Monthly Operations Rep
August 2000
Prepared for:
Peggy Wilder
September 29, 2000
~~~
~
I
~
-
ENVIRONMENTAL
MANAGEMENT
CORPORATION
September 29, 2000
701 CHAMPION ROAD
JEFFERSONVillE, INDIANA 47130
812-285-6451
FAX 812-285-6454
Peggy Wilder
CITY OF JEFFERSONVILLE
City/County Building
Jeffersonville, IN 47130
Dear Ms. Wilder:
Enclosed please find Environmental Management Corporation's (EMC) "Operations
Report" for the month of August 2000, containing information on the following:
1.0 Effluent Quality
2.0 Design Loading Limits
3.0 Facility Operations
3.1 Pretreatment
4.0 Preventive and Unscheduled Maintenance
4.1 Maintenance & Repair Expenditures
4.2 Repair & Replacement Expenditures
4.3 Electrical Expenditures
5.0 Facility Safety and Training
6.0 Sewer Collection System
As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we
are available to discuss this report, or any other aspect of our operations, at the convenience
of the City.
Sincerely,
ENVIRONMENTAL MANAGEMENT CORPORATION
~:(j
Project Manager
JET;sb
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
1.0 EFFLUENT QUALITY
During August, effluent quality was within NPDES permit limits for CBOD, TSS and NH-3. Table 1.1
summarizes the effluent quality data. Attachment A contains Time Series Plots of daily Carbonaceous
Biochemical Oxygen Demand (CBOD) and Total Suspended Solids (TSS) values. Attachment B contains Time
Series Plots of Aeration Mixed Liquor Suspended Solids (MLSS) and Sludge Volume Index (SVI).
t
~
I
Parameters Permit Limit Monthry Average
mg/L mg/L
...,..mtmmrr:~,,, .<~:':~r.~~:=.~",,^._....,.._.~:';"'=l::~~~. .."'...."',,.,...,....~~
Carbonaceous 25 6
Biochemical Oxygen
Demand (CBOD)
- ,-,-".."-"",. ..,"c.~.,._.,~__~,",.."
Total Suspended Solids 30 5
(TSS)
. ,"d'.
E-Coli 235 2
( Colonies/ 100 ml)
.
Chlorine Residual .05 daily .01
Maximum
,." ,'~ '.' o. ..>.,-....,',
Ammonia 3.0 0.278
Average Dry Weather 5.2 See Table 1.2
Flow
Table 1.1
EFFLUENT QUALITY
r
.
p
r'
r
o
r-
f .
t
Table 1.2
WET WEATHER VS. DRY WEATHER
,-,
i
{
~.- ~~
Number of Wet Days * 19
"..=...m _, .,-, . "~.._~.~=
Average Flow of Wet Days 4.28 MGD
q. r-'"=~""O':"
Number of Dry Days 12
"....~--~~
Average Flow of Dry Days 3.34 MGD
- "'A ..,.,
* Wet Day = Rain (> 0.05 in) and one day after
r-
'r I
3~0 DESIGN LOADING LIMITS
The Flows and Loadings report for August 1994 through August 2000 can be found in Attachment C.
r
i
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
n
(:j
3.0 FACILITY OPERATIONS
r
,
l
Attachment D contains a list of septic haulers that discharged at the facility during the month of August.
r
( j
During August the treatment processes performed very well. The facility experienced normal rainfall for the
month.
The sludge settleability and Sludge Volume Indexes (SVIs) in the secondary treatment process were normal for
the month of August.
Smith Contractors has been awarded the Influent Flume and Clarifier project. They are on site and
proceeding. This project is nearing completion. The clarifier should be completed near the end of October.
r 3.1 PRETREATMENT
I ;
It. ."t
L)
Pretreatment activities for the month of August include:
. Voss Clark was determined to be out of compliance on 8-30-00 when the Jeffersonville Wastewater
n Laboratory staff performed their annual sampling. Voss Clark had a zinc result of 4.64 mg/L. This
result exceeds the permitted limit. Voss Clark was issued a Notice of Violation (NOV).
. Annual inspections were performed at Dallas, Voss Clark, Cargo Clean, and Alumnitec.
. Annual sampling was performed at Voss Clark and Dallas.
. Oil and Grease was found entering the collections system on the morning of
August 14, 2000 at the Silver Creek Business Center. The lift station and surrounding manholes
were inspected and samples were collected. The only industry that had a similar discharge was Cargo
Clean. Holly Vail, the Environmental Manager for Cargo Clean, was notified of the problem the lift
station was experiencing.
. There was a meeting held with representatives from the City of Jeffersonville and Cargo Clean
discussing issues, such as, the metals violations and getting permission to install a pretreatment
system. Cargo Clean will be issued a consent order until the pretreatment system is installed.
4.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE
Preventive maintenance was performed on all equipment as scheduled for August. There were 15
unscheduled maintenance tasks performed.
!
A list of unscheduled maintenance work orders and sewer calls is included as Attachment E.
Maintenance & Repair expenditures for the month of August are detailed in Attachment F . Table 4.1
presents the amount expended in August. Table 4.2 includes the same information for Repair &
Replacement expenditures. Attachment G contains detail of Repair & Replacement expenditures for August.
r-:
~ !
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
fI
$ 1
l ,)
-
Time Period Amount Budget (Over)
Expended Under
." .~h ".'''' "',~,"-"', ,Co"~,
August
$5,698 $4,200 ($1,498)
...~.,..." .., "',~
July $3,582
- " ,,,. '" " "' '~'-'
Year-To-Date $19,569 $16,800 ($2,769)
Table 4.1
MAINTENANCE & REPAIR EXPENDITURES
Time Period Amount Budget (Over)
~...,-'
August $16,174 $8,334 ($7,840)
"
July $17,504
. ._.,',...,-."'~~~.~
Year-To-Date $89,065 $33,336 ($55,729)
- - --" _on_ ....-- ------ ~_. ~ "'"" -~. --~ '.--:-'" -- -~---~--,,",--
. . " ~ -", ..... ~~.
Table 4.2
REPAIR & REPLACEMENT EXPENDITURES
4.3 ELECTRICAL EXPENDITURES
Table 4.4 presents total electrical expenditures for August 2000. The next table presents facility electrical
~xpenditures August 2000.
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
Table 4.4
FACILITY ELECTRICAL EXPENDITURES
AUGUST 2000
~._- .-.,.-
Time Period Amount Budget (Over)
Expended Under
""" ";.', '" ."".~ ~,.,-.:""-;,.",",,:.,,;:," """"::,,.',,,, "......."....,.."..~",....,,.~
August $13,748 $12,953 ($795)
(actual)
,.~-
Year-to- Date $55,989 $51,812 ($4,177)
(actual)
5.0 FACILITY SAFETY & TRAINING
I
I
I
A safety inspection was conducted on August 15, 1999. The rating was 100%. There were no deficiencies
reported. Our plant is in great shape.
A copy of the Safety Inspection report is included as Attachment I.
SfFety training was provided by our Safety Coordinator on Machine and Hand Tool Safety for the month of August.
6.0 SEWER COLLECTION SYSTEM
During the month there were 23 sewer calls. The calls were related to the following:
~
t,,,
.
.
.
.
.
.
.
.
Residential problems
Blockages in the City's main line
Catchbasins
Odor complaints
Roots
Other reasons
Storm Related
Backup
8
2
11
1
o
1
o
o
i
\:ollection system personnel have been cleaning and preforming preventive maintenance work at various liftstations.
Several stations have been painted inside and out. Catch basins have been checked and cleaned as needed. Four of the
CSO gates have been repaired and are being scheduled to be put back in place. During inspection of various lift
stations there were several maintenance items found that need to be addressed. Check valves and other routine
rhaintenance items have been placed on the maintenance schedule to be completed in the following months. After
r~pairs are completed, the lift stations will be scheduled for painting. The lift stations scheduled for painting are as
follows: lO'h Street, Golfview, Silver Creek Business Center, Cherry Creek, Eastbrook, Arctic Springs, Crums Lane
III, Mill Creek, Camp Powers, Powerhouse, and Eastern Boulevard.
Jeffersonville Wastewater Treatment Facility
Monthlv OIJerations ReIJort
,...,
i 1
LJ
Project August Year to Date
Feet of Sanitary Sewer 3,405 12,792
Cleaned
.. .... . .
Feet of Storm Sewer Cleaned 400 1,058
Catchbasins Cleaned Grate Tops = 25 Grate Tops = 102
Vactored = 19 Vactored = 137
.. ..
Catchbasins Raised 0 0
...
Feet of Sanitary Sewer 1,069 7,426
Televised
",-
Sewer Tap Inspections 9 13
Dye Tests 0 1
.-
Manhole Castings Replaced 0 0
". ....-.,. " -"-. .._.
Air Tests 5 11
Manholes Sealed 0 0
. _ _,~~_ ~". '._.~".M"_ _____ ~ ~---~~ -- -- -"-_.- - --- "-...---- .- ~-~ - ~-----
Table 6.1
MONTHLY COLLECTION ANALYSIS REpORT
Service Calls Backup Odor Main Resident Storm
Received Block Problem Related
Backups
23 0 1 2 8 0
Locates Roots Other Catch Basin
115 0 1 11
--- -------- ~~-
~ ~-~~"------------_.- -.--
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
ATTACHMENTS -
A Time Series Plots - CBOD & TSS
B Time Series Plots - MLSS & SVI
C Flows & Loadings Report - August 1994 through August 2000
D Septic Haulers Report
E Unscheduled Maintenance Work Orders & Sewer Calls
F Maintenance & Repair Expenditures
G Repair & Replacement Expenditures
H Safety Inspection Report
n
Iilo.c.J
AttachInent A
Thne Series Plots
CBOD & TSS
I:;;::)
Jeffersonville Wastewater Treatment Facility
Effluent CBOn / TSS
- Effluent CBOD - Effluent TSS
II
26
21
16
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
August 2000
r->
H
\."."..... I
f"'
> .,
AttachnJent B
Thne Series Plots
MLSS &.. SVI
Jeffersonville Wastewater Treatment Facility
Aeration Mixed Liquor
Suspended Solids (MLSS) mgll
- MLSS mgll - Design Limit MLSS
4500
4000
3500
3000
2500
2000
1500
1000 -
500
0
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
August 2000
Operated and Maintained by:
Environmental Management Corporation
Jeffersonville Wastewater Treatment Facility
Aeration Mixed Liquor
Sludge Volume Index (SVI) ml/gm
- SVI mVgm - Design Limit SVI
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
August 2000
Operated and Maintained by:
Environmental Management Corporation
~
[:'1
,.-
i
L:
AttachInent C
Hows &.. Loadings Report
May 1994- August 2000
] -'~~1 ., ""J ~'J ~'] ~~~"l '''~']
ii':--... __~. .
Jeffersonville Wastewater TreatmenlFacility
May 1994 - August 2000
Design % Design % Design % Total
Month Flow (MGD) Limit Design TSS (Ibs) Limit Design BOD (Ibs) Limit Design Rain
May 1994 450 5.2 87% 6,042 ]0,105 60% 3,490 10,58] 33% 2.35
June 3.84 5.2 74% 8,038 10,105 80% 3,843 10,581 36% 3.70
July 3.68 5.2 71% 8,311 [0,105 82% 3,913 10,581 37% 2.25
Aug 355 5.2 68% 7,668 10,105 76% 3,819 10,581 36% 2.40
Sept 3.81 5.2 73% 8,726 10,105 86% 4,798 10,581 45% 3.65
Oct 3.71 5.2 71% 8,493 10,105 84% 4,356 10,58 ] 41% 2.20
Nov 4.09 5.2 79% 9,483 10,105 94% 4,025 10,581 38% 3.85
Dee 4.19 5.2 81 % 10,434 10,105 103% 3,886 10,581 37% 4.45
Jan 1995 3.81 5.2 73% 9,23] 10,105 91% 3,864 10,58] 37% 3.75
Feb 2.92 5.2 56% 6,393 10,105 63% 2,710 10,581 26% 1.60
March 2.87 5.2 55% 5,572 10,105 55% 2,480 10,581 23% 2.05
April 2.63 5.2 51% 4,211 10,105 42% 2,178 10,581 21% 2.80
May 3.46 5.2 67% 3,593 10,105 36% 1,622 10,581 15% 10.25
June 2.79 5.2 54% 4,824 10,105 48% 2,683 10,581 25% 3.35
July 2.31 5.2 44% 4,244 10,105 42% 1,809 10,581 17% 250
Aug 3.22 5.2 62% 6,338 10,105 63% 3,491 10,581 33% 3.45
Sept 2.33 5.2 45% 5,962 10,105 59% 3,022 10,58] 29% 1.60
Oct 2.87 5.2 55% 6,235 ]0,105 62% 3,124 10,581 30% 5.25
Nov 2.64 5.2 51% 7,449 10,105 74% 2,519 10,581 24% 2.75
Dec 3.22 5.2 62% 9,211 10,105 91% 3,620 10,581 34% 5.85
Jan 1996 4.29 5.2 83% 8,229 10,105 81% 7,084 10,581 67% 5.00
Feb 3.28 5.2 63% 8,480 10,105 84% 6,620 10,58 ] 63% 2.63
March 5.45 5.2 105% 11,091 10,105 ]10% 9,045 10,581 85% 5.98
April 5.85 5.2 113% 12,148 10,105 120% 9,075 10,581 86% 650
May 8.] 7 5.2 157% 14,5]3 10,] 05 ]44% 10,902 10,58] 103% 7.30
June 5.74 5.2 ]10% ]2,447 10,105 ]23% 10,] 49 10,581 96% 3.72
July 4.36 5.2 84% 11,672 10,105 116% 9,345 10,581 88% 3.40
Aug 3.83 5.2 74% ] 1,] 48 10,105 ]10% 10,312 10,581 97% 1.90
Sept 4.96 5.2 95% 12,865 10,105 127% 9,928 10,581 94% 9.02
Oct 4.25 5.2 82% 11,059 10,105 109% 8,471 10,581 80% 2.60
Nov 4.80 5.2 92% ]3,77] 10,105 ]36% 1 ] ,689 10,58] ]10% 4.10
Dee 5.77 5.2 111% 14,725 10,105 146% 11,020 10,581 104% 4.90
Jan 1997 559 5.2 108% 19,581 10,105 194% 16,597 10,581 157% 3.85
Feb 5.84 5.2 112% 22,892 10,105 227% 15,732 10,58] 149% ]2.25
March 10.62 5.2 204% 22,586 10,105 224% 13,197 10,581 125% 6.30
April 5.63 5.2 108% 17,584 10,105 174% 10,330 10,581 98% 2.31
May 6.27 5.2 12]% ] 8,] 45 10,105 180% 9,726 10,58] 92% 7.]5
June 7.05 5.2 136% 13,347 10,105 132% 8,937 10,581 84% 5.05
July 4.32 5.2 83% 13,979 10,105 138% 12,862 10,581 122% 055
Aug 4.43 5.2 85% 11,925 10,105 ] ]8% ]] ,8] 7 10,581 ] 12% 3.95
Operated and Mainted by:
Environmental Management Corporation
Month
Sept
Oct
Noy
Dec
Jan 1998
Peb
March
April
May
June
July
Aug
Sept
Oct
Noy
Dee
Jan 1999
Peb
March
April
May
June
July
Aug
Sept
Oct
Noy
Dee
Jan 2000
Peb
March
April
May
June
July
August
Flow (MGD)
3.84
3.60
3.81
4.23
4.71
5.31
4.77
5.62
5.57
5.83
4.90
5.04
4.03
3.62
4.01
4.67
6.63
5.36
6.00
5.70
5.35
6.45
5.57
5.49
3.96
3.77
3.80
4.49
4.51
7.26
5.45
5.49
4.03
4.17
3.67
3.92
Design
Limit
""5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
--'-1
L~,,'__ ___ ....
-<.....,
\.--." -
::~]
r- :-1
Jeffersonville Wastewater Treaiment Facility-
May 1994 - August 2000
% Design % Design % Total
Design TSS (Ibs) Limit Design BOD (Ibs) Limit Design Rain
74% 9,166 ]0,]05 9]% 10,]60 10,581 96% 1.47
69% 12,539 10,105 124% 10,439 10,581 99% 1.47
73% 8,516 10,105 84% 10,359 10,581 98% 3.35
81% 9,208 10,105 91% 8,290 10,58] 78% 4.30
91% 10,920 10,105 108% 8,838 10,581 84% 4.15
102% 7,661 10,105 76% 8,636 10,58 [ 82% 1.65
92% 9,309 10,105 92% 11,656 10,58] ] 10% 5.85
108% 9,187 10,105 91% 8,812 10,581 83% 7.60
107% 8,640 10,105 86% 10,9[7 10,581 103% 4.71
1 ]2% ]0,0]6 10,]05 99% ]0,794 10,.581 102% 7.46
94% 8,418 10,105 83% 6,661 10,581 63% 7.90
97% 8,112 10,105 80% 7,356 10,581 70% 4.22
78% 8,302 10,105 82% 8,100 10,581 77% 0.05
70% 7,216 10,105 71% 6,612 10,581 62% 2.40
77% 7,525 10,105 74% 7,659 10,581 72% 2.60
90% 10,399 10,105 103% 8,9]9 10,58] 84% 3.35
128% 13,381 10,105 132% 10,064 10,581 95% 11.40
103% 9,566 10, t05 95% 7,868 to,58 I 74% 2.50
115% 9,508 10,105 94% 7,756 10,.58] 73% 3.40
110% 12,360 10,105 122% 10,126 10,581 96% 3.32
103% 10,976 tO,t05 109% 9,28 [ 10,581 88% 2.10
124% 11,404 10,105 ] 13% 10,759 10,58] 102% 6.30
107% 8,362 10,105 83% 9,523 10,581 90% 0.70
t06% 7,921 10,105 78% 9,569 10,581 90% 0.95
76% 5,945 10,105 59% 6,209 10,58] 59% 0.70
73% 6,949 10,105 69% 7,703 10,581 73% 2.70
73% 8,050 to, t05 80% 7,796 10,581 74% 2.70
86% 9,287 10,105 92% 7,564 10,581 71% 6.]7
87% 8,839 10,105 87% 6,883 10,581 65% 4.65
140% 10,354 10,105 t02% 9,324 to,581 88% 6.10
105% 8,727 10,105 86% 8,045 10,58] 76% 2.75
106% 8,608 10,105 85% 6,227 10,581 59% 3.70
78% 7,932 to, 105 78% 7,293 10,581 69% 1.00
80% 8,347 10,105 83% 7,512 10,58] 71% 4.]]
71% 8,172 10,105 81% 6,183 10,581 58% 4.11
75% 6,800 10,105 67% 6,3 to 10,581 60% 4.11
2
Operated and Maimed by:
Environmental Management Corporation
Attachn1ent D
Septic Haulers Report
August 2000
r
L
n
U
~
fj
SEPTIC HAULERS REPORT
August 2000
Loads Delivered To Treatment Facility
"'" ..;.;""....."...~,;;",.,"'"><""",''','''',,',,..'''",';;..".;."'",."
Hauler August Hauler Total (YTD)
-''''~" """.;:.,, ""' -
Rumpke of Indiana 6 29
"'.,
TOTAL 6 29
,-
Gallons Delivered To Treatment Facility
-, " '1lI'~ ..,. ooW< ."''''''''''''''..........''''...d'. ...:;-";.w;,..",,.'li....,,".:._.=.. ..:..", :.." ,....".".;'"-'-,'~,-',
Hauler August Hauler Total (YTD)
Rumpke of Indiana 7,900 35,900
TOTAL 7,900 35,900
- -- - -. .. - - -- ----- ----" -- .. ~-,~ ---,.~ --------- -- _u____, ____.
r
~
€
r
t,
AttachInent E
Unscheduled Maintenance Work Orders
Ii.
Sewer Calls
n
Request No. 9803923
Close Date 8/31/2000
9/29/2000
8:43:31AM
Paee 1
r MAINLINE
,
dL~
" ,i
:~j!
1
Requested Service SEWER CALL
Tenant ELLWANGER DRIVE 1507
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/27/2000
Request Time 07:09:00
Originator SRB
Telephone No. 283-3704
Extension
WO Type
Completion Date 8/27/2000
Completion Time 13:21 :33
Craft
Crew Size
&tim"ed Lobo< Ho""1
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
MAIN LINE STOPPED UP. SHOT WITH JET TRUCK AND MAIN LINE IS FINE NOW.
Equipment No.
Meter Name
Mole' Reading I
~
Item No.
Equipment No.
Description
Qty Required Date Used
Qty Used Total Unit
rnC"t
Ii" "'1m ports and ",mme"1s he"
Equipment No.
Work Date
First Name
Last Name
Regular Hours Overtime Hours
fl
I \
Request No. 9803772
Close Date 8/22/2000
9/29/2000
8:43:31AM
Page 1
L" ODOR,
" '
1 '
r
~
~
t j(
Requested Service SEWER CALL
Tenant HAMBURG PIKE 2209
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/17/2000
Request Time 12:20:00
Originator SRB
Telephone No. 8/17/00
Extension
WO Type
Completion Date 8/1712000
Completion Time 09'48'40
Craft
Crew Size
",limaWl La"", """"I
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub. location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
CHECKED FOR ODOR - PUT DEODERANT IN SPRING STREET LIFT STATION
Equipment No.
Meter Name
M'te< Re""n'l
Item No.
Equipment No.
Description
Qty Required Date Used
Qty Used Total Unit
[" ..". parts and oo=ents here
Equipment No.
Work Date
First Name
Last Name
Regular Hours Overtime Hours
nii
!
1;
Request No. 9803773
Close Date 8/22/2000
9/29/2000
8:43:31AM
Pal!e 1
t, MAIN LINE
dr.,
:"1
~
t
Requested Service SEWER CALL
Tenant SPRING 930
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/ 9/2000
Request Time 10:45:00
Originator SRB
Telephone No. 285-6476
Extension
WO Type
Completion Date 8/ 912000
Completion Time 09:48:50
Craft
Crew Size
""rim"'" Labo, HO"~I
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
. Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
CHECKED MAIN LINE - MAIN WAS FLOWING FINE.
NEEDS TO BE FLUSHED OUT, BUT MAIN WAS OKAY
I Ean;mn,nl No,
THERE IS SOME GREASE IN LINE AND
Meter Name
Mote,R,,,"oo I
Equipment No.
Description
Qty Required Date Used
Qty Used Total Unit
r,...cot
f;" "'ra pa'" and rommen" h....
Employee Code
Equipment No.
W ark Date
First Name
Last Name
Regular Hours Overtime Hours
~.
i ,
t,h
Request No. 9803774
8:43:31AM
r BACKUP IN YARD
J
t ;'
J
f .
~
J
Requested Service
Tenant
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty
Priority
Expense Class
Close Date 8/22/2000
SEWER CALL
MECHANIC 724
No
3.00
9/29/2000
Pal!e I
Request Date 8/ 7/2000
Request Time 10:40:00
Originator SRB
Telephone No. 456-5429
Extension
WO Type
Completion Date 8/ 7/2000
Completion Time 09:49:05
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
Safety Notes
Comments
Craft
Crew Size
E.'moted Lobo, H"""J
User~defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
RESIDENT AT 726 COMPLAINED ABOUT RAW SEWAGE IN BACKYARD OF RESIDENT AT 724,
CAUSING ODOR. PROBLEM HAS BEEN ONGOING FOR SOMETIME. HERSHEL CHECKED THE
RESIDENCE AND FOUND THE DOWNSPOUTS CONNECTED TO THE SEWER AND BACKING UP.
RESIDENT AT 726 WANTED TO F IL
I "".',men, No.
Equipment No.
I
I
['" "mea pam and oonun,.'" hm
Employee Code
Equipment No.
Description
Work Date
Meter Name
First Name
Mme'ROOdin"1
Qty Required Date Used
Qty Used Total Unit
rnC't
Last Name
Regular Hours Overtime Hours
[1"
'I
1\
L'
Request No. 9803775
Close Date 8/22/2000
9/29/2000
8:43:31AM
Pae:e 1
f SINKHOLE
t.'....."I...
r
J
f
J
fj
Requested Service SEWER CALL
Tenant CALLA WAY 3018
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/1 0/2000
Request Time 09:06:00
Originator SRB
Telephone No. 283-7115
Extension
WO Type
Completion Date 8/1 0/2000
Completion Time 09:49'14
Craft
Crew Size
E,rim"'" Lab", Hom'l
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
CHECKED FOR SINKHOLE AT DRAINPIPE ON EASEMENT. SINKHOLE IS BY SIDEWALK ON STORM
LINE AND NEEDS TO BE FIXED. CONTACTED BOB MILLER'S OFFICE
I Equipme", No Me'" Nome Mete'R"mn_1
Equipment No.
Description
Qty Required Date Used
Qty Used Total Unit
rAC't
ri.. "d<o ""ns ond ",mmenOs h",
Employee Code
Equipment No.
Work Date
First Name
Last Name
Regular Hours Overtime Hours
n
&:-;:
. Il
Request No. 9803776
Close Date 8/22/2000
9/29/2000
8:43;3IAM
Paee 1
r MAIN LINE
{ !!
)
i
! .
j
~
; i
Requested Service SEWER CALL
Tenant SPRING STREET 1701
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/8/2000
Request Time 02: 11:00
Originator SRB
Telephone No. 282-1367
Extension
WO Type
Completion Date 81 8/2000
Completion Time 09'49'22
Craft
Crew Size
E~hna"", Lobo_ Hum'l
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
TROUBLES POT - CHECK
LINE WAS FINE.
I Equ;pm,", No.
MAIN LINE DURING RAIN STORMS DUE TO BASEMENT FLOODING.
MAIN
Meter Name
M,te_ ',,<liog I
Equipment No.
Description
Qty Required Date Used
Qty Used Total Unit
rnC'of
r'" .ma parts and ,m","'nOs h."
Equipment No.
Work Date
First Name
Last Name
Regular Hours Overtime Hours
r,
l i
~\
Request No. 9803777
Close Date 8/22/2000
9/29/2000
8:43:31AM
Pa2e 1
~ MAIN LINE
j
t
~J
j
L
Requested Service SEWER CALL
Tenant EAST 8TH STREET 1420
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/ 7/2000
Request Time 02:00:00
Originator SRB
Telephone No.
Extension
WO Type
Completion Date 8/ 7/2000
Completion Time 09'49:31
Craft
Crew Size
"'t;m."", Labo' Ho'''1
ri
II
tj
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
LINE STOPPED
RESIDENT WAS
I EQu;pmeot No.
UP - CHECKED MAIN FROM CLEANOUT TO STREET AND MAIN LINE WAS FINE.
INFORMED TO CONTACT PLUMBER AGAIN.
Meter Name
M,,,, R'odm_1
Equipment No.
Description
Qty Required Date Used
Qty Used Total Unit
r"C't
,,~
r em. parts .m! oomments h..-,
Equipment No.
Work Date
First Name
Last Name
Regular Hours Overtime Hours
r
t ,
~
Request No. 9803778
Close Date 8/22/2000
9/29/2000
8:43:31AM
Paee 1
r CLEA~OUT
)
~ i
~
H
~
i '
Requested Service SEWER CALL
Tenant L YNDALE DRIVE 1535
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/1/2000
Request Time 01:40:00
Originator SRB
Telephone No. 284-6076
Extension
WO Type
Completion Date 8/1/2000
Completion Time 09:49.38
Craft
Crew Size
""'m,,",, Labot HO""I
;.
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
CHECK MAIN LINE - MAIN LINE WAS FLOWING FINE
RESIDENT WAS INFORMED TO CONTACT PLUMBER
I """'pm",' No.
AND ALSO CHECKED CLEANOUT.
Meter Name
Motet Rooo". I
rncof
Equipment No.
Description
Qty Required Date Used
Qty Used
r" "u," parts ... '0=0"'" he"
Equipment No.
Work Date
First Name
Last N arne
Regular Hours Overtime Hours
[I
.:'::1
. \
--
Request No. 9803890
Close Date 8/25/2000
9/29/2000
8:43:31AM
Pa2e 1
~ CATCHliASIN
t i
t(
~
tl
t!
Requested Service SEWER CALL
Tenant 7TH & WALNUT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/23/2000
Request Time 12:49:00
Originator SRB
Telephone No. 282-2047
Extension
WO Type
Completion Date 8/23/2000
Completion Time 10'02'59
Craft
Crew Size
Estimated Labor Hours
,.-..
t
LJ
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
CLEANED GASS OFF OF CATCHBASIN
EquiJ;>ment No.
Meter Name
Mele< Re,,"n. I
r""C"t
Equipment No,
Description
Qty Required Date Used
Qty Used Total Unit
,-,
~'
{
r' "''''' - and ",mmenls h....
Employee Code
Equipment No.
Work Date
First Name
Last Name
Regular Hours Overtime Hours
r
, ~d
t...
fi
~, ,.1
~J
Request No. 9803924
Close Date 8/31/2000
9/29/2000
8:43:31AM
Page 1
r MAINLINE
f , '
~
rl
to,!
tl
~
.' q
i j
Requested Service SEWER CALL
Tenant SPRINGDALE 913
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/28/2000
Request Time 01:35:00
Originator SRB
Telephone No. 283-8315
Extension
WO Type
Completion Date 8/28/2000
Completion Time 13:21'43
Craft
Crew Size
"',hna,'" Labo' How'l
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
MAIN LINE STOPPED UP - SHOT WITH JET TRUCK 300'
Equipment No.
Meter Name
Me", R"",in'l
Equipment No.
Description
Qty Required Date Used
Qty Used Total Unit
rr\~t
[i" ~tra p.,'" and ",mm.n'" b."
Equipment No.
Work Date
First Name
Last Name
Regular Hours Overtime Hours
n
H
Request No. 9803891
Close Date 8/25/2000
9/29/2000
8:43:31AM
Pae:e 1
r BACKUP
;
t !
J
t
t .,
rl
~
" j
Requested Service SEWER CALL
Tenant MEIGS AVENUE 912
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/22/2000
Request Time 12:20:00
Originator SRB
Telephone No. 500-3102
Extension
WO Type
Completion Date 8/22/2000
Completion Time 10:03'14
Craft
Crew Size
E,timalW Lobo, Hou"l
"
.
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
~
t
Safety Notes
Comments
RESIDENT HAVING BACKUP, CHECKED MAIN LINE, MAIN
RESIDENT THEY WILL NEED TO CONTACT A PLUMBER
I Equ;pme.. No.
LINE IS FINE. INFORMED
Mot" "0"".'1
Meter Name
Equipment No.
Description
Qty Required Date Used
Qty Used Total Unit
r''''''f
r" ",Ira pa,ts and 'o~,.ts hot'<
I
Equipment No.
Work Date
First Name
Last Name
Regular Hours Overtime Hours
,....,
.
~
t';-
Request No. 9803922
Close Date 8/31/2000
9/29/2000
8:43:31AM
Page 1
r BACKUP
'1 .
r:
~
(,
~
Requested Service SEWER CALL
Tenant HAMPTON COURT 2710
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/28/2000
Request Time 09:15:00
Originator SRB
Telephone No. 288-8405
Extension
WO Type
Completion Date 8/28/2000
Completion Time 13'21'20
Craft
Crew Size
","ro,ted La,,,,, HO"~I
r,
l I
I J
Equipment No.
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
RESIDENT HAVING BACKUP. CHECKED MAIN LINE AND LINE IS FLOWING FINE.
RESIDENT THEY WOULD NEED TO CONTACT PLUMBER
I """ipmon' No.
INFORMED
Meter Name
Mete' Rond'n'J
Equipment No.
Description
Qty Required Date Used
Qty Used Total Unit
r,.....C"t
rst oxlm ,,'Is and "mmonls h....
Equipment No.
Work Date
First Name
Last Name
Regular Hours Overtime Hours
n
Request No. 9803771
Close Date 8/2212000
9/2912000
8:43:31AM
Pa2e 1
Requested Service SEWER CALL
Tenant EAST COURT AVENUE 933
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Perform by Warranty No
Priority 3.00
Expense Class
Request Date 8/1912000
Request Time 07:00:00
Originator SRB
Telephone No. 282-3231
Extension
WO Type
Completion Date 8/1912000
Completion Time 09:48'30
Craft
Crew Size
&d="" La";' "OU"I
Equipment No. -
Equipment Description
Serial No.
Cost Center
General Ledger No.
Department
Location -
Sub-location 1 -
Sub-location 2 -
Sub-location 3 -
Reason for Outage
User-defined Field 1
User-defined Field 2
User-defined Field 3
User-defined Field 4
User-defined Field 5
Must Be Down No
Down Time
Estimated Down Time
Safety Notes
Comments
RESIDENT HAS BACKUP IN BASEMENT - CHECKED MAIN LINE AND MAIN WAS FLOWING
INFORMED PLUMBER THAT IF THEY COULD NOT GET LINE OPEN, CONTACT US AND WE
INVESTIGATE FURTHER.
I ",,",~, No
FINE.
WOULD
Meter Name
Mot" Reod'o, I
Equipment No.
Description
Qty Required Date Used
Qty Used Total Unit
rAcot
r" -. po"" and ou......,.. be...
1
Equipment No.
Work Date
First Name
Last Name
Regular Hours
Work Order History Comprehensive
9/28/2000
n
Page 1
WO No. 9803898
Close Date 8/25/2000
~ '
LINE, CLEANING
,
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
JET TRUCK
JET TRUCK
Originator
Telephone No.
Extension
Request Date 8/ 9/2000
Completion Date 8/ 912000
Completion Time 10:24: 17
10:23:25
3.00
No
Employee Labor Hours 24.00
Contract Labor Hours
Total Labor Hours 24.00
r:
tii
J
I :i
J
f,i.. Con~ments
! RAN ALL CATCHBASINS DOWN TOWN. HELPED HERSHEL WITH A LOCATE AT PARKVIEW MIDDLE SCHOOL.
-,.1",' JET CLEANED 10" SEWER MAIN TO SEE IF WE COULD MANHOLES. HELPED SONNY AND ELMER IN PLANT
r1 WITH GRIT PUMP THAT'S STOPPED UP.
P
i..,......
. Equipment Num CA TCHBASIN
Equipment Description GENERAL
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
JET 'CLEANED - 360'
Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
CA TCHBASIN 8/ 912000 KENNETH S. JAMES 8.00
CA TCHBASIN 8/ 912000 DONNIE GRIFFIN 8.00
CA TCHBASIN 8/ 912000 JEFF GRIFFIN 8.00
~
t
WO No. 9803898
'. ., ,. '., " ,
Close Date 8/2512000
LINE CLEANING
Task No. JET TRUCK
WO Type JET TRUCK
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Originator
Telephone No.
Extension
Request Date 8/912000 10:23:25
Completion Date 8/ 9/2000
Completion Time 10:24: 17
Employee Labor Hours 24.00
Contract Labor Hours
Total Labor Hours 24.00
Work Order History Comprehensive
9/28/2000
Page 2
Response Time (Minutes)
Delay Description
i
j
]
.,
,
~""" ,
,
, f
;- Comments
1
li.,,:,
Equipment Num JET TRUCK
Equipment Description FOOT AGE CLEANED
Location -
Sub-location 1
Sub-location 2
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
C
t
....
WO No. 9803899
Close Date 8/25/2000
'f
LINE CLEANING
,....-.
t
~
Task No. JET TRUCK
WO Type JET TRUCK
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/10/2000 10:33:34
Completion Date 8/1 0/2000
Completion Time 10:34: 16
r-:
t
!
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
Equipment Num JET TRUCK
Equipment Description FOOTAGE CLEANED
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Comments
I
JET CLEANEb VORTEX PIPING. WORKED ON VALVES IN GRIT LINES. TOOK APART TO CLEAN THEM OUT. WORKEr
ALL DAT IN GRIT BUILDING AND STILL DID NOT GET THEM UNSTOPPED.
Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
JET TRUCK 8/1 0/2000 KENNETH S. JAMES 8.00
JET TRUCK 8/10/2000 DONNIE GRIFFIN 8.00
JET TRUCK 8/1 0/2000 JEFF GRIFFIN 8.00
JET TRUCK 8/10/2000 ELMER MCKIM 8.00
WO No. 9803899
Close Date 8/25/2000
LINE CLEANING
Task No. JET TRUCK
Originator
Work Order History Comprehensive
9/28/2000
Page 3
n
~- 'I.
J
H
j
l I
J
l}
WO Type JETTRUCK
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Telephone No.
Extension
Request Date 8110/2000 10:33:34
Completion Date 8/10/2000
Completion Time 10:34: 16
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
Equipment Num PLANT
Equipment Description GENERAL WORK ON PLANT GROUNDS
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Comments
WO No. 9803925
Cl()seDate 8/31/2000
LINg CLEANING
f]
j -:
oJ
" .
Id
i
I]
F:
~..
Task No. JETTRUCK
WO Type JET TRUCK
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/31/2000
Completion Date 8/31/2000
Completion Time 14:31: 14
14:30:33
r,
Employee Labor Hours 24.00
Contract Labor Hours
Total Labor Hours 24.00
Equipment Num JET TRUCK
Equipment Description FOOTAGE CLEANED
Location
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
Comments
WENT BACK TO 800 BLOCK OF PENN TO JET CLEAN 15" MAIN TO TV TO LOCATE TAP.
CONTINUOUSLY DROPPED VACTOR OFF AT VEHICLE MAINTENANCE TO BE WORKED ON.
JET CLEANED - 350'
Work Order History Comprehensive
Equipment No.
Page 4
Work Date First Name Last Name Regular Hours Overtime
Hours
8/3112000 KENNETH S. JAMES 8.00
8/31/2000 DONNIE GRIFFIN 8.00
8/3112000 JOE HEMBREE 8.00
9/28/2000
R KJ
r j
t; DG
JH
JET TRUCK
JET TRUCK
JET TRUCK
WO No. 9803927
Close Date 8/3112000
Task No. JET TRUCK
WO Type JETTRUCK
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/29/2000 14:35:27
Completion Date 8/29/2000
Completion Time 14:36:39
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
rr
f I
n
j
I il Comments
iJ' CUT GRASS ALL DAY ON LIFT STATIONS. PUT WEED KILLER OUT AND HAD TO TAKE JET TRUCK TO PARKVIEW
SCHOOL TO CLEAN SEWER MAIN OUT FOR LEE & CREW
i,,~
Equipment Num JET TRUCK
Equipment Description FOOT AGE CLEANED
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
JET CLEANED - 125'
Work Order History Comprehensive
9/28/2000
Page 5
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
t '\
~.
Equipment Num US GRASS
Equipment Description CUT GRASS AT ALL LIFrST A TIONS
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
i\
I
r
~
~
Comments
D
~ ;j
Grand Total Down Time
Grand Total Employee Hours
Grand Total Contract Labor Hours
Grand Total Labor Hours
0.00
112.00
0.00
112.00
,...-"
~. ~
~ !
Work Order History Comprehensive
..?/28/2000
I I
t
Page 1
WO No. 9803900
I Im:1' 11,,(1'
_ PLANT MAINT
~ '
.
,
n
f ,
,
i
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
PLANT
GENERAL
Originator
Telephone No.
Extension
Request Date 8/11/2000 10:36:05
Completion Date 8/11/2000
Completion Time 10:38:18
n
. ,
3.00
No
Employee Labor Hours 33.50
Contract Labor Hours
Total Labor Hours 33.50
J
t
t
t [
F Comments
HELPED ELMER CLEAN GRIT PUMP AND LINES GOING TO VORTEX.
i Equipment Num LIS GRASS
Equipment Description CUT GRASS AT ALL LIFTST A TIONS
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
THEN WENT TO LIFT STATIONS TO CUT GRASS
r Employee Code Equipment No. Work Date First Name Last Name Regular Hours
t:
I
KJ LIS GRASS 8/11/2000 KENNETH S. JAMES 8.00
DG LIS GRASS 8/11/2000 DONNIE GRIFFIN 8.00
I
JG LIS GRASS 8/11/2000 JEFF GRIFFIN 8.00
JH LIS GRASS 8/11/2000 JOE HEMBREE 8.00
n EM LIS GRASS 8/11/2000 ELMER MCKIM 1.50
~
WO No. 9803900
PLANT MAINT
Task No. PLANT
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Originator
Telephone No.
Extension
Request Date 8/11/2000 10:36:05
Completion Date 8/11/2000
Completion Time 10:38:18
Employee Labor Hours 33.50
Contract Labor Hours
Total Labor Hours 33.50
f1
l ,
Work Order History Comprehensive
9/28/2000
Page 2
Response Time (Minutes)
Delay Description
~
~
~.
Equipment Num PLANT
Equipment Description GENERAL WORK ON PLANT GROUNDS
Location -
Sub.location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
Comments
WO No. 9803929
Close Date 8/31/2000
I
I
I I
PLANT MAINT
,
Task No. PLANT
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
.
Originator
Telephone No.
Extension
Request Date 8/29/2000 14:42:37
Completion Date 8/29/2000
Completion Time 14:43:43
n
I !
t ;
t)
Employee Labor Hours 2.50
Contract Labor Hours
Total Labor Hours 2.50
n
! i
ri.
I
I
f !;
, [
r.
t
)
I
r
Equipment Num I PLANTW A TER I
Equipment Description PLANT WATER PUMP #1
Location CHLORINE PIT
Sub-location 1 CHLORINE
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Comments
I
TOOK MOTOR OFF AND BEAT HUBS OFF. REPLACED ALLENS AND COUPLING AND PUT BACK ON LINE
,
Emp]oyee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
I
DM I PLANTW A TER 1 8/29/2000 DANNY MILES 2.50
WO No. 9803930
Close Date 8/31/2000
Task No. PLANT
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Originator
Telephone No.
Extension
Request Date 8/25/2000 ]4:44:42
Completion Date 8/25/2000
Completion Time 14:46:35
9/28/2000
r
~ I
J
, i
~
~.
Work Order History Comprehensive
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Employee Labor Hours 1.00
Contract Labor Hours
Total Labor Hours 1.00
Equipment Num J PRESSW A TER 1
Equipment Description PRESS WATER PUMP #1
Location CHLORINE PIT
Sub-location 1 CHLORINE
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
Comments
REPLACED 30' OF RUBBER SEAL AROUND WASH BOX & UNSTOPPED DIFUSER
Employee Code
Equipment No.
Work Date
First Name
Last Name
Regular Hours
DM
r
1-.. I
I PRESSW A TER 1
8/25/2000
DANNY
MILES
1.00
Page 3
No
Overtime
Hours
r
i
r
~.
~
Grand Total Down Time 0.00
Grand Total Employee Hours 37.00
Grand Total Contract Labor Hours 0.00
Grand Total Labor Hours 37.00
Work Order History Comprehensive
Page 1
9/28/2000
f!
l
9803892
Close Date. 8/2512000
Task No. V ACTOR
WO Type V ACTOR
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/16/2000 10:03:26
Completion Date 8/16/2000
Completion Time 10:04:46
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
t
]
t
~i Comments
"J..' . WENT TO VISSINGS DODGE TO CLEAN STORM LINE AND VACTOR THREE CATCHBASINS
WENT TO PARKVIEW MIDDLE SCHOOL TO TV 10" SEWER MAIN
WENT TO RHONDA DRIVE TO TV AND JET CLEAN 8" SEWER MAIN
JET ~LEANED 10" SEWER MAIN BEHIND PARKVIEW MIDDLE SCHOOL
Equipment Num V ACTOR TRUCK
Equipment Description V ACTOR TRUCK
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
L"I ' [D~E ~ :;:~o
k N'D - 669.6'
~ STORM LINE CLEANED - 400'
~ CATCHBASINS CLEANED - 3
i
L
,
KJ
DG
JG
JH
Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
V ACTOR TRUCK 8/16/2000 KENNETH S. 8.00
VACTOR TRUCK 8/16/2000 DONNIE GRIFFIN 8.00
V ACTOR TRUCK 8/16/2000 JEFF GRIFFIN 8.00
VACTOR TRUCK 8/16/2000 JOE HEMBREE 8.00
r
I
I
I
i WO No. 9803892
LINE & MANHOLE CLEANING
Close Date 8/25/2000
Task No. V ACTOR
WO Type VACTOR
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Originator
Telephone No.
Extension
Request Date 8/16/2000 10:03:26
Completion Date 8/16/2000
Completion Time 10:04:46
r
,
t.
n
I
i
9/28/2000
n
t
e !
~. )
I
~
! I
r
~
L,
Comments
Work Order History Comprehensive
Page 2
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
Equipment Num CA TCHBASIN
Equipment Description GENERAL
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
VACTOR
VACTOR
" "". ""
Close Date 8/25/2000
Originator
Telephone No.
Extension
Request Date 8/16/2000 10:03:26
Completion Date 8/16/2000
Completion Time 10:04:46
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
WO No. 9803892
LINE & MANHOLE CLEANING
,
t'
i
f
t
.
t .,
I
n
F .
~.
t.
~.
Comments
r.
r
3.00
No
Equipment Num JET TRUCK
Equipment Description FOOTAGE CLEANED
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
" ',"
Close Date 8/25/2000
.
. ,".
~.
WO No. 9803892
LINE & MANHOLE CLEANING
Task No. V ACTOR
I
Originator
9/28/2000
r
.
\
I
r
Work Order History Comprehensive
Page 3
WO Type V ACTOR
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Telephone No.
Extension
Request Date 8/16/2000 10:03:26
Completion Date 8/16/2000
Completion Time 10:04:46
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
Equipment Num TELEVISING
Equipment Description SEWER LINES TV
Location -
Sub. location 1
Sub-location 2 -
Sub. location 3 -
Comments
!
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
......,.
I
,
€
r'
"
r'
f I
n
Grand Total Down Time 0.00
Grand Total Employee Hours 32.00
Grand Total Contract Labor Hours 0.00
Grand Total Labor Hours 32.00
r~/28/20qo
t
Work Order History Comprehensive
Page 1
Close Date 8/25/2000
, ",,,
WO No. 9803902
r CHECK LIFT STATION
,
,
(
r
I ,I
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
LSMAINT
LS MAINT
Originator
Telephone No.
Extension
Request Date 8/22/2000 10:40:09
Completion Date 8/22/2000
Completion Time 10:41 :42
3.00
No
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
Equipment Num LIFT STATIONS
Equipment Description CHECK LIFT STATIONS
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
:J
t
J. COl11ments
CLEANED WEEDS AND VINES OFF FENCES AT EASTBROOK, EWING LANE, COLONIAL PARK, LOUISE STREET AND
GOLFVIEW LIFT STATIONS.
TOOK 3642 TO STREET DEPARTMENT TO GET IT LOOKED AT. NEW BATTERY WAS INSTALLED.
Employee Code Equipment No.
r-. KJ'
~
DG
JG
JH
LIFT STATIONS
LIFT STATIONS
LIFT STATIONS
LIFT STATIONS
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Work Date
First Name
Last Name
Regular Hours'
8/22/2000
8/22/2000
8/22/2000
8/2212000
KENNETH S.
DONNIE
JEFF
JOE
JAMES
GRIFFIN
GRIFFIN
HEMBREE
8.00
8.00
8.00
8.00
CHECK LIFT STATION
WO No. 9803903
Originator
Telephone No.
Extension
Request Date 8/23/2000 10:43: 16
Completion Date 8/23/2000
Completion Time 10:44:07
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
Work Order History Comprehensive
9/28/2000
Page 2
Response Time (Minutes)
Delay Description
t Equipment Num CA TCHBASIN
~ Equipment Description GENERAL
,,] SUb-l~':~::~ :
Sub-location 2
, j
. I Sub-location 3 -
r Com~ents
J WENT BACK TO GETTING WEEDS OFF OF LIFT STATION FENCES AND WAS CALLED OFF TO CLEAN SHOP.
, CATCBBASINS ALSO. PUT GAS IN VEHICLE 3642
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
RAN
r Employee Code Equipment No. Work Date First Name Last Name Regular Hours
!
KJ CA TCHBASIN 8/23/2000 KENNETH S. JAMES 8.00
DG CA TCHBASIN 8/2312000 DONNIE GRIFFIN 8.00
JG CA TCHBASTN 8/23/2000 JEFF GRIFFIN 8.00
JH CATCHBASIN 8/23/2000 JOE HEMBREE 8.00
.....,...... ..i
WONo. 9803903 Close Date ""
CHECK LIFT STATION
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actu,al Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Exteusion
Request Date 8/23/2000 10:43:16
Completion Date 8/2312000
Completion Time 10:44:07
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
r
J
f
t,]
~,
c; :,i
~'1 Comments
Equipment Num LIFT STATIONS
Equipment Description CHECK LIFT ST A TraNS
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
WO No. 9803906
Close Date 8125/2000
Task No. LSMAINT
Originator
Work Order History Comprehensive
9/28/2000
Page 3
n
~
~, '
d
~ ~~;:~:~_ '2 TRIPPED OUT DURING STORM 'RAN SHORT TIME & TRIP} CONTROLS OKAY. OPENED UP AND FOum
, RAGS ON IMPELLOR. ALSO REPAIRED (2) LIGHT FIXTURES (RAINING, HAD TO WAIT TO OPEN PUMP, FLOW
~ i NEEDED TO GO DOWN)
~
~
t
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
LS MAINT
Telephone No.
Extension
Request Date
Completion Date
Completion Time
] 0:53:00
,.-.
f
I'
8/18/2000
8/]8/2000
10:53:43
3.00
No
Employee Labor Hours 13.50
Contract Labor Hours
Total Labor Hours 13.50
Equipment Num 5MAGNOLIA ST
Equipment Description
i Location -
I
, Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
UTICA II - #1 TRIPPED OUT, CONTACTS BURNT, MORTOR NOT SHORTED BUT STOPPING UP.
CONTACTS (NO SUCH LUCK-NEW CONTACTOR INSTEAD)
ORDERED NEW
RIVERPORT II - CHECKED ALARM SYSTEM, FOUND SOME LOOSE AND BROKEN WIRES - REPAIRED
ORDERED PARTS FOR UTICA II AND RETURNED CALL TO ANDERSON ON 10TH ST. CHECKS.
HELPED SONNY IN PLANT ON CLARIFIERS
WO No. 9803906
Date
CHECK LIFT STATION
r
j..
: t
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Originator
Telephone No.
Extension
Request Date 8/18/2000 ] 0:53 :00
Completion Date 8/18/2000
Completion Time 10:53:43
Employee Labor Hours 13.50
Contract Labor Hours
Total Labor Hours 13.50
Work Order History Comprehensive
9/28/2000
Page 4
Response Time (Minutes)
Delay Description
l
fJ
(
~
i Equipment Num 5UTICA II
Equipment Description
Location -
Sub-location 1 _
Sub-location 2
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
~ Comments
~
WO No. 9803906
Close Date 8/25/2000
n
i
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/18/2000 10:53:00
Completion Date 8/18/2000
Completion Time 10:53:43
Employee Labor Hours 13.50
Contract Labor Hours
Total Labor Hours 13.50
~.. ;,
~
~
~ :,
. I Comments
r;
~: i
Equipment Num PLANT
Equipment Description GENERAL WORK ON PLANT GROUNDS
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
WO No. 9803907
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Originator
Telephone No.
Extension
Request Date 8/21/2000 10:56:41
Completion Date 8/21/2000
Completion Time 10:57:42
Employee Labor Hours 13.50
Contract Labor Hours
Work Order History Comprehensive
9/28/2000
Page 5
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Total Labor Hours 13.50
~
b
]
~': COlf!.ments
J cSo "S AND CHECK OF STATIONS WITH HERSHEL
t'; :~~d~R~~. PO~~~~O~~~N~2 #~~~; ~~~~~~N~~TA~~~~
I Equipment Num 5POWERHOUSE
I
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
PLATE IS LOOSE (NO BOLTS) REPLACED (PICKED UP
OFF AND IT'S OKAY NOW. GREASED BOTH.
WORKED ON PAPERS FOR ENGINEERS & RAY
~ Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
MA 5POWERHOUSE 8121/2000 MIKE ARMS 8.00
I
HH; 5 POWERHOUSE 8/21/2000 HERSHEL HAMBY 5.50
WO No. 9803910
Close Date 8/25/2000
CHECK LIFT STATION
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No,
Extension
Request Date 8/14/2000 11 :06:58
Completion Date 8/14/2000
Completion Time 11:09:01
Employee Labor Hours 8.00
Contract Labor Hours
Total Labor Hours 8.00
Equipment Num 5SIL VER CREEK
Equipment Description
I Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Work Order History Comprehensive
9/28/2000
~ SPILL AT SILVER CREEK BUSINESS CENTER (FOUND ON CALL OUT ALARM)
lJ' SEARCH OF AREA, MANHOLE TO FIND WHO WITH CARRIE.
BACK TO STATION TO GET MORE SAMPLES
it': CALL TO ASHLEY COURT BY CONSTRUCTION CREW. VACTORED MANHOLE FILLED WITH DIRT.
I PARKVIEW - MANHOLE FOUND - SAM - TV WEDNESDAY 8/16 TO FIND TRAVEL. WENT TO VISSINGS
~ DODGE, STORM LINE NEES TO BE CLEANED BEHIND BULDING.
i ' I
~'~ WORKED ON PAPERWORK FOR RAY ON ALARM SYSTEM
CHECK PLANT CLARIFIERS WITH ELMER, HITS SCUM BOX.
,
"
Employee Code Equipment No. Work Date First Name
Page 6
MA
5SILVER CREEK
8/14/2000
MIKE
Last Name Regular Hours Overtime
Hours
ARMS 8.00
Close Date 8/25/2000
Originator
Telephone No.
Extension
Request Date 8/14/2000 11 :06:58
Completion Date 8/14/2000
Completion Time 11 :09:01
Employee Labor Hours 8.00
Contract Labor Hours
Total Labor Hours 8.00
r
WONo. 9803910
CHECK LIFT STATION
[
~
d
~ Comments
~,~.
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
LSMAINT
LS MAINT
3.00
No
Equipment Num GENERAL MAINTENANCE
Equipment Description GENERAL MAINTENANCE WORK
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
r CHECK LIFT STATION
WO No. 9803912
Close Date 8/25/2000
UI~
'"
"",)
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scl1eduleclFillisl1 Date
Originator
Telephone No.
Extension
RequestDate 8/8/2000 11:30:14
Completion Date 8/ 8/2000
Completion Time 11 :30:52
Work Order History Comprehensive
9/28/2000
Page 7
-
t
to.: "'~.
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Employee Labor Hours 16.00
Contract Labor Hours
Total Labor Hours 16.00
J
I U
~ ;R~:"~~ I - " PUMP, PULLED (USED BOOM TRUCK) TOP CAVITY SOME OIL AND LOWER CAVITY, SKIM MILK
J.. COLOR, BAD. TOOK TO SPENCERS FOR SEAL REPAIR. TOOK GLEN BACK TO STATION FOR TAG INFORMATION FROM
HEAD. TOOK LONGER THAN USUAL DUE TO RAIN STORM.
f
[
~
~
, Equipment Num 5CRUMS LANE I
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
RIVERPORT II - ALARM, TISSUE ON OFF FLOAT
TO PLUMBERS TO PICK UP CHECKS FOR POWERHOUSE.
TO FALLS CITY TO PICK UP PARTS FOR LIGHTS AT MAGNOLIA, CONTACTS FOR MIDDLE SCHOOL AND MAIN
DISCONNECT FOR GOLFVIEW.
I
REPAIR STEPHANIE'S CHAIR
10TH STREET RTU - FLATLINE REPORTED - CHECKED & RESET
POWERHOUSE ALARM - HEAVY FLOW TO STATION DUE TO RAIN
BACK TO 10TH STREET TO DOUBLE CHECK EVERYTHING DUE TO STORM
Employee Code
Equipment No.
Work Date
First Name
Last Name
Regular Hours
Overtime
Hours
MA
JH
5CRUMS LANE I
5CRUMS LANE I
8/8/2000
8/ 8/2000
MIKE
JOE
ARMS
HEMBREE
8.00
8.00
WONo. 9803912
Close Date 8/25/2000
'i...""",
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/8/2000 11 :30: 14
Completion Date 8/ 8/2000
Completion Time 11 :30:52
r-
~
Employee Labor Hours 16.00
Contract Labor Hours
Total Labor Hours 16.00
Work Order History Comprehensive
9/28/2000
Page 8
. Equipment Num 5RIVERPORT II
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
WO No. 9803912
Close Date 8/25/2000
r CHECK LIFT STATION
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
LSMAINT
LS MAINT
Originator
Telephone No.
Extension
Request Date 8/ 8/2000
Completion Date 8/ 8/2000
Completion Time I] :30:52
11:30:]4
3.00
No
Employee Labor Hours ]6.00
Contract Labor Hours
Total Labor Hours ]6.00
t ,
~
J Comments
F
Equipment Num 5TENTH ST.
Equipment Description
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
WONo. 9803913 Close Date 8/25/2000
Task No. LSMAINT Originator
WO Type LS MAINT Telephone No.
Assigned By Extension
Assigned To Request Date 8/ 9/2000 ] 1:36:49
Scheduled Start Date Completion Date 8/ 9/2000
Scheduled Finish Date Completion Time ] 1:37:29
Est. Duration (days)
Actua] Duration (days) Employee Labor Hours ]6.00
Priority 3.00 Contract Labor Hours
~ Perform by Warranty No Total Labor Hours 16.00
b i
tJ Expense Class
Response Time (Days)
Work Order History Comprehensive
9/28/2000
Page 9
Response Time (Hours)
Response Time (Minutes)
Delay Description
f".
J
)
t ... Comments
'1...... CHECKED GOLFVIEW - MAIN BREAKERS TRIPPED IN STORM NIGHT BEFORE - ANALYSIS OKAY
~' CHECK OF NEW CHECKS FOR POWERHOUSE - OKAY, LEFT NEW ONE IN STATION
'.'...1..'......' TO MILL CREEK TO CHECK FOR INFORMATION FOR SPENCER MACHINE
rr. PICKED UP SUPPLIES AT SHOP FOR TRUCK (BULBS, ETC.)
1[' WORKED AT 10TH STREET ON FLOW METER - WORKING THERE, INFORMATION NOT GETTING THROUGH TO RTU (USED
PARTS FOR FLOW METER FROM PRESS ROOM.
., CALi TO MOTION CONTROL, ORDERED REMOTE COUNTER GUAGE. RECHECKED 10TH STREET WITH 4/20 MA METER
Equipment Num 5GOLFVIEW
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
PICKED UP SUPPLIES AT FALLS CITY (WEDGE NUTS)
r Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
L Hours
MA 5GOLFVlEW 8/ 9/2000 MIKE ARMS 8.00
JH 5GOLFVIEW 8/ 9/2000 JOE HEMBREE 8.00
t
f
WONo. 9803913
Close Date 8/25/2000
CHECK LIFT STATION
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/ 9/2000 11 :36:49
Completion Date 8/ 9/2000
Completion Time 11 :37:29
Employee Labor Hours 16.00
Contract Labor Hours
Total Labor Hours 16.00
Work Order History Comprehensive
9/28/2000
Page 10
, Equipment Num 5MILLCREEK
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
~
,
J
t:
,
t
Comments
WO No. 9803913
Close Date 8/25/2000
CHECK LIFf STATION
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/9/2000 11 :36:49
Completion Date 8/ 912000
Completion Time 11:37:29
Employee Labor Hours 16.00
Contract Labor Hours
Total Labor Hours 16.00
!
f,
)
t :
~
l ;
Equipment Num 5POWERHOUSE
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
Comments
WONo. 9803913
Close Date 8/25/2000
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Originator
Telephone No.
Extension
Request Date 8/9/2000 11 :36:49
Completion Date 8/ 9/2000
Completion Time 11:37:29
Employee Labor Hours 16.00
Contract Labor Hours
Total Labor Hours 16.00
fl
, .
@
Work Order History Comprehensive
9/28/2000
Page 11
Response Time (Hours)
Response Time (Minutes)
Delay Description
r
Equipment Num 5TENTH ST.
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Comments
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
WO No. 9803913
Close Date 8/25/2000
CHECK LIFT ST A TlON
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/ 9/2000 11 :36:49
Completion Date 8/ 9/2000
Completion Time 11:37:29
Employee Labor Hours 16.00
Contract Labor Hours
Total Labor Hours 16.00
r
\
~
I
j
~: Comments
t
Equipment Num GENERAL MAINTENANCE
Equipment Description GENERAL MAINTENANCE WORK
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
WO No. 9803916
Close Date 8/25/2000
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Originator
Telephone No.
Extension
Request Date 8/2/2000 13:49:23
Completion Date 8/ 2/2000
Completion Time 13:50:06
Employee Labor Hours 9.25
Contract Labor Hours
Work Order History Comprehensive
9/28/2000
Page 12
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Total Labor Hours 9.2S
r
,
J
~. I,
t.:
~ Comments
I WORKED AT SPRING STREET
:~: (HERSHEL HELPED UNLOAD EQUIPMENT TO FIRST FLOOR)
~."
f
Equipment Num SSPRING STREET
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down.
Estimated Down Time
Down Time
Reason for Outage
No
REP~IRED UNIVERSAL ON #1 PUMP, USED BUFFER/SCRUBBER ON BOTH TILE LANDING (BORROWED FROM PARKS
DEP~.) ELMER HELPED MOVE EQUIPMENT DOWN TO LOWER LEVEL AND ALSO HELPED REMOVE BUFF/SCRUB FROM
LOWER LEVEL.
r
t Employee Code Equipment No. Work Date
f i
MA SSPRING STREET 8/ 2/2000
HH SSPRING STREET 8/ 2/2000
EM 5SPRING STREET 8/ 2/2000
wb No. 9803917
First Name Last Name Regular Hours Overtime
Hours
MIKE ARMS 8.00
HERSHEL HAMBY O.SO
ELMER MCKIM 0.75
Close Date 8/25/2000
Originator
Telephone No.
Extension
Request Date 8/ 312000 13:S1 :44
Completion Date 8/ 312000
Completion Time 13:52:29
Employee Labor Hours 11.00
Contract Labor Hours
Total Labor Hours 11.00
r
f'
!
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
r-
.'
~
f
d CO'1'ments
,
. "
Equipment Num LIFT ST A nONS
Equipment Description CHECK LIFT STATIONS
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Work Order History Comprehensive
9/28/2000
Page ]3
! RTU.AT 10TH STREET DOWN. RESET ,WORKING BUT SHOWING TWO LINES OF INVALII) SCRIl?T> -- R:El?ROGA.M:MBD
~ CLEANED UP STATION - ALL AREA f CLEANED FOUR FILTERS ON ROOF USED IN BAR SCREEN AREA.
.
~[
RETURNED EQUIPMENT TO PARKS DEPT.
FINISHED CLEANING UP AT SPRING STREET
WORKED AT CHANGING BULBS AT MAGNOLIA (LOWER LEVEL)
MEAUSRED CHECKS AT POWERHOUSE (CHANGE OUT BEFORE PAINTING)
CHECK OF CHECKS AT MILL CREEK (DIFFERENT THAN SPRING STREET)
SPENCERS} PACKING GLANDS TO BE REPLACED BEFORE PAINTING.
(INFORMATION GIVEN TO SAM AND
.
.
( ,
Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
MAl LIFT STATIONS 8/ 3/2000 MIKE ARMS 8.00
LIFT STATIONS 8/ 3/2000 JOE HEMBREE 3.00
WO No. 9803919
Close Date 8/25/2000
CHECK LIFT STATION
r
~
~.;
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/7/2000 13:58:52
Completion Date 8/ 7/2000
Completion Time 13:59:37
Employee Labor Hours 16.50
Contract Labor Hours
Total Labor Hours 16.50
~
~
ji;.
~
J
,
~I Comments
i' 1) ,
~ CHECK OF CANTEX STATIONS AND ALARMS WITH JOE
~.." WORKED AT SPRING STREET I WET WELL CLEANING (CREW)
~. FINISHED CHECKING STATIONS THAT HERSHEL HADN'T COMPLETED WITH JOE
INSTALLED NEW MOTOR ON #1 PLANT WATER PUMP (11.5 AMPS)
Equipment Num LIFT STATIONS
Equipment Description CHECK LIFT STATIONS
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Employee Code Equipment No.
Work Date First Name Last Name Regular Hours Overtime
Hours
8/ 712000 MIKE ARMS 7.50
8/ 7/2000 JOE HEMBREE 7.50
8/ 712000 ELMER MCKIM 1.50
MA LIFT STATIONS
JH LIFT STATIONS
LIFT STATIONS
rl
~,
~,; :
r,
Work Order History Comprehensive
9/2812000
[I CHECK LIFf ST AnON
Page 14
WO No. 9~03nl
Close Date ~/25/2000
r
,
~
!
~
.
~
I
)
t
~
L
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/23/2000 14:05:16
Completion Date 8/25/2000
Completion Time 14:06:06
Employee Labor Hours 12.00
Contract Labor Hours
Total Labor Hours 12.00
Equipment Num LIFf STATIONS
Equipment Description CHECK LIFf STATIONS
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Comments
UTICA II - PULLED #1 PUMP AND CHECKED OUT ANOTHER POSSIBLE CHANGED COMPASS, BROUGHT AMPS DOWN,
STILL UP SOME (AMPS) WORKED CONTROLS, THREW OR CHEWED UP WHATEVER WAS IN THE PUMP, AMPS, SAME AS
OTHER
WENT TO LOUISVILLE TO PICK UP BOLTS AT NEIL LAVElL / MEASURING WHEELS AT BARGAIN SUPPLY
TO OFFICE TO DISCUSS PAPER WORK WITH RAY
REPAIRED ARROW BOARD ON BACK OF VACTOR (FUSE LOOKED GOOD/GAD)
ALARM AT MIDDLE SCHOOL, OKAY, IN TELEPHONB LINE
PAPERWORK DONE - COPIES/BOX SHIPMENT, BTC.
PUT SUPPLIES IN TRUCK
Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
MA L1Ff STATIONS 8/23/2000 MIKE ARMS 8.00
!
HH LIFf STATIONS 8/23/2000 HERSHEL HAMBY 4.00
f
I
WO No. 9803931
Close Date 8/31/2000
CHECK LIFf STATION
Task No. LSMAINT
WO Type LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Originator
Telephone No.
Extension
Request Date 8/25/2000 14:49:29
Completion Date 8/25/2000
Completion Time 14:50:45
Employee Labor Hours 36.00
Contract Labor Hours
Work Order History Comprehensive
9/28/2000
Page 15
n
.
!
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Total Labor Hours 36.00
n
! i
n
J
.
t'
Equipment Num LIFT STATIONS
Equipment Description CHECK LIFT STATIONS
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
LIFT STATIONS 8/25/2000 KENNETH S. JAMES 8.00
LIFT STATIONS 8/25/2000 DONNIE GRIFFIN 8.00
LIFT STATIONS 8/25/2000 MIKE ARMS 4.00
LIFT STATIONS 8/25/2000 JEFF GRIFFIN 8.00
JH LIFT STATIONS 8/25/2000 JOE HEMBREE 8.00
~ ,;
WO No. 9803932
Close Date 8/31/2000
[I CHE~KLIFT STATION
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
LSMAINT
LS MAINT
Originator
Telephone No.
Extension
Request Date 8/25/2000 14:52: 10
Completion Date 8/25/2000
Completion Time 14:52:50
3.00
No
Employee Labor Hours 26.00
Contract Labor Hours
Total Labor Hours 26.00
~c "
~
t
t I
[l Co~ments
Equipment Num LIFT ST A nONS
Equipment Description CHECK LIFT STATIONS
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Work Order History Comprehensive
9/28/2000
Page 16
WORKED AT "POWERHOUSE CHANGfNGOUTTW041i' cHEcKVAt.VEsANb;PUTBAeK()kLf~#1. 'DisCHARGE VALVE,'
BROKE INTERNALLY. SAM TOOK TO CORLEY EN']:'ERPRISESAF'TEf I'r WAS REMOVED IT AND PIPING. CALLED
SPENCERS ON CRUMS LANE #1 AND #2 PUMPS, WAITING ON PARTS FOR PUMP X
Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
MA LIFT STATIONS 8/25/2000 MIKE ARMS 6.00
KJ LIFT STATIONS 8/25/2000 KENNETH S. JAMES 5.00
JG LIFT STATIONS 8/25/2000 JEFF GRIFFIN 5.00
n JH LIFT STATIONS 8/25/2000 JOE HEMBREE 5.00
!
t DG LIFT STATIONS 8/25/2000 DONNIE GRIFFIN 5.00
WO No. 9803933
Close Date 8/31/2000
Task No. LSMAINT
WO ~ype LS MAINT
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/28/2000 14:54:58
Completion Date 8/31/2000
Completion Time 14:55:37
Employee Labor Hours 41.00
Contract Labor Hours
Total Labor Hours 41.00
~
n
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
9/28/2000
n
,
L.
JG
DM
HH
MA'
KJ
JH
Q
Work Order History Comprehensive
Equipment No. Work Date First Name Last Name Regular Hours
LIFT STATIONS 8/28/2000 JEFF GRIFFIN 6.50
LIFT STATIONS 8/28/2000 DANNY MILES 4.00
LIFT STATIONS 8/28/2000 HERSHEL HAMBY 5.00
LIFT STATIONS 8/28/2000 MIKE ARMS 8.00
LIFT STATIONS 8/28/2000 KENNETH S. JAMES 6.50
LIFT STATIONS 8/28/2000 JOE HEMBREE 6.50
Page 17
Overtime
Hours
4.50
rj
~'1
"'"""-=
fij
LJ
Grand Total Down Time
Grand Total Employee Hours
Grand Total Contract Labor Hours
Grand Total Labor Hours
0.00
282.75
0.00
282.75
WONo.
CHECK OR CLEAN CA TCHBASINS
tI i
!
~
l'f
fh Co~ments
, STARTED AT SPRING STREET LIFT STATION. WAS CALLED AWAY DUE TO RAIN.
TOWN AND THEN MADE SEWER CALL TO 1420 EAST 8TH ST.
9/28/2000
fl i
t
[
Work Order History Comprehensive
Page 1
9803896
Close Date 8/25/2000
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
CA TCHBASINS
PM
Originator
Telephone No.
Extension
RequestDate 8/7/2000 10:18:18
Completion Date 8/7/2000
Completion Time 10: 19:02
3.00
No
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
Equipment Num 5SPRING STREET
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
CLEANED CATCHBASINS AROUND
r Employee Code Equipment No.
,
5SPRING STREET
5SPRING STREET
5SPRING STREET
5SPRING STREET
Work Date First Name Last Name Regular Hours Overtime
Hours
8/ 7/2000 KENNETH S. JAMES 8.00
8/ 712000 DONNIE GRIFFIN 8.00
8/ 712000 JEFF GRIFFIN 8.00
8/ 712000 ELMER MCKIM 8.00
Close Date 8/2512000
WO No. 9803896
n CHECK OR CLEAN CATCHBASINS
Task No. CA TCHBASINS
WO Type PM
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/712000 10:18:18
Completion Date 8/ 7/2000
Completion Time 10: 19:02
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
n'
. I
~.. .:
fd
Work Order History Comprehensive
9/2812000
n
f ~
Jt..... .,:. Equipment Num CA TCHBASIN
Equipment Description GENERAL
Location -
~, .~ Sub-location 1
J Sub-location 2 -
L., Sub-location 3 _
~", Comments
t
Page 2
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
9803896
Close Date 8/25/2000
Task No. CA TCHBASINS
WO Type PM
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
hi Equipment Num SEWER CALL
.~.. r, Equipment De~~~::: ~ADE SEWER CALL
r Sub-location 1
Sub-location 2 -
J Commen:"b-I""'UOn 3 -
~.
Originator
Telephone No.
Extension
Request Date 8/ 7/2000 10: 18: 18
Completion Date 8/ 712000
Completion Time 10:19:02
Employee Labor Hours 32.00
Contract Labor Hours
Total Labor Hours 32.00
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
9803897
Close Date 8/25/2000
Task No. CA TCHBASINS
WO Type PM
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Originator
Telephone No.
Extension
Request Date 8/ 8/2000 10:20:51
Completion Date 8/ 8/2000
Completion Time 10:21:23
Employee Labor Hours 36.50
Contract Labor Hours
Total Labor Hours 36.50
Work Order History Comprehensive
9/28/2000
Page 3
Response Time (Hours)
Response Time (Minutes)
Delay Description
r
~ ;
k[
fil
,;
,
)
Equipment Num CA TCHBASIN
Equipment Description GENERAL
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
~ Comments
t I
RAN CATCHBASINS. WORKED IN RAIN STORM UNTIL 6:17 P.M.
DONNIE AND ELMER RAN STATION ALARMS
Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
KJ CA TCHBASIN 8/ 8/2000 KENNETH S. JAMES 8.00 2.50
DG CA TCHBASIN 8/ 8/2000 DONNIE GRIFFIN 8.00 2.00
JG CA TCHBASIN 8/ 8/2000 JEFF GRIFFIN 8.00
EM CA TCHBASIN 8/ 8/2000 ELMER MCKIM 8.00
r WO No. 9803904
r CHECK OR CLEAN CA TCHBASINS
Close Date 8/25/2000
r:
J. ,j
1 .
J Equipment Num CA TCHBASIN
. Equipment Description GENERAL
~, .j Location
It , I Sub-location 1 -
> Sub-location 2 -
: Sub-location 3 -
J Comments
CLEANED CATCHBASINS FOR 6.5 HOURS. THEN CLEANED OUT TOOL BOX ON 3642 THE REST OF THE DAY. TOOK
~., 3642. TO VEHICLE MAINTENANCE TO HAVE DRIVERS DOOR LOOKED AT, IT'S HARD TO OPEN OUTSIDE. DONNIE
,.1 CLEANED THE LUNCHROOM.
~, CHECK LIFT STATIONS THAT ARE GOING TO BE PAINTED FOR WEEDS. NEED WEED KILLER
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
CA TCHBASINS
CB
Originator
Telephone No.
Extension
Request Date
Completion Date
Completion Time
8/24/2000 10:45:56
8/24/2000
10:46:55
3.00
No
Employee Labor Hours
Contract Labor Hours
Total Labor Hours
16.00
16.00 .
rJ
;
c
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
9/28/2000
KJ
DG
Work Order History Comprehensive
Page 4
Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
CA TCHBASIN 8/24/2000 KENNETH S. JAMES 8.00
CA TCHBASIN 8/24/2000 DONNIE GRIFFIN 8.00
n
\
r'
,
Grand Total Down Time
Grand Total Employee Hours
Grand Total Contract Labor Hours
Grand Total Labor Hours
0.00
84.50
0.00
84.50
Work Order History Comprehensive
9/28/2000
r
; "
t 1
Page 1
WO No. 9803928
"" " " "" " ,
Close Date 8/31/2000
" ,
r.
~
LIFfST A TION REPAIR
r
Task No. LSRP
WO Type LS CHECK
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/28/2000 14:38:48
Completion Date 8/28/2000
Completion Time 14:40:38
Employee Labor Hours 37.00
Contract Labor Hours
Total Labor Hours 37.00
) "
f
Equipment Num LIFf STATIONS
duipment Description CHECK LIFf STATIONS
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
j
r '
f\
d Com,ments
f, WORKED ALL DAY ON MILL CREEK LIFT STATION. MADE A SEWER CALL TO 1627 HAMPTON COURT TO CHECK MAIN
LINE. MAIN LINE WAS FLOWING FINE. MADE SEWER CALL AT 1622 BRIGHAM AVENUE. STOPPED UP WITH
ROOTS. TOOK PUMP TO LOUISE STREET LIFT STATION. OVERTIME: AT' LouIsE: STREET
LIFf STATIONS
LIFT STATIONS
LIFf STATIONS
LIFf STATIONS
Work Date First Name Last Name Regular' HOllrs
8/28/2000 KENNETH S. JAMES 8.00
8/28/2000 MIKE ARMS 8.00
8/28/2000 JEFF GRIFFIN 8.00
8/28/2000 JOE HEMBREE 8.00
Overtime
Hours
Employee Code Equipment No.
KJ
MA
JG
JH
2.50
2.50
Grand Total Down Time 0.00
Grand Total Employee Hours 37.00
Grand Total Contract Labor Hours 0.00
Grand Total Labor Hours 37.00
Work Order History Comprehensive
9/28/2000
r
Page 1
WO No. 9803893
UFf STATION GRASS CUTTING
Close Date 8/25/2000
r'
Task No. LSGRASS
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/14/2000 10: 10:09
Completion Date 8/14/2000
Completion Time 10: 11 : 24
Employee Labor Hours 24.00
Contract Labor Hours
Total Labor Hours 24.00
~
! i
~
H
J
,
f
\
i Equipment Num LIS GRASS
Equipment Description CUT GRASS AT ALL UFfST A TIONS
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Comments
CUT LIFT STATION GRASS AND USED WEED KILLER.
PUT GAS IN LAWN MOWERS AND DODGE TRUCK
Employee Code Equipment No. Work Date First Name Last Name Regular Hours OvertiIlle
Hours
KJ LIS GRASS 8/14/2000 KENNETH S. JAMES 8.00
,
DG LIS GRASS 8/14/2000 DONNIE GRIFFIN 8.00
JG LIS GRASS 8/14/2000 JEFF GRIFFIN 8.00
r
I
t
WO No. 9803894
UFf STATION GRASS CUTTING
Task No. LSGRASS
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Close Date 8/2512000
Originator
Telephone No.
Extension
Request Date 8/3/2000 10:13: 15
Completion Date 81 3/2000
Completion Time 10: 14:03
Employee Labor Hours 24.00
Contract Labor Hours
Total Labor Hours 24.00
I rJ
r I
r.
, '.'
,
9/28/2000
~ '
),
, '
t ~
~,
I
~
Work Order History Comprehensive
Page 2
i Equipment Num US GRASS
Equipment Description CUT GRASS AT ALL LIFTST A TIONS
Location -
Sub-location 1
Sub-location 2
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Comments
I
PUT OUT WEED KILLER ON 3/4 LIFT STATIONS
CUT MILL CREEK AND PUT OUT 17 GALLONS OF WEED KILLER
WORKED ON SEWER PLUG
PICK~D UP 6" PUMP FOR SPRING STREET LIFT STATION
Employee Code Equipment No.
Work Date
First Name
Last Name
Regular Hours
KJ
DG
JG
US GRASS
LIS GRASS
US GRASS
8/ 3/2000
8/ 3/2000
8/ 3/2000
KENNETH S.
DONNIE
JEFF
JAMES
GRIFFIN
GRIFFIN
8.00
8.00
8.00
Overtime
Hours
r\
R i
t
I'
t \
r-
!
t'
r
t
r,
'~
L
r,
, i
t
Grand Total Down Time
Grand Total Employee Hours
Grand Total Contract Labor Hours
Grand Total Labor Hours
0.00
48.00
0.00
48.00
Work Order History Comprehensive
9/28/2000
Page
," " ,
WO No. 9803926
Close Date 8/31/2000
TELEVISING LINES
r
i
\
Task No. TV TRUCK
WO Type TV
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/3012000 14:32:43
Completion Date 8/3012000
Completion Time 14:33:29
Employee Labor Hours 24.00
Contract Labor Hours
Total Labor Hours 24.00
)
,
, Equipment Num JET TRUCK
Equipment Description FOOT AGE CLEANED
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
~ '
)
t
(
)
Comments
TV'D, JET CLEANED AND VACTORED 12 MAIN IN RIVERWOODS SUBDIVISION TO LOCATE TAP ON LOT #15.
THIS TWICE TODAY. STARTED JET CLEANING 15" MAIN ON PENN STREET TO TV FOR TAP AT NEW HOME.
DID
JET CLEANED 350'
Employee Code Equipment No.
Work Date First Name Last Name Regular Hours Overtime
Hours
8/3012000 KENNETH S. JAMES 8.00
8/3012000 MIKE ARMS 8.00
8/3012000 DONNIE GRIFFIN 8.00
KJ JET TRUCK
MA JET TRUCK
DG JET TRUCK
WO No. 9803926
Close Date 8/31/2000
TELEVISING LINES
Task No. TV TRUCK
WO Type TV
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Originator
Telephone No.
Extension
Request Date 8/30/2000 14:32:43
Completion Date 8/30/2000
Completion Time 14:33:29
Employee Labor Hours 24.00
Contract Labor Hours
Total Labor Hours 24.00
Work Order History Comprehensive
9/28/2000
Page 2
Response Time (Minutes)
Delay Description
I
ri
h
, [
,
,
Equipment Num TELEVISING
Equipment Description SEWER LINES TV
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Comments
# j
r
~ !
Grand Total Down Time
Grand Total Employee Hours
Grand Total Contract Labor Hours
Grand Total Labor Hours
0.00
24.00
0.00
24.00
"
I
,r;
t
Work Order History Comprehensive
9/28/2000
r
f
\
Page 1
WO No. 9803895
GENERAL MAINTENANCE WORK
ccc
Close Date 8/25/2000
n
I '
Task No. GENERAL MAINT.
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
RequestDate 8/4/2000 10:15:31
Completion Date 8/ 4/2000
Completion Time 10:16:19
r-,
, '
!
Employee Labor Hours 40.00
Contract Labor Hours
Total Labor Hours 40.00
r
t
. I
\ [
r'
Equipment Num GENERAL MAINTENANCE
Equipment Description GENERAL MAINTENANCE WORK
Location -
Sub-location 1 _
Sub-location 2
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
F: i
J Comments
CLEANED UP SHOP AND ALL BAYS. CLEANED UPSTAIRS ALSO.
SAFETY SHED. HELPED ROD PUT OUT WEED KILLER IN PLANT.
CLEANED DUMP PAD AND PUT SEWER PLUGS IN Tffi
f
r Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
{ Hours
KJ GENERAL 8/ 4/2000 KENNETH S. JAMES 8.00
MAINTENANCE
DG GENERAL 8/ 4/2000 DONNIE GRIFFIN 8.00
MAINTENANCE
JG GENERAL 8/ 4/2000 JEFF GRIFFIN 8.00
MAINTENANCE
JH GENERAL 8/ 4/2000 JOE HEMBREE 8.00
r, MAINTENANCE
! EM GENERAL 8/ 4/2000 ELMER MCKIM 8.00
MAINTENANCE
r
,
!. WO No. 9803905
GENERAL MAINTENANCE WORK
Task No. GENERAL MAINT.
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Close Date 8/25/2000
Originator
Telephone No.
Extension
Request Date 8/17/2000 10:48:49
Completion Date 8/17/2000
Completion Time 10:50:39
Employee Labor Hours 8.25
Contract Labor Hours
Work Order History Comprehensive
9/28/2000
Page 2
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Total Labor Hours 8.25
~
Equipment Num 5GOLFVIEW
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
f I
~
f '
J
Comments
GOLFVIEW - RETURNED SAW FROM DAY BEFORE TO CO~STRUCTION CREW.
STATION/REPAIR FENCE
FINISHED JOB ON CUTTING SHRUBS AT
t 1 PLANT - CHANGED OUT CONTACTOR ON PLANT WATER PUMP #l.
~ { (pul'led spare from panel day before)
r
b
(
ONLINE
WORKED ON PAPERWORK FOR ENGINEERS & RAY
Employee Code
Equipment No.
Work Date
First Name
Last Name
Regular Hours
Overtime
Hours
MA
HH
5GOLFVIEW
5GOLFVIEW
8/17/2000
8/17/2000
MIKE
HERSHEL
ARMS
HAMBY
7.50
0.75
Close Date' 8/25/2000
9803905
r
r I
Task No. GENERAL MAINT.
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Originator
Telephone No.
Extension
Request Date 8/17/2000 10:48:49
Completion Date 8/17/2000
Completion Time 10:50:39
r
t
Employee Labor Hours 8.25
ConrractLaborHours
Total Labor Hours 8.25
(
, l
c:- '
,
.
~
),
t
Equipment Num PLANT
Equipment Description GENERAL WORK ON PLANT GROUNDS
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
Comments
r
I
Work Order History Comprehensive
9/28/2000
Page 3
WO No. 9803908
GENERAL MAINfENANCE WORK
Task No. GENERAL MAINT.
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Close Date 8/25/2000
r,
, '
Originator
Telephone No.
Extension
Request Date 8/16/2000 II :00:49
Completion Date 8/16/2000
Completion Time 11:01:31
,
Employee Labor Hours 9.50
Contract Labor Hours
Total Labor Hours 9.50
(""1
r,
Equipment Num 5GOLFVlEW
Equipment Description
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
)
\
~ '
J Comments
~ CHECKED CANTEX STATIONS WITH HERSHEL (STATION CHECK & ALARMS
)
t'
)
f
CHECK OF FOUR OTHER STATIONS
MEETING WITH JIM
GOLFVIEW - (PSI - PULLED METER AT 12:30) CHANGED OUT, MAIN DISCONNECT. PSI REINSTALLED METER AT
2:15. SAM MET WITH ME AND AGREED THAT THE SHRUBS NEEDED TO BE REMOVED TO PAINT FENCE. SAM TOOK
JOE TO GET THE SAW. RETURNED AND REMOVED MOST OF THEM.
PLANT - CHECK OF #1 PLANT WATER PUMP, CONTACTOR FOUND TO BE BAD.
MAINTENANCE BUILDING PANEL AND WILL INSTALL ON 8/17/00
PULLED ONE FROM SPARE SLOT IN
r Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
f Hours
MA 5GOLFVIEW 8/16/2000 MIKE ARMS 8.00
r, HH 5GOLFVlEW 8/16/2000 HERSHEL HAMBY 1.50
.
f
r,
r WO No. 9803908
~ GENERAL MAINfENANCE WORK
Task No. GENERAL MAINT.
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Close Date 8/25/2000
Originator
Telephone No.
Extension
Request Date 8/16/2000 11 :00:49
Completion Date 8/16/2000
Completion Time 11:01:31
r,
Employee Labor Hours 9.50
Contract Labor Hours
P
I '
Work Order History Comprehensive
9/28/2000
Page 4
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Total Labor Hours 9.50
n
I '
J
I
~.. ~
)
Ji I COll1ments
Equipment Num PLANT
Equipment Description GENERAL WORK ON PLANT GROUNDS
Location -
Sub-location 1 _
Sub-location 2
Sub-location 3 -
Must Be Down N a
Estimated Down Time
Down Time
Reason for Outage
,
.
WO No. 9803909
r GENERAL MAINTENANCE WORK
Close Date 8/25/2000
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
GENERAL MAINT.
GENERAL
Originator
Telephone No.
Extension
Request Date 8/15/2000 11:04:33
Completion Date 8/15/2000
Completion Time 11 :05:06
3.00
No
Employee Labor Hours 8.00
Contract Labor Hours
Total Labor Hours 8.00
Equipment Num GENERAL MAINTENANCE
Equipment Description GENERAL MAINTENANCE WORK
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
,
,
~
H
rl Comments
. ,
\ ' ANNUAL BUSINESS MEETING FROM 9:00 UNTIL 2:00
MORNING - CHECKED CSO'S
r Employee Code Equipment No. Wark Date First Name Last Name Regular Hours Overtime
, Hours
MA GENERAL 8/15/2000 MIKE ARMS 8.00
MAINTENANCE
WO No. 9803911
GENERAL MAINTENANCE WORK
Task No. GENERAL MAINT.
Close Date 8/2512000
Originator
Work Order History Comprehensive
9/28/2000
Page 5
r:
t
, I
r'
~
, !
t J
-'
I '
,
,
'I
r
i
i
~
i
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Telephone No.
Extension
RequestDate 8/11/2000 11:27:21
Completion Date 8/11/2000
Completion Time 11 :28: 16
Employee Labor Hours 9.75
Contract Labor Hours
Total Labor Hours 9.75
Equipment Num GENERAL MAINTENANCE
Equipment Description GENERAL MAINTENANCE WORK
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Comments
DISCUSSION WITH RAY OF LIFT STATION CONSTRUCTIONS, ETC.
CALL FROM YAKOV WITH CONTROL TOUCH, WILL BE HERE AT 9:00 AT 10TH STREET
WORKED AT 10TH STREET, FLOW NOW SHOWING ON RTU AND AT PLANT (METER NEEDS CALIBRATING) DIVIDE FLOW
BY 2 FOR NOW.
i
WENT TO MIDDLE SCHOOL WITH HERSHEL TO CHANGE CONTACTS IN pUMP #1
WENT TO CRUMS LANE I - INFORMATION FOR RAY
WORKED IN SHOP - PICKED UP PAPER WORK
Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
MA GENERAL 8/11/2000 MIKE ARMS 8.00
0 MAINTENANCE
HH GENERAL 8/11/2000 HERSHEL HAMBY 1.75
MAINTENANCE
WO No. 9803914 Close Date 8/25/2000
GENERAL MAINTENANCE WORK
f Task No. GENERAL MAINT. Originator
WO Type GENERAL Telephone No.
Assigned By Extension
r: Assigned To Request Date 8/1 0/2000 11 :40:55
L Scheduled Start Date Completion Date 8/1 0/2000
,
Scheduled Finish Date Completion Time 11:41:49
Est. Duration (days)
Actual Duration (days) Employee Labor Hours 8.00
Priority 3.00 Contract Labor Hours
r: Perform by Warranty No Total Labor Hours 8.00
t 1 Expense Class
: Response Time (Days)
Response Time (Hours)
9/28/2000
Work Order History Comprehensive
Page 6
Response Time (Minutes)
Delay Description
t ,;
, r
r
.: ;1
) Comments
r
t
Equipment Num 5MILLCREEK
Equipment Description
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Close Date 8/25/2000
WO No. 9803914
GENERAL MAINTENANCE WORK
Task No. GENERAL MAINT.
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
f
r:
~
Originator
Telephone No.
Extension
Request Date 8/10/2000 ] 1:40:55
Completion Date 8/1 0/2000
Completion Time ] ]:41:49
Employee Labor Hours 8.00
Contract Labor Hours
Total Labor Hours 8.00
r
f ;
J
I
, i
J
~ .
l
t
Comments
WO No. 9803914
GENERAL MAINTENANCE WORK
Task No. GENERAL MAINT.
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
fL '
.
Equipment Num 5SPRING STREET
Equipment Description
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down
Estimated Down Time
Down Time
Reason for Outage
No
Close Date 8/25/2000
Originator
Telephone No.
Extension
Request Date 8/10/2000 11:40:55
Completion Date 8/1 0/2000
Completion Time ]]:4] :49
Employee Labor Hours 8.00
Contract Labor Hours
Work Order History Comprehensive
9/28/2000
Page 7
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Total Labor Hours 8.00
r
~,
I tHl:~
~,
i ~1
1
,..
.
~
j
~ .;
11>" .,
)
f
.
\
Equipment Num 5TENTH ST.
Equipment Description
Location -
Sub-location 1
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Comments
,
CHECKED EQUIPMENT BOXES AT 10TH STREET, SPRING STREET & MILL 30"W X 36"H X 10"D TO GEORGIA
CROSSING ADDRESS. 3552 PEACHTREE, REMC METER #28082 / BUILDER IS AJ&E 923/1452 - FOR RAY
WORKED IN PRESS ROOM, REMOVED WIRING TO POLY MIX TANK (3) (TO FALLS CITY - PLUGS TO MAKE BOXES
WATER TIGHT)
SAFETY MEETING ON ELECTRICAL & HAND TOOLS
YAKOV CALLED, WILL BE IN FRIDAY 9/9:30
CALLED TO GRIT BUILDING TO ASSIST
Employee Code
Equipment No.
Work Date
First Name
Last Name
Regular Hours
Overtime
Hours
MA'
5TENTH ST.
8/10/2000
MIKE
ARMS
8.00
r WO No. 9803915
t GENERAL MAINTENANCE WORK
Task No. GENERAL MAINT.
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Close Date 8/25/2000
Originator
Telephone No.
Extension
Request Date 8/ 1/2000 13:45:35
Completion Date 8/ 1/2000
Completion Time 13:46:23
Employee Labor Hours 14.00
Contract Labor Hours
Total Labor Hours 14.00
r
t:
.' :
r
t
Work Order History Comprehensive
9/2812000
Page 8
~.'
t 'j
~
'I
f Co~ments
, I INSTALLED #2 PUMPT AT FILTRATE STATION, DID MAINTENANCE TO CHECK RECOIL CYLINDER.
[,
[1
t
t
, EquipmentNum lFILTRATE
I
Equipment Description
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
MEETING WITH RAY
I
i
PICKED UP BUFFER AT PARKS DEPT. FOR SPRING ST FLOORS
PICKED UP SUPPLIES AT HEUSERS FOR SPRING STREET FLOORS
WHILE AT STATION, FOUND UNIVERSAL ON #1 PUMP BREAKING APART, SHUT DOWN & LOCKED OUT.
Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
Hours
MA I FILTRATE 8/ 112000 MIKE ARMS 8.00
DM lFTLTRATE 8/112000 DANNY MILES 3.00
[""", EM I FfLTRATE 8/ 112000 ELMER MCKIM 3.00
r WO No. 9803915
..;. GENERAL MAINTENANCE WORK
Close Date 8/25/2000
f
~J
;1
J
k.,
) Comments
~
Task No.
WO Type
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority
Perform by Warranty
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
GENERAL MAINT.
GENERAL
Originator
Telephone No.
Extension
Request Date 8/112000 13:45:35
Completion Date 8/112000
Completion Time 13:46:23
3.00
No
Employee Labor Hours 14.00
Contract Labor Hours
Total Labor Hours 14.00
Equipment Num 5SPRING STREET
Equipment Description
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
WO No. 9803918
GENERAL MAINTENANCE WORK
Task No. GENERAL MAINT.
Close Date 8/25/2000
Originator
Work Order History Comprehensive
9/28/2000
Page 9
n
t
rl
, I
r"
~ ..
f'~
)
J l
~,
.
t
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Response Time (Minutes)
Delay Description
Telephone No.
Extension
Request Date 8/4/2000 13:55:27
Completion Date 8/4/2000
Completion Time 13:56:24
Employee Labor Hours 10.14
Contract Labor Hours
Total Labor Hours 10.14
r'
fI
Equipment Num GENERAL MAINTENANCE
Equipment Description GENERAL MAINTENANCE WORK
I Location _
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
I
Comments
#1 PLANT WATER PUMP OVERHEATED - PULLED, CALLED DERBY CITY ELECTRIC TO PICK UP.
TO PULL FROM WELL.
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
USED BOOM TRUCK
I
I
CHECKED RAS METER - FOUND NO LOOSE CONNECTIONS, ETC, CHANGED FRONT PANEL OUT WITH ONE IN PRESS
ROOM (#1 DIGESTER)
MEETING WITH RAY
ALARM GIVEN TO ME WHILE IN RAS DRY WELL - GIVEN TO HERSHEL BEFORE GOING TO MEETING.
f' Employee Code Equipment No.
Work Date
First Name
Last Name
Regular Hours
Overtime
Hours
MA
GENERAL
MAINTENANCE
GENERAL
MAINTENANCE
GENERAL
MAINTENANCE
8/ 4/2000
MIKE
ARMS
3.75
i
EM
8/ 4/2000
ELMER
MCKIM
3.25
SB
8/ 4/2000
SONNY
BRANNON
3.14
r-
;
WO No. 9803920
GENERAL MAINTENANCE WORK
Task No. GENERAL MAINT.
WO Type GENERAL
Assigned By
Assigned To
Scheduled Start Date
Scheduled Finish Date
Est. Duration (days)
Actual Duration (days)
Priority 3.00
Perform by Warranty No
Expense Class
Response Time (Days)
Response Time (Hours)
Close Date 8/2512000
Originator
Telephone No.
Extension
Request Date 8/22/2000 14:02:02
Completion Date 8/22/2000
Completion Time 14:02:49
Employee Labor Hours 9.50
Contract Labor Hours
Total Labor Hours 9.50
Work Order History Comprehensive
9/28/2000
Page ] 0
Response Time (Minutes)
Delay Description
Equipment Num GENERAL MAINTENANCE
Equipment Description GENERAL MAINTENANCE WORK
Location -
Sub-location 1 _
Sub-location 2 -
Sub-location 3 -
Must Be Down No
Estimated Down Time
Down Time
Reason for Outage
Comments
WORKED ON PAPERS FOR ENGINEER & RAY
TO 3 MAIN STATIONS TO CHECK INFORMATION, SPRING STREET, MILL CREEK AND 10TH STREET, RESET RTU AT
10TH, OTHER INFORMATION FOUND IN LIBRARY/CONFERENCE
BLUE PRINTS OF PLANT ELECTRICAL TAKEN TO COPY COPY (PICK UP LATER IN DAY)
TO UTICA II AND INSTALLED NEW CONTACTOR, STILL PULLING HIGH AMPS, PULL PUMP
2 SEWER CALLS WITH HERSHEL
ORDERED BOLTS FOR FLOOD GATES / P.O. FOR CRUMS I AT SPENCERS
r
f Employee Code Equipment No. Work Date First Name Last Name Regular Hours Overtime
f
, Hours
",.
MA GENERAL 8/22/2000 MIKE ARMS 8.00
MAINTENANCE
HH GENERAL 8/22/2000 HERSHEL HAMBY 1.50
MAINTENANCE
Grand Total Down Time
Grand Total Employee Hours
Grand Total Contract Labor Hours
Grand Total Labor Hours
0.00
117.14
0.00
117.14
r
I
r
I
It,
r
t
~ .
AttachInent F
Maintenance~Repair Expenditures
Jeffersonville Wastewater Treatment Facility
Maintenance & Repair Expenditures
r
f P.O. DA TE Phase Code Vendor Description Amount
8/4/2000 4402 PLUMBERS SUPPL Y MISC. PLANT PARTS $24.77
8/4/2000 4413 ORR SAFETY SAFETY EQUIPMENT (TRIPOD) $495.42
,...-, MAINTENANCE
~ . 8/4/2000 4441 HEUSER HARDWARE CONCRETE SUPPLIES $26.08
I
8/4/2000 4441 HEUSER HARDWARE MISC. PLANT SUPPLIES $16.74
8/4/2000 4442 HEUSER HARDWARE WEED SPRA YER $75.58
8/4/2000 4442 WA TER WORKS AIR RELEASE REPAIR $203.97
8/4/2000 4400 CLARKSVILLE SALES MISe. ITEMS FOR COLLECTIONS $47.20
8/4/2000 4400 COpy COpy COPIES $2.00
8/4/2000 4400 GOODWILL RAGS FOR PLANT $21.53
8/18/2000 4400 GENERAL RUBBER PLANT SUPPL Y $199.50
8/18/2000 4400 HEUSER HOSE NOZZLE FOR PLANT $7.34
8/18/2000 4402 DERBY CITY SUPPLIES FOR PLANT WA TER $426.95
PUMP
8/18/2000 4402 FALLS CITY SEAL PLUGS FOR PRESS ROOM $49.08
8/18/2000 4402 HEUSER HARDWARE COLLECTION SYSTEM STOCK $67.00
8/18/2000 4402 INHOVIA PNEUMATICS ELEMENTS FOR PLANT BLOWERS $383.84
8/18/2000 4440 HEUSER HARDWARE L.S. SUPPL Y $26.08
8/18/2000 4440 TRANSCA T CALlBRA TOR 4/20 MA METER $534.25
8/18/2000 4441 CONTROL TOUCH WEIGHT #2 PUMP AT 10TH ST. L.S. $162.50
8/18/2000 4441 FALLS CITY CONTACTS FOR MIDDLE SCHOOL L. $182.32
S.
8/18/2000 4441 FALLS CITY DISCONNECTS FOR GOLFVIEW L.S. $230.28
8/18/2000 4441 FALLS CITY LIGHT FIXTURES FOR MAGNOLIA L. $48.97
S.
8/18/2000 4441 HEUSER HARDWARE SUPPL Y FOR SPRING STREET $15.00
8/18/2000 4441 MOTION CONTROL SYSTE CONTACTS FOR CRUMS LANE I L.S. $268.59
8/18/2000 4441 PLUMBERS SUPPL Y CHECK VAL VE FOR POWERHOUSE $879.52
L.S.
8/18/2000 4441 RUGID COMPUTER REPAIR RUGIDAT 10TH ST. L.S. $40.50
8/18/2000 4443 CONTRACTOR'S SAFETY LOCATE PAINT $151.73
8/18/2000 4443 CONTRACTOR'S SAFETY MISC. COLLECTION SYSTEM STOCK $23.63
8/18/2000 4443 GRAINGER CAP TESTER $63.56
8/18/2000 4443 HEUSER HARDWARE COLLECTIONS SYSTEM STOCK $15.74
8/18/2000 4443 HEUSER HARDWARE COLLECTIONS SYSTEM STOCK $47.51
8/18/2000 4443 HEUSER HARDWARE AAKE FOA COLLECTION SYSTEM $12.06
8/18/2000 4443 PLUMBERS SUPPL Y 2 1/2" CAP FOR COLLECTIONS $15.90
r
Jeffersonville Wastewater Treatment Facility
Maintenance & Repair Expenditures
P.O. DATE Phase Code Vendor
PLUMBERS SUPPL Y
SONNY BRANNON
KENNY INDUSTRIAL
NEILL LA VlELLE
HEUSER HARDWARE
Description
PA TCH KIT PLUGS
FOGGER FOR PLANT
LIFT STA TlON CLEANING - SPRING
STREET
BOL TS FOR FLOODGA TES AT
SPRING STREET
COLLECTION SYSTEM STOCK
Amount
$73. 12
$125.00
$660.00
$38.22
$36.53
Total 5,698.01
r
L
AttachInent G
Repair &.. ReplaceI11ent Expenditures
Jeffersonville Wastewater Treatment Facility
Repair & Replacement Expenditures
P.O. DATE Phase Code Vendor Description Amount
8/4/2000 4492 AMWELL (project #00234) CLARIFIER REPAIR $1,583.40
PARTS
8/18/2000 4492 CORLEY ENTERPRISES (project #00235) FLOOD GA TES FOR $3,655.41
SPRING STREET L.S.
8/18/2000 4492 ISCO, INC. (project #00236) REPLACE PLANT $8,672.00
SAMPLERS
8/29/2000 4492 AMWELL (project #00234) CLARIFIER REPAIR $1,200.00
8/29/2000 4492 KENNY INDUSTRIAL (project #00237)CLEANING OF $1,064.00
WETWELL AT SPRING STREET
Total 16,174.81
~
L
n'
:J
kJ..d
Attachment H
Safety Inspection Report
r
ENVIRONMENTAL MANAGEMENT CORPORATION
MONTHLY SAFETY INSPECTION
CHECKOFF SHEET
JEFFERSONVILLE W ASTEW A TER TREATMENT FACILITY
701 CHAMPION ROAD
JEFFERSONVILLE, IN 47130
(812) 285-6451
PERSON COMPLETING INSPECTION:
Wavmon Payne
I. Personnel Safety
A. Personal Protective Clothing
J. Safety Helmets Provided
(for Personnel & Visitors)..................................
2. Hearing Protection
(for High Noise Areas).......................................
3. Eye Protection - Goggles, etc.
(for Personnel & Visitors)..................................
4. Gloves
(for Personnel)................ ....... ...... ..... ... ..... ... ......
5. Rubber Boots with Steel Toes
(provided for Personnel). ..... ... ... ..... ....................
6. Rain Suits Provided
(for Personnel)........... ........................................
7. Is Respiratory Protection Provided including
ventilators and hoods over high dust areas, dust
masks, etc. (for Personnel)................................
B. Safety Devices and Equipment
P
LJ
1. Non-sparking Tools in areas where flammable
or explosive gases may be present?.....................
2. Oxygen Deficiency, Toxic, & Explosive Gas
indicator................. ....................................... .....
3. Self-contained Breathing Apparatus for entry
to chlorine room.................................................
4. Confined Space Entry Equipment Available
such as and including Safety Harness, Portable
Wench, Hoist, etc...............................................
5. First Aid Kits with proper & adequate supplies
readily available for any First Aid Emergency....
AUl!Ust 15. 2000
Yes'/ NO N/A
Yes'/ NO N/A
Yes'/ NO N/A
Y cs'/ NO N/A
Y cs'/ NO N/A
Yes ,/ NO N/A
Y cs'/ NO N/A
Yes'/ NO N/A
Y cs'/ NO N/A
Yes'/ NO N/A
Yes'/ NO N/A
Y cs'/ NO N/A
6. Traffic Control Cones Available........................ Yes'/ NO N/A
7. Ladders to enter manholes of wet wells
(fiberglass or wooden for electrical work)......... Yes ,/ NO N/A
8. Safety Buoys and Life Lines, Life Preservers
at all open structures (02 Ditches, Clarifiers,
Lagoons, etc.......... .,. ..... ............. ................... ... Yes'/ NO N/A
II. General Plant Safety
1. Are Personnel trained in the use and location
of safety equipment at the plant...................... Yes'/ NO N/A
2. Are there railings around all tanks with
openings chained off..........................,........... Yes'/ NO N/A
3. Are holes covered? Including all pits & wells,
drains, valve holes, hatch covers in place........ Yes'/ NO N/A
4. Are explosion proof fixtures used where
needed......................................................... .. Yes'/ NO N/A
5. Are all equipment guards in place? Including
mowing equipment....... ... ... ..... ... ..... ... ........ .... Yes'/ NO N/A
6. Are dry wells ventilated and is ventilation
adequate in all areas.............................,......... Yes'/ NO N/A
7. Are emergency numbers posted & accessible.. Yes'/ NO N/A
8. Is proper liquid flammable storage used.......... Y cs'/ NO N/A
9. Is general plant cleanliness being practiced?
Including floors (No oil or grease or pools of
water), Storage Areas (No clutter & supplies
stored properly), Chlorine Room (Free of
clutter), Laboratory..... ....... ........ ...... .............. Yes'/ NO N/A
10. Are all walkways, exists and routes, &
stairways clear & unobstructed (No ice, oils,
water, grease, or debris)................................. Y cs'/ NO N/A
11. Are all slippery surfaces posted and/or covered
with anti-skid material, including stair treads
and ramps, in good repair and covered with
non-skid surface.......... ... ..... ..................... ....... Yes'/ NO N/A
12. Are all mats and rugs in good repair so as not
to become tripping hazards............................. Yes'/ NO N/A
13. Are work area layouts adequate...................... Yes'/ NO N/A
14. Is lighting adequate in all areas (Work areas,
stairways, walkways, etc.).............................. Yes'/ NO N/A
15. Are noise levels within allowable limits or
danger areas posted........................................ Yes'/ NO N/A
16. Are toilet facilities available & clean............... Yes'/ NO N/A
17. Is safe drinking water available....................... Yes'/ NO N/A
18. Is pest control adequate.................................. Yes'/ NO N/A
19. Are all exists properly marked......................... Yes'/ NO N/A
20. Is inclement weather protection provided at
entrances (mats, safety strips, de-icers, etc.).... Yes'/ NO N/A
21. Are tripping hazards eliminated at all doors
(threshold plates in good repair, etc.).............. Yes./ NO N/A
22. Is safety glass provided in all doors................. Y cs./ NO N/A
23. Are handrails provided on stairs (Both sides
if necessary)..... ........ ... ....... ... ..... ... ... ..... ... ..... Y cs./ NO N/A
24. Are ladders properly anchored....................... Yes./ NO N/A
25. Are fixed ladders provided with safety cages
or safety side rails......................................... y cs./ NO N/A
26. Are all elevation differences between floors
clearly defined and properly lighted................ Yes./ NO N/A
27. Are portable ladders in good condition........... Yes./ NO N/A
28. Kick boards in place if needed........................ Yes./ NO N/A
29. No Broken steps............................................ Y cs./ NO N/A
30. Are ashtrays provided and emptied regularly.. y cs./ NO N/A
31. Are trash cans covered and emptied regularly. Y cs./ NO N/A
32. Are portable hoists for lifting heavy equipment
in good repair................................................. Yes./ NO N/A
33. Are plant personnel immunized for tetnus....... Y cs./ NO N/A
34. No electrical cords stretched over tanks.......... y cs./ NO N/A
35. No gas leaks................................................... Yes./ NO N/A
36. Fuel supply tank in good condition................. Yes./ NO N/A
37. No excessively hot operating temperature on
machinery or equipment................................ Yes./ NO N/A
38. No excessive vibration of machinery or
equi pment....................... ............................. Y cs./ NO N/A
39. No water or oil being "slung" from equipment Y cs./ NO N/A
40. No worn or cracked equipment..................... Yes./ NO N/A
41. No excessive dust on equipment................... Y cs./ NO N/A
42. Adequate dehumidifier and heaters where
needed...... ... .......... ..... ... ... ............. ........ ....... Y cs./ NO N/A
43. Emergency Medical Information on all
employees available for determination of job
assignments. ..... ... ..... ..... .., ..... ... ... ..... ..... ... .... Y cs./ NO N/A
44. Cross connections have been eliminated
between potable water supply and non-potable
source:
a. Pump & Mixer Seals................................. Y cs./ NO N/A
b. Digester Heating System Makeup Water... Y cs./ NO N/A
c. Vacuum Filter Water Sprays..................... Yes./ NO N/A
d. Chemical Mixing Tank............................... Y cs./ NO N/A
e. Chlorinator Water Source........................... Y cs./ NO N/A
f. De-Chlorination Water Source.................... Y cs./ NO N/A
0- Yard Hydrants............................................ Y cs./ NO N/A
b'
h. Other......................................................... . Yes./ NO N/A
III. Electrical Safety
1. Is all electrical circuitry enclosed and identified. Yes./ NO N/A
2. Is all wiring in good condition.......................... Yes./ NO N/A
3. Are the number of outlets adequate.................. Yes'/ NO N/A
4. Is equipment properly grounded or insulated.... Yes'/ NO N/A
5. Are extension cords in good condition and
used properly..... .......... ... ... ........ ............. ......... Yes'/ NO N/A
6. Is electrical test equipment available. Such as
voltmeter, amp meter, etc................................. Yes'/ NO N/A
7. Are dielectric rubber mats presents for
electrical work.. ... .......... ..... ... ..... ... ........ ........ Yes'/ NO N/A
8. All control panel switches in good condition.. Yes'/ NO N/A
9. All control panels unobstructed...................... Yes'/ NO N/A
10. Are dielectric rubber gloves available............. Yes'/ NO N/A
11. Are ground fault interrupters used.................. Yes'/ NO N/A
12. Are warning or caution signs posted............... Y cs'/ NO N/A
13. Is control panel area clean and dry.................. Y cs'/ NO N/A
14. Are all needed fuses or breakers in place......... Yes'/ NO N/A
15. Are all contacts clean and dust free................. Y cs'/ NO N/A
16. Is there emergency stop buttons on all
machines and equipment................................. Y cs'/ NO N/A
17. Are personnel familiar with the electrical safety
R such as lock out/tag out procedures................ Y cs'/ NO N/A
tJ 18. Is power supply locked out/ tagged out on
equipment presently being repaired................. Y cs'/ NO N/A
IV. Chlorine & Dechlorination Safety
1. All standing cylinders chained in place and/or
ton cylinders chocked...................................... Yes'/ NO N/A
2. All personnel rained in the use of C~.............. y cs'/ NO N/A
3. Appropriate repair kits available...................... y cs'/ NO N/A
4. Chlorine & dechlorination leak detector tied
into the facility alarm system........................... Yes'/ NO N/A
5. Ventilator fan with outside switch present and
either comes on when door opens or manually
with switch at entrance door........................... y cs'/ NO N/A
6. Ammonia and Sulphur for checking chlorine &
dechlorination leaks available.......................... y cs'/ NO N/A
7. Are all safety precautions posted..................... y cs'/ NO N/A
8. Proper Chlorine wrench available to open
val ves............................................................. Yes'/ NO N/A
9. Chlorine protected from direct sunlight, cool
and dry..... ... ............. ..... ... ........ ..................... Y cs'/ NO N/A
10. No petroleum or other chemicals store in
chlorine room.......... ..... ... ..... ... ... ..... ........ ....... Y cs'/ NO N/A
11. Spare lead washers available on site................ Yes'/ NO N/A
V. Process Chemical Safety
1. Are personnel trained to handle all chemicals
properl y......................................................... Y cs'/ NO N/A
2. Is proper safety clothing present for the
chemical to be handled................................... Yes'/ NO N/A
3. Are all containers, vats, and tanks properly
labeled........................................................... . Yes'/ NO N/A
4. Is employee exposure within accepted limits.... Yes'/ NO N/A
5. Are there proper containment of storage areas,
including curbing............................................ Yes'/ NO N/A
6. Are management & employees aware of the
hazards of the materials being used.................. Yes'/ NO N/A
7. Knows proper response to an accidental spill... Yes'/ NO N/A
8. All MSDS available and easily accessible......... Yes'/ NO N/A
9. Has complied with the 6 employer
responsibilities of the Worker Right to Know
Law? (SARA)......... ... ..... .,. ........... ......... ......... Yes'/ NO N/A
10. Emergency Action Plan on file with local Fire,
Police Departments and appropriate Emergency
Agency........................................................... . Yes'/ NO N/A
VI. Tools & Equipment
1. Are hand tools in good repair and stored
properl y.......................................................... Yes'/ NO N/A
2. Are power tools stored properly and in good
condition - cords, plugs, etc............................ Yes'/ NO N/A
3. Are the tools adequate for the tasks to be
performed...................................................... . Yes'/ NO N/A
4. Are defective tools replaced as needed............ Yes'/ NO N/A
5. Are tool guards in place.................................. Yes'/ NO N/A
6. Are employees trained in the proper use of the
various tools they are expected to use............. Yes'/ NO N/A
7. Are employees given additional instruction and
periodic reviews of specialized tools and
equipment....... ................................................. Yes'/ NO N/A
8. Are proper lifting techniques used by
employees......... ............................................... Yes'/ NO N/A
VII. Fire Safety & Protection
1. Are fire/emergency evacuation plans posted...... Yes'/ NO N/A
2. Are employees familiar with fire/emergency
evacuation plan................................................ Yes'/ NO N/A
3. Are there sufficient number and types of fire
ex ti nguishers.................................................... Y cs'/ NO N/A
4. Are the fire extinguishers properly located and
identified......................................................... . Yes'/ NO N/A
5. Are the fire extinguishers checked annually...... Y cs'/ NO N/A
6. Are all of the fire extinguishers in working
condition........................................................ . Yes'/ NO N/A
7. Are employees trained in the proper use of the
extinguishers to be used................................... Yes'/ NO N/A
8. Are smoke detectors in working order............. YES NO N/A'/
VIII. Laboratory Safety
l. Emergency Eyewash & Shower Station are
present and work properly and tested monthly.. y cs.l NO N/A
2. Fume hood is present....................................... y cs.l NO N/A
3. All chemicals safely and properly stored, well
labeled and in original containers..................... y cs.l NO N/A
4. Laboratory Safety devices used such as: Pipette
suction bulbs, Eye Protection, Gloves, Aprons
or Jackets, & Tongs......................................... y cs.l NO N/A
5. No brokenl chipped or cracked glassware........ y cs.l NO N/A
6. No overloaded outlets..................................... y cs.l NO N/A
7. Acid spill kit available..................................... y cs.l NO N/A
8. Emergency procedures for acid spills posted
and used by all personneL............................. y cs.l NO N/A
9. Laboratory Safety Rules posted and obeyed by
all personnel such as no cooking or eating from
laboratory glassware.... ............................ ........ y cs.l NO N/A
IX. Other Safety
l. Are the required safety programs presented
and/or attended during the year........................ y cs.l NO N/A
2. Is a suitable identification system used to
identify the plant's piping system...................... Yes./ NO N/A
3. Has the operator taken steps to remove or
minimize safety hazards.................................. Y cs./ NO N/A
4. Are all personnel provided with a shower and
locker for their work clothes........................... Yes./ NO N/A
5. Are personnel trained in First Aid & CPR........ Y cs.l NO N/A
6. Have the following proper safety signs been
provided such as: Non-potable Water, Chlorine
Hazard, No Smoking, High Voltage, Watch
Your Step Signs in Certain Areas, & Exit Signs. Yes.l NO N/A
7. Is your Facility safety program Up to Date
(VV orksafe Program).................. ...................... Y cs.l NO N/A
(# YES)
134-0 x 100= 100 %
(# YES + # NO)
Our plant is in great shape
..-
L