS
CHECKED UTICA II ALARM (NOW SHORTED, NEED TO CALL IN)
Must Be Down No
F.s1lmaled Down Time
Down Time
Reason for Outage
CHECKED MAGNOLIA - BOTH PUMPING, AMPS OKAY
CHECKED CEDARVIEW - CHECKED n, RESET, RUNS, AMPS OKAY (WILL CHECK AGAIN LATER)
CHECKED POWERHOUSE - HIGH LEVEL ALARM - OKAY
CHECKED CRUMS LANE I - TRIPPED HEATER BLOCK (BABYSET) OVERHEATED
WASH 6413 & VACTOR TRUCK
CALL TO SPENCERS ON n 10TH STREET, CALL TO CORLEY ON MILL CREEK PIPING AND CALLED WESCO ON CRUMS
LANE I ELECTRICAL PARTS
INSTALLED BUCKET ASSEMBLY BACK ON JOHN DEERE TRACTOR
I Employee Code Equipment No. Worl<Date First Name L~ Name
HH GENERAL 912212fX1J HERSHEL HAMBY
MAIN1ENANCE
MA GENERAL 9/2112000 MIKE ARMS
MAIN1ENANCE
m GENERAL 912212fX1J JOE HEMBREE
MAIN1ENANCE
Regular Hours
Overtime I
Hours
Employee Code Equipmenl No. Work Dare First Name Last Name Regular Hours Overtime I
Hours
MA GENERAL 9/25nOOO MIKE ARMS 8.00
MAINTENAN(;E
JH GENERAL 9n5nooo JOE HEMBREE 8.00
MAINTENANCE
HELPED BILL DIXON REMOVE PANEL FROM WATHEN PARK
CHECKED MIDDLE SCHOOL LIFT STATION - OKAY
0.75
7.50
I WO No. 9804024 CJose Dale 1013nOOO I
CHECKLlFfSTATION
6.25
Task No. LSMAINT
WOType
AssigDed By
Assigned To
_SlartDale
_led FI_ Dale
Est. DuratioD (days)
AetuaJ Durall"" (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
ResponseTime (Hours)
Response Time (M1nutos)
Delay Destrlption
OrIxlnalor
Telephone No.
Extenslou
Request Dale 9/29/2000 12:39:46
Completion Date 9/29nooo
Comple1lou TIme 12:39:53
I wo No. 9804021 Close Dale IO/3nOOO I
CHECK LIFT STATION
Task No. LSMAJNT
WOType
AssIgned By
AssIgned 'r.
_Start Dale
_F1_Dale
Est. Du_(days)
Actual Dura_ (days)
PriorIty 3.00
PerformbyWarrnnly No
Ex_Class
R..pouse TIme (Days)
Response TIme (Hoors)
RespouseTIme (MInutes)
Delay Destrlp1lon
OriginalOt"
Telephooe No.
ExtensioD
RequestDate 9/25/2000 12:32:53
CompleUml Date 9n5/2000
Completion Ume 12:33:02
Employee Labor Hours 22.00
Conlral:l Labor Hours
T_LaborHours 22.00
Employee Labor Hours 16.00
Contract Labor Hours
TolaILaborHours 16.00
Eq.lpment Num GENERAL MAIN1ENANCE
Eqolpment Destrlpliou GENERAL MAINTENANCE WORK
Localiou .
Sub-Ioca_ t .
Sub-_l -
Sub-loea1l0H 3 -
Must De Do..n No
F.s1Imaled Do_TIme
Dowa TIme
Reason for Oulage
Equlpmeal Nom GENERAL MAIN1ENANCE
Equipment DestrlplioD GENERAL MAIN1ENANCEWORK
LocaIioD .
Sub-localiOlll _
Sub-localioDZ -
Sub-locaIioD 3 -
Comments
Must De Do... No
F.slimaled Dow.. TIme
Down Time
Reason for Outage
Comments
10TH STREET - RESET RTU - OFF LINE (OFF AT 3:17PM 9-28-00 - BYPASS 36")
CEDARVIEW - REINSTALLED #l MOTOR (6229.7 ERS) (CENTRIFUGAL SWITCHES BAD)
PARKVIEW - NEW MANHOLE FOUND
TO PEERLESS TO PICK UP WIRE FOR RAS REMOTE GUAGE
WORKED AT RAS - INSTALLED WIRING - STATION WENT DOWN DURING WORK - BLOWN CONTROL PUSE IN PUMP
CONTROL BOX
i
I
;,rr'l
1
r::=)
~.:-)
10/9/2000
Work Order History Comprehensive
Page 7
-
Work Date First Name Last Name Regular llours Overtime
IlOUfS
912912000 WAYMON PAYNE 1.00
9129/2000 MIKE ARMS 7.00
912912000 DONNIE GRIH'IN 7.00
912912000 IIERSHEL IlAMBY 7.00
Employee Code F.qulpmenl No,
PW GENERAL
MAINlENANCE
MA GENERAL
MAINlENANCE
IJG GENERAL
MAIN"ffiNANCE
1111 GENERAL
MAINlENANCE
Grand Total Down Time 0.00
Grand Tolal Employee Hours 143.00
Grand Tolal Conlract Labor Hoon 0.00
Grand ToIal Labor Hours 14.1.00
~)
Work Order History Comprehensive
1019/2000 Page I
I WO No. 9803981 Oose Date 9I22f2000 I
CHECK OR CLEAN CATCHBASINS
Task No. CATCHBASlNS Original...
WO Type PM Telephone No.
Assigned By Extension
AssIgned To ReqneslDaIe 911112000 01:38:44
Scheduled Start Date C...plellon Dale 9112/2000
Schedoled _ Date Completion Time 01:40:22
Est. Duralkm (da,.)
Actual Durallon (da,.)
PrIorIty 3.00
Perform by Warranly No
Expense a-
Response Time (Da,.)
Response Time(H.....)
Response Time (Mlaules)
Delay ~pIkm
Ilqulpmenl Nom CATCHBASIN
Ilqulpmenl Des<rlpIkm GENERAL
Locallon -
Sub-lnenlion 1 _
Sub-IocaIkm I -
Sub-_.3 -
Employee Lahor H..... 8.00
Contract Labor Hours
Total Labor Hours 8.00
Must Be Down No
Estimated Dowu 'l1me
Downnme
Reason for OUtage
CommenlS
Rl\N CATCHBASINS. WENT TO 8TH &. PENN WITH VACTOR TRUCK TO CLEAN OUT A MANHOLE. CLEANED VACTOR
TRUCK AND MADE A SEWER ('ALL TO CLARK MARITIME. NOT OUR PROBLEM
I Employee Code I!qWpmeUl No.
WorI<Date
KJ
CATCHBASIN
911212000
First Name
Last Name
Regular HOUfS
Overtime I
Hoors
I wo No. 9803983 CIo6e Date 9/22/2000 I
'. CHECKORCLEANCA'l'CHBASlNS
Task No. CATCHBASINS Original...
WO Type PM Telephone No.
AssIgned~ Ex~~
Assigned To Request Date 911112000 01:45:44
Scheduled Start Date Complelion Date 911112000
_ fin"'" Date C...pleIlon Time 01:46:22
Est. Dorallon (da,.)
A<tuaI Darallon (da,.)
Priorlly 3.00
Perform by Warnnly No
Expense a-
Response Time (Da,.)
Response Time (Hours)
RospolR Time (MlaoltS)
Delny Description
KENNETH S. JAMES
8.00
Employee Labor Hoors 16.00
Contrad Labor Hours
TotalL_Hoors 16.00
L
-)
~
Work Order History Comprehensive
101912000
llqulpmenlNum CA'l'CHBASIN
EqulpmeDt ~rIplloll GENERAL
Location -
Sob-location t _
Sub-Iocallon 1 -
Sob-locatioo 3 -
CommenlS
Rl\N LIFT STATION ALARMS AND THEN CATCHBASINS THE REST OF THE DAY.
~:-l
C'''' 1
Page 2
Must Be DoWII No
Estimated Down Time
Dowll Time
Reason fMOUlage
CAME IN WHEN IT STARTED TO RAIN. HIGH FLOW IN PLANT. 10TH STREET AND POWERHOUSE WENT ON ALARM.
CRUMS LANE ALARM AND CALLED MIKE IN.
I Employee Code Equipment No. Work Date Fust Name Last Name Regular HOUfS Oveni~ 1
HOUIll
KJ CATCHBASIN 91nl2OOO KENNE1lI S. JAMES 8.00
00 CATCHBASlN 911112000 DONNIE GRIFFIN 8.00
I wo No. 9804013 Oose Dale 101312000 I
CHECK OR ClEANCATCHBASINS
Task No. CATCHBASINS Orlglllalor
WO Type PM Telephone No.
Assigned By Extension
AssIgned To Request Dale 912612000 12'18:27
Scheduled Start Date C....pIeliou Date 9126/2000
Sdleduledt'l_Date C....pIelionTime 12:18:59
F.sL Doralkm (da,.)
ActuaI_(duys)
PrIorlly 3.00
Perform by Warraaty No
ExpellSO C....
Respoase Tlln<'(Days)
Response Time (Hours)
Response Time (Mlllu"')
DeIny Des<rlpllon
llqulpmeAt Num CA:I'CHBASIN
Equlpmenl Descrlpllon GENERAL
LocaIkm -
Sub-lnentioo 1 _
Sob-_onl -
Sob-lnentioo 3 -
Comments
CLEANED CATCHBASINS AROUND TOWN
I Employee Code Equipment No.
FlrstName
I.astName
Work Date
DG
CATCHBASIN
9126/2000
DONNIE
GRll-FIN
Employee Labor Hours 8.00
Coatracl Labor Hoors
T_ '.abur Hours 8.00
Must Be Dowll No
EslImaIed Dowa Time
Down Time
Reason f... OUlage
Regular Hours
Overtime I
Hours
8.00
Gnmd TolaI Daw. Tlln<' 0.00
Grand T_ Employee Hoors 32.00
Grand T_ Cootraet Labor Hours 0.00
GrandT_Labor"'""" 31.00
:J
==:J
--:'J
Work Order History Comprehensive
Work Order History Comprehensive
1019/2000
Page 2
101912000
Page J
R..ponse Time (Hoors)
Response 'lime (MIDules)
Delay DescrlpllOB
I WONo. 9803996 CIoseDote 9/2112000 I
GENERAL MAINTENANCE WORK
Task No. GENERAL MAllU.
WOType
AssIgoed By
Assigned To
Scheduled SllIrt Date
Scheduled FID..h Date
F.st. Duralloo (days)
Actual DuralloD (days)
Prlorlly 3.00
Perform by WarraDly No
Expense C....
Rospoose Time (Days)
R..pouse Time (Hours)
R..pouse'lime(MlllIJIes)
Delay DescrlplIoo
OrlgiDalDr
Telephone No.
Extension
Requesl Dale 911/2000 07:52:37
Completloo Dale 9/1/2000
Complellon Time 07:53:33
EquipmenlNum GENERAL MAINTENANCE
Equlpmenl Doserlpllou (JF.NERAl. MAINTENANCE WORK
LocaIloD -
Snb-localloo} _
Sub-Iocallon:: -
Sub-Iocallm.3 -
Must Be Down No
Estimated Down TIme
DowDTime
ReasoD for Outage
Employee Labor Hours 11.00
Conlnlcl Labor Hours
Total Labor Hours 11.00
Comments
CHECKED STATIONS
WORKED AT POWERHOUSE - COUPLING LOOSE ON n PUMP (FOUND DURING CHECK) DID MAINTENANCE TOO. BACK
ON LINE
ALARM AT RIVERPORT II - CHECKED, TISSUE ON OFF FLOAT
WORKED AT STATIONS - SPRAYED WEED KILLER AND USED WEEDEATER AT LOUISE, EWING, CHERRY CREEK AND
GATEWAY.
Must Be DowD No
Estimated DBwlI11me
Down Time
Reason for Outage
I Employee Code Equipment No. Work Date FlISlName Last Name
MA GENERAL 9/612000 MIKE ARMS
MAINlliNANCE
IH GENERAL 9/612000 JOE HEMBREE
MAINTENANCE
Regotar HOllIS
Ovenimel
Hours
Equipment Nom GENERAl. MAlNIENANCE
FAjUlpmenl Doserlplloo GENERAL MAJNfENANCE WORK
LocaIlOB -
Sub-locallOB} _
Sub-locallo..:: -
Sub-locaIlOB3 -
Comments
CHECK OF JOBS WITH STEVE
8TH & PENN - VACTOR STILL DOWN - GREASE. ETC. VEHICLE MAINTENANCE
CUT GRSS
WORKED IN PLANT III PUMP ON PLANT WATER TRIPPED. CONTROLS STICKING. SPRAYED AND LOOSENED UP. HARD
TO ADJUST. SPENT REST OF DAY TRYING TO ADJUST. SPENT TIlE REST OF THE DAY TRYING TO ADJUST (NO
LUNCH + 1 HR. OT) NEEDS NEW CONTROLS
8.00
8.00
I WO No. 9803998 Close Dale 9/2112000 I
GENERAl. MAINTENANCE WORK
Employee Code Equipment No. Work Dale First Name Last Name Regular Hours Overtime I
Hours
MA GF.NERAl. 9/112000 MIKE ARMS 8.00 1.50
MAINTENANCE
KI GENERAl. 9/1/2000 KENNETH s. lAMES 150
MAINfENANCE
"fask No. GENERAL MAINT.
WO Type
Assigned By
AssIgned To
Scheduled Slllrt Dote
Selteduled Finisb Dale
F.st.. Duration (days)
Actual Duralloo (days)
PrIority 3.00
Perfonn by Warraoly No
Expense Class
Response l1me (Days)
Response Time (Hours)
R..po....11me (MiDules)
Delay Descrlplio"
OrIgioalDr
TeIepbone No.
ExleoslOB
RequesI Dale 9/712000 08:02:20
Complellon Dale 91712000
Complelimt'lime 08:02:23
Employee Labor Hoors 15.00
Contract Labor Hours
ToIa! Labor Hours 15.00
I WO No. 9803997 Close Date 9/2212000 I
GENERAl. MAINTENANCE WORK
Task No. GENERAL MAiNe.
WOType
Assigned By
Assigned To
Sclleduled Slllrt Date
Selleduled Flnlob Date
EsL Durall... (days)
Actual Durallon (days)
Prlorlly 3.00
Perform by Warmnly No
Expeuse Class
Respouse'lime (Days)
Originator
Telephone No.
Extension
RequestDate 9/612000 08:00:19
CompletiOD Dale 9/612000
Completion Time 08:00:34
Equipment Nom GENERAL MAINIENANCE
EquIpment Doserlption GENERAL MAlNfENANCE WORK
J.ocatiOD .
Sub-localIoo I _
Sub-Iocallon Z -
Sub-locatiOB 3 -
Comments
WORKED AT 9TH & PENN - CLEANING LINE
AIR 'I'EST AT JEFFERSON CENTER - 8 LINES (1 FAILED #4 TO itS)
MILL CREEK - #2 PUMP NOT SHOWING FLOW ON CHART - CHECKED - BARELY PUMPING. BACK FLUSHED.
EVERYTHING OKAY NOW. .
Mnst Be Down No
F..stimated Down- Tune
DownTime
Reason for Outage
Employee Labor Hours 16.00
Contract Labor Hours
Total Labor Hours 16.00
l "'"
Work Order History Comprehensive
10/9/2000 Page 3
Employee Code Equipment No. Work Date First Name '....Name Regular Hours Overtime
Hoo",
MA GENERAL 91712000 MIKE ARMS 7.25
MAINlENANCE
JH GENERAL 917J2000 JOE HEMBREE 4.25
MAINJENANCE
DG GENERAL 91712000 DONNIE GRIFFIN 3.50
MAINlENANCE
Work Order History Comprehensive
IOf9J2000
Page 4
Task No. GENERAL MAlNT.
WO Type
Assigned By
AssIgned To
ScbeduIed Start Dale
S<heduled Finish 1M..
Est. Duratl... (days)
Ae1uaI Duratioo (days)
Priority 3.00
Perform by Warranty No
ExpenseClass
Response nme (Days)
Response Time (Hoors)
Response Thne (MInutes)
Delay Descrlptl...
Originator
Telepbone No.
Extension
Request Date 9/8/2000 08:04:03
Completion Date 9/8/2000
Completion Time 08:()4:27
WO Type
Assigned By
Asslgued To
S<heduled Start Date
Scbeduled FIuIsh Dale
Est. Duration (days)
Actual Duratioo (days)
PrIority 3.00
Perform by Warranty No
ExpenseOass
Response nme (Days)
Response Thne(Hoors)
Response nme (Minutes)
Delay Description
Telepbone No.
Extensl...
Request Dale 9/IJ12000 08:06:30
Compled... Date 9/11/2000
C...pledon Thne 08:06:40
Employee Labor Hours 40.00
Conlra<t Labor Hoors
Total Labor Hours 40.00
I WO No. 9803999 Oose Date 9/22/2000 I
GENERAL MAINTENANCE WORK
Equipment Nom GENERAL MAINTENANCE
EquIpment IJes<rlptloD GENERAL MAINTENANCE WORK
Locatioll -
Sub-locaUOD 1 _
Su....ocatlon Z -
Sn....ocatlon 3 -
Comments
CHECKED OF STATIONS (HERSHEL CSO ONES)
INSPEcrION OF GEORGIA CROSSING - PUMPS FAILED TEST
WORKED AT MIDDLE SCHOOL - UNSTOPPED SUMP PUMP AND INSTALLED DRY WELL ALARM FLOAT
CLEANED FLOOR OF RUST
Must Be Down No
Estimated Down nme
Down Time
Reason for Outage
Employee Labor Hoors 8.00
Cootract I~abor Hours
Total Labor Hours 8.00
Employee Code Equipment No. Work Dale FirstNarne Last Name Regular Hours Overtime
H<
MA GENERAL 9/11/2000 MIKE ARMS 8.00
MAlNJENANCE
JH GENERAL 9/1IJ2000 JOE HEMBREE 8.00
MAlNJENANCE
KJ GENERAL 9/IIJ2000 KENNE1H S. JAMES 8.00
MAlNJENANCE
DO GENERAL 9/1112000 DONNIE GRIFFIN 8.00
MAlNIENANCE
HH GENERAL 9/IJ/2000 IiERSHEL HAMBY 8.00
MAINTENANCE
EqulpmentNum GENERAL MAlNlENANCE
Equipment Deserlption GENERAL MAINTENANCE WORK
LocatIoo -
Su.....,caU..l _
Sub-iocationZ -
SUb-locaUOD 3 -
Comments
DID CSO' S AND TWO LOCATES
ORDERED CONTROLS FOR PLANT WATER PUMPS
CALLED SPENCERS ON CRUMS LANE 111 - DONE - PICKUP LATE MONDAY OR TUESDAY AND INSTALL
PICKUP SWITCHES AT SWH - INSTALLED FOR PLANT WATER PUMPS - ONLINE NOW
H SETTING ON 38# OFF 80#
#2 SETTING ON 36# OFF 70# (PUMP ONLY PUTS OUT 70#)
Must Be Down No
F..stimated Down 'lime
Down Time
Reason for Outage
Employee Code Equipment No.
Work Dale
First Name
Last Name
Regular Hours
Overtime
HoUlS
I WONo. 9804001 CIoseDate 9122/2000 I
GENERALMAJNJENANCE WORK .
MA
GENERAL
MAllfruNANCE
9/8/2000
MIKE
ARMS
8.00
Task No. GENERAL MAINT.
WO Type
Assigned By
AssIgned To
Seheduled Start Date
Scbeduled Fiulsb Date
Est. Duration (days)
Ae1uaI Duratioo (days)
PrIority 3.00
Perform by Warranty No
Expense Oass
Response Thne (Days)
Response Thne(Hoors)
Origlnalor
Telephone No.
Extensinn
RequestDate 9/12/2000 08:12:10
C<HOpletlon Date 9/12/2000
C...pIetlon nme 08: 12: 16
I WO No. 9804000 Oose Date 9122/2000 I
GENERAL MAINJENANCE WORK
Task No. GENERAl. MAINT. Origlnalor
EmpklyeeLaborHoors 16.00
ConlractLabor Hours
ToIaILaborllours 16.00
f--"'I
~J
l
Work Order History Comprehensive Work Order HIstory Comprehensive
10/9/2000 Page 5 1019/2000 Page 6
Response TIme (MIBUtes) I Employee Code Equipment No.
Delay Descripllon Work Dale First Name Last Name Regular Hours Overtime I
HOllIS
F.qulpment Nmn GENERAL MAINTENANCE MA GENERAL 9/1512000 MIKE ARMS 8.00
Equipment DescripliOft GENERAL MAiNtENANCE WORK MAlNIENANCE
Loaollon - Must Be Down No KJ GENERAL 911512000 KENNETH S. JAMES 8.00
Sub-localloa 1 _ Estinrolted Down nme MAlNIENANCE
Sub-lo<allon 1 . Down Time
Sub-lo<allon3 - Reason for Outage I WONo. 9804005 I
Comments a..e Date 9mt2000
CHECK OF RTU AT 10TH STREET - NO FLOW READING (BOARD FAILURE ON FLOW METER - NEEDS CHANGED OUT) GENERAL MAINTENANCE WORK
CRUMS LANE - GET PARTS INFORMATION / ORDERED PARTS FOR CONTACTOR (HEATERS/O.L. BLOCK / CONTACTS) Task No. GENERAL MAlNT. Originator
LOUISE STREET - CBECKED #2 PUMP, UNSTOPPED RAGS AND BROKEN CLEAN OUT CAP) ADJUSTED PACKING AND WOType Telephone No.
GREASED PUMPS. Assigned By ExtensiOll
WENT TO SPENCER' S TO PICK UP CRUMS LANE I PUMP (WASN' T READY) (GUIDE AND FRONT SEAL RING STILL
NEEDED TO BE REPAIRED) AssIgned To Rcquost Date 911812000 08:45:16
MAGNOLIA - #2 TRIPPED OUT - CHECKED - STOPPED UP - CLEANED RAGS FROM VOLUTE. Seheduled Start Date CompIeti... Date 9/1812000
Sdteduled F101s'' Dale Completlon TIme 08:45:35
I Employee Cooe Equipmenl No. Work Date FtrSl Name Last Name Regular Hours Ovenimel Est. Duralloa (days)
H~'rs Actual Dundlon (days) Emplo,..,LaborHours 11.00
MA GENERAL 9/1212000 MIKE ARM.~ 8.00 PrIority 3.00 Conlrnct Labor Hours
MAINtENANCE Perfonn by Warranty No Total Labor Hours 11.00
JH GENERAL 9/1212000 JOE HEMBREE 8.00 Expense Class
MAlNIENANCE Respoose Time (Day.)
Respoose TIme (Hoors)
I WON... 9804004 I Response TIme (Mlnntes)
a..e Date 9/2212000 Delay Description
GENERAL MAINTENANCE WORK
Task No.. GF.NERA1. MAINT. Originator FAjulpmeot Nom GENERAL MAINTENANCE
WO Type Telephone No. F.quIpmeot Description GENERAL MAlNIENANCE WORK
AssIgned By Extension l..ocatfOB - Must Be Down No
Assigned To Rcqoesl Dale 9/15/2000 08:43:01 Sub-locotlOD 1 _ EstImated _ TIme
Se_ SlDrtDate Completion D-.te 9/1512000 Snb-lo<allon 1 . DownTIme
SeheduIed VI""'" Dute Completion Time 08:43: 14 Sub-Iocollon 3 - -..rorOUIDge
Est. Duratiou(doys) Comments
Ae_ Durollon (days) Employ.., Labor Hours 16.00 CHECKED STATIONS & ALARMS (MADE LIST OF CHECKS & REPAIRS}
PrIority 3.00 Conlroet Labor Hours LOCATE OFF 8TH STREET FOR NEW POOL
Perfonn by Warranty No TolDl Labor Honrs 16.m SEWER CALLS - KNOBLOCH (NO ONE HOMEI
ExpenseClass BELMAR (RESIDENT HAD STOPPED UP DOWN SPOUT}
PERIMETER (RESIDENT LINE BACKED UP, MAIN OKAY}
R<spoase Time (Days) FINISHED CHECKING STATIONS
Respoose TIme (Hours) I Employee Code
Respoose TIme (MInutes) Equipment No. Work Dale FJffiName Last Name Regular HOUI'S Overtime r
Delay Descrlpllon HOllIS
MA GENERAL 911812000 MIKE ARMS 5.50
EqulpmentNom GENERAL MAINTENANCE MAINTENANCE
FAjulpment DescrlpIiOft GENERAL MAlN1ENANCE WORK JH GENERAL 9/1812000 JOE HEMBREE 4.00
toeaIfoa - Must Be Down No MAINtENANCE
Sub-lo<ation I _ Estimated Down Time HH GENERAL 9/1812000 HERSHEL HAMBY 1.50
Sub-lo<ation 1 - Down Time MAINlENANCE
Sub-Io<allon 3 - Reason for Outage
Comments I WON... 9804007 I
MIDDLE SCHOOL - LEAKING SEAL #2, GET'l'ING WORSE - NEEDS PULLED SOON FOR REPAIR Close Date 9l2212OOO
CHECKED eso's - INTBRRPUTED - CALL FROM MAYOR GALLIGAN ON 414 WALNUT - WE ASSISTED - DYED LINES GENERALMAIN'ffiNANCE WORK
ORDERED LIGHT BULBS FOR PLANT LIGHTS & STATION ALARMS FROM FALLS CITY - WILL PICKUP LATER Task No. (iENERAL MAINT. OrIginator
WORKED IN PLANT ON STORM LINE : ~ VACTOR FILL GUAGE FAILED, COVERED TRUCK IN SAND, ETC. - CLEANED U
6413 TO VEHICLE MAINTENANCE - WATER PUMP FAILURE - REPAIRED
- ~~~------~---- ~-------_._.._- ._-.
Work Order History Comprehensive
Work Order History Comprehensive
10/9/2000
Page 7
IlV 9/2000
Page 8
WOType
AssIgned By
AssIgaed To
Scheduled Start Dale
_ FInish D9Ie
Est. Dandon (days)
Aetual Duradon (days)
PrIority 3,00
Perfonn by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Descrlpdon
Telepbune No.
Extension
Request Date 9/2012000 08:54:37
Compledon Date 9/20l200O
Compledon Time 08:54:55
EqulpmentNum GENERAL MAIN1ENANCE
Equipment Descrlpdon GENERAL MAIN1ENANCE WORK
Lucadoll -
Sub-locadon I _
S1Jb-/ocad0ll2 -
S1Jb-/ocadon:J -
Comments
CLEANED TRUCK *3642 & 9804.
WENT TO MARYSVILLE TO PICK UP PARTS FOR MOWERS.
HELPED CLEAN UP SHOP
Must Be Down No
&timated Down nme
Down Time
Reason for Outage
Employee!.abor Hours 16.00
Contract Labor Hours
Total !.abur Hours 16.00
Equipment Nom GENERAL MAINTENANCE
Equipment Descrlpdon GENERAL MAINTENANCE WORK
Locadon -
Sub-Iocadon I _
Sub-locndoll2 -
Sub-locadon:J -
Comments
SAFETY CLASS ( FIRE / LADDERS)
SEWER INSPECTION (SPRING STREET)
CLEANED LINE FOR CONSTRUCTION CREW AT PEARL & CHESTNUT (SHOT 450')
FINISHED AT 10TH STREET - LOADED PUMP AND TOOK TO SPENCERS (WIRING DIAGRAM)
CRUMS III - CHECKED ALARM - FOUND FLOAT BAD - REPLACED
SEWER INSPECTIONS AT WHISPERING OAKS - LOT 9 OKAY - LOT 10 NOT FINISHED
CHECKED UTICA II ALARM (TELEPHONE COMPANY REPAIRED LINE) OKAY
Must Be Down No
Fslimaled Dowll Time
Down Time
Reasoo for Outage
Employee Code Equipment No. Work Dale First Name Last Name Regular Hours Overtime
Hours
KJ GENERAL 9122J2OOO KENNETH S. JAMES ROO
MAINTENANCE
00 GENERAl. 9/22I1IXXJ DONNIE GRIFFIN ROO
MAINTENANCE
I ~~_6 ~D9IeW_ I
GENERAL MAIN1ENANCE WORK
Employee Code EquipmenlNo. Work Dale Ftrst Name Last Name Regular Hours Overtime
Hours
MA GENERAL 9/2012000 MIKE ARMS 8.00
MAIN1ENANCE
JH GENERAL 9/20l200O JOE HEMBREE 8.00
MAIN1ENANCE
Task No. GENERAL MAINT.
WO Type
Assigned By
AssIgned To
Scheduled Start DIlle
_ Finish DIlle
EsLDuradon(days}
Actual Dundon (days)
PrIority 3.00
Perform by Warnnty No
Expense Class
Ilesponse TIme (Dllys)
Response Time (H......)
Response Time (Minutes)
Delay Descrlpdon
OrIglnalor
Telephone No.
Extension
Request Dale 9nt/2000 12:23:47
Compledon Date 9nll2ooo
Complelion Time 12:24:04
EmployeeLaborHours 16.00
Contract Labor Hours
Total !.abur Hours 16.00
WO~ 9804015
GENERAL MAINIF.NANCE WORK
Task No. GENERAL MAINT.
WO Type
Assigned By
AssIgned To
Scheduled SlarI Dale
_Floisb Dale
Est. D9radon(days}
Actual Duradon (days)
PrIority 3.00
Perfonn by Warranty No
ExpenseCIass
Response TIme (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Descrlpdon
Close Date 1O/3nooo
Originator
Telepbune No.
Extension
RequestDale 9/2212000 12:21:59
Compledon Date 9/2212000
Compledon Time 12:22:39
EqulpmenlNum GENERAL MAINTENANCE
Equipment Descrlplion GENERAL MAIN1ENANCE WORK
Locadon -
S1Jb-/ocndon I _
Sub-lo<adOR 2 -
Sub-Iocadon 3 -
Connnents
RAN CATCHBASINS UNTIL DINNER.
CHECKED MANHOLE FOR MAYOR AT 8TH & MECHANIC
FINISHED UP CATCH BASINS
STOPPED AT LITTLE ENGINES ABOUT PLANT MOWER. NEED TO GO TO MARYSVILLE TO GET PARTS
Must Be Down No
Fslimated Down TIme
DowIl Time
Reason for Outage
Employee Labur Hours 16.00
Contract Labor Hours
TotaILahur Hours 16.00
Employee Code Equipment No. Work Dale First Name Last Name Regular Hours Overtime
"'
KJ GENERAL 9nJI2OOO KENNETH S. JAMES 8.00
MAINTENANCE
00 GENERAL 9nJnooo DONNIE GRIFFIN 8.00
MAINTENANCE
Work Order History Comprehensive
10/9/2000
Page 9
I wo No. 9804022 Oose Dale IOl3nooo I
GENERAL MAINTENANCE WORK .
Task N... GENERAL MAINT.
WOType
Asslg""" By
AssIgne<I To
_Start Dale
Scbeduled Flni<h Date
F.st. Doradoa (days)
Ae_ Doradon (days)
PrIority 3.00
Perform by Warranty No
Expense Class
Response TIme (Days)
Respeose Tho. (Hoors)
Respeose l1me (Minutes)
Delay Description
Originator
Telephone N...
Extension
RequestDate 9n6l2OOO 12:35:17
Complelion Dale 9/26/2000
Complelion Time 12:35:35
Employee Labor HOUTS 16.00
Contract Labor Hours
Total Labor Hours 16.00
Equipment N1U1I GENERAL MAINTENANCE
Equipment Descriptio.. GENERAL MAINTENANCE WORK
Loc:atIoo -
Su....oealiolll _
s....IoeatIoaZ -
s....1oeatIoa 3 -
Comments
CHECKED & CLElINED CATCHBASINS.
VACTOR & FRONT LOADER TAKEN TO VEHICLE MAINTENANCE FOR WORK.
PICKED UP VACTOR AFTER LUNCH
WORKED AT CEDARVIEW - CHECKED - #1 TRIPPED - FOUND PROBLEM TO BE CENTRIFIGAL SWITCH IN MOTOR
CALLED TO DERBY CITY TO PICK UP.
CKECKED MIDDLE SCHOOL - SMELLS - LEFT VENT FAN ON #2 STILL LEAKING ABOUT THE SAME
MustBeDowD No
Estimated Down 'fime
Down Time
RelISOO for Outage
Employee Code Jiquipmenl No. Work Date FlfSt Name La'\! Name Regular Hours Overtime I
Hours
MA GENERAL 9/2612000 MIKE ARMS 8.00
MAiN1ENANCE
JH GENERAL 9n6l2ooo JOE HEMBREE 8.00
MAiNTENANCE
Grand Total DowD Time 0.00
Grauel Total Employee Hours 197.00
GrancI Total Contract Labor Hours 0.00
Granel Total Labor Hours 197.00
.
Work Order History Comprehensive Work Order History Comprehensive
10/9/2000 Page 2
10/9/2000 Page 1
Response Time (Hours)
I LINE CLEANING WO No. 9803994 Close Date 9122/2000 I Response Time (Minutes)
Delay lles<rlpllou
Task No. lET TRUCK Orlg/Dntor Eqnl_tNum lET TRUCK
WOType TelephooeNo. Equlpmellt lles<rlpllOll FOOT AGE CLEANED
AsslgoedBy Extension Location - Most Be Down No
Assigned To ReqoestDate 911/2000 07:45:16 SulHocallon I _ EstImated Down Dme
S<heduIed Slart Date Completion Date 911/2000 Sub-locatIou 2 - Down Time
Sclteduted Floish Date Complellon Time 07:46:22 Sob-locatlon 3 . Reason for Outage
Est. Duration (days) Comments
Actual Duration (days) Employee Lobor Hours 28.00
PrIority 3.00 Contract Labor Hours CHECKED ALARMS AND LIFT STATIONS
Perform by Warranty No Total Labor Hours 28.00 MADE SEWER CALL TO 204 KEWANNA DRIVE
MADE SEWER CALL TO 1701 SPRING - CHECKED MAIN LINE - OKAY
Expense C....
Rosponse Time (Days) JET CLEANED - 35'
Response Dme (Hours) r Employee Code Last Name Regular Hours Overtime l
Response Dme (Minutes) Equipment No. Work Dale First Name
Hours
Delny _pilon
KJ lET TRUCK 9/25/2000 KENNEIH S. JAMES 8.00
Equipment Nwn JET TRUCK DO lET TRUCK 9/25/2000 DONNIE GRJEFIN 8.00
Equlpmentlles<rlptlon FOOTAGE CLEANED
Locatloa . Must Be Down No I
SulHocationl . EstImated Dow. Time I UNE C1.EANlNG WO No. 9804014 Close Dale 10/ 3/2000
Sob-locatloa 2 - Do... Time
Sob-klcalloa 3 . Reason for Outage T...k No. lET TRUCK Originator
Comments WOType Telephone No.
WENT TO CLARK MARITIME WITH HIM & BOB ABOUT SEWER MAIN. THEN WENT TO INDUSTRIAL PARK TO MEET WIT! Assigned By ExtensiOD
JIM & BOB AND CLARKSVILLE ABOUT LIFT STATION. AssIgned To Reqnesl Dale 9/25/2000 12:19:45
RAN CSO'S Sdled_ Start Dale Complellon Date 9/25/2000
MADE SEWER CALL AT 9TH & VFW BLVD. JET CLEANED WITH OLD TRUCK.
_led Finish Date Completloa Time 12:20:20
JET CLEANED 10" MAIN - 130' Est. DuratIoa (clays)
Ov::1 Actuallloratlon (clays) Employee Labor Hours 16.00
I Employee Code Equipment No. Work IlaIe F"" N>.une Last Name Regular Hours PrIority 3.00 ConlradLabor Hours
Perform by Warranty No Total Lobor Hours 16.00
KJ lETTRUCK 911/2000 KENNEnI S. JAMFli 8.00 Espense Class
IJG JET TRUCK 9/712000 DONNIE GRIFFIN 8.110 Response Tone (Days)
JET TRUCK 9/712000 JOE HEMBREE 8.00 Rosponse~(Hoors)
JH RosponseDme(Minnles)
MA lET TRUCK 91712000 MIKE ARMS 4.00 Delay _pllun
I LINE CLEANING Close Dale 1O/3/WOO I Equl_t Num SEWER CALL
WONo. 9804014 FAJUipmentlles<rlptlolt MADE SEWER CALL
LecatIon . Must Be Dowa No
TaskNo. JETTRUCK Orlg/Dator Sub-location t . Estimated DoWB. nme
WO Type Telepbone No. Sub-IocatIon2 - _Tune
AssIgned By Ex.tension Sub-ln<atloo 3 - Reason for Oolage
AssIgned To Reqoest Date 9/25/2000 12: 19:45 Comments
S<heduIed Start Date Completion Dale 9/25/2000
_Flnish.Date Completloa Time 12:20:20
Est. DuratI"'(<Iays)
Actual Duration (days) Employee Labor Hours 16.00 I
PrIority 3.00 Contract Labor Hoors I LINE CLEANING WONo. 9804017 Oose Date lCI3/2000
Perform by W8IT8II11 No Total Labor Hoors 16.00
Expense Class -
Response Time (Days) Task No. JET TRUCK OrIg/Dator
'0
---~_. ------~-
.--,
Work Order History Comprehensive
Work Order History Comprehensive
10/912000
Page 3
H1I912000
Page 4
WOType
AsslgRed By
AssIglle<I To
Sdleduled Slart Dale
SdIeduIed FloIsb Dale
Est. DuratioR(days)
Actual Durall... (days)
PrIori" 3.00
Perform by WamlOty No
Expeose Class
RcspooIse Time (Days)
Response Time (Hours)
Response TIme (Mlnu"')
Del.., Descriptloo
Telephone No.
ExlenSloa
Request Dale 9/1812000 12:25:23
Completloo Date 9/1812000
Completlon'i"1me 12:25:32
EqulplOent Nom JET TRUCK
Eqnlpmentllescriptlolt FOOTAGE CLEANED
L..atioR -
SUb-IoeatioRt _
Sab-l...tioR:z -
Sn.......IIo" 3 -
Must Be Dow" No
Eslimaled Dowa TIme
Dowa TIme
R....... for Dotage
Employeel.abor Hours 2.00
Contract Labor Hours
Tolal Labor Hours 2.00
Comments
TOOK TV & JET VACTOR TO MISSOURI AVENUE TO TV 36" BRICK SEWER.
JET CLEANED REST OF DAY. WENT TO 10TH ST LIFT STATION TO CLEAN BAR SCREENS.
EqulplllCDt Nom JET TRUCK
Equipment DescriptioR FOOTAGE CLEANED
l.ocalloB -
Sub-lOCBli...l _
Sab-loeatioR:z -
Sub-loeatioR3 -
Comments
JET CLEANED AND CLEANED OFF STREET.
Must Be Dow" No
Estimated Down l1me
Down Time
Reason for Ontage
TV'D - 460'
JET CLEANED - 460'
F.rnployee Code Equipment No. Worlt Date 1'lJSlName Last Name Regular HOUI1I Overtime
HOIIfS
KJ JET TRUCK 9/912000 KENNETH S. JAMES &.00
DG JET TRUCK 9/ Kl2000 DONNIE GRIFFIN &.00
JH JET TRUCK 9/812000 JOE HEMBREE &.00
ALSO CHECKED EWING LANE LIFT STATION
I ~~-~ ~DaleW~ I
UNECLEANlNG
Task ~ JET TRUCK 0rigfIIa1oc
WOType TeIepbone~
AsslgRed By ExtensIOlt
AsslgRed To Req..... Date 9/612000 12:26:49
Scheduled SllIrI Date CompIeIIoIl Dale 9/612000
SdIeduIed FloIsb Dale CompIeIIoB TIme t2:21:05
F..sl.Dura_(days)
AetuaI DuratloB(dayS)
PrIority 3.00
PerformbyW.........y No
Expease Class
Respoase Time (Days)
Response TIme (Hours)
Response TIme (Ml.......)
Delay Descrlpdon
EmpIoyeel.abor Hours 24.00
CootnI<ll.abor Hours
T_l.aborllours 24.00
JET CLEANED - 400'
fployee Code Equipment N" Worlt Date Fifst Name Last Name Regular Hvur.; Oveni~ 1
"""'"
KJ JETTRUCK 9/1812000 KENNETH S. JAMES 1.00
PW JETTRUCK 9/1812000 WAYMON PAYNE 1.00
I WO~ 9&0401& OoseDate 10/312000 I
LINE CLEANING
Task No. Jh"l'TRUCK Originator
WOType Telephone No.
AsslgRed By ExteusIon
AsslgRed To Reqnest Date 9/612000 12:26:49
ScbedaIed Storl Date COIOpledon Date 9/612000
_ Finish Date Complellon Time 12:21:05
Est. DuratioR (days)
AclualDuradon(days)
PrIori" 3.00
Perform by Warranty Nu
Expease Class
RespoaseTlme(Days)
Response TIme (Hours)
Response TIme (Ml.......)
Delay DescrlptioR
F.rnployee Lobor Hours 24.(]()
Contract Labor Hours
T_ Labor Hours 24.00
EquIpn1eat Num TELEVISING
Eqnipment IlescrlptioR SEWER LINES TV
LoeatioR -
S.....hlead... 1 _
Snb-kJca_1 -
SUb-Ioead... 3' -
Commenls
Mustlle Down No
_Dow"Tlme
Dowa TIme
_for-Outage
er.dT_DownTlme 0JIlI
GnMT_EmpIoyeeHoors _
Grand 'f_ Contra<ll.abor Hoors D.8fI
GIMdT_I.aborHours _
-
~71
Work Order History Compl'ebensive
Work Order History ComprebeDsive
Hl/912OOO
Page 2
IlV Q/2000
Equipment Num US GRASS
Eqafpment Des<rlpIioa CUT GRASS AT AU. LIFl'STATIONS
Localiuu -
~aul_
Su...._ Z -
SulMoolllau:J -
MustlleDowu No
Estimated Down 11me
DowaTlme
Reasoa Cor Outage
Comments
SPRAY FOR WEEDS & TRIM GRASS WITH WEEDIlATERS. MOWER BROKE DOWN, BELT SNAPPED. ALL STATIONS
CHECKED .
Employee Labor Houn 18.50
Contract Labor Hours
Total Labor Hours 18.50
CALLED TO CHECK ON PARTS FOR CHUMS I PROM WESCO - WHERE ARB THEY. DOMINICAN REPUBLIC!
I Employee Core Equipment No. Work Date HIS! Name 1.&<1 Name Regular Hours 0.: I
MA US GRASS 9ml2OOO MIKE ARMS 8.00
JH US GRASS 9ml2OOO JOE IlEMBREE 8.00
DG US GRASS 9ml2OOO DONNIE GRIFFIN 8.00
Equipment Num US GRASS
Equipment """'riptlau CUT GRASS AT AU. LIFI"STA11ONS
Localiuu -
Sub-kl<atl08 1 _
Sub-loca1luuZ -
SU....ocalI08:J -
MustlleDowu No
Estimated Dowal1me
Down Time
Reasoa Cor Outage
Graad Tola! Dowu TIme 0.00
Grund Total Employee Hours 4LSO
Graad Total Cuolratl Labor H..... 0..00
GraudTotaILaborHoors 4LSO
Comments
CUT GRASS AT MIDDLE SCHOOL, lOTIt STREET. OLD STONER, LITERS. AND PUT WEED KILLER DOWN AT WILSON.
PICKED UP VACTOR AND EMPTIED AND CLEANED TRUCK
I Employee Code EquiplllCll1 No. Work Date BISI Name 1.&<1 Name Regular Hours 0.: I
Kl US GRASS 9/112000 KENNElH S. JAMES 8.00
JH US GRASS 9/112000 JOE HEMBREE 8.00
DP US GRASS 9/112000 DAVID PAYNE 2.50
I WO No. 9804023 C1000 Dale 10/3/2000 t
LIFT STATION. GRASSCUT11NG
Task No. U,GRASS
WOType
AssIgoed By
AssIpedTo
Scheduled Slart Dale
Scheduled F1nlsll Dale
EsI.D\mlliuu(days)
AewaI Duraliuu (da,.)
PrIority 3.00
Perform by WlUTlDIly No
ESJI"IIS"CIass
Response Time (Do,.)
Response TIme (Hoors)
Response 11me (MIDDleS) _
Delay DoscrIpliuu -
Origioator
Telephone No.
ExtemiOll
Request Dale 9/27/2000 12:38:03
Completion Dale 9/27/2000
Completion TIme 12:38:20
Employee Labor Hours 24.00
C081rart Labor H.....
Total Labor Hoors 24.00
Work Onfer History Comprehensive
Page I
I WONu.. 9803993 CI<JoeDale 9/2212000 I
PLANTMAINT
Task No. PLANT OrigInallJr
WO Type Telephone No.
AssIgDed By Extension
AssigBed To Request Date 9/5/2000 07:42:32
Scheduled Start Dale Complelion Dale 9/ 512000
Scbe<Iuled F1nlslt Dale Completion Tune 07:43:47
Est. Duration (cloys)
ActoBt Duration (cloys)
PriorIty 3.00
l'efiorm by Warranty No
Expense Class
Response Time (Days)
Response Time (H.....)
Response TIme (Minutes)
PetayDoscriplion
10/912000
Employee Labor Hoon 5.00
Contract Labor Hours
Total Labor Koors 5.00
Equipment NlDD tPLANTW AlERI
EqulpmentDoscripllon PLANT W AlER PUMP III
Location CHLORINE PIT
SU....ocatloa 1 CHLORINE
Su......-1 -
Su..._3-
Comments
n EFFLUENT WATER PUMP KEEPS BUSTING COUPLING.
Must Be Down No
Ilstimaled Dowu Time
DownTIme
Reason for Otttage
PUT ON DIFFERENT COUPLING AND NEW HUBS
I Employee COOe Equipment Nl>
Work Dale
First Name
Last Name
Regular Hours
Overtime I
Hours
DM
II'LAN.JWAlERl
91512000
DANNY
MILES
5.00
Grand Total Down Time 0.00
Grand Total Employee noors 5.00
Grand Total Contract Labor Hoors 0.00
Grand Total Labor Hours 5.00
......~-1
,---~ 1
-"'~1
-~1
1
L;
~.=1
Work Order In~tory Comprehensive Work 0nIer History Comprehensive
10/ 9/2000 10/ 912000 Page 2
Page I
I MADE SEWER CAlL I EqulpnMlt Nom SEWER CAlL
WO No.. 9803988 Oose _9f2Zl1OOO EqulpnMlt Descrlpt\Oll MADE SEWER CAlL
LocalloG . MlJSI Be Dowo No
T.... No.. SEWER CAlL OrIgInator So...._... I _ F.stimated Do.... Time
WOType TeIep/1oDe No.. Sub-IocalIoo Z . Dow.. TIme
AssIgned B1 EIle_ Su....oca_~ - RensoD for Onlllge
AssIgned To Req.... Dale 9/812000 07:55:49 Comments
Sc_ Start Dale CompIedon Dale 91812000 CHECKED MAIN ON PLANK ROAD TO MAKE SURE IT WAS FLOWING OKAY FOR STEMLERS. SEWER CALL MADE FOR
ScbeduIed Fillisb Dale Complelloo TIme 07:56:22 1448 PLANK ROAD
Est. _on (da1S) I Employee Code
ActuaI_on(cIays) F.mployee Labor Houn 4.00 Equipment No. Worl<llale tlrst Name Last Name Regolar Honrs Overtirm:1
PrIority 3.00 Contract Labor Hours Hows
Perform by Warranty No Total Labor Houn 4.00 JH SEWER CAlL 913nooo 101! HEMBREE 0.45
Expense Class
Response TIme (Da1S) I MADE SEWER CAU. I
Response TIme (HOUIS) WO No. 9803991 0_ Dale 9/2212000
Response TIme (MiDDles)
DelI1J i8<rIptlon T....No.. SEWERCAlL Orlglll1Jlor
EqolpmeDl Nom SEWER CAlL WO Type Telepbone No.
AosignedBy _00
Equfpment~ MADESEWERCAlL AssIgned Tt> Request Dale 91512000 07:39:53
.-. Must Be Down No Scbeduled Start Dale Completion Dale 915nooo
Su_I. Estimated Dowo TIme _feci Fillisb Dale Completion TIme 07:40: 12
Sub-lo<a_Z . Down Time Est. DorDlIoD (cIa1S)
Sub"'oCll_~ - Reason for Oulllge Actual Duratloo(dalS) Employee Labor Houn 0.45
Comments PrIority 3.00 ConlrlIct Labor Jloun
CLEANED LINE AT 2SU KEWANNA. FOUND NO PROBLEMS IN OUR LINE. TIlE HOMEOWNER WILL NEED TO CONTACT Performby Warranty No Total Labor HOUIS 0.45
PLUMBER Expense aass
I Employee Code Ov~1 Response Time (Da1S)
Equipment No. Worl< Dale F_ Name Last Name Regular Hoors Response Tune (Hours)
Hows Response TIme (MIonleS)
JH SEWER CALL 9/812000 101! HEMBREE 2.00 Delay DescrfpllOll
DM SEWERCALL 91812000 DANNY MILES 2.00
EqulpmenlNom SEWER CALL
I MADE SEWER CALL I EqulpmeDti8<rIplloG MADE SEWER CALL
WO No.. 9803990 0_ Dale 9n2l2OOO Locatloa . MlJSIBeDowo No
SulJ.loollloo) , EstImatedDuwn TIme
SuIJ.Ioca1lon Z - Down TIme
T.... No. SEWER CALI. OrIginalor Sub-IocalIon ~ ' Reason for OU1age
WOType Telephone No.
Asslgned B1 Exlenslon Comments
AssIgned To Reqnest Dale 9/3/2000 07:38:08 CHECKED MAIN LINE ON MERTYL TO MAKE SURE LINE WAS FLOWING OKAY. HOMEOWNER WI LL NEED TO CONTACI' A
Sc_StartDate Completion Dale 9/3nOOO FLUMBER
S<beduiecI_ Dale Completion Time 07:38:35 I Employee Code Ov~~l
F.... DuratIon (days) Equipment No. Worl<llate First Name Last Name Regular Honrs
Actual DorDlIoD (days) Employee Labor HODrs 0.45
PrIorIty 3.00 Contract Labor Honrs IH SEWER CALL 91512000 JOE HEMBREE 0.45
Perform '" Warranty No Total l.abor HOUIS 0.45
Ex..- C'- I MADE SEWER CAU, I
Response TIme (Da1S) WO No.. 9803992 a..... Dale 9n212OOO
Response TIme{HOUlS)
Response TIme (MIonles) T.... No. SEWERCALL Originator
DeI8J _pilon .
, . .
'- '-
-
-- -..-
)
-""-"1
-,.~]
Work Order History Comprehensive
Work Order History Comprehensive
10/9/2000
Page 3
10/9/2000
Page 4
WOType
AssIgBed By
AssIgBed To
Scheduled SJarlDale
Scheduled Finlsb Dale
EsI. ~ (days)
Actual Dura_ (days)
PrIorIty 3.00
Perfonn by Warraol1 No
Ex_ Class
Response Time (Duys)
Response TIme (Hours)
Response TIme (Minutes)
Deiay Descripllotl
Telephone No..
E_
RequestDale 9/412000 ()7:41:12
Completio. Dale 9/412000
CompIetIo.'lilue ()7:41:31
EqulpoMnt Nom .
Equlp_ Doscr1ptloo
Localioa .
_IO<1Ido..l .
SulHoca_: .
SuIJ.Io<aIIott 3 .
Commenls
ODOR COMPLAINT - RESIDENT'S VENT STOPPED UP IN HOUSE.
Must Be Down No
_led Down TIme
Down Time
Reaso. ror Outage
Employ.., Labor IIouB 3.00
Contraci Labor Hours
Tolal Labor Honrs 3.00
I BACKUP WO No. 9804009 0- Dale 9/2212000 I
Equlp"".1 Num SEWER CALL
F.qulpmeolDescrip_ MADE SEWER CALL
1.0<11_ .
SuMocadon I .
8oMocadon 2 .
Sub-ioca_J .
Must Be Down No
_led Down Time
Down-TIme
_ rorOotage
Task No. SEWER CALL
WO Type
Asslgoed By
AssIgBed To
Scheduled SJarI Dale
Scheduled Finlsb Dale
EsI. Durado. (days)
Actual Dura_ (days)
l'rIorlty 3.00
Perfonn by W.......nly No
Ex_ Class
Response T'- (Days)
Response Time (Honrs)
Response Time (Mlnnles)
IloIay Description
Origlnalor SRB
Telephone No. 282.7036
Extension
Request Dale 9/1812000 12:55:00
Comptetion Dale 9/18/2000
CnmpielIoo Time 09:05:50
Comments
CLEANED MAIN LINE AT 1616 E. 8TH STREET TO MAKE SURE IT WAS FLOWING FINE.
Employee Labor Hours
Coutract Labor Hours
T_ Labor Honrs 0.00
I Employee Code Equipment No. Work ~ First Name Last Name Regular Hours Overtime I
Hours.
JH SEWER CALL 9/412000 JOE HEMBREE 1.50
DP SEWER CALL 9/4/2000 DAVID PAYNE 1.50
I ODOR WO No.. 9804008 0- Dale 9/22/2000 I
Taok No. SEWER CALL OrigInalor SRB
WO Type Telephone No. 283.1302
Assigned By Exlellslon
AssIgned To ReqnestDale 9119/2000 10:10:00
Scheduled SJarI Dale Completion Dale 9/19/2000
Scheduled Finlsb Dale Completion TIme 09:05:37
Est. ~(days)
Actual Durall.. (days)
PrIorIly 3.00
Perfonn by Wammly No
Ex_Class
Response TIme (Duys)
Response Time (Hours)
Respoase TIme (Mlsuta)
-y DoscriplloD
EquIpmeot Num .
EIjUi,.- Doscr1ptloo
LO<alioa .
SuIHocalioal _
SIIb-IoealIoD: -
SIIb-IoealIoD J .
Comments
RESIDENT IS HAVING A BACKUP - MAIN LINE CHECKED AND IS FINE.
CONTACT A PLUMBER
Mast Be Down No
Estimated Dows TIme
Down TIme
_rorOulage
RESIDENT WAS INFORMED THEY NEEDED T'
Employee Labor Hours
Conlract Labor Hours
Total Labor Hours 0.00
.1 WO No. 9804010 Oose Dale 912212000 I
RAW SEWAGE
Taok No. SEWER CALL OrigIaator SRB
WO Type Telephone No. 282-6172
AssIgBed By Ex_
AssIgned To Request Dale 911812000 02:25:00
Scheduled SJarI Dale Comptetion Dale 91l8l2OOO
Scheduled _ Dale CompletioD TIme 09:05:58
EsI. DuratIna (days)
A_Du_(days)
PrIorIty 3.00
Perfonn by Warraol1 No
Ex_O_
Response TIme (Days)
l!mpIOyee Labor Hours
Conlral:t Labor Hoors
T_LaborHours 0.00
~TIJ
~..._,.~)
~.~l
Work Order I&tory Comprehensive Work Order I&tory Comprehensive
10/ 9/2000 Pllge 5 10/912000 Page 6
_poose Tlme (Hoors) Est.Dural/Oa (day.)
_poose Time (MIDDIeS) Actualllurallon (days) Employee Labor Hours
Delay Dosaipl/Oa Priority 3.00 Contract LaborHoors
hrformby Warranty No T_LaborHoors 0.00
Equlp....nt Num - F..pense CI...
Equip.....t DescriplioD _poose Time (Days)
Location - Must Be Down No Respo.... Time (Hoors)
SulJ.locallou I _ Estimated Down Time Response Time (MlnuleS)
Sub-l<leaIioal - Down nme Delay Description
Sub-Iocal/Oa 3 - Reason for OUtage
Comments Equipment Num -
RESIDENT HAS RAW SEWAGE IN BACKYARD - DOWN SPOUT AND SUMP PUMP ARE MAKING WATER. RESIDENT F.quipment Iles<ripl/Oa
INFORMED IT WAS THEIR PROBLEM Lo<nl/Oa - Most Be Down No
SulHocalIoa I _ F.slImated Down TIme
SulJ.locatioa:2 - Down Time
I SEWAGEINYAIID I SulJ.location 3 - Reason for OUtage
WONo. 9804011 Close Dale 9/22/2000 Comments
CATCHBASIN NEEDS TO BE CLEANED - GAVE TO JIM TO HANDLE WITH BOB MILLER. JET CLEANED AS BEST AS
T.... No. SEWER CAlL OriginalOr SRB POSSIBLE.
WOType Telephone No. 280-4111
AssIgpedBy Extension
AssIgnedT.. Request Dale 9/2012000 02:00:00 I CHECK MAINLINE I
~SlartDale Completion Dale 9/2012000 WO No. 9804025 Close Dale 10/312000
_fi_Dale Completion Time 09:06:08
Est.1luralIon (lIay.) Task No. SEWER CAlL OrigInal...- SRE
A'-Duration (days) Employee Labor Hoors WOType TelepboneNo. 283-1179
Priority 3.00 Contrad Labor Hoors AssIgned By EJrtenSion
hrformbyWarranIy Nu T_LaborHoors 0.00 AssIgued T.. Bequest Dale 912512000 10:45:00
EspenseClass SdleduIed SIart Dale Completioo Dale 9125/2000
Ib!spoose Time(Days) SdleduIed FioI$b Dale Complel/Oal'me 12:46:14
Respo.... Time (Hours) Est. DuralIon (lIays)
Response Time (Minutes) Actual_oa(lIays) Employ.., Labor H.......
Delay Dos<rlp1I.... Priority 3.00 Conlrad LaborHoors
hrform by WarraDly No TotaJLaborHoors 0.00
Equipment Nma - Expense Class
Equipment DescriplioD Ib!spoose Time (Days)
Location - Must Be Down No Ib!spoose Time (Hours)
Sub-location J _ EstImated Do.... Time Response Time (MlnuIeS)
SulJ.local/Oa % - Down Time Delay Descrlpl/Oa
SulHocalloo3 - Reason for OUtage
Comments Equipment Nom -
FORCE MAIN IS LEAKING - DONNIE TO GET WITH JIM OR DAN STONE TO SEE ABOUT FIXING EquIpment Descripl/Oa
Location - Must Be Iluwn No
Sub-locatiOlt I _ F.stIm*d Down Time
Sub-locatioa:2 - DownTime
I CATCHBASIN WO No. 9804012 Close Dale 9/22/2000 I SulHocalloo 3 - Reason rorOn1age
Comments
T.... No. SEWER CAlL Original...- SRB SOUTHERN INDIANA PEDIATRICS - CHECKED MAIN LINE FOR BACKUP. MAIN LINE IS FLOWING FINE.
WOType Telephone No. (PRECAUTIONARY)
AssIgped By Extemfon
AssIgned T.. Bequest Dale 9/2112000 01:45:00
SdleduIed SIart_ completion Dale 9/2112000 I BACKUP WONo. 9804026 CIoseDale 10/312000 I
SdleduIedFl_ Date . Completion Tillie 09:06:15 .
.
Task No. SEWER CAlL OrIginator SRB
-. -.
-
n _ .-
'}
Work Order History Comprehensive
10l9nooo
Page 1
WO T1JIe
Assigned 81
A$SIgBed To>
Scheduled SllIrtDate
_led 11_ Date
Est. Duradon (daJs)
Actual Dura_ (da10)
PrIorlt1 3.00
hrformb1 Warranl)' No
Expease C....
Respon5"TIme (DaJS)
RespoJL<e TIme (H.....)
Response nme (Mlnu"')
Dela1lleserip_
Telephone No. 284-2215
Exteusion
Request Date 9/2512000 11:35:00
Compledon Date 9125nooo
Compledon TIme 12:46:23
F.mploJU' Labor H.....
Conlract Labor Hours
TotaJ Labor Honrs 0.00
Equlpment Nwn -
Equlpmentlleseripdon
Loeadon -
Sub-locadon I _
Sub-loca_: -
Sub-loeadon 3 -
Must Be Down No
Esllmaled Down TIme
DownTime
_rorOotage
Comments
MAIN LINE STOPPED UP - JET CLEANED 175' AND 'lWO CATCHBASINS - MAIN IS OKAY NOW.
Gnmd TotaJ Down TIme 0.00
Gra'" Total Employee Hours 7.90
Gnmd TotaJConlract Labor Hours 0.00
Grand Tola! Labor Hours 1.90
''''-~--l
-'N'l
-~']
1
Req.... No. 98OOlO8 Close _ 9/22/2000 101912000 9:36:15AM I'al!e 1 Req.... No. 9S04009 Close Date 912212000 101912000 9:36:15AM I'al!e 1
ODOR BACKUP
Requested Seni<e SEWER CALL Req....t_ 911912000 Requested Seni<e SEWER CALL Requosf _ 911812000
Tenant E. 10111712 Req.... TIme 10: 10:00 Tenanl PERIMETER DRIVE 3104 Requosf TIme 12:55:00
AssIpeoI By Orig/natorSRB AssIpeoI By Originator SRB
AssIpeoI Tn Telephone No. 283.1302 AssIpeoI Tn ToIepbone No. 282.1036
Sehedulod S..... Date Extension _SlartDaa Extenskm
_F1__ WO Type Sebeduled n__ WOType
Perf_by Warranty No Completion Dale 911912000 Perform by W.....ly No CompIetloll Dale 911812000
PrIorIty 3.00 Completion TIme 09:M'11 Priority 3.00 Completion TIme 09'f)';''iO
Ex_Class ExoeoseClass
I Q;Ul ~ E"lmated 1..110< ROll"l I Q;Ul ~ E"'mated I abor HOlIISI
Equipment No. . Equipment No. .
Equlpmeol_ptIoa Equlpmeot_ptIon
SerIal No. User_nett Field 1 SerIal No. User__ Field 1
en.t Center User_oed Field 2 en.t Center User_oed Field 2
General Ledger No. User-delloed Field 3 General Ledger No. User__Field3
Depa- User-delloed Field 4 Depa<Iment User_nettFleld4
,.....-. User-delloed Field 5 Loea_ . User__ t1oId5
_.- Most Be Down No SulHocallon. . Most Be DoWII No
_1. Dlwn'Time SuIHocatIoR 1 . DowII TIme
5__3'. EstImated Down Time SulHocatloll3 . Esllmaleti Dowll Time
__ C...OlIIage _C""Outage
Safety Notes Safety Notes
c.....-ass Comments
OOOR COMPLAINT - RESIDENT'S VENT STOPPED UP IN HOUSE. RESIDENT IS HAVING A BACKUP - MAIN LINE CHECKED AND IS FINE:. RESIDENT WAS
INFORMED THEY NEEDED TO CONTACT A PLUMBER
l F.qpivrnent No. Ml:Il:rl!lIml: Meter Readln~ I I Eouinmem No.. ~ Meter Readlna\
II,emNo. Equipmenl No. Descrlptloll Qty Required Date Used Qty Used Total Unit I 1'!emNo. EqnlpmetO No. Description Qty Required Dote Used Qty Used Total Unit I
C.-.t r~.
j-~---- I j-F---- I
I Employee Code Equipment No. Work Date F'1rsl Name Last Name Regnlar Hours Overtime Hours I Employee Code Eqnlpment No. WorklJate FltSt Name l.asl Name Regular Hours Overtime Hours
.
'.
Req..... No. 9804010 CJose Dale 912'1J2OO(J 1& 9/2000 9:36:ISAM I'lIl!e 1 Ilequ<sl No. 9804011 CJose Dale 9n112OOO 10/9/2000 9:36:15AM I'lIl!e 1
RAW SEWAGE SEWAGE IN YARD
R.......... Senke SEWER CAlL ReqIBlDale 911812000 Ilequ<s.... Senk:e SEWER CAU. Ilequ<sl Dale 9/20l200O
T_ BEl.MARDRIVE23IS Req.... TIme 02:25:00 Tenanl SCOIT DRIVE 1531 RequeslTIme 02:00:00
AssIped By OrIglDalorSRB AssIped By OrIgInator SRB
A5sIgaed To Telephone No. 282.6172 AssIgned To Te/epbOne No. 281}.4111
Sc_ Start Dale E.....slon _ SlarlDale v_
_F\alsbDale WOType Scheduled Flnlsh Dale WO Type
Perform by WIlmIDly No Complelloo Dale 9/18/2000 Perfonn by WllITlUlty No Complelloo Dale 9/20l200O
Prforil1 3.00 Coolplelloo TI_ 09-0~'~R Prforll1 3.00 Coo1pIelloo TIme 09:06-0&
Exuense C.... E._ct....
I lliIl ~ Estima.ed I ~hor HOllIsl I lliIl ~ I'slimatedI""J<11<1
Eqolpmenl No. - EqolpJlleDlNo. -
Eqoipmenl DescrlpIloo Eqolpmenl DescrIption
SerIal No. UseNlelioed F1eId 1 SerIal No. U___l
c.st Center Userodelloed Fleld 2 c.st Cenler U__oed FIeld 2
Genend Lodger No. U_odeIloed FIeld 3 General Lodger No. U__Fldd3
~ Userodelloed F1eId 4 DeparlllleDl User_F1eId4
LocallOll - U....odeIloed FIeld S Localloo - User-delioed F1eId S
S_.I- MU5l1le Dowo No Sub-kl<alloo 1 - Mosl1le Down No
_2- Down Time Sub-localloo2 - DownTIme
S_3- Estimated Down Time Sob-l_3 - Esllma....DowDTIme
_foro... Reasoo for Oulage
Safety Notes Safety Notes
Commenls Comments
RESIDENT HAS RAW SEWAGE IN BACKYARD - DOWN SPOUT AND SUMP PUMP ARE MAKING WATER. FORCE MAIN IS LEAKING - DONNIE TO GET WITH JIM OR DI\N STONE TO SEE ABOUT FIXING
RESIDENT INFORMED IT WAS THEIR PROBLEM
I EauiomeDl No ~ Meter Readi02' I F..(Jllipment No ~ M~er R~Df I
ItcmNo. Equipmenl No. Descrlption Qty Required Date Used Qty Used Total Unit litem No. Equipment No_ Descriplion Qty Required Dale Used Qly Used Total Unit I
r~. r~.
i"~---'" I ,----_... I
Employee Code Equipment No. Work Dale rlJSl Name Last Name Regular Hoors Overtime Hours Employee Code Equipment No. Work Dale rlJSl Name Last Name Regular Hours Overtime Hours
---~--.-
Req....t NIt. 9804012 CIo5e Dale 9n2J2000 IIV 9nooo 9:36:15AM l'B2e 1 Request No. 91lO4025 CIo5e Dale 10/312000 IIV 9nooo 9:36:15AM l'B2e I
CA TCHDASIN CHECK MAINLINE
~Ser.ke SEWERCALL Request Dale 9mnooo Requested Seroice SEWER CALL Request Dale 9n5nooo
T-..t DUNBAR 2414 Request Time 01:45:00 Tenant SPRING ST 1701 Request Time 10:45:00
AssIgned By OrlgIoaIorSRB AssIgned By OrIgInalor SRB
AssIgned TD TeJeplloae No. Assigaro TD TeJepIIoae No. 283-7179
Sc:IIeduJecI Start Dale Extension Sc:IIeduJecI SIarI Dale ExtensIoD
_F1__ WOType S<beduIed f1_ Dale WOType
Pedormby Warranty No CompleUoo Dale 9/21/2000 Perform by Warranty No C....pIeUoa Dale 9125n000
Prforfty 3.00 ComplelJon Time 09'Il6'I~ PrIority 3.00 OlmplellonTIme 11'41;-)4
Ex CIaos E_se 01lss
I 0lIA ~ "..Im.,ed bOOr HOUfl\I t 0lIA ~ F.slimated 1.a00r HOUfl\!
Eqnlpmellt No. 0 EqulpmenlNo. 0
Equlpment_pII... Equlpment_pU...
Serial NIt. User_oed FIeJd I Serial No. User__ Field I
Cost Center User-delloed Field 2 Cost Cenler User-delllIed Field 2
GeaeraI Ledger No. User_oed FIeJd) GeaeralI.edger No. User__FleJd)
DeparImenI User_oed FIeJd 4 Department User_Field 4
......- - User_lied FIeJd 5 Loo:ation 0 User_lied FIeJd 5
_to Must Be Dow. No Snb-IoeaUoa 1 - Must Be DoWD No
_2- >>OW"TIme SUb-loeati... 2 0 Down Time
SUb-IoeaUoa 3 - F31ima1ed >>owaTllne __3 0 El<tima1edDowaTIme
Reasoa for 0nIa&e Reasoo for Ontage
Safely Notes Safety Notes
Comments Comments
CATCHBASIN NEEDS TO BE CLEANED - GAVE TO JIM TO HANDLE WITH BOB MILLER. JET SOUTIfERN INDIANA PEDIATRICS - CHECKED MAIN LINE FOR BACKUP. MAIN LINE IS
CLEANED AS BEST AS POSSIBLE. FLOWING FINE. (PRECAUTIONARY)
I Eauioment No. ~ Meter Rea<linol t F..ouinmenl No.. ~ Meier Readl"l
Item No. Equipment No. Descrlplion Qty Required Date Used Qty Used TOlal Unit litem No. Equipment No. Descrlplion Qty Required Date Used Qty Used Total Unit I
rrwt r~.
r-""--'" I j---_... I
Employee Code F.qUipment No. Worl< Date FitS! Name LastName Regular Hours Overtime Hours Employee Code Equipment No. Work Dale FIrst Name Last Name Regular Hours Overtime Hours
Req.... No. 9804026
CkJoe Oak 10/3/2000
10/9nooo 9:36: 15AM
Paee 1
BACKUP
RequesledServIce SEWER CAlL
T...... PRAlT 1010
AssIgned 8y
AssIgned To
s._ SlartDale
_~DaIe
Perform by W........ty No
Prtortty 3.00
ExIlell5e ctass
aequesl Date 9n5nooo
Request TIme 11:35:00
OrIginator SRB
Teleplaone No. 284-2215
Extension
WOType
Complelloo Date 2illllQ!lO
Complelloo 11me 12:46:23
I UaA ~ F.slimale.d 1 .borHOUIll\
Equipment No. -
F.qulpmeut [lescriptloa
SerIal No.
Cost eeRier
General Ledger No.
Department
Localloo -
Sub-Iotalloo I -
S_:-
Sub-~) -
-... ror Outage
Safety Notes
U....-delinedField I
U....-dellned Field 2
U....-de8ned Field)
U....-dellned Field 4
U....-dellned Field 5
MUS! Be Down No
Down Time
Eslimaled Down 11me
Comments
MAIN LINE STOPPED UP - JET CLElINED 175' l\ND TWO CATCHEASINS - MAIN IS OKAY NOW.
I F.fjIlipmen. No Mmr1lllmI: Meter Rcadinr I
IremNo.
Equ!pmenl No.
Description
Qty Required Date Used
Qty Used Total Unil
r~.
j"h_"__ I
Employee Code
Work Date
First Name
Regular Hours Overtime Hours
Last Name
Equipment No.
r
t .
AttachInent F
Maintenance &.. R~pair Expenditures
r;
I ,
r
t
~
n
. I
. j
Ii
.
i
.
~.~ ,}
o
r
~!
l,J
rJ
t.,&
,~
LJ
Jeffersonville Wastewater Treatment Facility
Maintenance & Repair Expenditures
P.p. DA,oT!= .Phase Code Vendor
I,. \
9/15/2000 4400
9/15/2000 4400
9/15/2000 4400
9/15/2000 4400
9/15/2000 4400
I
9/15/2000 4402
9/~ 5/2000 4402
9/15/2000 4402
9A 5/2000 4402
9A 5/2000 4402
i
I
9/15/2000 4441
9/f 5/2000 4441
9/15/2000 4441
+12000 4460
9r 4400
9A '212000 4400
T~ 4400
9A '2/2000 4400
9A. '2I20QO . \.4402
9/22/2000 4402
9/22/2000 4440
9/22/2000 4440
9/~2/2000 4441
9/27/2000 4400
i
9/27/2000 4441
I
9/27/2000 4441
I.. .
9/27/2000 4441
I
9/27/2000 4443
I 4460
9/27/2000
I
I
I
GENERAL RUBBER
GRAPHIC CONTROLS
HEUSER HARDWARE
HEUSIER HARDWARE
KENNY INDUSTRIAL
ALBERT CRUSH
CONTROL ELlECTRONICS
HEUSER
HEUSER HARDWARE
SPENCER MACHINE
CAMBAR
CORLEY ENTERPRISES
NEILL LA VIELLE
BROWN EQUIPMENT
GENERAL RUBBER
GENERAL RUBBER
HEUSER HARDWARE
HEUSER HARDWARE
HARRINGTON
S. W.H. SUPPL Y
FALLS CITY
FALLS CITY
KPSI
DELQRME
DERBY CITY ELECTRIC
WESCO
WESCO
RADIOSHACK
BROWN EQUIPMENT
Description
VINYL TUBING
FLOW CHARTS
FIL Tf.RS FOR PLANT
PLANT ITEMS
SPRING STREET CLEANING
PIPE WORK AT PLANT
RAS - PLANT
HOSE CLAMPS
SET SCREWS
SHEAR PIN
CONTACTOR FOR UTICA /I
FABRICA iE PIPE MANIFOLD
B04TS FQfl F4QOD GATES AT
SPRING STREET
TIRES FOR SEWER CAMERA
GLOVES FOR PLANT
HOSE NOZZLES
PLANT SUPPL Y
PLANT SUPPL Y
SCREENS FOR CL2 AND PRESS
PLANT WA TER PUMPS
BUL8.S FOR LIFT STA TlONS
BULBS FOR PLANT LIGHTING
TRANSDUCER FOR 10TH
TOPO MPA MAPPING SOFTWARE
CAPACITOR FOR CE15ARvrEW
HEA TE:R ELEMENTS FOR CRUMS
LANE I
OVERLOADS & BLQCK FOR CRUMS
LANE I
VCR TAPES FOR CAMERA TRUCK
SKIDS FOR CAMERA FOR TV TRUCK
Amount
$35.00
$130.48
$3.78
$20.53
$598.00
$146.66
$114.00
$3.36
$16.53
$109.62
$174.36
$611.25
$9.19
$87.71
$55. 13
$91.19
$6.08
$12.05
$169.97
$44.73
$11.00
$309.37
$289.52
$106.95
$40.00
$27.30
$266.50
$20.44
$146.20
Total 3,656.90
Attachn1ent G
Repair &.. Replacen1entExpenditures
n
J' J
Jeffersonville Wastewater Treatment Facility
Repair & Replacement Expenditures
n
~.. ~
. j
t j
p.b. DATE Phase Code Vendor
" .
Description
Amount
9/15/2000
9/15/2000
9/22/2000
9/b2l2000
I
I
i
I
I
4492
4492
4492
4492
AMWELL
WATERWORKS
SPENCER MACHINE
SPENCER MACHINE
(project #00234) CLARIFIER REPAIR
(project #00234)PIPE REPAIR ON
CLARIFIER #2
(project #00234) CLARIFIER REPAIR
(project #00238) CRUMS LANE PUMP
#1
$1,361.00
$1,070.11
$2,126.10
$3,548.71
n
l !,
f J
Total
8,105.92
n
j i
r )
,
,
i,\
r
i
; I
,.....,
~
j t
AttachInent H
Safety Inspection Report
n
~,~,.i
n
Fl..!,
t.J
ENVIRONMENTAL MANAG~MENT CORPORATION
MON'tHLYSAFETY INSPECTION
CHECKOFF SHEET
-'.
" -."
^'
JEFFERSONVILLE W ASTEW A TER TREATMENT FACILITY
701 CHAMPION ROAD
JEFFERSONVILLE, IN 47130
(812) 285-6451
.-.-,
,,"-,_.-_.._,0., ,.. ,'C-'
PERSON COMPLETING INSPECTION:
Wavmon Pavne
I. Personnel Safety
A. Personal Protective Clothing
1. Safety Helmets Provided
(for Personnel & Visitors)..................................
2. Hearing Protection
(for High Noise Areas).......................................
3. Eye Protection - Goggles, etc.
(for Personnel & Visitors)..................................
4. Gloves
(for Personnel). ... ....... ...... .... .... ....... ................ ...
5. Rubber Boots with Steel Toes
(provided for Personnel).....................................
6. Rain Suits Provided
(for Personnel)....................................... .... .........
7. Is Respiratory Protection Provided including
ventilators and hoods over high dust areas, dust
masks, etc. (for Personnel)................................
8~ Safety Devices and Equipment
1. Non-sparking Tools in areas where flammable
or explosive gases may be present?....................
2. Oxygen Deficiency, Toxic, & Explosive Gas
indicator........................... ........ ................ ~.........,
3. Self-contained Breathing Apparatus for entry
to chlorine room.................................................
4. Confined Space Entry Equipment Available
such as and including Safety Harness, Portable
Wench, Hoist, etc...............................................
5. First Aid Kits with proper & adequate supplies
readily available for any First Aid Emergency....
~'-. .
September 29. 2000
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes ./ NO N/A
Yes./ NO N/A
Yes./ NO
N/A
Yes./ NO
N/A
Yes./ NO
N/A
Yes./ NO
N/A
Yes./ NO
N/A
r 6. Traffic Control Cones Available........................ Yes./ NO N/A
li,;,..-"j
7. Ladders to enter manholes of wet wells
(fiberglass or wooden for electrical work)......... Yes ./ NO N/A
8. Safety Buoys and Life Lines, Life Preservers
at all open structures (02 Ditches, Clarifiers,
Lagoons, etc.. ...... .... ............. ........ ............. ....... Yes./ NO N/A
II. General Plant Safety
,.-, 1. Are Personnel trained in the use and location
t~
J of safety equipment at the plant...................... Yes.! NO N/A
2. Are there railings around all tanks with
openings chained off.... ..... ............................. Yes.! NO N/A
3. Are holes covered? Including all pits & wells,
drains, valve holes, hatch covers in place........ Yes.! NO N/A
4. Are explosion proof fixtures used where
needed....... ... ......... ... .......... ........ ............. ...... Yes.! NO N/A
5. Are all equipment guards in place? Including
mowing equipment. ............. ... ..... ........ .......... Yes.! NO N/A
6. Are dry wells ventilated and is ventilation
adequate in all areas....................................... Yes.! NO N/A
7. Are emergency numbers posted & accessible.. Yes.! NO N/A
8. Is proper liquid flammable storage used.......... Yes.! NO N/A
9. Is general plant cleanliness being practiced?
Including floors (No oil or grease or pools of
water), Storage Areas (No clutter & supplies
stored properly), Chlorine Room (Free of
clutter), Laboratory............ ..... ...... ................. Yes.! NO N/A
10. Are all walkways, exists and routes, &
stairways clear & unobstructed (No ice, oils,
water, grease, or debris)................................. Yes.! NO N/A
11. Are all slippery surfaces posted and/or covered
with anti-skid material, including stair treads
an~~amps, in good repair and covered with Yes.! NO N/A
non-skid surface......... ........... ................... .......
12. Are an mats and rugs in good repair so as not
to become tripping hazards............................. Yes.! NO N/A
13. Are work area hlyouts adequate...................... Yes./ NO N/A
14. Is lighting adequate in all areas (Work areas,
stairways, walkways, etc.).............................. Yes./ NO N/A
15. Are noise levels within allowable limits or
danger areas posted........................................ Yes.! NO N/A
16. Are toilet facilities available & clean............... Yes.! NO N/A
17. Is safe drinking water available....................... Yes.! NO N/A
18. Is pest control adequate.................................. Yes.! NO N/A
19. Are all exists properly marked......................... Yes.! NO N/A
20. Is inclement weather protection provided at
entrances (mats, safety strips, de-icers, etc.).... Yes.! NO N/A
21. Are tripping hazards eliminated at all doors
(ilireshold plates in good repair, etc.)..............
22. Is safety glass provided in all doors.................
23. Are handrails provided on stairs (Both sides
if necessary)......... .......... .......... .......... ............
24. Are laf:iders properly anchored.......................
25. Are fixed laf:iders provided with safety cages
or safety side rails............................................
26. Are all elevation differences between floors
clearly defined and properly lighted................
27. Are portable ladders in good condition...........
28. Kick boards in place if needed........................
29. No Broken steps............................................
30. Are ashtrays provided and emptied regularly..
31. Are trash cans covered and emptied regularly.
32. Are portable hoists for lifting heavy equipment
in good repair.................................................
33. Are plant personnel immunized for tetnus.......
34. No electrical cords stretched over tanks..........
35. No gas leaks...................................................
36. Fuel supply tank in good condition.................
37. No excessively hot operating temperature on
machinery or equipment................................
38. No excessive vibration of machinery or
equipment....... .......... ..... '.' ............. ..............
39. No water or oil being "slung" from equipment
40. No worn or cracked equipment.....................
41. No excessive dust on equipment...................
42. Adequate dehumidifier and heaters where
needed......................................................... .
43. Emergency Medical Information on all
employees available for determination of job
assignments................................................. .
44. Cross connections have been eliminated
between potable water supply and non-potable
source:
a. Pump & Mixer Seals.................................
b. Digester Heating System Makeup Water...
c. Vacuum Filter Water Sprays.....................
d. Chemical Mixing Tank...............................
e. Chlorinator Water Source...........................
f. De-Chlorination Water Source....................
g. Yard Hydrants............................................
h. Other... .......................................................
r
l
In. Electrical Safety
1. Is all electrical circuitry enclosed and identified.
2. Is all wiring in good condition..........................
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yesv' NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO
Yes./ NO
Yes./ NO
Yes./ NO
Yes./ NO
Yes./ NO
Yes./ NO
Yes./ NO
Yes./ NO
Yes./ NO
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
r
.
3. Are the number of outlets adequate.................. Yes./ NO N/A
4. Is equipment properly grounded or insulated.... Yes./ NO N/A
5. Are extension cords in good condition apd
used properly. ..................... ........... ..... ............ ... Yes./ NO N/A
6. Is electrical test equipment available. Such as
voltmeter, ampmeter, etc................................. Yes./ NO N/A
7. Are dielectric rubber mats presents for
electrical work............ ..................... ....... ....... Yes./ NO N/A
8. All control panel switches in good condition.. Yes./ NO N/A
9. All control panels unobstructed...................... Yes./ NO N/A
10. Are dielectric rubber gloves available............. Yes./ NO N/A
11. Are ground fault interrupters used.................. Yes./ NO N/A
,.... 12. Are warning or caution signs posted............... Yes./ NO N/A
~
, 13. Is control panel area clean and dry........"........ Yes./ NO N/A
i
~.. _J 14. Are aU needed fuses or breakers in place......... Yes./ NO N/A
15. Are aU contacts clean and dust free................. Yes./ NO N/A
16. Is there emergency stop buttons on aU
machines and equipment................................. Yes./ NO N/A
17. Are personnel familiar with the electrical safety
such as lock out/tag out procedures................ Yes./ NO N/A
18. Is power supply locked out/ tagged out on
equipment presently being repaired................. Yes./ NO N/A
r IV. Chlorine & Dechlorination Safety
t
1. AU standing cylinders chained in place and/or
ton cylinders chocked...................................... Yes./ NO N/A
2. All personnel rained in the use of CLz.............. Yes./ NO N/A
3. Appropriate repair kits available....................... Yes./ NO N/A
4. Chlorine & dechlorination leak detector tied
into the facility alarm system........................... Yes./ NO N/A
5. Ventilator fan with outside switch present and
either comes on when door opens or manually
with switch at entrance door........................... Yes./ NO N/A
6. Ammonia and Sulphur for checking chlorine &
dechlorination leaks available.......................... Yes./ NO N/A
7. Are all safety precautions posted..................... Yes./ NO N/A
8. Proper Chlorine wrench available to open
valves~ ~.-.... .....-..'......... ,. ......... ..... ........'.-.'... '" ,-,.. .'..... ".............. ,', ,"<t"., Y es./ NO N/A
9. Chlorine protected from direct sunlight, cool
and dry ...................,...............,.....-..........,..t....:..... Yes./ NO N/A
10. No petroleum or other chemicals store in
chlorine room................................................. Yes./ NO N/A
11. Spare lead washers available on site................ Yes./ NO N/A
V. Process Chemical Safety
1. Are personnel trained to handle all chemicals
pr()petl y......................................................... Yes./ NO N/A
n
~ )
~... J
2. Is proper safety clothing present for the
chemical to be handled...................................
3. Are all containers, vats, and tanks properly
labeled........................................................... .
4. Is employee exposure within accepted limits....
5. Are there proper containment of storage areas,
including curbing.. .......... ...... ......,............ .......
6. Are management & employees aware of the
hazards of the materials being used..................
7. Knows proper response to an accidental spill...
8. All MSPS available and easily accessible.........
9. Has complied with the 6 employer
responsibilities of the Worker Right to Know
Law? (SARA)...................... ..... ......................
to. Emergency Action Plan on file with local Fire,
Police Departments and appropriate Emergency
Agency....... ............... ........................ .,. ...........
VI. Tools & Equipment
1. Are hand tools in good repair and stored
properly......................................................... .
2. Are power tools stored properly and in good
condition - cords, plugs, etc............................
3. Are the tools adequate for the tasks to be
performed............. ..... ..... ... ....... ........ ........... ...
4. Are defective tools replaced as needed............
5. Are tool guards in place..................................
6. Are employees trained in the proper use of the
various tools they are expected to use.............
7. Are employees given additional instruction and
periodic reviews of specialized tools and
equipment....................................................... .
8. Are proper lifting techniques used by
employees.......... ..............................................
VII. Fire Safety & Protection
1. Are fire/emergency evacuation plans posted......
2. Are employees familiar with fire/emergency
evacuation plan... .................. ........ ...................
3. Are there suffIcient number and types of fire
extinguishers................................................... .
4. Are the fire extinguishers properly located and
identified............ on........................ ...................
5. Are the fire extinguishers checked annually......
6. Are all of the fire extinguishers in working
condition.............................. ........ ..,.................
7. Are employees trained in the proper use of the
extinguishers to be used...................................
8. Are smoke detectors in working order.............
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
YES NO N/A./
,)
r
E,j
r
.
t"J
..-
,
Ih..,-,
VIII. Laboratory Safety
1. Emergency Eyewash & Shower Station are
present and work properly and tested monthly..
2. Fume hood is present.......................................
3. All chemicals safely and properly stored, well
labeled and in original containers.....................
4. Laboratory Safety devices used such as: Pipette
suction bulbs, Eye Protection, Gloves, Aprons
or Jackets, & Tongs.........................................
5. No brokenl chipped or cracked glassware........
6. No overloaded outlets.....................................
7. Acid spill kit available.....................................
8. Emergency procedures for acid spills posted
and used by all personnel................................
9. Laboratory Safety Rules posted and obeyed by
all personnel such as no cooking or eating from
laboratory glassware........................ ................
IX. Other Safety
1. Are the required safety programs presented
and/or attended during the year........................
2. Is a suitable identification system used to
identify the plant's piping system......................
3. Has the operator taken steps to remove or
minimize safety hazards...................................
4. Are all personnel provided with a shower and
locker for their work clothes...........................
5. Are personnel trained in First Aid & CPR........
6. Have the following proper safety signs been
provided such as: Non-potable Water, Chlorine
Hazard, No Smoking, High Voltage, Watch
Your Step Signs in Certain Areas, & Exit Signs.
7. Is your Facility safety program Up to Date
(W orksafe Program)....... ........................... ......
(# YES)
134-0 x 100 = 100 %
(II YES + # NO)
Our plant is in lrreat shape
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO N/A
Yes./ NO
Yes./ NO
Yes./ NO
Yes./ NO
Yes./ NO
N/A
N/A
N/A
N/A
N/A
Yes./ NO
N/A
Yes./ NO
N/A