HomeMy WebLinkAbout10) October
MONTHLY OPERATIONS
REpORT.
JEFFERSONVILLE WASTEWATER TREATMEJ
FACILITY
mE CITY OF JEFFERSONVIUE
Prepared for
Mayor Thomas R. Galligan
C. Richard Spencer, Clerk Treasurer
Bob Goldman, Billing Office Manager
Jim Urban, Department of Safety
Robert Miller, City Engineer
,
October 1997
--
=-
=
=.
e:::::i
ENVIRONMENTAL
MANAGEMENT
CORPORATION
November 17, 1997
701 CHAMPION ROAD
JEFFERSONVillE, INDIANA 47130
812-285-6451
FAX 812-285-6454
C. Richard Spencer, Jr.
CITY OF JEFFERSONVILLE
City/County Building
Jeffersonville, IN 47130
Dear Mr. Spencer:
Enclosed please find Environmental Management Corporation's (EMC) "Operations
Report" for the month of October 1997, containing information on the following:
1.0 Effluent Quality
2.0 Design Loading Limits
3.0 Facility Operations
3.1 Pretreatment
4.0 Preventtveandl1nscheduled Maintenance
4.1 Maintenance & Repair Expenditures
4.2 Repair & Replacement Expenditures
4.3 Capital Improvement Expenditures
4.4 Electrical Expenditures
5.0 Facility Safety and Training
6.0 Sewer Collection System
As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we
are available to discuss this report, or any other aspect of our operations, at the convenience
of the City.
Sincerely,
ENVIRONMENTAL MANAGEMENT CORPORATION
!~:~im~
F acili ty Manager
SJT;sb
1.0 EFFLUENT QUALITY
During October, effluent quality was within NPDES permit limits for CBOD and TSS
concentrations. Table 1.1 summarizes the effluent quality data. Attachment A
contains Time Series Plots of daily Carbonaceous Biochemical Oxygen Demand
(CBOD) and Total Suspended Solids (TSS) values. Attachment B contains Time
Series Plots of Aeration Mixed Liquors Suspended Solids (MLSS) and Sludge Volume
Index (SVI).
r:
,
!
Table 1.1
EFFLUENT QUALITY
-
Parameters Permit Limit Monthly
mglL Average
mglL
Carbonaceous Biochemical 15 3
Oxygen Demand (CBOD)
Total Suspended Solids 18 6
(TSS)
Fecal Coliform 200 109
(Colonies/ 100 ml)
Chlorine Residual .05 daily <.005
Maximum
-~
Ammonia 1.5 .33
Flow 5.2 3.60
(MGD)
t-
r
t
r
~
~
2.0 DESIGN LOADING LIMITS
The Flows and Loadings report for May 1994 through October 1997 can be found in
Attachment C.
3.0 FACILITY OPERATIONS
Attachment D contains a list of septic haulers that discharged at the facility during the
month of October.
l
!
During October the treatment processes performed well. The facility did experience a
few high peak flows events during the month. The high peak flows are a result of
rainfall events and infiltration of storm water into the collection system. However due
to operator attention and making the proper adjustments, these events did not create
any significate problems.
r-,
,
,
,
The poor sludge settleability and high Sludge Volume Index's (SVI's) which has
created some concern at the wastewater treatment facility has been located. While
trying to work with the local industry, we still have high SVI's when this industry
discharges. However, we do now require the industry that has been discharging the
toxic substance to notify the Facility Manager before they are permitted to discharge.
The influent loadings at the head works of the facility are also still relatively high and
are still a concern. The excessive loadings are causing an increase in odors at the
influent structure and an increase in sludge production and electrical consumption.
Our continued efforts to reduce the influent loadings should help in reducing this
problem.
3.1 PRETREATMENT
Pretreatment activities for the month of October include:
The Jeffersonville staff continues to perform daily sampling of Wyandot's discharge to
verify loadings to the Jeffersonville facility.
There was one Notice of Violation issued for the month of September and sent out in
October for Wyandot Incorporated. The NOV was issued for exceeding the Oil and
Grease permit limit.
There were two industrial inspections performed during the month of October;
Philadelphia Quartz and Wyandot. Philadelphia Quartz was a routine annual
inspection where as Wyandot was inspected, due to a complaint of oil and grease
found in the ditch line. The oil and grease was determined to be coming from
containers that were leaking oil and grease onto the parking lot from the Wyandot
facility.
4.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE
Preventive maintenance was performed on all equipment as scheduled in October.
There were 24 unscheduled maintenance tasks performed. All were minor repairs
except for:
r ~
f
l , ~
~
~
~
~
Repaired 24 inch sewer line at 403 Terrace Heights.
Installed discharge valve on No.2 pump at Camp Powers lift station.
Pulled No.2 pump at Riverport 2 lift station to check for blockage.
Repaired No.2 pump at Camp Powers lift station.
Installed storm culvert, graded and seeded grass at Middle School lift
station.
Provided cleanup assistance on Howard Avenue sewer line project.
A list of unscheduled maintenance work orders is included as Attachment. E.
Maintenance and repair expenditures for the month of October are detailed in
Attachment F. Table 4.1 represents the amount expended in October. Table 4.2
includes the same information for repair and replacement expenditures. Attachment G
contains a detail of repair and replacement expenditures for October.
.--'
~ '
~
t
Table 4.1
MAINTENANCE & REPAIR EXPENDITURES
r-
i :
i
Time Period Amount Budget (Over)
Expended Under
October $2,315 $4,200 $1,885
- -,
Year-To-Date $25,271 $25,200 ($71)
r-,
~
t
,.-
1 .
f
-
.
\
t
Table 4.2
REPAIR & REPLACEMENT EXPENDITURES
r;-.
I
Time Period Amount Budget (Over)
Expended Under
.
October $9,572 $8,334 ($1,238)
..
Year-To-Date $63,024 $50,004 ($13,020)
",,"~~=".' ~ -~"'".'" '"-""'-~-'"_....""...
4.3 CAPITAL IMPROVEMENT EXPENDITURES
Attachment H details expected Capital Improvement expenditures for the contract
period of May 1, 1997 through April 30, 1998.
4.4 ELECTRICAL EXPENDITURES
Table 4.4 relates to electrical expenditures for October 1996.
Table 4.4
ELECTRICAL EXPENDITURES
Time Period Amount Budget (Over)
Expended Under
.
October $14,925 $15,918 $993
( estimated)
Year-to-Date $107,633 $95,508 ($12,125)
(estimated)
r-
. l
, "
, t ;
r-".
r
,
5.0 FACILITY SAFETY & TRAINING
A safety inspection was conducted on October 25, 1997. The rating was a 96%. The
deficiencies reported were:
~
,..... ~
f
! ~
Clutter on lockers and on the floor in the toolroom.
Trailer left parked in front of the rear side door in the Maintenance Garage.
Power tools left out on the tool bench in the toolroom after use.
A copy of the Safety Inspection report is included as Attachment 1. Safety training was
provided by the facility Safety Coordinator on proper Chlorine and Sulphur Dioxide
handling procedures.
6.0 SEWER COLLECTION SYSTEM
During the month there were 17 sewer calls. The calls were related to the following:
.~
I
~ Eight were related to residential problems.
~ Three were due to blockages in the City's main line.
~ Four were due to odors
~ One was due to a catchbasin.
~ One was caused by roots in the resident's line.
r
Collection systems personnel continue with there investigation in trying to locate
Infiltration/Inflow (1&1) problems in the Meadows Subdivision. All homes will be
inspected for illegal sump pump connections and these illegal connections will be required
to be removed within 30 days of the inspection. Collection system personnel are also
extensIvely working on grounds improvement at all lift stations.
r
t
l:
The No.5 sewage pump at 10th street lift station has been repaired and has been
installed. Mter reinstalling the pump it was determined that the motor controller was
severely damaged when the pump failed. The controller was ordered and will be installed
by Ready Electric.
r-
~.
r
Table 6.1, on the next page, details the data on October's sewer projects.
r
Table 6.1
MONTHLY COLLECTION SYSTEM ANALYSIS
-
i
t
Project October Year to Date
Sanitary Sewer Cleaned / 17,990 114,266
Feet
Storm Sewer Cleaned / Feet 0 2,250
Catchbasins Cleaned Grate Tops = 350 Grate Tops = 1,170
Vactored = 3 Vactored =32
Catchbasins Raised 0 0
Sewer Televised / ft 2,690 11,337
Sewer Tap Inspections 9 42
Dye Testing 0 9
Manhole Castings Replaced 0 1
Air Testing I 29
Manholes Sealed 0 8
r,
~
f
r-
. ;
{ "'
r-
i
t
Service Calls Backup Odor Main Block Resident Storm Related
Received Problem Backups
.
17 0 4 3 8 0
Locates Roots Catch Basin
76 1 1
. . . m" " ."...., '""'" _~^ ~ ^_" fi "n ".~--...",~_.. ".~.._-"'-
r;
~
\
r.
~
r
t
L'
MOR
r
n
L;
ATTACHMENTS -
-
I
~
A
B
C
D
E
F
G
H
I
r-
~
f
!'
~
r
r'
-
k '
! I
I
p
!
r
i
t
TIME SERIES PLOTS - CBOD & TSS
TIME SERIES PLOTS - MLSS & SVI
FLOWS & LOADINGS REpORT MAy 1994 THROUGH OCTOBER 1997
SEPTIC HAULERS REPORT
UNSCHEDULED MAINTENANCE WORK ORDERS
MAINTENANCE & REPAIR EXPENDITURES
REPAIR & REPLACEMENT EXPENDITURES
CAPITAL IMPROVEMENT EXPENDITURES
SAFETY INSPECTION REPORT
r
l
k
~
r;
~ j
~..;
r'
i
>
r,
Attachment A
,..-
,
j
t
Time Series Plots
CBOD & TSS
~
,
J
r.
"
; t"~
r
i
~
r-
! "
----<)
~_. J "'.'"~]- ]
"-rl
Jeffersonville Wastewater Treatment Facility
Effluent CBOD / TSS
- Effluent CBOD - Effluent TSS - Permit CBOD - Permit TSS
50
10
2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
40
30
20
October 1997
Operated and Maintained by:
Environmelltal Managemellt Corporation
,......,
!
r
~
t
r-,
I
I
"
Attachment B
r
I
Time Series Plots
MLSS & SVI
r,
, i
~
r,
j t '
'~r_']_." J
6000
5000
4000
3000
2000
-~W)
~--~--)
J
'~""-l
~- 'J
Jeffersonville Wastewater Treatment Facility
Aeration Mixed Liquor
Suspended Solids (MLSS) rng/l
- MLSS mg/l - Design Limit TSS
1000
o
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
October 1997
Operated and Maintained by:
Environmental Management Corporation
,]
-~l
"~'J''''l '-"8
,...~] ~~..l
'_.)""~ ]
Jeffersonville Wastewater Treatment Facility
Aeration Mixed Liquor
Sludge Volume Index (SVI) mIlgm
- SVI mVgm - Design Limit SVI
200
180
160
140
120
100
80
60
40
20
0
I 2 3 4 5 6 7 8
9 10 II 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
October 1997
Operated and Maintained by:
Environmental Management Corporation
,-.
t
r
i
,
Attachment C
r
i
,-.
& i
~
Flows & Loadings Report
May 1994 - October 1997
r,
.
€
r:
. r
~J
C':]
~"'":l
'~~:l
Jeffersonville Wastewater Treatment Facility
May 1994 - October 1997
Loadings
Design % Design % Design % Total
Month Flow (MGD) Limit Design TSS (lbs) Limit Desi~n BOD (lbs) Limit Desi~n Rain
May 1994 4.50 5.2 87% 6,042 10,105 60% 3,490 10,581 33% 2.35
June 3.84 5.2 74% 8,038 10,105 80% 3,843 10,581 36% 3.70
July 3.68 5.2 71% 8,311 10,105 82% 3,913 10,581 37% 2.25
Aug 3.55 5.2 68% 7,668 10,105 76% 3,819 10,581 36% 2.40
Sept 3.81 5.2 73% 8,726 10,105 86% 4,798 10,581 45% 3.65
Oct 3.71 5.2 71% 8,493 10,105 84% 4,356 10,581 41% 2.20
Nov 4.09 5.2 79% 9,483 10,105 94% 4,025 10,581 38% 3.85
Dec 4.19 5.2 81% 10,434 10,105 103% 3,886 10,581 37% 4.45
Jan 1995 3.81 5.2 73% 9,231 10,105 91% 3,864 10,581 37% 3.75
Feb 2.92 5.2 56% 6,393 10,105 63% 2,710 10,581 26% 1.60
March 2.87 5.2 55% 5,572 10,105 55% 2,480 10,581 23% 2.05
April 2.63 5.2 51% 4,211 10,105 42% 2,178 10,581 21% 2.80
May 3.46 5.2 67% 3,593 10,105 36% 1,622 10,581 15% 10.25
June 2.79 5.2 54% 4,824 10,105 48% 2,683 10,581 25% 3.35
July 2.31 5.2 44% 4,244 10,105 42% 1,809 10,581 17% 2.50
Aug 3.22 5.2 62% 6,338 10,105 63% 3,491 10,581 33% 3.45
Sept 2.33 5.2 45% 5,962 10,105 59% 3,022 10,581 29% 1.60
Oct 2.87 5.2 55% 6,235 10,105 62% 3,124 10,581 30% 5.25
Nov 2.64 5.2 51% 7,449 10,105 74% 2,519 10,581 24% 2.75
Dec 3.22 5.2 62% 9,211 10,105 91% 3,620 10,581 34% 5.85
Jan 1996 4.29 5.2 83% 8,229 10,105 81% 7,084 10,581 67% 5.00
Feb 3.28 5.2 63% 8,480 10,105 84% 6,620 10,581 63% 2.63
March 5.45 5.2 105% 11,091 10,105 110% 9,045 10,581 85% 5.98
April 5.85 5.2 113% 12,148 10,105 120% 9,075 10,581 86% 6.50
May 8.17 5.2 157% 14,513 10,105 144% 10,902 10,581 103% 7.30
Operated and Mainted by:
Environmental Management Corporation
n~]
-"'~1
-,~'~)
Jeffersonville Wastewater Treatment Facility
May 1994 - October 1997
Loadings
Design % Design % Design % Total
Month Flow (MGD) Limit Design TSS (lbs) Limit Design BOD (lbs) Limit Design Rain
June 5.74 5.2 110% 12,447 10,105 123% 10,149 10,581 96% 3.72
July 4.36 5.2 84% 1l,672 10,105 116% 9,345 10,581 88% 3.40
Aug 3.83 5.2 74% 11,148 10,105 110% 10,312 10,581 97% 1.90
Sept 4.96 5.2 95% 12,865 10,105 127% 9,928 10,581 94% 9.02
Oct 4.25 5.2 82% 11,059 10,105 109% 8,471 10,581 80% 2.60
Nov 4.80 5.2 92% 13,771 10,105 136% 11,689 10,581 110% 4.10
Dec 5.77 5.2 111% 14,725 10,105 146% 11,020 10,581 104% 4.90
Jan 1997 5.59 5.2 108% 19,581 10,105 194% 16,597 10,581 157% 3.85
Feb 5.84 5.2 112% 22,892 10,105 227% 15,732 10,581 149% 12.25
March 10.62 5.2 204% 22,586 10,105 224% 13,197 10,581 125% 6.30
April 5.63 5.2 108% 17,584 10,105 174% 10,330 10,581 98% 2.31
May 6.27 5.2 121% 18,145 10,105 180% 9,726 10,581 92% 7.15
June 7.05 5.2 136% 13,347 10,105 132% 8,937 10,581 84% 5.05
July 4.32 5.2 83% 13,979 10,105 138% 12,862 10,581 122% 0.55
August 4.43 5.2 85% 11,925 10,105 118% 11,817 10,581 112% 3.95
September 3.84 5.2 74% 9,166 10,105 91% 10,160 10,581 96% 1.47
October 3.60 5.2 69% 12,539 10,105 124% 10,439 10,581 99% 1.47
2
Operated and Mainted by:
Environmental Management Corporation
Attachment D
Septic Haulers Report
May 1 997 - October 1 997
SEPTIC HAULERS REPORT
October 1997
-~,~- ._-~ ~.~._- ~~ ~., "_ .._"_,__..w~"..,"_." .~ ~. ,-,.'
Loads Delivered To Treatment Facility
"'Ii........"... ;"""'........""''''',...."''''.. -. ........~.""-"',~,. .;""_..""~~,"""..",_.".-.";,,...,,;;,,,~..._,',,, ""~""""- -
Hauler October Hauler Total (YTD)
-....- :-,..""'" lo-."....~."'_","~",,,.
Rumpke of Indiana 12 44
."", ,'-..
TOTAL 12 44
Gallons Delivered To Treatment Facility
Hauler
October
Hauler Total (YTD)
Rumpke of Indiana
TOTAL
13,200
13,200
48,400
48,400
. "~. .-" .,-~,,~... "~^...,""<...."-,.,,,,,
--.
,
r
to. .
r
U
Attachment E
Unscheduled Maintenance Work Orders
r
11/3/97
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
1
Page
I CloseDa.te:/10/1/97
.-.- ,-,.,,-..-.. .. ".
W.O..#:...9603229
H I
MIDDLE SCHOOL
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/1/97
Delay Description:
WoType:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
PROJECT
1.00
0.00
22.00
0.00
ST
COLLECTION
22.00
12:57:45
Equipment #:
Description:
Comments:
f CloseD*te:
WJoJ#:...9ElQ3233
5MIDDLE SCHOOL
Down Time:
WORKED ON DITCH AT MIDDLE SCHOOL
10/1191"
HOWARD ST. PUMPING
Task #:
Originator:
Phone:
Down Time: 0.00
Emp. Hours: 1.00
Vendor Hours: 0.00
Request Date:
Sched Start Date:
Completion Date: 10/1/97
Delay Description:
Equipment #: UNKNOWN
Description :
Comments:
I CloS4!pate:/1Q/1/97
Wo Type: REPAIR
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 1.00,
Request Time:
Sched Finish Date:
Completion Time: 12:57:46
Down Time:
W.tH#: $60$372 ..
SET UP FLOW METER AT RAS STATION
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/1/97
Delay Description:
Wo Type: PROJECT
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 4.00
Request Time:
Sched Finish Date:
Completion Time: 11:19:04
0.00
4.00
0.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
I
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Equipment #: UNKNOWN
Description :
Comments:
Down Time:
11/3/97
'-->.': ,->-' ---~
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
Page
2
.1
I Closeqat~:<101'2197
MIDDLE SCHOOL LIFT STATION
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/2/97
Delay Description:
0.00
30.00
0.00
W.O. #:9603228 .....
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
PROJECT
1.00
ST
COLLECTION
30.00
12:57:45
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
5MIDDLE SCHOOL
Equipment #:
Description:
Comments:
I Close DatE!:
Down Time:
<10/2/97, .
PUT PIPE IN DITCH LINE IN FRONT AND BACK
MIDDLE SCHOOL LIFT STATION
r--.
. Task #:
Originator:
Phone:
Down Time: 0.00
Emp. Hours: 7.50
Vendor Hours: 0.00
Request Date:
Sched Start Date:
Completion Date: 10/2/97
Delay Description:
....ViO...#:~603230....
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
PROJECT
1.00
ST
COLLECTION
7.50
12:57:46
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
5MIDDLE SCHOOL
Equipment #:
Description :
Comments:
I Close Date:
Down Time:
10/6/97
LE\1ELED OUT 5.5 LOADS OF DIRT AROUND STATION
HOWARD ST. PUMPING
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/6/97
Delay Description:
0.00
1.00
0.00
Wi().#:$603234. .
Wo Type: REPAIR
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 1.00
Request Time:
Sched Finish Date:
Completion Time: 12:57:46
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
r-
Equipment #: UNKNOWN
Description :
Comments:
i
I...~
r
Down Time:
11/3/97
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
3
Page
IClos~[)at~: ....
. .... .w;o. #: 9603231
... .-..-.....,..-,...-.-.. .....-."-...,,. .
10/a/~7
MIDDLE SCHOOL STATION :" .
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/8/97
Delay Description:
PROJECT
1.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
0.00
15.45
0.00
ST
COLLECTION
15.45
12:57:46
Equipment #:
Description :
Comments:
5MIDDLE SCHOOL
Down Time:
PUT GRASS SEED DOWN AND COVERED WITH STRAW
LEVELED 4 MORE LOADS OF DIRT
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
tClos~~: . .... '10/8/97
HOWARD ST. CLEAN UP
. .W.o..#:9693?32
I
Task #:
Originator:
Phone:
Down Time: 0.00
Emp. Hours: 0.00
Vendor Hours: 0.00
Request Date:
Sched Start Date:
Completion Date: 10/8/97
Delay Description:
Wo Type: PROJECT
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 0.00
Request Time:
Sched Finish Date:
Completion Time: 12:57:46
Reason For Outage:
Expense Class:' .
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
UNKNOWN
Down Time:
Equipment #:
Description :
Comments:
ROLLED UP HOSES FROM PUMP , SPRAYED DOWN PARKING LOT
11/3/97
r,
~
t
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
Page
4
10/8/97
I Close Date:
CUT GRASS AT LIFT STATION
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/8/97
Delay Description:
0.00
14.00
0.00
W.O. #:9603235 .. ..
. ,-.."",,, ...."",....",..,.,..
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
PROJECT
1.00
14.00
13:01 :28
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
Equipment #: UNKNOWN
Description :
Comments:
I CI()$ep#.a:1Q/1$/97.
Down Time:
WORKED ON MIDDLE SCHOOL STATION FOR PAVING
....... vv.cf#: '$60~344...'
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/15/97
Delay Description:
0.00
32.00
0.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
PROJECT
1.00
COLLECTION
32.00
09:10:09
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
Equipment #:
Description :
Comments:
f C1oseOate:
5MIDDLE SCHOOL
. . 10/15/97.......
.-.--,--.., ,..., ,.
REPLACE MAILBOX AT PLANT
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/15/97
Delay Description:
0.00
2.15
0.00
Down Time:
. W.d.#:96d~371
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
REPAIR
1.00
ST
OM
2.15
11:19:03
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
Equipment #: --Top Level--
Description: Overall Facility
Comments:
Down Time:
11/3/97
:,(,' _",--: ;:'\'>:'-j?'.; \ .,z<,:,.y:,;_;;,';~~~,i,':::"",>:,:~'::
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
Page
5
I
f Close Date: ....
10J1.$fQl
wJ6J'#: 9603377
CHECK MILL.CREEK #2 PUiYlP KICKING OUT
Wo Type: REPAIR
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 2.00
Request Time:
Sched Finish Date:
Completion Time: 11: 19:04
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/15/97
Delay Description:
0.00
2.00
0.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Equipment #:
Description:
Comments:
I.CI.ose.Date:.....
5MILLCREEK
Down Time:
CLEANED ELECTRIAL CONTACTS GOOD WORKING FINE NOW
... ... ...10/17/97~
W.O.#:. Q603$75
REINSTALL #2 PUMP IN CAMPPOWERS
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/17/97
Delay Description:
Wo Type: REPAIR
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 3.00
Request Time:
Sched Finish Date:
Completion Time: 11:19:04
0.00
3.00
0.00
Reason For Outage:
Expense Class: .
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Equipment #: 5CAMP POWERS
Description :
Comments:
I Clos(!Date: "10J17/~7"
EWING LN STATION CHECK
Down Time:
.... W.O. #: ..9603376
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/17/97
Delay Description:
Wo Type: REPAIR
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 2.00
Request Time:
Sched Finish Date:
Completion Time: 11:19:04
0.00
2.00
0.00
I
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
r-.
\
.
r
, ~.
Equipment #:
Description :
Comments:
5EWING LANE
Down Time:
#1 PUMP INTAKE VALVE ALMOST CLOSED FIXED PROBLEM
OH':':".';:':';/;..;.._"\"
Work Order-History Comprehensive
E.M.C OF JEFFERSONVILLE
11/3/97
Page
6
r~"""""""-.-:-.
fCioseDate: . .
... W.O.#: 9603374..
..... '-.. ...,.........--..
10120/91
RIVERPORT'il PUMP MAKII\!G' NOISE
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/20/97
Delay Description:
Wo Type: REPAIR
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total labor Hrs: 7.00
Request Time:
Sched Finish Date:
Completion Time: 11: 19:04
0.00
7.00
0.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Equipment #:
Description:
Comments:
5RIVERPORT II
Down Time:
PULLED #2 PUMP FOUND NO PROBLEM, AMPS OK
IClosenate:
.W.(i#:.U~()3~41.......
I
.....10/21/97.. ...
MIDDLE SCHOOL READY FOR PAVING
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/21/97
Delay Description:
PROJECT
1.00
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
0.00
22.50
0.00
ST
COLLECTION
22.50
09:10:08
Equipment #:
Description:
Comments:
5MIDDLE SCHOOL
Down Time:
FINISHED SPREDING GRAVEL AND LEVELING
Reason For Outage:
Expense Class:.
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
N
I. Close bate:.....
W:6.#:96b~:34Q
10/22/97
CLEANED WET WELLS AT MAGNOLIA AND AT UTICA 1
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/22/97
Delay Description:
Wo Type: JET TRUCK
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 15.00
Request Time:
Sched Finish Date:
Completion Time: 09:10:08
0.00
15.00
0.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Equipment #:
Description :
Comments:
5MAGNOLlA ST
Dow!"! Time:
VACTORED GREASE OUT OF WET WELLS
Work Ord~rHi~t~'~ Comprehensive
E.M.C OF JEFFERSONVILLE
11/3/97
Page
1
ICJo~[)ate:
...... ...W.O..t!:~9q~R4o.....
>/
.....
...10/22/97 .
. .-.
CLEANED WET WELLS AT MAGNOLIA AND AT UTICA 1
Task #:
Originator.
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/22/97
Delay Description:
Wo Type: JET TRUCK
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 15.00
Request Time:
Sched Finish Date:
Completion Time: 09:10:08
0.00
15.00
0.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Equipment #:
Description :
Comments:
5MAGNOLlA ST
Down Time:
VACTORED GREASE OUT OF WET WELLS
Down Time:
Equipment #: 5UTICA I
Description:
Comments:
l.qIR~~t>at~:........ ...... .10/22/97 ............................W.q..#:...geq$~"7()
TAR MANHOLE COVER ON AT 7TH AND WALNUT ST. MANHOLE #125
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched.Start Date:
Completion Date: 10/22/97
Delay Description:
Wo Type: REPAIR
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 1.00
Request Time:
Sched Finish Date:
Completion Time: 11:19:03
0.00
1.00
0.00
....... .,
.-:
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Equipment #: UNKNOWN
Description:
Comments:
Down Time:
11/3/97
Work Order History Comprehensive
E.M.C OF JEFFERSONVILLE
Page
2
ICI()SePat~:
1.0/2'L./97. ..
<I
..
W.O.#: 9603373
INSTALL DISCHARGE VAL~I::CAI\i1POWERS PUMP #2
Wo Type: REPAIR
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 25.00
Request Time:
Sched Finish Date:
Completion Time: 11: 19:04
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/22/97
Delay Description:
0.00
25.00
0.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Equipment #: SCAMP POWERS
Description:
Comments:
ICI()$~pa~: .......1()/'L.4/97-
CATCH BASIN CLEANING
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/24/97
Delay Description:
0.00
9.00
0.00
Down Time:
."".9.#:~03342.
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
CB
1.00
Reason For Outage:
Expense Class:.
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
....1
. ..
N
Equipment #: UNKNOWN
Description :
Comments:
I r-
ST
COLLECTION
9.00
09: 1 0:09
Down Time:
11/3/97
'",-.:,.' .'. ',.,-,-",..
Work order HistorY Comprehensive
E.M.C OF JEFFERSONVILLE
3
Page
IOIOSeP#f;E!:/10/2S/97.....
W.O.#: .$t$d3345
I
Task #:
Originator:
Phone:
Down Time: 0.00
Emp. Hours: 4.00
Vendor Hours: 0.00
Request Date: 10/28/97
Sched Start Date: 11/4/97
Completion Date: 10/28/97
Delay Description:
Equipment #: Inspection
Description: Sewer inspections
Comments: The storm line that runs behind Wyandott Foods needs tio be dye tested and possibly televised. There is
clear water that constantly runs from this storm pipe. We need to find out were this water is coming from.
There is a scre.en that is on the outlet side of this storm line that needs to be removed.
Dye test the storm line behin~f\ivyandot Foods.
Wo Type:
Priority:
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs:
Request Time:
Sched Finish Date:
Completion Time:
PROJECT
1.00
ST
KJ
4.00
11/4/97
11:19:03
Down Time:
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty:
0.00
1
o
o
N
WATER IS COMING FROM BUILDING #72 FROM CENSUS BURERCONTACTED BOB MILLER & DON
MOUNT AT WYNDOT
tC.lq$E!t)a~: ........ ...........10/2$/97...
MOUNT LAB BLACK LIGHT
W.Q~.': .$6()~3"t8 ....
I
Task #:
Originator:
Phone:
Down Time:
Emp. Hours:
Vendor Hours:
Request Date:
Sched Start Date:
Completion Date: 10/29/97
Delay Description:
Wo Type: PROJECT
Priority: 1.00
Ext.:
Assigned By:
Assigned To:
Total Labor Hrs: 0.00
Request Time:
Sched Finish Date:
Completion Time: 11:19:04
0.00
0.00
0.00
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Equipment #: 1ADMlN1
Description : ADMINISTRATION BUILDING
Comments:
Down Time:
11/3/97
Work Order History Comprehensive
E.M.C OF .JEFFERSONVILLE
Page
4
I.CJC)~el)#~: . ...... .....10/30/97 .... ....... ............./W.().#:~9d~3()Q....... ....... ....
REPAiR SEWER LINE FaRINO. WATER AT 403 E. TERRACE HEIGHTS
.......... I
............................................
Task #:
Originator:
Phone:
Down Time: 0.00
Emp. Hours: 1.00
Vendor Hours: 0.00
Request Date:
Sched Start Date:
Completion Date: 10/30/97
Delay Description:
Wo Type: REPAIR
Priority: 1.00
Ext.:
Assigned By: ST
Assigned To:
Total Labor Hrs: 1.00
Request Time:
Sched Finish Date:
Completion Time: 11:19:03
Reason For Outage:
Expense Class:
Est. Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Perf By Warranty: N
Equipment #:
Description:
Comments:
UNKNOWN
Down Time:
REPAIRED 24" LINE WITH 2 FURIN COATS
Grand Totals:
Down Time:
Emp. Hours:
Vendor Hours:
Total Labor Hours:
0.00
55.00
0.00
55.00
r
t
L..
Attachment F
Maintenance & Repair Expenditures
Jeffersonvi!le Wastewater Treatment Facility
Maintenance & Repair Expenditures
Page 1
P.O. Date
,
Vendor
Description
Amount
10/10/97 ACE HARDWARE 1W0 25 WAtT BULBS FOR ALARM LIGHT AND $5.23
I CLARIFIER
!
10/10/97 B&R RUBBER & SUPPLY HIP BOOTS FOR SCOTT TIMMERMANN & JOE $69.30
i TACKETT
10/10/97 B&R RUBBER & SUPPLY TUBING FOR PLANT $17.01
10/10/97 EARTH FIRST MULCH FOR PLANT $52.50
'10/10/97 HOME QUARTERS MA TERIALS FOR CONCRETE PAD FOR $47.23
DUMPSTER
10/10/97 KMART COOLER FOR LAB PER ORSANCO $26.24
10/10/97 OFFICE DEPOT COMPUTER EQUIPMENT FOR DOCKING $270.84
STA TlON - SJT
10/10/97 OFFICE DEPOT MOUSE FOR DOCKING STA TION - SJT $20.99
10/10/97 VWR STAINLESS STEEL BUCKET FOR SAMPLE $96.37
COLLECTING PER ORSANCO
10/10/97 HUNT TRACTOR GEAR CASE $138.33
'10/10/97 WATER WORKS 12" PVC SEWER PLUG $28.30
10/10/97 NAPA AUTO MISC. ITEMS FOR SEMI TRUCK $4.81
'10/10/97 ACE HARDWARE MA TERIAL FOR SPRING STREET FLUSH LINE $3.28
10/10/97 ACE HARDWARE MA TERIAL FOR SPRING STREET FLUSH LINE $31.68
I WA TER WORKS
10/10/97 12" HANCOR SPLlr COUPLING $5.22
10/10/97 WATER WORKS 12" HANCOR SPLIT COUPLING $15.66
'10/10/97 SA1=- TI-CO CSO SIGN $26.90
10/10/97 ORR SAJ=ETY CORP HARNESS FOR JOE TACKETT & ROB LUNEY $58.67
10/16/97 LESHER FIRE PROTECTION FIRE EXTINGUISHER MAINTENANCE $374.98
10/16/97 OFFICE DEPOT PRINTER CABLE FOR SJT DOCKING STA TION $25.16
10/16/97 OFFICE DEPOT REPLACE ADMIN. ASST. KEYBOARD $26.24
I
I
10/16/97 ACE HARDWARE NEW MAIL BOX FOR PLANT $31.98
10/16/97 GRAINGER FLUSH LINES FOR SPRING STREEr L.S. $133.31
10/16/97 HEUSER HARDWARE FLUSH LINES AT SPRING STREET $7.14
10/16/97 HEUSER HARDWARE WA TER LINE ON PUMPS Ar SPRING STREET $70.13
10/23/97 US FIL TER ACTIVATED FILTERS FOR LAB $194.64
10/23/97 BEARING HEADQUARTERS SEALS FOR #1 BLOWER $58.66
$,;,.,.,,,,, 10/23/97 LITER'S QUARRY #9 STONE FOR MIDDLE SCHOOL LIFT STATION $48.01
10/23/97 NEILL LA VIELLE BOLTS AND NUTS FOR INSTALLING VALVE FOR $48.86
CAMP POWERS
Vendor
Jeffersonville Wastewater Treatment Facility
Maintenance 8. Repair Expenditures
Description
Page 2
P.O. Date
Amount
10/30/97 DEEDS EQUIPMENT 1" ALUMINUM SAND NOZZLE $156.98
10/30/97 DEEDS EQUIPMENT HANDLE FOR VACTOR TRUCK $37.43
10/30/97 FARM BUREAU COPPER SULFA TE FoR SEWER LINES $53.99
10/30/97 HEUSER HARDWARE REMOVED RAIL AND USED CHAIN TO REPLACE $16.08
IT
10/30/97 HEUSER HARDWARE REMOVED RAIL AND USED CHAIN TO REPLACE $17.70
IT
10/30/97 LITERS QUARRY #9 STONE $32.94
10/31/97 GENERAL AUTO BREA THER CAP FOR BLOWERS $3.38
10/31/97 OFFICE DEPOT PLANT SUPPLIES $28.19
10/31/97 HEUSER HARDWARE LAB EQUIPMENT SUPPLIES $6.76
Total 2,315.14
r-
.
L
I.. ,
,~. --,-,
.,
, -,
~ -
Attachment G
Repair & Replacement Expenditures
r
,
r'
r
I ' I
P,O, Date
10/10/97
i
I
10/10/97
10/16/97
10/31/91
10/31/97
r
!
Jeffersonville Wastewater Treatment Facility
Repair &. Replacement Expenditures
Vendor
PETERSON ELECTRIC
READY ELECTRIC
SPENCER MACHINE & TOOL
E&H ELECTRICAL SUPPL Y
READY ELECTRIC
Description
(project #97052) SPARE BREAKER FOR
AERA TION TANK
(project #97053) SURGE PROTECTOR
EQUIPMENT
(Project #97019) REPAIR #2 PUMP AT CAMP
POWERS
(project #97053) REPAIR CAPACITORS
(Project #97()53) REPAIR CAPACITOR
Page 1
Amount
$1,698.49
$3,068.00
$1,069,84
$1,638.00
$2,097.82
Total 9,572.15
1996-1997 Repair & Replacement
r-
t
i,...,
.-. --
Wastewater Treatment Facility
~
Actual %
Priority Description Estimated Cost Complete
- . .
2 Replace Carpet at Main Office Building (project No. $2,250 0%
96009)
1 Replace Steering Valve on Belt Press (project No. $2,500 $1,559.38 100%
97049)
.-
1 Repair #2 Non-Potable Water Pump (project No. 97038) $1,600 $1,643.00 100%
~'". .- .""
2 Seal Driveway (project No. 97007) $4,500 $4,500.00 90%
--.
1 Belt Replacement on Dewatering Press (project No. $3,000 $796.50 10%
97001)
-. ,
1 Replace Riding Mower (project No. 97002) $8,500 0%
-,~
1 Ethernet Cable to Network Lab to Operations (project $40,000 $125.15 5%
No. 96014)
.. --
I Surge Protection System (project #97053) $3,100 $6,863.82 100%
w.,._ .__
1 Installation of Hose Racks at Facility (project No. 97055) $1,500 $1,077.00 100%
$3'508~I ,.- ,
1 Vertical Mixers and Electrical Breaker (project No. $3,500 100%
97052)
1 Replace D.O. Probe in Laboratory (project No. 97051) $5,972 $6,458.76 100%
~ '" . ... ~--"~
1 Painting of Iron Warks at Final Clarifiers (project No. $16,000 0%
97001)
M'~' . H.''',,"
Total Expenditures for Treatment Facility $92,422 $26,532.38
,~ ~ffl"""_""'"; ,",,,,,~,,",,,,","""'_""
Lift Stations
""'_.... ....;..
1 Electrical wiring and related components to phase I $5,500 $9,121.67 80%
alarm system upgrade. (Project No. 96002)
1 Alarm System Upgrade materials (project No. 96015) $250 $21~ 80%
,
1 Repair #1 Pump at Louis Street (project No. 97034) $2,000 $2,255.00 100%
,.-.
r '
~ '
r
L
---
. "
~
,
,
Actual %
Priority Description Estimated Cost Complete
2 Replace Electrical Breakers and Pump Upgrade (project $7,500 $2,225.24 30%
No. 97022)
1 Sunset Mobile Home Park, Seal Wetwell, Upgrade $3,500 0%
Electrical Systems, Replace Door and Roof. (project No.
96006) (**Investigation is taking place at this time for
removal of L.S. to gravity flow).
1 Move Weather Head at Crums Lane No.1 (project No. $1,500 0%
96007)
1 Painting of Interior Piping and repair of Mechanical $3,000 10%
Hoist System at Spring Street (project No. 97027)
1 Replace 3" portable trash pump (project No. 97014) $3,500 $1,721.14 100%
"'
1 Replace 2" trash pump (project No. 97015) $2,500 $1,414.00 100%
1 Repair #2 pump at Camp Powers L.S. (project No. $1,100 $1,069.84 100%
97019)
1 Trouble Shoot and Repair #5 pump at 10th Street Lift $20,000 $14,722.02 100%
Station (project No. 96029)
1 Trouble Shoot and Repair #1, #2, #3, #4 and #5 pumps at $20,000 $28,731.98 100%
10th Street Lift Station (project No. 96029)
Total Expenditures for Lift Stations $70,350 $47,658.98
Vehicles
Estimated Actual %
Priority Description Cost Cost Complete
1 Replace hose to Jet Truck & purchase new nozzles $3,000 $2,863.00 100%
(project No. 97017)
, . .,..".,. ^"''''^~''''--' - r"'" ' $1 ~,o~~l
1 Replace 1987 Ram (project No. 97039) 0%
.",," . , _. ...0'.'.-'" ,_,~.,,_. _",~......,.. .~. . .,..~.,- ,~- ...." .. " -.-"-
1 Motor Control for Sewer Camera (project No. 97056) $1,200 $1,056.40 100%
..
1 Replace 1986 Chevy Van (project No. 97035) $19,000 0%
....... -... .......,.' . ".",..,;,.,""","~'..._...,;"c".,,~,;.. ",,....,.. ";.,.'.._...~....'-~_"'.,_.,.;"".,_.:..w
Total Expenditures for Vehicles $42,200 $3,919.40
TOTAL $204,972 $78,110.76
G
I, ;
F 1
r
,
j
, r,
f'
~
t'
r-,
;: .
r--\
f'
Attachment H
Capital Improvement Expenditures
r;
t
.
~.
r
.
J
r
t
(-~
..-
t
't
r
r-'
'"'
f
t .
,-
-
.
fi
r-,
~I
-
,.
f
E
~
b
\.,
i
l
1 t
1996-1997 Capital Improvement Expenditures
Wastewater Treatment Facility
Priority
Description
1
Repair #3 Fi.l1al Clarifier Drain Valve (project No.
97005)
R..eplar..e Digester A if Distribution Line (project No.
97004)
1
Equipment (project No. 97036)
26)
Ttllal Expenditures f(1r Hla.wewaler Facility
Collection System
1
Repair Line on East Gardner Drive (project No.
97039)
1 Install Manhole on Ridgeway Drive (project No.
97042)
1
1
Install Manhole on Morris Avenue (piOject No.
97040)
Total &penditures for L'ollectiim System
Estimated
Cost
Actual
Cost
%
Completed
$20,000
10%
$60,000
10%
1000/<
100%
001.:
IU
nn/
'-'70
0%
0%
$1,000
100%
$1,500 $1,200 100%
$1,000 0%
$1,000 00/
/0
0%
$164,800 $9,443
r,
Lift Stations
r
1 Sensers and flew metering for 10th Street, Spring $75,000 50%
,--., Street & Mill Creek Lift Stations, redundant control
system (project No. 96015)
L.S. (project No. 97
r
" Install Back-flow C,Qlltrol on Bypass Channel at lOth $26,000 0%
L
Street L.S. (project No. 97(28)
-,
1 Relocate'Bar Screens to Influent'Channel at lOth $50,000 0%
Street L.S. (project No. 97(26)
~...--..
023)
1 Convert Cedarview L.S. to Gravity Sewer (project $1,500 0%
No. 97021)
,..-, 1 Jnstall Dry-well Submersible PUJ,llps at Louise Street $60,000 1 no/
IV/O
L.S. (project No. 97011)
1 Install Dry-well Submersible Pmr.ps at Magnolia 41:,:;;(\ (\(\(\ 10%
r-. "V_v,,,",,,,,,v
L.S. (project No. 97009)
1 Install Dry-well Submersible Pumps at Ewing Lane :;;00 000 10%
.,.--,---
L.S. (project No. 97(10)
,/.
1
2 R""lace Rol}irn F.olA" '111+1, Ora"'''"' S~;Vo.. (p"o.oct 100%
"'-WI" .......:&6 .a.""...~ yy............ ... v,u"J "....... ... Jllo'.....
r No. 96018)
2 Relocate Barscreen 8-fld Install Sluice Gate's at 10th $45,000 n^'
1)1'0
r-. Street <project No. 96(19)
Total EA.-penditures For Lift Stations $669,500 $0
:-
Vehicies
,.-
r-
Total Expenditures on ;/'ehicles
$30,000
.for.
...~
r-.
r-,
r-
fi
i 1
r
{
,-.
\
i
\
Attachment I
r
Safety Inspection Report
"
:
t
r-
,
t
r.
~ .
t .
~ '
r
t1
,-
t :
t
n
L
ENVIRONMENTAL MANAGEMENT CORPORATION
MONTHLY SAFETY INSPECTION
CHECKOFF SHEET
JEFFERSONVILLE W ASTEW ATER TREATMENT FACILITY
701 CHAMPION ROAD
JEFFERSONVILLE, IN 47130
(812) 285-6451
PERSON COMPLETING INSPECTION:
Wavmon Payne
I. Personnel Safety
A. Personal Protective Clothing
r:
1. Safety Helmets Provided
(for Personnel & Visitors)..................................
2. Hearing Protection
(for High Noise Areas).......................................
3. Eye Protection - Goggles, etc.
(for Personnel & Visitors)..................................
4. Gloves
(for Personnel)..... ........ ..................... .................
5. Rubber Boots with Steel Toes
(provided for Personnel).....................................
6. Rain Suits Provided
(for Personnel)... ..................... ...........................
7. Is Respiratory Protection Provided including
ventilators and hoods over high dust areas, dust
masks, etc. (for Personnel)................................
{
r-'
f .
r
f
B. Safety Devices and Equipment
r:
,
1. Non-sparking Tools in areas where flammable
or explosive gases may be present?.....................
2. Oxygen Deficiency, Toxic, & Explosive Gas
indicator...................... ................... ..... ...............
3. Self-contained Breathing Apparatus for entry
to chlorine room.................................................
4. Confined Space Entry Equipment Available
such as and including Safety Harness, Portable
Wench, Hoist, etc...............................................
5. First Aid Kits with proper & adequate supplies
readily available for any First Aid Emergency....
n
!
,r
t
October 30. 1997
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes NO N/A
Yes
NO
N/A
Yes
NO
N/A
Yes
NO
N/A
Yes
NO
N/A
Yes
NO
N/A
6. Traffic Control Cones Available........................ Yes NO N/A
7. Ladders to enter manholes of wet wells
(fiberglass or wooden for electrical work)......... Yes NO N/A
8. Safety Buoys and Life Lines, Life Preservers
at all open structures (02 Ditches, Clarifiers,
Lagoons, etc....... ..................... ..................... .... Yes NO N/A
II. General Plant Safety
1. Are Personnel trained in the use and location
of safety equipment at the plant...................... Yes NO N/A
2. Are there railings around all tanks with
openings chained off...................................... Yes NO N/A
3. Are holes covered? Including all pits & wells,
drains, valve holes, hatch covers in place........ Yes NO N/A
4. Are explosion proof fixtures used where
needed..... ... .......... ... ..... ... ....... ... ..... ... ... ..... .... Yes NO N/A
5. Are all equipment guards in place? Including
mowing equipment...................... .......... ......... Yes NO N/A
r' 6. Are dry wells ventilated and is ventilation
adequate in all areas....................................... Yes NO N/A
7. Are emergency numbers posted & accessible.. Yes NO N/A
8. Is proper liquid flammable storage used.......... Yes NO N/A
9. Is general plant cleanliness being practiced?
Including floors (No oil or grease or pools of
water), Storage Areas (No clutter & supplies
stored properly), Chlorine Room (Free of
clutter), Laboratory............ ........ ........ ............ Yes No N/A
10. Are all walkways, exists and routes, &
r' stairways clear & unobstructed (No ice, oils,
j water, grease, or debris)................................. Yes No N/A
11. Are all slippery surfaces posted and/or covered
with anti-skid material, including stair treads
and ramps, in good repair and covered with
non-skid surface..... ... ... ....... ... ..... ... ... ..... ... ...... Yes NO N/A
12. Are all mats and rugs in good repair so as not
Ci to become tripping hazards............................. Yes NO N/A
, 13. Are work area layouts adequate...................... Yes NO N/A
i 14. Is lighting adequate in all areas (Work areas,
stairways, walkways, etc.).............................. Yes NO N/A
r 15. Are noise levels within allowable limits or
I danger areas posted........................................ Yes NO N/A
16. Are toilet facilities available & clean............... Yes NO N/A
n 17. Is safe drinking water available....................... Yes NO N/A
, 18. Is pest control adequate.................................. Yes NO N/A
19. Are all exists properly marked......................... Yes NO N/A
r 20. Is inclement weather protection provided at
t entrances (mats, safety strips, de-icers, etc.).... Yes NO N/A
-
Iii
t '
"
3. Are the number of outlets adequate.................. Yes NO N/A
4. Is equipment properly grounded or insulated.... Yes NO N/A
5. Are extension cords in good condition and
used pro perl y................................................... Yes NO N/A
6. Is electrical test equipment available. Such as
voltmeter, ampmeter, etc................................. Yes NO N/A
7. Are dielectric rubber mats presents for
electrical work... ..... ... ... ... .... ... ....~ ... ... ..... ... .... Yes NO N/A
8. All control panel switches in good condition.. Yes NO N/A
n 9. All control panels unobstructed...................... Yes NO N/A
, 10. Are dielectric rubber gloves available............. Yes N,O N/A
~
11. Are ground fault interrupters used.................. Yes ~O N/A
12. Are warning or caution signs posted............... Yes NO N/A
13. Is control panel area clean and dry.................. Yes NO N/A
14. Are all needed fuses or breakers in place......... Yes NO N/A
15. Are all contacts clean and dust free................. Yes NO N/A
16. Is there emergency stop buttons on all
machines and equipment................................. Yes NO N/A
17. Are personnel familiar with the electrical safety
such as lock out!tag out procedures................ Yes NO N/A
18. Is power supply locked out! tagged out on
equipment presently being repaired................. Yes NO N/A
IV. Chlorine & Dechlorination Safety
1. All standing cylinders chained in place and/or
ton cylinders chocked...................................... . Yes NO N/A
2. All personnel rained in the use of CL2.............. Yes NO N/A
3. Appropriate repair kits available...................... Yes NO N/A
4. Chlorine & dechlorination leak detector tied
into the facility alarm system........................... Yes NO N/A
5. Ventilator fan with outside switch present and
either comes on when door opens or manually
with switch at entrance door........................... Yes NO N/A
6. Ammonia and Sulphur for checking chlorine &
dechlorination leaks available.......................... Yes NO N/A
7. Are all safety precautions posted..................... Yes NO N/A
8. Proper Chlorine wrench available to open
valves............... .................. ............................ Yes NO N/A
9. Chlorine protected from direct sunlight, cool
and dry..... ..... ... ..... ..... ... ..... .,. ..... ... ... ,. ... ... ..... Yes NO N/A
10. No petroleum or other chemicals store in
chlorine room......... ................... ..................... Yes NO N/A
11. Spare lead washers available on site................ Yes NO N/A
V. Process Chemical Safety
1. Are personnel trained to handle all chemicals
properly........................................................ . Yes NO N/A
r,
. ,
2. Is proper safety clothing present for the
chemical to be handled................................... Yes NO N/A
3. Are all containers, vats, and tanks properly
labeled........................................................... . Yes NO N/A
4. Is employee exposure within accepted limits.... Yes NO N/A
5. Are there proper containment of storage areas,
including curbing........................... ................. Yes NO N/A
6. Are management & employees aware of the
hazards of the materials being used.................. Yes NO N/A
7. Knows proper response to an accidental spill... Yes NO N/A
8. All MSDS available and easily accessible......... Yes NO N/A
9. Has complied with the 6 employer
responsibilities of the Worker Right to Know
Law? (SARA)................................................. Yes NO N/A
10. Emergency Action Plan on file with local Fire,
Police Departments and appropriate Emergency
r-', Agency........................................................... . Yes NO N/A
~
.
I
VI. Tools & Equipment
1. Are hand tools in good repair and stored
properly......... ............................. .................... Yes No N/A
2. Are power tools stored properly and in good
condition - cords, plugs, etc............................ Yes No N/A
3. Are the tools adequate for the tasks to be
performed..................... ........ ................ ...... .... Yes NO N/A
4. Are defective tools replaced as needed............ Yes NO N/A
5. Are tool guards in place.................................. Yes NO N/A
6. Are employees trained in the proper use of the
various tools they are expected to use............. Yes NO N/A
7. Are employees given additional instruction and
periodic reviews of specialized tools and
equipment........... ..................... ........ ................ Yes NO N/A
8. Are proper lifting techniques used by
employees. ..... ..... ..... ... ..... ... ... ..... .......... ...... ..... Yes NO N/A
VII. Fire Safety & Protection
1. Are fire/emergency evacuation plans posted...... Yes NO N/A
2. Are employees familiar with fire/emergency
evacuation plan.... ............................. ............... Yes NO N/A
3. Are there sufficient number and types of fire
extinguishers................................................... . Yes NO N/A
4. Are the fire extinguishers properly located and
identified......................................................... . Yes NO N/A
5. Are the fire extinguishers checked annually...... Yes NO N/A
6. Are all of the fire extinguishers in working
condition........................................................ . Yes NO N/A
7. Are employees trained in the proper use of the
extinguishers to be used................................... Yes NO N/A
8. Are smoke detectors in working order............. Yes NO N/A
We have clutter on lockers and the floor in the toolroom. We also have a trailer left parked in front of the
rear side door in the Maintenance Garage. We have had power tools left out on the tool bench in the toolroom
after use.
c :\office\report\jeffersonville\august\sftyinsp. wpd