Jeffersonville Wastewater
Treatment Facility
Monthly Operations Report
Operated By
~
J"~
@:
=
a
ENVIRONMENTAL
MANAGEMENT
CORPORATION
July 28, 1997
701 CHAMPION ROAD
JEFFERSONVillE, INDIANA 47130
812-285-6451
FAX 812-285-6454
C. Richard Spencer, Jr.
CITY OF JEFFERSONVILLE
City/County Building
Jeffersonville, IN 47130
Dear Mr. Spencer:
Enclosed please find Environmental Management Corporation's (EMC) "Operations
Report" for the month of June 1997, containing information on the following:
1.0 Effluent Quality
2.0 Design Loading Limits
3.0 Facility Operations
3.1 Pretreatment
4.0 Preventive and Unscheduled Maintenance
4.1 Maintenance & Repair Expenditures
4.2 Repair & Replacement Expenditures
4.3 Capital Improvement Expenditures
4.4 Electrical Expenditures
5.0 Facility Safety and Training
6.0 Sewer Collection System
As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we
are available to discuss this report, or any other aspect of our operations, at the convenience
of the City.
Sincerely,
ENVIRONMENTAL MANAGEMENT CORPORATION
~Lm~
Facility Manager
SJT;sb
1.0 EFFLUENT QUALITY
During June, effluent quality was within NPDES permit limits
for CBOD and TSS concentrations. Table 1.1 summarizes the
effluent quality data. Attachment A contains Time Series Plots
of daily CBOD and TSS values. Attachment B contains Time
Series Plots of Aeration Mixed Liquors Suspended Solids
(MLSS) and Sludge Volume Index (SVI).
Table 1.1
EFFLUENT QUALITY
Parameters Permit Limit Monthly Average
mg/L mg/L
..
Carbonaceous 15 3
Biochemical Oxygen
Demand (CBOD)
Total Suspended 18 5
Solids (TSS)
Fecal Coliform 200 36
(Colonies/ 100 ml)
"
Chlorine Residual .05 daily 0.00
Maximum
Ammonia 1.5 .40
Flow 5.2 7.05
(MGD)
2.0 DESIGN LOADING LIMITS
The Flows and Loadings report for May 1994 through June 1997 can be found in
Attachment C.
3.0 FACILITY OPERATIONS
Attachment D contains a list of septic haulers that discharged at the facility during the month
of June.
During June the treatment processes performed well. The facility did experience several high
peak flow events throughout the month. However due to operator attention and making the
necessary adjustments, these events did not create any significant operational problems. Poor
sludge settleability at the final clarifiers and high SVI's (sludge volume index), continue to
create some concern. The poor settleability can be attributed to the high influent loadings
and oil and grease concentration. The high flow rates, due to heavy rains reduces the
detention time through the secondary treatment process. This, along with the high TSS &
CBOD influent loadings, continue to create settling problems. The increased influent
loading requires a higher Dissolved Oxygen (DO) concentration in the oxidation ditch. Also,
the excessive loadings are causing an increase in odors at the influent structure, increase in
sludge production and electrical consumption. Our continued efforts to reduce the influent
loadings should help in reducing this problem.
3.1 PRETREATMENT
.. A annual inspection was conducted at Industrial Water
Recycling. IWR was cited for . having drums
improperly labeled.
Pretreatment activities for the month of June included:
.. Routine annual sampling was conducted at Voss Clark.
All discharge parameters were within limits.
.. Continuous sampling is being performed at Wyandot to verify there loadings.
.. Sampling was conducted at the three major lift stations for two weeks to determine
if loadings had changed significantly since the 90 day evaluation was conducted.
4.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE
Preventive maintenance was performed on all equipment as scheduled in June. There were
9 unscheduled maintenance tasks performed. All were minor repairs except for:
.. Repaired impeller and wear ring in the non-potable water pump.
.. Repaired mechanical hoist at 10th street lift station.
.. Repaired No.5 pump at 10th street lift station.
.. Replaced vacuum pump at Wilson School lift station.
A list of unscheduled maintenance work orders is included as Attachment. E.
Maintenance and repair expenditures for the month of June
are detailed in Attachment F. Table 4.1 represents the
amount expended in June. Table 4.2 includes the same
information for repair and replacement expenditures.
Attachment G contains a detail of repair and replacement
expenditures for June.
Table 4.1
MAINTENANCE & REPAIR EXPENDITURES
,d
Time Period Amount Budget (Over)
Expended Under
.;....
June $4,228 $4,200 ($28)
..
Y ear- To-Date $9,350 $8,400 ($950)
Table 4.2
REPAIR & REPLACEMENT EXPENDITURES
Time Period Amount Budget (Over)
Expended Under
-.'-"_.~..,....~~,.,,,,-_.
June $19,881 $8,334 ($11,547)
-
Year-To-Date $24,999 $16,668 ($8,331 )
4.3 CAPITAL IMPROVEMENT EXPENDITURES
Attachment H details expected Capital Improvement expenditures for the contract period
of ,May 1, 1997 through April 30, 1998.
I"'""
f ,.;
t
!
4.4 ELECTRICAL EXPENDITURES
Table 4.4 relates to electrical expenditures for June 1996.
r-
! .
>
t
Table 4.4
ELECTRICAL EXPENDITURES
r
f
'.
.. .
Time Amount Budget (Over)
Period Expended Under
~, "''''. "",,' ...... '-.,-"
June $17,936 $15,918 ($2,018)
(estimate)
_. .
Year-to-Date $36,103 $31,836 ($4,267)
5.0 FACILITY SAFETY & TRAINING
.. Clutter and trash in and around Tool Room area.
... Trash cans in lunchroom left uncovered.
.. All personnel are not trained in c.P.R. and First
Aid.
..-
t
Safety inspections were conducted on June 20, 1997 . The
rating was 98%. The deficiencies reported were:
A copy of the Safety Inspection report is included as Attachment I. Safety training was
provided by the facility Safety Coordinator on Chlorine Safety.
6.0 SEWER COLLECTION SYSTEM
During the month there were 49 sewer calls. The calls were related to the following:
..
,....., ..
l
, I
..
..
.. Thirty-one were related to the following:
.. Twenty-nine were related to blockages within the resident's line.
.. Two were due to blockages within the City's main line.
Eight were related to catchbasin drainage.
Eight were caused by odor complaints.
One was caused by roots.
One backup due to blockage in sewer line.
Collection systems personnel have finished there investigation in trying to locate
InfiltrationlInflow (1&1) problems at the Middle School Lift Station area. All manholes have
been inspected and repaired, sewer lines have been televised ..
and sump pump inspections have been completed in the !"".
Mallard Run and Foxboro subdivisions.
r-
t
Table 6.1, on the next page, details the data on June's sewer
projects.
r-
I
i
Table 5.1
MONTHLY COLLECTION SYSTEM ANALYSIS
Project June Year to Date
Sanitary Sewer Cleaned / 13 ,443 38,629
Feet
Storm Sewer Cleaned / Feet 0 1,350
- """ --
Catchbasins Cleaned Grate Tops = 120 Grate Tops = 270
Vactored = 6 Vactored = 18
Catchbasins Raised 0 0
Sewer Televised / ft 2,070 4,737
Sewer Tap Inspections 15 17
Dye Testing 1 4
Manhole Castings Replaced 0 1
Air Testing 5 8
Manholes Sealed 4 8
., ~" "_ " "" h '" "~,",,~ _", "~"'" "" ""',. ..,,,~, ,..~ '"~" ro"" ....'"_"'......."'"....__,.,,,,,...... ....."""",,;!_ ___
~.
Service Calls Backup Odor Main Block Resident Storm Related
Received Problem Backups
-
49 1 8 2 29 0
Locates Roots Catch Basin
58 1 8
"","",,~ ,"" "'""""......."".........-""""'.. '"""....----
MOl;?
ATTACHMENTS -
A TIME SERIES PLOTS - CBOD & TSS
B TIME SERIES PLOTS - MLSS & SVI
C FLOWS & LOADINGS REPORT MAY 1994 THROUGH JUNE 1997
D SEPTIC HAULERS REpORT.
E UNSCHEDULED MAINTENANCE WORK ORDERS
F MAINTENANCE & REPAIR EXPENDITURES
G REPAIR & REPLACEMENT EXPENDITURES
H CAPITAL IMPROVEMENT EXPENDITURES
I SAFETY INSPECTION REPORT
r
r .
t
f
F
r:
f
r,
,
~ .
r0-
t
t
r
I
,
Attachment A
r
t
i
Time Series Plots
CBOD & TSS
,.....
f
0
'"
0-
N
00
N
l-
N
'D
N
V)
N
iZI
iZI
E-< '<t
E-< N
r ......
::;E '"
~ N
~ ~
,... 0...
.- I N
- N
.-
~
~ -
~ 0 N
0
,... CO 0
= U N
~ E-<
e ...... 0-
00 ::;E -
,... 00 ~
~ ~ g: ~
~
J,.o ....... I
~ Q ~ r-...
J,.o 0 iZI Q\
~ iZI 'D Q\
,... = E-< - ~
~ U E-<
~ Z ~
~ ,... ~ ~ =
~ ::
,... == ~
rI.l ~ ;! ~
~ =
~ ~
e + '"
-
r-. ~ ~
. -
. - 0 N
, .-
bl ~ 0 -
= CO
0 U -
- E-< -
.. i rI.l
:. Z
~ ~ 0
~ -
~ ti
~
n ~ u. 0-
f ~
t + 00
r-, l-
I
~
'D
r V)
t
!
'<t
r-.
'"
N
0 0 0 0 0 0 0 s 0
00 l- 'D V) '<t '" N
,-,
l
o
f
,
r
,
!
r.
j;
i
Attachment B
r
,
~
Time Series Plots
MLSS & SVI
r
,
I
r
,
,
,
,
r
~
r
.
€
r-. 0
t . '"'
~
0\
01
00
01
r-
01
r-
\0
01
III
01
"""
01
'"'
r 01
01
~ 01
~
.- -
-
.- 01
U
~ 0
~ 01
~ ~
=: 0\
8 -
QJ $..i CIJ
8 CIJ
0 -- E-< 00
~ = 00. ..... .......
...- ~ 0"'00. 's
, QJ .- ~ ;J r-
~ .......
~ ~~ c
CI)
'r;; \0 l'
~ ~"-' ~ ....... ~
r"', QJ QJ {I..l 0 ~
~ ~ ~ I III 1"'"'1
~ .-
~ .- ....... ~
~ -
0 =
QJ =: 00. ~ """ =
~ - I-:l
{I..l 0 ~ s
~ .- CIJ '"'
~ ~ QJ CIJ -
~ ~ .....:l
~ =: ~
QJ 01
QJ QJ + -
, - -<
! - ~
.- {I..l -
.... = -
=
0 00. 0
r {I..l -
$..i
~ 0\
~
QJ
,..... ~ 00
r-
,.......
; \0
I
!
III
"""
'"'
01
-
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
III 0 III 0 III 0 III 0 III
""" """ '"' '"' 01 01 - .......
r
r
r
c
.-
-
.-
~
~ 8
== :g:
~ :.. 8
80-.
~ &>
~ .- 00.
&::~'-"
"'t::l ~
~ ~ ~
~ ~ "'t::l
~ .- =
~~~
~ = ~
rI:1 0 8
~.- =
~Eo
~ ~ >
=<~
.- OJ)
~ "'t::l
= ::I
o _
rI:1 00.
~
~
~
~
~
n
r,
r-
!
,
r-
t
,
r-
>'
CI'.l
.....
's
;J
s:::
.~
'"
<U
Q
I
8
~
a
>'
CI'.l
+
o
V)
C'l
o
o
C'l
o
V)
......
o
o
......
o
V)
o
~
0\
C'l
00
C'l
r-
C'l
'D
C'l
V)
C'l
'<t
C'l
~
C'l
C'l
C'l
C'l
o
C'l
0\
......
00
......
r-
......
'D
......
t--
0"1
0"1
1"""'i
Q)
=
=
~
V)
'<t
......
~
......
C'l
......
......
......
o
......
0\
00
r-
'D
V)
'<t
~
C'l
o
n
t
(
r-
r
t-
i
Attachment C
r--
t
f
Flows & Loadings Report
May 1994 - June 1997
r
"..-.,
f
I
I: t
,......
t
t
r
t
t
,n
r
t
,....,
r
,
,
;
,
L
r
r
l
.0
;::
. ....
~
~
.....
~
~
S
~
~
~
;....
~
~
::
~
~
~
~
=::::
.....
;:...
:::
~
~
~
~
~
t-....
~
~
"'-
.r=:
~
~
~
.....
~
~
~
~
~
Q\
~
~
~
~oooo~oo~ooo~~o-~~
~~~~~~~~~-~~~~~-~
-=~~0~~~-~~~~~~0~~~
.s .; -
~~
'. ::
"'c
.c '_
'"t;j tj
" '-
.... c
.S ~
~~
.", ....
:: ::
<::: "
.", !E:
" "
.... ""
~ ~
6"~
]
::
"
"
::
2
.;:
~
J~~~~~~~~~~~~~~~~~
~~~~~~~00~7007~~~OON7
~~ooooS~oo~~oo~S~~~~~oo
=~~~~~~~~~~~~~~~~~~
~-oooooooooooooooooooooooooooooooooo
~e~~~~~~~~~~~~~~~~~
~.~ooooooooooooooooo
~~~~'!""""l'!"""""l""""'(~~,.,....-oj~~~~~~,........(~~
..--
~
~O~~~~~Noo_~O~N~O~~
eN7~~~7~N~~8~~~~N~
~~oo ..~ .~7 ......~q
O~~~SS~S~oo~~~~~S~oo
=
=
.~~
~ ~ 7
~oo
~~~~~~~~~~~~~~~~
007~~0~~~~7~770N
-N7N--NO~7~NN~00~
~~~~,........(~~~,.....[,.....[,.....[NC""I,.....[,.....[,.....[
=-~~~~~~~~~~~~~~~
~~OOOOOOOOOOOOOOO
.~~,.....[~,.....[,.....[,.....[~~,.....[,.....[,.....[,.....[,.....[,.....[,.....[,.....[
~.~ooooooooooooooo
1--4~'!"""""4"""["""["""["""[,.....["""[,.....["""[,.....[l""""'I,.....[,.....[,.....[,.....[
~ ~
00
- -
00
- -
C\l
..--
~0-00~~NOO~~-~-N~7
_ ~7-7~7~~~NOO~0000
'-' ~ O. - VI.. 7. ~ -. 00. O. t'-;. t'-;. VI.. 00. VI.. VI..
00 .-0f7N--N-~7~NN~
oo.OO~,.....[,.....[,.....[,.....[,.....[,.....[,.....[,.....['!""""l,.....[NN,.....[
Eo-;
~ ~
77
- ~.
OO~
- -
=
S~~~~~~~~~~~~~~~~~
~~ ~~~07 N-OON700-~
~~S=~~OO~~~~~S~~S~~
= -
~i~~~~~~~~~~~~~~~~~
~-~~~~~~~~~~~~~~~~~
~~
s
~
::;EOO
'-'~
~~
o
~
~~~7~~~~0~~7N~~~
-.:t:oo-r-:~~~~OOr-:V)OO~~N~
~~00~7~-.i77~~~3~>o~
r--
-= ..= 0\
-=,.Q t.i:= ~~= ~~~_ > t.i0\,.Q
~IooIooC= -=-t.io~......~
o~ c= l:l.::;E =.;<J50z~ =~
::;E ::;E< ~ c=
...,
"5... ~ ~
; ~ ~ a
::;E < ~ ...,
!r"'\
I
r
Attachment D
Septic Haulers Report
r:
@':..:;;
SEPTIC HAULERS REPORT
JUNE 1997
~
I
,
~
\: u
"'-
Loads Delivered To Treatment Facility
. ",",,""". ....0.;.
Hauler June Hauler Total (YTD)
" '" ",,,,,. '"''';',,;.'''" ".:.",;.""""".....,""""'"....."...","".,
Rumpke of Indiana 7 12
TOTAL 12 12
~ .-
n
ii
Gallons Delivered To Treatment Facility
-
Hauler June Hauler Total (YTD)
Rumpke of Indiana 7,700 13,200
TOTAL 13,200 13,200
r-,
,
~
r'
~
Attachment E
Unscheduled Maintenance Work Orders
~
~ '
7/18/$7
Work Order History Comprehensive
Page
1
1.(;1~$~0at~:.'..: ...........61H3I97:..:... ............/...W~6.tI:.9$()2i47..........
#1 E:Ff' PUMP
r-
l
,
Task #:
Priority:
Phone:
Emp. Hours:
Vendor Hours:
Tot. Labor Hrs:
Emp. Cost:
Part Cost:
Request Date:
Sched Start Date:
Completion Date:
Delay Description:
Equipment #.:
Description :
CQmments:
1.00
Wo Type:
Originator:
Extension:
Assigned By:
Assigned To:
Down Time:
Vendor Cost:
Total Cost:
Request Time:
Scheel Finish Date:
Completion Time:
REPAIR
0.00
$0.00
$188.34
12:18:01
1 PLANTWA TER1 Down Time:
PLANT WATER PUMP #1
NEW FLEX COUPLING, NEW MYERS PUMP, NEW UNION
Perf By Warranty:
Estimated Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Reason For Outage:
Expense Class:
.' '1
.. ':
N
18.00
0.00
18.00
$188.34
$0.00
6/19/97
1.(;I.~#f:>at~:/......... .....qt2,3/97 ............ T...............W.6..j:...$$o~i52.y........... ...
VAC PUMP WILSON STATION
Task #;
Priority;
Phone:
Emp. Hours:
Vendor Hours:
Tot. Labor Hrs:
Emp. Cost:
Part Cost:
Request Date:
Schad Start Date:
Completion Date:
Delay Description:
Equipment #.:
Description :
Comments:
1.00
Wo Type:
Originator:
Extension:
Assigned By:
Assigned To:
Down Time:
Vendor Cost:
Total Cost:
Request Time:
Sched Finish Date:
Completion Time:
2.00
0.00
2.00
$23.08
$0.00
6/23/97
.REPAIR
o. ()()
$0.00
$23.08
12:46:43
......................................:...............I
Perf By Warranty:
Estimated Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Reason For Outage:
Expense Class:
5WILSON SCHOOL Down Time:
WILSON SCHOOL L.S.
TOOK VAC PUMP APART .LOCKED UP, CLEANED PUT BACK ON LINE
N
7/18/97
Work Order History Comprehensive
Page
2
1.(;I~se[)ate:..."." ........Qf2..:3/~7... ...........................W.q.#: .S692755............ ......
12TH & WALNUT HELP INSTALL NEW LINE
r;
!
.
Task #:
Priority:
Phone:
Emp. Hours:
Vendor Hours:
Tot. Labor Hrs:
Emp. Cost:
Part Cost:
Request Date:
Sched Start Date:
Completion Date:
Delay Description:
Equipment #.:
Description :
Comments:
r,
I
,
t
r-
i
,
1.00
Wo Type:
Originator:
Extension:
Assigned By:
Assigned To:
Down Time:
Vendor Cost:
Total Cost:
Request Time:
Sched Finish Date:
Completion Time:
REPAIR
Perf By Warranty:
Estimated Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Reason For Outage:
...... ... .... ....- . '1
..."........,.'.-'..-...........
..-.-...........".,.....-......,,-...
..............-.........--.,."'...
.--......."'......."...-."........,..
.;;:;:; ~::":". ::::::.:' ::::" :::;;;:'.. ;.;;
N
HELPED BOB MILLERS CREW PUT NEW LINE ON 12TH & WALNUT, ALSO HAD TO VACTOR
1.00
Wo Type:
Originator:
Extension:
Assigned By:
Assigned To:
Down Time:
Vendor Cost:
Total Cost:
Request Time:
Sched Finish Date:
Completion Time:
19.50
0.00
19.50
$222.66
$0.00
6/23/97
UNKNOWN
Down Time:
0.00
$0.00
$222.66
12:46:43
Expense Class:
I CI .. - . D t .... . . '6/24I9T>W.d.#:9602749
.o~.a~:/ . ... ... ........ ......................_....._._._...
SPRING ST. STATION #2 PUMP
Task #:
Priority:
Phone:
Emp. Hours:
r Vendor Hours:
l Tot. Labor Hrs:
Emp. Cost:
Part Cost:
Request Date:
Sched Start Date:
Completion Date:
Delay Description:
r-
t
2.00
0.00
2.00
$11.54
$0.00
6/24/97
... . ... ..... ... .... '.. ......<> .... ....... .........1
REPAIR
Perf By Warranty:
Estimated Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mil1s:
Reason For Outage:
N
Equipment #.:
Description :
Comments:
t
r:
!
0.00
$0.00
$11.54
12:46:43
Expense Class:
5SPRING STREET Down Time:
SPRING STREET LIFT STATION
#2 PUMP CHECKED FOR STOPPAGE OPENED CLEANOUT OK
Work Order History Comprehensive
7/18/97 Page
3
ICI9~ebat~:(6/25/97W.Q.#:9~()i7'Sd/
10 TH ST STATION HOIST REPAIR
Task #:
Priority:
Phone:
Emp. Hours:
Vendor Hours:
Tot. Labor Hrs:
Emp. Cost:
Part Cost:
Request pate:
Sched Start Date:
Completion Date:
Delay Description:
Equipment #.:
Description :
Comments:
1.00
Wo Type:
Originator:
Extension:
Assigned By:
Assigned To:
Down Time:
Vendor Cost:
Total Cost:
Request Time:
Sched Finish Date:
Completion Time:
n I
..
REPAIR
Perf By Wartanty:
Estimated Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Reason For Outage:
N
4.00
0.00
4.00
$23.08
$0.00
6/25/97
0,00
$0.00
$23.08
12:46:43
Expense Class:
5TENTH ST. Down Time:
TENTH STREET LS.
UP BUTTON NOT WORKING, HIGH UP SWITCH BAD, NEED TO ORDER ONE
1.00
Wo Type:
Originator:
Extension:
Assigned By:
Assigned To:
Down Time:
Vendor Cost:
Total Cost:
Request Time:
Sched Finish Date:
Completion Time:
I .... .. ... '.f3./26I@7 ........................... .... ..
..CI#~el:>tltE!:. .... .......... ............ .... '.HW.Q.#I.. S$Q27$ f' .
INSTALL #5 PUMP 10 TH ST.
Task #:
r-
f. Priority:
t Phone:
Emp. Hours:
Vendor Hours:
Tot. Labor Hrs:
Emp. Cost:
Part Cost:
Request Date:
Sched Start Date:
Completion Date:
Delay Description:
Equipment #.:
Description:
Comments:
r
~
9.00
0.00
9.00
$90.30
$0.00
6f26/97
5TENTH ST.
TENTH STREET L.S.
INSTALLED PUMP
Down Time:
.............<1
REPAIR
Perf By Wartanty:
Estimated Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Reason For Outage:
N
0.00
$0.00
$90.30
12:46:43
Expense Class:
7/18/97
Work Order History Comprehensive
Page
4
ICIOSElbate:/ ...........6/30/97..
EYE WASH MAINTAINCE BULD.
Task #:
Priority:
Phone:
Emp. Hours:
Vendor Hours:
Tot. Labor Hrs:
Emp. Cost:
Part Cost:
Request Date:
Sched Start Date:
Completion Date:
Delay Description:
1.00
0.50
0.00
0.$0
$6.25
$0.00
6/30/97
'W.Q.#:$()02746/ ..
Wo Type:
Originator:
Extension:
Assigned By:
Assigned To:
Down Time:
Vendor Cost:
Total Cost:
Request Time:
Sched Finish Date:
Completion Time:
.... .. "'1
.. ... ...
REPAIR
Perf By Warranty:
Estimated Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Reason For Outage:
N
0.00
$0.00
$6.25
12:18:00
Expense Class:
Equipment #.:
Description :
Comments:
Down Time:
1-BUILD
BUILDING MAINT
REINSTALLED
Grand Totals:
r
I
~.
r
t
I
r
i.
,.....
I
,
r,
f
Down Time:
Employee Labor Hours:
Vendor Labor Hours:
Total Labor Hours:
Employee Labor Cost:
Vendor Labor Cost:
Part Cost:
Total Cost:
0.00
55.00
0.00
55.00
$565.25
$0.00
$0.00
$565.25
7/18/97
Work Order History Comprehensive
Page
1
r
f
.........1
IC'~~fOate:' ... '6/30/97'
TROUBLE SPOTS
Task #:
Priority:
Phone:
Emp. Hours:
Vendor Hours:
Tot. Labor Hrs:
Emp. Cost:
Part Cost:
Request Date:
Sched Start Date:
Completion Date:
Delay Description:
1.00
16.00
0.00
16.00
$117.50
$0.00
6/30/97
. W.().#:/9$o2143/
Wo Type:
Originator:
Extension:
Assigned By:
Assigned To:
Down Time:
Vendor Cost:
Total Cost:
Request Time:
Sched Finish Date:
Completion Time:
FOOTAGE
Perf By Warranty:
Estimated Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Reason For Outage:
N
Equipment #.:
Description :
Comments:
Down Time:
JET TRUCK
FOOTAGE CLEANED
TOTAL FT 9370
0.00
$0.00
$117.50
12:00:49
Expense Class:
Grand Totals:
r
f
,
rr-.
,.
i
~
i
r
1
~
r
,
r
Down Time:
Employee Labor Hours:
Vendor Labor Hours:
Total Labor Hours:
Employee Labor Cost:
Vendor Labor Cost:
Part Cost:
Total Cost:
0.00
16.00
0.00
16.00
$117.50
$0.00
$0.00
$117.50
7/18/97
Work Order History Comprehensive
Page
1
l.CIO$eoate:.... .............f3/17/97
TV 7TH & MEIGS
Task #:
Pri~rity:
Phone:
Emp. Hours:
Vendor Hours:
Tot. Labor Hrs:
Emp. Cost:
Part Cost:
Request Date:
Sched Start Date:
Completion Date:
Delay Description:
r
f !
'n W.Q.#:....96027S;,,....................
1.00
Wo Type:
Originator:
Extension:
Assigned By:
Assigned To:
Down Time:
Vendor Cost:
Total Cost:
Request Time:
Sched Finish Date:
Completion Time:
nl
n.
TV
Perf By Warranty:
Estimated Duration:
Actual Duration:
Response Days:
Response Hrs:
Response Mins:
Reason For Outage:
N
16.00
0.00
16.00
$139.80
$0.00
6/17/97
0.00
$0.00
$139.80
12:46:43
Expense Class:
Equipment #.:
Description:
Comments:
JET TRUCK Down Time:
FOOTAGE CLEANED
TRY TO TV 12" LINE ON MEIGS JET CLEANED 2700 FT OF LINE. COULDNT TV NOT ENOUGH
HOSE ON JET TRUCK TO PULL CAMERA
Equipment #.:
Description :
Comments:
TELEIVISING
SEWER LINES TV
Down Time:
Grand Totals:
,.....
f
,
t I
r
Down Time:
Employee Labor Hours:
Vendor Labor Hours:
Total Labor Hours:
Employee Labor Cost:
Vendor Labor Cost:
Part Cost:
Total Cost:
0.00
16.00
0.00
16.00
$139.80
$0.00
$0,00
$139.80
r-
;
~
r--
,
t
G
,
Attachment F
Maintenance & Repair Expenditures
r'
, '
\
ri
.,
~-
~
.-.
Ji.-
; ,
P.O. Date
6/2197
612197
612197
612197
6/2197
6/2/97
612191
6/2/91
612197
r
t
,
612191
612191
612197
612197
,....,
i,
612197
612197
612197
612191
612197
612197
r
,
6/2/91
6/13197
6/13/97
6/13197
6/13/91
6/13/91
6/13/91
r
t
!
6/13/97
r
! '
~
Jeffersonville Wastewater Treatment Facility
Maintenance & Repair Expenditures
Vendor
Description
ZEP MANUFACTURING
PARTS FOR DEODERIZER
MULCH FOR PLANT
FARM BUREAU CO-OP
FARM BUREAU CO-OP
GENERAL AUTO
MULCH FOR PLANT
FILTER AND WIPERS FOR SJT
HEUSER HARDWARE
HEUSER HARDWARE
BRUSH FOR PLANT
EXTENSION CORD FOR PLANT
HEUSER HARDWARE
KEY FOR MARKETING OFFICE
HEUSER HARDWARE
MAKOWSKY OIL CO., INC.
SUPPLIES FOR PLANT
10W30 OIL FOR OIL CHANGES IN RASIWAS
PUMP
PLANT SUPPLIES
OFFICE DEPOT
PEERLESS ELECTRONIC
PANEL BULBS FOR PLANT CONTROLS
PETERSON ELECTRIC
SHER/DEN SAFETY
ELECTRICAL SUPPLIES FORMAINTENANCE
SVS CORPORA TION
ZEP MANUFACTURING
PENN VALLEY PUMP
REPAIR ON GAS METER
REPAIR OF GAS METER
DEODERANT MISTER
REPAIR'OF#3 SLUDGE PUMP
EUBANK, HALL & ASSOC.
PETERSON ELECTRIC
FLOATS FORMIDDLESCHOOLLlFT STATION
COIL AND WIRE CONNECTION FOR LOUISE ST.
LS;
CONTACTORSFOR PUMP CONTACT AT SILVER
CREEK BUSINESS CENTER
ELECTI?ODES FOR SENSORS ON CSO'SAT
10TH STREET
TUBING FOR SAMPLERS IN PLANT
WESCO
KELBURN ENGINEERING
BR RUBBER
FARM BUREAU CO OP
WEED SPRAY
GOODWILL
HEUSER HARDWARE
RAGS FOR PLANT
PLANT SUPPLIES
HEUSER HARDWARE
HEUSER HARDWARE
HEUSER HARDWARE
SUPPLIES FOR PLANT
TOOLS AND SUPPLIES. PLANT
WEED SPRAY FORPLANf
Page 1
Amount
$93.78
$24.90
$26.15
$9.12
$5.24
$16.79
$0.83
$9.89
$229.95
$22.99
$313.65
$66.50
$241.58
$523.50
$467.82
$589.98
$50.36
$44.26
$31.79
$62.90
$27.56
$38.80
$21.53
$4.41
$21.44
$30.10
$7.81
P.O. Date
6/13/97
6/13/97
6/13/97
6/13/97
r
~ '
6/13/97
6113/97
6/13/97
r,
r
,
6/17/97
....-.
6/17/97
6/17/97
r-
i
,
6/17/97
6/17/97
r
6127/97
6127/97
6127/97
6127/97
6127/97
r
.,
,
t
r
t ;
6127/97
r
.
r
~ '
,
~
i
t
Vendor
GOODYEAR
LIVING WATERS CO
MIDSOUTH
PLUMBERS SUPPLY
TRANSCATIEIL
KELBURN ENGINEERING CO
SOUTHLAND ELECTRICAL
HEUSER HARDWARE
LOUISVILLE WELlJINGSUPPL Y
GRAINGER
HEUSER HARDWARE
METZGER ELECTRIC
K-MART
FURROW
HEUSER HARDWARE
HOME QUARTERS
PLUMBERS SUPPLY
FURROW
Jeffersonvilfe Wastewater Treatment Facility
Maintenance & Repair Expenditures
Description
TIRE REPAIR,ON SEMI
VALVECONNECTORS AND .TtJBE
REPLACEMENTS FORCHLORINECYLlNDER
SO' HOSE FOR PRESS ROOM
SUPPLIES FOR CHLORINELINE REPAIR
REPLACEMENT GUAGEFOR RAS STATION
BULBS FOR 10TH LoS
MOTOR STARTER FOR UTICA J LIFT STA TlON
WEED EATER CORD AND BUG SPRAY
OXYGEN AND ACYTONEGAS FOR CUTTING
TORCH
FAN FOR COOLANT ON CAPACITOR UNtT
PLASTIC BACKING FOR BELT PRESS
TROUBLE SHOOT ALARM PANEL ATCRUMS
LANE III
LAB EQUIPMENT
WHEEL BARROW FOR PLANT
SUPPLIES FOR PLANT
MISC. PLANT ITEMS
COPPER WIRE FOR REPAIR OF EFFLUENT
WATER PUMP
CONTROL CABLE FOR 1V TRAILOREQUIPMENT
Page 2
Amount
$64.00
$193.48
$90.10
$11.91
$104.49
$42.40
$55.46
$32.78
$35.15
$26.92
$3.51
$140.00
$18.93
$75.88
$1.68
$81.96
$31.69
$139.51
Total 4,228.17
,-
~
~
I
Attachment G
Repair & Replacement Expenditures
r
,
~
,r--
\
P.O. Date
6117197
6117197
6117197
6117197
6117197
6117197
6/17197
6/17197
6/27197
6/27197
6127197
6/27197
6127/97
r"
~
Jeffersonville Wastewater Treatment Facility
Repair & Replacement Expenditures
Vendor
AMERICON
ASHBROOK
DERBY CITY ELECTRIC
PETERSONELECTRIC SUPPLY
READYELECTRIC
SPENCER MACHINE & TOOL
SPENCER MACHINE & TOOL
SPENCER MACHINE & TOOL
ALBERTB. CRUSH
ASHBROOK
ORR SAFETY
SPENCER MACHINE
SPENCER MACHINE
Descriptton
(project #97'014& 97'015)2"&3" TRASH PUMP
W/1'OO'HOSEAND 5'0' SUCTiON HOSE
(project #97'049) BEARINGS FOIiREPAIR OF
STEERING VALVE
(projectJl.97037}IiEPAJR.MOTOR,ATEWlNG
LANE es.
(project #97'049) BEARING FOR BELT PRESS
(project #97(34) CHECK CONTROLS AND
AL TERNATOR ATLOUISE STREETL.S.
(project #97'036) BEARINGS FORFIL TER PRESS
#4
(Project #97'037) REPLACED BEARINGS,
MECHANICAL SEAL, IMPELLER'
(project #97'049) BUSHINGS FOR CONVEYOR
ROLLERS
(project #97'038). EFFI..UENT.WATER PUMP
(project#97049) SEALS FOR WASHBOX /
STEERING VALVE REPAIR
(Project#97'036) FALL PROTECTION EQUIPMENT
(Project #96(24) REPAIR NO. 5 PUMP AT 1'OTH
STREET L.S.
(project #97'038) . REPLACENON-POTABLE
WATER PUMP
Page 1
Amount
$2,827.57
$1,009.50
$290.21
$144.96
$273.48
$294.28
$798.33
$255.00
$137.29
$149.92
$2,185.'02
$1'0,009.73
$1,5'05.71
Total 19,881.00
1996 Repair & Replacement
,.....
i
- -".
Wastewater Treatment Facility
-. -----rE~~~:1 .._.',w'" ,..
Actual %
Priority Description Cost Complete
!'MO!illf'""""...........,~>l... ..... - - -,
2 Replace Carpet at Main Office Building (project No. $2,250 0%
96009)
1 Replace Steering Valve on Belt Press (project No. $2,500 $1,559.38 100%
97049)
"- _.- ,~-
1 Repair #2 Non-Potable Water Pump (project No. 97038) $1,600 $1,643.00 100%
2 Seal Driveway (project No. 97007) $4,500 0%
.. I $3:~~ I . -
1 Belt Replacement on Dewatering Press (project No. 0%
97001)
.......,..., '.-..." ~.. .., -'.. . .-.'
1 Replace Riding Mower (project No. 97002) $8,500 0%
,~.. ~. . -"-..
1 Ethernet Cable to Network Lab to Operations (project $40,000 $125.15 5%
No. 96014)
. "~- ",,",,'
1 Painting of Iron Works at Final Clarifiers (project No. $16,000 0%
97001)
""" ...
Total Expenditures for Treatment Facility $78,350 $1,829.15
....,
OIIM!; ~."".,.-;;~"",""",""",_,......,;.",,,,,-<>.;,.'<
Lift Stations
'.
1 Electrical wiring and related components to phase I $5,500 $9,121.67 80%
alarm system upgrade. (Project No. 96002)
-
1 Alarm System Upgrade materials (project No. 96015) $250 $219.39 80%
1 Repair #1 Pump at Louis Street (project No. 97034) $2,000 $2,255.00 100%
"..
2 Replace Electrical Breakers and Pump Upgrade (project $7,500 0%
No. 97022)
,.
1 Sunset Mobile Home Park, Seal Wetwell, Upgrade $3,500 0%
Electrical Systems, Replace Door and Roof. (project No.
96006) (**Investigation is taking place at this time for
removal of L.S. to gravity flow).
r
l~
r
l
r
~ '
r
t
r
.'. .,,"
Actual %
Priority Description Estimated Cost Complete
,. "~''';''';,",,,,",,,,,u.,,,,,,,;",..",,~,,,,..~~,,'.,.'. -~"~" ..
1 Move Weather Head at Crums Lane No. 1 (project No. $1,500 0%
96007)
1 Painting of Interior Piping and repair of Mechanical l ~$3'~O[. 0%
Hoist System at Spring Street (project No. 97027)
^..~. '"
1 Replace 3" portable trash pump (project No. 97014) $3,500 $1,414.00 100%
1 Replace 2" trash pump (project No. 97015) $2,500 $1,414.00 100%
1 Trouble Shoot and Repair #1, #2, #3, #4 and #5 pumps at ~20':OJ ...... $28,732.:. 90%
10th Street Lift Station (project No. 96029)
_....__........,'...""'''''".,"'~J..".'"''''''''>'',.'.;.".'''_"..,,'w;....... ~~~~:1~~.$43,156.061
Total Expenditures for Lift Stations
Vehicles
,.......,... "
Estimated Actual %
Priority Description Cost Cost Complete
1 Replace hose to Jet Truck & purchase new nozzles $3,000 $2,863.00 100%
(project No. 97017) "-
".'-' r $l?,?~
1 Replace 1987 Ram (project No. 97039) 0%
.,-",.,," '",,, ,", "',..,........."" -
1 Replace 1986 Chevy Van (project No. 97035) $19,000 0%
Total Expenditures for Vehicles $41,000 $2,863.00
TOTAP;~8~600 ,..."...."....
$48,394.21
r;
t ,
r-
r
t. ,
,
r
,
\, j
r
I
!
t.ccd
r
r
!
r
~ ~
!
, ,
Attachment H
Capital Improvement Expenditures
n
I
r
~
I
r,
~
r
1
!
,......,
.
r
~
\
r
t ~
~
r
I
I
1996 Capital Improvement Expenditures
Wastewater Treatment Facility
_. .,.
Priority Description Estimated Actual %
Cost Cost Completed
1 Repair #3 Pinal Clarifier Drain Valve (project No. $20,000 0%
97005)
1 Replace Digester A ir Distribution Line (project $60,000 0%
No. 97004)
1 Pall Protection Equipment (project No. 97036) $2,500 $2,185 100%
2 Pad for 20 yd. Roll off dumpster (project No. $2,000 0%
97008)
...
2 Valve Actuators - 10 (project No. 96026) $35,000 0%
.", - .
Total Expenditures for Wastewater Facility $119,500
-~_.....'""""""
Collection System
"""'._';""'""--'""-'-'~~
2 6" Portable Pump (project No. 97020) $12,000 0%
."''''''"""",," ""'......"''''""',""-~""''''''.... ",~: ..........,
2 60 KW Mercy Generator for Lift Stations $25,000 0%
(project No. 97030)
",,,;,-,,'<",,;;~"""',";'" .....,,"'.''''''"''
1 Alarm System Upgrade Phase II (project No. $56,300 0%
97013)
"...."--..,:."......;'.,'"
1 Combined Sewer Overflow Sign Posting $1,000 0%
(project No. 97038)
- .,....."" ",.-;,'"~",,":"."'"',~..,;. "'''' ,:.,;..'M.,",C..._M".
1 Portable Flow Meter & Sampler (project No. $7,000 $7,243 100%
97032)
1 Repair Line on East Gardner Drive (project No. $1,500 $1,200 100%
97039)
.J. ., "
1 Install Manhole on Ridgeway Drive (project $1,000 0%
No. 97042)
1 Install Manhole on Morris Avenue (project No. $1,000 0%
97040)
1 Repair Line on Charlestown Avenue "I $60,000 C 0%
- '-" ,;"",.":,.:"",,,,,,,,,:";"" r
Total Expenditures for Collection System $164,800
. ------ .....,..-- -
,......
f '
r
/
r
,-,
t
I
""'0""--> ~.
Lift Stations
'"
1 Sensors and flow metering for 10th Street, Spring $75,000 25%
Street & Mill Creek Lift Stations, redundant control
system (project No. 96015)
,
1 Upgrade Middle School L.S. (project No. 97018) $40,000 20%
2 Install Back-flow Control on Bypass Channel at 10th $26,000 0%
Street L.S. (project No. 97028)
"
1 Relocate Bar Screens to Influent Channel at 10th $50,000 0%
Street L.S. (project No. 97026)
1 Upgrade Powerhouse L.S. (project No. 97024) $60,000 0%
1 Upgrade Mill Creek L.S. (project No. 97023) ] $60,000 I C?~
,",.. -"~-" ....- ,......-. " -c.. '.. . ~,,~ . 1
1 Convert Cedarview L.S. to Gravity Sewer (project $1,500 0%
No. 97021)
," ...-. e~. ".,,, ~""
1 Install Dry-well Submersible Pumps at Louise $60,000 10%
Street L.S. (project No. 97011)
~, _ ..___."', .x... .......'"...m''' "
1 Install Dry-well Submersible Pumps at Magnolia $60,000 10%
L.S. (project No. 97009)
1 Install Dry-well Submersible Pumps at Ewing Lane $60,000 10%
L.S. (project No. 97010) ,
2 Upgrade Camp Powers L.S. (project No. 97019) $50,000 0%
1 Upgrade Colonial Park (project No. 96017) $32,000 10%
2 Replace Rolling Fields With Gravity Sewer (project $50,000 10%
No. 96018)
_.~.
2 Relocate Barscreen and Install Sluice Gate's at 10th $45,000 0%
Street (project No. 96019)
Total Expenditures For Lift Stations $669,500
Vehicles
I "....""m....O...;c...;.J.",..,;"" c';~. '1$30,000 .1 LO%
1 Replace Boom Truck (project No. 97016)
~'" ;0",';' ""-""'~ "".:""'..,,,...;;,,...._'.......
Total Expenditures on Vehicles $30,000
r
,
.'
,
f
Attachment I
,.....
!
Safety Inspection Report
r-,
i
f
,
r
,-..
t :
ENVIRONMENTAL MANAGEMENT CORPORATION
MONTHLY SAFETY 1NSPECTION
CHECKOFF SHEET
JEFFERSONVILLE WASTEWATER TREATMENT FACILITY
701 CHAMPION ROAD
JEFFERSONVILLE, IN 47130
(812) 285-6451
PERSON COMPLETING INSPECTION: Wavmon Pavne 6/20/97
r""" I. Personnel Safety
,
.
t A. Personal Protective Clothing
1. Safety Helmets Provided
(for Personnel & Visitors).................................. Yes NO N/A
2. Hearing Protection
...- (for High Noise Areas)....................................... Yes NO N/A
\ 3. Eye Protection - Goggles, etc.
r
t ; (for Personnel & Visitors).................................. Yes NO N/A
4. Gloves
r (for Personnel).. ..... ... ..... ... ....... ... ... ..... ... ..... ... .... Yes NO N/A
i
i 5. Rubber Boots with Steel Toes
(provided for Personnel)..................................... Yes NO N/A
6. Rain Suits Provided
(for Personnel).. ........ ..................... .................... Yes NO N/A
7. Is Respiratory Protection Provided including
ventilators and hoods over high dust areas, dust
masks, etc. (for Personnel)................................ Yes NO N/A
B. Safety Devices and Equipment
r--.
.
f 1. Non-sparking Tools in areas where flammable
t
or explosive gases may be present?..................... Yes NO N/A
2. Oxygen Deficiency, Toxic, & Explosive Gas
indicator............................................................ . Yes NO N/A
3. Self-contained Breathing Apparatus for entry
to chlorine room................................................. Yes NO N/A
r--, 4. Confined Space Entry Equipment Available
t I
t such as and including Safety Harness, Portable
Wench, Hoist, etc............................................... 1{ re~ NO N/A
l 5. First Aid Kits with proper & adequate supplies
readily available for any First Aid Emergency.... Yes NO N/A
3. Are the number of outlets adequate.................. Yes NO N/A
4. Is equipment properly grounded or insulated.... Yes NO N/A
5. Are extension cords in good condition and
used properly............... ..... ............................... Yes NO N/A
6. Is electrical test equipment available. Such as
voltmeter, amp meter, etc................................. Yes NO N/A
7. Are dielectric rubber mats presents for
electrical work.......... ...... ,....... ....................... Yes NO N/A
8. All control panel switches in good condition.. Yes NO N/A
9. All control panels unobstructed...................... Yes NO N/A
10. Are dielectric rubber gloves available............. Yes NO N/A
11. Are ground fault interrupters used.................. Yes NO N/A
...- 12. Are warning or caution signs posted............... Yes NO N/A
13. Is control panel area clean and dry.................. Yes NO N/A
14. Are all needed fuses or breakers in place......... Yes NO N/A
15. Are all contacts clean and dust free................. Yes NO N/A
16. Is there emergency stop buttons on all
machines and equipment................................. Yes NO N/A
17. Are personnel familiar with the electrical safety
such as lock out/tag out procedures................ Yes NO N/A
18. Is power supply locked out/ tagged out on
equipment presently being repaired................. Yes NO N/A
IV. Chlorine & Dechlorination Safety
1. All standing cylinders chained in place and/or
r- ton cylinders chocked...................................... Yes NO N/A
t I
. 2. All personnel rained in the use of CL2.............. Yes NO N/A
t'
3. Appropriate repair kits available...................... Yes NO N/A
4. Chlorine & dechlorination leak detector tied
into the facility alarm system........................... Yes NO N/A
5. Ventilator fan with outside switch present and
r-, either comes on when door opens or manually
with switch at entrance door........................... Yes NO N/A
6. Ammonia and Sulphur for checking chlorine &
dechlorination leaks available.......................... Yes NO N/A
7. Are all safety precautions posted..................... Yes NO N/A
8. Proper Chlorine wrench available to open
val ves............. ........ ..................... ................... Yes NO N/A
9. Chlorine protected from direct sunlight, cool
and dry,.. ..... ... ..... ..... ... ..... ... .......... ... ..... ... ..... Yes NO N/A
10. No petroleum or other chemicals store in
chlorine room. ..................... ........... ................ Yes NO N/A
r- 11. Spare lead washers available on site................ Yes NO N/A
f
t
V. Process Chemical Safety
r
1. Are personnel trained to handle all chemicals
pro perl y......................................................... Yes NO N/A
2. Is proper safety clothing present for the
chemical to be handled................................... Yes NO N/A
3. Are all containers, vats, and tanks properly
labeled........................................................... . Yes NO N/A
4. Is employee exposure within accepted limits.... Yes NO N/A
c: 5. Are there proper containment of storage areas,
including curbing.... ... ..... ............................. ... Yes NO N/A
i 6. Are management & employees aware of the
hazards of the materials being used.................. Yes NO N/A
7. Knows proper response to an accidental spill... Yes NO N/A
8. All MSDS available and easily accessible......... Yes NO N/A
9. Has complied with the 6 employer
responsibilities of the Worker Right to Know
Law? (SARA). ....... ......... ..... ........ ... ................ Yes NO N/A
10. Emergency Action Plan on file with local Fire,
.-. Police Departments and appropriate Emergency
Agency... .... ... ... .......... ..... ... ... ..... ... ........ .......... Yes NO N/A
VI. Tools & Equipment
1. Are hand tools in good repair and stored
properly......................................................... . Yes NO N/A
2. Are power tools stored properly and in good
condition - cords, plugs, etc............................ Yes NO N/A
3. Are the tools adequate for the tasks to be
performed...................................................... . Yes NO N/A
4. Are defective tools replaced as needed............ Yes NO N/A
5. Are tool guards in place.................................. Yes NO N/A
6. Are employees trained in the proper use of the
various tools they are expected to use............. Yes NO N/A
7. Are employees given additional instruction and
periodic reviews of specialized tools and
equipment.................. ... ....... .............. ........ ...... Yes NO N/A
8. Are proper lifting techniques used by
employees........... ........ ................ ... ........ .......... Yes NO N/A
VII. Fire Safety & Protection
1. Are fire/emergency evacuation plans posted...... Yes NO N/A
2. Are employees familiar with fire/emergency
evacuation plan. ..... .......... ... ... ..... ... ..... ... ..... ..... Yes NO N/A
3. Are there sufficient number and types of fire
extinguishers... .......... ..... ...... ..... ... .................... Yes NO N/A
4. Are the fire extinguishers properly located and
identified......................................................... . Yes NO N/A
5. Are the fire extinguishers checked annually...... Yes NO N/A
r 6. Are all of the fire extinguishers in working
, condition....... ........ ..... .......... ... ... ..................... Yes NO N/A
t 7. Are employees trained in the proper use of the
extinguishers to be used................................... Yes NO N/A
8. Are smoke detectors in working order............. YES NO N/A.
r
VIII. Laboratory Safety
1. Emergency Eyewash & Shower Station are
present and work properly and tested monthly.. Yes NO N/A
2. Fume hood is present....................................... Yes NO N/A
3. All chemicals safely and properly stored, well
labeled and in original containers..................... Yes NO N/A
4. Laboratory Safety devices used such as: Pipette
suction bulbs, Eye Protection, Gloves, Aprons
or Jackets, & Tongs......................................... Yes NO N/A
5. No broken/ chipped or cracked glassware........ Yes NO N/A
6. No overloaded outlets..................................... Yes NO N/A
7. Acid spill kit available..................................... Yes NO N/A
8. Emergency procedures for acid spills posted
and used by all personneL............................. Yes NO N/A
9. Laboratory Safety Rules posted and obeyed by
all personnel such as no cooking or eating from
laboratory glass ware....,................................... Yes NO N/A
x. Other Safety
1. Are the required safety programs presented
and/or attended during the year........................ Yes NO N/A
2. Is a suitable identification system used to
identify the plant's piping system...................... Yes NO N/A
3. Has the operator taken steps to remove or
r: minimize safety hazards.................................. Yes NO N/A
i
, 4. Are all personnel provided with a shower and
t
locker for their work clothes........................... Yes NO N/A
5. Are personnel trained in First Aid & CPR........ Yes No N/A
6. Have the following proper safety signs been
provided such as: Non-potable Water, Chlorine
Hazard, No Smoking, High Voltage, Watch
Your Step Signs in Certain Areas, & Exit Signs. Yes NO N/A
7. Is your Facility safety program Up to Date
(W orksafe Program).... ...... ........ ........ .............. Yes NO N/A
(# YES)
135 - 3 x 100 = 98 %
(# YES + # NO)
We have clutter and trash in and around our tool room area.. Our trash cans are being left uncovered in the
maintenance lunchroom. Evervone still is not trained in c.P.R. and First Aid.
r-
c:\office\mor\sftyinsp. wpd