Loading...
HomeMy WebLinkAbout03) March o [ r: u r i L n r i . , u [ r [ ~ ~t ====:J': r I' L r I L-,.~ [ April 28, 1997 C. Richard Spencer, Jf. CITY OF JEFFERSONVILLE City/County Building Jeffersonville, IN 47130 Dear Dick: ENVIRONMENTAL MANAGEMENT CORPORATION PARIC CENTRE 689 CRAIG ROAD S1 LOUIS, MISSOURI 63141 314-432.8070 Enclosed please find Environmental Management Corporation's (EMC) "Operations Report" for the month of March 1997, containing information on the following: 1. 0 Effluent Quality 2.0 Facility Operations 2.1 Pretreatment 3.0 Preventive and Unscheduled Maintenance 3. 1 Maintenance & Repair Expenditures 3.2 Repair & Replacement Expenditures 3.3 Capital Improvement Expenditures 3.4 Electrical Expenditures 4.0 Facility Safety and Training 5.0 Sewer Collection System As always, we appreciate the opportunity to be of service to the City of Jeffersonville, and we are available to discuss this report, or any other aspect of our operations, at the convenience of the City. Sincerely, ENVIRONMENTAL MANAGEMENT CORPORATION (~) < (L, .......~~.hdCtL I d. ~mo.(\ Kendall S. Coleman Facilities Manager 1.0 EFFLUENT QUALITY . r- During March, the plant performed well. However, we experienced a monthly total suspended solids (TSS) concentration and pounds exceedence and a monthly exceedence in carbonaceous biochemical oxygen demand (CBOD) pounds discharged due to a heavy rain storm. Table 1.1 summarizes the effluent quality data. Attachment A contains Time Series Plots of daily CBOD and TSS values. Q [~ -. .": [ [ fi . I Parameters Permit Limit Monthly Average mg/L mg/L Carbonaceous Biochemical 25 19 Oxygen Demand (CBOD) Total Suspended Solids 30 60 (TSS) Fecal Coliform 1000 195 (Colonies/ 100 ml) Chlorine Residual .05 daily 0.02 Maximum Ammonia 3.0 .59 Flow 5.2 10.62 (MGD) Table 1.1 EFFLUENT QUALITY IT 2.0 FACILITY OPERATIONS - r L Attachment B contains a list of septic haulers that discharged at the facility during the month of March. "JFl! JEFFERSONVILLE, IN [ [ fj LJ ,...... t L, t I ~. c t: During March the treatment processes experienced extremely high peak flows which caused an exceedence in CBOD and TSS due to a 12 inch rainfall on February 28 and March 1, 1997. Peak flows reached in excess of 30 million gallons per day (MGD) and consistent flows of over 20 MGD, which caused a washout of solids from the secondary clarifiers. The high TSS and CBOD loadings continues to hamper the secondary treatment process. Also, the excessive loadings are causing an increase in odors from the influent structure, an increase in sludge production and electrical consumption. A new permit was issued to Alumnitec (formerly Profile Extrusions) due to a change in ownership. An inspection of Louisville Barrel was conducted to verify proper initiation of scrubber water discharge. Process water is not to be discharged at this time. A draft discharge permit was issued and is awaiting comment. A Notice of Violation was issued to Wyandot Incorporated due to several Oil and Grease exceedences and failure to properly notify wastewater personnel of the violation. As a result, Wyandot has increased the cleaning of their grease traps from once to twice per month. Wyandot is also in the process of installing equipment to reduce flow, CBOD, TSS and Oil & Grease (O&G) levels in their discharge. Sampling was conducted at Philadelphia Quartz, Dallas Group of America, Wyandot and Industrial Water Recycling. 2.1 PRETREATMENT During March, the following activities occurred: ~ ~ ~ ~ We will continue to work with all industries to ensure compliance with their industrial discharge permit limits. 3.0 PREVENTIVE AND UNSCHEDULED MAINTENANCE Preventive maintenance was performed on all equipment as scheduled in March. There were 37 unscheduled maintenance tasks performed. All were minor repairs except for: ~ Repaired pump on No. 1 Polyblend machine. Sealed wet well lid and pulled electrical meter at Utica 1 lift station due to high river level. ~ ~ JEFFERSONVILLE, IN G r L._ ~ Repaired pumps, motors, and the control panel at Magnolia lift station after 12 inch rain storm. Repaired pumps, motors, and the control panel at Louise St. lift station after 12 inch rain storm. Repaired pumps, motors, and the control panel at Ewing Lane lift station after 12 inch rain storm. Replaced No.1 vacuum pumps at Wilson School lift station. Repaired breaker on No.1 pump at Crums Lane lift station. Repaired sump pump, motors, and pumps at Sunset Mobile Home Park lift station after 12 inch rain storm. Installed repaired No.3 pump at 10th St. lift station. ~ ~ ~ ~ ~ ~ A list of unscheduled maintenance work orders is included as Attachment. C. Maintenance and repair expenditures for the month of March are detailed in Attachment D. Table 3.1 represents the total amount expended in March, and for the year. Table 3.2 includes the same information for repair and replacement expenditures. Attachment E contains a detail of repair and replacement expenditures for the year. Table 3.1 MAINTENANCE & REPAIR EXPENDITURES Time Period Amount Budget (Over) Expended Under March $7,816 $4,200 ($3,616) Year-To-Date $44,506 $46,200 $1,694 - JEFFERSONVILLE, IN c Table 3.2 REPAIR & REPLACEMENT EXPENDITURES r L Time Period Amount Budget (Over) Expended Under March $2,296 $8,334 $6,038 Y ear- To-Date $94,508 $91,674 ($2,834) r- . l L 3.3 CAPITAL IMPROVEMENT EXPENDITURES Attachment F details expected Capital Improvement expenditures for the contract period of May 1, 1996 through April 30, 1997. 3.4 ELECTRICAL EXPENDITURES Table 3.4 relates to electrical expenditures for March 1996. Table 3.4 ELECTRICAL EXPENDITURES Time Amount Budget (Over) Period Expended Under March $19,069 $15,918 ($3,151) Year-to-Date $171,748 $154,568 ($17,180) JEFFERSONVILLE, IN Table 3.2 REPAIR & REPLACEMENT EXPENDITURES Time Period Amount Budget (Over) Expended Under March $2,296 $8,334 $6,038 Year-To-Date $94,508 $91,674 ($2,834 ) 3.3 CAPITAL IMPROVEMENT EXPENDITURES Attachment F details expected Capital Improvement expenditures for the contract period of May 1, 1996 through April 30, 1997. 3.4 ELECTRICAL EXPENDITURES o Table 3.4 relates to electrical expenditures for March 1996. Table 3.4 ELECTRICAL EXPENDITURES r . L. Time Amount Budget (Over) Period Expended Under March $19,069 $15,918 ($3,151) Year -to-Date $171,748 $154,568 ($17,180) _Jli~ JEFFERSONVILLE, IN 4.0 FACILITY SAFETY & TRAINING Safety inspections were conducted on March 20, 1997 . The rating was 95%. The deficiencies reported were: ~ We have openings at the grit landing area that need covered. ~ We had flammable liquids improperly stored in the maintenance garage ~ We had an exit blocked in the maintenance garage. A copy of the Safety Inspection report is included as Attachment G. Safety training was conducted by the Public Service Indiana on Electrical Safety. 5.0 SEWER COLLECTION SYSTEM During the month there were 195 sewer calls. The calls were related to the following: ~ Four were due to odor. ~ Three were due to blockages within the City's main line. ~ Twenty-eight were due to blockages within the resident's line. ~ One hundred forty-five were storm related. ~ Fifteen were catchbasin problems. Collection systems personnel continue to investigative and determine the location of Infiltration/Inflow (1&1) problems in the service area of the Middle School Lift Station. Sump pump inspections in Foxboro were conducted in March. One resident has been sent a certified letter notifying them of an illegal sump pump hookup. The next page, details the data on March's sewer projects. ---=-::t:-.lftl.-:~__ JEFFERSONVILLE IN [ [ r 1,,,; Table 5.1 J\'IONTHL Y COLLECTION SYSTEM ANALYSIS Project February Year to Date SaPitary Se\Xler Cleaned! Feet 18,110 165,612 C'..~~ C'~.n~_ ""1~~_~..:l I D~~.. A A AC '"' ,.,~'"' 0~VIUl 01;;WI;;1 \...,.ll;;aUI;;U 1 l'l;;l;;~ ""t,""t""t..} 7,1.;:J7 Catchbasins Cieaned Grate Tops = 60 Grate Tops = 2350 Vactored =13 Vactored = 116 Catchbasins Raised 0 9 Sewer T devised / ft 2,329 20,012 Sewer Tap Inspections 0 17 Dye Testing 2 18 Manhole Castings Replaced 0 6 Air Testing 0 17 Manholes Sealed 0 55 Service Calls Backup Odor Main Block Resident Storm Received Problem Related 195 0 4 3 28 145 (backup) Locates Roots Catch Basin 32 0 15 MOR .. JEFFERSONVILLE, IN ATTACHMENTS - o A B C D E F G r-- , t fi L; r-- L r ~,l ","""",j TIME SERIES PLOTS SEPTIC HAULERS REPORT UNSCHEDULED MAINTENANCE WORK ORDERS MAINTENANCE & REPAIR EXPENDITURES REPAIR & REPLACEMENT EXPENDITURES CAPITAL IMPROVEMENT EXPENDITURES FOR 1996 SAFETY INSPECTION REPORT _~!:c..... JEFFERSONVILLE, IN ~ i . l..-:,..,,"~ r L Attachment A Time Series Plots [ JEFFERSONVILLE, IN ....... 0. 0. ..- ..- .c .." v ,...... .... 0 to .." X 0- r C'ol co C'ol r-.... C'ol -0 C'ol LO C'ol rn ~ rn C'ol E-< .~ .." ~ C'ol ...- , ~ C'ol i ... - C'ol .... I Coo) c - r. C'ol .... 0 e 8 C'ol ~ e 0- rIl ..... rIl .~ co 2: ~ ..... E- as ~ r-.... a 0 I ,.-, = -0 t c U ..... ~ ~ j rn LO -= rn ..- ...- C E-< ~ ~ e $$ ..... ~ & Iiil .." ..... ...- .... I C'ol I - ..- ..- ...- ~ 8 0 ~ e ..- $$ 0- ~ co I r-.... -0 r.t) ~ .." r C'ol ..- 8 0 8 ~ 0 0 ~ ~ 0 0 ~ ~ 8 ~ 0 ~ 0 r LO 0 LO 0 LO 0 co r-.... r-.... -0 -0 r.t) ~ ~ .." C'ol C'ol ..- ..- IJ8W r ~. L Attachment B r- r I b_,~.~ Septic Haulers Report t k,,_ , D TW JEFFERSONVILLE, IN D r I r ~.e.4 r ~ L. c r l r L: ~ i"" r L: SEPTIC lfAULERS REPORT Mtlrch 1997 Loads Delivered To Treatment Facility ~ '.", ""- Hauler March Hauler Total (YTD) " Rumpke of Indiana 3 42 TOTAL 44 44 Gallons Delivered To Treatment Facility Hauler March Hauler Total (YTD) . ""'" _=-"a' M. ., Rumpke of Indiana 3,300 42,780 TOTAL 52,180 52,180 ~..-'-- JEFFERSONVILLE. IN r; ! : .-- , r r l , D Attachment C Unscheduled Maintenance Work Orders ._ :HDlr. 0 JEFFERSONVILLE, IN 04/23/n r , t l,... WORK ORDER HISTORY REPORT Page 1 I______________~--------------------------------------_____________~______________________________._________------------------------- ------------------------------------------------------------------------------------------------------------------------------------ TOTAL COST EQUIPMENT NUMBER '::; :':=:::::=: =::: =:: === ::::: ==: ::::::::: =: :::::::::::: =::::: ::::: :::: :::::: :=:=::: :::::::: ::::=:::: =::::::::::::::::: ::: ;.:::: ;;;;:;: r t . -None- TASK DESC COMMENTS WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME 0.000 LABOR MATERIAL COST COST TOTALS ;--------------------~------------------------------------.-------------------------------------------------------------------------- 0.00 9602221 REPAIR : QUICK CHECK STATIONS : QUICK CHECK ON STATIONS 03/05/91 0.000 0.00 0.00 : (LABOR HOURS -) Total: 7.500 1.50 Ot: 0.00) ------------------------------------------------------------------------------------------------------------------------------------ r L Reg: 7.500 7.50 Ot: 0.00) EQUIP TOTALS : (LABOR HOURS -) Total: Reg: 0.000 0.00 0.00 0.00 ::::====::::::=:==::::::::===::::=::::::::::::::=======:======::=::::=:=::~:::==::::::=::::==:=::=::::==::=:::::=:=:::=:==::::::==:: -None- TASK DESC COMMENTS 9602181 REPAIR 03/10/91 0.000 REMOVE SAND BAGS OUT OF CSO GATES REMOVE SAND BAGS OUT OF ALL THE CSO GATES REMOVE THE CSO GATES AND HAVE THEM REVORKED AND GET A GOUTE ON REPLACING THE BRASS STEMS WITH STAINLESS STEEL STEMS AND COLLARS. TOTALS I ------------------------------------------------------------------------------------------------------------------------------------ 68.28 0.00 68.28 : (LABOR HOURS -) Total: 8.000 8.00 Ot: 0.00) 0.000 , -, -' ________________w___________________________________________________________________________________________------------------------ i-None- TASK DESC COMMENTS Reg: 9602237 REPAIR 03/11{97 : CATCHBASIN : CLEANED AND VACTOR CATCHBASIN ON HARKET + GRAHAM ST. NORTH WEST CORNER. 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 23.41 0.00 23.41 : (LABOR BOURS -) Total: 3.000 3.00 Ot: O.OO} 0.000 ------------------------------------------------------------------------------------------------------------------------------------ -None- TASK DESC COmNTS r r-j L Reg: 9602248 REPAIR : SERINITY CT. : HOSED AREA DOWN AROUND HANHOLE 03/18/97 0.000 i tOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.00 0.00 0.00 : (LABOR HOURS -) Total: 1.000 1.00 Ot: O.OO} 0.000 ------------------------------------------------------------------------------------------------------------------------------------ -None- TASK DESC COMMENTS Reg: 9602225 REPAIR : STATIONS : KADE QUICK CHECKS ON LIFT STATIONS 03/24/97 0.000 i TOTALS ----------------------.---------------.--------------------------------------------------------------------------------------------- 69.78 0.00 69.78 : (LABOR HOURS -) Total: 12.000 Reg: 12.00 Ot: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ -None- TASK DESC COMMENTS 9602243 REPAIR : CATCHBASIN : VACTOR CATCHBASIN AT 8TH + SHARON BOTH BASINS 03/31/97 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 17.67 0.00 17.61 : (LABOR HOURS -) Total: 3.000 3.00 Ot: 0.00) 0.000 ,.--.-------------------------------------------------------------------------------------------------------------------.------------ Reg: 'EQUIP TOTALS : (LABOR HOURS -) Total: 27.000 Reg: 27.000t: 0.00) 0.000 179.14 0.00 179.14 ------------------------------------------------------------------------------------------------------------------------------------ -------------------------'----------------------------------------------------------------------------------------------------------- i IBFP1 TASK DESC COMMENTS 03/11/91 0.000 9602265 REPAIR BELT FILTER PRESS #1 Repair REPLACED RUBBER SEAL 10FT. GREASED STIRRING ROLLERS TOTALS 1___.__-----------------------------------------------______________________________________________________------------------------- 31. 25 0.00 31.25 : (LABOR HOURS -) Total: 2.500 Reg: 2.50 Ot: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ r- I l . _JllI-~ JEFFERSONVILLE, IN 04/23/97 r I ..."',,"" WORK ORDER HISTORY REPORT Page 2 ------------------------------------------------------------------------------------------------------------------------------------ i----------------------------------------------------------------------------------------------------------------------------------- EQUIPMENT WORK ORDER W.O. EQUIPMENT TASK MTASK DATE DOWN LABOR MATERIAL TOTAL NUMBER NUMBER TYPE DESCRIPTION NO. NO. CLOSED TIME COST COST COST ----------....---------------------.'.----------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------ 2.500 2.50 Ot: 0.00) EQUIP TOTALS : (LABOR HOURS -> Total: Reg: 0.000 31. 25 0.00 31. 25 :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: 1BFPFEED1 TASK DESC COMMENTS 03/03/97 0.000 9602258 REPAIR BELT FILTER PRESS SLUDGE Repair REPAIRED GEAR BOX. . TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.000 60.56 0.00 60.56 : (LABOR HOORS -> Total: 5.000 5.00 Ot: 0.00) ------------------------------------------------------------------------------------------------------------------------------------ Reg: EQUIP TOTALS : (LABOR HOURS -> Total: 5.000 Reg: 5.00 Ot: 0.00) 0.000 60.56 0.00 60.56 I ::::::::::::=:==:::::::::::::::::::::;::::::::::::::==:::::=::::::=::::=:::::=::=:::=:::::=~::::::=::=:=:==::::::::::::::::::::::::: 1POLYMERMIXl rASK DESC COMMENTS 03/01/97 0.000 9602256 REPAIR POLYMAX POLYMER MIXER '1 Repair REBUILT INJECTION AND DIAPRAM PUMP BALLS ,SPRINGS TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.000 25.00 0.00 25.00 : (LABOR HOURS -> Total: 2.000 2.00 Ot: 0.00) I ------------------------------------------------------------------------------------------------------------------------------------ Reg: 2.000 2.00 Ot: 0.00) EQUIP TOTALS : {LABOR HOURS -> Total: Reg: 0.000 25.00 0.00 25.00 =::::::::::::::::':::::::=:=:=::::::::::::::::::::::::=::::::::::::::=:===:::=:=::::::;:===::::=::::=::==:::::::::::::::::::::::::::: 1POLYMERMIX2 TASK DESC ! COMMENTS 03/12/97 0.000 9602266 REPAIR POLYMAX POLYMER MIXER #2 Repair UNSTOPPED PUMPS AFTER CLEANING SCREENS TOTALS -------------------.---------------------------------------------------------------------------------------------------------------- 0.000 25.00 0.00 25.00 : (LABOR HOORS -> Total: 2.000 Reg: 2.00 Ot: 0.00) --------------------------~---~-------------~-~------------------------------------------------------------------------------------- 2.000 2.00 Ot: 0.00) EQUIP TOTALS : (LABOR HOURS -> Total: Reg: 0.000 25.00 0.00 25.00 ----------------------------------------------------------------------------------------------------------------------------.------- -----------------------------------------------------------------------------------------------..----------------------------------- r I L 4-EMCGMC TASK DESC COMMENTS 03/30/97 0.000 9602270 REPAIR GMC PICKUP Service CHANGED OIL , ROTATED THE TIRES MILES 21481 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.000 0.00 0.00 0.00 : (LABOR HOURS -> Total: 1.000 1.00 Ot: 0.00) ------------------------------------------------------------------------------------------------------------------------------------ Reg: 1. 000 1.00 Ot: 0.00) r- I I ~ ~...c.. EQUIP TOTALS : (LABOR HOURS -> Total: Reg: 0.000 0.00 0.00 0.00 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 5ARTIC SPRINGS TASK DESC COMMENTS 9602232 REPAIR ARTIC SPRING L.S. 03/04/97 FLOOD SEALED STATION SO FLOOD WATER WOULDN'T ENTER STATION, CHECKED FLOATS FOUND ROOTS ON ON/OFF FLOAT HAD TO REPLACE FLOAT 0.000 JEFFERSONVILLE, IN 04/23/97 WORK ORDER HISTORY REPORT Page 3 ::::====:::::::=:==:::-:::::::::::===:::::::::::::::==:::=::::=:====:=::::::=::::====::::::::::::::::::::===;:;;:;;::;;;;;;;;;;;;:;;: DOWN TIME LABOR MATERIAL COST COST TOTAL COST L EQUIPMENT NUMBER ::::=~::==::=:::==::::===:::::::::::::===::::::::::::=::::==:::::::::::::::==::::::::::::::::::::::::::::::::::;:;;:;:;;;::;;:::;;;; 0.000 28.85 0.00 28.85 WORK ORDER W.O. HUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED TOULS -~-----------------------------------------------_._-------------------------------------------------------------------------------- : (LABOR HOURS -) Total: 2.500 Reg: 2.50 Ot: 0.00) ------------------------------------------------------------------------------------------------------------------------------------ 5ARTIC SPRINGS 9602231 REPAIR ARTIC SPRING L.S. 03/07/97 0.000 TASK DESC : FLOOD COMMENTS : CHECKED STATION MOTOES ETC. FLOOD WATER HIGH HAD TO USE A BOAT : TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.000 60.84 0.00 60.84 : (LABOR HOURS -) Total: 10.000 Reg: 10.00 Ot: O.OO} ------------------------------------------------------------------------------------------------------------------------------------ 5ARTIC SPRINGS 9602230 REPAIR ARTIC SPRING L.S. 03/08/91 0.000 i TASK DESC : ARTIC SPRINGS COMMENTS : CHECKED 3 TIMES TO HAKE SURE MOTORS ARE DRY AND STATION DRY, OK i TOTALS -~-----------~---------------------------------------------------------------------------------------------------------------------- 0.000 25.96 0.00 25.96 : (LABOR HOURS -) Total: 6.750 Reg: 6.750t: O.OO} 03/21/97 0.000 ---------------------------------~---------------~---------------------------------------------------------------------------------- 5ARTIC SPRINGS 9602293 REPAIR ARTIC SPRING L.S. TASK DESC : EVAL. COMMENTS : EVALUATION. ------------------------------------------------------------------------------------------------------------------------------------ : TOTALS : (LABOR HOURS -) Total: 13.000 Reg: 13.00 Ot: O.OO} 0.000 75.01 0.00 75.01 j----------------------------------------------------------------------------------------------------------------------------------- EQUIP TOTALS : (LABOR HOURS -) Total: 32.250 Reg: 32.25 Ot: O.OO} 190.66 r ~ L..; ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 0.000 190.66 0.00 5CEDARVIEW TASK DESC i COMMENTS 9602235 REPAIR CEDARVIEW L.S. 03/08/97 0.000 '1 CONTROL NOT WORKING #1 CONTACT OR NOT WORKING COIL BAD I PICKED UP NEW PART AND INSTALLED TOTALS ._--~---------------------~--------~------------------------------------------------------------------------------------------------- 0.000 34.62 0.00 34.62 : (LABOR HOORS -) Total: 3.000 Reg: 3.00 Ot: O.OO} ------------------------------------------------------------------------------------------------------------------------------------ I EQUIP TOTALS : (LABOR HOURS -) Total: 3.000 Reg: 3.00 Ot: O.OO} 0.000 34. 62 0.00 34.62 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ r f t . seRUMS LANE I . TASK DESC COMMENTS 9602241 REPAIR CRUMS LANE I L.S. 03/12/97 0.000 INSTALL BREAKER 11 INSTALLED NEW BREAKER, OTHER ONE FAULTY REPLACEMENT SENT WILL RETURN BAD ONE FOR CREDIT TOTALS I . ------------------------------------------------------------------------------------------------------------------------------------ 0.000 11. 54 0.00 11.54 : (LABOR HOORS -) Total: 1. 000 Reg: 1.00 Ot: O.OO} ------------------------------------------------------------------------------------------------------------------------------------ r I . , ~ sCROl<!S LANE I I TASK DESC COMMENTS 9602292 REPAIR CRUMS LANE I L.S. Repair RESET #1 PUMP TO LEAD FOR CHECKING OUT TRIP OUT BREAKER RESET FLOAT HEIGHT 03/21/97 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.000 17.31 0.00 17.31 : (LABOR HOORS -) Total: 3.000 Reg: 3.00 Ot: 0.00) 03/22/97 0.000 ------------------------------------------------------------------------------------------------------------------------------------ [.: "J 5CRUMS LANE I 9602291 I TASK DESC : Repair REPAIR CRUMS LANE I L.S. n l JEFFERSONVILLE. IN 04/23/97 WORK ORDER HISTORY REPORT Page 4 ------------------------------------------------------------------------------------------------------------------------------------ j----------------------------------------------------------------------------------------------------------------------------------- EQUIPMENT WORK ORDER W.O. EQUIPMENT TASK lffASK DATE DOWN LABOR MATERIAL TOTAL NUlBER NUMBER TYPE DESCRIPTION NO. NO. CLOSED TrIm COST COST COST ::::::==:::::====:::::::::::===::::====:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::;;:::::==::====:::::==:::: i COMMENTS : CHECKED AND FOUND PROMBLEM IN THE PHONE LINE , TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.000 28.85 0.00 26.85 : (LABOR HOURS -) Total: 5.000 5.00 Ot: 0.00) --_.------------_._.---------_.-~-----------------------------------------------......-..------------------------------------------- Reg: 9.000 9.00 Ot: 0.00) EQUIP TOTALS : (LABOR HOURS -) Total: Reg: 0.000 57.70 0.00 57.70 =='::::====::::::::::::=:::::==::::::::::::::::=:::::::::::::::::::::::::::::::::::::::::::;;:;:::::::::::::::::::::::::::::::::::::: 03/31/97 0.000 SCRUMS LANE III 9602290 REPAIR CRUMS LANE III L.S. TASK DESC CHECK i COMMENTS CHANGED BOTH CHECK VALVE, IN DRY WELL TOTALS ~------------------------------------_.----------------------------------------~------------------------------------.---------------- 0.000 17.31 0.00 17.31 : (LABOR HOURS -) Total: 3.000 Reg: 3.00 Ot: O.OO} j----------------------------------------------------------------------------------------------------------------------------------- EQUIP TOTALS : (LABOR HOURS -) Total: 3.000 Reg: 3.000t: 0.00) 0.000 17.31 0.00 17.31 --------------.--------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------ [j 5EASTBROOK ! TASK DESC COMMENTS 9602277 REPAIR EAST BROOK L.S. 03/25/97 0.000 Wetwell CLEANED WETVELL GREASE AND GRIT, PUMP ALL THE WAY DOWN AND CLEANED AR AROUND PUMPS TOTALS I ------..-----------------------------..-------------------------------------------------------------------------------------.-------- 0.000 56.53 0.00 56.53 : (LABOR BOURS -) Total: 5.000 Reg: 5.00 Ot: 0.00) ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -) Total: 5.000 Reg: 5.00 Ot: O.OO} 0.000 58.53 0.00 58.53 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 5LOUISE ST. TASK DESC COMMENTS 03/08/97 0.000 9602236 REPAIR LOUISE STREET L.S. Repair REPLACED AMP COIL DAMAGED BY HIGH WATER n TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.000 8.65 0.00 8.65 : (LABOR HOURS -) Total: 0.750 Reg: 0.750t: 0.00) ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -) Total: 0.750 Reg: 0.750t: 0.00) 0.000 8.65 0.00 8.65 ~::==:::::::=:::=::===:::::=:=::==:=~:::::::=::=:::::=::::::::::::::::::::::::::::::::::::::::::====::====::===:=:=::===::::==:::::: 5SUNSET MOBILE TASK DESC ! COMMENTS 9602233 REPAIR SUNSET MOBILE L.S. 03/01/97 UNDER VATER PULLED MOTORS , INSTALLED ONE SPARE TOOK MOTORS TO DERSY TO BE CHECKED DRY OUT. 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.000 69.51 0.00 69.51 : (LASOR HOURS -) Total: 6.000 Reg: 6.00 Ot: 0.00) , ~-_._------------------------------------------------------------------------------------------------------------------------------- 5SUNSET HOBILE TASK DESC COMMENTS i 9602234 REPAIR SUNSET HOBILE L.S. 03/05/97 INSTALL 11 INSTALLED NEW MOTOR, ON LINE, PUMP MAKING EXCESSIVE NOISE, BEARING HAVE 0.000 ..--- JEFFERSONVILLE. IN 04/23/97 Page 5 WORK ORDER HISTORY REPORT :~:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: EQUIPMENT WORK ORDER W.O. EQUIPMENT TASK MTASK DATE DOWN LABOR MATERIAL TOTAL NUMBER NUMBER TYPE DESCRIPTION NO. NO. CLOSED TIME COST COST COST -------------------------------------------.---------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------ COHKENTS : HAD WATER IN THEM, SUMP PUMP ALSO NEEDS TO BE CHANGED TO HIGHER CAPICITI TOTALS ------------------------------------------------------------------------------------------------------------------------------------ : (LABOR HOURS -) Total: 5.000 Reg: 5.00 Ot: O.OO} 0.000 28.85 0.00 28.85 ------------------------------------------------------------------,------------------------------------------------~----------------- 5SUNSET MOBILE 9602238 REPAIR SUNSET MOBILE L.S. 03/11/97 0.000 TASK DESC : PULLED PUMP COMMENTS : PULLED PUMP, WATER DAMAGE TO BEARING, TOOK TO SPENCER,KACH. FOR REPAIR TOTALS ----------------------------------------------------------------------------------------------------------------------------------.- : (LABOR HOURS -) Total: 4.000 4.00 Ot: O.OO} 0.000 23.08 0.00 23.08 Reg: -'---------.-------.-.------------------------------------------------------------------------------.-------------------------------- 5SUNSET MOBILE 9602244 REPAIR SUNSET MOBILE L.S. 03/14/97 0.000 TASK DESC : #1 PUMP COMMENTS : 11 PUMP REBUILT DUE TO FLOODING IN DRYWELL , REINSTALLED PUMP J TOTALS -,----------------------------------------------------------------------------------------------------------------------------------- : (LABOR HOURS -) Total: 1. 700 1.700t: 0.00) 0.000 17.31 0.00 17.31 Reg: ------------------------------------------------------------------------------------------------------------------------------------ 03/31/97 0.000 5SUNSET MOBILE 9602287 REPAIR SUNSET MOBILE L.S. i TASK DESC : EVAL. COMMENTS : EVALUATIONS i TOTALS -,~---------------------------------------------------------------------------------------------~------------------------------------ Reg: : (LABOR HOURS -) Total: 9.00 Ot: O.OO} 0.000 51.93 0.00 51.93 9.000 --------------------------------------------------------------.--------------------------------------------------------------------- EQUIP TOTALS : (LABOR HOURS -) Total: 25.700 Reg: 25.700t: 0.00) 0.000 190.68 0.00 190.68 ::::===:::::::::::::::==::==:::::::::::::::::::::::::=::=::::::=:::::=:=::=:=:::::::::::::::=::::::::::::::::::::::::::::::::::::::: 5TENTH ST. TASK DESC COMMENTS 9602182 REPAIR TENTH STREET L.S. INSTALL NO. 3 PUMP AT 10TH STREET INSTALLED NO.3 PUMP AT TENTH STREET LIFT STATION. 03/11/97 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ : (LABOR HOURS -) Total: 15.000 Reg: 15.00 Ot: 0.00) 0.000 115.85 0.00 115.85 -------------------.-----.---------------------------------------------------------------------------------------------------------- 5TENTH ST. TASK DESC COMMENTS 03/11/97 0.000 9602239 REPAIR TENTH STREET L.S. t3 PUMP INSTALLED INSTALLED #3 PUMP ON LINE, CHECKED + CHANGED SUMP PUMP, CLEANED UP DRY WELL AREA CLEANED BAR SCREEN AREA TOTALS ------------------------------------------------------------------------------------------------------------------------------------ : (LABOR HOURS -) Total: 9.000 9.00 Ot: 0.00) 0.000 51. 93 0.00 51. 93 Reg: ------------------------------------------------------------------------------------------------------------------------------------ 5TENTH ST. TASK DESC comns 03/17/97 0.000 9602181 REPAIR TENTH STREET L.S. PUlp flov meter pit dry PUMP FLOW METER PIT DRY AND DRY FLOW METER SENSOR OFF. CLEAN UP DRY WELL PIT TOTALS -------------------------------------------------------------------------------------------------------------------.---------------- : (LABOR HOURS -) Total: 6.000 6.00 at: O.OO} 0.000 70.23 0.00 70.23 Reg: ------------------------------------------------------------------------------------------------------------------------------------ ~QUIP TOTALS : (LABOR HOURS -) Total: 30.000 Reg: 30.00 Ot: 0.00) 0.000 238.01 0.00 238.01 ~:~=:=::=:::::::=:::=::==::=:::=::::':==::::=:::::::==::::==::::::::::==::::::::::::::::==::::::=:::::::::::::::::::::::::::::::::::: r SUTICA I TASK DESC 9602180 REPAIR UTICA STATION 1 Put lift station back in service 03/12/97 0.000 ...- JEFFERSONVILLE, IN 04/23/97 WORK ORDER HISTORY REPORT Page 6 ::::::::=::::::::::====::::=====:::::==::::::=:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: LABOR MATERIAL COST COST TOTAL COST EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MUSK NO. NO. DATE CLOSED DOWN TIME ------------------------------------------------------------------------------------------------------------------------------------ -----------------------------------------------------------.------------------------------------------------------------------------ COMMENTS : CALL PSI AND HAVE THEK INSTALL THIER ELECTRICAL METER. PUT LIFT STATION BACK IN SERVICE TOTALS --------------------------------------------------------------------------------------------------------------------~--------------- 69.51 0.00 69.51 : (LABOR HOURS -) Total: 6.000 6.00 Ot: 0.00) 0.000 ---------------------------------------------------------------------------------------------------------.-------------------------- 5UTICA I : TASK DESC . COMMENTS Reg: 9602240 REPAIR UTICA STATION I 03/13/97 0.000 FLOOD TURNED STATION OFF 3/9/97 2 A.M. RIVER WATER ALMOST TO PANEL. STATION BACK ON LINE 7:10P.M. 3/12/97 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 92.32 0.00 92.32 : (LABOR HOURS -) Total: 12.000 Reg: 12.00 Ot: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ L EQUIP TOTALS : (LABOR HOURS -) Total: 18.000 Reg: 18.00 at: 0.00) 0.000 161. 83 0.00 161.83 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 5t1ILSON SCHOOL TASK DESC COMMENTS 9602246 REPAIR WILSON SCHOOL L.S. 03/19/97 Repair VAC PUMP LOCKED UP I STARTER WORN OUT , VENT BAD DUE TO CONTROL COIL BEING DIRTY 3/19/97 REINSTALLED 0.000 . TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 75.01 0.00 75.01 : (LABOR HOURS -) Total: 11.000 Reg: 11.00 Ot: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -) Total: 11.000 Reg: 11.00 Ot: 0.00) 0.000 75.01 75.01 0.00 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ GRANDTOTALS: (LABOR HOURS -) Total: 184.700 Reg: 184.70 Ot: 0.00) f! Li 0.00 1353.95 0.000 1353.95 Mt- - JEFFERSONVILLE. IN 04/23/91 WORK ORDER HISTORY REPORT Page 1 ------------------------------------------------------------------.-.---------------------------------------.----------------------- ------------------------------------------------------------------------------------------------------------------------------------ EQUIPMENT NUMBER WORK ORDER W.O. NUMBER TYPE TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR MATERIAL COST COST TOUL COST .----------------.-------------------------------------------------.----------------------.----------------------------------------- ---------------------------------------------------------------------------------------------.-----------------------------------.-- -None- TASK DESC COMMENTS EQUIPMENT DESCRIPTION 9602221 PROJECT 03/01/91 0.000 FLOOD KADE SEWER CALLS, CHECKED STATIONS, KEEP PUMPS FILLED WITH GAS AT STAT. POT OUT SUMP PUMPS, TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 370.19 0.00 370.19 : (LABOR HOURS -) Total: 34.500 Reg: 34.50 Ot: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -) Total: 34.500 Reg: 34.50 at: 0.00) 0.000 370.19 0.00 370.19 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ -None- TASK DESC COMMENTS 9602223 PROJECT 03/03/97 0.000 FLOOD HADE SEWER CALLS, CHECK LIFT STATIONS, PUT OUT SUMP PUMPS, WORK ON LOUSIE STAT., CLEANED CATCH BASIN TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 471.20 0.00 471.20 : (LABOR HOORS -) Total: 40.000 Reg: 40.00 at: 0.00) 0.000 -,----------------------------------------.----------------------------------.------------------------------------------------------- -None- TASK DESC COMMENTS 9602224 PROJECT 03/03/97 0.000 FLOOD PUT OUT SUMP PUMPS TO RESIDENCE, FILLED UP PUMPS AT MAGNOIA,LOUSIE, EWING LANE LIFT SUT., DELIVERD PUMP TO MAGNOIA, CHECK STATIONS, MADE SEVER CALLS, CLEANED CATCH BASINS TOTALS ----------------------------------------------------------------------------------------.------------------------------------------- 0.00 0.00 0.00 : (LABOR HOURS -) Total: 45.000 Reg: 45.00 Ot: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ -None- TASK DESC COMHENTS 9602226 PROJECT 03/03/97 0.000 FLOOD WORKED IN PLANT, PUT PUMPS AT LIFT STATIONS, PUT 6 CLYINDER POMP ON 8TB ST. FOR BOB HILLER, PUT SUMP PUMPS OUT, CLEANDE CATCH BASINS TOTALS --.------------------------------------------------------------------------------------~------------'-------------------------------- 412.87 0.00 412.87 : (LABOR BOORS -) Total: 35.500 Reg: 35.50 Ot: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ -None- TASK DESC COMMENTS 9602222 PROJECT : FLOOD GATES : VACTORtCLEANED FLOOD GATES FOR BOB MILLER 03/05/91 0.000 r f l TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 188.48 0.00 188.48 : (LABOR HOURS -) Total: 16.000 Reg: 16.00 Ot: 0.00) 0.000 -----------------------------------------------------------------------------------------------------------------------.--------.--- -None- TASK DESC COMMENTS 9602228 PROJECT : CSO GATES : CLOSED GATES ON CSO ON MARKET ST., AND SAND BAGED 3 03/05/97 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 271. 55 0.00 271. 55 : (LABOR HOURS -) Total: 59.000 Reg: 59.00 Ot: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ -None- TASK DESC . COMMENTS 9602229 PROJECT : CSO GATES : HELPED WORK ON eso GATES ON MARKET ST. 03/05/91 0.000 TOTALS ------------------------------------------------------------------------------------------------------------------------------------ I 110.49 0.00 110.49 : (LABOR HOURS -) Total: Reg: 9.50 Ot: 0.00) 03/14/97 0.000 9.500 0.000 ------------------------------------------------------------------------------------------------------------------------------------ -None- 9602184 PROJECT TASK DESC : CLEAN ALL CATCH BASINS ALONG RIVERSIDE DRIVE - JEFFERSONVILLE. IN 04/23/97 WORK ORDER HISTORY REPORT Page 2 ------------------------------------------------------------------------------------------------------------------------------------ -------------------------------------------------------------------.---------------------------------------------------------------- EQUIPMENT !lUMBER WORK ORDER W.O. NUMBER TYPE EQUIPMENT DESCRIPTION TASK MTASK NO. NO. DATE CLOSED DOWN TIME LABOR MATERIAL COST COST TOTAL COST COMMENTS ------------------------.-.--------...---------------------------------------------------------------------------------------------- ---.-------------------------------------------------------------------------------------------------------------------------------- CLEAN ALL CATCH BASINS ALONG RIVERSIDE DRIVE. GET WITH BOB MILLER TO SEE IF HE HAS ANYMORE CATCH BASINS THAT NEED TO BE VACTORED OUT. BASIN LOOK FINE RAIN MUST HAVE FLUSHED THEM TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 23.56 0.00 23.56 : (LABOR HOURS -> Total: 4.00 Ot: 0.00) 0.000 .--------------------------------------------------~-------------------------------------------------------------------~------------ -None- TASK DESC i COMMENTS 4.000 Reg: 0.000 TOTALS ~----------------------------------------------------------------------------------------------------------------------------------- 0.00 9602245 PROJECT : SERINITY CT. : WASHED DOWN GRASSY AREA AROUND HAN HOLE + THE STREET 03/19/97 0.000 17.31 17.31 : (LABOR HOURS -> Total: 3.000 3.00 Ot: 0.00) ------------------------------------------------------------------------------------------------------------------------------------ I -None- TASK DESC COMMENTS Reg: 9&02242 PROJECT 03/31/97 0.000 TV TV. LINE 8TH DOWN MEIGS TOWARDS 7TH ST. TO LOCATE TAP FOR RESIDENCE AT 733 MEIGS FOUND 'TAP AT 105 FT. TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 0.00 : (LABOR HOURS -> Total: 12.000 Reg: 12.00 at: 0.00) 0.000 66.81 66.81 ------------------------------------------------------------------------------------------------------------.----------------------- -None- TASK DESC COMMENTS 9602247 PROJECT 03/31/97 :TV : TV LINE FROM SUNSET MOBIL DOWN TO RIVER VALLEY HIDDLE SCHOOL 0.000 , TOTALS ------------------------------------------------------------------------------------------------------------------------------------ 85.12 0.00 85.12 : (LABOR HOURS.) Total: 7.500 7.50 at: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ Reg: EQUIP TOTALS : (LABOR HOURS.> Total: 231.500 Reg: 231.50 Ot: 0.00) 0.00 1647 .38 0.000 1647.38 :::::::::::::::===:===::::::====:===:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::===:==:===::===:::: 5TENTH ST. i !ASK DESC COMMENTS 9602183 PROJECT TENTH STREET L.S. 03/11/97 0.000 CLEAN WET WELL AT TENTH STREET LIFT STATION CLEANED WET WELL OUfFRO! FLOOD. WELL WAS FULL OF GREASE THAT ACUMILATED OVER THE PAST MONTH TOTALS , . .----------------------------------------------------------------------------------------------------------------------------------- 93.79 0.00 93.79 : (LABOR HOURS -) Total: 16.000 Reg: 16.00 at: 0.00) 0.000 ------------------------------------------------------------------------------------------------------------------------------------ EQUIP TOTALS : (LABOR HOURS -> Total: 16.000 Reg: 16.00 Ot: 0.00) 0.000 93.79 0.00 93.79 :::::::::::==:::::::=====:=::::::::=::==::::::::::::==:::::::===::::::::;:::::::::::::::::::::::::::::::::::::;:::;:;:;;;;;;;:;;;;;: GRANDTOTALS: (LABOR HOURS -> Total: 282.000 Reg: 282.00 Ot: 0.00) 0.00 2111. 36 0.000 2111.36 I.: JEFFERSONVILLE, IN 04/23/91 Page 1 WORK ORDER HISTORY REPORT ::::::::::=:::::::::::::::::=:::::==::::::::::::::::::::::::::':===::::::::::::===::::====:::::::::::::==:::=:::::::===::=:===:::=:::: EQUIPMENT HUlmER r ~ L- WORK ORDER i.O. NUlmER TYPE EQUIPMENT DESCRIPTION TASK MTASK liO. NO. DATE CLOSED DOWN TIME LABOR COST MATERIAL COST TOTAL COST ::::::::::::::::::::::::::::::::::::::::::::::::=:::::::::::::;;::::::;;;;:::;:;;:::::::::::::;::::;:::::::;::::::;;:::::::;:::::::: ,-None- TASK DESC comns 9601361 SAFETY 03/06/97 : PURCHASE AND SETUP FLAMHIBLE STORAGE CABINET : WAYMAR, I NEED QUOTES ON ALL LARGE ITEMS THAT ARE TO PURCHESED. 0.000 TOTALS '.-------.-.---------------------------------------------------------------------------------------------------------------------.--- 0.00 0.00 : (LABOR HOURS -) Total: O.OOOt: 0.00) 0.000 0.00 ~-----------------------.----------------------------------------------------------.----------------------------.------------------- 0.000 Reg: 0.000 0.00 Ot: 0.00) EQUIP TOTALS : (LABOR HOURS -) Total: Reg: 0.000 0.00 0.00 0.00 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 0.000 0.00 Ot: O.OO} GRANDTOTALS: (LABOR HOURS -) rotal: Reg: 0.000 0.00 0.00 0.00 --- JEFFERSONVILLE. IN Apr 23, 1997 2:30 pm Page 1 EMC JEFFERSONVILLE SEWER DEPT. 701 CHAMPION RD JEFFERSONVILLE,IN 47130 Unscheduled Maintenance History Selection Criteria: Structure Number........All Date (Date Completed)...03/01/97 to 03/31/97 Maintenance Code........All Type of Maintenance.....All Structure Type..........All --------------------------------------------------------------------- --------------------------------------------------------------------- Request Date Number Structure Type/Number Complete Type of Problem -------- -------------------------- -------- ------------------------- 0300397 L 03/03/97 TV SEWER MAIN 00031197 L 03/11/97 SEWER EVALUATION 31397 L 03/13/97 CATCHBASIN CLOGGED 031397 L 03/18/97 TV SEWER MAIN 031897 L 03/18/97 CATCHBASIN CLOGGED 31897 L 03/18/97 CATCHBASIN COMPLAINT 0031897 C 03/18/97 CATCHBASIN CLOGGED 00301897 C 03/18/97 CATCHBASIN CLOGGED 00031897 C 03/18/97 CATCHBASIN CLOGGED 00003187 L 03/18/97 RESIDENT COMPLAINT 32097 L 03/20/97 RESIDENT COMPLAINT 032097 C 03/20/97 CATCHBASIN COMPLAINT 032597 L 03/25/97 RESIDENT COMPLAINT 32697 L 03/26/97 RESIDENT COMPLAINT 0302697 L 03/26/97 RESIDENT COMPLAINT 32797 L 03/27/97 RESIDENT COMPLAINT ----------------------------~---------------------------------------- --------------------------------------------------------------------- ?----= JEFFERSONVILLE. IN n t i t.e; Attachment D Maintenllnce & Repair Expenditures JEFFERSONVILLE, IN Jeffersonville Wastewater Treatment Facility Maintenance & Repair Expenditures Page 1 P.O. Date Vendo, Description Amount 3/12/97 BR RUBBER SILICONE TUBING & CURED PEROXIDE FOR LIFT $217.86 STA TlON SAMPLERS 3/12/97 CUNNINGHAM OVERHEAD DOOR REPAIR OF OVERHEAD DOOR AT PRESS ROOM $107.60 3/12/97 GOODWILL RAGS FOR PLANT $21.53 3/12/97 HEUSER HARDWARE HACKSAW BLADE & FILE USED FOR FLOOD $13.53 3/12/97 HEUSER HARDWARE NYLON ROPE AND CLAMPS FOR HOSES ON $10.71 AUTO SAMPLERS 3/12/97 HEUSER HARDWARE PLANT KEYS $14.02 3/12/97 MAKOWSKY OIL COMPANY GREASE FOR PLANT USE $90.30 3/12/97 OFFICE DEPOT STORAGE BOXES $4.74 3/12/97 SOUTHLAND ELECTRICAL FUSES FOR CONTROL PANEL FOR FIL TRA T10N $30.00 STA TION 3/12/97 THE COBB GROUP WORDPERFECT SUITE 7 SUBSCRIPTION $59.00 3/12/97 WALGREENS FILM DEVELOPING - COLLECTIONS SYSTEM $41.17 ~/12/97 DONNIE GRIFFIN BOA T RENTAL $50.00 3/12/97 HEUSER HARDWARE SILICONE AND TARPS FOR LIFT STA T10NS $16.02 3/12/97 FALLS CITY ELECTRIC PUTTY TAPE AND MA TERIAL USED TO SEAL $18.57 ARTIC SPRINGS L.S. 3/12/97 READY ELECTRIC CRUMS LANE I CONTROL PANEL WORK $59.63 (BREAKER TROUBLE) ~/12/97 SPENCER MACHINE & TOOL CLEAN OUT #'1 PUMP AT LOUISE STREET $82.50 3/12/97 K-MART LIFE JACKETS $62.67 ~/12/97 OFFICE DEPOT PORTFOLIO AND BINDERS FOR SAFETY $46.71 3/12/97 COPY COpy STANDARD OPERA TING PROCEDURES COPIES $11.47 3/17/97 HEUSER HARDWARE SILICONE TO SEAL UP L.S. $18.65 3/17/97 NAPA AUTO PARTS SOCKET SET HOLDER $14.68 r: 3/17/97 PLUMBERS SUPPLY CO FOUR SUMP PUMPS WITH SUMP PUMP KITS $460.85 f ! 1...) 3/17/97 STEWART FEED & SEED GRASS SEED FOR PLANT $187.50 3/17/97 BITWISE UPGRADE ON LAB PC RAM MEMORY $175.00 3/17/97 ALBERT B. CRUSH LOCKING SHEA VE FOR #1 MOTOR AT SUNSET $42.35 MOBILE HOME PARK 3/17/97 D&F DISTRIBUTORS FIL TER KIT FOR VACUUM PUMPS AT WILSON $57.51 SCHOOL 3/17/97 D&F DISTRIBUTORS VACUUM PUMP FOR WILSON SCHOOL LIFT $347.65 STATION 3/17/97 FALLS CITY ELECTRIC SEAL UP VENT HOLES AT ARTlC SPRINGS LIFT $19.50 STATION 3/17/97 FRANK STEMLER & SONS SEAL ARTIC SPRINGS LIFT STA TION VENT $7.60 HOLES 3120/97 HEUSER HARDWARE DUCT TAPE $12.57 JEFFERSONVILLE, IN Vendor Jeffersonville Wastewater Treatment Facility Maintenance & Repair Expenditures Description Page 2 P.O. Date Amount 3/20/97 RADIOLAND BA TTERY AND CAP FOR RADIOS $173.24 3/20/97 STEWART FEED & SEED GRASS SEED FOR PLANT $262.50 3/20/97 MISCELLANEOUS SLIP OVER BOOKS FOR FOXBORO $20.00 3/20/97 WALGREENS FILM FOR CAMERA FOR COLLEcnONS $20.00 3/20/97 WA TER WORKS SUPPLIES MANHOLE COVER HOOKS $39.09 3/20/97 FALLS CITY ELECTRIC FURNASFOR#1PUMPATLOU~ESTREETLIFT $71.00 STATION 3/20/97 FALLS CITY ELECTRIC MOTOR CONTROL EQUIPMENT $64.24 3/24/97 ElL MEG OHN METER $850.42 3/24/97 HEUSER HARDWARE CLEAR TUBING FOR POLY MAX IN PLANT $19.69 F1 3/24/97 HEUSER HARDWARE FITTING TO REPAIR POL Y BLEND MACHINE $4.61 L . \:..: 3/24/97 OFFICE DEPOT LA TERAL FILE CABINET FOR OFFICE $469.49 3/24/97 RADIOLAND RADIO REPAIR $75.00 3/24/97 WA TERWORKS 2 SECTIONS OF 8" SEWER PIPE AND JOINT $36.07 COMPOUND 3/24/97 WATERWORKS SEWER CAP $4.88 3/24/97 WESCO SPLASH PLA T FOR VACTOR TRUCK $692.50 3/24/97 ZEP FOGGER $314.95 3/24/97 DAN'S TRUCK AND DEISEL SERVICE ON 10TH STREET GENERATOR $557.40 3/24/97 DAN'S TRUCK AND DEISEL SERVICE ON MILL CREEK GENERATOR $235.66 3/24/97 DAN'S TRUCK AND DEISEL SERVICE ON PLANT GENERATOR $198.38 3/24/97 DAN'S TRUCK AND DEISEL SE~VICE ON SPRING STREET GENERA TOR $259.82 3/24/97 METZGER ELECTRIC CEDARVIEW LIFT STA nON $60.00 3/24/97 METZGER ELECTRIC CRUMS LANE I BREAKER #1 $80.00 3/24/97 PETERSON ELECTRIC WILSON SCHOOL MOTOR STARTER $203.93 3/24/97 SPENCER MACHINE REPLACE BEARINGS IN PUMP #1 @SUNSET $801.20 MOBILE HOME Total 1,815.96 JEFFERSONVILLE. IN Attachment E Repair & Replacement Expenditures ~-" JEFFERSONVILLE, IN Jeffersonville Wastewater Treatment Facility Repair & Replacement Expenditures Page 1 P.O. Date Vendor Description Amount 3/17/97 ASHBROOK (Project #96036) HYDRAULIC STEERING VALVE $881.35 FOR #2 BEL T PRESS 3/17/97 CORRO-FLO (project #96036) FIL TER AND ASSEMBL Y FOR $334.53 EFFLUENT WATER 3/17/97 SPENCER MACHINE & TOOL (project #96036) REPAIR REEVE DRIVE GEAR $1,080.27 BOX ON PRESS ROOM SLUDGE PUMP #1 Total 2,296.15 n L ---'- JEFFERSONVILLE, IN 1.996.Repair & Replacement I ;.., , Wastewater Treatment Facility Actual % Priority Description Estimated Cost Complete 1 Replace 2 Gas Detectors (project No. 96008) $3,800 $3,800.00 100% 2 Replace Carpet at Main Office Building (project No. 96009) $2,250 1 Ethernet Cable to Network Lab to Operations (project No. 96014) $40,000 $124.88 5% 1 Replace 24" Dandy Roller to belt Filter Press (project No. 96027) $5,800 $5,886.64 100% 1 Clean oxidation ditches (project No. 96028) $3,500 $1,339.35 100% 1 Replacement Belts for Filter Press #2 (project No. 96030) $3,000 $2,709.26 100% 2 Repair of Belt Press in Process Building (project No. 96036) $2,300 $2,296.15 100% 2 Painting ofIron Works at Final Clarifiers (project No. 97001) $16,000 Total Expendituresfor Treatment Facility $76,650 $16,156.28 L{ft Stations 1 Cedar View replace NO.1 pump and motor and rehab NO.2 pump. $1,250 $273.33 50% (Project No. 96001) ** We are investigating the possibility of removing this station from service and replace with gravity sewer. 1 Eiectrical wiring and related components to phase I alarm system $5,500 $9,185.41 80% upgrade. (Project No. 96002) 1 Mill Creek L.S., repair, test & certify elevator (project No. 96003) $2,800 $953.17 100% 1 Replace Roofs at Powerhouse and Spring Street (project No. 96005) $4,500 $5,157.75 100% 1 Sunset Mobile Home Park, Seal Wetwell, Upgrade Electrical $3,500 Systems, Replace Door and Roof. (project No. 96006) (**Investigation is taking place at this time for removal ofL.S. to gravity flow). 1 Move Weather Head at Crums Lane No. 1 (project No. 96007) $1,500 1 Replace Doors at Camp Powers, Louise & Magnolia (project No. $2,500 96010) ...- > ~ r , . ~--~ JEFFERSONVILLE, IN Actual ,>/ '/0 Priority Description Estimated Cost Complete 1 Pavement and access improvements Spring St. Lift Station (project $3,500 100% No. 96024) 2 Painting of Spring Street, Mill Creek and Louise Street (project No. $15,300 96021 1 Middle School Lift Station Motor #1 and #2 Repair(project #96034) $7,000 $6,647.30 100% 1 Rebuild Power House Lift Station Pump #2 (project No. 96033) $1,700 $1,600.00 100% 1 Trouble Shoot and Repair #1, #2, #3, #4 and #5 pumps at 10th Street $20,000 $28,732.00 90% Lift Station (project No. 96029) Total Expenditures for Lift Stations $69,050 $52,548.96 Vehicles Estimated Actual % Priority Description Cost Cost Complete 1 Replace hose to Jet Truck & purchase new nozzles (project No. $3,685 $3,607.65 100% 96004) 1 Replace 1987 Ram with 4x4 pickup (project No. 96023) $18,739 $18,739.75 100% 1 Replace Hydraulic Gate on Vactor Truck (project No. 96031) $5,946 $2,973.92 100% 1 Replace tires on Jet Truck (project No. 96032) $1,200 $482.40 100% Total Expenditures for Vehicles $29,570 $25,803.72 TOTAL $175,270 $94,508.96 ....~ JEFFERSONVILLE, IN Attachment F CapitallmprovenlentExpenditures r- ~ i U k. JEFFERSONVILLE. IN r- t [ ..... 1996 Capital Improvement Expenditures Wastewater Treatment Facility Priority Description Estimated Actual % Cost Cost Completed 2 Main Power Line Capacitors (project No. 96025) $25,000 $12,697 100% 2 Valve Actuators - 10 (project No. 96026) $35,000 0% Total Expenditures for Wastewater Facility $12,697 Collection System 1 Portable Sampler with Flow Meter (project No. 96012) $6,500 $7,900 100% 1 Replace 3" Portable Pump with 6" Portable Pump $12,500 0% (project No. 96013) Total Expenditures for Collection System $7,900 Priority Description E.vtimated Actual % Cost Cost Compl.eted 1 Mann System Upgrade Phase II (project No. 96014) $40,000 0% 1 Sensors and flow metering for 10th Street, Spring Street $75,000 25% & Mill Creek Lift Stations, redundant control system (project No. 96015) 1 Riverport II, Increase Capacity (project No. 96016) $17,500 $18,862 100% 1 Upgrade Colonial Park (project No. 96017) $32,000 10% 2 Replace Rolling Fields With Gravity Sewer (project No. $50,000 10% 96018) 2 Relocate Barscreen and Install Sluice Gate's at 10th $45,000 0% Street (project No. 96019) Total Expenditure... For Lift Stations $18,862 Vehicles 1 I Trailer to Transport Backhoe (project No. 96022) $5,800 I I 0% Total Expenditures on Vehicles $0 JEFFERSONVILLE, IN , , k" r t L. Attachment G Safety Inspection Report [ - JEFFERSONVILLE, IN l h",,--,-, ..- , f l" n l ~ ENVIRONMENTAL MANAGEMENT CORPORATION MONTHLY SAFETY INSPECTION CHECKOFF SHEET JEFFERSONVILLE W ASTEW A TER TREATMENT FACILITY 701 CHAMPION ROAD JEFFERSONVILLE, IN. 47130 (812) 285-6451 PERSON COMPLETING INSPECTION: WAYMONPAYNE 1. Personnel Safety A. Personal Protective Clothing 1. Safety Helmets Provided (for Personnel & Visitors).................................. 2. Hearing Protection (for High Noise Areas)....................................... 3. Eye Protection - Goggles, etc. (for Personnel & Visitors).................................. 4. Gloves (for Personnel)................................................... 5. Rubber Boots with Steel Toes (provided for Personnel)............. ...... ....... ........... 6. Rain Suits Provided (for Personnel)................................................... 7. Is Respiratory Protection Provided including ventilators and hoods over high dust areas, dust masks, etc. (for Personnel)................................ B. Safety Devices and Equipment 1. Non-sparking Tools in areas where flammable or explosive gases may be present?.................... Y elll 2. Oxygen Deficiency, Toxic, & Explosive Gas indicator.......................................................... .. Yes 3. Self-contained Breathing Apparatus for entry to chlorine room................................................. Yes 4. Confined Space Entry Equipment Available such as and including Safety Harness, Portable Wench, Hoist, etc............................................... Yes 5. First Aid Kits with proper & adequate supplies readily available for any First Aid Emergency... . Yes 6. Traffic Control Cones Available........................ Yes 3-20-97 Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A Yes NO N/A NO N/A NO N/A NO N/A NO N/A NO NO N/A N/A --- JEFFERSONVILLE, IN 22. Is safety glass provided in all doors................ Yes NO N/A 23. Are handrails provided on stairs (Both sides if necessary).................................................. Yes NO N/A 24. Are ladders properly anchored....................... Yes NO N/A 25. Are fixed ladders provided with safety cages or safety side rails...... ................................... Yes NO N/A 26. Are all elevation differences between floors clearly defined and properly lighted................ Yes NO N/A 27. Are portable ladders in good condition........... Yes NO N/A 28. Kick boards in place ifneeded........................ Yes NO N/A 29. No Broken steps............................. ............... Yes NO N/A 30. Are ashtrays provided and emptied regularly.. Yes NO N/A 31. Are trash cans covered and emptied regularly. Yes No N/A 32. Are portable hoists for lifting heavy equipment in good repair.......... ............... ............. ........... Yes No N/A 33. Are plant personnel immunized for tetnus....... Yes NO N/A 34. No electrical cords stretched over tanks.......... Yes NO N/A 35. No gas leaks.............. ............. ............. ........... Yes NO N/A 36. Fuel supply tank in good condition................. Yes NO N/A 37. No excessively hot operating temperature on machinery or equipment................................ Yes NO N/A 38. No excessive vibration of machinery or equipment. ........................... ............. ........... Yes NO N/A 39. No water or oil being "slung" from equipment Yes NO N/A 40. No worn or crackedequipment..................... Yes NO N/A 41. No excessive dust on equipment................... Yes NO N/A .-- 42. Adequate dehumidifier and heaters where " " l needed................................. ......................... Yes NO N/A 43. Emergency Medical Information on all employees available for determination of job assignments..................... ............................. Yes NO N/A 44. Cross connections have been eliminated between potable water supply and non-potable source: a. Pump & Mixer Seals................................. Yes NO N/A b. Digester Heating System Makeup Water... Yes NO N/A c. Vacuum Filter Water Sprays..................... Yes NO N/A d Chemical Mixing Tank............................... Yes NO N/A e. Chlorinator Water Source........................... Yes NO N/A f. De-CWorination Water Source.................... Yes NO N/A g. Yard Hydrants......... ............. ............... ....... Yes NO N/A h. Other......................................................... . Yes NO N/A m. Electrical Safety 1. Is all electrical circuitry enclosed and identified.Yes NO N/A 2. Is all wiring in good condition.......................... Yes NO N/A 3. Are the number of outlets adequate.................. Yes NO N/A 4. Is equipment properly grounded or insulated.... Yes NO N/A 5. Are extension cords in good condition and used properly.......... ......................................... Yes NO N/A L, JEFFERSONVILLE, IN 6. Is electrical test equipment available. Such as voltmeter, ampmeter, etc................................. Yes NO N/A 7. Are dielectric rubber mats presents for electrical work............................................... Yes NO N/A 8. All control panel switches in good condition.. Yes NO N/A 9. All control panels unobstructed...................... Yes NO N/A r- 10. Are dielectric rubber gloves available............. Yes NO N/A r , 11. Are ground fault interrupters used.................. Yes NO N/A f 12. Are warning or caution signs posted............... Yes NO N/A 13. Is control panel area clean and dry.................. Yes NO N/A 14. Are all needed fuses or breakers in place......... Yes NO N/A 15. Are all contacts clean and dust free................. Yes NO N/A 16. Is there emergency stop buttons on all machines and equipment.................. .. ......... .. .. Yes NO N/A 17. Are personnel familiar with the electrical safety such as lock out/tag out procedures................ Yes NO N/A 18. Is power supply locked out/ tagged out on equipment presently being repaired................. Yes NO N/A IV. Chlorine & Dechlorination Safety 1. All standing cylinders chained in place and/or ton cylinders chocked..................................... Yes NO N/A 2. All personnel rained in the use of CL2.............. Yes NO N/A 3. Appropriate repair kits available...................... Yes NO N/A 4. Chlorine & dechlorination leak detector tied into the facility alarm system........................... Yes NO N/A 5. Ventilator fan with outside switch present and either comes on when door opens or manually with switch at entrance door........................... Yes NO N/A 6. Ammonia and Sulphur for checking chlorine & dechlorination leaks available.......................... Yes NO N/A 7. Are all safety precautions posted..................... Yes NO N/A 8. Proper Chlorine wrench available to open valves..... ........................ ................................ Yes NO N/A 9. Chlorine protected from direct sunlight, cool and dry.......................................................... Yes NO N/A 10. No petroleum or other chemicals store in chlorine room................................................. Yes NO N/A II. Spare lead washers available on site................ Yes NO N/A V. Process Chemical Safety I. Are personnel trained to handle all chemicals properly........................................................ . Yes NO N/A 2. Is proper safety clothing present for the chemical to be handled.................................. Yes NO N/A 3. Are all containers, vats, and tanks properly labeled. ......... .. ........... .. ......... .. ........................ Yes NO N/A 4. Is employee exposure within accepted limits.... Yes NO N/A r I l -- JEFFERSONVILLE, IN 5. Are there proper containment of storage areas, including curbing............. ............................... Yes NO N/A 6. Are management & employees aware of the hazards of the materials being used................. Yes NO N/A 7. Knows proper response to an accidental spill... Yes NO N/A 8. All MSDS available and easily accessible......... Yes NO N/A r 9. Has complied with the 6 employer ; responsibilities of the Worker Right to Know Law? (SARA)....... .................... .................. .... Yes NO N/A 10. Emergency Action Plan on file with local Fire, Police Departments and appropriate Emergency Agency........................................................... . Yes NO N/A VI. Tools & Equipment 1. Are hand tools in good repair and stored properly......................................................... . Yes NO N/A 2. Are power tools stored properly and in good condition - cords, plugs, etc............................ Yes NO N/A 3. Are the tools adequate for the tasks to be performed..................................................... .. Yes NO N/A 4. Are defective tools replaced as needed........... Yes NO N/A 5. Are tool guards in place.................................. Yes NO N/A 6. Are employees trained in the proper use of the various tools they are expected to use............. Yes NO N/A 7. Are employees given additional instruction and periodic reviews of specialized tools and equipment... .................................................... Yes NO N/A 8. Are proper lifting techniques used by employees.............. .... ...................................... Yes NO N/A VII. Fire Safety & Protection 1. Are fire/emergency evacuation plans posted...... Yes NO N/A 2. Are employees familiar with fire/emergency evacuation plan................................................ Yes NO N/A 3. Are there sufficient number and types of fire extinguishers............ ......... .. ............................. Yes NO N/A 4. Are the fire extinguishers properly located and identified............................................... ........... Yes NO N/A 5. Are the fire extinguishers checked annually...... Yes NO N/A 6. Are all of the fire extinguishers in working condition... ........... ............. ........... .. .. .............. . Yes NO N/A 7. Are employees trained in the proper use of the extinguishers to be used................................... Yes NO N/A 8. Are smoke detectors in working order............. Yes NO N/A VIII. Laboratory Safety 1. Emergency Eyewash & Shower Station are present and work properly and tested monthly.. Yes NO N/A -:~.. JEFFERSONVILLE, IN 2. Fume hood is presenL.................................... Yes NO N/A 3. All chemicals safely and properly stored, well labeled and in original containers..................... Yes NO N/A 4. Laboratory Safety devices used such as: Pipette suction bulbs, Eye Protection, Gloves, Aprons or Jackets, & Tongs......................................... Yes NO N/A 5. No broken! chipped or cracked glassware........ Yes NO N/A 6. No overloaded outlets..................................... Yes NO N/A 7. Acid spill kit available..................................... Yes NO N/A 8. Emergency procedures for acid spills posted and used by all personneL............................. Yes NO N/A 9. Laboratory Safety Rules posted and obeyed by all personnel such as no cooking or eating from laboratory glassware........................................ Yes NO N/A X. Other Safety 1. Are the required safety programs presented and/or attended during the year... ............. ........ Yes NO N/A 2. Is a suitable identification system used to identify the plant's piping system...................... Yes 3. Has the operator taken steps to remove or minimize safety hazards.................................. Yes 4. Are all personnel provided with a shower and locker for their work clothes........................... Yes 5. Are personnel trained in First Aid & CPR. ... ... . Yes Have the following proper safety signs been provided such as: Non-potable Water, CWorine Hazard, No Smoking, High Voltage, Watch Your Step Signs in Certain Areas, & Exit Signs. Yes 7. Is your Facility safety program Up to Date (Worksafe Program)........................................ Yes NO N/A NO N/A NO Nc N/A N/A 6. NO N/A NO N/A (# YES) 128 + 7 x 100 = (# YES + # NO) 95 % We have improper flammable liquids stored clutter in Maintenance gara!,!e. left on lockers and in walk- ways. We have feeders around grit landing and digester area. Vent openings need covered also. we are not di~sing of oil when fished witho our iobt at the end of our shift. c:lofliceltomlsftyinsp,wpd JEFFERSONVILLE, IN