HomeMy WebLinkAbout04) April
_.1 ." ,
r-
i
ENVIRONMENTAL
MANAGEMENT
CORPORATION
~
-
'~
"""""'
t=L
--
=.
=,
=
May 28, 1998
701 CHAMPION ROAD
JEFFERSONVILLE, INDIANA 47130
812-285-6451
FAX 812-285-6454
,,-..,
C. Richard Spencer, Jr.
CITY OF JEFFERSONVILLE
City/County Building
Jeffersonville, IN 47130
Dear Mr. Spencer:
Enclosed please find Environmental Management Corporation's (EMC) "Operations
Report" for the month of April 1998, containing information on the following:
1.0 Effluent Quality
2.0 Design Loading Limits
3.0 Facility Operations
3.1 Pretreatment
4.0 Preventive and Unscheduled Maintenance
4.1 Maintenance & Repair Expenditures
4.2 Repair & Replacement Expenditures
4.3 Capital Improvement Expenditures
4.4 Electrical Expenditures
5.0 Facility Safety and Training
6.0 Sewer Collection System
As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we
are available to discuss this report, or any other aspect of our operations, at the convenience
of the City.
Sincerely,
ENVIRONME TAL MANAGEMENT CORPORATION
~
I
Scott J. lmmermann
Facility Manager
SJT;sb
r
!
r
Jeffersonville Wastewater Treatment Facility
Monthl 0 erations Report
1.0 EFFLUENT QUALITY
During April, effluent quality was within NPDES permit limits for CBOD and
TSS concentrations. Table 1.1 summarizes the~ffJ.uent quality data. Attachment
A contains Time Series Plots of daily Carbonaceous Biochemical Oxygen Demand
(CBOD) and Total Suspended Solids (TSS) values. Attachment B contains Time
Series Plots of Aeration Mixed Liquors Suspended Solids (MLSS) and Sludge
Volume Index (SVI).
Table 1.1
EFFLUENT QUALITY
Parameters Pennit Limit Monthly
mg/L Average
mg/L
".'"'"'''''''"'''''''''' ~-~'.,~.,~". . ~ '-'"'="'"
Carbonaceous 25 4
Biochemical Oxygen
Demand (CBOD)
Total Suspended Solids 30 7
(TSS)
Fecal Coliform 200 17
(Colonies! 100 ml)
Chlorine Residual .05 daily .01
Maximum
. Ammonia 3.0 1.35
Flow 5.2 5.62
(MGD)
2.0 DESIGN LOADING LIMITS
The Flows and Loadings report for May 1994 through April 1998 can be
found in Attachment C.
r
i :
Jeffersonville Wastewater Treatment Facility
Monthl 0 erations Report
r
[
[
[
r;
t:
[
Steps were taken to cap the sewer line of Custom Plating. The property
owner, IDEM and the Health Department was contacted and a meeting was
held on the Custom Plating site. An inspection of the facility revealed
numerous hazardous chemicals on site. IDEM provided insight to
requirements needed to clean the property prior to reconnecting sewer service
to the facility.
4.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE
Preventive maintenance was performed on all equipment as scheduled in April.
There were 32 unscheduled maintenance tasks performed. All were minor
repairs except for:
Rebuilt No.2 RAS pump, new seals, bearings and a new trimmed
impeller.
Completion and start up of the new digester line.
Rebuilt pump No.1 at Crums Lane No.1 station.
Rebuilt pump No.1 and No.2 at Spring Street station.
A list of unscheduled maintenance work orders is included as Attachment. E.
Maintenance and repair expenditures for the month of April are detailed in
Attachment F. Table 4.1 represents the amount expended in April. Table 4.2
includes the same information for repair and replacement expenditures.
Attachment G contains a detail of repair andreplacement expenditures for
April.
Table 4.1
MAINTENANCE & REPAlR EXPENDITURES
r
I
t
.......
Time Period Amount Budget (Over)
Expended Under
April $5,579 $4,200 ($1,379)
Year-To-Date $50,720 $50,400 ($320)
(estimated)
Jeffersonville Wastewater Treatment Facility
Monthl 0 erations Report
3.0 FACILITY OPERATIONS
Attachment D contains a list of septic haulers that discharged at the faCility
during the month of April.
During April the treatment processes performed well. The facility did experience
several high peak flows events during the month. The high peak flows are a
result of rainfall events during the month.
The sludge settleability and Sludge Volume Index's (SVI's) are starting to
decline in the secondary treatment process. Foaming in the treatment process
is still a concern at the wastewater treatment facility. The influent loadings at
the head works of the facility continue to be relatively high and are also a
concern. The excessive loadings at the influent structure are causing an increase
in sludge production and electrical consumption at the facility.
The cavitation that is occurring at RAS station will be corrected by replacing the
current pumps with pumps that are properly designed for that lift station. These
pumps have been ordered from Flygt pumps and will be installed in the RAS
station in about six weeks.
3.1 PRETREATMENT
Pretreatment activities for the month of April include:
,-,
I
!
\o.,_.-c,,,
There were five (5) NOV's issued in the month of April. The following
industries were cited for not meeting the City of Jeffersonville Industrial
Pretreatment Program.
1) Ryder Transportation for discharging material (oil, diesel and
sludge) that interfered with the conveyance of sewage through
the city sewer line.
2) IWR for a spill on 3/16/98. No notification was given to EMC
or the City for the incident.
3) George Pfau & Sons for a spill that reached the City's
combined sewer.
4) Wyandot for an Oil & Grease exceedel1ce (102 mgll).
5) Wyandot for two spills, both reaching the storm sewer and the
creek. The first spill happened over the weekend and neither
EMC or the City was notified. The second spill (2 days later)
was discovered by EMC personnel and reported to Wyandot.
r
i
~..J
5. 0 FACILITY SAFETY & TRAINING
A safety inspection was conducted on April 27, 1998. The rating was a 99%.
The deficiencies reported were:
. Tools being left out in the tool room.
Safety training for the month was conducted by Jeffersonville's Safety Coordinator
on Confined Space for employees from Jeffersonville and Clarksville. The training
was given at the Jeffersonville and the Clarksville Facility. A copy of the Safety
Inspection report is included as Attachment I.
6.0 SEWER COLLECTION SYSTEM
During the month there were 23 sewer calls, The calls \Vere relate.d to the following:
~ Seventeen were related to residential problems.
~ Three were due blockages in the City's main line.
~ One was caused by other problems
~ One was due to a catch basin.
~ One was storm related.
Collections system personnel continue working in the Meadows Subdivision
investigating homes for illegal sump pumps connections. All troubled sewer spots
around the city have been cleaned, catchbasins have been checked and cleaned twice
a week, and the roadways which are to be paved by the city have been televised,
checked and cleaned in Eastgate, Suburban Acres, and Industrial Parkway.
Table 6.1, on the next page, details the data on April's sewer projects.
,....,
..1
U
r-:
j
. I
,
i
Jeffersonville Wastewater Treatment Facility
Monthl 0 erations Report
Table 4.2
REPAIR & REPLACEMENT EXPENDITURES
Time Period Amount Budget (Over)
Expended Under
- ,~ ""'''-''''''-
April $13,120 $8,334 ($4,786)
Year-To-Date $100,878 $100,000 ($878)
4.3 eAPIT AL IMPROVEMENT EXPENDITURES
Attachment H details expected Capital Improvement expenditures for the
contract period of May 1, 1997 through April 30, 1998.
4.4 ELECTRICAL EXPENDITURES
Table 4.4 relates to electrical expenditures for April 1998.
Table 4.4
ELECTRICAL EXPENDITURES
Time Period
Amount
Expended
Budget
(Over)
Under
April
$16,053
$15,918
($135)
Year-to-Date
$209,055
(actual)
$191,016
($18,039)
r
I '
Jeffersonville Wastewater Treatment Facility
Monthly Operations Report
ont ly 0 ectlOn alYS1S e::>ort
Project April Year to Date
--
Sanitary Sewer Cleaned / Feet 17,940 201,280
- .
Storm Sewer Cleaned / Feet 1325 5503
..
Catch basins Cleaned Grate Tops =220 Grate Tops = 2310
Vactored = 19 Vactored = 97
. ,.Ib.".... ~'~'.,",,_ . ",,*," ,,,,.,,
Catch basins Raised 0 0
Sewer Televised / ft 5,200 19,613
-. "<'"'. ..
Sewer Tap Inspections 8 62
Dye Testing 0 18
~ ,-." ~ ...~~
Manhole Castings Replaced 0 1
Air Testing 0 32
- ._-
Manholes Sealed 0 8
An 1 . R
Service Calls Backup Odor Main Resident Storm Related
Received Block Problem Backups
23 0 0 3 17 1
. . ...- .. ... ".
Locates Roots Other Catch Basin
75 0 1 1
.. - ~~...- -- ~~ ,----.. ~ -~-"" -..- ~"--- ~---~.--_. - . -,--~"-
,....,
i
,
"-.e-j
r
i
\
r
t
r
t
(
r
I..'
ATTACHMENTS -
A Time Series Plots - CBOD & TSS
B Time Series Plots - MLSS & SVI
C Flows & Loadings Report May 1994 through April 1998
D Septic Haulers Report
E Unscheduled Maintenance Work Orders
F Maintenance & Repair Expenditures
G Repair & Replacement Expenditures
H Capital improvement expenditures
I Safety Inspection Report
Attachment A
Time Series Plots
CBOD & TSS
C -:1 t.....'"J
r~]
ld
1"
Jeffersonville Wastewater Treatment Facility
Effluent CBOD / TSS
- Effluent CBOD - Effluent TSS - Permit CBOD - Permit TSS
50
10
40
30
20
o
I 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
April 1998
Operated and Maintained by:
Environmental Management C(Jrporation
Attachment B
Time Series Plots
MLSS & SVI
., 1
i-~l
:-] r-~l
~"..~] ~~.., ] '''~'] c~~"J
-"]
Jeffersonville Wastewater Treatment Facility
Aeration Mixed Liquor
Sludge Volume Index (SVI) ml/gm
- SVI mVgm - Design Limit SVI
250
200
150
100
50
o
2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
April 1998
Operated and Maintained by:
Environl1lClltal Managel1lCllt Corporation
'_.,~ c:~]
[J C')
1"''':J=~'=1
L:=l
"~...-]
C~']
Jeffersonville Wastewater Treatment Facility
Aeration Mixed Liquor
Suspended Solids (MLSS) mg/l
- MLSS mg/l - Design Limit TSS
5000
4500
4000
3500
3000
2500
2000
1500
1000
500
0
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
April 1998
Operated and Maintained fry:
Environmental Management Corporation
Attachment C
Flows & Loadings Report
May 1994 - April 1998
~~~']
---"'.1
Jeffersonville Wastewater Treatment Facility
May 1994 - April 1998
Design % Design % . Design % Total
Month Flow (MGD) Limit Design TSS (lbs) Limit Design BOD (lbs) Limit Design Rain
May 1994 4.50 5.2 87% 6,042 10,105 60% 3,490 10,581 33% 2.35
June 3.84 5.2 74% 8,038 10,105 80% 3,843 10,581 36% 3.70
July 3.68 5.2 71% 8,311 10,105 82% 3,913 10,581 37% 2.25
Aug 3.55 5.2 68% 7,668 10,105 76% 3,819 10,581 36% 2.40
Sept 3.81 5.2 73% 8,726 10,105 86% 4,798 10,581 45% 3.65
Oct 3.71 5.2 71% 8,493 10,105 84% 4,356 10,581 41% 2.20
Nov 4.09 5.2 79% 9,483 10,105 94% 4,025 10,581 38% 3.85
Dee 4.19 5.2 81% 10,434 10,105 103% 3,886 10,581 37% 4.45
Jan 1995 3.81 5.2 73% 9,231 10,105 91% 3,864 10,581 37% 3.75
Feb 2.92 5.2 56% 6,393 10,105 63% 2,710 10,581 26% 1.60
Mareh 2.87 5.2 55% 5,572 10,105 55% 2,480 10,581 23% 2.05
April 2.63 5.2 51% 4,211 10,105 42% 2,178 10,581 21% 2.80
May 3.46 5.2 67% 3,593 10,105 36% 1,622 10,581 15% 10.25
June 2.79 5.2 54% 4,824 10,105 48% 2,683 10,581 25% 3.35
July 2.31 5.2 44% 4,244 10,105 42% 1,809 10,581 17% 2.50
Aug 3.22 5.2 62% 6,338 10,105 63% 3,491 10,581 33% 3.45
Sept 2.33 5.2 45% 5,962 10,105 59% 3,022 10,581 29% 1.60
Oct 2.87 5.2 55% 6,235 10,105 62% 3,124 10,581 30% 5.25
Nov 2.64 5.2 51% 7,449 10,105 74% 2,519 10,581 24% 2.75
Dee 3.22 5.2 62% 9,211 10,105 91% 3,620 10,581 34% 5.85
Jan 1996 4.29 5.2 83% 8,229 10,105 81% 7,084 10,581 67% 5.00
Feb 3.28 5.2 63% 8,480 10,105 84% 6,620 10,581 63% 2.63
March 5.45 5.2 105% II ,091 10,105 110% 9,045 10,581 85% 5.98
April 5.85 5.2 113% 12,148 10,105 120% 9,075 10,581 86% 6.50
May 8.17 5.2 157% 14,513 10,105 144% 10,902 10,581 103% 7.30
1
Operated and Mainted by:
Environmental Management Corporation
'-'~J
",,"""'''1
r~l
C~]
C~""J
C ~~'J C""""""1
C~'l
Jeffersonville Wastewater Treatment Facility
May 1994 - April 1998
Design % Design % Design % Total
Month Flow (MGD) Limit Design TSS (lbs) Limit Design BOD (lbs) Limit Design Rain
June 5.74 5.2 110% 12,447 10,105 123% 10,149 10,581 96% 3.72
July 4.36 5.2 84% 11,672 10,105 116% 9,345 10,581 88% ,3.40
Aug 3.83 5.2 74% 11,148 10,105 110% 10,312 10,581 97% 1.90
Sept 4.96 5.2 95% 12,865 10,105 127% 9,928 10,581 94% 9.02
Oct 4.25 5.2 82% 11,059 10,105 109% 8,471 10,581 80% 2.60
Nov 4.80 5.2 92% 13,771 10,105 136% 11,689 10,581 110% 4.10
Dec 5.77 5.2 111% 14,725 10,105 146% 11,020 10,581 104% 4.90
Jan 1997 5.59 5.2 108% 19,581 10,105 194% 16,597 10,581 157% 3.85
Feb 5.84 5.2 112% 22,892 10,105 227% 15,732 10,581 149% 12.25
March 10.62 5.2 204% 22,586 10,105 224% 13,197 10,581 125% 6.30
April 5.63 5.2 108% I 7,584 10,105 174% 10,330 10,581 98% 2.31
May 6.27 5.2 121% 18,145 10,105 180% 9,726 10,581 92% 7.15
June 7.05 5.2 136% 13,347 10,105 132% 8,937 10,581 84% 5.05
July 4.32 5.2 83% 13,979 10,105 138% 12,862 10,581 122% 0.55
Aug 4.43 5.2 85% 11,925 10,105 118% 11 ,81 7 10,581 112% 3.95
Sept 3.,84 5.2 74% 9,166 10,105 91% 10,160 10 ,581 96% 1.47
Oct 3.60 5.2 69% 12,539 10,105 124% 10,439 10,581 99% 1.47
Nov 3.81 5.2 73% 8,516 10,105 84% 10,359 10,581 98% 3.35
Dec 4.23 5.2 81% 9,208 10,105 91% 8,290 10,581 78% 4.30
Jan 1998 4.71 5.2 91% 10,920 10,105 108% 8,838 10,581 84% 4.15
Feb 5.31 5.2 102% 7,661 10,105 76% 8,636 10,58 1 82% 1.65
March 4.77 5.2 92% 9,309 10,105 92% 11,656 10,581 110% 5.85
April 5.62 5.2 108% 9,187 10,105 91% 8,812 10,581 83% 7;60
2
Operated and Maimed by:
Environmental Management Corporation
Attachment D
Septic Haulers Report
May 1997 - April 1998
[
r
l
~
n
I
,
\,,- "
,,-.
t .
~
r-
~. ,
L
r
l
r
I
f
\..-..'~
. SEPTIC HAULERS REPORT
April 1998
.. ...
Loads Delivered To Treatment Facility
.. ,.
Hauler April Hauler Total (YTD)
..
Rumpke of Indiana 12 92
._ 0 0;:,.., .....,...,~~, .'~. ~. ,'., "..",,,. ,- -~"~ ,~._, =., I
TOTAL 12 92 I
,...........,,'.- ....,......-.......-. .
Gallons Delivered To Treatment Facility
Hauler Total (YTD)
Rumpke of Indiana
TOTAL
109,000
109,000
13,000
_H___M__.__~_ ____ - - ~--~-, n____" - --_.""_._--~-
,
Attachment E
Unscheduled Maintenance Work Orders
r
r
i..,.
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
Page
1
I Close Date:
MONTHLY TROUBLE SPOTS
.4/29/98
W.O. #; 9800496
I
Task #: TRBL SPOTS Wo Type: PM Reason For Outage:
Originator: Priority: 1.00 Expense Class:
Phone: Ext.: Est. Duration:
Down Time: 0.00 Assigned By: ST Actual Duration:
Emp. Hours: 10.00 Assigned To: MAJ Response Days:
r-- Total Labor Hrs: 10.00
L; Vendor Hours: 0.00 Response Hrs:
Request Date: Request Time: Response Mins:
Sched Start Date: 4/27/98 Sched Finish Date: 4/27/98 Perf By Warranty:
Completion Date: 4/29/98 Completion Time: 09;44:19
Delay Description:
3.00
N
Equipment #: HRBLSPOTS1 Down Time:
Description: TROUBLE SPOTS
Comments: CLEANED AND JET RODDED ALL TROUBLE SPOTS 10,920' FEET
Employee #
Name
Date
Reg Hours
OTHolJrs
DG
DONNIE GRIFFIN
5/6/98
10.00
Grand Totals:
Down Time:
Emp. Hours: .
Vendor Hours:
Total Labor Hours:
0.00
10.00
0.00
10.00
r
t
L~
r
L
o
r
L._
r. !
i.
IfI.,,,,..,,,,,
r'
l,;
r
t
,
'--
r
r
L
r:
...,......"
r:-
f
L
r
I
l
r
I
l. .
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
Page
16
I Close Date:
4/30/98
REPLACE CONDUIT AND LIGHT POLE BY DIGESTER
W.o. #: 9800567
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/13/98
Completion Date: 4/30/98
Delay Description:
Equipment #: UNKNOWN
Description:
Comments:
0.00
9.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
REPAIR
1.00
KW
MA
9.00
09:36:40
Employee #
Name
FIXED CONDUIT AND REPLACED LIGHT POLE.
Date
HH
MA
RL
HERSHEL HAMBY
MIKE ARMS
ROBERT LUNEY
5/12/98
5/12/98
5/12/98
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 13.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Reg Hours
1.00
6.50
1.50
OT Hours
Grand Totals:
Down Time:
Emp. Hours:
Vendor Hours:
Total Labor Hours:
0.00
124.60
0.00
124.60
[
r
,
r
r
l ~;
r-
r
L,
[
r
l
I
r:,
f' l
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
15
Page
I Close Date:
W.O. #: 9800404
'/
4/30/98
REPLACE WIRING AND CONDUITEFOR LIGHT POLE BVD1GESTER BLOWER LINE.
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/9/98
Completion Date: 4/30/98
Delay Description:
Equipment #: UNKNOWN
Description :
Comments:
0.00
0.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
PROJECT
1.00
KW
MA
0.00
4/13/98
10:06:55
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
15.00
N
PLEASE REPLACE WIRE AND CONDUIT FOR LIGHT POLE BY DIGESTER BLOWER LINE::.
SO THAT BLOWER LINE CAN BE COVERED.
I Close Date:
W.O. #: 9800526
I
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched start Date: 4/29/98
Completion Date: 4/30/98
Delay Description:
Equipment #: 1 BUNMOW#2
Description: MOWER
Comments: PLEASE CUT GRASS AND WEED EAT AT ALL STATIONS.
4/30/98
CUT GRASS AT STATIONS
0.00
8.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
Employee #
RL
Name
ROBERT LUNEY
PROJECT
1.00
KW
RL
8.00
4/30/98
09:40:23
Date
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 2.00
Response Days:
-Response Hrs:
Response Mins:
Perf By Warranty: N
Reg Hours
OT Hours
8.00
5/6/98
c
r-
i
.
l
r-
t
5/13/98
Work ()rderHistory Comprehensive
E.M.C OF JEFFERSONVILLE
14
Page
I Close Date:
W.O. #: 9800392
4/30/98
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/7/98
Completion Date: 4/30/98
Delay Description:
Equipment #: Inspection
Description: Sewer inspections
Comments: PLEASE CLEAN AND TV MAIN AT OLD STONERS PLACE, WE WILL MEET MAYOR TUESDAY 4/7198
THERE.
TV SEWER MAIN IN OLD STONERS PLACE
0.00
0.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
TV
1.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
KW
KJ
0.00
17.00
4/9/98
10:08:29
I Close Date:
W.O.#: 9800395
4/30/98
TV SEWER LINE ON SUNSHINE,BLUEGRASS, STARV1EW, THAt IS l.JNDERSTRE:ET.
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/3/98
Completion Date: 4/30/98
Delay Description:
Equipment #: TELEIVISING
Description: SEWER LINES TV
Comments: PLEASE TV ANY SEWER LINES THAT RUNS UNDER ANY OF THESE STREETS, SUNSHINE,
BLUEGRASS, STARV1EW. CHECK FOR CONDITION OF MAIN, IF BAD IT CAN BE FIXED BEFORE
PAVING.
0.00
0.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
TV
1.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
BOB MILLER
KJ
0.00
19.00
4/17/98
10:07:39
r-
[
t .'
r-
i
i
[
r'
r
f
~
r
i
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
13
Page
I Close Date: 4/29/98
REPLACE PIG TAIL ON TV CAMERA
W.O. #:9800565
;;.\:
I
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/1/98
Completion Date: 4/29/98
Delay Description:
Equipment #: TELEIVISING
Description: SEWER LINES TV
Comments: REPLACED PIG TAIL 4 TIME ON TV CAMERA THIS MONTH. COMPANY SENT 4 MORE FOR ARE
SiOCK.
0.00
4.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Schad Finish Date:
Completion Time:
Down Time:
Employee #
Name
MA
MIKE ARMS
REPAIR
1.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
KW
MA
4.00
20.00
09:37:00
Date
Reg HOlJrS
OT Hours
.-, ... ...
5/12/98
4.00
I Close Date:
W.O. #: 9800356
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/1/98
Completion Date: 4/30/98
Delay Description:
Equipment #: TELEIVISING
Description: SEWER LINES TV
Comments: PLEASE TV LINE BETWEEN HOUSES, FROM MH26 TO MH49, VICTOR SAID HOME-OWNER THANKS
MAIN IS BAD CAUSING DRIVE TO CAVE IN.
2043/2045 CARDINAL.
4/30/98
TV LINE BETWEEN HOUSES ON CARDINAL
MH 26 TO MH49
0.00
0.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
TV
1.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
KW
KJ
0.00
21.00
4/9/98
10:11:48
-I
11
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
12
Page
I Close Date:
W.O. #: 9800482
4/24/98
it; SERVICE VACTOR TRUCK
L
l
m
i I,j
r
it.
, \".,j
r
t_~
[J
fl
~cc..I,
[J
E
E
(
IT'
r
t
0.00
6.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/23/98
Completion Date: 4/24/98
Delay Description:
Equipment #: 4VEHICLE09 Down Time:
Description: 1989 FORD F-800 JET TRUCK #4459
Comments: PLEASE SERVICE VACTOR TRUCK.
JET TRUCK
1.00
KW
RL
6.00
4/23/98
09:45:56
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 2.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
GREASED ALL FITTING, CHECKED OIL, COOLANT AND TRANSMISSION.
CLEANED INSIDE AND OUTSIDE OF TRUCK.
Employee '#
RL
Name
ROBERT LUNEY
Date
Reg Hours
or Hours
6.00
REPAIR
1.00
KW
MA
3.00
09:36:49
Date
5/6/98
I Close Da.te:
W.O. #: 9800566
4/28/98
CHECK OUT #2 PUMP AT LOUISE ST
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/28/98
Completion Date: 4/28/98
Delay Description:
Equipment #: 5LOU1SE ST.
Description :
Comments:
Wo. Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
0.00
3.00
0.00
Down Time:
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
1.00
N
Employee #
Name
PULLED AND UNSTOPPED #2 PUMP LOTS OF PAPER TOWELS IN IT.
Reg Hours
OT Hours
DG
MA
DONNIE GRIFFIN
MIKE ARMS
1.50
1.50
5/12/98
5/12/98
r:
t
<-
ti
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
11
Page
4/23/98
I Close Date:
PUT #2 PUMP BACK IN AT CRUMS 1
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/23/98
Completion Date: 4/23/98
Delay Description:
Equipment #: 5CRUMS LANE t
Description:
Comments:
0.00
2.00
0.00
W.O. #: 9800560
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
REPAIR
1.00
'r0N
MA
2.00
09:37:45
Employee #
Name
PUT #2 PUMP BACK INITS OKNOW 6482.37.HOURS
Date
2.00
HERSHEL HAMBY &1V98
HH
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 1.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Reg Hours
OT Hours
4/24/98 W.O. #: 9800481
r
f LOCATE TAP FOR CARETAKER BUILDING AT EIGHT AND GRAHAM
t '
...-
!
r
>I
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/23/98
Completion Date: 4/24/98
Delay Description:
Equipment #: Inspection
Description: Sewer inspections
Comments: PLEASE LOCATE TAP FOR CARETAKER BUILDING AT EIGHT AND GRAHAM IN CEMETERY
BY DYE TEST OR TVING. FOR BOB GOLDMAN.
I Close DatE!:
0.00
1.40
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
LATERIAL GOES TO MH IN STREET.
Name
Employee #
DG
HH
PROJECT
1.00
KW
KJ
1.40
4/30/98
09:46:06
Date
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
2.00
N
Reg Hours
OT Hours
0.70
0.70
DONNIE GRIFFIN
HERSHEL HAMBY
5/12/98
5/12/98
,......
r
L
r
r
t.c~
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
10
Page
I Close Date:
W.O. #: 9800476
4/20/98
PUT TEMPERARY FLOW RECORDER IN AT RAS STATION TAKE OUT OF RIVER PORT 2.
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/20/98
Completion Date: 4/20/98
Delay Description:
Equipment#: 1RASSTATION
Description: RAS PUMP STATION
Comments:
Wo Type: PROJECT
Priority: 1.00
Ext.:
Assigned By: KW
Assigned To: MA
Total Labor Hrs: 0.00
Request Time:
Sched Finish Date: 4/20/98
Completion Time: 09:46:43
0.00
0.00
0.00
Down Time:
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 1.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
PLEASE TAKE FLOW RECORDER OUT OF RIVER PORT #2 AND PUT IN AT RAS STATION.
FLOW METER NOT WORKING IN SHOP.
I Close Date:
W.O. #: . 9800564
I
4/22/98.
PUll #2 PUMP AND GET IT REBUILT AT SPRI NG STREET
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/8/98
Completion Date: 4/22/98
Delay Description:
Equipment #: 5SPRING STREET
Description:
Comments:
REPAIR
1.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
0.00
8.00
0.00
KW
MA
8.00
09:37:09
Down Time:
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
11.00
N
Employee #
Date
PULLED #2 PUMP AND HAD SPENCERS TO REBUILD. 16846.2 HOURS
OTHours
Name
Reg Hours
HH
MA
HERSHEL HAMBY
MIKE ARMS
5/12/98
5/12/98
4.00
4.00
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
9
Page
I Close Date: .
W.O. #: 9800451
4/20/98
PULL #2 PUMP AT CRUMS #1 STATION
r
t
I
t.
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/20/98
Completion Date: 4/20/98
Delay Description:
Equipment #: 5CRUMS LANE I
Description :
Comments:
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total LaborHrs:
Request Time:
Schad Finish Date:
Completion Time:
0.00
9.00
0.00
Down Time:
r
I
,
(
REPAIR
1.00
KW
KJ
9.00
4/20/98
09:55:30
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
1.00
N
PULL #1 PUMP AT CRUMS STATION #1 TAKE TO SPENCERS TO BE FIXED.
Employee #
Name
PULL #2 PUMP AND SENT TO SPENCERS TO REBUILD. AND PUT BACK IN.OK NOW.
OTfJours
DG
KJ
MA
DONNIE GRIFFIN
KENNETH S. JAMES
MIKE ARMS
Date
Reg Hours
5/12/98
5/12/98
5/12/98
3.00
3.00
3.00
I Close Da~:
W.O. #: 9800475
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/20/98
Completion Date: 4/20/98
Delay Description:
Equipment #: 1SAMPLERFINAL 1
Description: FINAL EFFLUENT SAMPLER
Comments: PLEASE CHECK EFFLUENT SAMPLER MOTOR DRIVE.
4/20/98
CHECK EFFLUENT SAMPLER MOTOR DRIVE
0.00
1.50
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
REPAIR
1.00
KW
OM
1.50
4/20/98
09:46:53
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 1.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Employee # .
Name
REPLACED MOTOR WITH A REBUILT ONE WE HAD INSTOCK SENT OLD ONE OUT FOR REPAIRS.
OT Hours
DM
DANNY MILES
r
i
'.
Date
Reg Hours
1.50
4/20/98
r
i
~.."""
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
Page
8
5/13/98
I Close Date:
I
4/17/98
W.O. #: . 9800527
CUT ROOTS OUT OF SEWER MAIN IN EASTGATE BETWEENMH#105 AND MH#106
[
JET TRUCK
1.00
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/17/98
Completion Date: 4/17/98
Delay Description:
Equipment #: JET TRUCK
Description: FOOTAGE CLEANED
Comments: CUT OUT ROOTS FROM MAIN.OK NOW. CLEANED 320'.
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
KW
RL
1.00
0.00
1.00
0.00
1.00
4/17/98
09:40:14
N
~
L
Down Time:
Employee #
Reg Hours .
or Houts
Name .
Date
[
RL
ROBERT LUNEY
4/18/98 W.O. #: 9800480
5/6/98
1.00
I Close Date:
r CLEAN CATCH BASIN IN DOWN TOWN AREA
t
L
CB
1.00
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/18/98
Completion Date: 4/18/98
Delay Description:
Equipment#: CATCHBASIN
Description: GENERAL
Comments: PLEASE CLEAN CATCH BASIN IN DOWN TOWN AREA.
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 0.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
r
L
ST
HH
0.00
0.00
0.00
0.00
4/18/98
09:46: 14
Down Time:
[
r
,
L.,
I
G
r
l.<
,.....
L~
r
i
t;.._-",
r
l~
r--
I
1
L~
r
t ..,
,....
L
r
l ,
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
7
Page
.1 Close Date:
CHECK OUT #2 MOTOR
W.O.#: 9800561
4/15/98
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 3/30/98
Completion Date: 4/15/98
Delay Description:
Equipment #: 5CEDARVIEW
Description:
Comments:
0.00
7.50
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
REPAIR
1.00
KW
MA
7.50
09:37:36
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 12.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Employee #
REPLACED MOTOR AND SPACERS, GOT PUMP FROM DERBY.
Named Date
Reg Hours .". OT Hours
DG
MA
DONNIE GRIFFIN
MIKE ARMS
5/12/98
5/12/98
2.00
5.50
I Close Date:
W.O. #:9800394
4/17/98
TV SEWER MAIN ON INDUSTRIAL PARKWAY THAT IS UNDER STREET.
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/3/98
Completion Date: 4/17/98
Delay Description:
Equipment #: THEIVISING
Description: SEWER LINES TV
Comments: PLEASE TV ANY SEWER LINE THAT RUNS UNDER INDUSTRIAL PARKWAY, CHECK FOR CONDITION
OF MAIN SO IF BAD CAN BE FIXED BEFORE PAVING.
0.00
8.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time: .
TV
1.00
BOB MILLER
KJ
8.00
4/17/98
10:07:54
CLEANED ALL LINES UNDER INDUSTRIAL PARKWAY
FROM MH# 309 460'
FROM MH# 84 300'
FROM MH# 84 350'
FROM MH# 94 320'
FROM MH# 147 670'
Employee #
TOTAL CLEANED 2100'
Name
RL
ROBERT LUNEY
Date
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
11.00
N
Reg Hours
OT Hours
8.00
5/6/98
r
I
!
\.."
r
I
~---
r
,
I
L.....
r-
,
,
t
r
!'
l
r-
t ~
r-
I
f
,-
t
t .
r
L ;
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
6
Page
I Close Date:
W.O.#: 9800406
I
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/13/98
Completion Date: 4/14/98
Delay Description:
Equipment #: 1 RAS1 Down Time:
Description: RETURN ACTIVATED SLUDGE PUMP #1
Comments: PLEASE CHANGE OIL IN ALL PUMPS AT RAS STATION. NOT THE ONE THAT IS ALREADY OUT.
4/14/98
CHANGE OIL ON ALL RAS PUMPS
0.00
8.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
PROJECT
1.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
KW
DM
8.00
2.00
4/17/98
10:04:11
#1 PUMP IN BAD SHAPE SHORTED OUT, IMPELLER BAD WORE OUT NOT GETTING FIXED.
#2 PUMP AND BAD WIRING, SEAL FAILURE, VERY BAD IMPELLER. SENT TO SPENCERS TO GET
FIXED. FIXED WIRING AND REPLACED SEALS, PUT ON NEW IMPELLER BUT HAD IT TRIMMED DOWN
TO MEET PUMP CURVE. PUT BACK IN.
DIDN'T PULL #3 AND #4 PUMP.
SCOTT IS GETTING PRICES ON NEW PUMPS FOR THIS STATION.
Employee # ....
Name
DG
OM
KJ
DONNIE GRIFFIN
DANNY MILES
KENNETH S. JAMES
Date
Reg fiours
ot Hours
5/12/98
5/12/98
5/12/98
3.00
3.00
2.00
Equipment #: 1 RAS2 Down Time:
Description: RETURN ACTIVATED SLUDGE PUMP #2
Comments:
Equipment #: 1 RAS3 Down Time:
Description: RETURN ACTIVATED SLUDGE PUMP #3
Comments:
Equipment #: 1 RAS4 Down Time:
Description: RETURN ACTIVATED SLUDGE PUMP #4
Comments:
r
! ~
n
I '
rJ
r"'
I
I
(
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
5
Page
I Close Date:
W.O. #: 9800477
4/10/98
PFAU HAD SPILL OF Oil AND GREASE IN 10TH WETWELl
Task#:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/9/98
Completion Date: 4/10/98
Delay Description:
Equipment #: 5TENTH ST.
Description:
Comments:
0.00
0.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
PROJECT
1.00
KW
KJ
0.00
4/10/98
09:46:34
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
2.00
N
Employee #
DG
KJ
Name
PLEASE STAY AND OVER SEE THE CLEANING OF WETWEll BY PHAU AND CONTRACTOR.
bfHours
DONNIE GRIFFIN
KENNETH S. JAMES
Date
Reg Hours
I Close Date:
W.O. #: 9800403
4/14/98
Install pressure gauges on 10th street and RAS
Task #:
Originator:
Phone:
Down Time: 0.00
Emp. Hours: 1.00
Vendor Hours: 0.00
Request Date: 4/7/98
Sched Start Date: 4/8/98
Completion Date: 4/14/98
Delay Description:
Equipment #: 1 RASST A TION
Description: RAS PUMP STATION
Comments: TAPPED AND PUT IN PSI GAUGE
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
Employee #
MA
Name
MIKE ARMS
PROJECT
1.00
ST
MA
1.00
4/10/98
10:04:23
Date
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 5.00
Response Days: 6
Response Hrs: 0
Response Mins: 0
Perf By Warranty: N
Reg Hours
OT Hours
1.00
5/12/98
Equipment #:
Description:
Comments:
5TENTH S1.
Down Time:
Install pressure gauges on the suction and the discharge line at the RAS station and at 10th street lift stati<:ln.
This is so I can determine the actual TDH of both stations so the pumps can be brought back into pump
curve. Get with me to determine the exact location on the lines.
r
,
f
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
4
Page
I Close Date:
W.O. #: 9800563
4/8/98
.r PULL #1 PUMP AND GET REBUILT
r
t.._"
r:
I
r-
i
r
,.-
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/7/98
Completion Date: 4/8/98
Delay Description:
Equipment #: 5SPRING STREET
Description:
Comments:
0.00
3.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
REPAIR
1.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 2.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
KW
MA
3.00
09:37:18
Name
PULLED #1 PUMP AND HAD SPENCERS TO REBUILD.
OTHourS
Employee #
DG
MA
Date
Reg Hours
DONNIE GRIFFIN 5/12/98
MIKE ARMS 5/12/98
1.50
1.50
I Close Date:
4/9/98 W.O. #: 9800357'
I
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/1/98
Completion Date: 4/9/98
Delay Description:
Equipmi:mt #: TELEIVISING
Description: SEWER LINES TV
Comments: PLEASE TV ALL SEWER MAINS IN EASTGATE AREA, LOOK FOR PAVED OVER MH AND BROKEN
SEWER MAIN. FOR MAYOR AND BOB MILLER.
TV ALL SEWER MAINS INEASTGATE,
0.00
32.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
TV
1.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
KW
KJ
32.00
7.00
4/9/98
10:11:13
WE TV 95% OF EASTGA TE,
3 MH ARE COVERED GAVE WORK ORDER TO BOB MILLER TO UNCOVER MH 113,115,116.
ON BRAIN BELL IN MAIN LEAKING 230' FROM MH #108.
ON DOUGLAS MAIN IS BADLY BROKEN 91'FROM MH #109.
ON DOUGLAS MAIN HAS BAD CRACK 160' FROM MH #109.
ON DOUGLAS MAIN HAS BAD CRACK 586' FROM MH #109.
ON SHERMAN MAIN HAS A BAD TAP 171' FROM MH #112.
ON MCAUTHUR MAIN HAS ROOTS 41' FROM MH #105. WE CUT OUT.
ON MC AUTHUR MAIN HAS BAD TAP 43' FROM MH #104.
SHOWED TAPE TO BOB MILLER HE TO LET MAYOR KNOW ABOUT THESE PROBLEM AREAS.
Employee #
Name
DG
KJ
DONNIE GRIFFIN
KENNETH S. JAMES
Date
Reg Hours
OT Hours
4/9/98
4/9/98
16.00
16.00
r
r
r
,
~
r,
I '
!
",
,.-
f
,
(
r
~
L
r
l
r-
[
t
r
5/13198
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
3
Page
. 416198
I Close Date:
CHECK OUT PUMPS AT MAGNOLIA
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/6/98
Completion Date: 4/6/98
Delay Description:
Equipment #: 5MAGNOUA ST
Description:
Comments:
0.00
2.00
0.00
W.O. #:9800568
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
REPAIR
1.00
KW
MA
2.00
09:36:31
Employee #
Name
PULLED AND UNSTOPPED #2 PUMP FULL OF RAGS.
Date
1.00
1.00
HH
MA
HERSHEL HAMBY
MIKE ARMS
4/7/98
I Close Date:
CLEAN CATCH BASIN IN DOWN TOWN AREA.
W.O. #: 9800479
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 417/98
Completion Date: 417198
Delay Description:
Equipment #: CATCHBASIN
Description: GENERAL
Comments: PLEASE CLEAN CATCH BASIN IN DOWN TOWN AREA.
0.00
0.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
5/12198
5/12198
CB
1.00
ST
DG
0.00
4/7198
09:46:24
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 1.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Reg HOllrsOTHours
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 1.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
r
~
L
r-.
l
w
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
Page
2
I Close Date:
4/3/98
W.O. #: 9800360
WELD PLATE OVER HOLE ON #2 BLOWER DISCHARGE TANK.
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
3.00
N
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/1/98
Completion Date: 4/3/98
Delay Description:
Equipment #: 1 BLOWER2
Description: BLOWER #2
Comments: PLEASE WElD PLATE OVER HOLE ON DISCHARGE TANK ON # 2 BLOWER.
Employee"
MA
0.00
1.70
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
REPAIR
1.00
Reg Hours
1.70
OTHours
KW
MA
1.70
4/9/98
10:11:04
Down Time:
JOB DONE OK NOW.
Name
Date"
MIKE ARMS
5/12/98
I Close Date:.
CHECK #2 PUMP AT RIVER PORT 1
4/6/98
W.O.#: '9800562
0.00
6.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
REPAIR
1.00
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/6/98
Completion Date: 4/6/98
Delay Description:
Equipment #: 5RIVERPORT I
Description:
Comments:
KW
MA
6.00
09:37:26
Down Time:
PULLED #2 PUMP IT OK. REPLACED CONTACTS OK NOW.
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 1.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
r Employee # Name Date Reg Hours OT Hours
i
i HH HERSHEL HAMBY 5/12/98 3.00
MA MIKE ARMS 5/12/98 3.00
r
,
.
l .'
".......
I
l
t...
n
L.:
r:
, ,
L~
fl
L-J
r-
I
L,
r
r
i
,
r-
1
~
L,
5/13/98
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
1
Page
I Close Date:
W.O. #: 9800358
4/1/98
CHECK MH ON INDUSTRIAL PKW, SUNSHINE BLUEGRASS, STARVIEW,
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/1/98
Completion Date: 4/1/98
Delay Description:
Equipment #: Inspection
Description: Sewer inspections
Comments: CHECK AND MAKE SURE ALL MH ARE AT GRADE LEVEL AND NOT BURIED.
INDUSTRIAL PARKWAY, SUNSHINE, BLUEGRASS (FROM 1106 TO HAMBURG PIKE)
STARVIEW (FROM 3004 TO BLUEGRASS).
0.00
1.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
PROJECT
1.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
KW
HH
1.00
1.00
4/1/98
15:25:07
ALL MH ARE COUNTED FOR, TWO IN STREET ON INDUSTRIAL PARKWAY THE REST ARE IN
EASEMENT AREA.
Employee #
HH
N;:une
HERSHEL HAMBY
Date
Regfiouts .....
.OTHours
I Close Date:
REWELD HOLE IN BLOWER TANK
W.O. #: 9800569
4/1/98
1.00
4/2/98
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date: 4/2/98
Completion Date: 4/2/98
Delay Description:
Equipment #: 1 BLOWER2
Description: BLOWER #2
Comments: REWELDED HOLE IN #2 BLOWER TANK.
0.00
1.50
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
Down Time:
Employee #
MA
Name
MIKE ARMS
REPAIR
1.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration: 1.00
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
KW
MA
1.50
09:36:21
Date
Reg Hours
OT Hours
5/12/98
1.50
5/13/98
Select Record Criteria
Page
1
Field Label
SelectionCriteria1 MoreCriteria2
MoreCriteria3
MoreCriteria4 MoreCriteria5 SortPriority
SortOrder
>= Completion Date 4/01/98
<= Completion Date 4/30/98
Wo#
Task #
Work Order Type CB
Expense Class
Reason For Outage
Equipment #
Cost Center
General Ledger #
Department
Down Time
Eq Type
Craft
Employee Code
Vendor 10
Item #
4/01/98
4/30/98
4/01/98
4/30/98
4/01/98
4/30/98
4/01/98
4/30/98
JET TRUCK
PROJECT
REPAIR
TV
L~__
Attachment F
Maintenance & Repair Expenditures
[
Jeffersonville Wastewater Treatment Facility
Maintenance & Repair Expenditures
Page 1
P.O. Date
Vendor
Description
Amount
4/6/98 HEUSER HARDWARE FRAMING SQUARE $10.99
4/6/98 HOME QUARTERS TOOLS FOR PLANT $384.04
4/6/98 JACKSON - JENNINGS TOOLS (PINCH BAR) $26.20
4/6/98 NAPA AUTO SOCKET HOLDERS FOR NEW SOCKET $14.68
SETS
4/6/98 OFFICE DEPOT CHAIR FOR ADMINISTRATIVE $209.99
ASSISTANT
4/6/98 OFFICE DEPOT PLANT SUPPLIES $18.89
4/6/98 RADIOS HACK GENDER CHANGER FOR COMPUTER $6.29
n 4/6/98 SIGN DESIGNS VINYL LETTERING FOR CITY VEHICLES $96.00
L · 4/6/98 YSr INC. DO METER PROBE $532.20
r 4/6/98 HEUSER HARDWARE SUPPLIES FOR PLANT $33.14
L 4/6/98 DERBY CITY ELECTRIC REPAIR DAYTON MOTOR AT SUNSET L.S. $97.70
4/6/98 DERBY CITY ELECTRIC REPAIR STERLING MOTOR AT SUNSET L. $99.82
S.
4/6/98 NEILL LA VIELLE STAINLESS STEEL BOLTS FOR SPRING $1l7.91
STREET
4/6/98 NEILL LA VIELLE SUPPLIES FOR PUMP NO. I AT SPRING $81.03
STREET
[ 4/6/98 NEILL LA VIELLE SUPPLIES TO INSTALL PUMP NO. I AT $33.39
SPRING STREET
4/6/98 SPENCER MACHINE SPACERS AND PLASTIC WASHER SEALS $129.39
C FOR PUMPS
4/9/98 CONTRACTORS SAFETY FLAGS, PAINT AND DYE $95.13
4/9/98 HEUSER HARDWARE SUPPLIES FOR SPRING STREET PUMP $4.20
[ NO.1
4/16/98 HOME QUARTERS CIRCULAR SAW FOR PLANT $62.90
4/16/98 W ALGREENS PHOTO DEVELOPING $10.70
4/16/98 HEUSER HARDWARE SUPPLIES FOR PLANT $31.34
I 4/16/98 HEUSER HARDWARE HOSE ENDS AND NOZZLES FOR 10TH $5.76
STREET '
4/16/98 FALLS CITY ELECTRIC SUPPLIES TO REPAIR NO.3 PUMP AT $23.00
r- 10TH STREET
l" 4/16/98 FALLS CITY ELECTRIC SUPPLIES TO REPAIR NO.3 PUMP AT $262.40
10TH STREET
r 4/23/98 B&R RUBBER & SUPPLY TUBING FOR THE EFFLUENT AND $40.11
, INFLUENT/RAIN SUIT FOR BC
L"
r
L
- -------...------------------
P.O. Date
Vendor
Jeffersonville Wastewater Treatment Facility
Maintenance & Repair Expenditures
Description
Page 2
Amount
4/23/98 EARTH FIRST MULCH FOR PLANT $27.56
4/23/98 GENERAL AUTO ANTI-FREEZE FOR VEHICLES $32.94
4/23/98 HEUSER HARDWARE BOLTS FOR PENN VALLEY PUMP IN $1.14
PRESS ROOM
4/23/98 WALNUT RIDGE PLANTS & POTTING SOIL FOR PLANT $62.44
4/23/98 ZEP CHAIN LUBRICANT $27.45
4/23/98 HARRINGTON SUPPLIES FOR PLANT $41.11
4/23/98 DERBY CITY ELECTRIC CEDARVIEW LIFT STATION REPAIRS $185.38
4/23/98 FALLS CITY ELECTRIC STARTER FOR CEDARVIEW $35.48
4/30/98 ACE HARDWARE TRIMMER LINE FOR WEED EATER $16.79
4/30/98 B&R RUBBER & SUPPLY GLOVES FOR PLANT $124.69
4/30/98 EARTH FIRST MULCH FOR PLANT $27.56
4/30/98 HEUSER HARDWARE MISe. PLANT SUPPLIES $4.61
4/30/98 HEUSER HARDWARE MISe. PLANT SUPPLIES $5.36
[ 4/30/98 HEUSER HARDWARE MISe. PLANT SUPPLIES $23.69
4/30/98 HEUSER HARDWARE SAW BLADES FOR CONVEYOR $5.15
D 4/30/98 OFFICE DEPOT PLANT SUPPLIES $46.87
. .
'4/30198 UPS SHIPPING CHARGES FOR PLANT $29.00
4/30/98 WALNUT RIDGE MULCH FOR PLANT $36.75
4/30/98 WALNUT RIDGE PLANTS & FLOWERS FOR PLANT $77.69
n 4/30/98 ZEP ELECTRICAL CONTACT CLEANER $274.43
U
4/30/98 ALBERT B. CRUSH MATERIALS NEED TO REPAIR PIPE $217.47
r WORK AT PROCESS WATER STATION
C 4/30/98 LIL ENGINE SALES & SVe. REPAIR BUNTON MOWER $139.66
I; ;
4/30/98 LIL ENGINE SALES & SVe. REPAIR WEED EATER $27.65
. 4/30/98 SPENCER MACHINE BRUSHES FOR RAGIBAR SCREEN $685.68
r 4/30/98 WATERLINK REPLACEMENT FILTER FOR THE $81.02
I PROCESS WATER PUMPS
f
\.uj $8.13
4/30/98 FALLS CITY ELECTRIC SUPPILES TO INSTALL NO 2 PUMP AT
r SPRING STREET
i 4/30/98 FALLS CITY ELECTRIC SUPPLIES FOR LIFT STATIONS $52.24
,
6_
r
U
r
I
f
\
r
u
n. '
.. ~
i i
1"..1
fi
lJ
,.....
~
~...4
,.-.
r
l
r
~
l
i
,,-,.~
P.O. Date
4/30/98
4/30/98
4/30/98
Vendor
SPENCER MACHINE
MCMASTER-CARR
MCMASTER-CARR
J effersonvilIe Wastewater Treatlnent Facility
Maintenance & Repair Expenditures
Page 3
Description
Amount
VALVE SOCKETS
$187.65
$204.89
$461.61
CHAIN TO REPAIR C$O GA YES
CHAIN TO REPAIR CSO GATES
Total 5,579.29
Attachment G
Repair & Replacement Expenditures
I
Jeffersonville Wastewater Treatment Facility
Repair & Replacement Expenditures
Page 1
P.O. Date
Vendor
Description
Amount
4/6/98 DERBY CITY ELECTRIC (project #96026) CABLE FOR REBUILDING $109.02
10TH STREET
4/6/98 SPENCER MACHINE (Project #97063) REPAIR SPRING STREET $2,128.64
r--, PUMP NO.1
4/6/98 SWITCHING SYSTEMS (Project #97062) SWITCH GEAR FOR MILL $1,000.00
CREEK (DEDUCTIBLE)
4/16/98 SPENCER MACHINE (Project #96029) PUMP #3 AT 10TH $1,000.00
STREET (DEDUCTIBLE)
4/23/98 MAC'S WELDING, INC. (project #97059) WELDING THE FLANGE $816.00
ON THE GRIT PUMP
4/23/98 SPENCER MACHINE (project #97064) REPAIR OF PUMP #2 AT $8,066.64
RAS STATION & CREDIT FORDED. ON
10TH
r
,
r
~
l :
r
l '
r
!
~ )
r-
Total 13,120.30
(
-
r-'
1;.""",
L~
1996-1997 Repair & Replacement
Wastewater Treatment Facility I
Estimated Actual %
i
I
2 Replace Carpet at Main Office Building (project No. $2,250 0% I
!
96009) I
1 Replace Steering Valve on Belt Press (project No. 97049) $2,500 $2,898.23 100% I
1 Repair #2 Non-Potable Water Pump (project No. 97038) $1,600 $1,643.00 100% !
2 Seal Driveway (project No." 97007) $4,500 $4,500.00 100% I
1 Belt Replacement on Dewatering Press (project No. $3,000 $ 796.50 100%
97001)
1 Replace Riding Mower (project No. 97002) $8,500 0%
1 Ethernet Cable to Network Lab to Operations (project No. $40,000 $125.15 5%
96014)
..tll. ~~ ~~ .",ll."iIlll\,
1 Surge Protection System (project #97053) $3,100 $6,863.82 100%
1 Installation of Hose Racks at Facility (project No. 97055) $1,500 $1,077.00 100%
-- ,~_,""'...O<_
1 Vertical Mixers and Electrical Breaker (project No. 97052) $3,500 $3,508.77 100%
1 Replace D.O. Probe in Laboratory (project No. 97051) $5,972 $8,227.01 100%
," "- ,".-. '"
1 10" Check Valve for Blower Room (project No. 97060 $650 $607.81 100%
1 Replace 2 Radios (project No. 97058) $1,500 $1,507.80 100%
-
1 Painting of Iron Works at Final Clarifiers (project No. $16,000 0%
97001)
"" " -
Total Expenditures for Treatment Facility $94,572 $31,755.09
w. #-. . ...'" ,w' """'", ,- .."'. '";""""""''''''..''''''''~",","'''""'<_,"",., ......."."Jw_-<;-,"'''''....,~'''...,.;".".i."'''''',,'''''"^
Lift Stations
1 Electrical wiring and related components to phase I alarm $5,500 $9,341.06 100%
system upgrade. (Project No. 96002)
1 Repair # 1 Pump at Louis Street (project No. 97034) $2,000 $2,255.00 100%
2 Replace Electrical Breakersat Crums Lane I (project No. $ 7 ,500 $2,225.24 100%
97022)
--- -
1 Sunset Mobile Home Park, Seal Wetwell, Upgrade $3,500 0%
Electrical Systems, Replace Door and Roof. (project No.
96006) (**Investigation is taking place at this time for
removal of L.S. to gravity flow).
I
I
I
I
I
I
I
I
I
I
I
r.
t I
r-
I
I
, I
Le..
1
I
I
r
!
le.")
$1,500 0%
$3,000 0%
$3,500 $1,721.14 100%
$2,500 $1,414.00 100%
.. -- -~
$50,000 $1,712.52 15%
.,.,.,--
$20,000 $49,786.12 100%
Lift Stations
Move Weather Head at Crums Lane No. I (project No.
96007)
Painting of Interior Piping and repair of Mechanical Hoist
System at Spring Street (project No. 97027)
Replace 3" portable trash pump (project No. 97014)
Replace 2" trash pump (project No. 97015)
Repair #2 pump at Camp Powers L.S. (project No. 97019)
Trouble Shoot and Repair #5 pump at 10th Street Lift
Station (project No. 96029)
Repair #5 Pump at 10th Street Lift Station (project No.
96029)
.. $6~~J$~,559.87
$2,000 $2,691.02
Rebuild Grit Pump and Replace Mechanical Seal (project
No. 97059
Switch Gear for Mill Creek (deductible) (project No.
97062
$1,000
$1,000.00
Cable for Rebuilding 10th Street (project No. 96026)
$110
$109.02
100%
100%
100%
100%
Repair Pump #1 at Spring Street (project No. 97063)
Resurface Crums Lane II (project No. 98014)
$2,200 $2,128.64 100%
. $;0,0001 $1,000.00 10%
';;;:::"_'"""0 ,_.,"""*",,,,,u.' "","'.....:';; "''''H;'''''';,'''';;'''':;'''~'___:'''';';''';'""'';'';'';''''''''C.;~..,.,;;,,;,':.
$130,910 $68,122.33
Total Expenditures for Lift Stations
'.
Vehicles
, -
_~_~=_-~=~]..!t::~d]~~_~~l
Replace hose to Jet Truck & purchase new nozzles (project $3,000 $3,182.82
No. 970 17)
~ __ _._~~,_~_'_,~.~._., >-"''''_...~,.,_.",...,~w''. ...w.. ,,,,....... ...~"._..."~>_~_. '-~"" , '" ....,.... _'_~.h.
Motor Control for Sewer Camera (project No. 97056) $1,200 $2,522.55
...
Repair No.2 pump at Ewing Lane (project No. 97037) $1,000 $1,088.54
-~. .-
Replace 1986 Chevy Van (project No. 97035) $19,000
Total Expenmtures for Vehicl~ -.. . . . _ ." .. .$242~I ~$~,~93..9............1...
o "".'-WAL- -$2";9,6821$106,671.3
%
100%
100%
100%
0%
.
Attachment H
Capital Improvement Expenditures
1996-1997 Capital Improvement Expenditures
r
-
Wastewater Treatment Facility
Priority Description Estimated Actual %
1 Repair #3 Final Clarifier Drain Valve (project No. $20,000 10%
97005)
- "-
I Replace Digester A ir Distribution Line (project $60,000 10%
No. 97004)
- . -'
1 Fall Protection Equipment (project No. 97036) $2,500 $2,185 100%
-,
2 Pad for 20 yd. Roll off dumpster (project No. $2,000 $750 100%
97008)
2 Valve Actuators - 10 (project No. 96026) $35,000 0%
Total Expenditures for Wastewater Facility $119,500 $2,935
Collection System
2 6" Portable Pump (project No. 97020) $12,000 0%
2 60 KW Mercy Generator for Lift Stations (project $25,000 0%
No. 97030)
1 Alarm System Upgrade Phase II (project No. $56,300 0%
97013)
1 Combined Sewer Overflow Sign Posting (project $1,000 $1,000 100%
No. 97038)
1 Portable Flow Meter & Sampler (project No. $7,000 $ 7 ,243 100%
97032)
1 Repair Line on East Gardner Drive (project No. $1,500 $1,200 100%
, , 97039)
1 Install Manhole on Ridgeway Drive (project No. $1,000 0%
97042)
1 Install Manhole on Morris Avenue (project No. $1,000 0%
97040)
. "'
1 Repair Line on Charlestown Avenue $60,000 0%
U' ,_ .,,,, '''''~'''' ,......,"'...,,""',0',"".,'""........,.",,"''''''''
Total Expenditures for Collection System $164,800 $9,443
r-
I
Li
r:
[
r
n
t
---"~~
Attachment I
Safety Inspection Report
r-
r
,.
,.......
t
l ;
ENVIRONMENTAL MANAGEMENT CORPORATION
MONTHLY SAFETY INSPECTION
CHECKOFF SHEET
JEFFERSONVILLE W ASTEW ATER TREATMENT FACILITY
701 CHAMPION ROAD
JEFFERSbNVILLE, IN 47130
(812) 285-6451
!
PERSON COMPLETING INSPECTION:
Wavmon Pavne
April 23. 1998
I. Personnel Safety
A. Personal Protective Clothing
1. Safety Helmets Provided
(for Personnel & Visitors)..................................
2. Hearing Protection
(for High Noise Areas)..........~............................
3. Eye Protection - Goggles, etc.
(for Personnel & Visitors)..................................
4. Gloves
(for Personnel)............ ............ ........ ...................
5. Rubber Boots with Steel Toes
(provided for Personnel).....................................
6. Rain Suits Provided
(for Personnel)..... ..............................................
7. Is Respiratory Protection Provided including
ventilators and hoods over high dust areas, dust
masks, etc. (for Personne!)................................
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
B. Safety Devices and Equipment
r-
J
L
[
I
1. Non-sparking Tools in areas where flammable
or explosive gases may be present?.....................
. 2. Oxygen Deficiency, Toxic, & Explosive Gas
indicator.................................... .........................
3. Self-contained Breathing Apparatus for entry
to chlorine room.................................................
4. Confined Space Entry Equipment Available
such as and including Safety Harness, Portable
Wench, Hoist, etc...............................................
5. First Aid Kits with proper & adequate supplies
readily available for any FirstAid Emergency....
Yes
NO
N/A
Yes
NO
N/A
Yes
NO
N/A
Yes
NO
N/A
Yes
NO
N/A
f
!
f!
[~; 6. Traffic Control Cones Available........................ Yes NO N/A
7. Ladders to enter manholes of wet wells
r: (fiberglass or wooden for electrical work)......... Yes NO N/A
,
L 8. Safety Buoys and Life Lines, Life Preservers
at all open structures (02 Ditches, Clarifiers,
Lagoons, etc.......................... ........................... Yes NO N/A
II. General Plant Safety
1. Are Personnel trained in the use and location
of safety equipment at the plant...................... Yes NO N/A
2. Are there railings around all tanks with
'f1 openings chained ofL................................... Yes NO N/A
f 3. Are holes covered? Including all pits & wells,
r
, 1"."",,,,, drains, valve holes, hatch covers in place........ Yes NO N/A
4. Are explosion proof fixtures used where
needed...................................................... ...... Yes NO N/A
5, Are all equipment guards in place? Including
mowing equipment......... ... ... ........... ... ..... ....... Yes NO N/A
r-. 6. Are dry wells ventilated and is ventilation
l
r adequate in all areas....................................... Yes NO N/A
L.. 7. Are emergency numbers posted & accessible.. Yes NO N/A
8. Is proper liquid flammable storage used.......... Yes NO N/A
9. Is general plant cleanliness being practiced?
Including floors (No oil or grease or pools of
water), Storage Areas (No clutter & supplies
stored properly), Chlorine Room (Free of
clutter), Laboratory. ..... ................. .............. ... Yes No N/A
10. Are all walkways, exists and routes, &
stairways clear & unobstructed (No ice, oils,
water, grease, or debris)................................. Yes NO N/A
11. Are all slippery surfaces posted and/or covered
with anti-skid material, including stair treads
and ramps, in good repair and covered with
non-skid surface...... ........................................ Yes NO N/A
12. Are all mats and rugs in good repair so as not
to become tripping hazards............................. Yes NO N/A
13. Are \\'~)fkare~layouts adequate...................... Yes NO N/A
14. Is lighting adequate in all areas (Work areas,
stairways, walkways, etc.).............................. Yes NO N/A
15. Are noise levels within allowable limits or
danger areas posted........................................ Yes NO N/A
16. Are toilet facilities available & clean............... Yes NO N/A
17. Is safe drinking water available....................... Yes NO N/A
18. Is pest control adequate.................................. Yes NO N/A
19. Are all exists properly marked........~................ Yes NO N/A
20. Is inclement weather protection provided at
entrances (mats, safety strips, de-icers, etc.).... Yes NO N/A
[
r
L"
21. Are tripping hazards elhllinated a.t all doors
(threshold plates in good repair, etc.).............. Yes NO N/A
22. Is safety glass provided in all doors................. Yes NO N/A
23. Are handrails provided on stairs (Both sides
if necessary).................... ...... ........... ... .......... Yes NO N/A
24. Are ladders properly anchored....................... Yes NO N/A
25. Are fixed ladders provided with safety cages
or safety side rails......................................... Yes NO N/A
26. Are all elevation differences between floors
clearly defined and properly lighted................ Yes NO N/A
27. Are portable ladders in good condition........... Yes NO N/A
28. Kick boards in place if needed........................ Yes NO N/A
29. No Broken steps............................................ Yes NO N/A
30. Are ashtrays provided and emptied regularly.. Yes NO N/A
31. Are trash cans covered and emptied regularly. Yes NO N/A
32. Are portable hoists for lifting heavy equipment
in good repair................................................. Yes NO N/A
33. Are plant personnel immunized for tetnus....... Yes NO N/A
34. No electrical cords stretched over tanks.......... Yes NO N/A
r 35. No gas leaks.............~..................................... Yes NO N/A
I 36. Fuel supply tank in good condition................. Yes NO N/A
! 37. No excessively hot operating temperature on
r- machinery or equipment................................ Yes NO N/A
W 38. No excessive vibration of machinery or
~
t,,) equipment................................................... . Yes NO N/A
39. No water or oil being "slung" from equipment Yes NO N/A
40. No worn or cracked equipment..................... Yes NO N/A
41. No excessive dust on equipment................... Yes NO N/A
42. Adequate dehumidifier and heaters where
needed......................................................... . Yes NO N/A
43. Emergency Medical Information on all
employees' available for determination of job
assignments...................................... ............ Yes NO N/A
.-- 44. Cross connections have been eliminated
t
L between potable water supply and non-potable
source:
r a. ~ump & Mixer Seals................................. Yes NO N/A
l.~ b. Digester Heating System Makeup Water... Yes NO N/A
c. Vacuum Filter Water Sprays..................... Yes NO N/A
d. Chemical Mixing Tank............................... Yes NO N/A
e. Chlorinator Water Source........................... Yes NO N/A
f. De-Chlorination Water Source.................... Yes NO N/A
g. Yard Hydrants..................... .............. ......... Yes NO N/A
h. Other......................................................... . Yes NO N/A
III. Electrical Safety
r--:
I 1. Is all electrical circuitry enclosed and identified. Yes NO N/A
c"" 2. Is all wiring in good condition.......................... Yes NO N/A
,.......
!
(,..".
r
fj
.lJ 3. Are the number of outlets adequate.................. Yes NO N/A
4. Is equipment properly grounded or insulated.... Yes NO N/A
r; 5. Are extension .cords in good condition and
U used properly..................... .............................. Yes NO N/A
6. Is electrical tesfequipment availa.ble. Such as
voltmeter, ampmeter, etc.........................~....... Yes NO N/A
7. Are dielectric rubber mats presents for
electrical work............ ........ .............. ............. Yes NO N/A
8. All control panel switches in good condition.. Yes NO N/A
I' 9. All control panels unobstructed...................... Yes NO N/A
10. Are dielectric rubber gloves available............. Yes NO N/A
11. Are ground fault interrupters used.................. Yes NO N/A
12. Are warning or caution signs posted............... Yes NO N/A
13. IscontrO,I panel area clean and dry.................. Yes NO N/A
14. Are all needed fuses or breakers in place......... Yes NO N/A
15. Are all contacts clean and dust free................. Yes NO N/A
16. Is there emergency stop buttons on all
machines and equipment................................. Yes NO N/A
17. Are personnel familiar with the electrical safety
such as lock out/tag out procedures................ Yes NO N/A
18. Is power supply locked out/ tagged out on
equipment presently being repaired................. Yes No N/A
IV. Chlorine & Dechlorination Safety
r"
.
1. All standing cylinders chained in place and/or
ton cylinders chocked......................................
2. All personnel rained in the use of CLz..............
3. Appropriate repair kits available......................
4. Chlorine & dechlorination leak detector tied
into the facility alarm system...........................
5. Ventilator fan with outside switch present and
either comes on when door opens or manually
with switch at entrance door...........................
6. Ammonia and Sulphurfor checking chlorine &
dechlorination leaks available..........................
7. Are all safety precautions posted.....................
8. Proper Chlorine wrench available to open
valves;.......................................................... ..
9. Chlorine protected from direct sunlight, cool
and dry............................................. .............
10. No petroleum or other chemicals store in
chlorine room.. ... ................. ..... ... ........... ... .....
11. Spare lead washers available on site................
V. Process Chemical Safety
1. Are personnel trained to handle all chemicals
properly....................................................... ..
r-'
I
L
r
&
, .
r
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes
NO
N/A
2. Is proper safety clothing present for the
chemical to be handled................................... Yes NO N/A
3. Are all containers, vats, and tanks properly
labeled............... ...................... ....................... Yes NO N/A
4. Is employee exposure within accepted limits.... Yes NO N/A
n 5. Are there proper containment of storage areas,
including curbing........................ ................ .... Yes NO N/A
I
+<..."".i 6. Are management & employees aware of the
hazards of the materials being used.................. Yes NO N/A
7. Knows proper response to an accidental spill... Yes NO N/A
8. All MSDS available and easily accessible......... Yes NO N/A
9. Has complied with the 6 employer
responsibilities of the Worker Right to Know
Law? (SARA)................................................. Yes NO N/A
10. Emergency Action Plan on file with local Fire,
Police Departments and appropriate Emergency
Agency............................................ ................ Yes NO N/A
VI. Tools & Equipment
1. Are hand tools in good repair and stored
properly.............................................. ............ Yes No N/A
2. Are power tools stored properly and in good
condition - cords, plugs, etc............................ Yes No N/A
3. Are the tools adequate for the tasks to be
performed...... ..... .:..... ...................................... Yes NO N/A
4. Are defective tools replaced as needed............ Yes NO N/A
5. Are tool guards in place......................~........... Yes NO N/A
6. Are employees trained in the proper use of the
r- various tools they are expected to use............. Yes NO N/A
I 7. Are employees given additional instruction and
l periodic reviews of specialized tools and
equipment........... .................. ........ ................... Yes NO N/A
8. Are proper lifting techniques used by
employees..................... ........... .... ...... ... ........... Yes NO N/A
VII. Fire Safety & Protection
1. Are fire/emergency evacuation plans posted...... Yes NO N/A
2. Are employees familiar with fire/emergency
r evacuation plan.. ... ................H.... .............. ....... Yes NO N/A
L~_, 3. Are there sufficient number and types of fire
extinguishers................................................... . Yes NO N/A
4. Are the fire extinguishers properly located and
identified..................... ..................................... Yes NO N/A
5. Are the fire extinguishers checked annually...... Yes NO N/A
6. Are all of the fire extinguishers in working
condition........................................................ . Yes NO N/A
7. Are employees trained in the proper use of the
extinguishers to be used................................... Yes NO N/A
8. Are smoke detectors in working order............. Yes NO N/A
D
D
. I VIII. Laboratory Safety
,-~:;;J
1. Emergency Eyewash & Shower Station are
present and work properly and tested monthly.. Yes NO N/A
2. Fume hood is present....................................... Yes NO N/A
3. All chemicals safely and properly stored, well
labeled and in original containers..................... Yes NO N/A
4. Laboratory Safety devices used such as: Pipette
suction bulbs, Eye Protection, Gloves, Aprons
or Jackets, & Tongs......................................... Yes NO N/A
5. No broken! chipped or cracked glassware........ Yes NO N/A
6. No overloaded outlets..................................... Yes NO N/A
7. Acid spill kit available..................................... Yes NO N/A
8. Emergency procedures for acid spills posted
and used by all personneL.........,................... Yes NO N/A
9. Laboratory Safety Rules posted and obeyed by
all personnel such as no cooking or eating from
laboratory glassware................ ... ........ ...... ....... Yes NO N/A
IX. Other Safety
1. Are the required s::tfety programs presented
and/or attended during the year......................... Yes NO N/A
2. Is a suitable identification system used to
identify the plant's piping system...................... Yes NO N/A
3. Has the operator taken steps to remove or
fl minimize safety hazards.................................. Yes NO N/A
l.J 4. Are all personnel provided with a shower and
locker for their work clothes........................... Yes NO N/A
5. Are personnel trained in First Aid & CPR........ Yes NO N/A
6. Have the following proper safety signs been
provided such as: Non-potable Water, Chlorine
Hazard, No Smoking, High Voltage, Watch
Your Step Signs in Certain Areas, & Exit Signs. Yes NO N/A
7. Is your Facility safety program Up to Date
(W orksafe Program). ..... ................. .............. ... Yes NO N/A
(# YES)
134-1 x 100= 99 %
(# YES + # NO)
,-. Clutter on lockers and tool bench in the toolroom.
.
L
e:\reports\jeffersonville\sftyinsp. wpd
ri
LJ
n:
,1
b ;