HomeMy WebLinkAbout05) May r I , ~"""'-'~ [! 1 9 9 7 r r- L I" Jeffersonville Wastewater Treatment Facility . Monthly Qperations ~epOJ1 OperaleJ and mainlainml tg: qc c 1'"""1 ~ = = ~.. ----:c =' r- l" II l.J [, ," n L, r- t ' ! l June 30, 1997 ENVIRONMENTAL MANAGEMENT CORPORATION 701 CHAMPION ROAD JEFFERSONVillE, INDIANA 47130 812-285-6451 FAX 812-285-6454 Enclosed please find Environmental Management Corporation's (EMC) "Operations Report" for the month of May 1997, containing information on the following: 1.0 2.0 3.0 4.0 5.0 6.0 Effluent Quality Design Loading Limits Facility Operations 3.1 Pretreatment Preventive and Unscheduled Maintenance 4.1 Maintenance & Repair Expenditures 4.2 Repair & Replacement Expenditures 4.3 Capital Improvement Expenditures 4.4 Electrical Expenditures Facility Safety and Training Sewer Collection System As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we are available to discuss this report, or any other aspect of our operations, at the convenience of the City. Sincerely, ENVIRONMENTAL MANAGEMENT CORPORATION ~/-t Scott J. Timmermann F acili ty Manager SJT;sb 1.0 EFFLUENT QUALITY During May, effluent quality was within NPDES permit limits for CBOD and TSS concentrations. Table 1.1 summarizes the effluent quality data. Attachment A contains Time Series Plots of daily CBOD and TSS values. Table 1.1 EFFLUENT QUALITY n ! i,..... Parameters Permit Limit Monthly Average mg/L mg/L ___1~~, .. .. J. '. Carbonaceous 15 3 Biochemical Oxygen Demand (CBOD) V,,^ .. Co'., "","""".".,,, .'''''' ','.., .,-.., .." Total Suspended 18 11 Solids (TSS) . ",~ .. .. Fecal Coliform 200 46 (Colonies/ 100 ml) .'~"""'"'.,.,.~ ,ltl!P.l!l , ..," ,"au., ~ "' "~".",,,,,,,,,. '_',,_,,~_, 1 Chlorine Residual .05 daily 0.00 Maximum ^".. m. I ' . ~,. ."r."...,,, _.,., .., . "!r _.J Ammonia 1.5 .70 ~- .~..." ~.,,,~, k.. ,,'"". . 'c """'.,,~, . ...'~ Flow J" 5.2 6.27 (MGD) ""~'"'" ",.,.,. ....."""'""''''''''' .. r: t! fi tJ r i L., r 2.0 DESIGN LOADING LIMITS [ Table 2.1 summarizes the influent design limits vs. actual influent loadings in pounds while Table 2.2 summarizes the influent design limit in mg/l to the wastewater treatment facility. Table 2.1 INFLUENT LOA])ING LIMITS (lbs) f,l fJ ,....c",.,..."...,,,,,., ,..,",,,', May Influent Design limits Actual Percent Of Limits (Ibs) (lbs) Design Flow 5.2 mgd 6.27 mgd 120% Total 1O,1051bs 18,1451bs 180% Suspended Solids (TSS) lbs. " Carbonaceous 10,581 lbs 9,7261bs 92% Oxygen Demand (BOD) lbs. Ammonia lbs. 867 lbs 585lbs 67% t',,""",............ [ r 1 Table 2.2 INFLUENT LOADING LIMITS (mg/l) l",..:.. ,", ....... '"","r.!:. May Influent Design Actual Percent Of Limits (mg/I) (mg/l) Design .. Flow 5.2 mgd 6.27 mgd 120% Total 233 mg/l 347 mg/l 149% Suspended Solids (TSS) mg/l " .~ . Carbonaceous 244 mg/l 186 mg/l 76% Oxygen Demand (BOD) lbs. Ammonia 20 mg/l 11.19 mg/l 56% (mg/l) I r f I 1....0 r- i; f t . c o 3.0 FACILITY OPERATIONS Attachment B contains a list of septic haulers that discharged at the facility during the month of May. [I. ,,J During May the treatment processes performed well. The facility did experience several high peak flow events throughout the month. Poor sludge settleability at the final clarifiers and high SVI's (sludge volume index), continue to create some concern. The poor settleability can be attributed to the high influent loadings and oil and grease concentration. Mixed Liquor Suspended Solids (MLSS) concentrations have been lowered in the oxidation ditch to aid in the settleability problems. High flow rates due to heavy rains reduces the detention time through the secondary treatment process. This, along with the high TSS & CBOD influent loadings, continue to create settling problems. The increased influent loading requires a higher Dissolved Oxygen (DO) concentration in the oxidation ditch. Our continued efforts to reduce the influent loadings should help in reducing this problem. [ 3.1 PRETREATMENT o Pretreatment activities for the month of May included: ~ A meeting was held with A.W. Goodman & Associates on June 13, 1997 to discuss the 90 day loading study at three main lift stations and five significant industrial users (G. Pfau, Dallas Group, PQ, Wyandot and IWR). This study was completed on May 16, 1997. The purpose of the meeting was to: r . ! . . Provide the most current draft of the surcharge ordinance to the industries for their review. Review all data collected from February 17 thru May 16, and determine the accuracy of the data. Compare the current Industrial loadings with what was projected in the 1990 Facilities Plan. r , I I I. , ~ A Notice of Violation (NOV) was issue~ to Wyandot Inc. for interference at the Wastewater Treatment Facility. Wyandot Inc. has been discharging very high loadings of Biochemical Oxygen Demand (BOD) and Total Suspended Solids (TSS) to the facility requiring substantial plant adjustments. o ~ A Notice of Violation (NOV) was issued to Custom Plating after an inspection was conducted by the Pre-Treatment Coordinator for the following. . Improper Solids Removal. Improper Tank Labeling. Spill plan was not posted. . o . [ r L, r I t D D D n ~~ ~ Sampling is currently being conducted at Clark Memorial Hospital, to determine the strength of their discharge loadings and possible impact on the wastewater treatment facility. 4.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE Preventive maintenance was performed on all equipment as scheduled in May. There were 17 unscheduled maintenance tasks performed. All were minor repairs except for: ~ Repaired No. I pump at Spring street lift station. ~ Repaired three roller assemblies on conveyor belt for belt filter press. ~ Replaced electrical contacts and motor alternating switch at Silver Creek lift station. ~ Pulled No.5 pump at 10th Street lift station for replacement of worn impeller and wear ring. A list of unscheduled maintenance work orders is included as Attachment. C. Maintenance and repair expenditures for the month of May are detailed in Attachment D. Table 4.1 represents the amount expended in May. Table 4.2 includes the same information for repair and replacement expenditures. Attachment E contains a detail of repair and replacement expenditures for May. Table 4.1 MAINTENANCE & REPAIR EXPENDITURES Time Period Amount Budget (Over) Expended Under ,. ,,,"~" '-~'~'"'""~"'""._'" .......",".. ".,.....;,.-.,;..""".""."...,,,,,,,.....,,-',..,...,,,,:.,,..,,..'.-.,,-'.. ^ ~.~'_...,.....:."... ,'" May $5,122 $4,200 ($922) ", Y ear- To-Date $5,122 $4,200 ($922) r k-" Table 4.2 REPAIR & REPLACEMENT EXPENDITURES Time Period Amount Budget (Over) Expended Under """ May $5,118 $8,334 ... $3,216 Y ear- To-Date $5,118 T $8,334 J $3,216 ,..."'" 4.3 CAPITAL IMPROVEMENT EXPENDITURES Attachment F details expected Capital Improvement expenditures for tbe contract period of May 1, 1996 through May 30, 1997. 4.4 ELECTRICAL EXPENDITURES Table 4.4 relates to electrical expenditures for May 1996. r ld Table 4.4 ELECTRICAL EXPENDITURES l "" Time Amount Budget (Over) Period Expended Under ..",,' '" nmi,.""",,"' May $18,109 $15,918 ($2,191) (estimated) Y ear-to- Date $18,109 . [~15'918 J ($2,191) (estimated) -"..,." - fl L.J o 5.0 FACILITY SAFETY & TRAINING D Safety inspections were conducted on May 9,1997 . The rating was 95%. The deficiencies reported were: ~ L ~ Walkways being blocked by vehicles and mowing equipment. ~ Combustible materials not being properly stored. ~ All personnel are not trained in C.P.R. o c o [ r t,,; A copy of the Safety Inspection report is included as Attachment G. Safety training was provided by the facility Safety Coordinator on proper traffic control procedures. 6.0 SEWER COLLECTION SYSTEM During the month there were 30 sewer calls. The calls were related to the following: ~ Twenty-three were related to the following: ~ Twenty were related to blockages within the resident's line ~ Three were due to blockages within the City's main line. ~ Four were related to catchbasin drainage. ~ Two were caused by odor complaints. ~ One was caused by roots. c n r t I U Collection systems personnel are continuing to locate InfiltrationlInflow (1&1) problems at the Middle School Lift Station area. All manholes in the Mallard Run subdivision have been inspected and have been repaired. We have televised sewer lines and started with sump pump inspections, trying to locate any possible 1&1 problems and any possible illegal connection into the sanitary sewer system in the Mallard Run subdivision. Table 6.1, on the next page, details the data on May's sewer projects. [ OJ I ,.: D C rj tJ C o c r l~~ c r l" n; n c n c Table 5.1 MONTHLY COLLECTION SYSTEM ANALYSIS Project May Year to Date .",. ...- .. _.- Sanitary Sewer Cleaned / 25,186 25,186 Feet Storm Sewer Cleaned / Feet 1,350 1350 Catchbasins Cleaned Grate Tops = 150 Grate Tops = 150 Vactored = 12 Vactored = 12 Catchbasins Raised 0 0 -'''' ,"," Sewer Televised / ft 2,667 2667 Sewer Tap Inspections 2 2 .._.w Dye Testing 3 3 Manhole Castings Replaced 1 1 Air Testing 3 3 Manholes Sealed 4 4 ~. Service Calls Backup Odor Main Block Resident Storm Related Rece.ived Problem Backups .-' 30 0 2 3 20 0 "' "' "." " - Locates Roots Catch Basin 64 1 4 MOR o ~1 ,1 [ ATTACHMENTS - o [ A B C D E F G ~ L C D n [ [ [J o r L Q [l L D [ [ i .4 [ TIME SERIES PLOTS SEPTIC HAULERS REPORT UNSCHEDULED MAINTENANCE WORK ORDERS MAINTENANCE & REPAIR EXPENDITURES REPAIR & REPLACEMENT EXPENDITURES CAPITAL IMPROVEMENT EXPENDITURES SAFETY INSPECTION REPORT - i r . Attachment A r l Time Series Plots b,._, '-~'''I ""1 1 "I Jeffersonville Wastewater Treatment Facility Effluent CBOn / TSS -+- EFFLUENT CBOD -ll- EFFLUENT TSS -PERMIT CBOD -PERMIT TSS 10 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 110 100 90 80 70 60 50 40 30 20 May 1997 r , f L ~" r r-- i r AttachmentB Septic Haulers Report r-- r- r r r ...- 1.,,-,...,., ...- 1 l - 1 L..,; SEPTIC HA llLERS REPORT MaJ'1997 Loads Delivered To Treatment Facility Hauler May Hauler Total (YTD) - . P... y. 5 54 TOTAL 54 54 Gallons Delivered To Treatment Facility Hauler May Hauler Total(YTD) - . P... .. 5,500 65,830 TOTAL 65,830 65,830 r r- Attachment C Unscheduled Maintenance Work Orders - , 6/23/97 Work Order History Comprehensive 1 Page Repair Task #: Originator: Phone: Down Time: 0.00 Emp. Hours: 9.00 Vendor Hours: 0.00 Request Date: Sched Start Date: Completion Date: 5/1/97 Delay Description: Equipment #: Description : Comments: Wo Type: REPAIR Priority: Ext.: Assigned By: Assigned To: Total labor Hrs: 9.00 Request Time: Sched Finish Date: Completion Time: Down Time: Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N PULLED OFF JOB AT MEADOWS ,PICKED UP 6" SUCTION HOSE AND DISCHARGE HOSE & PUMP TO SET UP AT GRAHAM ST. TO PUMP FROM MANHOLE TO ANOTHER ON 7TH ST. FOR IRISH PARK CONST. PANEL LIGHTS o Wo Type: REPAIR Priority: 1.00 Ext.: Assigned By: Assigned To: Total labor Hrs: 1.00 Request Time: Sched Finish Date: Completion Time: 00:30:32 Task #: Originator: Phone: Down Time: 0.00 Emp. Hours: 1.00 Vendor Hours: 0.00 Request Date: Sched Start Date: Completion Date: 5/1/97 Delay Description:. Equipment #: --Top Level-- Down Time: Description: Overall Facility Comments: CHANGED 10 BULBS AROUND PLANT l' L_ Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N LIGHT BULBS 10.00 $11.50 [ o _..1- 6/23/97 . . Work Order History Comprehensive 2 r ~ I LJ Page 01 - - - _.-~ CHECK OF 8AD ALARMS PROJECT 1.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/1/97 Delay Description: 0.00 0.00 0.00 0.00 01 :42:07 n LJ [ Equipment #: Description : Comments: Down Time: Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N HELP 808 MILLER n [j Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/2/97 Delay Description: Wo Type: REPAIR Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: 6.50 Request Time: Sched Finish Date: Completion Time: 0.00 6.50 0.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response M ins: Perf By Warranty: N Equipment #: Down Time: Description : Comments: HELPED 808 MILLER CREW PUT SEWER CLEANOUT IN ON JOY ST. l n D 6/23/97 Work Order History Comprehensive 3 Page CLEAN WET WELL AT SELLERSBURGH WWTF ST Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: PROJECT 1.00 G [j D Task #: Originator: Phone: Down Time: 0.00 Emp. Hours: 5.00 Vendor Hours: 0.00 Request Date: 5/5/97 Sched Start Date: Completion Date: 5/6/97 Delay Description: Equipment #: CSO Description: COMBINE SEWER OVER FLOW Comments: Down Time: ST DG 5.00 00:52:18 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: 2 Response Hrs: 0 Response Mins: 0 Perf By Warranty: N D CLEAN WET WELL AT THE SELLERSBURGH WWTF. WE VACTORED AND CLEANED WET WELL AT SELLERSBURG PLANT Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/6/97 Delay Description: Equipment #: CSO Description: COMBINE SEWER OVER FLOW Comments: CLEAN CATCH BASIN ON 7TH AND GRAHM. WE ALSO NEED TO FIND OUT WHAT DIRECTION THIS CATCH BASIN FLOWS. CLEAN CATCH BASIN ST Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: PROJECT 1.00 0.00 2.00 0.00 5/5/97 ST DG 2.00 00:52:32 Down Time: Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: 2 o o N [' I ..~ WE VACTORED & CLEANED CATCHBASIN, CATCH BASIN FLOWS INTO GRAHAM ST. LINE c 6/23/97 [ Work Order History Comprehensive Page 6 10TH STREET FLOWMETER Task #: 9riginator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/6/97 qelay Description: Q 0.00 14.50 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: PROJECT 1.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 14.50 01:10:43 Equipment #: 5TENTH ST. Down Time: r Description: TENTH STREET LS. l Comments: SET AUX. FLOW METER OF FORCE MAIN AND DISCHARGE LINE OF EACH PUMPS P I 1307 PEACH ST. JET TRUCK Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/7/97 Delay Description: o 0.00 2.00 0.00 Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 2.00 Request Time: Sched Finish Date: Completion Time: 03:47:53 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Equipment #: JET TRUCK FT. Down Time: Description: FOOTAGE OF LINE CLEANED BY JET TRUCK Comments: JET RODDED & CLEANED MAIN SEWERLlNE VACTOR MAN HOLE OUT TOTAL FT. 250 JET CLEANING MEADOWS Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/7/97 Delay Description: 0.00 6.00 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: FOOTAGE 1.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 6.00 03:59:33 ~ Equipment #: JET TRUCK FT. Down Time: Description: FOOTAGE OF LINE CLEANED BY JET TRUCK Comments: JET RODDED MAIN LINES BELMAR DR. & SCOTT DR., BELMAR CT.TOTAL FT. 1380 c c 6/23/97 Work Order History Comprehensive 7 Page OJ, ':'1 [J .J 112W. RIDDLE ST.JET TRUCK Task #: Originator: Phone: Down Time: 0.00 Emp. Hours: 8.00 Vendor Hours: 0.00 Request Date: Sched Start Date: Completion Date: 5/7/97 Delay Description: Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total labor Hrs: 8.00 Request Time: Sched Finish Date: Completion Time: 04:08:18 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N c Equipment #: Description: Comments: I JET TRUCK FT. Down Time: FOOTAGE OF LINE CLEANED BY JET TRUCK VACTOR TWO CATCHBASIN THEN CLEANED STORM LINE, TOTAL FT. 450 CLEANUP ON BUNTON MOWERS c Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/8/97 Delay Description: Wo Type: PROJECT Priority: 3.00 Ext.: Assigned By: ST Assigned To: MAJ Total labor Hrs: 4.00 Request Time: Sched Finish Date: Completion Time: 01:08:12 ST 0.00 4.00 0.00 [ ~ Ln,J Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Down Time: Equipment #: 1 BUNMOW#1 Description: BUNTON MOWER Comments: [ Equipment #: 1 BUNMOW#2 Description: MOWER Comments: Down Time: ~quipment #: 1 BUNMOW#3 Description: BUNTON MOWER #3 Comments: Down Time: [ [,, 'j (.'1 ' ,~ c c 6/23/97 Work Order History Comprehensive 8 Page Task #: Originator: Phone: Down Time: 0.00 Emp. Hours: 2.25 Vendor Hours: 0.00 Request Date: Sched Start Date: Completion Date: 5/8/97 qelay Description: Equipment #: JET TRUCK FT. Down Time: Description: FOOTAGE OF LINE CLEANED BY JET TRUCK Comments: JET CLEANED 8" MAIN ON LOCUST ST. IT WAS NOT STOPPED UP TOTAL FOOTAGE 275 r LJ RIDDLE ST. JET TRUCK [ [ Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total labor Hrs: 2.25 Request Time: Sched Finish Date: Completion Time: 04:03:59 [J Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N PENN ST.JET TRUCK r l Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/9/97 Delay Description: Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 2.00 Request Time: Sched Finish Date: Completion Time: 03:50:19 0.00 2.00 0.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N c Equipment #: Description: Comments: JET TRUCK FT. Down Time: FOOTAGE OF LINE CLEANED BY JET TRUCK JACKEHAMMERED CATCHBASIN TOP OUT, AND VACTORED C.B. OUT JET CLEANED LINE TOTAL FT. 24 FT ~ o [ o n ~ , 6/'2.3/97 Work Order History Comprehensive Page 9 DUNCAN AVE. JET TRUCK Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/9/97 Delay Description: [ 0.00 7.00 0.00 Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 7.00 Request Time: Sched Finish Date: Completion Time: 04:06:36 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Equipment #: Description: Comments: JET TRUCK FT. Down Time: FOOTAGE OF LINE CLEANED BY JET TRUCK JET CLEANED 10" MAIN 2250 FT. ON SEWER CALL THEN CLEANED 8" MAIN ON SPARKS TOTAL FT. 2680 D CREATE AND INSTALL NEW CHAIN GUARD FOR FINISH MOWER Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/12/97 Delay Description: ...- I f l . r i..,,,,,."I [ ST Wo Type: SAFETY Priority: 2.00 Ext.: Assigned By: ST Assigned To: MAJ Total Labor Hrs: 6.00 Request Time: Sched Finish Date: Completion Time: 01:13:46 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 0.00 6.00 0.00 Equipment #: 1BUSHHOG1 Description: BUSH HOG MOWER Comments: r i Down Time: Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/12/97 Delay Description: r , t L. [: .."",, n LJ 01 j CLEAN CATCHBASINS ST Wo Type: PROJECT Priority: 1.00 Ext.: Assigned By: ST Assigned To: RL Total Labor Hrs: 3.00 Request Time: Sched Finish Date: Completion Time: 03:27:59 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 0.00 3.00 . 0.00 Equipment #: CATCHBASINS Down Time: Description: GENERAL Comments: WE CLEANED BASINS IN DOWNTOWN AREA & OUTER LIMITS OF TOWN [, : [ o 6/23/97 Work Order History Comprehensive 10 Page Oi \ J Oak park jet truck n o Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/12/97 Delay Description: Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 6.00 Request Time: Sched Finish Date: Completion Time: 04:01 :54 0.00 6.00 0.00 r ! Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Equipment #: JET TRUCK FT. Down Time: Description: FOOTAGE OF LINE CLEANED BY JET TRUCK Comments: CLEANED MAIN SEWER LINE FO JOE RESHEAR AND 3 MANHOLES, TOTAL FT.1245 ~ n [J ~ Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: 5/13/97 Completion Date: 5/13/97 Delay Description: Equipment #: televising Description: Televising collection system Comments: TV 8" MAIN MANHOLE #34 TO MANHOLE #63 (CHERRY ST. DOWN PEACH CT.). MAIN LINE DID HAVE ROOTS, TOOK ROOT CUTTER THROUGH MAIN AND REMOVED ROOTS, A FEW TAPS STILL HAVE ROOTS GROWING THROUGH THEM. FROM MANHOLE #34 154'FT IS CLAY PIPE, THEN TURNS TO PVC TO MANHOLE #63. WE FORWARDED THIS INFORMATION TO CONSTRUCTION CREW. TVING MAIN LINE DOWN PEACH CT. PROJECT 1.00 ST Wo Type: Priority: Ext.: Assigned By: Assigned To: Total labor Hrs: Request Time: Sched Finish Date: Completion Time: 5/13/97 00:33:03 0.00 12.00 0.00 ST KJ 12.00 n Down Time: ~ n o o D C fl I,J Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: 1.00 N [, , :,J 6/23/97 Work Order History Comprehensive 11 D OJ , .i ~ 'J ,~ Page REEDS LN JET TRUCK Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/13/97 Delay Description: Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 12.00 Request Time: Sched Finish Date: Completion Time: 03:53:35 t 0.00 12.00 0.00 o Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Equipment #: Description : Comments: JET TRUCK FT. Down Time: FOOTAGE OF LINE CLEANED BYJET TRUCK JET CLEANED 8" MAIN THE COMPLETE MAIN WAS STOPPED UP , OVERFLOWED IN A DITCH FOR 4.5 DAYS VACTOR OUT DITCH ALSO, RAGS AND GREASE lJ P'EACH ST. JET TRUCK & TV r L. Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/13/97 Delay Description: Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 12.00 Request Time: Sched Finish Date: Completion Time: 03:57:23 0.00 12.00 0.00 [ D Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Equipment #: Description : Comments: JET TRUCK FT. Down Time: FOOTAGE OF LINE CLEANED BY JET TRUCK TV 8" MAIN AND TRY TO FIND OUT WHAT PROBLEM IS ROOTS USED ROOT CUTTER 154 FT, AND JET CLEANED 238 FT. r n LJ D' , ,1 . '! ~ o [1 ,"; 6/23/97 Work Order History Comprehensive Page 12 c 9TH ST. JET TRUCK Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/15/97 Delay Description: c c D Wo Type: Priority: Ext.: Assigned By: Assigned To: Total labor Hrs: Request Time: Sched Finish Date: Completion Time: 0.00 2.00 0.00 FOOTAGE 1.00 2.00 03:33:04 " Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N [ Equipment #: Description: Comments: i JET TRUCK FT. Down Time: FOOTAGE OF LINE CLEANED BY JET TRUCK CLEANED 10" MAIN IN 90Q BLOCK OF 9TH ST. TOTAL FT. 445 n JOHNQUIL DR. JET TRUCK Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/15/97 Delay Description: c r L 0.00 1.50 0.00 Wo Type: Priority: Ext.: . Assigned By: Assigned To: Total labor Hrs: Request Time: Sched Finish Date: Completion Time: FOOTAGE 1.00 1.50 03:35:22 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N [ Equipment #: JET TRUCK FT. Down Time: Description: FOOTAGE OF LINE CLEANED BY JET TRUCK Comments: HELP JOE REASHER CLEAN 8" MAIN FOR ROLLING FEILDS LIFT STATION TOTAL FT.275 [ PEACH RD. JET TRUCK Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/15/97 Delay Description: [ 0.00 0.00 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total labor Hrs: , Request Time: Sched Finish Date: Completion Time: REPAIR 1.00 0.00 03:37:54 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Down Time: Equipment #: SEWER CALLS Description: GENERAL Comments: [ r LJ 6/23/97 Work Order History Comprehensive Page 13 GRATE IN SIDEWALK AT CLAIFIERS Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/16/97 Delay Description: [ 0.00 1.50 0.00 Wo Type: REPAIR Priority: 1.00 Ext.: Assigned By: Assigned To: Total labor Hrs: 1.50 Request Time: Sched Finish Date: Completion Time: 00:16:04 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Equipment #: --Top Level-- Description: Overall Facility Comments: REPAIRED AND PUT BACK IN Down Time: f1 L SILVER CREEK STATION Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/16/97 Delay Description: f t. n Li 0.00 8.00 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total labor Hrs: Request Time: Sched Finish Date: Completion Time: REPAIR 1.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 8.00 01:19:09 [ Equipment#: 5SILVER CREEK Down Time: Description: SILVER CREEK L.S. Comments: FOUND SWITCH BAD WAS NOT ALTERNATING REPLACED GANDR DR. JET TRUCK Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/16/97 Delay Description: r L 0.00 21.00 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: FOOTAGE 1.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 21.00 04:03:56 Equipment #: JET TRUCK FT. Down Time: Description: FOOTAGE OF LINE CLEANED BY JET TRUCK Comments: CLEANED AND VACTOR 8" MAIN LINE TOTAL FT. 1144 c [ Q 6/23/97 Work Order History Comprehensive Page 14 fi L 43 LOUISE ST. SEWER CALL Task #: 9riginator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/17/97 Delay Description: [ Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: REPAIR 1.00 0.00 0.50 0.00 0.50 Reason For Outage: Expense Class: Est. "Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 00:38:23 Equipment #: SEWER CALLS Down Time: Description: GENERAL Comments: CHECKED MAIN LINE ITS OK , RESIDENTS PROMBLEM . Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/18/97 Delay Description: BISHOP CIRCLE. l [ 0.00 9.00 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: REPAIR 1.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 9.00 00:48: 18 [' . i J Equipment #: CATCHBASINS Description: GENERAL Comments: REPAIRED STORM LINE Down Time: [; 1800 DUTCH LN. JET TRUCK Task #: Originator: Phone: Down Time: ~mp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/18/97 Delay Description: 0.00 5.00 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: FOOTAGE 1.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 5.00 03:31 :04 Equipment #: JET TRUCK FT. Down Time: Description: FOOTAGE OF LINE CLEANED BY JET TRUCK Comments: MANHOLES WHERE STOPPED UP, MANHOLE 189 STOPPED UP ALSO, SHOT FROM #189 TO #187 TO UNSTOP THEN SHOT #189 TO #190 TO MAKE SURE SOLIDS WHERE OUT TOTAL FOOTAGE 1230FT. D 6/23/97 '.:. Work Order History Comprehensive Page 15 BISHOP LN. Task #: Qriginator: .,hone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/19/97 Delay Description: Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: REPAIR 1.00 0.00 13.00 0.00 13.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 00:46:10 Equipment #: SEWER CALLS Down Time: Description: GENERAL Comments: HELPED BOBS CREW FIX TAP ON BISHOP LN. HAD DOWN LINE GOING OUT INTO MAIN BRIGHAM ST JET TRUCK Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/19/97 Delay Description: [ 0.00 4.50 0.00 Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 4.50 Request Time: Sched Finish Date: Completion Time: 04:10:41 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N o Equipment #: JET TRUCK FT. Down Time: Description: FOOTAGE OF LINE CLEANED BY JET TRUCK Comments: CLEAN 15" MAIN WITH ROOT CUTTER TOTAL FT. 600FT [ 404 GRAHAM ST. TVING Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/21/97 Delay Description: r LJ r; Lj 0.00 24.00 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: REPAIR 1.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 24.00 00:51:10 Down Time: Equipment #: televising Description: Televising collection system Comments: TV 30" MAIN ON GRAHAM ST. [, I ,.! ",d r: L 6/23/97 Work Order History Comprehensive 16 Page PLANT GENERATOR Wo Type: REPAIR Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 1.50 Request Time: Sched Finish Date: Completion Time: 22:20:00 Task #: Originator: Phone: Down Time: 0.00 Emp. Hours: 1.50 Vendor Hours: 0.00 Request Date: Sched Start Date: Completion Date: 5/22/97 qelay Description: Equipment #: 1GENERATOR1 Description: 750 KILOWATT GENERATOR Comments: Down Time: Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 1.00 $126.62 n . BATTERY 12V 5/22/97 ,.- f L.. BATTETRY 12V 5/22/97 ~ 3.00 $321.54 D; ,. '1 .J Wo Type: REPAIR Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 2.00 Request Time: Sched Finish Date: Completion Time: 22:36:58 c Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Equipment #: 1CLARIFIER4 r Description: SECONDARY CLARIFIER #4 i. Comments: RELPACED GUIDE LINE ROD il".,.,.; Down Time: .--- ALL THREAD ROD 5/22/97 1.00 $8.95 REDI BOLT 5/22/97 TURNBUCKLE 5/22/97 1.00 $0.68 1.00 $24.09 rl L1 6/23/97 Work Order History Comprehensive Page 17 CONVEYOR Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/23/97 Delay Description: r L [" "J r L. Wo Type: Priority: Ext.: Assigned By: Assigned To: Total ,labor Hrs: Request Time: Sched Finish Date: Completion Time: REPAIR 1.00 0.00 2.50 0.00 2.50 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 22:31:53 Equipment #: 1 BFPCONVEYOR1 Down Time: Description : BELT FILTER PRESS CONVEYOR Comments: REPLACED 3 ROLLERS TOOK TO SPENCERS IN STOCK o TROUBLE SPOTS Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/23/97 Delay Description: l 0.00 24.00 0.00 Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total labor Hrs: 24.00 Request Time: Sched Finish Date: Completion Time: 04:01:18 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N D Equipment #: JET TRUCK FT. Down Time: Description: FOOTAGE OF LINE CLEANED BY JET TRUCK Comments: CLEANED TROUBLE SPOTS TOTAL FT. 9655 n Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/27/97 Delay Description: #3 CLAIFIER 0.00 2.00 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total labor Hrs: Request Time: Sched Finish Date: Completion Time: REPAIR 1.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 2.00 22:28:20 D Equipment #: 1CLARIFIER3 Down Time: Description: SECONDARY CLARIFIER #3 Comments: REPALCED SHIR PIN, ADJ BRUSHES, PUT NEW LIGHT BULB IN ALARM o o D r 6/23/97 -~ . Work Order History Comprehensive Page 18 r CLEANED CA TCHBASIN Task #: Originator: Phone: bown Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/27/97 Delay Description: [" ] n LJ 0.00 15.00 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total labor Hrs: Request Time: Sched Finish Date: Completion Time: PROJECT 1.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 15.00 00:52:37 o Equipment #: CA TCHBASINS Description: GENERAL Comments: Down Time: D CLEANED CATCHBASINS Task #: 9riginator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/27/97 belay Description: Equipment #: CA TCHBASINS Description: GENERAL Comments: l' I ,-~ o o 0.00 15.00 0.00 Wo Type: PROJECT Priority: 1.00 Ext.: Assigned By: Assigned To: Total labor Hrs: 15.00 Request Time: Sched Finish Date: Completion Time: 00:56:28 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Down Time: RIVERPORT 2 SAMPLER Task #: Originator: Phone: Down Time: ~mp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/28/97 Delay Description: c D o 0.00 1.00 0.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total labor Hrs: Request Time: Sched Finish Date: Completion Time: PROJECT 1.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N 1.00 00:54:10 Down Time: Equipment #: 5RIVERPORT " Description: RIVERPORT II L.S. Comments: INSTALLED SAMPLER D [ [ 6/23/97 Work Order History Comprehensive 19 Page Task #: Originator: Phone: Down Time: 0.00 Emp. Hours: 8.00 Vendor Hours: 0.00 Request Date: 5/28/97 Sched Start Date: 5/29/97 Completion Date: 5/29/97 Delay Description: Equipment #: televising Description: Televising collection system Comments: TELEVISE MAIN LINE TO DETERMINE WERE THE RESIDENTS TAP IS LOCATED. . ADDRESS IS 1205 SPORTSMAN DRIVE. TV MAIN LLlNE TO DETERMINE WERE TAP IS LOCATED. PROJECT 1.00 Wo Type: Priority: Ext.: Assigned By: Assigned To: Total Labor Hrs: Request Time: Sched Finish Date: Completion Time: r t , L. , ST KJ 8.00 00:58:41 [ C Down Time: Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: 1.00 2 o o N RESIDENTS fl U SPORTSMAN DR. JET TRUCK [ C Task #: Originator: Phone: Down Time: . Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/29/97 Delay Description: Wo Type: FOOTAGE Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 18.00 Request Time: Sched Finish Date: Completion Time: 03:45:21 0.00 18.00 0.00 [ Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N [ Equipment #: Description: Comments: JET TRUCK FT. Down Time: FOOTAGE OF LINE CLEANED BY JET TRUCK JET CLEAN 10" MAIN ON SPORTSMAN DR., THEN TVED LINE TO FINE 1205 TAP AND MARK IT FOR THE RESIDENT c [ o Work Order History Comprehensive SPRING ST. STATION r , L; Task #: Originator: Phone: Down Time: Emp. Hours: Vendor Hours: Request Date: Sched Start Date: Completion Date: 5/30/97 Delay Description: Wo Type: REPAIR Priority: 1.00 Ext.: Assigned By: Assigned To: Total Labor Hrs: 17.00 Request Time: Sched Finish Date: Completion Time: 01 :38:00 r L L . 0.00 17.00 0.00 Reason For Outage: Expense Class: Est. Duration: Actual Duration: Response Days: Response Hrs: Response Mins: Perf By Warranty: N Equipment #: Description: Comments: 5SPRING STREET Down Time: SPRING STREET LIFT STATION #1 PUMP ,NOT PUMPING, OPENED CLEANOUT TO REMOVE PART OF PLASTIC BUCKET&RAGS, SUMP PUMP NOT WORKING, GOT IT WORKING AND CLEANED UP Grand Totals: r f l > Down Time: Emp. Hours: Vendor Hours: Total Labor Hours: r L.> D D.: ,,,,..;J r L G 0.00 333.25 0.00 333.25 ,.-- f ~ - ~ Attachment D Maintenance & Repair Expenditures o c P.O. Date 515197 515197 515197 515197 5/5/97 r L [J,; },":l :j o D o 515197 515197 515197 5/5/97 515197 515/97 515197 515197 515197 ; 5/5/97 515197 515197 515197 5/5/97 5/5/97 5/5/97 n lJ , 515197 5/5/97 5/5/97 5/5/97 5/5/97 515197 Jeffersonville Wastewater Treatment Facility Maintenance & Repair Expenditures Vendor Description BR RUBBER & SUPPL YBOOTS & GLOVESFOR PLANT USE CARDINAL DISTRIBUTION GLOVES BOUGHT IN BULK FORPl.AIlT CUNNINGHAM OVERHEAD DOOR OVERHEAD DOOR REPAIR IN SLUDGE BUILDING FALLS CITY ELECTRIC FLOURESCENT LAMPS FOR PLANT FARM BUREAU CO-OP WEED SPRAY FOR PLANT FRANK STEMLER SUPPLIES FOR CHLORINE LINE REPAIR HEUSER HARDWARE TAPE FOR PLANT JNOHVAPNEUMATICS, INC. ISCO, INC. OFFICE DEPOT PARKSON CORPORATION RUMPKE U.S. RL TER ULAND SUPPLY COMPANY Ell. INSTRUMENTS ISCO, INC. PLUMBERS SUPPLY #1 BLOWER FIL TER PUMP HOSE FOR INFLUENT SAMPLER PLANTSUPPL/ES BRUSHES FOR #2 BARSCREEN INPl.ANT 30 YARD LEASE & DISPOSAL BLOWER FILTERS FOR PLANT REPAIR OF 61NCHPUMP REPAIR VOLTMETER FOR PLANT PLUMBERS SUPPLY SEMBLEX SAMPLER MOTOR REPLACEMENT PLUMBING MATERIAL FOR CHLORINE SYSTEM PVC CHLORINE LINE #1 POLY BLEND MACHINE #1 POLY BLEND MACHINE BU~S FOR THICKNER TIMERS PVC FOR FLOAT ASSEMBLY AT MIDDLE SCHOOL FILTERS FOR SPRING STREET L.S. SEMBLEX SPENCER MACHINE FALLS ClTYELECTRIC HEUSER HARDWARE PEERLESS FALLS CITY ELECTRIC J FRANK STEMLER KELBURNENGINEERING CO. LAMP BULBS FOR 10TH STREET LIFT STATION STARTER FORPUMP CONTROL AT LOUISE STREET #2 PUMP LIFT STATION SUPPLIES WILSON SCHOOL L.S.COIL FOR MOTOR Page 1 Amount $209.64 $1111.80 $277.50 $74.72 $38;80 $19.95 $26.31 $338;65 $175.00 $45.98 $48.00 $475.90 $323.20 $66.17 $103.15 $139.25 $29.00 $47.89 $162.50 $301.50 $85.97 $285.60 $27.56 $46.20 $227.46 $2.35 $46.10 o P.O. Date 515/97 5/13/97 5/13/97 5/13/97 5/13/97 I 5113/97 [ 5/13/97 5/13/97 5/13/97 5/13/97 5/13/97 5/13/97 5/13/97 5/13/97 ~,'I '. J j oj 5/13/97 5/13/97 5/13/97 5/13/97 5/13/97 5/13/97 5/14/97 5/14/97 5120/97 5120/97 5120/97 5120/97 5120/97 5120/97 Vendor WATER WORKS SUPPLIES GE SUPPL Y HEUSER HARDWARE HEUSER HARDWARE HEUSER HARDWARE HEUSER HARDWARE HEUSER HARDWARE HEUSER HARDWARE JACKSON-JENNINGS MIDWEST WHOLESALE OFFICE DEPOT OFFICE DEPOT RADIOSHACK HEUSER HARDWARE HEUSER HARDWARE HEUSER HARDWARE MAIN ELECTRIC WATER WORKS NAPA AUTO OFFICE DEPOT MIKE ARMS, JR. PARRISH HEUSER HARDWARE HEUSER HARDWARE HEUSER HARDWARE HEUSER HARDWARE HEUSER HARDWARE SEMBLEX Jeffersonvilfe Wastewater Treatment Facility Maintenance & Repair Expenditures Description CLEANOUT CAP FOR MIDDLE SCHOOL L.S. SUPPORT 8RACKET FOR LAB 2 SCREWS GRINDING DISC ITEMS TOREPAIR WOODS MOWER MISC. EQUIPMENTFORPLANT SAFETY CHAIN FOR MOWER SUPPLIES FOR PLANT WEED SPRAYER FOR PLANT FLOW METER PLANT SUPPLIES PLANT SUPPLIES 16 GAUGE WIRE FOR PLANT SAFETY CHAIN FOR WOODS MOWER AIR RELEASE VALVE FORMIDOLE SCHOOL L.S. CHEATER POWER SUPPLY RELAYFOREASBROOK CLAMP FOR FLOWMETER AT 10TH STREET OIL FOR CEDARVIEWPUMP OFFICE SUPPLIES SOCKET RAILS NUTS &80LTS FOR PLANT COTTER PINS FOR PLANT DUCT TAPE FOR PLANT KEYS FOR VEHICLES #6413& MAINTENANCE SHOP SUPPLIES FOR PLANT SUPPLIES FORPLANT VALVE HOUSING FOR PRESS ROOM Page 2 Amount $15.75 $34.56 $0.25 $6.28 $14.22 $21.44 $20.95 $13.84 $38.17 $4.20 $10.67 $11.48 $9.44 $22.26 $225.57 $26.66 $96.31 $10.99 $53.49 $6.97 $15.00 $4.81 $4.41 $2.61 $1.87 $0.95 $2.10 $45.50 P.O. Date o c 5/20/97 5/20/97 D 5/28/97 5128/97 5/28/97 5128/97 5/28/97 5/28/97 5128/97 5/28/97 5130/97 [ o Vendor Jeffersonvi/fe Wastewater Treatment Facility Maintenance & Repair Expenditures Description METZGER ELECTRIC DIODES FOR CONTROL PANEL AT SILVER CREEK BUS. CTR. SAFETY SIGNS FOR CLARIFIERS COLLECTIONS SYSTEM PICTURE DEVELOPING ALL THREADRAD FOR FINAL CLARIFIER #4 CAULKING FOR PENN VALLEY #4 PUMP SUPPUES FOR PLANT CANISTER FOR DEIONIZED WATER IN LAS HEUSER HARDWARE WALGREENS HEUSER HARDWARE HEUSER HARDWARE HEUSER HARDWARIE US FIL TER US FILTER KELBURN ENGINEERING KELBURN ENGINEERING o RING FOR DIONIZEDWATER CANISTER IN LAB CREDITMEIAO FOR INVOICE #19866300 UPS MOTOR CONTROL FOR SILVER CREEK BUSINESS CENTER SHIPPING CHARGES TO ASHBROOK Tbtai Page 3 Amount $21.00 $4.73 $13.34 $18.80 $4.15 $0.76 $56.45 $8.86 ($46.10) $302.46 $109.16 5,122.36 r- I I I ; r I ~ r AttachmentE r L..: , Repair & Replacement Expenditures ..- ~ ~ i-""- i r , , , Ie ...; r- , It.. 1 I C D D Q P.O. Date Vendor 5/13/97 DEEDS EQUIPMENT 5/13/97 DERBY CITY ELECTRIC 5/13/97 DERBY CITY ELECTRIC 5/13/97 SPENCER MACHINE 5128/97 DEEDS EQUIPMENT 5/28/97 DEEDS EQUIPMENT o U D~-" !:I t [ fi [,,2 r [ [j r n [j D [ n Jeffersonville Wastewater Treatment Facility Page 1 Repair & Replacement Expenditures Description Amount (project #97017) 500' HOSE FOR VACTOR TRUCK $1,114.50 (project #97034) REPAIR DAYTON MOTOR AT $196.00 WILSON SCHOOL (project #97034) WILSON SCHOOL L.S. REPAIR $758.00 PUMP #2 (Project #97034) REPAIR PUMP AND $1,300.88 MECHANICAL SEAL AT LOUISE STREET (Project #97017) MENDER FOR JET TRUCK HOSE $868.57 AND NOZZLES (Project #97017) MENDER FOR JET TRUCK HOSE $880.29 AND NOZZLES Totai 5,118.24 r I L; r . "....,.....-.,..., I Actual % Priority Description Estimated Cost Complete ;o,,,""'''';';';'''''''''''''''''''';;''''u 1 Move Weather Head at Crums Lane No. 1 (project No. $1,500 0% 96007) .. ... 1 Painting of Interior Piping and repair of Mechanical $3,000 0% Hoist System at Spring Street (project No. 97027) 1 Replace 3" portable trash pump (project No. 97014) $3,500 $1,~14.?OJ 1000/0....., 1 Replace 2" trash pump (project No. 97015) $2,500 $1,414.00 100% 1 Trouble Sboot aud Repair #1: #2,#3, #4 an~;;;~~;sa;1 $20,00J] $28,732.00 90% 10th Street Lift Station (project No. 96029) ~ ._................;.. ,!Ml,'",."..,,,,;;;,,"",,,,"'....o,,,-.;,,.......,,..;.>,,,,",;,...:..:." ... I $49,250~43,156,061 I " Total Expenditures for Lift Stations ~~'"~~"'"'iJa.llltI"\II...,,"!1,,<ml,...:if""'".,,"~,~""'''''''''""'.."",.''i,,.,'''''''''',..""'"";_""""";",:,,,,,",,,,,,,,,,,,;,,,,_,"'''"'_''_',u,,,~,_._."" I Vehicles .1lli.""":;ll,..;;;"O;_".,"',...w._....""'~,,:"_"""',"';""'~~;:;.;"',"":.:~,_':".,~,.",:.".~,::..;:.c:_.,.,,~~''::.,... Estimated Actual % ~ Priority Description Cost Cost Complete F 1 Replace hose to Jet Truck & purchase new nozzles It 1 ()()() $2,863.00 100% (project No. 97017) 1 Replace 1987 Ram (project No. 97039) $19,000 0% I .. "., ._," 1 Replace 1986 Chevy Van (project No. 97035) $19,000 0% .,.-"'"".....""'~'-<~'"".-.. , .;....;'''..."".,,:,..~.~..~,.._.i__..... ...$41,000] $2,863.00 I Total Expenditures for Vehicles I =T--~---~- - . .-. .. . I TOTAL $168,600 J $48,394~ ~ ~ " l' 'I '.,., ,'C":~ ~ ~i o r I r L~ ri L. r Attachment F Capital Improvement Expenditures - I; r r L. r L.,.." 1996 Capital Improvement Expenditures Wastewater Treatment Facility Priority Description Estimated Actual % Cost Cost Completed 1 Repair #3 Final Clarifier Drain Valve (project No. $20,000 0% U 97005) , i , Replace Digester A ir Distribution Line (project $60,000 0% No. 97004) 1 Fall Protection Equipment (project No. 97036) $2,500 0% l 2 Pad for 20 yd. Roll off dumpster (project No. $2,000 0% 97008) 2 Valve Actuators - 10 (project No. 96026) $35,000 0% r [, Total Expenditures for Wastewater Facility $119,500 [J Collection System oJ 2 6" Portable Pump (project No. 97020) $12,000 0% n 2 60 KW Mercy Generator for Lift Stations $25,000 'I 0% '",j (project No. 97030) ~ 1 Alarm System Upgrade Phase II (project No. $56,300 0% 97013) D 'I 1 Combined Sewer Overflow Sign Posting $1,000 0% ." (project No. 97038) 1 Portable Flow Meter & Sampler (project No. $7,000 $7,243 100% 97032) C 1 Repair Line on East Gardner Drive (project No. $1,500 $1,200 100% f.! 97039) ~ 0 1 Install Manhole on Ridgeway Drive (project $1,000 0% J No. 97042) ,"""'."'".......","'"" '""i... U 1 Install Manhole on Morris Avenue (project No. $1,000 0% 97040) 1 Repair Line on Charlestown A venue $60,000 0% Total Expenditures for Collection System $164,800 ~ L n "' "" ~._",-"."" ","""'~"""" -- ".'" u ' ,,~ , ') D 1 D 1 0 2 D 1 1 1 0 1 0 [J 1 2 [ 1 2 fl id 2 Lift Stations Sensors and flow metering for 10th Street, Spring $75,000 Street & Mill Creek Lift Stations, redundant control system (project No. 96015) Upgrade Middle School L.S. (project No. 97018)1 $40,0001" Install Back-flow Control on Bypass Channel at 10th $26,000 Street L.S. (project No. 97028) 25% Lio~ 0% Relocate Bar Screens to Influent Channel at 10th Street L.S. (project No. 97026) Upgrade Powerhouse L.S. (project No. 97024) $50,000 0% 0% 0% 0% 10% 10% 10% I 0% 10% 10% $60,000 Upgrade Mill Creek L.S. (project No. 97023) $60,000 ~~~;~~;~arvlew LS. to Gravity sewer(:oJ:t-]~,5~ 1 Install Dry-well Submersible Pumps at Louise $60,000 Street L.S. (project No. 97011) $60,000 Install Dry-well Submersible Pumps at Magnolia L.S. (project No. 97009) $60,000 Install Dry-well Submersible Pumps at Ewing Lane L.S. (project No. 97010) Upgrade ca~p~;~~~,~~s..~~~~?~:~~~?~!?l~)~ $50,000 Upgrade Colonial Park (project No. 96017) Replace Rolling-Fields With G;~vity Sewer (project I' $50,000 No. 96018) Relocate Bars~re~n and Install Sluice Gate's at 10th . $45,000' L" .. I 0% Street (project No. 96019) ~ ... ,., - 'I" .. .... .... . . $669,500 ;'""iZ';'::;i,~",;':;;,;r.ltl,;",,:,,~."i",,::^,,,J,;""m~.\.,: .~..._,':",..~,.._;"....;".;;'..L,;,-,;..'".,'.'< ~'" ~~ < ~ ~ $32,000 Total Expenditures For Lift Stations o o n lJ C Vehicles 1 Replace B~m Tru~<(. ~r~j;~t 0~~,?~~~~i~:~~,'~.:.~':' Total Expenditures on Vehicles 'T.'$;~:OOO "1" . r' LO% $30,000 "' ,.-,-- o c r ~ , , k,..., Attachment G I' Safety Inspection Report I' ..- , f t o r L r L: r L, r L r L r , L [, I J ENVIRONMENTAL MANAGEMENT CORPORATION MONTHLY SAFETY INSPECTION CHECKOFF SHEET JEFFERSONVaLE WASTEWATER TREATMENT FACILITY 701 CHAMPION ROAD JEFFERSONVILLE, IN 47130 (812) 285-6451 PERSON COMPLETING INSPECTION: Waymon Payne I. Personnel Safety A. Personal Protective Clothing 1. Safety Helmets Provided (for Personnel & Visitors).................................. 2. Hearing Protection (for High Noise Areas)........................................ 3. Eye Protection - Goggles, etc. (for Personnel & Visitors).................................. 4. Gloves (for Personnel)..... ........ .............. ............... ......... 5. Rubber Boots with Steel Toes (provided for Personnel)..................................... 6. Rain Suits Provided (for Personnel)..... ............ .................. ................ 7. Is Respiratory Protection Provided including ventilators and hoods over high dust areas, dust masks, etc. (for Personnel)................................ B. Safety Devices and Equipment 1. Non-sparking Tools in areas where flammable or explosive gases may be present?.................... 2. Oxygen Deficiency, Toxic, & Explosive Gas indicator ....-.. ..... ........ ......-..................................................... 3. Self-contained Breathing Apparatus for entry to chlorine room........... ...... ........ ........... .............. 4. Confined Space Entry Equipment Available such as and including Safety Harness, Portable Wench, Hoist, etc............................................... 5. First Aid Kits with proper & adequate supplies readily available for any First Aid Emergency.... 5/9/97 Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes N@ N/A Yes NO N/A D 6. Traffic Control Cones Available........................ Yes NO N/A 7. Ladders to enter manholes of wet wells (fiberglass or wooden for electrical work)......... Yes NO N/A 8. Safety Buoys and Life Lines, Life Preservers at all open structures (02 Ditches, Clarifiers, 0 Lagoons, etc....... .................................... ...... .... Yes NO N/A D. General Plant Safety 1. Are Personnel trained in the use and location of safety equipment at the plant...................... Yes NO N/A 2. Are there railings around all tanks with r, openings chained off...................................... Yes NO N/A . L I 3. Are holes covered? Including all pits & wells, t,. drains, valve holes, hatch covers in place........ W~ N@ N/A 4. Are explosion proof fixtures used where needed...................................... ..................... Yes NO N/A 5. Are all equipment guards in place? Including mowingequipment........................................... Yes NO N/A 6. Are dry wells ventilated and is ventilation adequate in all areas....................................... Yes NO N/A 7. Are emergency numbers posted & accessible.. Yes NO N/A [ 8. Is proper liquid flammable storage used.......... YES N@ N/A 9. Is general plant cleanliness being practiced? Including floors (No oil or grease or pools of water), Storage Areas (No clutter & supplies stored properly), Chlorine Room (Free of clutter), Laboratory....... ............ ........ ............. YES N$ N/A 10. Are all walkways, exists and routes, & D stairways clear & unobstructed (No ice, oils, water, grease~ or debris)................................. YES N$ N/A 11. Are all slippery surfaces posted .and/or covered n with anti-skid material, including stair treads Li and ramps, in good repair and covered with j non-skid surface................... .................. ......... Yes NO N/A r. 12. Are all mats and rugs in good . repair so as not , . to become tripping hazards............................. Yes NO N/A , tJ 13. Are work area layouts adequate...................... Yes NO N/A 14. Is lighting adequate in all areas (Work areas, 0 stairways, walkways, etc.).............................. Yes NO N/A 15. Are noise levels within allowable limits or danger areas posted........................................ Yes NO N/A 16. Are toilet facilities available & clean............... Yes NO N/A 17. Is safe drinking water available....................... Yes NO N/A 18. Is pest control adequate.................................. Yes NO N/A 19. Are all exists properly marked......................... Yes NO N/A 20. Is inclement weather protection provided at entrances (mats, safety strips,de.,icers, etc.).... Yes NO N/A [: ':--J n 11.,,,,-,.. D 21. Are tripping hazards eliminated at all doors (threshold plates in good.repair, etc.).............. 22. Is safety glass provided in all doors................. 23. Are handrails provided on stairs (Both sides if necessary)............... ................................... 24. Are ladders properly anchored....................... 25. Are fixed ladders provided with safety cages or safety side rails......................................... 26. Are all elevation differences between floors clearly defined and properly lighted................ 27. Are portable ladders in good condition........... 28. Kick boards in place if needed........................ 29. N o Broken steps......... ................................... 30. Are ashtrays provided and emptied regularly.. 31. Are trash cans covered and emptied regularly. 32. Are portable hoists for lifting heavy equipment in good repair................................................. 33. Are plant personnel immunized for tetnus....... 34. No electrical cords stretched over tanks.......... 35. .No gas leaks................................................... 36. Fuel supply tank in .good condition................. 37. No excessively hot operating temperature on machinery or equipment................................ 38. No excessive vibration of machinery or G LJ equipment.. ........... ..........................'..................... 39. No water or oil being "slung" from equipment 40. No worn or cracked equipment..................... 41. No excessive dust on equipment................... 42. Adequate dehumidifier and heaters where needed............................................................. ........ 43. Emergency Medical Information on all employees available for determination of job r U assignments.... ..:. ........... ........... ...... .....'............... 44. Cross connections have been eliminated between potable water supply and non-potable source: a. Pump & Mixer Seals................................. b. Digester Beating System Makeup Water... c. Vacuum Filter Water Sprays..................... d. Chemical Mixing Tank............................... e. Chlorinator Water Source........................... f. De-Chlorination Water Source.................... g. Yard Hydrants............................................ h. Other................................... .............. ......... III. Electrical Safety 1. Is all electrical circuitry enclosed and identified. 2. Is all wiring in good condition.......................... Yes N@ N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes N@ N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO YES NO Yes NO Yes NO Yes NO Yes NO Yes NO YIt3 NO N/A NfA N/A N/A N/A N/A N/A N/A Yes Yes NO NO N/A N/A 3. Are the number of outlets adequate.................. Yes NO N/A 4. Is equipment properly grounded or insulated.... Yes NO N/A 5. Are extension cords in good condition and used properly.............................. ..................... Yes NO N/A 6. Is electrical test equipment available. Such as r voltmeter, ampmeter, etc................................. Yes NO N/A t.~., 7. Are dielectric rubber mats presents for electrical work........... .................................... Yes NO N/A 8. AIl control panel switches in good condition.. Yes NO N/A 9. All control panels unobstructed...................... Yes NO N/A 10. Are dielectric rubber gloves available............. Yes NO N/A 11. Are ground fault interrupters used.................. Yes NO N/A 12. Are warning or caution signs posted............... Yes NO N/A 13. Is control panel area clean and dry.................. Yes NO N/A 14. Are all needed fuses or breakers in place......... Yes NO N/A 15. Are all contacts clean and dust free................. Yes NO N/A 16. Is there emergency stop buttons on all machines and equipment................................. Yes NO N/A 17. Are personnel familiar with the electrical safety 0 such as lock out/tag out procedures................ Yes NO N/A 18. Is power supply locked out/ tagged out on equipment presently being repaired................. Yes NO N/A IV. Chlorine & Dechlorination Safety 1. All standing cylinders chained in place and/or ton cylinders chocked...................................... Yes NO N/A 2. AIl personnel rained in the use of CLz.............. Yes NO N/A 3. Appropriate repair kits available...................... Yes NO N/A 4. Chlorine & dechlorination leak detector tied into the facility alarm system........................... Yes NO N/A 5. Ventilator fan with outside switch present and either comes on when door opens or manually with switch at entrance door........................... Yes NO N/A 6. Ammonia and Sulphur for checking chlorine & r dechlorination leaks available.......................... Yes NO N/A tJ 7. Are all safety precautions posted..................... Yes NO N/A 8. Proper Chlorine wrench available to open valves.................... ............... ................ .....-.................. Yes NO N/A r 9. Chlorine protected from direct sunlight, cool , , .and -dry ........................................................................-... Yes NO N/A t~"J 10. No petroleum or other chemicals store in chlorine room........... ............. ......................... Yes NO N/A 11. Spare lead washers available on site................ Yes NO N/A V. Process Chemical Safety 1. Are personnel trained to handle all chemicals properly...... ... ............. ................ ........ ............ Yes NO N/A D 2. Is proper safety clothing present for the chemical to be handled................................... Yes NO N/A E 3. Are all containers, vats, and tanks properly J labele_d..................................................................................... Yes NO N/A 4. Is employee exposure within accepted limits.... Yes NO N/A B 5. Are there proper containment of storage areas, including curbing....................................... ..... Yes NO N/A .~ 6. Are management & employees aware of the hazards of the materials being used.................. Yes NO N/A 7. Knows proper response to an accidental spill... Yes NO N/A 8. All MSDS available and easily accessible......... Yes NO N/A 9. Has complied with the 6 employer responsibilities of the Worker Right to Know Law? (SARA).................................................. Yes NO N/A 10. Emergency Action Plan on file with local Fire, Police Departments and appropriate Emergency Agency.......... ...... ............................................ Yes NO N/A VI. Tools & Equipment 1. Are hand tools in good repair and stored properly.......... ....................... ................ ......... Yes NO N/A 2. Are power tools stored properly and in good condition - cords, plugs, etc............................ Yes NO N/A 3. Are the tools adequate for the tasks to be .perlormed...................................................................... Yes NO N/A 4. Are defective tools replaced as needed............ Yes NO N/A 5. Are tool guards inplace.................................. Yes NO N/A 6. Are employees trained in the proper use of the various tools they are expected to use............. Yes NO N/A 7. Are employees given additional instruction and periodic reviews of specialized tools and equipment........................................................... Yes NO N/A 8. Are proper lifting techniques used by employees........................................................ Yes NO N/A VII. Fire Safety & Protection 1. Are fire/emergency evacuation plans posted...... Yes NO N/A n 2. Are employees familiar with fire/emergency t..,,; evacuation plan......... ..... ........ .......................... Yes NO N/A 3. Are there sufficient number and types of fire extinguishers....... .............................. ............... Yes NO N/A 4. Are the fire extinguishers properly located and identified.......................................................... Yes NO N/A 5. Are the fire extinguishers checked annually...... Yes NO N/A 6. Are all of the fire extinguishers in working condition....................................._....................................-. Yes NO N/A 7. Are employees trained in the proper use of the extinguishers to be used..............~.................... Yes NO N/A 8. Are smoke detectors in working order............. YES NO MIA D vm. Laboratory Safety 1. Emergency Eyewash & Shower Station are present and work properly and tested monthly.. Yes NO N/A 2. Fume hood is present....................................... Yes NO N/A C 3. All chemicals safely and properly stored, well labeled and in original containers..................... Yes NO N/A 4. Laboratory Safety devices used such as: Pipette suction bulbs, Eye Protection, Gloves, Aprons or Jackets, & Tongs......................................... Yes NO N/A 5. No broken! chipped or cracked glassware........ Yes NO N/A 6. No overloaded outlets..................................... Yes NO N/A 7. Acid spill kit available..................................... Yes NO N/A 8. Emergency procedures for acid spills posted and used by all personnel................................ Yes NO N/A 9. Laboratory Safety Rules posted and obeyed by all personnel such as no cooking or eating from laboratory glassware........ ............ .................... Yes NO N/A X. Other Safety 1. Are the required safety programs presented and/or attended during the year........................ 2. Is a suitable identification system used to identify the plant's piping system...................... 3. Has the operator taken steps to remove or "minimize. safety hazards.................................... 4. Are all personnel provided with a shower and locker for their work clothes........................... 5. Are personnel trained in First Aid & CPR........ 6. Have the following proper safety signs been provided such as: Non-potable Water, Chlorine Hazard, No Smoking, High Voltage, Watch Your Step Signs in Certain Areas, & Exit Signs. 7. Is your Facility safety program Up to Date (Worksafe Program)................... ...................... (# YES) 135 - 7 x 100 = (# YES + # NO) 95 % [ Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes N@ N/A Yes NO N/A Yes NO N/A We need a fall protection unit. We are still not properly storing our flammable liquids. Also. our ,.-- , I l"; Maintenance gara~e is not being kept clean. There is still a lot of clutter being left lying around. Our in CPR. Our trash cans in the maintenance garage are also not being emptied reeularly. c:\office\rnor\sftyinsp.wpd